﻿Fiscal Year 1999
qH: 
7 -i - * 
� m 
(1 Octor 18 30 S a 
Vom a 
Part 2 of 2
E S~

TABLE OF CONTENTS 
Northwestern Division 
Omaha, NE, District ............................................ 
Kansas City, MO, District ............................................ 
Portland, OR, District ............................................ 
Seattle, W A, District ............................................ 
Walla Walla, WA, District ............................................ 
Pacific Ocean Division 
Honolulu, HI, District ........................................ .. 
Alaska D istrict ........................................... 
South Pacific Division 
Los Angeles, CA, District ............................................ 
San Francisco, CA, District ........................................... 
Sacramento, CA, District ............................................ 
California Debris Commission ....................................... 
Albuquerque, NM, District ............................................ 
Southwestern Division 
Little Rock, AR, District ................ .......................... 
Tulsa, OK, District ........................................... 
Fort W orth, TX, District .... ....... ......................... 
Galveston, TX, District ........................................... 
Mississippi River Commission ............................................ 
Engineer Research and Development Center .................................. 
W ater Resources Support Center ......................................... 
Permanent International Association 
of Navigation Congresses ............................................ 
International Boundary Water Boards ....................................... 
Investigation of Projects Under Federal Power Act ............................ 
Regulatory, Sunken Vessel Removal and 
National Emergency Preparedness ........................................ 
Natural Disaster Preparedness, Response and 
Recovery Activities .................................... 
'qA 
Chapter 
26-1 
27-1 
28-1 
29-1 
30-1 
31-1 
32-1 
33-1 
34-1 
35-1 
35-1-A 
36-1 
37-1 
38-1 
39-1 
40-1 
41-1 
42-1 
43-1 
44-1 
45-1 
46-1 
47-1 
48-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Chapter 
Appendices 
Flood Control Reservoirs Operable ....................................... A-1 
Flood Control Reservoirs Constructed or Contributed to by Corps 
of Engineers but Operated by Others ..................................... A-26 
Flood Control Projects Under Construction .................................. B-1 
Beach Erosion Control Projects Under Construction .......................... B-16 
Environmental Restoration Projects Under Construction ........................ B-19 
Navigation Locks and Dams Operable ..................................... C-1 
Navigation Project Under Construction .................................... D-1 
Multiple-Purpose Projects Including Power Operable .......................... E-1 
Multiple-Purpose Projects Including Power Under Construction .................. F-1 
Flood Damages Suffered and Prevented .................................... G-1 
Index I-1 
ii

OMAHA, NE, DISTRICT *
This district comprises portions of Montana, Wyoming, North Dakota, South Dakota, Minnesota, Colorado, 
Nebraska, Iowa, and Missouri, all embraced in the drainage basin of the Missouri River along the mainstem and 
tributaries to Rulo, NE. 
IMPROVEMENTS 
Navigation 
1. Missouri River, Sioux City, IA 
to Rulo, NE 
2. Missouri River Fish & Wildlife 
Mitigation, IA, NE, KS, & ND 
3. Navigation Work Under Special 
Authorization 
Page 
26-3 
26-3 
26-3 
Flood Control 
4. 
5. 
6. 
7. 
8. 
9. 
10. 
11. 
Aberdeen and Vicinity, SD 
Bear Creek Lake, CO 
Bowman-Haley Lake, ND 
Buford Trenton Irrigation District, ND 
Chatfield Lake, CO 
Cherry Creek Lake, CO 
Fall River Basin, SD 
Logan Creek, Pender, NE 
12. Milk River, Malta, MT 
13. Missouri National Recreational 
River, NE and SD 
14. Missouri River, Kenslers Bend, 
NE to Sioux City, IA 
15. Nishnabotna River, Hamburg, IA 
16. Papillion Creek and Tributaries 
Lakes, NE 
17. Pebble Creek, Scribner, NE 
18. Perry Creek, IA 
19. Pick-Sloan Missouri River Basin 
Program (Omaha District) 
20. Pipestem Lake, ND 
21 Salt Creek & Tributaries, NE 
22. South Platte River Basin, CO 
23. Thurman to Hamburg, IA 
24. Van Bibber Creek, CO 
25. Inspection of Completed Flood 
Control Works 
26. Scheduling Flood Control 
Reservoir Operations 
27. Flood Control Activities Under 
Special Authorization 
26-3 
26-4 
26-4 
26-4 
26-4 
26-5 
26-5 
26-5 
26-6 
26-6 
26-6 
26-6 
26-7 
26-7 
26-7 
26-8 
26-8 
26-8 
26-8 
26-9 
26-9 
26-9 
26-9 
26-9 
Project Modifications for Improvement 
of Environment 
28. Project Modifications for 
Improvement of Environment 
Under Special Authorization 
29. Boyer Chute, NE 
30. California Bend, NE 
31. Deroin Bend, MO 
32. Hidden Lake/Great Marsh, NE 
33. Lower Decatur, NE 
34. Wehrspann Lake Aquatic 
Aquatic Ecosystem Restoration 
35. Aquatic Ecosystem Restoration 
Multiple Purpose Projects 
Including Power 
36. Big Bend Dam-Lake Sharpe, 
Missouri River Basin, SD 
37. Fort Peck Lake, MT 
38. Fort Randall Dam-Lake Francis 
Case, Missouri River Basin, SD 
39. Garrision Dam Major Rehabilitation, 
Lake Sakakawea, ND 
40. Garrison Dam-Lake Sakakawea, 
Missouri River Basin, ND 
41. Gavins Point Dam-Lewis and 
Clark Lake, Missouri River 
Basin, NE and SD 
42. Oahe Dam-Lake Oahe, Missouri 
River Basin, SD and ND 
43. Missouri River Between Ft. Peck 
Dam, MT and Gavins Point Dam, 
SD & NE 
26-1 
Page 
26-11 
26-11 
26-11 
26-12 
26-12 
26-12 
26-13 
26-13 
26-13 
26-13 
26-14 
26-14 
26-14 
26-15 
26-15 
26-15

Miscellaneous 
44. Missouri River Master Water 
Control Manual Review and 
Update 26-16 
45. National Emergency Preparedness 
(NEPP) 26-16 
46. Flood Control and Coastal 
Emergency (FC&CE) 26-16 
47. General Regulatory Functions 26-17 
48. General Investigations 
(See Table 26-K) 26-17 
Tables 
26-A Cost and Financial Statement 26-18 
26-B Authorizing Legislation 26-25 
26-C Other Authorized Navigation 
Projects 26-30 
26-D Not Applicable 
26-E Other Authorized Flood Control 
Projects 26-31 
26-F Other Multiple Purpose Projects 
Including Power 26-33 
26-G Deauthorized Projects 26-34 
26-H Missouri River Levee System, 
Sioux City, IA to Rulo, NE 26-36 
26-I Pick-Sloan Missouri Basin 
Program 26-37 
26-J Inspection of Completed Local 
Protection Projects 26-38 
26-K Active General Investigations 26-42 
26-L Flood Control Activities 
Under Special Authorization 26-44 
26-M Project Modifications for 
Improvement of Environment 26-45
26-2

OMAHA, NE, DISTRICT 
Navigation 
1. MISSOURI RIVER, SIOUX CITY, IA 
TO MOUTH (SIOUX CITY, IA 
TO RULO, NE) 
Location. Channel of the Missouri River extending 
from Sioux City, IA to Rulo, NE. 
Previous Projects. For details see page 1893, 
Annual Report for 1915, and page 1175, Annual Report 
for 1938. 
Existing Project. A navigation channel of 9-foot 
depth and width not less than 300 feet, obtained by revetment 
of banks, rock dikes to contract and stabilize waterway, 
cutoffs to eliminate long bends, closing minor channels, 
and removal of snags and dredging as required. 
Construction was initiated on this section of the project 
(Sioux City to Rulo) in FY 1928, the bank stabilization 
work was completed in April 1979, and the navigation 
feature was completed in September 1980. A reliable 
channel suitable for navigation is available through this 
section. Controlling depth at ordinary stages of the river is 
9 feet, with additional depths available during high stages. 
Commercial navigation was inaugurated on this section in 
May 1939, and common carrier transportation service was 
inaugurated in October 1946. Seven riverside recreation 
sites are complete and in operation. (See Table 26-A for 
total cost of construction.) 
Local Cooperation. Requirements are described in 
full on page 26-2 of FY 1988 Annual Report. 
Terminal Facilities. Terminal facilities for loading 
and unloading grain, liquids and dry bulk products are 
maintained by private interests at various locations on this 
section of the river. A complete list of terminal facilities is 
included in the Missouri River navigation maps and can be 
obtained from the Omaha District for a small fee. 
Operations During FY. District personnel accomplished 
channel reconnaissance, surveys and mapping, 
engineering and design, surveys and layouts of construction, 
and supervision and administration. Local interests 
operate and maintain the recreation sites. Government 
Hired Labor Forces completed maintenance, which 
consisted of placing stone on damaged structures and 
placing structure markers to aid navigation. 
2. MISSOURI RIVER FISH & WILDLIFE 
MITIGATION, IA, NE, KS, & MO 
Location. The project extends along the Missouri 
River from Sioux City, IA, to the mouth near St. Louis, Mo. 
Existing Project. To mitigate a portion of the fish and 
wildlife habitat losses resulting from the construction and 
operation of the Missouri River Bank Stabilization and 
Navigation project. Estimated total cost of the project is 
$81,400,000 federal funds. 
Local Cooperation. This project has no cost-sharing 
sponsor. The entire project is being borne by the Federal 
government with no cost to either local governments or the 
affected states. Therefore, no Project Cooperation Agreement 
is required. Although the four affected states are not 
participating financially in the project, the states are very 
actively involved in the planning and design of the project. 
The states also are participating in the project by furnishing 
perpetual easements for construction and operation on 
existing state-owned lands. The states of Missouri and Iowa 
are the primary donors of such easements. 
Operations During FY. Efforts continued on acquiring 
land rights on 29,900 acres of land and agreements with 
the states for development on 18,200 acres of state-owned 
land. Construction contracts were awarded to create wildlife 
habitat. 
3. NAVIGATION WORK UNDER SPECIAL 
AUTHORIZATION 
Small Navigation Projects Not Specifically Authorized 
by Congress (Sec. 107 of the River and Harbor 
Act of 1960, as amended, Public Law 645, 86th Congress). 
No work during the period. 
Flood Control 
4. ABERDEEN, SD 
Location. This project is in the Moccasin Creek 
subbasin in the city of Aberdeen, Brown County, South 
Dakota. Aberdeen is located in the James River Valley in 
the northeast quarter of South Dakota. 
26-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Existing Project. The selected alternative is a 100- 
year event levee 2.9 miles long on the northeast side of 
Aberdeen that will prevent 49 percent of the average 
annual flood damages to structures and contents in that 
area. The proposed levee will essentially block existing 
drainage to Moccasin Creek, and a combination of culverts 
with gates and detention ponds were incorporated into the 
design to mitigate this interior drainage problem. A twofoot 
road raise at Fairgrounds Road is also included. 
Local Cooperation. Section 205, Flood Control Act 
of 1948, as amended applies. The city of Aberdeen and 
Brown County is paying the local share of the project. 
Operations During FY. Preparation of the plans and 
specifications were completed for Phase I and initiated for 
Phase II. The Phase I construction contract was awarded 
to construct a 1.4 mile long earthfill levee on the northeast 
side of Aberdeen. 
5. BEAR CREEK LAKE, CO 
Location. The dam site is on Bear Creek in Jefferson 
County, CO, about 8 miles above the confluence of Bear 
Creek with the South Platte River at Denver. 
Existing Project. Earthfill dam 180 feet high, with a 
crest length of about 5,300 feet; and a supplementary 
earthfill dike with a height of 65 feet and a crest length of 
2,100 feet, to the south of the main dam, and an 
uncontrolled earth and rock-cut emergency spillway. The 
lake provides storage capacity of 28,831 acre-feet for flood 
control and 1,979 acre-feet for sediment and recreation. 
Construction of the project was initiated in October 1973 
and was completed in September 1982, exclusive of 
recreation facilities. (See Table 26-A for total cost of 
construction.) 
Local Cooperation. Requirements are described in 
full on page 21-3 of FY 1981 Annual Report. 
Operations During FY. Maintenance: Continued 
routine operation and maintenance activities. 
6. BOWMAN-HALEY LAKE, ND 
Location. The dam site is on North Fork of Grand 
River in southwestern North Dakota, about 6 miles above 
Haley, ND. 
Existing Project. An earth-fill dam 79 feet high, with 
a crest length of 5,730 feet, and a reservoir with a flood 
storage capacity of about 72,700 acre-feet, plus 19,780 acrefeet 
for sediment storage, fish and wildlife conservation, 
recreation, and future water supply for communities of 
Bowman, Reeder, Scranton, and Gascoyne, ND. 
Construction was initiated in July 1964, and the project was 
completed in 1970. (See Table 26-A for total cost of 
construction.) 
Local Cooperation. Requirements are described in full 
on page 26-2 of FY 1988 Annual Report. 
Operations During FY. Maintenance: Continued 
routine operation and maintenance activities. 
7. BUFORD TRENTON IRRIGATION 
DISTRICT, ND (LAND ACQUISITION) 
Location. The Buford Trenton Irrigation District 
(BTID) is located in the flood plain along the left (north) 
bank of the Missouri River near its confluence with the 
Yellowstone River, in Williams County near Williston, ND. 
Existing Project. The project consists of the 
acquisition of permanent flowage and saturation easements 
within and surrounding the BTID for land that has been 
affected by rising ground water and the risk of surface 
flooding. There are approximately 70 affected landowners 
and 90 tracts. Approximately 10,000 acres are irrigable and 
1,750 non-irrigable. Acquisition of easements and 
relocation assistance under P. L. 91-646 began in FY 1998. 
Estimated project cost is $40,129,000. 
Location Cooperation. The project is authorized 
under Section 336(a) of the Water Resources Development 
Act of 1996, P. L. 104-303. Local cooperation is not 
applicable. 
Operations During FY. This FY, seven easements 
were purchased totaling $2,421,119 with associated costs. 
Appraisal of existing tracts will continue into FY 2000 along 
with the purchase of additional easements. 
8. CHATFIELD LAKE, CO 
Location. A dam site on the South Platte River, just 
below the mouth of Plum Creek, about eight miles upstream 
from Denver, CO. 
26-4

OMAHA, NE, DISTRICT 
Existing Project. Consists of rolled earth-fill dam 
with a maximum height of 148 feet and a crest length of 
12,500 feet; a reservoir with flood control capacity of 
204,737 acre-feet and sediment capacity of 26,692 acrefeet, 
which will be used for recreation; and an enlarged 
channel from the dam downstream to Denver to 
accommodate reservoir flood releases. 
The Corps participated with local interests in acquisition 
of lands and development of recreation facilities 
immediately downstream of the Chatfield Dam in lieu of a 
portion of the channel improvement. Construction of the 
project was initiated in August 1967 and was physically 
completed in 1992. (See Table 26-A for total cost of 
construction.) 
Local Cooperation. Requirements are described in 
full on page 26-3 of FY 1993 Annual Report. 
Operations During FY. Maintenance: Continued 
routine operation and maintenance activities. 
9. CHERRY CREEK LAKE, CO 
Location. A dam site on Cherry Creek in Arapahoe 
County, CO, approximately 6 miles southeast of Denver, 
CO, just outside of city limits. Cherry Creek joins South 
Platte River within city limits of Denver, 
Existing Project. A rolled earth-fill dam with 
maximum height of 141 feet above streambed and a crest 
length of 14,300 feet. Project includes a reinforced 
concrete outlet works and an uncontrolled side channel 
spillway canal discharging into adjacent Toll Gate Creek. 
Cherry Creek project provides reservoir storage capacity 
of 93,920 acre-feet below spillway canal invert and, in 
addition, a surcharge storage of 134,470 acre-feet. Plan of 
operation in ultimate development for multiple-purpose 
uses includes 13,960 acre-feet for sediment storage and 
79,960 acre-feet for conservation purposes. Construction 
began in FY 1946 and was completed in June 1961, 
exclusive of recreation facilities. (See Table 26-A for total 
cost of construction.) 
Local Cooperation. None required except for recreation 
cost sharing. 
Operations During FY. Maintenance: Continued 
routine operation and maintenance activities. 
10. FALL RIVER BASIN, SD 
Location. In Custer and Fall River Counties, in and 
near the town of Hot Springs, SD. Hot Springs unit is in the 
town of Hot Springs, immediately south of the junction of 
Cold Brook and Hot Brook which combine to form the Fall 
River. Cold Brook Lake unit is approximately 1.25 miles 
north of the town of Hot Springs on Cold Brook, and 
Cottonwood Springs Lake unit is approximately 4.5 miles 
west of the town of Hot Springs on Cottonwood Springs 
Creek, one-half mile upstream from its confluence with Hot 
Brook. 
Existing Project. The general plan of improvement 
provides flood protection for Hot Springs, SD. The Hot 
Springs channel improvement unit consisted of widening, 
deepening and straightening 6,000 feet of channel of Fall 
River. The Cold Brook Lake unit, an earth-fill dam with 
appurtenant structures, controls an area of 70.5 square miles. 
The Cottonwood Springs Lake unit consists of an earth-fill 
dam with appurtenant structures and controls an area of 26 
square miles. Construction of Hot Springs unit was completed 
during FY 1951. Construction of Cold Brook unit 
dam and appurtenances was completed in FY 1953 with the 
exception of a road and parking area, which were completed 
in FY 1955. Construction of the Cottonwood Springs Dam 
was completed in FY 1970, with the exception of the 
recreation facilities, which were completed in FY 1972. (See 
Table 26-A for total cost of construction.) 
Local Cooperation. Local cooperation requirements 
have been fully complied with. 
Operations During FY. Maintenance: Routine 
operation and maintenance activities were continued on the 
Cottonwood Springs and Cold Brook Dams and structures. 
11. LOGAN CREEK, PENDER, NE 
Location. This project is located in northeastern NE, 
approximately 75 miles north-northwest of Omaha, NE. 
Pender is located along the right bank of Logan Creek, about 
midpoint in the Logan Creek basin. 
Existing Project. The selected plan is a combination 
levee and floodwall with a detention storage feature. It 
provides flood protection from Logan Creek as well as 
incidental benefit from Stage Creek flooding to the Village's 
residential and industrial area as well as its central business 
district. The levee extends approximately 15,000 feet in 
26-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
length along the north, east, and south edge of the 
community, averaging 10 feet in height. 
Local Cooperation. Section 205, Flood Control Act 
of 1948, as amended; Flood Damage Reduction applies. 
The Village of Pender is paying the local share of the 
project. 
Operations During FY. 
construction in FY 99. 
Continuation of 
12. MILK RIVER, MALTA, MT 
Location. This project is located in Phillips County 
in North Central MT. The city of Malta is located approximately 
170 miles northeast of Great Falls, MT. 
Existing Project. The selected plan is a levee/floodwall 
constructed along the right bank of the Milk River to 
provide protection for the area immediately upstream from 
the Burlington Northern Santa Fe Railroad (BNSF) bridge. 
The project consists of an earthen levee that is 1,800 ft in 
length, combined with a floodwall that extends 1,040 ft. 
The height of the levee ranges from 4 to 10 ft above natural 
ground along its entire length. The levee/floodwall 
requires a tie-off with the existing BNSF grade on the 
downstream end. 
Local Cooperation. Section 205 of the Flood 
Control Act of 1948, as amended; Flood Damage Reduction 
applies. The city of Malta participated in the projectfs 
costsharing requirements utilizing a $176,500 grant from 
the State of MT combined with real estate interests of 
approximately $282,000. 
Operations During FY. Construction phase is 
essentially complete with remaining requirements directed 
toward project management, coordination with local 
sponsors and project closeout. 
13. MISSOURI NATIONAL RECREATIONAL 
RIVER, NE AND SD 
Location. On the Missouri River between Gavins 
Point Dam and Ponca State Park, NE. This includes Cedar 
and Dixon Counties in Nebraska, and Yankton, Clay, and 
Union Counties in South Dakota. 
Existing Project. The designation as a National 
Recreational River will preserve outstanding and important 
scenic values and will provide additional opportunities for 
river access and recreation use. The project provides 
erosion control, consisting of bank stabilization and river 
management techniques designed to preserve the existing 
environment, and at the same time preserves high bank flood 
plain lands. Estimated total cost of construction is 
$21,640,000 (1996) of which $21,000,000 is the Federal 
cost of construction and $640,000 is the non-Federal 
contributed funds. 
Local Cooperation. All recreational construction on 
this project will be done in accordance with the cost-sharing 
and financing concepts reflected in the Water Resources 
Development Act of 1986. A cost-sharing contract with the 
state of South Dakota for the Myron Grove access site was 
signed on June 24, 1986; and the Yankton-Riverside Park 
Section 215 Agreement was signed on April 24, 1989. 
Construction was completed in June 1987 and June 1991, 
respectively. 
Operations During FY. Efforts to protect Federally 
listed threatened and endangered species and the drafting of 
a new General Management Plan (GMP) for this area were 
finalized and distributed. Construction contract for bank 
stabilization at Ponca State Park was awarded in August 
1999. 
14. MISSOURI RIVER, KENSLERS BEND, NE, 
TO SIOUX CITY, IA 
Location. Project is along Missouri River between 
Ponca Bend, NE, and combination bridge at Sioux City, IA. 
Existing Project. Construction of dikes, revetments 
and channel improvement along Missouri River from Miners 
Bend and vicinity, SD and NE, to Sioux City, IA. Project 
was started in June 1946 and completed in June 1961. (See 
Table 26-A for total costs.) 
Operations During FY. Routine operation and 
maintenance activities continued. 
15. NISHNABOTNA RIVER, HAMBURG, IA 
Location. This project, the Nishnabotna River and 
Main Ditch 6 at Hamburg, IA is located in Fremont County, 
40 miles south-southeast of Omaha, NE. 
26-6

OMAHA, NE, DISTRICT 
Existing Project. The selected plan determined in the 
feasibility investigations is the construction of a levee 
approximately 8,300 ft in length along the left bank of 
Main Ditch No. 6. A range of economically feasible plans 
were identified from which the city of Hamburg selected 
and is supported by the Corps. A levee will be constructed 
along Main Ditch 6 with a levee top, referenced as the 
911.0 m.s.l. plan having an accedence equivalent to a 300- 
year event and a 46 percent reliability passing 500-year 
event. Selection of a levee height was constrained by the 
elevation of the Burlington Northern Santa Fe (BNSF) 
Railroad mainline tracks. The BNSF has raised its mainline 
track approximately 1.5 ft to accommodate the new 
levee.
Local Cooperation. Section 205 of the Flood 
Control Act of 1948, as amended; Flood Damage Reduction 
applies. The city of Hamburg is participating in the 
project's cost- sharing requirements utilizing a Community 
Development Block Grant to help fund real estate interests 
of approximately $130,500 and cash contributions of 
$226,800. 
Operations During FY. Completion of construction 
contract occurred with final inspection in September 
1999. 
16. PAPILLION CREEK AND TRIBUTARIES 
LAKES, NE 
Location. The Papillion Creek basin is located in 
Washington, Douglas, and Sarpy Counties, NE. Big 
Papillion Creek rises west of Blair and flows south-easterly 
through metropolitan Omaha. It is joined by the Little 
Papillion Creek just above Offutt AFB, forming Papillion 
Creek. The combined creeks flow along the side of Offutt 
AFB to its confluence with the Missouri River. 
Existing Project. The project consists of a series of 
four dams and reservoirs, channel improvements, an 
effluent storage facility, and a flood warning system on 
tributaries of Papillion Creek. Construction was initiated 
in FY 1972. Completed projects include Standing Bear 
Lake, Glenn Cunningham Lake, and Wehrspann Lake. 
Estimated total costs for the project is $68,659,000 
consisting of $64,334,000 in Federal funds ($1,367,000 to 
be reimbursed by the non-Federal sponsor) and 
$2,958,000 non-Federal other costs and cash contributions. 
Local Cooperation. Requirements are described in 
full on page 21-6 of FY 1981 Annual Report. 
Operations During FY. Construction was completed 
on recreation facilities at Ed Zorinsky Lake, and on the Big 
Papillion Creek Channel flood control project. The recreational 
facilities at Zorinsky Lake have been transferred to 
the City of Omaha for operations and maintenance. The Big 
Papillion Creek channel flood control project has been 
transferred to the Papio Natural Resource District for 
operation and maintenance. O&M manuals were being 
prepared in FY 99. 
17. PEBBLE CREEK, SCRIBNER, NE 
Location. Scribner, NE, is located in Dodge County 
about 47 miles northwest of Omaha. Pebble Creek is a 
right-bank tributary to the Elkhorn River. 
Existing Project. The project includes a 3.6 mile-long 
levee along the Elkhorn River with a maximum height of 5 
ft (a modification to the original Pebble Creek project), one 
closure structure at U.S. HWY 275 at the northern edge of 
Scribner, and several ramps over the two levees. An 
automated flood warning system was installed that will allow 
adequate time to operate the closure structure. Both levees 
are completed which essentially is one ring levee that 
provides protection for the entire city of Scribner. 
Local Cooperation. The city of Scribner strongly 
supported the entire Pebble Creek levee project, including 
the Elkhorn River levee and its modification. The City 
obtained cost-sharing assistance from the Nebraska Natural 
Resources Commission and the Lower Elkhorn Natural 
Resources District. 
Operations During FY. Construction of the Elkhorn 
River levee was initiated in March 1994 with the original 
contract being completed in December 1995. A modification 
to the Elkhorn River levee was completed in July 1996. 
The total cost of the project was $3,232,000. The non- 
Federal portion of this totaled was $807,000 which includes 
$363,000 for lands, easements, and rights-of-way. Final 
audit and project closeout will occur in FY 2000. 
18. PERRY CREEK, IA 
Location. The Perry Creek basin is located in 
Woodbury and Plymouth Counties in northwestern Iowa. 
The downstream five miles of the basin lie within the 
corporate limits of Sioux City, IA, and drain the central 
26-7 
I - __ - -- I -- - -I - - I - _ _

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
portion of the city. 
Existing Project. The project consists of 14,800 
linear feet of grass and rock lined channel, 1,500 linear feet 
of new conduit, modification of 710 linear feet of existing 
conduit, and a concrete stilling basin, to provide capacity 
for the 100-year event. Also included are 4.25 miles of 
hiking/biking trail and a basin-wide flood warning system. 
Estimated project cost is $67,188,000, of which 
$42,580,000 is Federal cost and $24,608,000 is non- 
Federal cost. 
Local Cooperation. The project is authorized under 
the 1986 Water Resources Development Act. The city of 
Sioux City, IA, is the local sponsor. 
Operations During FY. The Phase III construction 
contract is 50 percent complete and is scheduled to be 100 
percent complete by October 2000. The Phase II 
construction contract was awarded in April 1999. Plans 
and specs for Phase IV were completed by December 
1999. Relocation of the State of South Dakota's railroad 
bridge, which spans Perry Creek, is scheduled for 
completion in October 1999. 
19. PICK-SLOAN MISSOURI BASIN PROGRAM 
(OMAHA DISTRICT) 
Location. Flood control improvements in this project 
are along the Missouri River and several of its principal 
tributaries and in states comprising the Missouri River 
Basin. 
Existing Project. A general comprehensive plan for 
flood control and other purposes in the Missouri River 
Basin provides for levees along Missouri River between 
Sioux City, IA, and mouth and reservoirs on the Missouri 
River main stem and tributaries. See individual reports 
and Table 26-I for projects in the Omaha District included 
in the program. 
20. PIPESTEM LAKE, ND 
Location. On Pipestem Creek in Stutsman County, 
ND, three miles upstream from where Pipestem Creek 
joins the James River at Jamestown, ND. 
Existing Project. The project consists of a rolled 
earthfill dam approximately 108 feet high with a crest 
length of 4,000 feet and outlet works of a gated reinforced 
concrete conduit. The reservoir provides 146,880 acre-feet 
of storage. The multipurpose pool provides space for silt 
storage and 885 acres of water surface for fish, wildlife and 
recreation needs. Construction of the project was initiated in 
FY 1970 and completed in FY 1977. (See Table 26-A for 
total construction costs.) 
Local Cooperation. Requirements are described in full 
on page 26-6 of FY 1988 Annual Report. 
Operations During FY. Routine operation and 
maintenance activities continued. 
21. SALT CREEK AND TRIBUTARIES, NE 
Location. Salt Creek Basin comprises an area of about 
1,627 square miles in and around Lincoln in southeastern 
Nebraska. 
Existing Project. The authorized project consists of a 
system of 10 dams and reservoirs, channel clearing, enlarging 
and realignment, levees and necessary bridge alternations. 
Pursuant to Senate Resolution adopted August 7, 
1964, which authorized a review of the Salt Creek survey 
report, additional units were placed in "inactive" classification. 
Construction of the project began in the spring of 
1962. All work under the active portion of the project, 
consisting of the 10 dams and reservoirs and the channel 
improvements and levees through Lincoln, was completed in 
1969. Funds were transferred to the project in FY 1980 with 
concurrence of Congressional Committees. These funds 
were used to determine an effective method of correction for 
the dispersive clay problem in the completed downstream 
levees through Lincoln. (See Table 26-A for total construction 
costs.) 
Local Cooperation. Requirements are described in full 
on page 26-6 of FY 1988 Annual Report. 
Operations During FY. Maintenance: Routine 
operation and maintenance activities continued. 
22. SOUTH PLATTE RIVER BASIN, CO 
Location. Flood control improvements in this project 
are along the South Platte River and its tributaries in 
Colorado. 
26-8

OMAHA, NE, DISTRICT 
Existing Project. General plan for flood control and 
other purposes to provide for construction of Chatfield 
Lake on the South Platte River, Bear Creek Lake on Bear 
Creek, and levee and channel improvements on the South 
Platte River. (See individual reports and Table 26-B for 
authorizing legislation). 
23. THURMAN TO HAMBURG, IA 
Location. The project area is approximately 110 
square miles. It extends from Thurman, IA, on the north to 
the mouth of the Nishnabotna River on the south and from 
the Missouri River on the west to the bluffs on the east. 
Existing Project. The flood problem was caused by 
floodwaters backing up behind the existing levees when 
drainage structures are closed during high flows on these 
rivers. Two pump stations have been built to alleviate this 
flooding in the southern half ofthe study area. The cost 
through construction was $1,040,760 Federal and 
$397,587 non-Federal. 
Local Cooperation. Fremont County, IA and five 
drainage districts were the cost-sharing sponsors. 
Operations During FY. The project was completed 
in April 1997. Final audit and project closeout were 
completed in FY 99. 
24. VAN BIBBER CREEK, CO 
Location. Van Bibber Creek is a right bank tributary 
of Ralston Creek with the confluence in Arvada, CO. The 
potential project area includes approximately one mile of 
the downstream portion of the creek located partially in 
Arvada and partially in Jefferson County. 
Existing Project. The proposed project would 
include channel improvements including an underground 
conduit to convey Van Bibber Creek flood waters to 
Ralston Creek. 
Local Cooperation. Section 205, Flood Control Act 
of 1948, as amended, applies. 
Operations During FY. Preparation of plans and 
specifications continued this FY. 
25. INSPECTION OF COMPLETED FLOOD 
CONTROL WORKS 
Flood Control Act of June 22, 1936, and subsequent 
acts require local interests to furnish assurances that they 
will maintain and operate certain local protection projects 
after completion, in accordance with regulations prescribed 
by Secretary of the Army. District Engineers are responsible 
for administration of these regulations within the boundaries 
of their respective districts. 
Inspections of completed local protection projects which 
have been turned over to local interests for maintenance and 
operation during the FY are set forth in Table 26-J, 
Inspections of Completed Local Protection Projects. FY 
1999 costs were $232,590. 
26. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Under Sections 7 and 9, Flood Control Act of December 
22, 1944, the Corps of Engineers is responsible for detailed 
scheduling of operations involving storage capacity reserved 
for or assigned to flood control in reservoirs constructed by 
the Bureau of Reclamation as well as those constructed by 
the Corps of Engineers. Costs for FY 1999 were $374,993; 
and total through September 30, 1999 were $9,413,890. 
27. FLOOD CONTROL ACTIVITIES UNDER 
SPECIAL AUTHORIZATION 
Emergency Response Activities - Repair, Flood 
Fighting and Rescue Work (Public Law 99, 84th Cong., 
and antecedent legislation.) 
Disasters. Disasters - On June 2, 1999 the Fall 
River County Board of Commissioners and the City of Hot 
Springs, SD requested technical assistance from the 
Omaha District to route outlet releases from Cold Brook 
Dam through the county and city to the Fall River. Spring 
snowmelt run-off had increased discharge flows through 
the glory hole to 2 cfs in the channel. This along with the 
potential threat of heavy rainfall had the city and county 
seeking assistance in the resolution of their immediate 
concerns. The downstream channel capacity had been 
encroached upon by local area residences, and minimal 
flows would have caused considerable flooding throughout 
the area. The Corp provided a plan to city and county 
officials to provide additional culverts through the county 
roads, ditch the channel in the county and bury a 36-inch 
26-9 
-I --- I - I- L---- a i - - - - I - - I I- -~--L.-_ -- - _ _ _

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
culvert under the street through the city. The city and 
county successfully completed the work on June 17, 
1999. 
On July 26, 1999 the Omaha District responded to the 
Governor of South Dakota's requests for assistance 
regarding a dangerous long term flooding situation for 
the community of Waubay, SD. Waubay is located in a 
closed basin region and rising lake levels were 
threatening the city's sanitary lift station #7. The district 
worked closely with State and Federal agencies to look at 
programs to protect the lift station. Various measures 
were considered including levees, raising roadways, 
relocations of both people and the lift station. It was 
decided that the Corp's Advance Measures program was 
the answer to the impending danger. An Advance 
Measures project was approved and funded. The project 
consists of constructing a concrete box structure around 
the lift station and a earthen berm to protect the lift 
station from rising lake levels and future ice related 
damages. Cost for the project is currently estimated at 
$30,000 and construction should be complete by 
November 23, 1999. 
Flood damages abounded from a 7 inch rainfall in the 
Omaha, NE, and Council Bluffs, IA, area on the evening 
and early morning of 6-7 August 1999. This storm 
raised havoc in a seven county area and in particular, 
residents of these two communities. A Presidential 
Disaster Declaration was signed and State and Federal 
agencies initiated the recovery efforts. The rainfall 
inundated numerous homes caused two deaths and 
damaged two Federally constructed projects. The 
Federal projects were the Missouri River Levee Unit L- 
611-614 tieback levee near Council Bluffs, Iowa, and the 
Little Papillion Creek channel project in Omaha, 
Nebraska. Preliminary repair costs are currently 
estimated at $60,000 and $300,000 respectively. 
Repairs to both projects should be completed by 
December 31, 1999. 
Operational Program Areas. FY costs as follows: 
Preparedness: 
All Hazards Planning Activities ............. $ 
All Hazards Training & Exercise.............. 
Facilities........................... ....... 
National Centers of Expertise.................. 
360,500 
39,094 
86,802 
23,003 
Emergency Operations: 
Response Operations............................... 
After Action Report .................. 
Post Flood Response........... .................. 
Acquisition of Supplies & Equipment ........ 
Support From Others.................................. 
Rehabilitation of Flood Control Works: 
Rehab. Federal Flood Control Works.......... 
Rehab. Non-Federal Flood Control Works.. 
Shore Protection.............................. ........ 
Field Investigations.................... ............ 
Inspections......................... ............ 
Interagency Levee Activities ....................... 
Advance Measures: 
Advance Measure Assistance ...................... 
Field Investigations ....................... ......... 
Hazard Mitigation (By State): 
Hazard Mitigation Team Activities............. 
64,592
0
0 
60,784 
682,013 
458,711 
153,275 
0 
18,783 
39,929
0 
8,706 
15,006
2 
Emergency Work in Support of Other Federal 
Agencies. The Omaha District provided support to other 
divisions in response to three Presidential Disaster 
Declarations during 1999. The Pine Ridge Indian 
Reservation received a Presidential Disaster Declaration 
(PDA) in the aftermath of a tornado. Omaha District 
received a mission from FEMA to provide Technical 
Assistance to the reservation in the design and layout of a 
temporary housing site. Personnel were deployed to the site 
to meet with FEMA, Bureau of Indian Affairs, and Public 
Health Service officials. The Temporary Housing Team was 
also placed on alert in anticipation of this housing mission. 
After several weeks of negotiation, the mission was 
cancelled. The Temporary Housing Management Team 
deployed to San Antonio, TX, in support of the 
Southwestern Division in the aftermath of Hurricane Bret. 
However, FEMA did not task the Corps with a housing 
mission and the team returned home. In response to 
Hurricane Floyd, the district deployed a member of the 
Resource Management Functional Team to the North 
Atlantic Division. This individual provided financial support 
in the Emergency Operations Center. A member of the 
Logistics Emergency Response Team was also deployed in 
anticipation of Hurricane Floyd. This individual went to the 
South Atlantic Division where support was provided to 
logistical field operations. 
Small Flood Control Projects Not Specifically 
Authorized by Congress (Sec. 205, 1948 Flood Control 
26-10

OMAHA, NE, DISTRICT 
Act as amended, Public Law 858, 80th Cong., June 30, 
1948 as amended.) 
Federal costs for FY 1999 were $203,454 for 
feasibility studies, $2,070,147 for plans and specifications 
and construction measures. See Table 26-L for detailed 
breakdown by project. 
Emergency Bank Protection (Sec. 14, 1946 Flood 
Control Act, Public Law 526, 79th Cong., July 24, 
1946 as amended.) 
Operations under this heading were as follows: 
Federal costs for FY 1999 were $0 for projects in the 
Planning and Design Analysis Phase and $262,613 for 
projects in the construction phase. See Table 26-L for 
detailed breakdown by project. 
Project Modifications For Improvement 
of Environment 
28. PROJECT MODIFICATIONS FOR 
IMPROVEMENT OF ENVIRONMENT 
These project modifications are accomplished under 
the authority of Section 1135, Water Resources Development 
Act of 1986 (Public Law 99-662) as amended. 
Environmental modification efforts during FY 1999 were 
as follows: California Bend, NE, project cost (Feasibility 
Phase) $30,543; Hidden Lake, NE, project cost 
(completion of construction) $8,126; Lower Decatur, NE 
project cost (Feasibility Phase) $135,983; Boyer Chute, 
NE, project cost (Post-Construction Monitoring) $12,663; 
Deroin Bend, MO project cost (Plans and Specs) $32,764; 
Wehrspann Lake, NE project cost (Construction) 
$1,270,323. 
29. BOYER CHUTE, NE 
Location. The side channel connecting river mile 
633.5 to 637.7 on the Missouri River in Washington 
County, NE, about 7 miles north of Omaha, NE. 
Existing Project. The project was constructed from 
October 1992 to April 1993. Its purpose is to restore 
flows from the Missouri River into an old river channel, 
Boyer Chute. This has restored fish breeding, brood 
rearing, resting and feeding habitat, and will benefit the 
riverine ecosystem as a whole. The part of the old channel 
that was previously filled with sediment and grown up in 
young trees was cleared of vegetation, and a pilot channel for 
new inflows was excavated through it. Soil excavated from 
the pilot channel was placed along the channel to be washed 
away by restored chute flows over time. A 180-foot wide 
notch in the upstream riverbank was constructed for new 
inflows, and the chute's old outlet at the downstream end was 
widened. The culvert crossing of a road across the chute 
was replaced by a bridge, which passes adequate flows to 
prevent backwater effects and sedimentation. The total cost 
of about $4,019,000 was 25 percent costshared by a non- 
Federal sponsor. 
Local Cooperation. Section 1135 of 1986 WRDA 
applies. The Papio-Missouri River Natural Resources 
District provided all needed cost-sharing, including real 
estate interests valued at approximately $1,033,000 and cash 
of about $82,000. 
Operations During FY. A final project inspection was 
performed on May 3, 1995; and the project was turned over 
to the local sponsor. FY 1999 efforts included summarizing 
physical changes, in preparation for project closeout in FY 
2000. 
30. CALIFORNIA BEND, NE 
Location. The remnant river channel and floodplain 
land along river miles 648.5 - 650.0 along the Missouri 
River, in Washington County, about one mile east of Blair, 
NE. 
Existing Project. The project to be modified is the 
Missouri River Navigation and Bank Stabilization Project. 
The California Bend modification will restore river flows 
through the historic river channel adjacent to the navigation 
channel, to restore fish breeding, brood rearing, resting and 
feeding habitat, and to benefit the riverine ecosystem as a 
whole. The downstream end of a 1.5-mile long backwater 
will be enlarged to provide a permanent connection to the 
navigation channel, and about I mile of excavation will 
connect its upstream end to the river. This will create 
permanent flows through about 2.5 miles of channels. Some 
of the surrounding farmland will be restored to floodplain 
forest. Also several of the spur dikes along the navigation 
channel will be lowered to enable navigation flows to create 
shallow margins along the river. 
Local Cooperation. Section 1135 of 1986 WRDA applies. 
The Papio-Missouri River Natural Resources District would 
26-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
provide all needed cost-sharing, including real estate 
interests valued at approximately $327,000, and cash of 
about $536,000. 
Operations During FY. Feasibility Studies were 
completed in FY 1999. 
31. DEROIN BEND, MO 
Location. The floodplain land and watered areas 
riverward of Levee L-536, river mile 516.5 to 521.0 along 
the Missouri River, in Holt and Atchison Counties, about 
2.5 miles west of Coming, MO. 
Existing Project. The project to be modified is the 
Missouri River Navigation and Bank Stabilization Project. 
The Deroin Bend modification would restore a diversity of 
river flows along this reach of the Missouri River 
floodplain, to restore fish breeding, brood rearing, resting 
and feeding habitat, and to benefit the riverine ecosystem 
as a whole. A flow-through chute would be excavated 
through the site along remnant channel alignments. This 
would create permanent flows through about 4 miles of 
channels. An existing 1 mile long scour lake would be 
connected to this chute, enabling river fish to access both 
the restored chute and the lake year-round. The surrounding 
lands would be restored to floodplain forest. 
Local Cooperation. Section 1135 of 1986 WRDA 
applies. The Missouri Department of Conservation would 
provide all needed cost-sharing, comprised entirely of real 
estate interests valued at approximately $750,000. The 
sponsor has already purchased all of the necessary tracts. 
Operations During FY. Plans and specs were 
completed this FY. Construction awaits successful 
execution of a Project Cooperation Agreement between the 
sponsor and the Corps. 
32. HIDDEN LAKE/GREAT MARSH, NE 
Location. A historic backwater adjacent to Missouri 
River miles 602.5-603.5, and a nearby marsh, in Sarpy 
County, about I mile south of Omaha and adjacent to 
Bellevue, NE. 
Existing Project. The project being modified is the 
Missouri River Navigation and Bank Stabilization Project. 
The Hidden Lake modification is restoring a historic 
backwater of the river to restore fish breeding, brood rearing, 
resting and feeding habitat, and to benefit the riverine 
ecosystem as a whole. A one mile long backwater lake 
which was filled with sediment in a rare flood event has been 
excavated and reconnected at its downstream end to the 
river. The Great marsh modification has removed sediment 
and encroaching plants to deepen and expand a marshy 
wetland, extending its life and benefiting the aquatic 
community. About 40 acres of wetland were excavated at an 
average of two feet deeper, increasing the marsh also in size. 
Total project costs are $3,020,000, with a Federal share of 
$2,266,000. 
Local Cooperation. Section 1135 of 1986 WRDA 
applies. Papio-Missouri River Natural Resources District 
provided all needed cost sharing including real estate 
interests. 
Operations During FY. Construction was essentially 
complete and post-construction monitoring continued. 
33. LOWER DECATUR, NE 
Location. The Missouri River's right (west) overbank 
including side channels, from river mile 684.5 to 689 on the 
Missouri River in Burt County, NE, about 2 miles southeast 
of Decatur, NE. 
Existing Project. Modification of the Missouri River 
Bank Stabilization and Navigation Project (MRBSN) 
constructed from 1935 to 1982. Lower Decatur Bend is one 
of many bend cutoffs (straightenings) created by the Corps 
during channelization of the Missouri River for navigation 
and bank stabilization. The proposed project modification 
includes 3 main off-stream aquatic components: side-channel 
restoration, lowering of the riverward extent of closure spur 
dikes, and revetment lowering over an extended length to 
allow river flows to erode the river bank behind the 
revetment, thereby increasing the top width of the channel 
over an extended area. An opportunity exists at Lower 
Decatur Bend to restore the physical habitat to 
configurations more similar to those that existed prior to the 
channelization of this reach of the river. Total Project costs 
are estimated at $6,599,000, with a Federal share of 
$4,949,000. 
Local Cooperation. Section 1135 of 1986 WRDA 
applies. The Papio-Missouri River Natural Resources 
District would provide all needed costsharing, including real 
26-12

OMAHA, NE, DISTRICT 
estate interests valued at approximately $574,000 and cash 
of about $1,076,000. 
Operation During FY. Feasibility studies were 
completed. 
34. WEHRSPANN LAKE AQUATIC 
Location. The existing Papio Dam #20 and its 
Wehrspann Lake are located on a tributary to the South 
Branch Papillion Creek, West Branch Papillion Creek 
Basin, Sarpy County, NE, about 4 miles southwest of 
Omaha. The subimpoundment is located in the headwaters 
of Wehrspann Lake, within the lake's flood control pool, 
and within the existing project's boundaries. 
Existing Project. Wehrspann Lake Aquatic 
Improvement Project - Modification of Wehrspann Lake, 
completed in 1984 as Papio Dam #20 for flood control and 
recreation; Congressional District: NE-2. Wehrspann 
Lake site is located within Omaha, NE metropolitan area, 
and as such it is highly visible, heavily utilized and 
important ecological, recreational, and educational 
resource. The modification, a subimpoundment in the 
lake's flood control pool, will play an essential role in 
maintaining water quality and fish habitat within 
Wehrspann Lake by decreasing the amounts of influent 
nutrients and especially sediment. Total project costs are 
currently estimated at $2,660,000 with a Federal share of 
$1,995,000. 
Local Cooperation. Section 1135 of 1986 WRDA 
applies. Papio-Missouri River Natural Resources District 
is providing all needed cost sharing including real estate 
interests. 
Operations During FY. Project construction was 
initiated. 
Aquatic Ecosystem Restoration 
35. AQUATIC ECOSYSTEM RESTORATION 
Project restoration are accomplished under the 
authority of Section 206, Water Resource Development 
Act of 1996, (P. L. 104-303) as amended. Restoration 
efforts during FY 1999 consisted of one project, the first 
Section 206 project authorized for study nationwide; 
Nathan's Lake in NE. Federal cost for FY 1999 to 
continue Planning and Design Analysis Phase was $52,102. 
Multiple Purpose Projects Including 
Power 
36. BIG BEND DAM-LAKE SHARPE, 
MISSOURI RIVER BASIN, SD 
Location. On the Missouri River, 987.4 miles above 
the mouth, near Fort Thompson, SD, and approximately 20 
miles upstream from Chamberlain, SD. Dam is located in 
the upstream reach of Fort Randall reservoir (Lake Francis 
Case). Big Bend reservoir (Lake Sharpe) extends upstream 
to Pierre, SD. 
Existing Project. A rolled earth-fill dam 95 feet high, 
with a crest length of 10,570 feet, a hydroelectric generating 
plant consisting of five 58,500 kilowatt units, three 67,276 
kilowatt units, and a chute-type gated spillway. Reservoir 
provides gross storage of 1,859,000 acre-feet. Federal cost 
of the project was $107,498,000. Construction began in 
September 1959 and was completed in September 1977, 
except for Code 710 recreation facilities. 
Local Cooperation. None required except for 
recreation cost-sharing. 
Operation During FY. Maintenance: Project was 
operated in conjunction with other Missouri River reservoirs 
for flood control, power production and other multiple 
purpose uses. Normal operation and maintenance 
procedures were accomplished during the FY. During the 
period, 1,107,278,000 net kilowatt-hours of electricity were 
produced. 
37. FORT PECK DAM AND LAKE, MT 
Location. The reservoir is in the Missouri River Valley 
in McCone, Valley, Garfield, Phillips, Petroleum, and Fergus 
Counties, MT. Dam is approximately 1,771.6 miles above 
the mouth of the Missouri River. Nearest towns are 
Glasgow, 17 miles northwest; and Nashua, nine miles north. 
Existing Project. A hydraulic earthfill dam with a 
maximum height of 251 feet, with a crest length of 21,026 
feet, and a reservoir for flood control, irrigation, navigation, 
hydroelectric power, and other purposes, with a gross 
storage capacity of 18,688,000 acre-feet at maximum 
operating pool. Work started on the original project in 
26-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
October 1933 and on the second power plant in August 
1956. The project was completed in 1965. The power 
installations at the project were uprated in FY 1979. The 
five generators have a total output of 185,250 KW: two 
generators at 40,000 KW each, two generators at 43,500 
KW each and one generator at 18,250 KW. See page 818 
of 1965 Annual Report and page 905 of 1958 Annual 
Report for project details. Federal cost of the project was 
$158,428,000, 
Local Cooperation. None required except for 
recreation cost-sharing. 
Operations During FY. Maintenance: Project was 
operated in conjunction with the other Missouri River 
reservoirs for flood control, navigation, power production, 
and other multiple purpose uses. Normal operation and 
maintenance procedures were accomplished during the FY. 
Generating facilities produced 1,082,740,000 net kilowatt 
hours of electricity. 
38. FORT RANDALL DAM-LAKE FRANCIS 
CASE, MISSOURI RIVER BASIN, SD 
Location. Located on the Missouri River in Charles 
Mix and Gregory Counties, SD, about 82 miles above 
Yankton, SD. Site is 880 miles above the mouth of the 
Missouri River and 148 miles above Sioux City, IA. 
Existing Project. A rolled earth-fill dam with a 
maximum height of 165 feet; a crest length of 10,700 feet; 
and a reservoir for flood control, irrigation, navigation, 
hydroelectric power, and other purposes, with a gross 
storage capacity of 5,494,000 acre-feet at maximum 
operating pool. The power installation consists of eight 
units rated at 40,000 kilowatts each. Construction began 
in May 1946 and was completed in 1969, except for Code 
710 recreation facilities. Federal cost of the project was 
$199,066,000. Non-Federal contribution for constructing 
approaches to the Platte-Winner Bridge was $720,000. 
Local Cooperation. None required except for 
recreation cost-sharing and bridge approaches. 
Operations During FY. Maintenance: Project was 
operated in conjunction with other Missouri River 
reservoirs for flood control, navigation, power production, 
and other multiple purpose uses. Normal operation and 
maintenance procedures were accomplished during the FY. 
Generating facilities produced 2,205,324,000 net kilowatt 
hours of electricity. 
39. GARRISON DAM MAJOR REHABILITATION, 
LAKE SAKAKAWEA, ND 
Location. Located on the Missouri River in McLean 
and Mercer Counties, ND, about 11 miles south of Garrison, 
ND, and 9 miles west of Coleharbor, ND, 1,389.9 miles 
about the mouth and 75 miles above Bismarck. 
Existing Project. Garrison Dam is a multi-purpose 
project consisting of a rolled earth-filled dam with a sheet 
pile cutoff, a hydroelectric power plant, and a reservoir with 
storage capacity of 23,821,000 acre feet for flood control, 
navigation, power, recreation, irrigation, and municipal 
water supply. This major rehabilitation project will replace 
the turbine runners on all five existing units with new 
runners designed to improve reliability and maximize 
efficiency over a broad range of operating conditions for a 
total project cost of $37,122,000. 
Local Cooperation. None required. 
Operations During FY. Continued design and 
initiated construction resulting in five new contract awards 
for turbine runner replacement (with options to rewind two 
generators), recondition governors, provide new set 
bulkheads and recondition cranes. 
40. GARRISON DAM-LAKE SAKAKAWEA, 
MISSOURI RIVER BASIN, ND 
Location. Located on the Missouri River in McLean 
and Mercer Counties, ND, about 11 miles south of Garrison, 
ND, and 9 miles west of Coleharbor, ND. 1,389.9 miles 
above the mouth and 75 miles above Bismarck, ND. 
Existing Project. A rolled earth-fill dam 11,300 feet 
long with a maximum height of 210 feet, and a reservoir for 
flood control, irrigation, navigation, hydroelectric power, and 
other purposes, with a gross storage capacity of 23,821,000 
acre-feet. It provides five power units (three units rated at 
109,250 kilowatts each and two units rated at 95,000 
kilowatts each), three flood control tunnels, and a gated 
spillway. Federal cost of the project was $299,938,000, 
including $4,208,000 for major rehabilitation. Non-Federal 
contribution in connection with widening Snake Creek 
Embankment was $687,000. Construction of the project 
was initiated in April 1946 and completed in 1966, except 
26-14

OMAHA, NE, DISTRICT 
for recreational development using Code 710 funds. 
Local Cooperation. None required except costsharing 
with the state of North Dakota for widening the 
Snake Creek Embankment and recreation cost-sharing. 
Operations During FY. Maintenance: Project was 
operated in conjunction with other Missouri River 
reservoirs for flood control, navigation, power production, 
and other multiple purpose uses. Normal operation and 
maintenance procedures were accomplished during the FY. 
Generating facilities produced 2,617,705,000 net kilowatt 
hours of electricity. 
41. GAVINS POINT DAM-LEWIS AND CLARK 
LAKE, MISSOURI RIVER BASIN, NE AND SD 
Location. On the Missouri River in Yankton County, 
SD, and Knox County, NE, about four miles upstream from 
Yankton, SD, and 811.1 miles above the mouth. 
Existing Project. A concrete and rolled earth-fill 
dam with a maximum height of 74 feet, and a reservoir for 
flood control, irrigation, navigation, hydroelectric power, 
and other purposes, with a gross storage capacity of 
492,000 acre-feet at maximum operating pool. The power 
installation consists of three units rated at 44,099 kilowatts 
each. Federal cost of the project was 
$49,617,000.Construction of the original project was 
initiated in March 1952 and completed in 1964. 
Local Cooperation. None required except for 
recreation cost-sharing. 
Operations During FY. Maintenance: Project was 
operated in conjunction with other Missouri River 
reservoirs for flood control, navigation, power production, 
and other multiple purpose uses. Normal operation and 
maintenance procedures were accomplished during the FY. 
Generating facilities produced 859,996,000 net kilowatt 
hours of electricity during FY. 
42. OAHE DAM-LAKE OAHE, MISSOURI 
RIVER BASIN, SD AND ND 
Location. Dam is on the Missouri River in Hughes 
and Stanley Counties, SD, about six miles northwest of 
Pierre, SD, and 1,072.3 miles above the mouth. 
Existing Project. A rolled earth-fill dam with 
maximum height of 245 feet; a crest length of 9,300 feet; and 
a reservoir for flood control, irrigation, navigation, 
hydroelectric power, and other purposes, with a gross 
storage capacity of 23,137,000 acre-feet at maximum 
operating pool. It contains seven power units rated at 
112,290 kilowatts each. Federal cost of the project was 
$346,521,000. Construction was initiated in August 1948 
and the project was placed in operation in June 1963. 
Local Cooperation. None required except for 
recreation cost-sharing. 
Operations During FY. Maintenance: Project was 
operated in conjunction with other Missouri River reservoirs 
for flood control, navigation, power production, and other 
multiple purpose uses. Normal operation and maintenance 
procedures were accomplished during the FY. Generating 
facilities produced 3,144,275,000 net kilowatt hours of 
electricity. 
43. MISSOURI RIVER, BETWEEN FT. PECK 
DAM, MT AND GAVINS POINT DAM, SD, NE 
Location. The project is located along the Missouri 
River between Fort Peck Dam, MT, and a point 59 miles 
downstream of Gavins Point Dam, SD and NE. 
Existing Project. Consists of undertaking measures, 
including maintenance and rehabilitation of existing 
structures, to alleviate bank erosion and related problems 
associated with releases from the six Missouri River main 
stem dams that the Secretary determines will be needed. In 
lieu of structural measures, lands may be acquired in affected 
areas from willing sellers. The costs of the measures shall 
be apportioned among project purposes as a joint-use 
operation and maintenance expense. Estimated Federal cost 
of the project is between $112 million for construction or 
$12 million for the land requisition alternative. Cost is 
limited to no more than $3 million per FY. 
Local Cooperation. Non-federal funds are not 
required for this project. One reach, the Missouri National 
Recreational River downstream from Gavins Point Dam, 
requires, under its separate authorization, that the 
landowners make available appropriate land interests to 
maintain the recreational and scenic qualities of the river and 
adjacent lands. In the other river reaches, lands can be 
26-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
acquired on a willing-seller basis if land acquisition is the 
recommended measure for erosion control at a given river 
site. 
Operations During FY. Continued coordination for 
sloughing easements in pursuit of real estate acquisitions 
in response to requests from landowners. Monitored 
previously constructed Section 33 projects. Completed 
constniction for the Conventional Erosion Control at 
Buford Trenton Irrigation District, ND. Began cumulative 
impacts study to determine effects of bank erosion. 
Miscellaneous 
44. MISSOURI RIVER MASTER WATER 
CONTROL MANUAL REVIEW AND UPDATE 
Location. The area being studied is the Missouri 
River basin, to include the Missouri River main stem 
system. States included in the study area include 
Nebraska, Montana, North Dakota, South Dakota, Iowa, 
Kansas, and Missouri. 
Existing Project. During 1987 through 1992, the 
Missouri River basin experienced a moderate to severe 
drought, impacting upon the Missouri River main stem 
projects for the first time since filled in 1967. The drought 
has had severe impacts on people and industries who use 
the Missouri River and the main stem reservoirs for 
navigation, hydropower, water supply, and recreation. 
Some of the people impacted by the drought have stated 
that the current Master Water Control Manual for the 
Missouri River main stem system of reservoirs does not 
adequately take into consideration the contemporary needs 
of the basin. The purpose of the Missouri River Master 
Water Control Manual Review and Update study is to 
determine the water control plan that best meets the needs 
of the Missouri River basin. 
Local Cooperation. None required. 
Operations/Activities During FY. A Draft 
Environmental Impact Statement (DEIS) was released for 
public review in September 1994. A public comment 
period was initiated with the release of the DEIS and 
completed March 1, 1995. During the public comment 
period, 24 public hearings were held throughout the 
Missouri and Mississippi River Basins. In order to 
respond to the numerous comments received on the DEIS, 
additional or revised technical analyses were necessary in the 
following areas; interior drainage and groundwater impacts 
landward of levees, cumulative impacts of bank stabilization, 
daily flow model, flood control, regional economics, 
Missouri and Mississippi River navigation, and Missouri 
River native river fish. During FY 1998, the results of these 
additional or revised analyses were documented and 
alternative reevaluation completed. A Preliminary Revised 
DEIS (PRDEIS), published in August 1998, identified eight 
alternatives representing the full range of Basin interests. A 
tribal and public coordination period, which extended until 
January 30, 1999 followed. A Revised Draft EIS (RDEIS) 
is scheduled to be published in October 1999. The PRDEIS 
will present a preferred alternative and will be the subject of 
full public review and comment, as required by the National 
Environmental Policy Act. A Final EIS (FEIS) is scheduled 
for completion in December 2000. Following release of the 
FEIS, a Washington level review will be conducted and a 
Record of Decision (ROD) signed. No substantial change in 
the operation of the mainstem reservoir system will be 
implemented until the ROD is signed and the Master Manual 
is revised. 
45. NATIONAL EMERGENCY PREPAREDNESS 
PROGRAM (NEPP) AND SUPPORT FOR FEMA 
P. L. 93-288 (and Antecedent Legislation) 
Continuity of Operations (510) 
National Preparedness 
Planning (520) 
Emergency Operations 
Center Support (530) 
Total Catastrophic Disaster 
Preparedness Program 
$ 20,484 
69,330 
3,012 
$ 90,826 
46. FLOOD CONTROL AND COASTAL 
EMERGENCIES (FC&CE) 
Flood control work under Authorization Emergency Flood 
Control Activities, Flood Fighting. P. L. 84-99. 
Disaster Preparedness (100) 
Emergency Operations (200) 
Rehabilitation and Inspection 
Program (300) 
Advance Measures (400) 
Hazard Mitigation (600) 
Reimbursable Activities (900) 
Total FC&CE 
$ 509,399 
125,376 
670,698 
23,712
2 
682,013 
$ 2,011,200 
26-16

OMAHA, NE, DISTRICT 
47. GENERAL REGULATORY FUNCTIONS 
Permit Evaluation 
Enforcement 
Studies 
Environmental Impact Statement 
Reimbursable Activities 
Total Regulatory 
$ 3,521,423 
283,828 
64,256 
65,567 
23,147 
$ 3,958,221 
48. GENERAL INVESTIGATIONS 
FY 1999 nonreimbursable costs totaled $1,643,269 
for all General Investigation activities. See Table 26-K 
which covers Surveys, Collection and Study of Basic Data, 
Research and Development, Preconstruction Engineering 
and Design (projects not fully authorized), Planning and 
Engineering under Proposed Program Legislation, and 
Preconstruction Engineering and Design (fully authorized 
projects). 
26-17 
- I I I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 26-A COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section September 30, 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 1999 
Missouri River, 
Sioux City, IA 
to Mouth (Sioux 
City, IA to Rulo 
NE) 
2. Missouri River 
Fish & Wildlife 
Mitigation, IA, 
NE, KS, MO 
4. Aberdeen & 
Vicinity, SD 
Required 
Contributed 
Funds 
Consolidated 
Summary 
5. Bear Creek Lake, 
CO 
6. Bowman-Haley 
Lake, ND 
7. Buford Trenton 
Irrigation District, ND 
(Land Acquisition) 
New Work: 
Approp. 
Cost. 
Maint: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
- 189,225,991 1/ 
--- 189,225,991 1/ 
1,671,000 1,802,000 2,143,000 
1,685,956 1,803,264 2,114,434 
2,779,000 1,584,000 1,374,000 
3,905,783 1,208,461 1,603,873 
130,957 
200,988 
130,957 
200,988 
394,000 
334,567 
205,000 
201,345 
187,000 
128,231 
187,000 
128,231 
345,700 
352,123 
164,000 
161,906 
54,000 
101,637 
2,034,000 
2,081 57 
4,070,000 
3,374,515 
352,802 
327,226 
30,084 
4,539 
54,000 382,886 
101,637 331,765 
360,000 416,000 
364,699 417,667 
155,000 130,000 
159,626 131,588 
2,300,000 2327,000 
2,071,907 2,421,119 
127,582,450 
127,581,934 
22,283,000 
21,333,536 
834,759 
791,039 
30,084 
4,539 
864,843 
797,578 
62,018,608 
62,018,608 
5,714,309 
5,713,613 
4,372,174 
4,372,174 
4,014,270 
4,013,753 
4,627,000 
4,493,026 
1/ Includes $18,325,581 National Industrial Recovery Act funds, $8,625,718 Emergency Relief Funds, and $1,181,125 for previous project. 
26-18

OMAHA, NE DISTRICT 
TABLE 26-A (continued) COST AND FINANCIAL STATEMENT 
See Total Cost to 
Section September 30, 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 1999 
8. Chatfield Lake, 
CO 
(Required 
Contributed 
Funds) 
(Consolidated 
Summary) 
9. Cherry Creek 
Lake, CO 
10. Fall River 
Basin, SD 
(Cottonwood & 
Coldbrook) 
11. Logan Creek 
Pender, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
12. Milk River, 
Malta, MT 
Required 
Contributed 
Funds 
Consolidated 
Summary 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint. 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint. 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work:, 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
929,000 
1,019,185 
525,000 
504,082 
424,000 
402,063 
42,713 
144,220 
11,654 
142,713 
155,874 
574,500 
571,354 
85,900 
53,502 
660,400 
624,856 
773,000 955,000 
791,429 954,737 
771,000 
781,224 
324,000 
344,833 
1,237,000 
1,212,239 
490,000 
474,854 
229,200 2,422,000 
222,084 2,392,477 
---- 264,790 
----- 63,895 
229,200 2,686,790 
222,084 2,456,372 
604,268 
555,205 
61,700 
76,486 
665,965 
631,691 
-39,200 
17,495 
938 
-39,200 
18,433 
783,000 
794,914 
95,444,010 
95,444,010 
1,315,328 
1,315,328 
96,759,338 
96,759,338 
13,980,230 
13,979,966 
15,220,364 
15,220,364 
1,326,000 14,917,474 
1,358,725 14,912,065 
337,000 
350,767 
1,083,100 
1,038,621
0 
131,543 
1,083,100 
1,170,164
0 
6,816
0
0
0 
6,816 
5,538,432 
5,538,432 
7,970,201 
7,964,602 
4,148,113 
4,053,569 
394,090 
324,736 
4,542,203 
4,378,305 
1,483,618 
1,470,507 
222,720 
205,937 
1,706,338 
1,676,444 
26-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 26-A (continued) COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project 
13. Missouri National 
Recreational River 
NE& SD 
14. Missouri River 
Kenslers Bend, 
NE, to Sioux 
City, IA 
15. Nishnabotna 
River, Hamburg, 
IA 
Required 
Contributed 
Funds 
Consolidated 
Summary 
16. Papillion Creek 
and Tributaries 
Lakes, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
17. Pebble Creek 
Scribner, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
Funding 
New Work: 
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint:
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp 
Cost. 
New Work: 
Approp. 
Cost. 
FY 96 
38,459 
45,887 
192,000 
406,340 
FY 97 
105,000 
110,890 
196,000 
174,245 
FY 98 
150,000 
117,322 
196,000 
229,911 
FY 99 
Total Cost to 
September 30, 
1999 
416,000 2,665,259 
235,697 2,443,885 
65,000 2,694,000 
167,384 2,688,150 
11,294,414 
11,294,414 
59,000 
57,772 
83,000 
19,117 
33,450 
23,130 
116,450 
42,247 
325,073 
37,614 
362,687 
571,000 
586,413 
-65,000 
116,079 
------- 
39,277 
-65,000 
155,356 
88,000 
88,349 
151,900 
188,774 
4,600 
17,413 
156,500 
206,187 
18,070 
5,857 
23,927 
615,000 
605,775 
3,221 
59,000 
57,132 
587,500 
281,129 
55,890 
11,733 
643,390 
292,862 
1,091 
38,000 5,021,419 
41,152 5,021,289 
266,500 1,318,600 
606,611 1,312,422 
170,947 
183,621 
359,887 
326,246 
437,447 1,678,487 
790,232 1,638,668 
0 66,612,215 / 
6,453 66,603,566 2/ 
955,000 
884,680 
1,091 
593,000 
581,127 
0 
6,453 
532,000 
552,855
0 
547
0 
444 0 
3,665 
67,567,215 
67,488,246 
9,666,444 
9,664,420 
2,725,728 
2,716,696 
435,656 
419,880 
0 3,161,384 
547 3,136,576 
2/ Does not include $1,854,338 cost of inactive sites. 
26-20

OMAHA, NE DISTRICT 
TABLE 26-A (nntinued) COST AND NANCIATL TATF'MFiNT 
See 
Section 
in Text Project 
18. Perry Creek, IA 
(Required 
Contributed 
Funds) 
(Consolidated 
Summary) 
20. Pipestem Lake, 
ND 
21. Salt Creek and 
Tributaries, NE 
23. Thurman to 
Hamburg, IA 
Required 
Contributed 
Funds 
Consolidated 
Summary 
24. Van Bibber 
Creek, CO 
Required 
Contributed 
Funds 
Consolidated 
Summary 
Funding 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint. 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work: 
Approp 
Cost. 
New Work: 
Approp. 
Cost. 
FY 96 FY 97 FY 98 
1,354,000 4,650,000 3,424,000 
5,524,584 4,850,900 2,516,925 
---- - 400,000 
- ---- 86,625 
1,354,000 4,650,000 3,824,000 
5,524,584 4,850,900 2,603,550 
494,000 
491,921 
674,000 
679,123 
449,612 
137,471
0 
137,471 
449,612 
213,889 
217,319 
619,000 561,000 
617,114 539,598 
778,000 757,000 
772,287 750,354 
360,000 
399,998 
157,000 
294,218 
517,000 
694,216 
6,000 
26,028 
26,028 
6,000 
355,000 216,000 
261,285 252,741 
1,030 
213,889 
217,319 
355,000 
261,285 
216,000 
253,771 
3/ Includes $123,000 of government cost applicable to that portion of the project which is currently being carried in a deferred status. 
26-21 
FY 99 
6,235,237 
6,799,322 
850,000 
1,023,819 
7,085,237 
7,823,141 
580,000 
608,744 
728,000 
741,767 
(30,237) 
(26,281) 
0 
26,281 
(30,237) 
0 
50,200 
77,715
0
0 
50,200 
77,515 
Total Cost to 
September 30, 
1999 
21,531,485 
21,099,711 
1,250,000 
1,110,444 
22,781,485 
22,210,155 
9,277,545 
9,277,545 
8,239,404 
8,239,085 
12,197,621 3/ 
12,197,621 3/ 
15,939,276 
15,938,107 
1,040,763 
1,040,763 
397,587 
397,587 
1,438,350 
1,438,350 
1,073,789 
1,037,515 
125,200 
125,200 
1,198,989 
1,162,715 
acaI ia AII rLa 1 \ Y I v vu r �,y r ' r r 'r i AJ_ y r A ~ VA JL~ A

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 26-A (continued) 
See 
Section 
in Text Project 
COST AND FINANCIAL STATEMENT 
Funding FY 96 FY 97 FY 98 
25. Inspections of 
Completed Local 
Protection Projects 
26. Scheduling Flood 
Control Reservoir 
Operations 
29. Boyer Chute, NE 
(Mo Riv Bank.. 
Stab/Nav) 
Required 
Contributed 
Funds 
Consolidated 
Summary 
30. California 
Bend, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
31. Deroin Bend, 
MO (Mo Riv 
Levee Unit L536) 
Required 
Contributed 
Funds 
Consolidated 
Summary 
Funds 
32. Hidden Lake/ 
Great Marsh, 
NE 
Required 
Contributed 
Consolidated 
Summary 
Maint.
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
188,000 253,000 238,000 
188,151 251,864 231,759 
377,000 470,000 334,000 
375,283 473,101 374,993 
10,000 
64,388 
2,453 
10,000 
37,948 
165,000 
156,120 
165,000 
156,120 
2,898 
20,000 
9,806 
6 ------ 
2,904 
20,000 
9,806 
16,000 137,000 
24,499 136,570 
16,000 137,000 
24,499 136,570 
115,000 140,000 135,000 
110,419 107,215 166,357 
115,000 140,000 135,000 
110,419 107,215 166,357 
1,550,000 359,000 
1,550,425 377,295 
548,000 102,000 
427,837 137,075 
2,098,000 461,000 
1,978,262 514,370 
200 
61,843 
62,043 
26-22 
FY 99 
Total Cost to 
September 30, 
1999 
224,000 
232,590 
372,000 
374,993 
20,000 
12,663 
5,457,476 
5,456,832 
9,416,684 
9,413,890 
1,779,500 
1,760,516 
82,000 
81,993 
1,861,500 
1,842,509 
445,500 
439,217 
445,500 
439,217 
494,500 
490,105 
494,500 
490,105 
2,221,000 
2,213,265 
650,000 
642,549 
2,871,000 
2,855,814 
20,000 
12,663 
35,000 
30,543 
35,000 
30,543 
25,000 
32,765 
25,000 
32,765 
15,000 
8,126
0 
15,794 
15,000 
23,920 
/a-t- e V - \-,-V--------/ V ~ - \Y -, - \L f \ - i -c, -- - -- -, -

OMAHA, NE DISTRICT 
TABLE 26-A (continued) 
See 
Section 
in Text Project 
COST AND FINANCIAL STATEMENT 
Funding FY 96 FY 97 
33. Lower 
Decatur, NE 
Required 
Contributed 
Funds 
Consolidated 
Summary 
Funds 
34. Wehrspann Lake 
Aquatic 
Required 
Contributed 
Funds 
Consolidated 
Summary 
Funds 
36. Big Bend Dam- 
Lake Sharpe, 
Missouri River 
Basin, SD 
37. Fort Peck Lake, 
MT 
38. Fort Randall 
Dam-Lake Francis 
Case, Missouri 
River Basin, SD 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work. 
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint.
Approp. 
Cost. 
2,500 
1,311 
2,500 
1,311 
65,000 
44,784 
65,000 
44,784 
263,000 
166,005 
268,000 
166,005 
110,000 
123,269 
110,000 
123,269 
307,000 
351,728 
307,000 
351,728 
171,000 
158,912 
171,000 
158,912 
5,527,000 5,692,300 7,121,300 
5,504,991 5,595,713 6,623,326 
100,000 675,000 
135,983 657,489 
100,000 675,000 
135,983 657,489 
1,328,000 1,674,000 
1,270,323 1,597,288 
506,000 506,000 
303,376 303,376 
1,834,000 2,180,000 
1,573,699 1,900,664 
107,497,597 
107,497,597 
6,035,000 115,635,573 4/ 
6,667,015 115,624,555 4/ 
158,428,080 
158,428,080 
4,481,000 3,459,000 4,141,000 
3,859,970 3,469,804 4,891,338 
4,391,000 100,669,834 4/ 
4,505,403 100,614,516 4/ 
199,065,883 
199,065,883 
9,122,000 8,943,500 9,118,000 
8,951,889 9,149,872 8,887,964 
7,844,000 179,071,134 4/ 
8,147,631 179,060,584 4/ 
4/ Includes Special Recreation Use Fees. 
26-23 
FY 98 FY 99 
Total Cost to 
September 30, 
1999 
__,

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Project 
Garrison Dam 
Lake Sakakawea, 
Missouri River 
Basin, ND 
COST AND FINANCIAL STATEMENT 
Funding FY 96 FY 97 
New Work: 
Approp. 
Cost. 
Federal Funds Maint
Approp. 
Cost. 
8,141,000 8,491,000 7,540,000 
8,111,952 8,113,054 7,942,739 
9,050,000 193,329,673 4/ 
9,165,548 193,325,741 4/ 
374,000 1,035,000 
356,271 555,288 
41. Gavins Point 
Dam-Lewis & 
Clark Lake, 
Missouri River 
Basin, 
NE and SD 
42. Oahe Dam-Lake 
Oahe, Missouri 
River Basin, 
SD & ND 
43. Missouri River 
Between Ft. Peck 
Dam MT & Gavins 
Point Dam, SD and NE 
44. Missouri River 
Master Water 
Control Manual 
Review and Update 
4/ Includes Special Recreation Use Fees. 
New Work: 
Approp. 
Cost. 
Maint:
Approp. 
Cost. 
New Work: 
Approp. 
Cost. 
Maint:
Approp. 
Cost. 
Maint. 
Approp. 
Cost. 
Maint: 
Approp. 
Cost. 
49,617,239 
49,617,239 
6,244,000 5,933,500 6,227,000 
6,170,067 5,931,717 5,965,884 
6,984,000 131,875,412 4/ 
7,336,181 131,840,026 4/ 
346,520,603 
346,520,603 
8,723,000 9,148,000 11,669,200 
8,737,237 9,246,349 10,292,662 
366,000 
1,568,739 
735,000 737,000 
242,223 1,528,412 
3,094,000 2,549,000 1,800,000 
3,351,586 2,566,603 1,810,941 
10,685,000 198,635,700 4/ 
12,081,727 198,592,834 4/ 
2,183,000 
2,385,152 
1,863,000 
1,814,557 
6,655,000 
6,596,114 
23,310,000 
23,261,557 
26-24 
TABLE 26-A (continued) 
See 
Section 
in Text 
40. 
FY 98 FY 99 
Total Cost to 
September 30, 
1999 
295,729,613 
295,729,613 
Major Rehab: 
Approp. 
Cost. 
Required 
Contributed 
Funds Approp. 
Cost. 
4,500,000 
4,424,506 
10,117,310 
9,544,375 
686,961 
686,961 
___._ L._._ ._ _- 
r

OMAHA, NE DISTRICT 
TABLE 26-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
(SIOUX CITY, IA TO RULO, NE) 
Appropriation of $12 million authorized for 
securing a 6 foot depth from Quindaro Bend 
(Kansas City, MO to Sioux City, IA). 
Appropriation of $15 million additional allotments 
totaling $29,153,108 made by Public Works 
Administration under provisions of National 
Industrial Recovery Act of 1933, and $9,669,791 
allotted under provisions of Emergency Relief 
Appropriations Act of 1935. 
For completion of project from mouth to Sioux City, IA. 
For a channel of 9-foot depth and 300-foot width. 
H. Doc. 1120, 60th Cong. 
PL 71-520 
PL 73-67 
H. Doc 238, 73rd Cong. 
PL 74-409 
H. Doc. 214, 76th Cong. 
PL 79-14 
2. 
Water Resources 
Development Act 
Of 1986 
Flood Control 
Act of 1948 
MISSOURI RIVER FISH & WILDLIFE MITIGATION, IA, NE, KS, MO 
Mitigate fish and wildlife losses resulting from the con- Section 601, 
struction and operation of the Missouri River Bank PL 99-662 
Stabilization and Navigation project. 
ABERDEEN & VICINITY, SD 
Section 205 of the Flood Control Act of 1948 as 
amended; flood damage reduction 
Aug 13, 1968 
Flood Control 
Act of 1962 
Section 336(a) 
Water Resources 
Development Act 
of 1996 
Flood control 
Act of 1950 
Water Resources 
Development Act 
of 1986 
BEAR CREEK LAKE, CO 
A flood control reservoir for protection of 
metropolitan Denver, CO. 
BOWMAN-HALEY LAKE, ND 
Flood Control reservoir and water supply. 
S. Doc. 87, 90th Cong. 
PL 90-483 
H. Doc. 574, 87th Cong. 
PL 87-874 
BUFORD TRENTON IRRIGATION DISTRICT, ND 
(LAND ACQUISTION) 
CHATFIELD LAKE, CO 
Flood control reservoir and channel improvements 
to provide downstream protection for Denver, CO. 
Modified 1950 Flood Control Act to operate dam 
and other Federal improvements to achieve 
authorized level of protection, beginning at dam 
and ending 82 miles downstream. Reassigns a 
portion of the storage space in the lake project to 
joint flood control-conservation purposes. Modified 
1974 WRDA to exempt prohibition of encroachment 
for Mineral Ave/ Ken Caryl Rd. ext & 
transmission line. 
P.L. 104-303 
H. Doc. 669, 80th Cong. 
PL 81-516 
H. Doc. 1013, 99th Cong. 
PL 99-662 
26-25 
MISSOURI RIVER, SIOUX CITY, IA TO MOUTH 
Jan 12, 1927 
July 3, 1930 
Aug 30, 1935 
Mar 2, 1945 
6. 
7. 
8.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 26-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
Aug.18, 1941 
Dec 22, 1944 
Dec 22, 1944 
Aug 18, 1941 
Flood Control 
Act of 1948 
Flood Control 
Act of 1948 
National Parks 
and Recreation 
Act of 1978 
Aug 18, 1941 
June 30, 1948 
Flood Control 
Act of 1948 
Flood Control 
Act of 1968 
Water Resources 
Development Act 
of 1986 
June 30, 1948 
Water Resources 
Development Act 
of 1986 
CHERRY CREEK LAKE, CO 
Initiation and partial accomplishment of project. 
Completion of plan approved in Act of Aug 18, 1941. 
General comprehensive plan, Missouri River Basin. 
FALL RIVER BASIN, SD 
Provide flood control to the town of Hot Springs, SD. 
LOGAN CREEK, PENDER, NE 
Section 205 of the Flood Control Act of 1948 as 
amended; flood damage reduction 
MILK RIVER, MALTA, MT 
Section 205 of the Flood Control Act of 1948 as 
amended; flood damage reduction 
MISSOURI NATIONAL RECREATIONAL RIVER, NE AND SD 
Preservation and enhancement of the Missouri 
River between the reaches from Gavins Point 
Dam, NE & SD to Ponca State Park, NE. 
MISSOURI RIVER, KENSLERS BEND, NE, TO SIOUX CITY, IA 
Construction of dike, revetments. 
H. Doc. 426, 76th Cong. 
PL 77-228 
H. Doc. 426, 76th Cong. 
PL 78-534 
H. Doc. 475, and S. Does. 
191 and 247, 78th Cong. 
PL 78-534 
H. Doe. 655, 76th Cong. 
PL 77-228 
PL 95-625 
H. Doe. 821, 76th Cong. 
PL 77-228 
PL 80-858 
NISHNABOTNA RIVER, HAMBURG, IA 
Section 205 of the Flood Control Act of 1948 as 
amended; flood damage reduction 
PAPILLION CREEK AND TRIBUTARIES LAKES, NE 
Series of flood control reservoirs, providing protection 
for the metropolitan areas of Omaha, NE. 
Authorized additional $4.8 million for channel 
improvement on Big Papillon Creek, and to 
Union Pacific RR bridge, rec trail and flood 
warning system. 
PEBBLE CREEK, SCRIBNER, NE 
Levee and channel improvement for local 
protection - Section 205. 
PERRY CREEK, IA 
Provide flood protection for Perry Creek, Iowa. 
H. Doe. 349, 90th Cong. 
PL 90-485 
H. Doc. 1013, 99th Cong. 
PL 99-662 
858, 80th Cong. 
Section 401, 
PL 99-662 
26-26 
9. 
10. 
11. 
12. 
13. 
14. 
15. 
16. 
17. 
18.

OMAHA, NE DISTRICT 
TABLE 26-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
June 28, 1938 
Aug 18, 1941 
Dec 22, 1944 
July 24, 1946 
May 17, 1950 
Sep 3, 1954 
Sep 3, 1954 
May 2, 1956 
July 3, 1958 
July 14, 1960 
Dec 30, 1963 
June 18, 1965 
Aug 13, 1968 
June 19, 1970 
Dec 24, 1970 
Dec 31, 1970 
Dec 23, 1971 
Mar 7, 1974 
July 8, 1976 
Nov 16, 1977 
Flood Control Act 
of 27 Oct 1965 
19. 
PIPESTEM LAKE, ND 
Provide flood control for Jamestown, ND and 
downstream areas. 
PICK-SLOAN MISSOURI BASIN PROGRAM (OMAHA DIST.) 
Adopted general comprehensive plan for Missouri 
River basin and authorized $9 million for 
initiation and partial accomplishment. 
Modified general comprehensive plan to include 
Harlan County Dam and Reservoir on Republican 
River, NE and authorized additional $7 million. 
Expanded general comprehensive plan for Missouri River 
Basin and authorized additional $200 million. 
Authorized additional $150 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Authorized additional $250 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Expanded general comprehensive plan for Missouri 
River Basin and authorized additional $217,710,000. 
Authorized $5,384,014 to compensate Sioux Indians for 
reservation lands required for Oahe, South Dakota project. 
Modified general comprehensive plan for Missouri 
River Basin by deletion of construction of Red 
Willow Dam and Reservoir, NE, and addition of 
construction of Wilson Dam and Reservoir, KS. 
Expanded general comprehensive plan for Missouri 
River Basin and authorized additional $200 million. 
Authorized additional $207 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Authorized additional $80 million for prosecution 
of general comprehehsive plan for Missouri River Basin 
and modified the plan to include work protection 
and rectification works below Garrison Dam. 
Authorized additional $116 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Authorized additional $38 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Authorized additional $109 million for prosecution 
of general comprehensive plan for Missouri River Basin. 
Changed comprehensive plan name to Pick-Sloan 
Missouri Basin Program. 
Oahe Dam and Reservoir, ND. 
Authorized additional $101 million for prosecution 
of Pick-Sloan Missouri Basin Program. 
Authorized additional $72 million for prosecution 
of Pick-Sloan Missouri Basin Program. 
Authorized additional $85 million for prosecution 
of Pick-Sloan Missouri Basin Program. 
Authorized additional $59 million for prosecution 
of Pick-Sloan Missouri Basin Program. 
26-27 
Flood Control Committee 
Doc. 1,75th Cong. 
PL 75-761 
H. Doc. 842, 76th Cong. 
PL 77-228 
H. Doc. 475, and S. D6cs. 191 
and 247, 78th Cong. 
PL 78-534 
PL 79-526 
PL 81-516 
H. Does. 549 and 642, 81st 
Cong. 
PL 83-780 
PL 83-776 
PL 84-505 
H. Doc. 409, 84th Cong. 
P. L. 85-500 
P.L 86-645 
P. L. 88-253 
P.L. 89-042 
P. L. 90-483 
H. Doe. 91-748 and 
S. Doec. 91-895 
P.L. 91-282 
S. Doe. 91-1100, 91st Cong. 
P.L. 91-576 
H. Doec. 91-23 and 
P.L. 91-611 
P.L. 92-222 
P.L. 93-251 
P. L. 94-347 
P.L. 95-189 
H. Doe. 266, 89th Cong. 
P.L. 89-298 
20.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 26-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
July 3, 1958 
May 17, 1950 
May 12, 1967 
Aug 13, 1968 
Jun 19, 1970 
Dec 23, 1971 
Mar 7, 1974 
Jul 8, 1976 
Nov 16, 1977 
Water Resources 
Development Act 
of 1986 
Flood Control 
Act of 1948 
Nov 17, 1986 
Nov 17, 1986 
Nov 17, 1986 
Nov 17, 1986 
Nov 17, 1986 
Nov 17, 1986 
Dec. 22, 1944 
SALT CREEK AND TRIBUTARIES, NE 
Series of dams and channel improvements for flood 
control around Lincoln, NE. 
SOUTH PLATTE RIVER BASIN, CO 
Adopted plan of improvement for South Platte 
River Basin and authorized $26.3 million for 
initiation and partial accomplishment. 
Authorized additional $2 million for prosecution of plan. 
Authorized additional $12 million for prosecution of plan. 
Authorized additional $21 million for prosecution of plan. 
Authorized additional $37 million for prosecution of plan. 
Authorized additional $15 million for prosecution of plan. 
Authorized additional $22 million for prosecution of plan. 
Authorized additional $3 million for prosecution of plan. 
THURMAN TO HAMBURG, IA 
Install pumping facilities to prevent flooding in the Thurman 
to Hamburg area of the Missouri River in western Fremont 
County, IA. 
H. Doc. 396, 84th Cong. 
P.L. 85-500 
H. Doc. 669, 80th Cong. 
P.L. 81-516 
P.L. 90-17 
P. L. 90-843 
P.L. 91-282 
P.L. 92-222 
P.L. 93-251 
P. L. 94-34'; 
P.L. 95-189 
Section 1152 
P. L. 99-662 
VAN BIBBER CREEK, CO 
Section 205 of the Flood Control Act of 1948 as 
amended; flood damage reduction 
BOYER CHUTE, NE 
Section 1135 (b) of the Water Resource Development Act of 
1986, as amended; environmental improvement 
CALIFORNIA BEND, NE 
Section 1135 (b) of the Water Resource Development Act of 
1986, as amended; environmental improvement 
DEROIN BEND, MO 
Section 1135 (b) of the Water Resource Development Act of 
1986, as amended; environmental improvement 
HIDDEN LAKE/GREAT MARSH 
Section 1135 (b) of the Water Resource Development Act of 
1986, as amended; environmental improvement 
LOWER DECATUR, NE 
Section 1135(b) of the Water Resource Development Act 
of 1986 as amended; environmental improvement 
WEHRSPANN LAKE AQUATIC, NE 
Section 1135(b) of the Water Resource Development Act 
of 1986 as amended; environmental improvement 
BIG BEND DAM - LAKE SHARPE, SD 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
P. L. 99-662 
P. L. 99-662 
P. L. 99-662 
P. L. 99-662 
P. L. 99-662 
P. L. 99-662 
H. Doc. 475 and S. Doc. 247, 
78th Cong. PL 78-534 
26-28 
21. 
22. 
23. 
24. 
29. 
30. 
31. 
32. 
33. 
34. 
36.

OMAHA, NE DISTRICT 
TABLE 26-B (Continued) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing Project and Work 
in Text Act Authorized Documents 
37. 
June 16, 1933 
Aug 30, 1935 
May 18, 1938 
38. 
Dec 22, 1944 
40. 
Dec. 22, 1944 
PWA 1968 
Dec. 22, 1944 
41. 
42. 
Dec. 22, 1944 
43. 
Water Resources 
Development Act 
of 1988 
44. 
Dec 22, 1944 
FORT PECK LAKE, MT 
Construction of earth dam, as recommended by Chief of 
Engineers Sep 30, 1933, was approved by Executive Order 
by the President and included in Public Works Administration 
program, Oct 14, 1933 as authorized by the National Industrial 
Recovery Act of 1933 and adopted by the River and Harbor 
Act of 1935 (PL 74-409). 
Completion, maintenance, and operation of a hydroelectric 
power plant, subject to certain provisions in act respecting 
transmission and sale of electric energy. Also authorizes 
installation of additional power-generating facilities by 
Secretary of War when deemed necessary in judgment of 
Bureau of Reclamation. 
FORT RANDALL DAM - LAKE FRANCIS CASE, SD 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
GARRISON DAM - LAKE SAKAKAWEA, 
MISSOURI RIVER BASIN, ND 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
GAVINS POINT DAM - LEWIS AND CLARK LAKE, 
MISSOURI RIVER BASIN, NE AND SD 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
OAHE DAM- LAKE OAHE, 
MISSOURI RIVER BASIN, SD & ND 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
MISSOURI RIVER BETWEEN FT. PECK DAM ,MT & 
GAVINS POINT DAM, SD & NE 
Undertake measures to alleviate bank erosion and related 
problems associated with releases along the Missouri 
River from the six main stem dams. 
MISSOURI RIVER MASTER WATER CONTROL 
MANUAL REVIEW AND UPDATE 
Expanded general comprehensive plan for flood control 
and other purposes in the Missouri River Basin. 
H. Doc. 238, 73rd Cong. 
P .L. 74-409 
P. L. 75-529 
H. Doc. 475 and S. Does. 191 
and 247, 78th Cong. 
P .L. 78-534 
H. Doc. 475 and S. Doc. 247, 
78th Cong. PL 78-534 
H. Doc. 475 and S. Doe. 247, 
78th Cong. P. L. 78-534 
H. Doc. 475 and S. Does. 191 
and 247, 78th Cong. 
Section 33, 
PL 100-676 
H. Doc. 475 and S. Does. 191 
and 247, 78th Cong. 
P. L. 78-534 
26-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 199, 
TABLE 26-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost Cost to September 30, 1999 
Full Report 
See Annual Operation and 
Projec Status Report For Construction Maintenance 
Missouri River, Sioux City, IA to 
Fort Benton, MT Complete 1948 3,123,141 644,863 
Small Navigation Project at 
Sioux City, IA Complete 1970 43,582 88,716 
26-30

OMAHA, NE DISTRICT 
TABLE 26-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost Cost to September 30, 1999 
Full Report 
Project Status Report For Construction Maintenance 
Belle Fourche, Cheyenne River, SD 1/ Complete 1940 37,410 
Big Sioux River at Sioux City, IA Complete 1982 7,458,934 
Blackbird Creek Near Macy, NE 2/ Complete 1970 262,479 
Buffalo Creek, Meadow Grove, NE 21 Complete 1974 293,016 
Buffalo Creek, Scranton, ND 2/ Complete 1960 102,980 
Cedar Canyon Dam, Rapid City, SD Complete 1960 120,482 
City ofAurora, 
Westerly Creek, CO Complete 1955 150,000 
Clarkson, NE, Maple Creek Complete 1967 191,282 
Council Bluffs, IA (Act of 1936) Complete 1939 
Council Bluffs, IA (Act of 1944) Complete 1954 2,557,680 
Deadman's Gulch, Sturgis, SD 2/ Complete 1981 3,000,000 
Dry Creek, Hawarden, IA Complete 1964 400,000 
East Nishnabotna River 
at Red Oak, IA 2/ Complete 1986 2,154,016 
Floyd River, Sioux City, IA Complete 1970 11,556,667 
Forsyth, MT Complete 1950 255,177 
Frazer-Wolf Point, MT Complete 1982 435,000 
Gering Valley, NE Complete 1971 5,989,663 
Glasgow, MT Complete 1939 16,832 
Great Falls, MT Complete 1991 11,905,000 
Greybull, WY Complete 1960 248,507 
Havre, MT Complete 1958 1,825,881 
Herreid, Spring Creek, SD Complete 1954 50,216 
Hooper, NE 2/ Complete 1968 326,667 
Ida Grove, IA 2/ Complete 1972 522,344 
Indian Creek at Emerson, IA 2/ Complete 1986 333,000 
Jamestown Reservoir, ND Complete 1950 
Linton, ND 2/ Inactive 1973 
Little Papillion Creek, NE Complete 1976 3,643,111 
Little Sioux River, IA Complete 1992 20,630,000 
Loup River, Columbus, NE 2/ Complete 1973 1,000,000 
Lower Heart River, ND Complete 1964 1,961,173 
Lower Heart River, Mandan, ND 2/ Complete 1991 1,153,430 
Madison, NE, Union and 
Taylor Creeks 2/ Complete 1967 234,839 
Mandan, Heart River, ND Complete 1960 676,916 
Marmarth, ND Complete 1960 169,498 
McCook Lake, SD Complete 1958 147,627 
Miles City, MT Inactive 1956 
Missouri River, Aten, NE Complete 1951 578,791 
1/ Completed as a Public Works Administration project. 
2/ Authorized by Chief of Engineers. 
26-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 26-E (Continued) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30, 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Missouri River Levee System, 
IA, NE, KS and MO Complete 1993 37,964,177 
Missouri River, Niobrara, NE Complete 1945 99,370 
Mott, ND Deferred - - - 
Mud Creek, Broken Bow, NE 2/ Complete 1976 1,000,000 
Nishnabotna River at 
Hamburg, IA Complete 1948 236,000 
Norfolk, NE Complete 1971 3,400,504 
Omaha, NE Complete 1954 5,903,640 
Pierce, NE Complete 1967 296,597 
Platte River Near Schuyler, NE 2/ Complete 1948 74,940 
Platte River and Lost Creek, 
Schuyler, NE Complete 1971 257,398 
Platte River and Tributaries, NE Inactive - 1,538,269 
Rapid Creek, Rapid City, SD Complete 1980 1,004,000 
Saco, MT Complete 1958 67,793 
Sacred Heart Hospital, 
Yankton, SD Complete 1978 184,380 
Sheridan, WY 3/ Complete 1976 2,618,809 
Shields River, 
Near Clyde Park, MT 2/ Complete 1951 25,747 - 
Sioux Falls, SD Complete 1966 5,288,707 
Vaughn, MT, Sun River 2/ Complete 1971 457,582 
Waterloo, NE Complete 1970 237,883 
West Point, NE Complete 1966 149,596 
Yellowstone River, 
W. Glendive, MT Complete 1960 230,294 
2/ Authorized by Chief of Engineers. 
3/ Includes Inactive segment. 
26-32

OMAHA, NE DISTRICT 
TABLE 26-F OTHER MULTIPLE PURPOSE PROJECTS INCLUDING POWER 
For Last Cost to September 30, 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Gavins Point Dam - Lewis and Clark Lake, 
Relocation of Niobrara, NE Complete 1980 13,516,459 
Williston, ND Water Intake Complete 1981 988,583 
26-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 26-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Deauthorization Funds Funds 
Project Report For Document Expended Expended 
Billings, MT (Western Unit) 
Boulder, CO 
Buffalo, Johnson County 
Diversion Channel, WY 
Castlewood Lake, 
Douglas County, CO 
Davids Creek Lake, IA 
Dayton, WY 
Giles Creek, Elkhorn, NE 
Indian Creek Lake, IA 
Lake Herman 
(Dredging), SD 
Little Nemaha River, 
Nemaha County, NE 
Milk River, 
Havre, MT 
Miles City, MT 
Morrison, Bear Creek, CO 
Oahe Dam - Lake Oahe 
(Wildlife Restoration), 
ND 
Redwater River and 
Hay Creek, Bell Fourche, SD 
1976 
1976 
1961 
1943 
1972 
1956 
1952 
1969 
N/A 
1973 
N/A 
1982 
1950 
N/A 
1966 
Sec. 201, FC Act 1950 
23 Mar 81 
FC Act 1950 
WRDA of 1986 
17 Oct 86 
FC Act 1950 
WRDA of 1986 
17 Oct 86 
PL 77-228 
WRDA of 1986 
17 Oct86 
Sec. 203, PL 90-483 
WRDA of 1986 
17 Oct 86 
Sec. 12, PL 93-251 
WRDA of 1974 
5 Aug 77 
Sec. 12, PL 93-251 
WRDA of 1974 
6 Nov 77 
Sec. 12, PL 93-251 
WRDA of 1974 
4 Jan 74 
Sec. 1001(a), PL 89-298 
WRDA of 1986 
17 Oct 86 
Sec. 204, PL 89-298 
WRDA of 1986 
17 Oct 86 
Sec. 1001(a), PL 89-298 
WRDA of 1986 
17 Oct 86 
FC Act of 1950 
Section 1001(b) 
WRDA 1986 
Sec. 12, PL 93-251 
WRDA of 1974 
5 Aug 77 
FC Act of 1970 
Section 1001(b) 
WRDA 1986 
Sec. 12, PL 93-251 
WRDA of 1974 
4 Jan 74 
26-34 
75,000 
142,666 
135,000 
282,200 
30,000
0 
1,000 
The following investigations for flood control called for by Flood Control Acts and committee resolutions were deauthorized by WRDA of 1986, 17 Oct 86; Aowa & South Creek, NE; Bow Creek, 
NE; Cannonball River, ND; James River, ND & SD;,Judith River Basin, MT; Niobrara River Basin, NE, SD & WY; Omaha Creek, NE; South Dakota Lakes, SD; Weeping Water Creek, NE; 
Windpower at Ft. Peck Lake, MT; Yellowstone River below Billings, MT; South Platte River, Denver-Ft. Lupton-Ft. Morgan, CO; Lower Big Sioux River IA & SD; Eagle Bay Highway Bridge, 
Missouri River Basin, ND; Sheridan, WY (Stage III); Missouri River Levee System Units: R531, R540, R553, R555, R577, R589, R603, R610, R623, R644, R645, R652, R661, R669, R676, R682, 
R686, R703, R717, R719, R725, R728, R742, R750.

OMAHA, NE DISTRICT 
TABLE 26-G (continued) DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Deauthorization Funds Funds 
Project Report For Document Expended Expended 
Shell Creek, NE 1962 Sec. 12, PL 93-251 71,000 
WRDA of 1974 
3 Oct 78 
Upper Missouri River, SD N/A Sec. 1001(a), PL 89-298 
Streambank Erosion Control Project WRDA of 1986 
17 Oct 86 
Vermillion River and Tribs, SD 1968 Sec. 12 PL 93-251 208,000 
WRDA of 1974 
4 Jan 74 
The following investigations for flood control called for by Flood Control Acts and committee resolutions were deauthorized by WRDA of 1986, 17 Oct 86; Aowa & South Creek, NE; Bow Creek, 
NE; Cannonball River, ND; James River, ND & SD;,Judith River Basin, MT; Niobrara River Basin, NE, SD & WY; Omaha Creek, NE; South Dakota Lakes, SD; Weeping Water Creek, NE; 
Windpower at Ft. Peck Lake, MT; Yellowstone River below Billings, MT; South Platte River, Denver-Ft. Lupton-Ft. Morgan, CO; Lower Big Sioux River IA & SD; Eagle Bay Highway Bridge, 
Missouri River Basin, ND; Sheridan, WY (Stage III); Missouri River Levee System Units: R531, R540, R553, R555, R577, R589, R603, R610, R623, R644, R645, R652, R661, R669, R676, R682, 
R686, R703, R717, R719, R725, R728, R742, R750. 
26-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
MISSOURI RIVER LEVEE SYSTEM, SIOUX CITY, IA TO RULO, NE 
TABLE 26-H 
Miles of 
Unit Levee Status 
L627-624 
L601 
L594 
R580 
L575 
R573 
R562 
L561-550 
R548 
L536 
R520 
R613 
R616 
L611-614 
L627, L624, 
L561-550 
Comprehensive 
Mosquito Creek Levee 
Watkins-Waubonsie Ditch Levees 
Pleasant Valley Levee 
Nebraska City Levee 
Thurman-Hamburg Levee 
Otto County Drainage District No. 2 
Peru Dike 
Atchison County Levee District No. 1 
Brownville-Nemaha Levee 
Mill Creek Levee 
Richardson County Drainage District No. 8 
Papillion Creek-Platte River Levee 
Bellevue-Papillion Creek Levees 
Mosquito-Keg Creek Levees 
Remedial Studies on Completed Units 
Restudy of Levee System 
14.2 
15.0 
11.4 
0.2 
45.8 
5.9 
7.6 
41.3 
19.5 
13.6 
6.3 
14.0 
4.5 
22.0 
Complete 1950 
Complete 1966 
Complete 1964 
Complete 1950 
Complete 1950 
Complete 1950 
Complete 1950 
Complete 1952 
Complete 1952 
Complete 1952 
Complete 1960 
Complete 1971 
Complete 1987 
Complete 1988 
Studies Complete 
Studies Complete 
26-36

OMAHA, NE DISTRICT 
PICK-SLOAN MISSOURI BASIN PROGRAM 
TABLE 26-I (See Section 19 of Text) 
Estimated Estimated 
Project Federal Cost Non-Federal Cost 
Fort Peck Lake, MT 1/, 2/ 158,428,000 1,103,000 
Garrison Dam, Lake Sakakawea, ND 1, 2/3/ 305,274,065 1,516,000 
Missouri River Levee System, IA, NE, KS and MO 
(Sioux City, IA to Rulo, NE) 1/ 37,931,000 4,618,000 
Oahe Dam-Lake Oahe, SD and ND 1, 2/ 346,521,000 2,320,000 
Big Bend Dam-Lake Sharpe, SD 1/,1/ 107,498,000 302,000 
Fort Randall Dam, Lake Francis Case, SD 1/, 2/ 199,066,000 1,609,000 
Gavins Point Dam, Lewis & Clark Lake, SD & NE 1, 2/ 49,617,000 137,000 
Gavins Point Dam, Lewis & Clark Lake, SD 
& NE-Relocation of Niobrara, NE 2/ 13,516,000 
Omaha, NE 2/ 5,904,000 362,000 
Council Bluffs, IA 2/1 2,558,000 146,000 
Missouri River, Garrison Dam to Lake Oahe, ND 2/ 9,413,000 270,000 
Cherry Creek Lake, CO 1/, 2/ 15,220,000 285,000 
1/ Details presented on Individual report. 2/ Completed. 3/ Active portion of project. 
26-37

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 264 (See Section 25 of Text) 
Location Month Inspected 
Montana 
Beaver Creek, Saco Sep 99 
* Clyde Park, Shields River Aug 92 
Glasgow, Milk River Sep 97 
Havre, Milk River Sep 98 
Havre, Scott Coulee-Bull Hook Dam Sep 98 
Three Forks, Lower Madison River Sep 92 
Forsythe, Yellowstone River Sep 99 
West Glendive, Yellowstone River Sep 99 
Sun River,Vaughn Sep 98 
* Yellowstone River, Water Plant, Livingston Oct 96 
Sun River, Great Falls Sep 98 
* Milk River, Malta (Sewer Line) May 96 
* Yellowstone River, Livingston (N.E. Livingston Bridge) Sep 99 
* Milk River, Chinook (Finley Bridge) Oct 96 
* Battle Creek, Chinook (Uhruh Bridge) May 99 
* East Gallatin, Near Bozeman (Intst Bridge) Sep 99 
* Yellowstone River, Near Livingston (Hwy 89 -7 Miles East of Livingston) Sep 99 
* Shields River, Near Livingston (Hwy 89) Sep 99 
* Teton River, Near Choteau (Hwy 89) Sep 98 
* Madison River, Quake Lake Sep 99 
* Milk River, Malta May 94 
Missouri River, Bank Stabilization Project, Frazer Sep 94 
* Dearborn River - Hwy 287, Wolf Creek Sep 98 
* Muddy Creek - Int Hwy 15 - Frontage Road, Vaughn Sep 98 
* Badger Creek - Hwy 89, Browning Sep 98 
Wyoming 
* Baldwin Creek, Lander (Sewage Lagoons) Sep 99 
Greybull, Big Horn River Sep 99 
Sheridan, Big and Little Goose Creeks Sep 99 
* Shoshone River, Bank Protection, Lovell Aug 92 
* Shoshone River, Byron Oct 98 
* Powder River, Arvada Oct 98 
* Medicine Bow River, Elk Mountain Jan 97 
North Dakota 
Mandan, Lower Heart River Oct 96 
Marmarth, Little Missouri River May 99 
Scranton, Buffalo May 99 
* Cannonball River Oct 97 
* Denotes Section 14 Projects 
** Denotes PL-84-99 Projects 
26-38

OMAHA, NE DISTRICT 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 26-J (Continued) (See Section 25 of Text) 
Location Month Inspected 
South Dakota 
Big Sioux River, Union County Jul 99 
Big Sioux River, North Sioux City Jul 99 
Sioux Falls, Big Sioux River Jul 99 
Belle Fourche, Belle Fourche River Aug 99 
Rapid City, Cedar Canyon Dam Sep 99 
Hot Springs, Fall River Channel Sep 99 
Herreid, Spring Creek Sep 95 
* Missouri River, Bank Protection, Greenwood Sep 93 
* Bad River, Bank Protection, Fort Pierre 
* Big Sioux River, Schofield Bridge, Near Flandreau Jun 99 
* Rapid Creek, Rapid City Sep 99 
* Missouri River, Sacred Heart Hospital, Yankton Aug 97 
* Vermillion River, Vermillion Jun 99 
* Big Sioux River, Harrisburgh Jun 99 
* Big Sioux River, Jefferson Aug 98 
Deadman Gulch, Sturgis Aug 99 
* Marne Creek, Yankton Jun 99 
* White River, Winner Oct 96 
* James River, Yankton Jun 99 
* Missouri River, White Swan & Sunshine Bottoms Aug 98 
* Big Sioux River, Plymouth County Jun 99 
Colorado 
Aurora, Westerly Creek-Kelley Road Dam May 99 
* South Platte River, Kersey Aug 99 
* South Platte River, Merino Sep 99 
* South Platte River, Iliff Sep 99 
* South Platte River, Platteville Sep 99 
* Big Thompson River, Johnstown Aug 99 
* Cache La Poudre River, Ft. Collins (Water Treatment Plant) Sep 96 
* South Platte River, Fort Lupton Hwy 85 Aug 99 
* South Platte River, Logan County (Bridges 175A & 173) Sep 99 
* Downstream Chatfield, Denver Jun 99 
Nebraska 
* Blackbird Creek, Burt County May 97 
Omaha, Missouri River Sep 97 
Waterloo, Elkhomrn River May 99 
West Point, Elkhorn River May 99 
Pierce, Elkhorn River May 99 
Clarkson, Middle Fork, Maple Creek Jun 99 
Hooper, Elkhorn River Jul 99 
Norfolk, North Fork, Elkhomrn River May 99 
Madison, Union & Taylor Creeks May 99 
Schuyler, Lost Creek & Platte River Sep 99 
Little Papillion, Little Papillion Creek Aug 96 
* Denotes Section 14 Projects 
** Denotes PL-84-99 Projects 
26-39

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 264 (Continued) (See Section 25 of Text) 
Location Month Inspected 
Nebraska (continued) 
Macy, Blackbird Creek May 99 
Lincoln, Salt Creek & Tributaries Mar 99 
Meadow Grove, Buffalo Creek May 99 
Columbus, Loup River Aug 99 
'Broken Bow, Mud Creek Aug 99 
* Platte River, Brady Feb 95 
* Elm Creek, Decatur Nov 98 
* Nebraska City South Table Creek Jul 99 
* Wigle Creek, Homer Dec 98 
* South Elkhorn River, near Ewing, NE May 99 
* Elk Creek, Jackson Dec 98 
* Elk Creek, Willis Dec 98 
Flood Control Project, Lost Creek, Columbus Aug 99 
* Middle Pebble Creek, Snyder Nov 98 
* Elm Creek, Burt County Apr 98 
* Platte River, Camp Ashland Nov 98 
* West Branch Papillion Creek, Omaha, NE Dec 98 
* Logan Creek, Near Bancroft Dec 98 
* Platte River, Near North Bend Aug 98 
* Elkhorn River, Near Beemer Nov 98 
* East Bow Creek, Wynot Jun 99 
* Cedar River, Spalding Aug 97 
** Ames Diking District near Ames Aug 98 
** North Bend Diking District Aug 98 
** Cottrelle Diking District Jul 99 
** Fremont County Bd of Sup Winslow Levee Jul 99 
** Fremont County Bd of Sup Bowman, Zach, Roth Jul 99 
** Fremont County Bd of Sup Peterson Jul 99 
** Clear Creek Diking District Jul 99 
** SID # 1 Lake Waconda Jul 99 
** SID #97 Hawaiian Village Jul 99 
** SID #101 Hansen Lake Jun 99 
** PMRNRD Western Feb 98 
** PMRNRD Cape-L Str May 98 
** LPSNRD Omaha Fish Jan 98 
** PMRNRD Union Dike Sep 98 
** PMRNRD No Name Jul 99 
** Coming Levee Dist #2 Mill Creek D.D. Jul 99 
** Fremont Co. Bd. of Sup. Whitehead Levee Jul 99 
* Lodgepole Creek, Sydney Sep 99 
Gering Drain, Gering Sep 99 
* Denotes Section 14 Projects 
** Denotes PL-84-99 Projects 
26-40

OMAHA, NE DISTRICT 
INSPECTION OF COMPLETED LOCAL PROTECTION PROJECTS 
TABLE 264 (Continued) (See Section 25 of Text) 
Location Month Inspected 
Iowa 
Council Bluffs, Missouri River Oct 99 
Ida Grove, Maple River-Odebolt Creek Aug 99 
Sioux City, Floyd River Aug 99 
Hawarden, Dry Creek Aug 99 
Hamburg L575, Nishnabotna River May 98 
Intercounty D.D., Little Sioux River Sep 99 
Nagel D.D., Little Sioux River Sep 99 
Bennett-McDonald-Smithland D.D., Little Sioux River Sep 99 
* West Nishnabotna River, Mills County Bridge, Near Malvem Jul 99 
* East Nisbnabotna River, Page County Bridge, Near Essex Jul 99 
East Nishnabotna River, Red Oak Aug 98 
* Mucky Creek, Mapleton, IA Dec 98 
Emerson, Indian Creek, Mills County Aug 98 
Monona-Harrison Ditch Control, Monona County Sep 99 
* Little Sioux River, Anthon Dec 98 
* Keg Creek, Minden Jul 99 
* Soldier River, Near Ute Sep 98 
Missouri River Levees 
L624 & L627, Mosquito Creek & Sieck Levees Oct 96 
L601, Watkins Levee District Apr 99 
L601, Miller-Sturgeon Levee District Apr 99 
L601, Missouri River Levee District #1 Apr 99 
L594, Waubansie Drainage District Apr 99 
L594, Pleasant Valley Levee District Apr 99 
L575, Benton-Washington Levee District Mar 99 
L575, Northwest Atchison Levee District May 98 
L575, McKissock Island Levee District May 98 
L575, Bucbannan Levee District May 98 
L561, L550, L536, Atchison County Levee District May 99 
L611-614, M & P Missouri River Levee District Sep 99 
R613, Papio Natural Resources District Aug 96 
R548, Little Nemaha Levee District May 99 
R520, Richardson Co. Levee Dist. #8 Sep 99 
R573, Otoe County Drainage Dist. #2 Jun 99 
R616, Sarpy County Papio Natural Resources District Aug 96 
R562, Peru Levee District Sep 99 
R548, Brownville-Nemaha Levee District May 99 
* Denotes Section 14 Projects 
"* Denotes PL-84-99 Projects 
26-41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
ACTIVE GENERAL INVESTIGATIONS 
TABLE 26-K (See Section 48 of Text) 
Federal Cost Totals By 
Item Fiscal Year 99 Subtotal and Category 
SURVEYS (Category 100) 
Flood Damage Prevention Studies (120) 
Reconnaissance Study (121) 
Indian Creek, Council Bluffs, IA 60,182 
Feasibility Study (121) 
Chatfield, Cherry Creek & Bear Creek, CO ( 422) 
Antelope Creek, Lincoln, NE 150,027 
Lower Platte River and Tribs., NE 464,166 
Subtotal 673,953 
Special Studies (140) 
None in FY 99 
Review of Authorized Projects (160) 
Review of Completed Projects: Recon. Study (163) 
Chatfield, Cherry Creek & Bear Creek, CO 19,801 
Review of Completed Project: Feasibility Study (164) 1,838 
Subtotal 21,639 
Miscellaneous Activities (170) 
Special Investigations (171) 142,501 
FERC Licensing Activities (172) 0 
Interagency Water Resources Development(173) 32,685 
North American Waterfowl Management Plan(176) 2,013 
Subtotal 177,199 
Coordination Studies with Other Agencies (180) 
Cooperation With Other Water Resources Agencies (181) 21,243 
Cooperation with States (186) 274,817 
Subtotal -296,060 
TOTAL (Category 100) 1,168,851 
COLLECTION AND STUDY OF BASIC DATA (Category 200) 
Flood Plain Management Services (250) 506 
Flood Plain Management, Omaha, NE 47,040 
National Flood Proofing Cmet (NFPC) 8,514 
Quick Responses (250) 5,991 
SS -May Creek, Bismarck, ND 6,738 
SS -Big Sioux River, Esteline, SD 0 
SS -N. Fork, Elkhorn River, CO 8,383 
SS - Montgomery County, IA 2,191 
SS - Butler County, NE 1,942 
SS - Polk, NE 1,280 
SS- Johnson County, KS 0 
SS - South Platte River, CO 141 
SS - Heart River, Morton County, ND 3,992 
SS - Winslow, NE, Nonstructural F.H. 29,981 
SS - Glendive, MT 28,739 
SS - Parkston, SD 12,844 
SS -Roundup, MT 13,141 
SS - Blackbird, Macy, NE 15,057 
SS - Little Sioux River, Anthon, IA 22,838 
Technical Services, General (250) 60,016 
Hydrologic Studies (260) 
General Hydrologic Studies (262) 33,441 
TOTAL (Category 200) 302,775 
26-42

OMAHA, NE DISTRICT 
ACTIVE GENERAL INVESTIGATIONS 
TABLE 26-K (Continued) (See Section 48 of Text) 
Federal Cost Totals By 
Item Fiscal Year 99 Subtotal and Categories 
PRECONSTRUCTION ENGINEERING AND DESIGN - 
PROJECTS NOT FULLY AUTHORIZED (Category 400) 
Wood River, Grand Island, NE (451) 
Big Sioux River, Sioux Falls, SD (451) 
Watertown and Vicinity, SD (451) 
TOTAL (Category 400) 
GRAND TOTAL GENERAL INVESTIGATIONS 
0 
107,265 
64,378 
171,643 
1,643,269 
26-43

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
FLOOD CONTROL ACTIVITIES UNDER SPECIAL AUTHORIZATION 
TABLE 26-L (See Section 27 of Text) 
Fiscal Year 99 
Project Name Stage Cost 
Flood Control and Coastal Emergencies 
Disaster Preparedness (100) - 509,399 
Emergency Operations (200) - 125,376 
Rehabilitation & Inspection Program (300) - 670,698 
Emergency Water Supplies & Drought Assistance (400) - 0 
Advance Measures (500) - 23,712 
Hazard Mitigation (600) - 2 
Support for Others 682,013 
Total (FCCE) 2,011,200 
Section 205: 
Logan Creek, Pender, NE C 1,038,621 
Aberdeen & Vicinity, SD C 327,226 
Maple Creek East Fork, Howells, NE C 12,811 
Milk River, Malta, MT C 6,816 
Nishnabotna River, Hamburg, IA C 606,611 
Pebble Creek, Scribner, NE C 547 
Salt Creek, Levees, Lincoln, NE F ( 12,935) 
Van Bibber Creek, Arvada, CO P 77,515 
James River, Jamestown, ND F 16,746 
Iowa & South Creeks, Ponca, NE F 66,342 
Denison, IA F 38,005 
Verdigre, NE F 41,059 
Burt & Washington County, NE F 17,931 
Livingsto, MT F 21,384 
Cold Brook Creek, Hot Springs, SD F 14,922 
Total (Section 205's) 2,273,601 
Section 14: 
MO River, Richland County Road 152, MT C 9,110 
Little Missouri River, E. River Rd., Medora, ND C 90,393 
James River Rd. (CR 213), SD C 102,831 
Cache La Poudre, CO PDA 29,908 
Coulson Park Landfill, Billings, MT PDA 30,371 
Total (Section 14's) 262,613 
Total Flood Control Activities $4,547,414 
L = Litigation 
R = Recon 
P = Plans & Specs 
C = Construction 
F = Feasibility 
= Does Not Apply 
PDA = Planning & Design Analysis (Section 14 only) 
26-44

OMAHA, NE DISTRICT 
TABLE 26-M PROJECT MODIFICATIONS FOR IMPROVEMENT OF ENVIRONMENT 
Modification of projects for the purpose of Improving 
the quality of the environment in the public interest. 
(Section 1135, Public Law 99-662, 99th Congress, as amended.) 
Fiscal Year 99 Fiscal Year 99 
Study/Project and Location Federal Funds Expended Contributed Funds Expended 
California Bend, NE 30,543 
Hidden Lake Restoration, NE 8,126 15,794 
Lower Decatur Bend, NE 135,983 
Boyer Chute, NE 12,663 . 
Missouri River Levee Unit L536 
Deroin Bend, MO 32,764 
Wehrspann, Lake Aquatic, NE 1,270,323 
Coordination Account Funds 12,328 303,376 
Initial Appraisals, General, NE 21,166 - 
26-45

KANSAS CITY, MO, DISTRICT *
The district comprises a portion of southwestern Iowa; northwestern, central and 
western Missouri; northern Kansas; southern Nebraska; and a portion of northeastern 
Colorado embraced in drainage basin of the Missouri River and tributaries from Rulo, 
Nebraska, to the mouth. Report on navigation project for section of Missouri River 
from Sioux City, Iowa, to Rulo, Nebraska, is in report of Omaha District. 
IMPROVEMENTS 
Navigation 
1. Missouri River, Sioux City,IA to 
Mouth (Rulo, NE, to Mouth) 
2. Missouri River Fish and Wildlife 
Mitigation,IA,NE,KS, and MO 
General Investigations 
30. General Investigations 
Page 
27-2 
27-2 
Flood Control 
3. Blue River Basin, Kansas City,MO 27-2 
4. Blue River Channel, Kansas City,MO 27-3 
5. Brush Creek, Kansas City, MO 27-3 
6. Clinton Lake, Wakarusa River, KS 27-3 
7. Harlan County Lake, Republican 
River, NE 27-3 
8. Hillsdale Lake, Big Bull Creek,KS 27-4 
9. Kanopolis Lake, Smoky Hill River,KS 27-4 
10. Little Blue River Lakes, MO 27-4 
11. Long Branch Lake, Little Chariton 
River, MO 27-5 
12. Melvern Lake, Marais des Cygnes 
(Osage) River, KS 27-5 
13. Milford Lake, Republican River, KS 27-5 
14. Missouri River Levee System, IA, NE, 
KS, and MO (Rulo, NE, to Mouth) 27-5 
15. Perry Lake, Delaware River, KS 27-6 
16. Pick-Sloan Missouri Basin Program 
(Kansas City Dist.) 27-6 
17. Pomme de Terre Lake, Pomme de Terre 
River, MO 27-6 
18. Pomona Lake, One Hundred Ten Mile 
Creek, KS 27-6 
19. Rathbun Lake, Chariton River, IA 27-7 
20. Smithville lake, Little Platte 
River,MO 27-7 
21. Turkey Creek Basin, KS & MO 27-7 
22. Tuttle Creek Lake,Big Blue River,KS 27-7 
23. Wilson Lake, Saline River,KS 27-8 
24. Scheduling of Flood Control 
Reservoir Operations 27-8 
25. Inspection of Completed Flood 
Control Projects 27-8 
Multiple Purpose Projects Including Power 
26. Harry S. Truman Dam and Reservoir, 
Osage River, MO 2 
27. Stockton Lake, Sac River, MO 2 
Work Under Special Authorities 
28. Continuing Authorities Program 2 
29. Emergency Response Activities 2 
27-10 
Other Activities 
31. Mississippi River Main Stem 
Model Development 
32. National Emergency Preparedness 
33. Missouri River Basin Collaborative 
Effort 
34. Regulatory Program 
27-10 
27-10 
27-10 
27-10 
Tables 
Table 27-A Cost & Financial Statement 27-12 
Table 27-B Authorizing Legislation 27-16 
Table 27-C Other Authorized Navigation 
Projects 27-22 
Table 27-D Not Applicable 
Table 27-E Other Authorized Flood Control 
Projects 27-23 
Table 27-F Not Applicable 
Table 27-G Deauthorized Projects 27-25 
Table 27-H Missouri River Levee System 27-29 
Table 27-I Kansas City District Projects 
Included in Pick-Sloan 
Missouri Basin Program 27-30 
Table 27-J Inspection of Completed Flood 
Control Projects 27-31 
Table 27-K Work Under Special Authorities 
Continuing Authorities Program27-32 
Aquatic Ecosystem Restor 27-33 
Project Modifications for 
Improvement of Environment 27-33 
Emergency Response Activities 27-33 
Table 27-L Active General Investigations 27-35 
Table 27-M Regulatory Program 27-37 
27-8 
27-8 
27-9 
27-10 
27-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Navigation 
1. MISSOURI RIVER,SIOUX CITY, IA,TO 
MOUTH (RULO,NE,TO MOUTH) 
Location. Jefferson, Madison, and Gallatin Rivers conjoin 
at Three Forks, Montana, to form the Missouri River, which 
flows southeasterly 2,315 miles (1960 mileage) across or 
along seven states to the Mississippi River, 17 miles above 
St. Louis. For description see page 1149, Annual Report for 
1932. The river is commercially navigable from Sioux City, 
Iowa, to the mouth, a distance of 732 miles. The portion of 
project in Kansas City District extends from Rulo, Nebraska, 
to the mouth, a distance of 498 miles. 
Previous Projects. For details see page 1891 of Annual 
Report for 1915, and pages 1153 and 1175 of Annual Report 
for 1938. 
Existing Project. A channel of 9-foot depth and width not 
less than 300 feet, obtained by revetment of banks, 
construction of permeable dikes to contract and stabilize the 
waterways, cutoffs to eliminate long bends, closing minor 
channels, removal of snags, and dredging as required. The 
improved reach within the Kansas City District extends from 
the mouth to Rulo, Nebraska, a distance of 498.4 miles. The 
Bank Stabilization and Navigation features of the project 
were completed in September 1980. For the reach from 
Rulo, Nebraska, to the mouth, the total construction cost was 
$237,943,190 including $8,665,594 for previous project. 
River access sites have been completed at 11 locations. 
Ordinary and extreme stage fluctuations are 16 and 38 feet, 
respectively. 
Local cooperation. Cooperation from benefited localities 
may be required where any improvement may confer special 
benefit. The receipt of contributions from private parties are 
to be expended along with Government funds upon 
authorized work where such work would be in the interest of 
navigation, as authorized by 1915 Rivers and Harbors Act. 
Secretary of the Army approved general principle of 
cooperative construction on Missouri River below Kansas 
City on basis that 25 percent of cost of any special 
installation shall be paid by the United States and 75 percent 
by local interests. Total contributed by local interests in 
cooperation with the United States from 1918 to June 30, 
1964, was $675,663, of which $8,647 was returned to 
contributors. Local interests must share in cost of recreation 
facilities in accordance with provisions of the Federal Water 
Project Recreation Act of 1965. Local interests have 
contributed $171,816 for cost sharing on construction of 
recreation in addition to constructing portions of the facility. 
Terminal facilities. A listing of terminal facilities are 
included in Missouri River Navigation Charts and can be 
obtained from Kansas City District Engineer for a small fee. 
Operations during fiscal year. Routine maintenance of 
dikes and revetments along the lower river was 
accomplished by contract. Field hired labor accomplished 
emergency construction of a flow control structure at the 
entrance of a newly formed chute. District personnel also 
accomplished other work items: Channel reconnaissance, 
stream gauging condition studies, surveys and mapping, 
engineering and design, surveys and layouts of construction, 
and supervision and administration. Project tonnage on the 
river for CY 1999 is estimated at 8.1 million tons, excluding 
waterway improvement materials. District estimates the 
recreation use on the Missouri River (NWK) at 1.2 million 
recreation days annually. 
2. MISSOURI RIVER FISH AND WILDLIFE 
MTIGATION,IA,NE,KS, and MO 
Location. This project extends along the Missouri River 
from Sioux City, Iowa, to the Mouth near St. Louis, a river 
distance of 732 miles. This location is coincident with the 
Bank Stabilization and Navigation Project on the river. 
Existing project. The project is to mitigate losses of fish 
and wildlife habitat resulting from construction and 
operation of the Missouri River Bank Stabilization and 
Navigation Project. The four major components of the plan 
are restoration of aquatic habitat on public and non-public 
lands (2,500 acres), preservation of aquatic habitat on public 
and non-public lands subject to the effects of riverbed 
degradation (700 acres), acquisition and development of 
existing undeveloped habitat on private lands (28,000 acres), 
and development of terrestrial wildlife habitat on existing 
undeveloped public lands (16,900 acres). Estimated fully 
funded cost of the project (1999) is $84,500,000, all Federal. 
Both the Kansas City and Omaha Districts are involved in 
the implementation of the project, with Kansas City District 
involvement directed mainly to sites in Kansas and Missouri. 
Local cooperation. There is no non-Federal sponsor for the 
project. The states of Iowa, Nebraska, Kansas, and Missouri 
are voluntarily serving on a coordinating team, which is 
actively involved in ongoing project activities. 
Operations during fiscal year. Funding was continued for 
land acquisition and construction of mitigation features. 
Land was purchased at the following sites: Blackbird- 
Tieville-Decatur, Iowa and Nebraska; Nottleman Island, 
Iowa; Berger Bend, Nishnabotna. Lower Hamburg, and 
Thurnau, Missouri. Design activities were also carried out at 
Blackbird-Tieville-Decatur, Iowa and Nebraska; and 
Overton Bottoms, Missouri. 
Flood Control 
3. BLUE RIVER BASIN, KANSAS CITY, 
MO 
Location. Along the left bank of the Blue River from U.S. 
Highway 71 upstream for a distance of about 1-1/4 miles in 
Jackson County, Missouri, to the Bannister Federal Complex 
levee. 
Existing project. The recommended project includes 
construction of approximately 1-1/4 miles in Jackson 
County, Missouri, to the Bannister Federal Complex levee. 
Existing project. The recommended project includes 
construction of approximately 1-1/4 miles of levee to 
27- 2

KANSAS CITY, MO, DISTRICT 
provide flood protection to 280 acres in the Dodson 
Industrial Area and surrounding area in Kansas City. 
Estimated Federal cost through construction of the project 
(2003) is $12,000,000, and estimated non-Federal cost of 
lands damages and relocations is $$5,100,000. 
Local Cooperation. The city of Kansas City provided a 
letter of assurance, dated November 17, 1995, officially 
stating its intent to cost share the project. 
Operations during fiscal year. Preconstruction 
engineering and design continues with preparation of the 
design memorandum and plans and specifications. 
4. BLUE RIVER CHANNEL, KANSAS CITY, 
MO 
Location. Along the Blue River and tributaries in Jackson 
County, Missouri. 
Existing Project. Preliminary plans consist of 12.5 miles of 
improved channel along the Blue River within Kansas City, 
Missouri. Estimated Federal cost through construction of 
the project (1999) is $211,000,000, and estimated non- 
Federal cost of lands, damages and relocations is 
$32,500,000.. 
Local Cooperation. Section 2, Flood Control Act of June 
22, 1936 applies. The City of Kansas City, Missouri, passed 
a resolution of intent on December 9, 1975 to provide the 
required assurances of local cooperation when requested. 
The Section 221 agreement was signed by the Kansas City 
District Engineer on September 8, 1983. 
Operations during fiscal year. All work on stages 1 and 2 
has been completed. The Stage 3 reach of the project 
consists of four construction contracts. The 12-19 tStreet 
contract is complete. The 19t h to Stadium Drive construction 
contract is nearing completion. The Plans and Specifications 
for the remaining two contracts have been initiated. 
Railroad alteration contracts in the Stage 3 reach with the 
Kansas City Southern and Burlington Northern Santa Fe 
Railroad Companies have been completed. One Union 
Pacific Railroad bridge has been completed and the design 
of the remaining three bridges is underway. 
5. BRUSH CREEK, KANSAS CITY, MO 
Location. A major tributary of the Blue River in Kansas 
City, Missouri, and Johnson County, Kansas, draining a 
highly urbanized 29-square-mile area in the two states. 
Existing project. The authorized project consists of 
improving about 7,500 feet of the channel from near 
Roanoke Parkway downstream to near Troost Avenue in 
Kansas City. At the request of the sponsor, Kansas City, 
Missouri, a modified project was built which provides 
identical flood protection, but which also accommodates 
park and recreation development in the authorized reach. 
Estimated fully funded Federal cost of the modified project 
(1996) is $14,464,000; and estimated non-Federal cost of 
lands, damages, and cash is $19,526,000. 
Local cooperation. The City of Kansas City and the Corps 
of Engineers entered into a Local Cooperation Agreement 
(LCA) on the project in March 1991. 
Operations during fiscal year. The dedication of the 
project was in June 1995. The project was turned over to the 
local sponsor in January 1997. 
6. CLINTON LAKE, WAKARUSA 
RIVER, KS 
Location. Damsite is on Wakarusa River about 4 miles 
southwest of Lawrence, in Douglas County, Kansas. The 
lake extends into Shawnee and Osage Counties, Kansas. 
Existing project. An earthfill dam about 9,250 feet long 
constructed to a height of about 114 feet with an 
uncontrolled spillway in left abutment. Total reservoir 
storage capacity 397,200 acre-feet (258,300 for flood 
control, 28,500 for sediment reserve, and 110,400 of 
multipurpose storage for municipal and industrial waste 
supply and recreation). Cost of constructing the completed 
project was $57,415,433. Construction was initiated in 
January 1972, and the project was placed in operation in 
November 1977. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938 applies. Reimbursement in the estimated amount 
of $6,768,000 is required for water supply storage in 
accordance with the Water Supply Act of 1958. A contract 
was signed by the State on September 6, 1978 and was 
approved by the Secretary of the Army on October 30, 1978. 
Utilization of storage was initiated in December 1979. 
Repayment also began at that time. 
Operations during fiscal year. Visitation for FY 1999 was 
7,154,149 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance and resurface roads. 
7. HARLAN COUNTY LAKE, 
REPUBLICAN RIVER, NE 
Location. Dam is on main stem of Republican River about 
235 miles above confluence of stream with Smoky Hill 
River. Site is in Harlan County, 1-1/2 miles south of 
Republican City and 13 miles west of Franklin, Nebraska. 
Existing project. An earthfill dam about 107 feet above 
streambed with a total length of 11,827 feet, including a 
gate-controlled, concrete, gravity-type spillway section near 
the center of dam. Reservoir provides storage capacity of 
850,000 acre-feet (500,000 for flood control and 350,000 for 
irrigation and sedimentation allowance). Initial cost of 
constructing the project was $45,279,532. Total Federal cost 
of project, including $1,017,623 for major rehabilitation 
work and $1,832,394 supplemental recreation development 
(Code 710), is $48,129,549. Construction of the project was 
initiated in August 1946. The project was placed in 
operation in December 1952. Major rehabilitation work was 
completed in FY 1968. 
27- 3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 1999 was 
7,233,073 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
Study of future operation. The Study of Future Operation 
at Harlan County Lake was delayed in FY 1996, FY 1997, 
and FY 1998 pending receipt of revised hydrology analyses 
and revised operation studies and revised operation studies 
from the Bureau of Reclamation (BOR). The purpose of the 
study is to develop an operating plan to serve the best public 
interest for Harlan County Lake under depleted inflow 
conditions. The study remains on hold; however, 
coordination with the BOR continues and we continue to 
provide input into BOR's Republican River Basin EIS as a 
cooperating agency. We also respond to requests from 
Department of Justice (DOJ) on the Kansas and Nebraska 
lawsuit on the Republican River Compact. 
8. HILLSDALE LAKE, BIG BULL 
CREEK, KS 
Location. The project is located approximately 12 miles 
above the mouth of Big Bull Creek, a tributary of the Marais 
des Cygnes River and about 2 miles west of Hillsdale, in 
Miami County, Kansas. 
Existing project. An earthfill embankment about 11,600 
feet long (including approximately 3,300 feet of dike 
section) about 75 feet above rising valley flood plain. The 
spillway is gravity type uncontrolled and the outlet works 
are controlled. The total reservoir storage capacity is 
160,000 acre-feet (81,000 for flood control, 11,000 for 
sediment reserve, and 68,000 for multipurpose storage for 
water supply, water quality control, and recreation). 
Construction was initiated in December 1974, and the 
project was placed in operation in October 1981. Federal 
cost of construction was $64,161,400. 
Local cooperation. Section 2, Flood Control Act 1938, 
applies. Local interests must make reimbursement of 
$21,145,338 for water supply storage in accordance with 
Water Supply Act of 1958. The Kansas Water Resources 
Board signed a contract in January 1974, approved by the 
Secretary of the Army in April 1974, for the entire 53,000 
acre-feet of water supply storage. The Kansas Department 
of Wildlife and Parks has s 50-year lease on 12,880 acres for 
management of land and water areas for public park, 
recreational, and fish and wildlife purposes. 
Operations during fiscal year. Visitation for FY 1999 was 
1,116,011 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
9. KANOPOLIS LAKE, SMOKY 
HILL RIVER, KS 
Location. The dam is on the Smoky Hill River about 184 
river miles above the mouth of the stream, and about 11 
miles northwest of Marquette, Kansas. 
Existing project. An earthfill dam about 131 feet above 
streambed, having a total length of 15,360 feet, including 
4,070 feet of dike section on the left abutment and 2,550 feet 
of dike section on right abutment. The reservoir provides 
storage capacity of 450,000 acre-feet, (400,000 for flood 
control and 50,000 for recreation and streamflow 
regulation). Outlet works and spillway are in right 
abutment. Initial cost of constructing the project was 
$12,327,735. Total Federal cost of project, including 
$249,492, supplemental recreational development (Code 
710), was $12,577,227. Construction was initiated in June 
1940, and project was placed in operation in May 1948. 
Local Cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 1999 was 
1,612,972 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
10. LITTLE BLUE RIVER LAKES,MO 
Location. This project consists of two lakes in Jackson 
County, Missouri, located in Kansas City, Missouri, and 
suburban communities. The Blue Springs Lake site is on the 
East Fork of the Little Blue River about mile south of U,S. 
Highway 40, and the Longview Lake site is on the main 
stem at approximately 109t Street. 
Existing Project. The Blue Springs dam is an earthfill 
embankment about 2,500 feet long and rising about 78 feet 
above the streambed, with an uncontrolled service spillway 
and uncontrolled outlet conduit. The total reservoir storage 
capacity is 26,600 acre-feet (15,700 for flood control, 10,600 
for multipurpose storage for water quality and recreation, 
and 300 for sedimentation). 
The Longview dam is an earthfill embankment about 1,900 
feet long and rising about 120 feet above the streambed, with 
an uncontrolled service spillway and an uncontrolled outlet 
conduit. The total reservoir storage capacity is 46,900 acrefeet 
(24,300 for flood control and 20,600 for multipurpose 
storage for water quality and recreation, and 2,000 for 
sedimentation). Federal cost (1992) for both lakes through 
construction of the project was $140,809,200. Construction 
was initiated in September 1977, and the project became 
operational in September 1988 
Local cooperation. Section 2 of the Flood Control Act of 
June 28,1938 applies. Local interest must share in separable 
costs allocated to recreation in accordance with Federal 
Water Project Recreation Act of 1965. The Jackson County 
Legislature approved a recreation cost-sharing contract on 
July 5, 1974, which was approved by the Secretary of the 
Army on June 24, 1976. A supplemental agreement, signed 
by Jackson County officials on June 5, 1978, and approved 
by the Secretary of the Army January 10, 1979, revised the 
existing contract to include additional costs involved in 
raising the multipurpose pool elevation at the Blue Springs 
Lake. Reimbursement for recreation was $15,047,000 of 
27- 4

KANSAS CITY, MO, DISTRICT 
which $450,000 was accomplished during construction by 
local interests. 
Operations during fiscal year. Project is complete. Land 
acquisition is complete. Visitation for FY 1999 was 
3,016,406 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
11. LONG BRANCH LAKE, LITTLE 
CHARITON RIVER, MO 
Location. The Damsite is on the East Fork Little Chariton 
River in north central Missouri about 2 miles west of Macon 
in Macon County. 
Existing project. An earthfill dam about 3,800 feet long 
and about 71 feet high with an uncontrolled outlet conduit 
and an uncontrolled service spillway in the right abutment. 
Total reservoir storage capacity is 65,000 acre-feet (29,000 
for flood control, 4,000 for sediment reserve, and 32,000 of 
multipurpose storage for water supply, water quality control, 
fish and wildlife, and recreation). Estimated Federal cost 
(1997) is $20,288,000, and estimated non-Federal cost is 
$3,605,000. Construction was initiated in March 1973. The 
project was placed in useful operation for flood control on 
September 1, 1980. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938 applies. Local interests must make reimbursement 
of $5,567,000 for water supply storage in accordance with 
Water Supply Act of 1958 and share in separable cost of 
$3,589,000 allocated to recreation in accordance with 
Federal Water Project Recreation Act of 1965. On 
September 15, 1972 the Secretary of the Army approved a 
contract signed by the City of Macon, Missouri, for water 
supply and recreation development. Missouri State agencies 
indicated their intent to sponsor future water supply and 
signed a contract on June 17, 1977 to sponsor recreational 
development in lieu of the City of Macon. After review by 
the Office of the Secretary of the Army, the state signed the 
contract in December 1979, and it was approved by the 
Secretary of the Army on April 18, 1980. Supplemental 
Agreement No. 1 to this contract was approved December 
28, 1993 to provide for additional recreational facilities. 
Additional facilities have been designed 
Operations during fiscal year. Visitation for FY 1999 was 
1,328,563 visitor hours. Project is.100 percent complete on 
scheduled work. The remaining unscheduled work is 
construction of recreation facilities. Maintenance: 
Activities consisted of ordinary operation and maintenance. 
12. MELVERN LAKE, MARAIS DES 
CYGNES (OSAGE) RIVER, KS 
Location. Damsite is on Marais des Cygnes (Osage) River 
in Osage County, Kansas, about 4 miles west of Melvernm, 
Kansas. 
Existing project. An earthfill dam about 9,700 feet long 
and about 98 feet high with an uncontrolled chute-type 
spillway in the left abutment. Total reservoir storage 
capacity is 363,000 acre-feet (200,000 for flood control, 
26,000 for sediment reserve, and 137,000 for multipurpose 
storage for water supply, water quality control, and 
recreation). Cost of constructing the completed project was 
$37,436,530. Construction was initiated in July 1967, and 
the project was placed in operation in August 1972. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Project storage was reallocated in 1989 to include 
municipal and industrial water supply in accordance with 
provisions of the Water Supply Act of 1958. In accordance 
with the provisions of the Memorandum of Understanding 
between the State of Kansas and the Department of the 
Army dated 1985, payment in full of $7,131,834 for 50,000 
acre-feet of water supply storage was made in March 1995. 
Utilization of storage for water supply was initiated in 
September 1993 under an interim contract and continues 
under the current contract signed in January 1995. 
Operations during fiscal year. Visitation for FY 1999 was 
6,200,482 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance and completion of 
connection to Rural Water District at Turkey Point Park. 
13. MILFORD LAKE, REPUBLICAN 
RIVER, KS 
Location. The Damsite is on the Republican River near the 
village of Alida about 10 miles above confluence of 
Republican and Smoky Hill Rivers which form Kansas 
River; and about 4 miles northwest of Junction City, Kansas. 
Existing project. An earthfill dam about 6,300 feet long 
and 126 feet high with an uncontrolled service-chute 
spillway in a saddle on right abutment. Total reservoir 
storage capacity is 1,160,000 acre-feet (700,000 for flood 
control, 160,000 for sediment reserve and 300,000 of 
multipurpose storage for water supply, water quality control, 
and recreation). Water supply storage is included in the 
project at the request of the Governor of Kansas under 
provisions of the Federal Water Supply Act of 1958. Initial 
cost of constructing the completed project was $48,268,843. 
Total Federal cost of project, including $1,297,649 
supplemental recreational development (Code 710), was 
$49,566,492. Construction was initiated in July 1961. The 
project was placed in operation in June 1965. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must make reimbursement of 
$12,162,134 for water supply storage in accordance with 
Water Supply Act of 1958. Utilization of storage for water 
supply was initiated in October 1984. Reimbursement was 
initiated, at the option of the State, in September 1976. 
Operations during fiscal year. Visitation for FY 1999 was 
4,556,377 visitor hours. Maintenance: Activities included 
ordinary operation and maintenance and tornado damage 
repair in the Rolling Hills Park. 
14. MISSOURI RIVER LEVEE SYSTEM 
IA, NE, KS AND MO 
(RULO, NE, TO MOUTH) 
27- 5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Location. On both banks of the Missouri River from Sioux 
City, Iowa, about 760 miles to the mouth near St. Louis, 
Missouri. The portion of the project in Kansas City District 
extends from Rulo, Nebraska, 498 miles to mouth. 
Existing project. A series of levee units and appurtenant 
works along both sides of Missouri River from Sioux City, 
Iowa, to the mouth, for protection of agricultural lands and 
small communities against floods. Estimated fully funded 
(1999) for the active portion of the project from Rulo, 
Nebraska, to mouth is $132,238,000, including $96,612,000 
Federal and $21,860,000 non-Federal contributions, and 
costs of $13,766,000 for lands and damages are to be borne 
by local interests. Remaining portion of project consists of 
units on which planning and construction are being delayed 
pending restudy to assure that additional levee construction 
is economically justified. Current cost estimate for deferred, 
inactive, and deauthorized portion of project Rulo, 
Nebraska, to mouth is $168,865,000 (1964, 1986, and 1987 
price levels), of which $153,233,000 is Federal cost for 
construction and $15,632,000 for lands and damages to be 
borne by local interests. Construction of the project was 
initiated in June 1948. 
Local cooperation. Section 3, Flood Control Act of 1936 
applies. Fully complied with for all completed units and 
units under construction. Local sponsors provide all 
operation and maintenance. 
Operations during fiscal year. Status of individual units of 
active portion at end of fiscal year is shown in Table 27-H 
on Missouri River Levee System. Unit L385 was approved 
for construction in FY 1994. Planning on Unit L142 
continued. The Project Cooperation Agreement on Unit 
L385 was executed September 23,1997. 
15. PERRY LAKE, DELAWARE 
RIVER, KS 
Location. The Damsite is on the Delaware River about 5 
miles above the mouth in Jefferson County, and about 3 
miles northwest of Perry, Kansas. 
Existing project. An earthfill dam about 7,750 feet long 
constructed to an elevation about 95 feet above valley floor 
with gated-outlet works and an uncontrolled spillway in left 
abutment. Total reservoir storage capacity is 770,000 acrefeet 
(480,000 for flood control, including 140,000 for 
sediment reserve and 150,000 of multipurpose storage for 
water supply, water quality control, and recreation). Water 
supply storage is included in the project plan at the request 
of the State of Kansas under provisions of the Federal Water 
Supply Act of 1958. Initial cost of constructing the 
completed project was $48,371,706. Total Federal cost of 
project, including $724,212 supplemental recreational 
development (Code 710), is $49,095,918. Construction was 
initiated in March 1964, and the project was placed in 
operation in January 1969. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Local interests must make reimbursement of 
$8,551,805 for water supply storage in accordance with 
Water Supply Act of 1958. Utilization of storage for water 
supply was initiated in October 1991. Reimbursement was 
initiated at the option of the State in September 1978. 
Operations during fiscal year. Visitation for FY 1999 was 
5,658,314 visitor hours. Maintenance: Activities included 
ordinary operation and maintenance. 
16. PICK-SLOAN MISSOURI BASIN 
PROGRAM (KANSAS CITY DIST.) 
Location. Flood control improvements included in this 
project are on and along the Missouri River and several of its 
principle tributaries, in states comprising the Missouri River 
Basin. 
Existing project. The Pick-Sloan Missouri Basin program 
for flood control and other purposes in Missouri River Basin 
provides for levees along Missouri River between Sioux 
City, Iowa, and the mouth, flood-protection works at certain 
municipalities, and reservoirs on main stem of Missouri 
River and on tributaries for control of flooding. (See Table 
27-B for authorizing legislation and Table 27-I on Kansas 
City District projects included in Pick-Sloan Missouri Basin 
program.) See individual project reports. 
17. POMME DE TERRE LAKE 
POMME DE TERRE RIVER, MO 
Location. The dam is on the main stem Pomme de Terre 
River, about 44 miles above the mouth in Hickory County, 
Missouri. The lake extends upstream into Polk County, 
Missouri. The site is about 4 miles south of Hermitage, 
Missouri, and 20 miles north of Bolivar, Missouri. 
Existing project. An earth and rockfill dam about 4,630 
feet long constructed to about 155 feet above riverbed and a 
dike section on left abutment about 2,790 feet long, 
providing storage capacity of 650,000 acre-feet (407,000 for 
flood control and 243,000 for sedimentation and multipurpose). 
Initial cost of constructing the complete project 
was $14,946,784. Total Federal cost of project, including 
$329,140 area redevelopment and $2,089,529 supplemental 
recreational development (Code 710), is $17,365,453. 
Construction was initiated in January 1957, and the project 
was placed in useful operation in October 1961. 
Operations during fiscal year. Visitation for FY 1999 was 
16,181,124 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
18. POMONA LAKE, ONE HUNDRED 
TEN MILE CREEK, KS 
Location. The dam is on One Hundred Ten Mile Creek, a 
tributary of Marais des Cygnes (Osage) River, 7 miles above 
mouth of stream in Osage County, Kansas, about 8 miles 
northwest of Pomona, Kansas, and 34 miles upstream from 
Ottawa, Kansas. 
27- 6

KANSAS CITY, MO, DISTRICT 
Existing project. An earthfill dam 7,750 feet long 
constructed to an average height of about 85 feet above 
streambed, with gated-outlet works and an ungated chutetype 
spillway near left abutment. Total reservoir storage 
capacity is 230,000 acre-feet (160,000 for flood control, 
14,000 for sediment reserve, and 56,000 of multipurpose 
storage for water quality control, and recreation). Initial cost 
of constructing the completed project was $13,272,108. 
Total Federal cost of project, including $731,130 
supplemental recreational development (Code 710), was 
$14,003,238. Construction began in July 1959, and the 
project was placed in operation in October 1963. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. Pomona has water supply reimbursement under 
Water Supply Act of 1958 totaling $862,923. 
Operations during fiscal year. Visitation for FY 1999 was 
3,914,191 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
19. RATHBUN LAKE, CHARITON 
RIVER, IA 
Location. The Damsite is on the Chariton River about 7 
miles north of Centerville and 1 mile north of Rathbun, 
Appanoose County, Iowa. 
Existing project. An earthfill dam 10,600 feet long 
constructed to an elevation about 86 feet above valley floor, 
with gated-outlet works and an uncontrolled service chute 
with paved sill spillway about a mile upstream from left 
abutment. Total reservoir storage capacity is 552,000 acrefeet 
(339,000 for flood control, 24,000 for sediment reserve 
and 189,000 of multipurpose storage for navigation, water 
quality control, and recreation). Initial cost of constructing 
the project was $27,033,210. Total Federal cost of project, 
including $588,948 supplemental recreation development 
(Code 710), was $27,622,158. Construction of the project 
was initiated in September 1964 and completed in 
November 1969. The operating plan for this project was 
revised to reduce flood control releases during critical times 
of the year to allow local farmers better access during 
planting and harvesting and to facilitate field drainage and 
drying out. The revised plan has resulted in more frequent 
high pool elevations than anticipated, which has inundated 
roads and recreation facilities. A shoreline erosion study 
was accomplished; and a supplement to the master plan was 
approved, which resulted in relocation of recreation facilities 
and bank stabilization work to compensate for the higher 
lake levels. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Visitation for FY 1999 was 
5,754,431 visitor hours. Maintenance: Activities included 
ordinary operation and maintenance. 
20. SMITHVILLE LAKE, LITTLE 
PLATTE RIVER, MO 
Location. The Damsite is on the Little Platte River about 1 
mile northeast of Smithville and about 5 miles north of 
Kansas City, in Clay and Clinton Counties, Missouri. 
Existing project. Earthfill dam about 4,200 feet long and 
95 feet high with an uncontrolled service spillway. A dike 
about 2,400 feet long crosses a saddle in the left abutment. 
Total reservoir storage capacity is 246,500 acre-feet (92,000 
for flood control, 52,300 for sediment reserve, and 102,200 
of multipurpose storage for water supply, water quality 
control, and recreation). Cost of constructing the project 
was $87,685,314. Construction was initiated in November 
1973, and the project was placed in operation in March 
1982. 
Local cooperation. Section 2, Flood Control Act of June 
28, 1938 applies. Reimbursement of $24,000,000 will be 
required for water supply storage in accordance with Water 
Supply Act of 1958, and reimbursement of $7,500,000 will 
be required for recreation development in accordance with 
Federal Water Recreation Act of 1965. Additional non- 
Federal contribution for recreation amounts to $737,000. 
All contracts for local cooperation were approved by the 
Secretary of the Army on November 27, 1972. 
Operations during fiscal year. Visitation for FY 1999 was 
6,931,441 visitor hours. Maintenance: Activities consisted 
of ordinary operation and maintenance. 
21. TURKEY CREEK BASIN, KS & MO 
Location: The Turkey Creek Basin is a 23-square mile area 
within Kansas City, KS and suburbs in Johnson and 
Wyandotte Counties in Kansas. 
Existing Project. The recommended project is estimated to 
cost $42,875,000, with an estimated Federal cost of 
$25,596,000 and an estimated non-Federal cost of 
$17,279,000, including construction of channel modification 
and tributary flood water diversion. 
Local Cooperation. Latest evidence of sponsor support for 
design and construction is letters of support dated November 
1998 from Kansas City, Missouri and Kansas City, Kansas. 
Operations during fiscal year. The Preconstruction 
Engineering and Design (PED) agreement was executed 29 
March 1999. Completed hydrology, mapping, surveying, 
borings, and tunnel assessment. 
22. TUTTLE CREEK LAKE, 
BIG BLUE RIVER, KS 
Location. The dam is on the main stem of the Big Blue 
River, about 12 miles above the stream mouth in Riley and 
Pottawatomie Counties, Kansas. Site is about 5 miles north 
of Manhattan, Kansas. 
Existing project. An earth and rock dam 7,500 feet long 
and 157 feet high. Total reservoir storage capacity is 
2,346,000 acre-feet (1,933,000 for flood control, 228,000 for 
27- 7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
sediment reserve and 185,000 for multipurpose storage, for 
low-flow regulation, navigation, and recreation). Initial cost 
of constructing the completed project was $80,051,031. 
Total Federal cost of project, including $533,048 
supplemental recreational development (ode 710), was 
$80,584,079. Construction began in October 1952. Project 
was placed in Operation in July 1962. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operations during fiscal year. Visitation for FY 1999 was 
2,503,201 visitor hours. Maintenance: Activities included 
ordinary operation and maintenance. 
23. WILSON LAKE,SALINE RIVER,KS 
Location. The dam is on the Saline River about 130 miles 
above its mouth, near the eastern edge of Russell County, 
Kansas, about 50 miles west of Salina, 10 miles north of 
Wilson, and 20 miles east of Russell, Kansas. 
Existing project. An earthfill dam about 5,600 feet long 
and 160 feet high with a gated-outlet works, chute spillway, 
storage capacity is 776,000 acre-feet (511,000 for flood 
control, 40,000 for sediment reserve and 225,000 
multipurpose storage for irrigation, navigation, and low-flow 
regulation). Initial cost of constructing the project was 
$20,015,023. Total Federal cost of project, including 
$448,344 supplemental recreational development (Code 
710), was $20,463,367. Construction began in April 1961, 
and the project was placed in operation in December 1964. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 1999 was 
2,149,838 visitor hours. Maintenance: Activity included 
ordinary operation and maintenance. 
24. SCHEDULING OF FLOOD CONTROL 
RESERVOIR OPERATIONS 
Under sections 7 and 9, 1944 Flood Control Act, the Corps 
is responsible for detailed scheduling of operations 
concerning storage capacity reserved for or assigned to flood 
control in reservoirs constructed by Bureau of Reclamation 
as well as those constructed by the Corps. Fiscal Year costs 
were $301,000. 
25. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Flood Control Act of June 22, 1936, P.L. 738, and 
subsequent acts require local interests to furnish assurances 
that they will maintain and operate certain local protection 
projects after completion in accordance with regulations 
prescribed by the Secretary of the Army. District Engineers 
are responsible for administration of these regulations within 
boundaries of their respective district. (See Table 27-J on 
inspection of completed flood control projects.) 
Multiple Purpose Projects 
Including Power 
26. HARRY S. TRUMAN DAM AND 
RESERVOIR, OSAGE RIVER, MO 
Location. The Damsite is on the main stem of the Osage 
River about 1.5 miles northwest of Warsaw, Benton County, 
Missouri. Reservoir extends into Bates, Henry, Hickory, St. 
Clair, and Vernon Counties, Missouri. 
Existing project. An earthfill dam about 5,000 feet long 
constructed to an average height of about 96 feet above 
streambed, including a gate-controlled overfall spillway and 
a power installation consisting of six inclined pumpgenerating 
units with a combined generating capability of 
160,000 kilowatts. Total reservoir storage capacity is 
5,202,000 acre-feet (3,918,000 for flood control, 244,000 for 
sediment reserve, and 1,040,000 multipurpose storage for 
power, low-flow regulation, and recreation). The operating 
purposes of the project are flood control, hydroelectric 
power, water supply, recreation, and fish and wildlife. 
Public Law 91-267, approved May 26, 1970, authorized a 
change in project name from Kaysinger Bluff Dam and 
Reservoir, Osage River Basin, Missouri, to the Harry S. 
Truman Dam and Reservoir. Initial cost of constructing the 
completed project was $550,909,000. Construction of 
relocated Missouri Highway M-13 was initiated September 
1964 and completed May 1966. Construction of the dam 
and reservoir was initiated in October 1964. The project was 
operational for flood control in October 1979, and 
multipurpose pool was reached in November 1979. The first 
power unit was placed on line on December 22, 1979. 
Subsequent problems with the turbine bearings required 
remedial repair that was completed in FY 1999. Through 
September 1999, power generation totaled 5,360,082,000- 
kilowatt hours. Of the gross income from the sale of power 
by Southwestern Power Administration, $117,815,049 was 
allocated to the Corps of Engineers for project power 
operating costs, interest, and investment recovery. 
Local cooperation. Section 2, Flood Control Act of 1938 
applies. 
Operation during fiscal year. Visitation for FY 1999 was 
11,421,349 visitor hours. Project is complete. During FY 
1999, 536,889,000 kilowatt-hours of electrical power were 
generated. Maintenance activities consisted of ordinary 
operation and maintenance and completion of turbine repair. 
27. STOCKTON LAKE, SAC RIVER, MO 
Location. The Damsite is on the Sac River about 49.5 miles 
above its confluence with the Osage River, and about 1 mile 
east of Stockton, Cedar County, Missouri. The lake extends 
into Dade and Polk Counties. 
Existing project. A rock-shell dam with impervious core 
about 5,100 feet long constructed to an average height of 
about 128 feet, ----- with a gated overfall spillway and a 
45,200-kilowatt power installation. Total reservoir storage 
capacity is 1,674,000 acre-feet (774,000 for flood control, 
27- 8

KANSAS CITY, MO, DISTRICT 
25,000 for sediment reserve and 875,000 multipurpose 
storage for power and recreation). The authorized project 
purposes are flood control, hydroelectric power, water 
quality, water supply, recreation, and fish and wildlife. 
Initial cost of constructing the completed project was 
$75,715,300. Cost of the project, including $3,758,000 for 
downstream channel work and $502,057 for supplemental 
recreational development (Code 710), was $79,975,357. 
Construction was initiated in October 1963, and the project 
was placed in operation in December 1969. Power operation 
problems were encountered with the initial operation in 
March 1973 because the downstream channel did not have 
the capacity which earlier observations and computations 
indicated. As a result, it has been necessary to restrict the 
power operation to about the 30,000-kilowatt level. Rightof-
way for construction of a channel cutoff and bridge at 
Horseshoe Bend were acquired, and construction completed. 
Sloughing easements downstream to Caplinger Mills were 
acquired. Completion assured downstream channel capacity 
to Caplinger Mills of 8,000 c.f.s. for powerplant operation. 
Discharge in this range will accommodate power operations 
at a 39,500-kilowatt level. Through September 1999, power 
generation totaled 1,656,119,000 kilowatt-hours. Of the 
gross income from the sale of power by Southwestern Power 
Administration, $33,147,783 was allocated to the Corps of 
Engineers for project operating costs, interest, and 
investment recovery. 
Local cooperation. Section 2, Flood Control Act of 1938, 
applies. 
Operations during fiscal year. Visitation for FY 1999 was 
7,406,261 visitor hours. The project is complete and in 
operational status. During FY 1999, 57,641,000 kilowatthours 
of electrical power were generated. Maintenance: 
Activities consisted of ordinary operation and maintenance 
and rehabilitation and repair of powerplant bridge crane 
controls. 
Work Under Special Authorities 
28. CONTINUING AUTHORITIES 
Small Flood Control Projects Not Specifically 
Authorized by Congress (Sec. 205, 1948 Flood Control 
Act, Public Law 858, 80 th Cong., June 30, 1948, as 
amended). 
Each project selected must be complete in itself, 
economically and environmentally justified, and limited to a 
Federal cost of not more than $7 million. The local 
sponsoring agency must agree to provide without cost to the 
Department of the Army, all lands, easements, and rights-ofway, 
including highway bridge, and utility relocations and 
alterations; hold and save the Department of the Army free 
from damages; maintain and operate the project after 
completion; assume all project costs in excess of the Federal 
cost limit; and prevent future encroachments on improved 
channels. 
The non-Federal sponsors of Section 205 projects are 
required to pay 50 percent of all feasibility study costs over 
$100,000. For structural flood control projects, the sponsor 
must pay in cash during the construction at least 
5 percent of the construction cost. The sponsor's cash and 
other contributions must equal 35 percent of the total 
construction cost, but will not be required to exceed 50 
percent. 
There were no Section 205 projects under construction in 
Fiscal Year 1999. 
See Table K for expenditures under Section 205 during 
1999. 
Emergency Streambank Protection (Section 14, 1946 
Flood Control Act, Public Law 526, 79 th Cong., July 24, 
1946) as amended. 
Each project selected must be complete in itself, engineering 
feasible, economically justifiable environmentally 
acceptable, and limited to a Federal statutory cost of not 
more than $1,000,000. The local sponsoring entity must 
agree to provide without cost to the Department of the 
Army, all lands, easements, and rights-of-way, including 
highway, highway bridge, and utility relocations and 
alterations required for project construction; provide over the 
period of construction, an amount equal to not less than 35 
percent or more than 50 percent of total project cost, at least 
5 percent of which will be cash; operate, maintain, repair, 
replace, and rehabilitate the project upon completion; hold 
and save the Department of the Army free from damages 
arising from the construction, operation, and maintenance of 
the completed project; and assume all project costs in excess 
of the Federal statutory cost limit. 
Construction was completed on two projects in FY 1999 that 
will be financially completed in FY 2000, as follows: 
West Fork, Grand River, Route H Bridge, MO, and 
Muddy Creek, Grundy County, MO, Projects were 
completed and turned over to the sponsors in September 
1999. 
See Table 27-K for Emergency Streambank Protection 
expenditures during FY 1999. 
Project Modifications for Improvement of Environment 
(Section 1135, Water Resources Development Act of 
1986, Public Law 662, 99 th Cong., November 17, 1986). 
Section 1135 authorizes review of the operation of 
completed water resources projects to determine need for 
modifications for the purpose of improving environmental 
quality. 
No projects were completed in FY 1999. 
See Table 27-K for Section 1135 studies status and 
expenditures for FY 1999. 
Aquatic Ecosystem Restoration (Section 206, Water 
Resources Development Act of 1996, Public Law 303, 
10 4 th Cong., October 12, 1996). Section 206 authorizes 
small aquatic ecosystem restoration projects to improve the 
27- 9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
quality of the environment if in the public interest and cost 
effective. 
No projects were completed in FY 1999. 
See Table 27-K for Section 206 Studies status and 
expenditures for FY 1999. 
29. EMERGENCY RESPONSE 
ACTIVITIES 
A. Disaster Preparedness Program. The Disaster 
Preparedness Program (DPP) involves planning, training, 
inspection, supplies and equipment, and personnel. Planning 
activities involve development of District response and 
recovery plans in support of natural disasters. Current plans 
within the District include the District Flood Fight Plan, 
Emergency Operations Center Plan, Emergency Alert and 
Dismissal Plan, Emergency Operations and Disaster 
Assistance-Deployment Plan, as well as the District 
Corrective Action Plan. 
Training activities to support disaster preparedness this year 
included both internal and external training exercises as well 
as conferences with State and local officials. A Y2K District 
Response Plan was developed and a Y2K exercise was 
conducted prior to the rollover. 
Disaster preparedness includes maintaining the necessary 
supplies and equipment to support disaster response. To 
support flood fighting efforts and technical assistance to the 
state and local officials, an inventory is maintained of over 
1.5 million sandbags and, 40 pumps and sandbag filling 
equipment. 
Response operations included the October and November 
1998 Missouri River floods as well as the extended April 
through June 1999 flood event. A minor earthquake (3.0) 
also occurred in Kansas City, Kansas in May 1999 causing 
damage to a Federal floodwall. The District also deployed 
its Emergency Water Team and other personnel under the 
Corps' Federal Response Plan role in response to the 1999 
hurricanes in the southeast. 
B. Public Law 84-99. 
Rehabilitation of Flood Control Works. Several non- 
Federal and Federal levees were damaged as results of the 
October-November 1998 and the April-June 1999 floods. 
The District's efforts in repairing damaged flood control 
works totaled $1.9 million. Of that amount $924,729 was 
was a result of the flood events that occurred during the FY. 
The remainder of work effort was from the prior year events. 
C. Catastrophic Disaster Response Planning. 
New Madrid Seismic Zone Earthquake Planning. A 
New Madrid Earthquake exercise was conducted with the 
First and Fifth Army at Fort Riley, KS. The New Madrid 
Earthquake Operations Plan was updated to incorporate the 
initiatives of Readiness 2000. The District also developed 
the Cascadia Response and Recovery (Earthquake) Plan. 
General Investigations 
30. GENERAL INVESTIGATIONS 
Fiscal year 1999 costs totaled $2,195,492.31 for all General 
Investigations activities. See Table 27-L, which covers 
Surveys, Collection and Study of Basic Data and 
Preconstruction Engineering and Design expenditures in FY 
1999. 
Other Activities 
31. MISSISSIPPI RIVER MAIN STEM 
No activity within this appropriation this fiscal year. 
32. NATIONAL EMERGENCY 
PREPAREDNESS PROGRAM 
FY 1999 expenditures of $85,000 provided for activities 
required for local and national preparedness. 
33. MISSOURI RIVER BASIN 
COLLABORATIVE WATER 
RESOURCES, PLANNING/ 
PARTNERING PROCESS 
Missouri River Basin Association and the Corps will 
manage and facilitate the process of collaboration for some 
limited studies. The collaborative effort allows input from 
the states, tribes, and Federal agencies economic and 
environmental interest groups and the general public on both 
the operation issues, i.e. Master Manual, and nonoperational 
issues. In addition, the collaborative process 
could address recreation industry development, ecosystem 
management, streambank erosion, project mitigation, 
structural changes for endangered species, environmental 
monitoring tribal water rights, and support to navigation and 
agriculture. Fiscal Year costs were $75,682. 
34. REGULATORY PROGRAM 
Statutes. The Corps of Engineers is charged with 
protecting the public interest in all waters of the United 
States, including wetlands. This is accomplished through a 
Department of the Army permit program pursuant to Section 
10 of the Rivers and Harbors Act of 1899 and Section 404 of 
the Clean Water Act. 
Operations during Fiscal Year 1999. Kansas City District 
completed 2,392 permit actions during the year. Of the 114 
violations reported and evaluated this year, 102 were 
resolved by permits or voluntary restoration or 
administrative action. Special projects or emphases during 
the year included continued review of dredging data for all 
commercial dredgers on the Kansas River (18 sites); final 
monitoring report completed on impacts to endangered 
species from seven permits issued for gravel excavation on 
27 - 10

KANSAS CITY, MO, DISTRICT 
the Neosho River; development of an agreement with the 
Missouri Conservation Heritage Foundation for in lieu fee 
mitigation of stream impacts; participation in a St. Louis 
District lead development of the Lower Missouri River 
wetland mitigation bank; continued development of a 
wetland mitigation bank in Johnson County, Kansas; 
completed two merged Environmental Impact 
Statement/Section 404 of the Clean Water Act applications 
for Federal Highway Administration/Missouri Department 
of Transportation projects; continued development of a Lake 
of the Ozarks general permit and consultant training 
program; and continued agency coordination for the 
development of regional conditions for the Nationwide 
Permits. Fiscal Year costs totaled $2,306,662 for all 
regulatory activities. See Table M that shows expenditures 
for Permit Evaluation and Enforcement. 
27 - 11

KANSAS CITY, MO, DISTRICT 
TABLE 27-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 1999 
1. Missouri River. New Work: 
Sioux City, IA 
to Mouth (Rulo, 
NE, to Mouth) 
(Federal Funds) 
Contributed Funds 
Consolidated 
Summary 
2. Missouri River Fish 
& Wildlife Mitigation, 
IA, NE,KS & MO 
3. Blue River Basin 
Kansas City, MO 
4. Blue River Channel 
Kansas City, MO 
(Federal Funds) 
Contributed Funds 
Consolidated 
Summary 
5. Brush Creek, 
Kansas City, MO 
(Federal Funds) 
Contributed Funds 
Authorized Project 
Consolidated 
Summary 
6. Clinton Lake, 
Wakarusa 
River, KS 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp- 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
5,418,000 
5,460,049 
5,418,000 
5,460,049 
2,648,000 
4,503,381 
7,000 
6,914 
9,517,000 
13,672,495 
7,035,000 
1,611,274 
16,552,000 
15,283,769 
-50,000 
-78,417 
.233,000 
156,569 
-283,000 
78,152 
1,421,000 
1,414,590 
4,370,000 1/ 5,394,000 
5,006,345 5,499,400 
4,370,000 
5,006,345 
1,734,000 
1,860,790 
312,000 
309,974 
5,394,000 
5,499,400 
2,950,000 
2,917,728 
558,000 
537,624 
4,919,000 
5,385,141 
4,919,000 
5,385,141 
2,494,000 
2,426,721 
323,000 
340,417 
7,623,000 23,224,000 38,357,000 
7,598,503 23,229,700 38,339,550 
1,597,981 
-1,000,000 
1,909,237 523,944 
7,623,000 22,224,000 38,357,000 
9,196,484 25,138,937 38,385,470 
176,000 
196,529 
-25,027 
176,000 
171,502 
1,374,000 
1,391,356 
15,880 
-819,998 
117,582 
-819,998 
133,462 
1,498,000 
1,493,154 
3,684 
765,000 
333,510 
765,000 
337,194 
2,464,000 
2,469,000 
237,942,190 1/ 
237,942,190 1/ 
337,379,774 2/ 
337,379,270 3/ 
816,190 
816,190 
22,642 
22,642 
238,758,380 1/ 
238,758,380 1/ 
337,402,416 2/ 
337,201,912 1/ 
21,130,000 
20,983,077 
1,200,000 
1,194,929 
153,343,171 
153,303,667 
6,738,041 
5,944,894 5/ 
160,081,212 
169,248,561 5/ 
14,390,000 
14,373,119 
7,716,002 
7,610,777 
22,106,002 
21,983,896 &/ 
57,415,433 
57,415,433 Z/ 
26,635,000 
26,635,000 
27-12

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 27-A D118 COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 1999 
7. Harlan County New Work: 
Lake, Republican 
River, NE 
8. Hillsdale Lake, 
Big Bull 
Creek, KS 
9. Kanopolis Lake, 
Smoky Hill 
River, KS 
10. Little Blue River 
Lakes, Little Blue 
River, MO 
11. Long Branch Lake 
Little Chariton 
River, MO 
Contributed 
Funds 
Consolidated 
Summary 
12. Melvern Lake 
Osage (Marais des 
Cygnes) River, KS 
13. Milford Lake, 
Republican River, 
KS 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
1,529,000 
1,538,711 
1,333,000 
1,128,655 
1,748,000 
1,615,900 
898,000 
874,775 
722,000 
724,290 
44,707 
44,707 
1,598,000 
1,596,101 
2,091,500 
2,193,483 
1,477,000 
1,449,128 
774,000 
978,231 
1,524,000 
1,644,406 
715,000 
741,235 
736,000 
697,100 
1,348 
1,348 
1,623,000 
1,606,853 
1,502,000 
1,528,992 
773,000 
773,114 
1,266,000 
1,292,359 
787,000 
789,435 
834,000 
877,245 
1,611,000 
1,631,492 
4,594,000 1/ 1,622,000 
4,413,833 4/ 1,812,038 
1,860,000 
1,867,001 
887,000 
887,000 
1,280,000 
1,282,500 
771,000 
771,000 
835,000 
835,000 
1,846,000 
1,846,000 
1,818,000 
1,818,000 
47,111,926 
47,111,9268/ 
35,944,984 
35,951,984 
1,017,623 
1,017,623 
64,161,400 
64,161,400 
13,253,870 
13,253,870 
12,577,227 
12,577,227 9/ 
34,398,312 
34,398,312 
140,809,200 
140,809,200 10/ 
9,761,784 
9,761,784 
18,216,177 
18,216,177 
11,984,112 
11,984,112 
1,139,455 
1,139,332 11/ 
19,355,509 
19,355,509 
37,436,530 
37,436,530 
31,466,154 
31,466,154 
49,566,492 
49,566,492 
41,101,940 
41,919,940 
27-13

KANSAS CITY. MO. DISTRICT 
TABLE 27-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 96 FY 97 FY98 FY99 Sep 30, 1999 
14. Missouri River New Work: 
Levee System 
IA, NE, KS 
and MO 
15. Perry Lake, 
Delaware River, KS 
17. Pomme de Terre 
Lake, Pomme de 
Terre River, MO 
18. Pomona Lake, One 
Hundred Ten Mile 
Creek, KS 
19. Rathbun Lake, 
Chariton River, 
IA 
20. Smithville Lake, 
Little Platte 
River, MO 
21. Tuttle Creek Lake 
Big Blue 
River, KS 
22. Wilson Lake, 
Saline River, 
KS 
23. Scheduling Flood 
Control Reservoir 
Operations 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
115,000 
316,089 
1,629,000 
1,627,100 
1,823,000 
1,805,557 
2,173,000 
2,171,733 
2,062,500 
2,126,882 
1,013,000 
920,636 
3,196,000 
3,033,190 
1,385,000 
1,380,235 
282,000 
282,000 
298,000 
249,182 
1,757,000 
1,758,054 
1,849,000 
1,850,621 
1,704,000 
1,698,224 
1,928,000 
1,948,639 
969,000 
1,051,859 
907,000 
859,101 
1,768,000 
1,771,291 
1,721,000 
1,736,822 
1,564,000 
1,572,043 
1,928,000 
1,918,090 
1,012,000 
989,947 
3,306,000 1,956,000 
3,448,551 4/ 2,094,153 
1,382,000 
1,341,516 
308,000 
308,000 
1,301,000 
1,346,829 
323,000 
323,000 
1,375,000 
1,451,985 
1,902,000 
1,902,000 
1,824,000 
1,824,000 
1,786,000 
178,000 
2,162,000 
2,179,433 
1,071,000 
1,102,637 
1,938,000 
1,938,000 
1,698,000 
1,698,000 
301,000 
301,000 
67,660,851 
67,624,835 
49,095,918 
49,095,918 
39,719,343 
39,806,461 
17,365,452 
17,365,452 
37,806,461 
37,806,461 
14,003,238 
14,003,238 
34,072,207 
34,072,207 
27,622,159 
27,622,159 
43,874,211 
43,874,211 
87,685,314 
87,685,314 
18,171,848 
18,171,848 
80,584,079 
80,584,079 
43,559,232 
43,559,232 
20,463,367 
20,463,367 
31,112,604 
31,112,604 
57,228,452 
57,228,452 
27-14

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 27-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 1999 
24. Inspection of Maint. 
Completed Flood 
Control Projects 
25. Harry S. Truman 
Dam & Reservoir 
Osage River, MO 
26. Stockton Lake, 
Sac River, MO 
30. Mississippi River 
Main Stem Model 
Development 
31. National Emergency 
Preparedness 
Program 
32. Missouri River Basin 
Collaborative 
Effort 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
576,000 
576,000 
-. 
713,442 
8,200,000 
8,235,466 
3,413,000 
3,281,209 
40,000 
40,000 
110,000 
110,000 
New Work: 
Approp. 
Cost 
521,000 
517,635 
-935 
7,833,000 
7,650,016 
3,467,000 
3,096,906 
50,000 
49,659 
174,500 
174,065 
229,000 
228,717 
583,000 
586,365 
8,954,000 
9,162,409 
3,042,000 
3,516,862 
426,000 
426,000 
6,948,000 
6,991,712 
4,096,000 
4,144,023 
341 -- 
104,000 
104,435 
100,000 
99,602 
9,601,431 
9,601,431 
550,909,000 
550,908,965 
124,298,162 
124,298,162 
79,975,357 
79,975,357 
62,667,159 
62,667,159 
90,000 
90,000 
90,000 
85,000 
75,000 
75,681 
3,823,350 
3,823,350 
404,000 
404,000 
1. Includes $8,665,595 cost of new work for previous 
project. 
2. Includes $738,109 for maintenance of previous 
project. 
3. Includes funds appropriated under FY 1993 Emergency 
Flood Supplemental Appropriation, 96 3/7 3123: Missouri 
River, Rulo, NE to Mouth, $40,000; and Milford Lake, KS, 
$40,000 
4. Includes funds expended under FY 1993 Emergency 
Flood Supplemental Appropriation, 96 3/7 3123: Missouri 
River, Rulo, NE to Mouth, $1,119,854; Milford Lake, KS 
$45,526; and Tuttle Creek Lake, KS $53,087. 
5. Excludes $35,296 non-Federal contribution not required 
for authorized Blue River Channel project (Blue River Channel 
Mobay Chemical 1984.1987). 
6. Corps is building Brush Creek Expanded Project requested 
by sponsor, City of Kansas City. MO, with all costs of bettern 
and enhancements not required by Authorized Project 
funded by sponsor. Excludes sponsor's contributions of 
$2,548,121 for Kansas City, MO, PED (FWKCM) 1987 through 
1997; $2,159,888 for Park Features Design; $1,071,274 for 
Water Pollution Control during construction; and $1,729,155 for 
Public Works Department. 
7. Excludes $118,805 non-Federal contribution not required for 
authorized Clinton Lake project (1973-1979). 
8. Excludes cost of materials furnished Harlan County 
project without charge in the amount of $24,198. 
9. Excludes cost of materials furnished Kanopolis Lake project 
without charge in the amount of $7,885. 
10. Excludes $2,732,554 thru FY 1990 non-Federal contributions 
not required for authorized Little Blue Lakes project. 
11. Corrected total. Excludes $42,149 interest during construction 
at Long Branch Lake project, and $500,000 work-in-kind. 
27-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 27-B AUTHORIZING LEGISLATION 
See Section Date of 
in Text Act Project and Work Authorized Documents 
MISSOURI RIVER, SIOUX CITY, IA, TO 
MOUTH (RULO, NE, TO MOUTH) 
1. Jul 25, 1912 
Aug 8, 1917 
Mar 3, 1925 
Jan 12,1927 
Jul 3, 1930 
Aug 30, 1935 
Mar 2, 1945 
2. Nov 17, 1986 
3. Oct 12,1996 
Project adopted for securing a permanent navigable 
channel of 6-foot depth from Kansas City, MO to 
mouth. 
Fixed upstream limit of improvement at upper end of 
Quindaro Bend (274.8 miles from mouth) and provided 
for dredging. 
For a minimum width of 200 feet and depth of 6 feet, 
with a reasonable additional width around bends, 
mouth to upper end of Quindaro Bend, Kansas City, MO. 
Appropriation of $12 million authorized for securing a 
6-foot channel depth between Kansas City, MO, 
Quindaro Bend, and Sioux City, IA. 
Appropriation of $15 million additional authorized; 
additional allotments totaling $29,153,108 were made 
by Public Works Administration under provisions of 
National Industrial Recovery Act of 1933, and 
$9,669,791 allotted under provisions of Emergency 
Relief Appropriation Act of 1935. 
Completion of improvement from mouth to Sioux City, IA. 
Securing a navigable channel of 9-foot depth and a 
minimum width of 300 feet. 
MISSOURI RIVER FISH AND WILDLIFE MITIGATION, 
MO, KS, IA & NE 
Project for mitigation of fish and wildlife losses 
Missouri River Bank Stabalization and Navigation 
Project, MO, KS, IA & //nE: April 24, 1984, Report of 
Chief of Engineers, authorized at estimated cost of 
$51,900,000. 
BLUE RIVER BASIN, KANSAS CITY, MO 
Project for flood control along the left bank of the Blue 
River from U.S. Highway 71 upstream for a distance 
of about 1 1/4 miles in Jackson County, MO, to the 
Bannister Federal Complex levee: Report of the Chief 
of Engineers, dated Sep 5, 1996, at a total cost of 
$17,082,000, with an estimated Federal cost of 
$12,043,000 and an estimated non-Federal cost of 
$5,039,000. 
27- 16 
H. Doc. 1287, 61st Cong., 
(contains latest published 
map). P.L. 241-62 
H. Doc. 463, 64th Cong., 
(contains latest published 
map). 
P.L. 585-68 
H. Doc.1120, 60th Cong., 
P.L. 560-70 
P.L. 67-73 
H.R. 11781 
P.L. 520-71 
H. Doc. 238, 73d Cong., 
(contains latest published 
map). P.L. 409-73 
H. Doc. 214, 76th Cong., 
(contains latest published 
map). P.L. 14-79 
Title VI, Section 601(a), 
Water Resources Development 
Act of 1986, P.L. 
99-662. 
Title I, Section 101(a), Water 
Resources Development 
Act of 1996, P.L. 104-303

KANSAS CITY, MO, DISTRICT 
TABLE 27-B AUTHORIZING LEGISLATION 
See Section Date of 
in Text Act 
4. Dec 31, 1970 
5. Nov 17, 1986 
Nov 28, 1990 
6. Oct 23, 1962 
7. Jun 28, 1938 
Aug 18, 1941 
Dec 22, 1944 
8. Sep 3, 1954 
June 28, 1938 
Aug 18, 1941 
Project and Work Authorized 
BLUE RIVER CHANNEL, KANSAS CITY, MO 
Adopted plan for Blue River Basin and authorized 
$40,000,000 for initiation and partial accomplishment. 
BRUSH CREEK, KANSAS CITY, MO 
Project for flood control on Brush Creek, a tributary of 
the Blue River, Kansas City, MO, authorized at estimated 
total cost of $16,100,000. 
Modified to authorize the Secretary of the Army to 
construct the project substantially in accordance with 
the Post Authorization Change Report, dated April 1989 
(revised January 1990), at a total cost of $26,200,000. 
CLINTON LAKE, WAKARUSA RIVER, KS 
The project for the Kansas River, KS,NE and CO is 
authorized at an estimated cost of $88,070,000. 
HARLAN COUNTY LAKE, REPUBLICAN, NE 
Adopted general comprehensive plan for Missouri River 
Basin and authorized $9 million for initiation and partial 
accomplishment. 
Modified general comprehensive plan to include Harlan 
County Dam and Reservoir on Republican River, NE, 
other supplemental flood control works on upper 
Republican River, and authorized $7 million additional 
expenditure. 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $200 million additional expenditure. 
HILLSDALE LAKE, BIG BULL CREEK, KS 
The comprehensive plan for the Missouri River Basin, 
approved by the Act of June 28, 1938, and as amended 
and supplemented is further modified to include the 
project for flood protection on the Kansas River and 
tributaries. It is further modified to include the project for 
flood protection on the Osage River and tributaries. 
KANOPOLIS LAKE, SMOKY HILL RIVER, KS 
Adopted general comprehensive plan for Missouri River 
Basin and authorized $9 million for initiation and partial 
accomplishment. 
Modified general comprehensive plan to include Harlan 
County Dam and Reservoir on Republican River, NE, 
other supplemental flood control works on upper 
Republican River, and authorized $7 million additional 
expenditure. 
Documents 
H. Doc. 91-332, 91st Cong. 
Sec. 401(a), Water Resources 
Development Act of 1986, 
P.L. 99-662 
Water Resources Development 
Act of 1990, P.L. 101-640. 
1962 Flood Control Act, H. Doc 
578, 87th Cong. P.L. 87-874. 
Flood Control Committee Doc. 1, 
75th Cong., P.L. 761. 
H. Doc. 842, 76th Cong.; 
P.L. 77-228 
H. Doc. 475 and S. Docs. 191 
and 247, 78th Cong., P.L. 534. 
P.L. 780, 83rd Cong., H. Doc. 
549, 81st Cong. 
Flood Control Committee Doc. 1, 
7th Cong., P.L. 761. 
H. Doc. 842, 76th Cong.; 
P.L. 77-228 
27 - 17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
AUTHORIZING LEGISLATION 
Se 
in 
;e Section Date of 
Text Act 
Dec 22, 1944 
10. Aug 13, 1968 
11. Oct 27, 1965 
12. Sep 3, 1954 
13. Sep 3, 1954 
14. Aug 18,1941 
Dec 22, 1944 
15. Sep 3, 1954 
16. Jun 28, 1938 
Aug 18, 1941 
Dec 22,1944 
Jul 24, 1946 
May 17, 1950 
I 
AUTHORIZING 
LEGISLATION 
27- 18 
TABLE 27-B 
Project and Work Authorized I, 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $200 million additional expenditure. 
LITTLE BLUE RIVER LAKES, MO 
Additional $38 million for prosecution of general comprehensive 
plan for Missouri River Basin 
LONG BRANCH LAKE, LITTLE CHARITON RIVER, MO 
The project for flood protection on the Chariton and Little 
Chariton Rivers and tributaries, IA and MO, is authorized 
at an estimated cost of $9,167,000. 
MELVERN LAKE, MARAIS DES CYGNES (OSAGE) 
RIVER, KS 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $217,710,000 for additional 
expenditure. 
MILFORD LAKE, REPUBLICAN RIVER, KS 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $217,710,000 for additional 
expenditure. 
MISSOURI RIVER LEVEE SYSTEM, IA, NE, KS AND MO 
Levees along both sides of river from Sioux City to 
Kansas City. 
Extended project from Kansas City to the mouth and 
provided for increased protection. 
PERRY LAKE, DELAWARE RIVER, KS 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $217,710,000 additional expenditure. 
PICK-SLOAN MISSOURI BASIN PROGRAM 
(KANSAS CITY DISTRICT) 
Adopted general comprehensive plan for Missouri River 
Basin and authorized $9 million for initiation and partial 
accomplishment. 
Modified general comprehensive plan to include Harlan 
County Dam and Reservoir on Republican River, NE, 
other supplemental flood control works on upper 
Republican River, and authorized $7 million additional 
expenditure. 
Expanded general comprehensive plan for Missouri River 
and authorized $200 million additional expenditure. 
Additional expenditure of $150 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
Additional expenditure of $250 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
Documents 
H. Doc. 475 and S. Docs. 191 
and 247, 78th Cong., P.L. 534. 
P.L. 90-483, H. Doc. 169, 
90th Cong. 
1965 Flood Control Act 
P.L. 89-298, H. Doc. 238, 
89th Cong 
H. Docs. 642, 549 1/ 
and 561, 81st Cong.; 
83rd Cong., P.L. 780 
H. Doc. 549 1/, 81st Cong.; 
P.L. 780 
H. Doc 821, 76th Cong. 
P.L. 77-228 
H. Doc 475 and S. Docs. 
191 and 247, 78th Cong. 
H. Docs. 642, 5491/, and 561, 
81st Cong.; 83rd Cong., 
P.L. 780 
Flood Control Committee Doc. 1, 
75th Cong. 
H. Doc. 842, 76th Cong.; 
P.L. 77-228 
H. Doc. 475 and S. Docs. 191 
and 247, 78th Cong.

KANSAS CITY, MO, DISTRICT 
TABLE 27-B AUTHORIZING LEGISLATION 
Se 
in
18. Sep 3, 1954 
. ._ .__.__ 
27 - 19 
I 
.e Section Date of 
Text Act 
Sep 3, 1954 
May 2, 1956 
Jul 3, 1958 
Jul 14, 1960 
Dec 30, 1963 
Jun 18, 1965 
May 12, 1967 
Aug 13, 1968 
Dec 24, 1970 
Dec 23, 1971 
Mar 7, 1974 
17. Jun 28, 1938 
Dec 22, 1944 
Sep 3, 1954 
Project and Work Authorized 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $217,710,000 for additional 
expenditure. 
Modified general comprehensive plan for Missouri River 
River Basin by deletion of construction of Red Willow 
Dam and Reservoir, NE, and addition of construction of 
Wilson Dam and Reservoir, KS. 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $200 million additional expenditure. 
Additional expenditure of $207 million for prosecution of 
general comprehensive plan for Missouri River Basin. 
Additional expenditure of $80 million for prosecution of 
general comprehensive plan for Missouri River Basin 
and modified plan to include bank protection or rectification 
works below Garrison Dam. 
Additional $116 million for prosecution of general comprehensive 
plan for Missouri River Basin. 
Additional $20 million for prosecution of general comprehensive 
plan for Missouri River Basin. 
Additional $38 million for prosecution of general comprehensive 
plan for Missouri River Basin. 
Change comprehensive plan name to Pick-Sloan 
Missouri River Basin Program. 
Additional $101,000,000 for prosecution of general 
comprehensive plan for Pick-Sloan Missouri River Basin 
Program. 
Additional $72,000,000 for prosecution of general 
comprehensive plan for Pick-Sloan Missouri River Basin 
Program. 
POMME DE TERRE LAKE, POMME DE TERRE RIVER, MO 
Adopted general comprehensive plan for Missouri River 
Basin and authorized $9 million for initiation and partial 
accomplishment. 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $200 million additional expenditure. 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $217,710,000 additional expenditure. 
POMONA LAKE, ONE HUNDRED TEN MILE CREEK, KS 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $217,710,000 additional expenditure. 
Documents 
H. Docs. 642 and 549 1/ 
81st Cong.; 83rd Cong., 
P.L. 780 
H. Doc. 409, 84th Cong. 
S. Doc. 91-1100, 91st Cong. 
S. Doc. 92-222, 92nd Cong. 
Flood Control Committee Doc. 1, 
75th Cong., P.L. 761. 
H. Doc. 475 and S. Docs. 191 
and 247, 78th Cong., P.L. 534. 
H. Doc. 642, 549 1/, and 561, 
81st Cong.; 83rd Cong., 
P.L. 780. 
H. Doc. 549 1/, 561, 81st Cong.; 
83rd Cong., P.L. 780

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 27-B AUTHORIZING LEGISLATION 
See Section Date of 
in Text Act 
19. Sep 3, 1954 
20. Oct 27, 1965 
21. Aug 17, 1999 
22. Jun 28, 1938 
Aug 18, 1941 
Dec 22, 1944 
23 Dec 22, 1944 
Jul 14, 1960 2/ 
26. Sep 3, 1954 
Oct 23, 1962 
Project and Work Authorized 
RATHBUN LAKE, CHARITON RIVER, IA 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $217,710,000 additional expenditure. 
SMITHVILLE LAKE, LITTLE PLATTE RIVER, MO 
The project for flood protection on the Platte River and 
tributaries, MO and IA, is authorized at an estimated cost 
of $26,889,000. 
TURKEY CREEK BASIN, KS & MO 
Project for flood control at the lower reaches of Turkey Creek 
Basin in Kansas City, KS and Kansas City, MO. Report of 
the Chief of Engineers dated April 21, 1999, at a total cost 
of $42,875,000, with an estimated Federal cost of 
$25,596,000 and an estimated non-Federal cost of 
$17,279,000. 
TUTTLE CREEK LAKE, BIG BLUE RIVER, KS 
Adopted general comprehensive plan for Missouri River 
Basin and authorized $9 million for initiation and partial 
accomplishment. 
Modified general comprehensive plan to include Harlan 
County Dam and Reservoir on Republican River, NE, 
other supplemental flood control works on upper 
Republican River, and authorized $7 million additional 
expenditure. 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $200 million additional expenditure. 
WILSON LAKE, SALINE RIVER, KS 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $200 million additional expenditure. 
Additional expenditure of $207 million for prosecution of 
general comprehensive plan for Missouri River Basin 
HARRY S. TRUMAN DAM AND RESERVOIR, OSAGE 
RIVER, MO 
Expanded general comprehensive plan for Missouri River 
Basin and authorized $217,710,000 additional expenditure. 
The Kaysinger Bluff Reservoir is hereby mosified in 
accordance with recommendations of the Chief of 
Engineers in H. Doc. 578, 87th Cong., at an estimated 
additional cost of $43,245,000; provided, that nothing in 
this Act shall be construed as authorizing the acquisition 
of additional lands for the establishment of a national 
wildlife refuge at the reservoir. 
Documents 
H. Doc. 561, 81st Cong., 
83rd Cong., P.L. 780 
1965 Flood Control Act, 
P.L. 89-298 (H. Doc. 262, 
89th Cong.) 
Title I Section 101(a) Water 
Resources Development Act 
of 1999, P.L. 106-53 
Flood Control Committee Doc. 1, 
75th Cong., P.L. 761. 
H. Doc. 842, 76th Cong.; 
P.L. 77-228 
H. Doc. 475 and S. Docs. 191 
& 247, 78th Cong., P.L. 645 
H. Doc. 475 and S. Docs. 191 
& 247, 78th Cong., P.L. 534 
S. Doc. 96, 86th Cong., P.L. 645 
H. Doc. 549 1/, 81st Cong.; 
83rd Cong., P.L. 780 
1962 Flood Control Act, 
H. Doc. 578, 87th Cong., 
P.L. 87-874 
27 - 20

KANSAS CITY, MO, DISTRICT 
TABLE 27-B AUTHORIZING LEGISLATION 
See Section Date of 
in Text Act Project and Work Authorized Documents 
STOCKTON LAKE, SAC RIVER, MO 
27. Sep 3, 1954 Expanded general comprehensive plan for Missouri River H. Doc. 549 1/, 81st Cong.; 
Basin and authorized $217,710,000 additional expenditure. 83rd Cong., P.L. 780 
1/ Contains latest published maps 
of Missouri River 
2/ Report of Chief of Engineers on justification of Wilson 
Dam and Reservoir, submitted in compliance with 
Public Law 505, 84th Congress, published as Senate 
Document 96, 86th Congress, was approved July 14, 
1960 (Public Law 645). 
27-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 27-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Fort Leavenworth Bridge removal Complete 1965 270,393 -- 
Gasconade River, MO 1/2/ Complete 1931 139,003 85,077 
1/ Improvement, adequate for existing needs. Project 
for maintenance only. Curtailment of project in H. Doc. 
467, 69th Cong. 
2/ Inactive portion of project deauthorized Jan 1, 1990 
in accordance with Section 1001(b)(1) of Water 
Resources Development Act (WRDA) of 1986 
(P.L. 99-662). 
27 - 22

KANSAS CITY, MO, DISTRICT 
TABLE 27-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Abilene, KS 
Atchison, KS 
Barnard, KS 1/ 
Bartley, NE 
Bedford, East Fork, 102 River, IA 1/ 
Big Blue River, Seward, NE 11 
Big Stranger Creek, KS 1/ 
Blue River Basin, Overland Park, KS 
Indian Creek Channel Modification 1/ 
Braymer Lake, Shoal Creek, MO 3/ 
Brookfield Lake, Yellow Creek, MO 3/ 
Chariton-Little Chariton Basin, MO (1965 Act) 4/ 
Chariton River, MO (1944 Act) 
East Muddy Creek, MO 3/ 
Elk Creek, Clyde, KS 1/ 
Fairbury, Little Blue River, NE 
Frankfort, Black Vermillion River, KS 
Gypsum, Gypsum Creek, KS 1/ 
Harry S. Truman Dam and Reservoir, MO 
(Downstream Fish and Wildlife Mitigation) 
Indianola, NE 
Kansas City, Kansas River, KS (62 Mod) 
Kansas Citys on MO and KS Rivers, 
MO and KS 
Lawrence, Kansas River, KS 
Little Blue River Channel Improvement, 
Little Blue River, MO 
Lower Grand River, MO 31 
Manhattan, Kansas River, KS 
Mercer Lake, Weldon River, MO 3/ 
Missouri River at New Haven, MO 
(Sec 212, 1950 Act) 
Osawatomie, Pottawatomie Creek, KS 
Ottawa, Osage, (Marais des Cygnes) River, KS 
Pattonsburg Lake, Grand River, MO 3/9/ 
Perry Lake Area (Road Improvements), KS 
Platte River, MO, Channel Improvement 
Rathbun Lake Fish Hatchery 
Salina, Smoky Hill River, KS 
Seward, NE 1/ 
Smithville Channel, Little Platte River, MO 
Stonehouse Creek, Jefferson Co., KS 1/ 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Inactive 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Inactive 
Completed 
Completed 
Completed 
Inactive 
Completed 
Deferred 
Completed 
Completed 
Completed 
Deferred 
Completed 
1961 
1973 
1953 
1974 
1994 
1966 
1976 
1977 
1973 
1966 
1984 
1973 
1966 
1984 
1950 
1984 
1980 
1985 
1989 
1966 
1967 
1976 
1973 
1966 
1976 
1982 
1973 
1975 
1967 
1973 
1972 
1,099,350 
4,099,590 
127,860 
118,269 
652,414 
126,887 
337,131 
269,288 2/ -- 
451,400 -- 
692,706 4/ -- 
8,052,990 -- 
989,015 -- 
726,966 -- 
1,271,025 -- 
2,782,793 5/ -- 
67,275 -- 
25,010,500 6/ -- 
42,434,197 7/ -- 
8,773,488 8/ -- 
25,530,083 -- 
2,488,585 -- 
432,245 -- 
139,883 -- 
2,036,624 -- 
4,462,661 -- 
5,315,168 -- 
222,193 -- 
700,000 -- 
3,878,668 -- 
126,887 -- 
6,896 -- 
246,995 -- 
27 - 23 
,, 
,, 
,I 
,I 
,, 
,,

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 27-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Topeka, Kansas River, KS Completed 1974 21,174,593 -- 
Trenton Lake, Thompson River, MO 3/ Inactive 1966 -- -- 
Trimble Wildlife Area, Smithville Lake, MO Completed 1990 1,570,000 -- 
Upper Grand River, MO 3/ Inactive 1966 -- -- 
1/ Authorized by the Chief of Engineers under 
Section 205, Public Law 858, 80th Congress, as 
amended. 
2/ Required non-Federal contributions $129,680. 
3I Grand River Basin reconnaissance study 
(authorized by resolution of the Committee on 
Public Works and Transportation, U.S. House of 
Representatives on July 3, 1987) reviewed and 
updated costs for these projects authorized in 
the Flood Control Act of 1965, and found no 
economically feasible plan. 
4/ Inactive units Little Chariton River (East and Middle 
Fork) and Mussell Fork were deauthorized Jan 1,1990 
by Section 1001(b)(1) of the Water Resources 
Development Act of 1986, P.L. 99-662. Construction 
cost includes $481,106 cost of completed Shoal Creek 
Unit and $211,600 cost of deauthorized Little Chariton 
River and Mussell Fork units. 
5/ Includes $130,841 non-Federal contributions. 
6/ Inactive units Kansas Avenue Bridge and Approach, 
and Lower Argentine Units were deauthorized Jult 9, 1995 in 
accordance with Section 1001(b)(2) of WRDA of 1986, P.L. 99- 
662. Construction cost above includes $67,500 for deauthorized 
Bridge and Approach Unit; does not include $1,181,000 non- 
Federal Contributions. 
7/ Includes $619,787 non-Federal contributions for work 
desired by local interests, but not required under the project. 
The project as a whole is complete except for Turkey Creek 
facilities in Central Industrial District Unit. 
8/ Includes $153,377 non-Federal contributions. 
9/ Patonsburg Lake Highway Relocation and town relocation 
portions of the project were deauthorized Jan 1,1990 in 
accordance with Section 1001 (b)(1) of the Water Resources 
Development Act of 1986, P.L. 99-662. 
27- 24

KANSAS CITY, MO, DISTRICT 
TABLE 27-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Funds Funds Date 
Project Report For Date and Authority Expended Expended Deauthorized 
Arlington Lake, MO 
Beatrice, Big Blue River, NE 
Chariton-Little Chariton 
Basin, MO (1965 Act)-- 
Inactive Units Little 
Chariton River (East and 
Middle Fork) and Mussell 
Fork Units only 1/ 
Dry Fork and East Fork 
Lakes, Fishing River, MO 
Fort Scott Lake 
Garnett Lake, Pottawatomie 
Creek, KS 
Gasconade River Navigation, 
MO 
Grove Lake, Soldier Creek, KS 
Hackleman Corners Lake, 
Cedar Creek, MO 
Hays, Big Creek, KS 3/ 
Indian Lake, Blue River, KS 
Kansas City, Kansas River, 
KS (62) Mod)--Inactive Units 
Kansas Avenue Bridge 
Approach, and Lower 
Argentine Units Only 
Kansas River Navigation 
1948 Flood Control Act approved June 28, 
1938, as modified by Flood Control 
Act approved August 18, 1941, and 
expanded by Flood Control Act 
approved December 22, 1944 
1965 Flood Control Act approved 
September 3, 1954 
1977 1965 Flood Control Act P.L. 89-298 
(H. Doc. 238, 89th Cong., 1st sess.) 
1974 1965 Flood Control Act P.L. 89-298 
(H. Doc. 281, 89th Cong., 1st sess.) 
1976 1954 Flood Control Act (H. Doc. 549, 
81st Cong. 2nd Sess) 
1973 Flood Control Act approved 
September 3, 1954 
1931 Curtailment of project in H. Doc. 467, 
69th Cong. 1928 
1977 1962 Flood Control Act (S. Doc. 122, 
87th Cong. 2d sess.) 
-- Authorized by Flood Control Act 
approved September 3, 1954 
1974 Flood Control Act of 1965 approved 
October 27, 1965 
1976 1970 Flood Control Act (H. Doc. 332 
91st Cong., 2d sess.) 
1984 1962 Flood Control Act, S. Doc. 122, 
87th Cong., P.L. 87-874 
1980 1965 Flood Control Act, P.L. 89-298, 
Sec. 201 
$8,651 
16,317 
211,600 
51,989 
757,500 
71,466 
2/ 
1,754,019 
499,200 
127,297 
67,500 4/ 
259,900 
-- Aug 5, 1977 
-- May 6, 1981 
-- Jan 1, 1990 
-- Jan 1, 1990 
-- Apr 5, 1999 
-- Nov 17, 1986 
-- Jan 1, 1990 
-- Nov 17, 1986 
-- Aug 5, 1977 
-- Jan 18, 1978 
-- Nov 17, 1986 
-- Jul 9, 1995 
-- Nov 17, 1986 
27-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 27-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Funds Funds Date 
Project Report For Date and Authority Expended Expended Deauthorized 
Marysville, KS 
Melvern Lake and Pomona 
Lake (Road Improvements) 
KS (1974 Act) 
Merriam, Turkey Creek, KS 
-- Flood Control Act of September 3, 
1954 
-- Water Resources Development Act 
of 1974, Section 17 
1970 Flood Control Act approved September 
3, 1954 
133,682 
39,708 
-- Jan 1967 
-- Jan 1, 1990 
-- Nov 27, 1973 
KANSAS CITY, MO, DISTRICT 
Mill Lake, Blue River, MO 
Missouri River Levee System, 
IA, KS, MO, and NE 
Deauthorized by Sec. 1002 
Water Resources Development 
Act of 1968, P.L. 99-662, 
Section 1002: Units R402; 
R393-395; and R414 
Deauthorized in accordance 
with WRDA Section 1001(b)(1): 
Units L36; R42; L51; R55-59-61; 
L68-92; R70; L78; R87;L94; 
L99; L103; R104; R107; R112; 
L117; L121; L124; L129; L134; 
L137-139; L145; R150; L154; 
L157; R161; L164; R169; L175; 
R179-184; L191-196; L205; 
L217; R226; R240; R251; L256; 
R259; L263-270 5/; R272; 
R284; R302; R336; L353; L357; 
R361; L362; L392; L419-426; 
L435; R512-513, Section III 
1971 1970 Flood Control Act (H. Doc. 332, 
91st Cong., 2d sess.) 
-- Flood Control Act of August 18, 
1941, P.L. 228, 77th Cong. 
-- Flood Control Act of August 18, 
1941, P.L. 228, 77th Cong. 
57,500 
1,631,700 
-- Nov 17, 1986 
-- Nov 17, 1986 
-- Jan 1, 1990 
27 - 26

KANSAS CITY, MO, DISTRICT 
DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Funds Funds Date 
Project Report For Date and Authority Expended Expended Deauthorized 
Onaga Lake, Vermillion Creek, 
KS 
Osage River Navigation, MO, 
lock and dam 
Pattonsburg Lake, Grand 
River, MO ZI 
1-35 Highway Relocation 
Town Relocation 
Pioneer Lake, KS 
Pomme de Terre Lake 
(Power Addition), MO 
Richland Lake, MO 
Flood Control Act of 1962, October 
23, 1962 (P.L. 87-874) 
1952 Original lock and dam authorized 
Mar 3, 1899; improvement authorized 
in 1928; placed in standby 
status Jul 1952 and operation & 
maintenance discontinued. 
1976 1965 Flood Control Act, P.L. 89-298 
1976 (H. Doc. 241, 89th Cong., 1st sess) 
1952 Flood Control Act approved June 28, 
1938, as modified by Flood Control 
Act of August 18, 1941, and 
expanded by Flood Control Act 
approved December 22, 1944 
1954 Flood Control Act of 1954 
1974 (H. Doc. 549, 81st Cong., 2d sess.) 
1948 Flood Control Act approved June 28, 
1938, as modified by Flood Control 
Act approved August 18, 1941, and 
expanded by Flood Control Act 
approved December 2, 1944 
2,178,261 
658,076 / 
393,623 
91,929 
95,692 
8,548 
-- Nov 17, 1986 
-- Jan 1, 1990 
-- Jan 1, 1990 
-- Jan 1, 1990 
-- Aug 5, 1977 
-- Nov 17, 1986 
-- Aug 5, 1977 
27 - 27 
TABLE 27-G

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 27-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Funds Funds Date 
Project Report For Date and Authority Expended Expended Deauthorized 
Tomahawk Lake, 1976 1970 Flood Control Act (H. Doc. 332, 77,189 -- Nov 17, 1986 
Blue River, KS 91st Cong., 2d sess.) 
Tuttle Creek Lake, KS (Road 1977 Sec. 18 of Water Resources 3,000 -- Nov 17, 1986 
Improvement--1974 Mod.) Development Act of 1974 
Tuttle Creek Lake, KS -- Water Resources Development Act of -- -- Jan 1, 1990 
Road and Bridge (1976 1976, Section 189, P.L. 94-587 
Act) 
Wolf-Coffee Lake, Blue River, 1976 1970 Flood Control Act (H. Doc. 332, 1,095,020 -- Nov 17, 1986 
KS 91st Cong., 2d sess.) 
1/ For completed Shoal Creek unit of Chariton-Little 
Chariton Basin, MO, see Table 27-E. 
2/ For completed project see Table 27-C. Deauthorized 
under Sec. 1001(b)(1) WRDA of 1986, P.L. 99-662. 
31 Hays, Lincoln Draw, KS, Section 205 feasibility study 
terminated in March 1991 due to lack of identifiable 
project that would meet dam safety concerns. 
4/ For completed Argentine, Amourdale, and Central 
Industrial Units of project, see Table 27-E. 
5/ Incorrectly shown as R263-270 in the deauthorization 
act. 
6/ Operation and maintenance costs $850,495. 
Deauthorized under Sec. 1001(b)(1) of WRDA, P.L. 99-662. 
7 Pattonsburg Lake portion of project is inactive. See 
Table 27-E. 
27 - 28

KANSAS CITY, MO, DISTRICT 
TABLE 27-H MISSOURI RIVER LEVEE SYSTEM 
(See Section 14 of Text) 
Miles of 
Unit Levee Status 
R512-513 Richardson Co. D.D. No. 7 
R500 Iowa Point D. D. No. 4 
Kimsey Holly Creek 
L497 Forest City L. D. 
L488 Holt Co. D. D. No. 7 
R482 Burr Oak D. D. No. 3 
L476 Amazonia L. D. 
R460-471 Elwood-Gladden L. D. 
L455 S. St. Joseph L. D. 
L443-448 Halls L. D. 
R440 Atchison & Doniphan Co. D. D. 
L408 Farley-Beverly D. D. 
L400 Waldron L. D. 
L385 Riverside-Quindaro D. D. 
R351 Atherton L. D. 
L330-345 Orrick L. D. 
L319-325 Henrietta-Crooked River D. D. 
L246 Brunswick-Dalton D. D. 
L142 
L15 North County L. D. 
Remaining units 
19.1 
4.1 
4.4 
16.0 
11.5 
8.2 
10.8 
13.8 
15.6 
17.3 
10.7 
12.2 
7.6 
6.5 
15.9 
43.4 
35.0 
20.0 
6.0 
40.0 
Complete--1958 
Complete--1954 
Complete--1970 
Complete--1962 
Complete--1955 
Complete--1954 
Complete--1956 
Complete--1968 
Complete--1967 
Complete--1957 
Complete--1959 
Complete (Levee raise modification)--1972 
Complete--1957 
Planning underway 
Complete--1966 
Inactive 
Inactive 
Complete--1983 
Active 
Active 
Detailed planning not initiated 
27 - 29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
KANSAS CITY DISTRICT PROJECTS INCLUDED IN 
PICK-SLOAN MISSOURI BASIN PROGRAM 
(See Section 16 of Text) 
Federal Non-Federal Non-Federal 
Project Status Cost Cost Reimbursable 
Abilene, Smoky Hill River, KS C $1,099,350 $287,000 
Bartley, Republican River, NE C 118,269 9,500 
Fort Scott Lake, Marmaton River, KS D 71,186,000 19,314,000 $44,800,000 5/ 
Garnett Lake, Pottawatomie Creek, KS D 71,466 -- 
Harlan County Lake, Republican River, NE C 48,129,549 -- 
Harry S. Truman Dam and Reservoir, Osage River, MO C 550,908,965 -- 138,385,000 6/ 
Hillsdale Lake, Big Bull Creek, KS C 64,161,400 -- 21,145,338 5/ 
Indianola, Republican River, NE C 67,275 7,592 
Kanopolis Lake, Smoky Hill River, KS C 12,577,227 -- 
Lawrence, Kansas River, KS C 8,620,111 2,130,000 
Manhattan, Kansas River, KS C 2,488,585 265,000 
Melvern Lake, Osage (Marais des Cygnes) River, KS C 37,436,530 -- 7,131,834 7/ 
Melvern Lake and Pomona Lake (Road Improvement), 
KS (1974 Authorization) D -- -- 
Milford Lake, Republican River, KS C 49,566,492 -- 12,162,134 5/ 
Missouri River Levee System, Rulo to the Mouth 8/ A 93,553,000 35,265,000 
Osawatomie, Osage (Marais des Cygnes) River, KS C 2,036,624 348,300 
Ottawa, Osage (Marais des Cygnes) River, KS C 4,462,661 876,000 
Perry Lake, Delaware River, KS C 49,095,918 -- 8,551,805 5/ 
Pomme de Terre Lake, Pomme de Terre River, MO C 17,365,453 -- 
Pomona Lake, Osage River Basin, KS C 14,003,238 -- 862,923 5/ 
Salina, Smoky Hill River, KS C 3,878,668 1,960,000 
Stockton Lake, Sac River, MO C 79,975,357 -- 24,206,593 9/ 
Topeka, Kansas River, KS C 21,174,593 10,383,492 
Tuttle Creek Lake, Big Blue River, KS C 80,584,079 -- 2,333,916 5/ 
Tuttle Creek Lake, KS--Road and Bridge (1976 Act) D -- -- 
Tuttle Creek Lake (Road Improvement), KS 
(1974 Modification) D 3,000 -- 
Wilson Lake, Saline River, KS C 20,463,367 -- 
j./ Status: A = Active; C = Completed; D = Deauthorized; Z/ In accordance with the Memorandum of Understanding 
I = Inactive. 
2/ Actual appropriations for completed and deauthorized 
projects; estimated appropriation requirements for active 
and inactive projects. 
31 Estimated cost during construction. 
4/ Future reimbursement of initial Federal cost. 
5/ Estimated reimbursement costs allocated to water 
supply. 
G/ Estimated reimbursement costs allocated to power. 
between the State of Kansas and the Dept. of the Army 
dated 1985, payment in full of $7,131,834 for 50,000 acrefeet 
of water supply was made in March 1995. 
8/ Active portion of project. Currently estimated cost 
(1997): Deferred portion of project--$46,753,000 Federal 
and $4,336,000 non-Federal; Inactive portion of project-- 
$104,791,000 Federal and $11,296,000 non-Federal. Actual 
cost of deauthorized units (1990) is $1,689,200 Federal. 
9/ Includes $22,116,864 estimated reimbursement costs 
allocated to power, and $2,089,729 estimated reimbursement 
costs allocated to water supply. 
27 - 30 
TABLE 27-1

KANSAS CITY, MO, DISTRICT 
INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
TABLE 27-J (See Section 25 of Text) 
Project 
Missouri River Main Stem 
R482, R500, R440 and Atchison, KS 
Birmingham (KCMO) 
Fairfax Jersey Creek (KCK), L408, L400, R471-460, R351 I, R351 II 
North Kansas City (Lower Section), GSA Complex (KCMO) 
KCMO Units--CID (MO), East Bottoms, NKC-Airport, Blue River Channel, 
Brush Creek, L448-443 
L455 
L246, Lower Chariton River Unit, New Haven 
L476, L488 
Kimsey Holley Creek 
R512-513 
Kansas River 
North Topeka, Soldier Creek, Auburndale, South Topeka, Waterworks Unit, Oakland 
Manhattan, KS 
Ft Riley 
Lawrence, KS 
Kaw Valley--Argentine, Armourdale, Lower Fairfax, CID (KS) 
Osage River (MO) Marais des Cygnes (KS) 
Ottawa, KS 
Osawatomie, KS 
Smokey Hill, Saline. Solomon Rivers & Tributaries (KS) 
Abilene, KS, Barnard, KS 
Salina, KS 
Gypsum, KS 
Republican River 
Clyde, KS 
Indianola, NE 
Big and Little Blue Rivers (KS & NE) 
Frankfort, KS 
Fairbury, NE, Seward, NE 
Little Blue River (MO) 
Little Blue River Channel, Jackson County, MO 
Lake City AAP, MO 
Miscellaneous 
Stonehouse Creek--Williamstown, KS 
Bedford Project--Bedford, IA 
Shoal Creek--Livonid, MO, Macon-Adair Creek--Kirksville, MO 
Month Inspected 
Apr-1999 
Jun-1999 
May-1999 
May-1999 
Jun-1999 
Jun-1999 
Aug-1999 
Sep-1999 
Nov-1999 
Oct-1999 
Apr-1999 
May-1999 
Jun-1999 
Sep-1999 
Oct-1 999 
Jun-1999 
Jun-1999 
Jun-1999 
Oct-1999 
Oct-1999 
Apr-1999 
Oct-1999 
Apr-1999 
Sep-1999 
Aug-1999 
Aug-1999 
Sep-1999 
Apr-1999 
Aug-1999 
27- 31 
.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 27-K WORK UNDER SPECIAL AUTHORITIES 
(See Section 28 of Test) 
Fiscal Year 
Study Status 1/ Cost 
Flood Control Activities Pursuant to Section 205, 1948 Flood Control Act, 
Public Law 858, 80th Congress, June 30, 1948, as Amended 
Section 205 Coordination Account 
Mitchell and Pearson Creeks, Waynesville, MO 
Mill Creek', Olathe, KS 
St Joseph, MO 
Excelsior Springs, MO 
Parkville, MO 
Brunswick, MO 
TOTAL FOR COORDINATION AND SIX ACTIVE PROJECTS: 
$12,289 
1,195 
51 
39,447 
40,000 
20,000 
20,000 
$132,982 
TOTAL ALL SECTION 205 ACTIVITIES $132,982 
Emergency Streambank Protection--Sec. 14, 1946 Flood Control Act 
Public Law 526, 79th Congress, July 24, 1946, as Amended 
Section 14 Coordination Account 
Chariton River, MO 
Delaware River Water Intake, Kickapoo Reservation, KS 
Flat Creek, MO 
Grand River, Route A Bridge, MO 
Grand River, Chariton County, MO, Salt Creek Bridge 
Hinkson Creek, Columbia Sewermain, MO 
Kansas River, Eudora Bend Bridge, KS 
Little Blue River Barnes Road 
0 Muddy Creek, Grundy County, MO 
Platte River Bridge, Conception, MO 
West Creek, Topeka, KS 
West Fork, Grand River, Route H Bridge, Gentry 
County, MO 
West Fork, Grand River, Route W Roadway 
TOTAL FOR COORDINATION AND 13 ACTIVE PROJECTS 
TOTAL ALL SECTION 14 PROJECTS 
D
C
D
D
C
D
D
D
C
D
C
C
C 
$14,100 
6,227 
8,931 
6,690 
61,179 
5,202 
37,901 
32,367 
5,727 
106,026 
5,036 
233,543 
202,555 
330,625 
$1,056,109 
$1,056,109 
27 - 32

KANSAS CITY, MO, DISTRICT 
Project Modifications for Improvement of Environment 
Section 1135, Water Resources Development Act of 1986, 
Public Law 662, 99th Congress, November 17, 1986 
Coordination Account Funds 
Initial Appraisals, General 
Blue Springs Lake Habitat, MO 
Milford Lake Habitat Restoration, KS 
Rathbun Lake Habitat Restoration, IA 
TOTAL ACTIVE SECTION 1135 
TOTAL ALL SECTION 1135 ACTIVITIES 
Aquatic Ecosystem Restoration 
Section 206, Water Resources Development Act of 1996 
Public Law 303, 104th Congress, October 12, 1996 
Coordination Account Funds -- 
Preliminary Restoration Funds I 
Lake Nemaha Wetlands, KS F 
Straightwater Marsh, Wetland Habitat F 
TOTAL SECTION 206 ACTIVITIES 
1/ Status: I = Initial; D = Planning and Design Analysis; F = Feasibility; P = P&S; C = Construction; 
O =Operational 
Emergency Response Activities 
(See Section 28 of Text) 
Emergency Flood Control Activities--Repair, 
Flood Fighting, and Rescue Work-- 
Public Law 99, 84th Congress 
and Antecedent Legislation 
Activity 
FLOOD CONTROL AND COASTAL EMERGENCIES 
Disaster Prepardness Program--100 
Planning Activities 
Training and Exercise 
Facilities 
National Centers for Expertise 
Total Disaster Preparedness Program 
Approp 96X3125 
FY 98 Expenditures 
$382,481 
15,787 
49,429
0 
$447,697 
27 - 33 
$7,684 
18,019 
11,441 
9,728 
33,052 
$97,924 
$97,924 
$7,855 
9,479 
99,849 
1,000 
$118,183

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Emergency Operations--200 
Response Operations--210 
Acquisition of Supplies & Equipment 
Operational Deployment 
Total Emergency Operations 
Rehabilitation--300 
Federal Flood Control Works 
Non-Federal Flood Control Works 
Field Investigation 
Inspections 
Interagency Levee Activities 
Total Rehabilitation 
Hazard Mitigation--600 
Hazard Mitigation Team Activities 
FLOOD CONTROL AND COASTAL EMERGENCIES 
TOTAL FEDERAL NON-REIMBURSEABLE ACTIVITIES 
SPONSOR'S CONTRIBUTED FUNDS 
Maintenance--300 
Non-Federal Flood Control Works--320 
$449,550 
24,978 
9,911 
$484,439 
$273,707 
102,526 
141,220 
3,337 
57,343 
$578,133 
1,807 
$1,512,076 
Rivers and Harbors 
Contributed Funds 
Approp 96X8862 
Expenditures 
$13,945 
TOTAL ALL EMERGENCY RESPONSE ACTIVITIES EXPENDITURES 
27 - 34 
$1,526,021

KANSAS CITY, MO, DISTRICT 
TABLE 27-L ACTIVE GENERAL INVESTIGATIONS 
(See Section 30 of Text) 
Federal Cost Total By 
Item and PWI Number FY 99 Category 
SURVEYS (Category 100) 
Flood Damage Prevention Studies (120) 
Swope Park Industrial Area, Kansas City, MO--012821 
Subtotal 
Review of Authorized Projects (160) 
MRLS, Units L455 and R460-471 (013267) 
Topeka, KS--013200 
Kansas City, MO & KS--013268 
Wilson Lake, KS--020060 
Subtotal 
Miscellaneous Activities (170) 
Special Investigations--017250 
Interagency Water Resources Development--014713 
North American Waterfowl Mgmt--053904 
Subtotal 
Coordination with Other Agencies and Non-Federal 
Interests (180) 
Coop with Other Water Resources Agencies (181)--053907 
Planning Assistance to States (186) 
Subtotal 
$151,376 
$151,376 
$89,457 
280,075 
351,449 
88 
$721,069 
$149,452 
7,868 
3,404 
$160,724 
$14,939 
126,019 
$140,958 
TOTAL SURVEYS (Category 100) 
COLLECTION AND STUDY OF BASIC DATA 
(Category 200) 
Flood Plain Management Services (250) 
Flood Plain Management Service Unit--082030 
Technical Services--082040 
Quick Responses--082045 
Flood Plains Management Study--082500 
Special Studies 
Mo River Flood Plain Eval, MO--083608 
Missouri SEM MRCS--083614 
Lindsburg, KS 
Brush Creek, Jackson Co., MO 
NorthmoOr, MO Line Creek, Maps 
Subtotal 
$1,174,121 
$32,175 
39,958 
4,500 
-613 
3,857 
27,579 
4,000 
35,000 
35,000 
$181,456 
27 - 35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITY FOR FY 1999 
Hydrologic Studies (260) 
General Hydrology Studies--053820 $33,822 
TOTAL COLLECTION AND STUDY OF BASIC DATA $215,278 
(Category 200) 
PRECONSTRUCTION ENGINEERING AND DESIGN 
Flood Control Projects (Project Not Fully Authorized) 
(Category 450) 
Turkey Creek Basin, KS & MO--012381 $465,672 
Flood Control Projects (Fully Authorized Project) (Category 600) 
Blue River Basin, Kansas City, MO--012563 340,417 
TOTAL PRECONSTRUCTION ENGINEERING AND DESIGN $806,089 
GRAND TOTAL GENERAL INVESTIGATIONS $2,195,494 
27 - 36

KANSAS CITY, MO, DISTRICT 
TABLE 27-M 
item and PWI Number 
PERMIT EVALUATION (100) 
REG--Permit Evaluation--008204 
ENFORCEMENT (200) 
REG--Enforcement--008205 
GRAND TOTAL REGULATORY PROGRAM 
REGULATORY PROGRAM 
(See Section 34 of Text) 
Federal cost 
FY 99 
$1,817,624 
489,038 
$2,306,662 
27 - 37 
__ __ 
__

PORTLAND, OR DISTRICT *
The territorial limits of the Portland District include the below McNary Dam, and south central Oregon west of the 
Pacific coastal drainage area of the State of Oregon, the portions Malheur River and the Steens Mountains, but not including 
of the States of Oregon and Washington which lie within the that part which drains into the Klamath Lake and River. 
Columbia River watershed downstream of the Umatilla Bridge 
IMPROVEMENTS 
Navigation Page 
1. Bonneville Navigation Lock, Bonneville Dam, 
O R and W A .............................. ...... .................... .. 28-2 
2. Chetco River, OR ..................................... 28-2 
3. Columbia and Lower Willamette Rivers below 
Vancouver, WA and Portland, OR ...................... 28-2 
4. Columbia River at Baker Bay, WA .................... 28-3 
5. Columbia River between Chinook, WA and 
Head of Sand Island ......................................... . 28-4 
6. Columbia River at the Mouth, OR and WA ........... 28-4 
7. Columbia River between Vancouver, 
WA and The Dalles, OR .................................... 28-4 
8. Columbia River, Seafarers Memorial 
Hammond, OR ..................................... 28-5 
9. Coos Bay, OR ..................................... 28-5 
10. Coquille River, OR ........................................... . 28-6 
11. Depoe Bay, OR ..................................... 28-7 
12. Port Orford, OR ..................................... 28-7 
13. Project Condition Surveys ................................. 28-7 
14. Rogue River Harbor at Gold Beach, OR .............. 28-7 
15. Siuslaw River, OR ..................................... 28-7 
16. Skipanon Channel, OR ...................................... 28-8 
17. Tillamook Bay and Bar, OR ................................. 28-8 
18. Umpqua River, OR .......................................... 28-9 
19. Willamette River at Willamette Falls, OR ............. 28-9 
20. Yaquina Bay and Harbor, OR .......................... 28-10 
21. Yaquina River, OR ............................................. 28-10 
Flood Control 
22. Applegate Lake, Rogue River Basin, OR ............ 28-11 
23. Blue River Lake, OR ....................................... 28-11 
24. Cottage Grove Lake, OR ................................. 28-11 
25. Dorena Lake, OR ..................................... 28-11 
26. Elk Creek Lake, Rogue River Basin, OR ........... 28-12 
27. Fall Creek Lake, OR ....................................... 28-13 
28. Fern Ridge Lake, OR ...................................... 28-13 
29. Inspection of Completed Flood Control Projects . 28-13 
30. Lower Columbia River Basin Bank Protection, 
OR and WA. ................................... 28-14 
31. Mt. St. Helens Sediment Control, WA ................ 28-14 
32. Scappoose Drainage District, OR .................... 28-14 
33. Scheduling Flood Control Reservoir Operations .28-15 
34. Willamette River Basin Bank Protection, OR ..... 28-15 
35. Willow Creek Lake, Heppner, OR ............... 28-15 
Page 
Multiple-Purpose Projects, Including Power 
36. Bonneville Lock and Dam 
Lake Bonneville, OR and WA ......................... 28-15 
37. Columbia River Fish Mitigation, 
OR and W A ..................................................... 28-16 
38. Columbia River Treaty Fishing Sites, 
OR and W A ................................ .................. 28-17 
39. Cougar Lake, OR ..................................... 28-17 
40. Detroit Lake - Big Cliff, OR ......................... 28-18 
41. Green Peter-Foster Lakes, OR ......................... 28-18 
42. Hills Creek Lake, OR ...................................... 28-19 
43. John Day Lock and Dam - 
Lake Umatilla, OR and WA ............................. 28-19 
44. Lookout Point-Dexter Lakes, OR .................... 28-19 
45. Lost Creek Lake, Rogue River Basin, OR ........... 28-20 
46. The Dalles Lock and Dam - 
Lake Celilo, WA and OR ................................. 28-21 
Work Under Special Authorities 
47. Projects Not Specifically Authorized ................ 28-21 
48. Emergency Response Activities ....................... 28-23 
General Investigations 
49. Surveys ..................................... 28-24 
50. Collection and Study of Basic Data ................. 28-24 
51. Preconstruction Engineering and Design ............ 28-24 
Tables 
Table 28-A Cost & Financial Statement ................ 28-25 
Table 28-B Authorizing Legislation ...................... 28-32 
Table 28-C Other Authorized Navigation 
Projects ..................................... 28-38 
Table 28-D Not Applicable 
Table 28-E Other Authorized Flood Control 
Projects ..................................... 28-39 
Table 28-F Other Authorized Multiple Purpose 
Projects, Including Power ................... 28-41 
Table 28-G Deauthorized Projects ........................ 28-41 
Table 28-H Columbia and Lower Willamette River 
Below Vancouver, WA and 
Portland, OR ...................................... 28-42 
Table 28-I Project Condition Surveys .................. 28-42 
28-1 
_ _ _ ~I~

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Page 
Table 28-J Willamette River at Willamette Falls, OR, 
Principal Features of Existing Canal 
and Locks ............................................. 28-42 
Table 28-K Flood Control Reservoir Operations ...... 28-43 
Table 28-L Work Under Special Authorities, Projects 
Not Specifically Authorized .................. 28-44 
Page 
Table 28-M Work Under Special Authorities, 
Emergency Response Activities ............. 28-45 
Table 28-N Principal Data Concerning Navigation 
Lock, Spillway Dam, and Powerplant.... 28-46 
Table 28-0 Bonneville Power Administration 
Financial Statement ............................ 28-48 
Navigation 
1. BONNEVILLE NAVIGATION LOCK, 
BONNEVILLE DAM, OR AND WA 
Location. On Columbia River 40 miles east of Portland, 
OR about 146 miles above mouth of river. 
Existing project. The existing lock chamber is 76 feet wide 
and 500 feet long with 24.2 feet depth of water over the sill. 
Construction ofa new navigation lock just south of the existing 
lock was authorized in the FY 1985 Supplemental 
Appropriations Act, Public Law 99-88, August 15, 1985. Inland 
Waterways Trust Fund will fund 50 percent of the project cost 
in accordance with the Water Resources Development Act of 
1986, Public Law 99-662, November 17, 1986. The new lock 
chamber is 86 feet wide and 675 feet long with 19 feet depth of 
water over the sill. Estimated cost for construction of the new 
navigation lock is $348,100,000. Construction of the lock is 
completed. The lock opened to shipping on March 26, 1993. 
Restoration of the grounds and historic buildings is complete. 
Local cooperation. None required. 
Operations during fiscal year. New work: Continued real 
estate activities to obtain title to project lands. 
2. CHETCO RIVER, OR 
Location. Rises in Siskiyou Mountains of Coast Range at 
an elevation of 4,000 feet, flows for about 51 miles in a 
circuitous route, and empties into Pacific Ocean at Brookings, 
OR, 300 miles south of entrance to Columbia River and 345 
miles north of San Francisco Bay. (See National Oceanic and 
Atmospheric Administration Charts 18600 and 18203.) 
Existing project. Provides for two jetties at the mouth of 
the river. Modification of 1965 authorized an entrance channel 
120 feet wide by 14 feet deep; a barge turning basin about 250 
feet wide, 650 feet long, and 14 feet deep; and a small boat 
access channel 100 feet wide by 12 feet deep. Also authorized 
was a 450-foot extension of north jetty with an increase in 
elevation of existing portion and a protective dike about 1,800 
feet long with a top elevation of 18 feet. Mean lower low water 
is plane of reference. Tidal range between mean lower low 
water and mean higher high water is 6.9 feet and extreme is 
about 12 feet. Construction ofjetties was completed December 
1957. Removal of rock pinnacles and an abandoned bridge 
structure was accomplished in June 1959. Under authorized 
modification of October 1965, two contracts were completed. 
Construction of entrance channel and extension of north jetty 
was completed in July 1969. Construction of a protective dike, 
turning basin and small boat access channel was completed in 
March 1970. The authorization was modified by WRDA 92 
to "direct the Secretary of the Army to assume maintenance of 
the approximately 200-foot long access channel to the south 
commercial boat basin consistent with authorized project 
depths". This channel will be maintained in lieu of the small 
boat access channel. 
Local cooperation. Fully complied with. 
Terminal facilities. The Port of Brookings has developed 
two large boat basins, one for commercial fishing boats and 
the other for sport boats, and a public boat launching ramp. 
There are four fish receiving docks and a sea-going barge dock 
for lumber loading and storage. There is also a privately owned 
marina and a Coast Guard Station. 
Operations during fiscal year. Maintenance: A total of 
39,813 cubic yards of material was removed by the contract 
hopper dredge Westport. The sand bypasser Sandwick worked 
five days. 
3. COLUMBIAAND LOWER WILLAMETTE 
RIVERS BELOW VANCOUVER, WA, AND 
PORTLAND, OR 
Location. The Columbia River rises in British Columbia, 
through which it flows for 425 miles. It enters the United States 
in northeastern Washington, and empties into the Pacific Ocean 
645 miles north of San Francisco Bay and 160 miles south of 
Strait of Juan DeFuca. Total length of river is 1,210 miles. (See 
NOAA Charts 18520, 18521, 18522, 18523, 18524, 18526, 
and 18531; also Geological Survey Map of Washington.) 
Willamette River rises in Cascade Range in western Oregon, 
flows northerly, and empties into Columbia River about 100 
miles from the sea. Its length from source of Middle Fork is 
about 294 miles. Project embraces 103.5 miles of Columbia 
River below Vancouver, WA, and 14.6 miles of Willamette 
River below Portland, OR. (See NOAA Chart 18526 and 
Geological Survey Map, State of Oregon.) 
Existing project. Provides for a channel 35 feet deep and 
500 feet wide from River Mile 106.5 to 105.5, the distance 
between existing highway and railroad bridges; a channel 40 
feet deep and 600 feet wide from Vancouver, WA, River Mile 
105.5 to mouth of Columbia River, River Mile 3; a turning 
basin at Vancouver, WA, 40 feet deep, 800 feet wide, and about 
5,000 feet long; a turning basin at Longview, WA, 40 feet deep, 
average width of 1,200 feet, and about 6,000 feet long; and a 
channel 40 feet deep in the Willamette River with varying 
widths of 600 to 1,900 feet from the mouth (River Mile 0) to 
Broadway Bridge (River Mile 11.6) which encompasses 
Portland Harbor area, subject to provisions that channel from 
mouth ofWillamette River to turning basin at Vancouver, WA, 
28-2

PORTLAND, OREGON DISTRICT 
be limited to 500 feet in width until need for additional width 
is demonstrated by developed traffic. Existing project also 
provides for auxiliary channels 10 feet deep and 300 feet wide 
near Cathlamet, WA; 30 feet deep and 300 feet wide in St. 
Helens, (Oregon); and 30 feet deep and 500 feet wide 
connecting upper end of St. Helens Channel with main ship 
channel of Columbia; 24 feet deep and 200 feet wide along 
frontage of town of Rainier, OR, extended to its upper and 
lower ends to deep water in Columbia River, 8 feet deep and 
150 feet wide from this depth in Columbia River through old 
mouth of Cowlitz River to a point about 3,000 feet upstream 
from present terminus of harbor line; a channel from Longview 
Port dock downstream along pierhead line and past 
Weyerhaeuser Timber Co. plant at Longview to a connection 
with main ship channel below Mount Coffin, the downstream 
2,400 feet of this channel to be 30 feet deep and 300 feet wide 
and remainder to be 28 feet deep and 250 feet wide; construction 
of a small boat mooring basin at Astoria, OR, to include a sheet 
pile, sand-filled breakwater about 2,400 feet long with a 30- 
foot roadway along its full length, and steel pile shore wings 
totaling about 1,460 feet long and for stone-and-pile dikes and 
revetments. Plane of reference in estuary from mouth of 
Harrington Point is mean lower low water; thence to Portland 
and Vancouver, adopted low water. Tidal range between mean 
lower low water and mean higher high water at mouth of 
Columbia is about 8 feet, and at Portland and Vancouver, about 
3 feet at low stage of rivers. Extreme tidal ranges are about 13 
and 3 feet, respectively. Annual freshets have little effect on 
stage of tide at mouth of Columbia; at Portland and Vancouver, 
they average about 12 feet, while highest know reached a stage 
of 33 feet above water at Portland. 
Work on the 40-foot channel in Columbia River from 
Portland, OR, and Vancouver, WA, to the sea was completed 
in 1976. Auxiliary channel in vicinity of Longview was 
completed in 1949, and improvement of mouth of Cowlitz River 
and small boat mooring basin at Astoria were completed in 
1950. Project depths are maintained all year except for the 
period immediately following the annual freshet in May-June 
when shoaling occurs at several locations. Timing of vessel 
movement with tidal fluctuations permit maximum draft 
conditions. In Columbia and Willamette Rivers between mouth 
and Broadway Bridge at Portland a depth of 40 feet at low tide 
and 42 feet at high tide is practicable all year. In Columbia 
River between mouth of Willamette river and Vancouver, WA, 
depths of 40 and 42 feet at low and high tide, respectively, are 
practicable all year. (For details relating to previous project, 
see pages 1995 and 1998 of Annual Report for 1915 and page 
1746 of Annual Report for 1938.) 
A feasibility study for deepening the Columbia and Lower 
Willamette navigation channel is being conducted in 
cooperation with the Association of Lower Columbia River 
Ports. 
Local cooperation. Fully complied with. Requirements are 
described in full on page 37-3 of FY 1981 Annual Report. 
Terminal facilities. At Portland, OR, there are six Port of 
Portland terminals consisting of 43 berths equipped to handle 
general cargo, bulk cargo, lumber, automobiles, lift-on-lift-off 
and roll-on-roll-off containers, and breakbulk vessels. The Port 
of Portland owns and operates a major ship repair yard, which 
includes the west coast's largest, and the world's third largest, 
floating dry dock. Also available in the harbor area are privately 
operated facilities for receiving, storing and outloading 
petroleum, wood chips, grain, logs, sand and gravel, cement, 
and steel products. 
At Astoria, OR, there is a terminal with facilities for receiving 
and handling all types of general cargo. 
At Vancouver, WA, there are municipal facilities capable of 
berthing five ships simultaneously. Each berth is completely 
outfitted with mechanical and lift facilities for receiving and 
handling all types of cargo. The port has a low dock to handle 
roll-on-roll-off and side-port discharging vessels. The grain 
terminal has a storage capacity of 4,500,000 bushels. 
Port of Longview has a public terminal on Columbia River 
and a privately owned grain elevator with a capacity of 
6,900,000 bushels. This port also has a heavy lift facility, with 
a capacity of 600 tons. 
Port of Kalama has two berthing areas, one port owned and 
one private. 
At other locations on Columbia River between Portland and 
Columbia River entrance there are sufficient private facilities 
to accommodate river vessels and fishing craft. These facilities, 
with planned extensions, are considered adequate for existing 
commerce. (For details, see Port Series Nos. 33 and 34, Corps 
of Engineers, published in 1974 and 1975 respectively.) 
Operations during fiscal year. Maintenance: A total of 
5.7 million cubic yards of material was removed. The U.S. 
hopper dredge Essayons removed 2.1 million cubic yards, the 
U.S. hopper dredge Yaquina removed 457,500 cubic yards, 
the pipeline dredge Oregon removed about 3 million cubic 
yards, and the contract hopper dredge Padre Island removed 
467,000 cubic yards. The sand bypasser Sandwick worked 27 
days in the Cowlitz Old Mouth Channel. The easternmost 400 
feet of the East Astoria Boat Basin North Breakwater was 
repaired with new sheetpile. 
4. COLUMBIA RIVER AT BAKER BAY, WA 
Location. Baker Bay is a shallow body of water about 15 
square miles in extent on the north side of Columbia River 
near its mouth. The bay is separated from the river by Sand 
Island, a low-lying sand bar only a few feet above high tide 
level. (See NOAA Chart 18521.) 
Existing project. A mooring basin 10 and 12 feet deep, 
about 20 acres in extent with protecting breakwaters; and a 
west channel 16 feet deep and 200 feet wide for the first 2,000 
feet, then 16 feet deep and 150 feet wide to the boat basin; a 
channel east of Sand Island to Port of Ilwaco, a distance of 
about 4 miles. Mean lower low water is plane of reference. 
Tidal range between mean lower low water and mean higher 
high water is about 8 feet, and extreme about 13 feet. 
Channel extending through easterly passage of Sand Island 
was completed in 1934. This portion of authorized project is 
not passable and is not maintained at the present time. Dredging 
28-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
west channel to 8 feet was accomplished September 1948. 
Deepening west channel to 10 feet, and boat basin and 
breakwater construction at Ilwaco, WA, was finished December 
1957, and again, deepening of the west channel to 16 feet 
completed in August 1985 under Section 107, finished the 
project. 
Local cooperation. Fully complied with. 
Terminal facilities. Wharves, floats, ramps, and berths, for 
fishing craft, barges and tow-boats. Small-boat basin and 
protecting breakwater provides moorings for numerous fishing 
and recreational craft all year. Facilities are considered adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: Performed 
condition surveys. 
5. COLUMBIA RIVER BETWEEN CHINOOK, 
WA, AND HEAD OF SAND ISLAND 
Location. At easterly end of Baker Bay, lying on north side 
of Columbia River near mouth. (See Coast and Geodetic Survey 
Chart 6151.) 
Existing Project. Channel 10 feet deep and 150 feet wide, 
extending from head of Sand Island to Chinook; a turning and 
mooring basin at upper end of channel, 10 feet deep, 660 feet 
long, and ranging from 275 to 500 feet wide; reconstruction of 
easterly 393 feet of existing breakwater; and extension of 
existing breakwater easterly and thence northerly to connect 
with shore in vicinity of Portland Street, Chinook, WA. Tidal 
range between mean lower low water and mean higher high 
water is about 8 feet and extreme about 13 feet. 
Project as originally authorized was completed in 1940. The 
10-foot channel depth modification was accomplished 
September 1958. Rehabilitation of existing breakwater was 
completed September 1962. 
Local cooperation. Fully complied with. 
Terminal facilities. Chinook Packing Company owns a 
wharf for receiving fresh fish, and one additional fish buying 
company is located at Chinook. Aportion of wharf is also used 
as a public landing. At upper end of channel there is a turning 
and mooring basin with facilities for mooring 350 fishing and 
recreational craft. Adequate terminal and mooring facilities 
include a public launching ramp, hoist with 10-ton capacity 
and suitable supply facilities. 
Operations during fiscal year. Maintenance: Initiated 
(mobilized and started dredging) a clamshell dredging contract 
that will be completed in FY00. 
6. COLUMBIA RIVERAT THE MOUTH, OR 
AND WA 
Location. The Columbia River entrance is 645 miles north 
of San Francisco Bay. Project is about 120 miles downstream 
of Portland, OR and Vancouver, WA. For description of 
Columbia River see Section 3. 
Existing project. Provides for a one-half-mile-wide channel 
across a bar 55 feet deep (mean lower low water) for the 
northernmost 2,000 feet, and 48 feet deep (mean lower low 
water) along the southern 640 feet, to be secured by two 
rubblemound jetties, spur jetty "A" on the north shore and by 
dredging. The north jetty is about 2.5 miles long and the south 
jetty about 6.6 miles long, spur jetty "A" is about 0.3 miles 
long. Tidal range on bar between mean lower low water and 
mean higher high water is about 8 feet, and extreme about 13 
feet. 
The originally authorized project depth of 40 feet was 
completed in 1918; south jetty completed in 1914 and north 
jetty in 1917. A spur jetty (jetty "A') was completed in 1939 
(repaired in 1961) for the purpose of channel stabilization. Spur 
jetty "B" currently is classified "inactive." Dredging of the 
48-foot bar channel started April 1956 was completed in 
September 1957. South jetty rehabilitation started June 1962 
was completed September 1964. North jetty rehabilitation 
started January 1965 was completed April 1965. Additional 
rehabilitation of the south jetty was initiated in May 1982 and 
completed in September 1982. Deepening bar channel to 55 
feet completed September 1984. In FY 95 a 500 foot section 
of the south jetty was removed to allow unimpeded access by 
fisheries resources to 603 acres of intertidal habitat under 
Section 1135 authority. Project dimensions were available at 
end of fiscal year. (For details relating to previous projects, see 
page 1999, Annual Report for 1915 and page 1740 of Annual 
Report for 1938.) 
Local cooperation. Fully complied with. Local interests 
contributed $500,000 toward construction of the north jetty 
which was completed in 1917. 
Operations during fiscal year. Maintenance: A total of 
4.2 million cubic yards of material was removed. The U.S. 
hopper dredge Essayons removed 1.8 million cubic yards of 
material, and the contract hopper dredge Padre Island removed 
2.4 million cubic yards. 
7. COLUMBIA RIVER BETWEEN VANCOUVER, 
WA, AND THE DALLES, OR 
Location. On Columbia River, between Interstate Bridge 
at Vancouver, WA, 106.5 miles above mouth and The Dalles, 
OR, mile 191, a distance of 84.5 miles. For description of 
Columbia River, See Section 3, "Columbia and Lower 
Willamette Rivers Below Vancouver, WA, and Portland, OR." 
Existing project. Channel 27 feet deep at low water and 
300 feet wide between Vancouver, WA, and The Dalles, OR, 
84.5 miles; a channel 10 feet deep at low water and 200 feet 
wide at upstream entrance to Oregon Slough, OR; a suitable 
turning basin adjacent to site of port development in vicinity 
of Camas and Washougal, WA; a boat basin at Hood River, 
OR, 500 by 1,300 feet and 10 feet deep at normal Bonneville 
pool level, with a connecting channel of same depth to 
deepwater, and a protecting breakwater on easterly side; a barge 
channel to waterfront at Bingen, WA, 10 feet deep at normal 
Bonneville pool level, 200 feet wide and about 1 mile long, 
and an access channel 7 feet deep at normal Bonneville pool 
level, 100 feet wide and about 1,000 feet long, to a natural 
mooring basin for small boats near east end of channel; and 
28-4

PORTLAND, OREGON DISTRICT 
construction of The Dalles small boat basin, to provide a 
breakwater and shear boom protected basin about 400 by 800 
feet in size with depth of 8 feet below a pool elevation of 72.5 
feet at mean sea level. Tidal range between mean lower low 
water and mean higher high water at Vancouver is about 3 feet 
and at Bonneville about 0.2 foot at low stages of the river. 
Extreme tidal ranges are about 4 feet and 0.4 foot, respectively. 
Existing project is complete. Construction of The Dalles 
small boat basin, was completed in 1949. Channel dredging at 
upper end of Oregon Slough was accomplished in 1957. Project 
depth of 27 feet between Bonneville and The Dalles, OR, was 
achieved April 1959. The 27-foot channel depth between 
Vancouver, WA, and Bonneville, OR, was completed May 
1938. Improvement of lower entrance of Bonneville Dam lock 
was completed in May 1961. At the present time, the channel 
is maintained to a depth of 17 feet, which is adequate for user 
traffic. Construction of a boat basin at Hood River, OR, and of 
Camas-Washougal, WA, turning basin was accomplished 
February 1962. Construction of a barge channel in Columbia 
River near Bingen, WA, was completed September 1963. Small 
boat recreation channel 100 feet wide 6 feet deep at South 
Channel Government Island completed 1985 under section 107. 
Local cooperation. Fully complied with. 
Terminal facilities. At Vancouver, WA, upstream of 
Interstate Highway bridge at River Mile 108.1 on site of former 
shipyard are numerous ship-building facilities equipped with 
railway and river moorage facilities. Also in this area are a 
paper-storage warehouse with barge slip, two boat building 
businesses, and a storage dock with gantry crane. Sites are 
available for development to suit lessee. 
At Camas, WA, about 13.5 miles upstream from Vancouver, 
there is a private wharf used for transfer of paper-mill supplies 
and paper to and from barges, and facilities for discharging 
bulk oils from barges. 
At Port of The Dalles (mile 44 above Bonneville) there is a 
municipal wharf 125 by 1,100 feet for use by tugs and barges. 
There is a one-story timber and corrugated iron warehouse, 94 
by 461 feet, on this wharf. Aprivate elevator with a capacity of 
40,000 bushels and a public elevator of 1,113,800-bushel 
capacity for handling bulk grain to barges are also at The Dalles. 
Public elevator has rail, truck, and water connections. There is 
a port owned rail connection about three-fourths mile below 
municipal wharf where certain types of cargo may be handled 
between railroad cars and barges. 
At numerous locations along the entire waterway there are 
facilities for transfer of logs to water from trucks and public 
and private boat basins. Facilities are considered adequate for 
present commerce. 
Operations during fiscal year. Maintenance: Condition 
surveys were performed. U.S. hopper dredge Yaquina removed 
69,000 cubic yards. 
8. COLUMBIA RIVER, SEAFARERS 
MEMORIAL, HAMMOND, OR 
Location. The memorial will be located at Point Adams, in 
the City of Warrenton, OR, at River Mile 8.5 on the Columbia 
River approximately 50 yards off shore and adjacent to an 
existing Corps of Engineers pile dike. 
Existing project. None. 
Local cooperation. ALocal Cooperation Agreement (LCA) 
with the local sponsor, City of Warrenton, OR, is being 
developed. This LCA will require the sponsor to pay for all 
costs above the authorized $150,000 for engineering, design, 
acquisition and construction of a support structure to serve as 
the foundation for the Seafarers Memorial. In addition, the 
sponsor is providing the statue for which the foundation 
structure is being built. 
Operations during fiscal year. All work has been 
suspended until the LCA has been approved by all parties and 
the local sponsor has raised sufficient funds for purchase of 
the statue and any costs above the $150,000 limit for the support 
structure. 
9. COOS BAY, OR 
Location. On Oregon coast 200 miles south of mouth of 
Columbia River and 445 miles north of San Francisco Bay. It 
is about 13 miles long and 1 mile wide, with an area at high 
tide of about 15 square miles. (See NOAA Charts 18580 and 
18587.) 
Existing project. Two rubblemound, high-tide jetties at 
entrance; a channel across the outer bar 45 feet deep and 700 
feet wide, reducing gradually to 35 feet deep and 300 feet wide 
near River Mile 1 and continuing to about mile 9; thence a 
channel 35 feet deep and generally 400 feet wide to mile 15; 
an anchorage area 35 feet deep, 800 feet wide, and 1,000 feet 
long at Empire (River Mile 5.5); turning basins at North Bend 
(River Mile 12.5) and Coalbank (River Mile 14.7) 35 feet deep, 
650 feet wide and 1,000 feet long; a channel 22 feet deep and 
150 feet wide from Smith's Mill (River Mile 15) to Millington 
(River Mile 17); a small boat basin, about 500 by 900 feet at 
Charleston, with a connecting channel, 16 feet deep, 150 feet 
wide and 6,200 feet long, to deep water in Coos Bay, and 
construction of a protecting breakwater and bulkhead. Plane 
of reference is mean lower low water. Tidal range between 
mean lower low water and mean higher high water is 7 feet 
and extreme is about 11 feet at both the entrance and at Coos 
Bay. 
South jetty was completed in 1928, north jetty in 1929, and 
24-foot channel in 1937. The south jetty was restored in 1941 
and 1942 by construction of a concrete cap for full length of 
the jetty. Excavation of channel to 30 feet deep and generally 
300 feet wide from entrance of Isthmus Slough was completed 
in 1951. Dredging outer bar channel to a depth of 40 feet, 
decreasing to 30 feet at Guano Rock was completed in 1952. 
Construction of the Charleston Channel and small-boat basin 
was completed in September 1956. Rehabilitation of south jetty 
was started in June 1962 and completed December 1963. Repair 
of north jetty was completed in August 1989. Construction of 
28-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
the deeper and wider channel to mile 15 was completed in 
1979. Deepening of Charleston channel and turning basin 
completed in 1985 under Section 107. (For details relating to 
previous projects, see page 1987 to Annual Report for 1915 
and page 1728 of Annual Report for 1938.) 
A modification to the existing project was authorized in the 
FY 1996 Energy and Water Development Appropriations Act, 
Public Law 104-46, November 13, 1995. This authorization 
provided for deepening the channel by 2 feet to 47 feet below 
mean lower low water (MLLW) from the entrance to Guano 
Rock (river mile 1) and to 37 feet below MLLW from river 
mile 1 to 15. Public Law 104-46 also provided for deepening 
by two feet and expanding the turning basin at river mile 12 by 
100 feet from 800 by 1000 feet to 900 by 1000 feet. The 
excavation material for the channel deepening was transported 
to the ocean for disposal. The cost for preparation of the plans 
and specifications and the construction of the project was 
$11,616,000, of which $8,116,000 was federal and $3,500,000 
was non-federal. In addition, the sponsor paid 100 percent of 
the estimated cost for dredging the berth areas. 
Local cooperation. Fully complied with. Requirements are 
described in full on page 37-5 of FY 1981 Annual Report. 
The sponsor, International Port of Coos Bay, signed a Project 
Cooperation Agreement on May 8, 1996 for the project 
modification to deepen the channel as authorized in Public Law 
104-46. In accordance with cost sharing requirements of the 
Water Resources Development Act of 1986, the Federal 
Government provided 75 percent of the costs associated with 
the general navigation features of the project. The non-federal 
sponsor was required to provide 25 percent of the total 
construction cost of the general navigation features up front. 
The sponsor was also required to provide an additional 10 
percent of the cost of the general navigation features of the 
project in cash over a period not to exceed 30 years. 
Terminal facilities. At North Bend there is a municipal dock 
649 feet long fronting on channel, about 2,380 feet of privately 
owned mill docks, and three oil receiving terminals in vicinity. 
At Coos Bay there is a privately owned dock with a frontage 
of 1,345 feet, open to the public on equal terms; several small 
landings for fishing and harbor craft; and three lumber docks 
with 1,300-foot, 576-foot and 500-foot frontages, respectively. 
In the North Spit industrial area, there is one woodchip 
loading facility having a frontage of 1200 feet and a smaller Tdock 
operated by the Port of Coos Bay. 
At Eastside, on Isthmus Slough, there is a 200-foot dock. 
At Empire there is a privately owned lumber dock with 
frontage of 510 feet, and an oil terminal, owned by Port of 
Coos Bay, for receipt of petroleum products by barge. A barge 
slip also owned by the Port was completed in 1986. 
At Charleston there are wharves, for receipt of fresh fish 
and shellfish and a large seafood receiving and processing plant. 
There are also two municipally owned small-boat basins, open 
to all on equal terms, capable of mooring 250 fishing and 
recreation craft. Servicing facilities for small craft are available 
at all facilities, and public launching ramps have been 
constructed in Charleston area by private interests. A privately 
owned floating moorage on Joe Ney Slough has facilities for 
mooring about 50 fishing vessels. 
At Jordan Cove area there is a dock, 248 feet long, for wood 
chip ships. 
Operations during fiscal year. New work: A contract to 
deepen the channel was awarded on May 23, 1996 and was 
completed in March 1997. A second contract was awarded in 
June 1997. The project construction was completed in first 
quarter of fiscal year 1998, except for post construction 
monitoring which is scheduled to continue through fiscal year 
2000. 
Maintenance: A total of 1,722,200 cubic yards of material 
was removed. The US hopper dredgeYaquina removed 154,500 
cubic yards; the contract hopper dredge Padre Island removed 
697,200 cubic yards and the contract dredges Seattle and Paula 
Lee removed 870,500 cubic yards. The sand-bypasser 
Sandwick worked 16 days in Charleston entrance channel. 
10. COQUILLE RIVER, OR 
Location. Rises in Coast Range, flows generally westerly 
for about 100 miles, and empties into Pacific Ocean at Bandon, 
OR, 225 miles south of mouth of Columbia River and 420 
miles north of San Francisco Bay. (See NOAA Charts 18580 
and 18186.) 
Existing project. Two rubblemound high-tide jetties at 
river mouth, south jetty 2,700 feet long and the north, 3,450 
feet long; and a channel 13 feet deep at mean lower low water 
and of suitable width from the sea to a point 1 mile above old 
Coquille River Lighthouse, and snagging to State highway 
bridge at city of Coquille. Mean lower low water is plane of 
reference. Tidal range between mean lower low water and 
mean higher high water at mouth is 7 feet and extreme about 
10 feet. 
Jetties were completed in 1908 and entrance channel in 1933. 
North jetty was reconstructed in 1942 and a 750-foot extension 
to easterly end was constructed in 1951. South jetty was repaired 
in 1954 and north jetty in 1956. Coquille Lighthouse 
rehabilitation was completed June 21, 1976. Port of Bandon 
constructed boat basin facility in conjunction with protective 
breakwater and entrance channel construction in 1985, under 
Section 107. (For details relating to previous projects, see page 
1986 of Annual Report for 1915 and page 1727 of Annual 
Report for 1938.) 
A plan to deepen the entrance channel of the Coquille River 
from 13 feet to 18 feet was approved in May 1988. The 
economics were reevaluated in FY1993 and the project was 
not economically feasible at that time. 
Local cooperation. Restoration of lighthouse using Code 
710, Recreation Facilities at Completed Projects funding, 
required 50 percent cost sharing with non-Federal sponsor 
(Oregon State Parks). 
28-6

PORTLAND, OREGON DISTRICT 
Terminal facilities. At Bandon: A publicly owned wharf, 
and a small-boat basin open to all on equal terms. 
Operations during fiscal year. Maintenance: contract 
hopper dredge Westport removed 18,415 cubic yards of material 
from the entrance channel. 
11. DEPOE BAY, OR 
Location. Harbor on Oregon coast 100 miles south of mouth 
of Columbia River. (See Coast and Geodetic Survey Chart 
5902.) 
Existing project. Two breakwaters north of entrance; an 
entrance channel 8 feet deep and 50 feet wide; an inner basin 
750 feet long, 390 feet wide and 8 feet deep with retaining 
wall along easterly side; and a stone spending beach. Mean 
lower low water is plane of reference. Tidal range between 
mean lower low water and mean higher high water is 8 feet 
and extreme is about 12 feet. Project as originally authorized 
was completed in 1939 and project modifications, enlarging 
the basin and deepening to 8 feet, were accomplished in June 
1952 and August 1966. 
Local cooperation. Fully complied with. 
Terminal facilities. Facilities, in inner basin, consist of 
landings and floats to accommodate operators of excursion and 
commercial fishing boats. Facilities considered adequate for 
existing commerce. 
Operations during fiscal year. A project condition survey 
and miscellaneous inspections were performed. 
12. PORT ORFORD, OR 
Location. On Oregon coast 250 miles south of Columbia 
River entrance and 390 miles north of San Francisco Bay. 
(NOAA Chart 18203 and Geological Survey Quadrangle, Port 
Orford, OR) 
Existing project. Improvement of harbor by 55-foot 
extension of existing locally constructed breakwater and 
dredging of a turning basin, 340 feet long, 100 feet wide and 
16 feet deep. Breakwater was completed October, 1968. 
Turning basin was completed September 1971. The 
authorization was modified by WRDA 92 to allow the Corps 
to maintain the authorized navigation channel within 50 feet 
of the port facility. 
Local cooperation. Fully complied with. 
Terminal facilities. A dock which is a timber piling structure 
about 210 by 70 feet, equipped with hydraulic crane for lifting 
boats from the water to dock for repairs and/or storage and 
removing fish catches from boats. Expansion of the dock 
structure to 210 x 220 feet is complete. The installation of the 
second hydraulic crane was completed in FY 1986. About 150 
fishing and private boats use this dock each year. 
Operations during fiscal year. Maintenance: During the 
summer months the sand-bypasser Sandwick worked 48 days. 
A contractor dredged 6,508 cubic yards during the winter 
season. 
13. PROJECT CONDITION SURVEYS 
Surveys were conducted during the fiscal year at a cost of 
$84,168; (See Table 28-I). 
14. ROGUE RIVER HARBOR AT GOLD BEACH, 
OR 
Location. Rises in Cascade Range in southwestern Oregon; 
flows westerly through Coast Range, and empties into Pacific 
Ocean 264 miles south of mouth of Columbia River and 381 
miles north of San Francisco Bay. (See NOAA Chart 18202.) 
Existing project. Two jetties at entrance, and a channel 13 
feet deep and 300 feet wide from ocean to a point immediately 
below State highway bridge, about 1 mile, including widening 
channel at a point about 0.25 mile below bridge to form a turning 
basin 13 feet deep, 500 feet wide, and 650 feet long. At request 
of local interests, turning basin was located in south portion of 
estuary downstream from a point 0.25 mile below bridge. This 
change was effected to permit adequate terminal facilities to 
be constructed adjacent to turning basin. Mean lower low water 
is plane of reference. Range of tide between mean lower low 
water and mean higher high water is 7 feet, and extreme about 
14 feet. 
Project as authorized has been completed. Construction of 
two jetties at entrance was completed September 1960. 
Dredging river channel by contract and entrance bar by 
government plant was completed October 1961. North jetty 
rehabilitation along channel side was completed October 1966. 
Breakwater construction and dredging, under contract awarded 
in September 1964, was 17 percent accomplished when flood 
of December 1964 destroyed all completed works. Contract 
was terminated as further construction at that location was 
considered unfeasible. Bank protection work at Wedderburn 
location was completed in October 1972. A breakwater, 
constructed by Port of Gold Beach, was completed during 1973. 
In 1985, three pile dikes, located on the south side of channel 
oceanward of the boat basin entrance, were completed. At the 
direction of Congress, the boat basin entrance channel was 
relocated approximately 1,000 feet upstream to a new opening 
in the breakwater provided by the Port of Gold Beach. 
Local cooperation. Fully complied with. 
Terminal facilities. There are various landings for fishing 
and recreational craft. At Wedderbum, across river from Gold 
Beach, is a facility to accommodate excursion passengers and 
small freight items destined for various private landings 
between Wedderbum and Agness, OR. Facilities considered 
adequate for existing commerce. 
Operations during fiscal year. Completed engineering 
studies on relocation of the boat basin access channel. 
15. SIUSLAW RIVER, OR 
Location. Rises in coast range, flows about 110 miles 
westerly and empties into Pacific Ocean about 160 miles south 
of entrance of Columbia River and 485 miles north of San 
Francisco Bay, CA. (See NOAA Charts 19583 and 18580.) 
28-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Existing project. Provides for 2 high-tide, rubblemound 
jetties 750 feet apart at the outer end, the north jetty 8,390 feet 
long (600 feet unconstructed) and the south jetty 4,200 feet 
long; an entrance channel 18 feet deep and 300 feet wide from 
deep water in ocean to a point 1,500 feet inside the outer end 
of existing north jetty; thence a channel 16 feet deep, 200 feet 
wide with additional widening at bends, and about 5 miles long, 
to a turning basin, 16 feet deep, 400 feet wide, and 600 feet 
long, opposite Siuslaw dock at Florence; a channel 12 feet deep, 
150 feet wide from Florence to mile 16.5; and at River Mile 
15.5 a turning basin 12 feet deep, 300 feet wide, and 500 feet 
long. Mean lower low water is plane of reference. Tidal range 
between mean lower low water and mean higher high water at 
mouth of river is 7 feet and extreme about 11 feet. During low 
stages of river, tidal effect extends to Mapleton, 20.5 miles 
above mouth. (For details relating to previous project, see page 
1988 of Annual Report for 1915.) 
A modification to the existing project was authorized by 
Public Law 96-367, October 1, 1980. North and south jetty 
modifications were completed in FY 86. Modifications provide 
for extending the north and south jetties by 1,900 and 2,300 
feet respectively. The jetty extensions terminate at 
approximately the minus 25-foot contour. Spur jetties were 
constructed on each jetty extension to reduce longshore currents 
from transporting material around the heads of the jetties. Each 
spur jetty is 400 feet long and originates approximately 900 
feet shoreward of the jetty head. The north jetty spur is oriented 
45 degrees to the north of the existing jetty alignment and the 
south jetty spur 45 degrees to the south of the jetty alignment. 
Local cooperation. Fully complied with. 
Terminal facilities. Port dock at Florence, 150 feet wide 
and 350 feet long, is about 5.3 miles above river entrance and 
accommodates a fish-receiving station at east end of wharf 
which maintains a 2-ton capacity winch and supplies gasoline, 
oil and ice to fishermen. Other facilities at Florence consist of 
various floatways which provide docking facilities for fishing 
vessels and other small craft and a floating dock with 
accommodations for 75 commercial fishing vessels. Adjacent 
to commercial basin is mooring basin with accommodations 
for 200 sport boats of all sizes. 
Modem docks for loading ocean-going barges with packaged 
lumber is maintained at Mapleton and owned by the Davison 
Lumber Company. 
There are also a number of private landings and log booms 
between Cushman and Mapleton to accommodate river traffic. 
These facilities are considered adequate for existing traffic. 
Operations during fiscalyear. Maintenance: U.S. hopper 
dredge Yaquina removed 43,490 cubic yards of material. 
16. SKIPANON CHANNEL, OR 
Location. In tidal waterway extending south 2.7 miles from 
deep water in Columbia River. Channel enters Columbia about 
10 miles above mouth and 4 miles below Astoria, OR. (See 
NOAA Chart 18523.) 
Existing project. Channel 30 feet deep and generally 200 
feet wide extending from deep water in Columbia River to 
railroad bridge at Warrenton, OR, distance of 1.8 miles, turning 
basin of same depth, mooring basin 12 feet deep at mean lower 
low water at Warrenton, OR, and channel 7 feet deep, generally 
40 feet wide, with increased widths at log dumps and terminals, 
for 4,500 feet via cutoff channel above railroad bridge. Channel 
is maintained to 16 feet which is adequate for user traffic. Mean 
lower low water is plane of reference. Tidal range between 
mean lower low water and mean higher high water is about 8 
feet, extreme is about 13 feet. 
Project as authorized is complete. Dredging river channel 
and turning basin was completed in 1939. Construction of 
small-boat mooring basin at Warrenton, OR, was completed 
October 1957, and fill stabilization work was accomplished in 
August 1958. 
Local cooperation. None required. 
Terminal facilities. City of Warrenton owns wharf with a 
300-foot frontage open to pubic on equal terms. One privately 
owned cannery wharf with a 300-foot frontage is used for 
unloading fish and handling fish nets. One privately owned 
boatyard has floats and moorage facilities for use by a maximum 
of 80 small boats. Small-boat basin has facilities for numerous 
fishing and recreation craft, and a privately owned lumber mill 
has a barge loading facility for chips and lumber. Facilities are 
considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: The U.S. 
hopper dredge Yaquina removed 9,754 cubic yards of material 
from the outer channel. 
17. TILLAMOOK BAYAND BAR, OR 
Location. Bay is on Oregon coast about 50 miles south of 
mouth of Columbia River. (See NOAA Charts 18520 and 
18558.) 
Existing project. Provides for a jetty about 5,700 feet long 
on north side of entrance and a jetty 8,000 feet long on south 
side; a channel through bar 18 feet deep and of such width as 
can be practically and economically obtained; for a channel 
200 feet wide and 18 feet deep from deep water in bay to Miami 
Cove; and for initial dredging to 12 feet deep of a small-boat 
basin and approach thereto at Garibaldi, OR. Project also 
provides for improvement of Bayocean Peninsula, OR, by 
construction of sand and rockfill dike 1.4 miles long, on 
alignment extending between Pitcher Point and town of 
Bayocean. Mean lower low water is plane of reference. Tidal 
range between mean lower low water and mean higher high 
water is 8 feet, extreme is about 14 feet. Hobsonville Channel 
portion of project is inactive. 
Except for construction of Hobsonville Channel portion, 
classified inactive, channels were completed in 1927, north 
jetty in 1933, improvement of Bayocean Peninsula in 1956 
and small-boat basin in 1958. The north jetty was rehabilitated 
in 1965 and again in 1991. South jetty construction was initiated 
in 1969, extended in 1974, and completed to the authorized 
8,000 feet in 1978. 18 foot channel to Miami Cove is inactive 
due to mill closure. (For details relating to previous projects, 
28-8

PORTLAND, OREGON DISTRICT 
see page 1989 of Annual Report for 1915 and page 1474 of 
Annual Report for 1936.) 
Local cooperation. Fully complied with. Requirements are 
described in full on page 37-9 of FY 1981 Annual Report. 
Terminal facilities. At Garibaldi: A facility owned by the 
Port of Bay City, for shipping lumber and receiving logs, a 
public landing suitable for mooring fishing vessels, towboats, 
and other craft. Small-boat basin has adequate facilities for 
mooring fishing and recreational craft. A privately owned boat 
ramp and moorage is available for recreational craft. 
At Bay City: A privately owned wharf used exclusively for 
receipt of fresh fish and shellfish. Facilities considered adequate 
for existing commerce. 
Operations during fiscal year. Maintenance: Project 
condition surveys were performed. 
18. UMPQUA RIVER, OR 
Location. Rises in Cascade Range, flows westerly about 
120 miles, and empties into Pacific Ocean 180 miles south of 
Columbia River and 465 miles north of San Francisco Bay. 
(See NOAA Charts 18580 and 18584.) 
Existing project. A jetty on north side of entrance about 
8,000 feet long, a south jetty 4,200 feet long extending to a 
point 1,800 feet south of outer end of north jetty; dredging to 
provide a usable entrance channel 26 feet deep, and a river 
channel 22 feet deep and 200 feet wide, from mouth to 
Reedsport, a distance of about 12 miles with a turning basin at 
Reedsport 1,000 feet long, 600 feet wide, and 22 feet deep; 
deepening of channel at Winchester Bay to 16 feet deep by 
100 feet wide for 3,100 feet, then adding 16 feet deep by 100 
feet wide for 500 feet, and 12 feet deep by 75 feet wide for 950 
feet beyond boat basin making up the East Boat Channel. A 
new West Boat Channel was added 16 feet deep by 100 feet 
wide for 4,300 feet and completed in 1984. Project was 
modified in 1951 to provide a channel in Scholfield River, but 
this portion of the project is currently inactive. Mean lower 
low water is plane of reference. Tidal range between mean 
lower low water and mean higher high water at river mouth is 
7 feet, and extreme range is about 11 feet. 
North jetty was completed in 1930. Extension to original 
south jetty was completed in 1938. Dredging a 22-foot channel 
from mouth of river to Reedsport was completed in 1941. 
Gardiner Channel and turning basin was completed in 1949 
and Winchester Bay Channel and mooring basin in 1956. 
Rehabilitation of south jetty was completed August, 1963. 
Extension of training jetty was completed October 9, 1980. 
Deepening Winchester Bay East Channel and new West 
Channel completed 1984 under Section 107. (For details 
relating to previous projects, see page 2967 of Annual Report 
for 1898 and page 1732 of Annual Report for 1938.) 
Local cooperation. None required. 
Terminal facilities. At Gardiner there is about 650 feet of 
wharf frontage. Also there is an oil unloading facility owned 
by International Paper Co. for exclusive use of tanker barges. 
Port of Umpqua owns one wharf with 456 feet of water 
frontage, of which 228 feet is usable for vessels and another 
with about 75 feet of water frontage which has not been used 
generally for commercial shipping. 
On Bolon Island across the river from Reedsport a wharf 
was constructed which has about 5 acres of open storage for 
lumber and available to all on equal terms. 
At Winchester Bay, 2 miles from river entrance there is a 
major sports and commercial fishing harbor. Facilities are 
considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: U.S. hopper 
dredge Yaquina removed 228,153 cubic yards of material, and 
the sand-bypasser Sandwick worked 18 days at Winchester 
Bay. 
19. WILLAMETTE RIVER AT WILLAMETTE 
FALLS, OR 
Location. Locks and dam covered by this project are at 
Willamette Falls, a rocky reef in Willamette River at Oregon 
City, OR, about 26 miles above mouth of river. 
Existing project. Canal and locks were originally 
constructed by private interest in 1873 and were purchased by 
the United States in April 1915 for $375,000. Final report on 
purchase and rehabilitation of canal and locks is in the Annual 
Report for 1923, when project was reported 98 percent 
complete. The project includes four locks a canal basin and an 
extra guard lock used to prevent flooding when river levels are 
high. The system acts as a fluid staircase between the upper 
and lower reaches of the Willamette River. Total length of 
existing canals and locks is about 3,500 feet. Principal features 
of existing canal and locks at Willamette Falls are set forth in 
Table 28-J. Ordinary fluctuation of stage of water above locks 
is 12 feet and extreme, due to flood conditions, 20 feet. Below 
locks, ordinary fluctuation is 15 feet and extreme 50 feet. 
Until the 1940's, the gates were opened manually. Now, the 
gates are operated by hydraulic pumps controlled by switches 
in two control stations with the aid of closed-circuit television 
and radio communication. All the gates have been replaced 
under minor rehabilitation funds. Existing locks and grounds 
are in good condition and in continuous operation. New service 
building was completed in 1988 costing $523,000. The project 
was placed on the National Register of Historic Places in 1974, 
and was established as an Oregon Civil Engineering Landmark 
in 1991. 
As a result of the mill closure in 1996, one of two shifts was 
eliminated and hours of operation reduced. 
Local cooperation. Fully complied with. 
Terminal facilities. Simpson Paper closed the mill in 1996 
after over 100 years of operations. The mill was sold to West 
Linn Paper. West Linn Paper has a timber wharf about 850 feet 
long, extending to and supported by a concrete division wall 
built in lock canal by the United States. The use of the wharf 
for operations purposes by the mill may be changed due to 
shipping changes by the new owner. 
28-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance continued. 
20. YAQUINA BAY AND HARBOR, OR 
Location. Yaquina Bay is on Oregon coast, 113 miles south 
of mouth of Columbia River. (See NOAA Charts 18580 and 
18581.) 
Existing project. Two high tide rubblemound jetties at 
entrance, north jetty 7,000 feet, and south jetty 8,600 feet long; 
a spur jetty on channel side of south jetty 4,700 feet from its 
sea end, 800 feet long; five groins channelward from south 
jetty; channel 40 feet deep for a general width of 400 feet across 
bar and at outer end of entrance channel; a channel 30 feet 
deep and 300 feet wide to a turning basin of same depth, 900 to 
1,200 feet wide and 1,400 feet long, and a channel 18 feet deep 
and 200 feet wide from 30-foot channel at about mile 2.4, thence 
upstream to abandoned railroad terminus atYaquina, a distance 
of about 4.5 miles. Project also provides for two small boat 
mooring basins at Newport, OR. Mean lower low water is plane 
of reference. Tidal range between mean lower low water and 
mean higher high water is 8 feet and extreme is about 12 feet. 
At mile 1.2 a 1,300 foot long breakwater protecting the Port of 
Newport South Beach Marina together with an entrance channel 
8 feet long by 100 feet wide for a distance of 2,035 feet. 
Project as originally authorized was completed in May 1952. 
Restoration of jetties was completed in 1934 and extension of 
north jetty 1,000 feet seaward was completed in 1940. 
Construction of mooring basin at Newport and dredging of 
channel and turning basin to project dimensions were completed 
during fiscal year 1949. Restoration of north jetty was again 
accomplished in 1956. Under modification of July 3, 1958, 
extension of north jetty was completed in September 1966, 
dredging of 40-foot bar channel and 30-foot river channel was 
completed in October 1968, and extension of south jetty was 
completed in June 1972. The north jetty was rehabilitated in 
1978 and again in 1988. (For details relating to previous projects 
see Annual Report for 1893, part 4, page 3314, and Annual 
Report for 1938, page 1736.) 
Local cooperation. None required. 
Terminal facilities. At McLean Point, on north side of bay, 
about 2 miles from entrance, Port of Newport has two berths 
capable of serving ocean-going vessels, one 435 feet long, the 
second 520 feet long. At the time the second berth was dredged, 
a retaining wall and fill of 6 acres were constructed adjacent to 
deep water. There now is 40 acres of filled land adjacent to 
deep water, and of this total, 7 acres were constructed in 1956- 
57. This facility has necessary carriers and lift trucks for 
handling lumber cargoes, warehouse for covered cargo storage, 
and is open to all on equal terms. 
Port of Newport also has a public wharf with 300 feet of 
frontage for servicing fishing boats. In addition, Port ofNewport 
maintains 510 berths for mooring commercial and sport fishing 
vessels. There are several seafood companies on the bay which 
have their own facilities for handling fresh fish and crab. 
Supplies and petroleum products are readily available for small 
vessels. On south side of bay about 1.2 miles above entrance, 
Port of Newport has constructed South Beach Marina which 
can handle approximately 600 pleasure craft and shallow draft 
fishing boats. Public facilities include public automobile and 
boat trailer parking, boat launching ramp, fuel dock, fishing 
pier, and picnic area. A dry boat moorage of 120 boats, is 
completed. A swing hoist with 3-ton capacity is currently 
available and one with 60-ton capacity is planned. 
About 1.5 miles above entrance, Oregon Aqua Foods, 
subsidiary of Weyerhaeuser Company, maintains a commercial 
fish farm facility. 
About 2.0 miles above entrance, Oregon State University, 
in conjunction with the Marine Science Center on 52 acres, 
maintains a 220-foot pier for docking large and small research 
vessels and a 100-foot float for docking small boats. Docking 
facilities are restricted to research vessels and State of Oregon 
small boats. 
Operations during fiscal year. Maintenance: U.S. hopper 
dredge Yaquina removed 165,836 cubic yards. Contract hopper 
dredge Westport removed 94,711 cubic yards. 41,217 tons of 
displaced jetty stone were removed from the entrance channel 
to alleviate dangerous navigation conditions. 
21. YAQUINA RIVER, OR 
Location. Rises in Coast Range, flows about 50 miles in 
a westerly direction, and empties into Yaquina Bay, on Oregon 
coast. (See US Coast and Geodetic Survey Charts Nos. 5802 
and 6058.) 
Existing project. Provides for two controlling half-tide 
dikes of piling, brush, and stone, each about 1,100 feet long 
(constructed by local interests), and for a channel 10 feet deep 
and generally 150 feet wide on Yaquina River and 200 feet 
wide in Depot Slough, extending from town of Yaquina near 
RM 4.0 to Toledo at RM 14.4. 
Mean lower low water is plane of reference. Tidal range 
between lower low water and mean higher high water is 8 feet 
and extreme about 12 feet. Freshet heights are about 12 feet at 
mouth of Depot Slough. Channel work authorized March 1913 
was completed in 1914. Additional work authorized in 1960 
was completed in 1969. 
Local cooperation. Fully complied with. 
Terminal facilities. Near town of Yaquina at river mouth, 
which is also head ofYaquina Bay, there is a moorage for small 
vessels and a small-craft shipyard. The Port of Toledo has 
public-terminal facilities for accommodation of local craft. 
There are also privately owned facilities for loading lumber 
barges, receipt of bunker fuel, and log rollways for receipt of 
logs. These facilities are considered adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: None 
required. 
28-10

PORTLAND, OREGON DISTRICT 
Flood Control 
22. APPLEGATE LAKE, ROGUE RIVER BASIN, 
OR 
Location In Jackson County, OR, on Upper Applegate 
River, a tributary of Rogue River, at River Mile 46, about 23 
airline miles southwest of Medford, OR. 
Existing project. A gravel-fill embankment dam, 242 feet 
high from streambed to crest with an overall length of 1,300 
feet. A gate-controlled concrete chute-type spillway on the left 
abutment, and a regulating outlet conduit, and intake tower 
with multilevel intakes on the left side of valley floor. Lake, 5 
miles long, provides 75,000 acre-feet of usable storage for flood 
control and water conservation utilization. Project controls 
runoff from a drainage area of 223 square miles. In addition to 
flood control, reservoir is operated to provide irrigation, fish 
and wildlife enhancement, water quality control, and recreation 
benefits. Recreation facilities were provided by the Corps of 
Engineers with operation and maintenance by the USFS under 
a memorandum of agreement. Project is complete and 
operating. 
Local cooperation. Authorizing act requires that State of 
Oregon insure maintenance of stream flow released for fishery. 
In addition, costs allocated to irrigation would have to be repaid 
in a manner and to an extent consistent with reclamation laws 
and policies. Oregon Department of Fish and Wildlife made 
filing May 31, 1962 with State Engineer for water rights for 
use of stored water and natural flows for fish habitat 
improvement in amounts and at times specified in project 
authorization. The U.S. Bureau of Reclamation has made a 
feasibility study of Applegate Irrigation Division. The results 
of the study indicate that at present there does not appear to be 
a feasible Federal irrigation project for the Applegate River 
valley. Local interests have furnished all local cooperation 
specified by the 1970 Flood Control Act. The assurances were 
approved by the Secretary of the Army on May 8, 1975. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance was performed. Freshets regulated 
by Applegate Lake on Applegate River and Rogue River are 
shown in Table 28-K. 
23. BLUE RIVER LAKE, OR 
Location. On Blue River, a major tributary of McKenzie 
River, 1.8 miles above confluence of the two streams at the 
confluence of Quartz Creek and Blue River and about 42 miles 
easterly of Eugene, OR. 
Existing project. A gravel-fill embankment dam 1,329 feet 
long at crest including spillway and 319 feet above the lowest 
point of the general foundation. A concrete gravity chute-type 
spillway with two gates is located on left abutment. Outlet works 
are in left abutment. On left shore of reservoir an earth-andgravel 
fill embankment, about 1,535 feet long and 70 feet high, 
closes a low saddle between Blue River and McKenzie River. 
Project controls runoff from drainage area of 88 square miles. 
Reservoir provides 85,000 acre-feet of usable flood control 
storage and is operated as aunit of coordinated reservoir system 
to protect Willamette River Valley and increase low waterflows 
for navigation and other purposes. Recreation facilities are 
provided by the U.S. Forest Service under a Memorandum of 
Agreement. Project is complete. Construction of dam and 
appurtenant works was initiated in May 1963 and operation 
for flood control was effective in October 1968. Settlement of 
claims was completed in May 1974. Eugene Water and Electric 
Board (EWEB) was granted a FERC license in November 1989 
to install two small hydropower units at Blue River Lake project. 
EWEB has delayed their plans for hydropower units pending 
the conclusion of a Corps proposal to add water temperature 
control to the regulating outlet tower. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance work performed. Freshets regulated 
by Blue River Lake project on Blue River, a major tributary of 
McKenzie River, are shown in Table 28-K. 
24. COTTAGE GROVE LAKE, OR 
Location. On Coast Fork ofWillamette River, 29 miles from 
mouth. Coast Fork rises in Douglas County, OR, on western 
slope of Cascade Range and northern slope of Calapooia Range, 
flows north for 49 miles, and unites with Middle Fork to form 
main Willamette River. 
Existing project. An earthfill dam, 1,750 feet long at crest, 
114 feet high from lowest point of the general foundation, a 
concrete gravity free overflow spillway 264 feet long near the 
right abutment, and a concrete gravity non-overflow section 
96 feet long forming the right abutment. Total length of dam is 
2,110 feet. Outlet works, consisting of three gate-controlled 
conduits, pass through spillway section. Reservoir provides 
30,060 acre-feet of usable flood control storage and controls 
runoff of drainage area of 104 square miles. Project is operated 
as a unit of coordinated reservoir system to protect Willamette 
River Valley and increase low waterflow for navigation and 
for other purposes. Recreational development consists of day 
use and overnight facilities at five sites operated by the Corps 
of Engineers. Construction of project initiated August 1940 
was completed April 1952. Dam and reservoir have been in 
continuous operation since September 1942. 
Local cooperation. Development of additional recreation 
facilities will require a local sponsor willing to cost share and 
assume all operation and maintenance of park facilities. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance work continued. Freshets regulated 
by Cottage Grove Lake on Coast Fork Willamette River are 
shown in Table 28-K. 
25. DORENA LAKE, OR 
Location. On Row River, OR, 7 miles from mouth. Row 
River rises in Lane County on western slope of Cascade Range, 
flows northwest for 19 miles, and enters Coast Fork of 
Willamette River 19.5 miles above mouth. 
Existing project. An earthfill embankment dam, 3,352 feet 
long at crest and 145 feet high from lowest point of the general 
foundation. Concrete gravity free-overflow spillway, 200 feet 
long, forms right abutment. Outlet works on five slide-gatecontrolled 
conduits pass through spillway section. Reservoir 
28-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
provides 70,500 acre-feet of usable flood control storage and 
controls runoff of 265 square miles. The Project is operated as 
a unit of coordinated reservoir system to protect Willamette 
River Valley and increase low waterflows for navigational and 
other purposes. Construction of project initiated June 1941 was 
completed October 1952 except for construction of additional 
recreation facilities that were funded under the Code 710 
program. Future recreation facility construction will be 
accomplished in accordance with the cost-sharing contract with 
Lane County, OR. Dam and reservoir have been in continuous 
operation since November 1949. 
Local cooperation. A multiple project cost sharing 
agreement has been in force with Lane County since Sept. 1976. 
It includes 4 projects and 14 parks. At Dorena Lake, 6 parks 
included in the agreement are managed by Lane County under 
a lease agreement. Future recreation development will require 
a supplement to the cost sharing agreement. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance continued. Freshets regulated by 
Dorena Lake project on Row and Coast Fork Willamette Rivers 
are shown in Table 28-K. 
26. ELK CREEK LAKE, ROGUE RIVER BASIN, 
OR 
Location. In Jackson County, OR at River Mile 1.7 on Elk 
Creek, a tributary of Rogue River, about 26.5 miles northerly 
from Medford, OR. 
Existing project. Construction work for the 249-foot high 
roller compacted concrete gravity dam, 2,600 feet long at the 
crest, with a gate controlled concrete chute spillway, regulating 
outlet conduits, power penstock and multiple use intake tower 
attached to the upstream face of the dam has been stopped due 
to a court injunction. The project would control runoff from a 
drainage area of 135 square miles, and provide future municipal 
and industrial water supply, irrigation, fish and wildlife 
enhancement, water quality control, and recreation benefits. 
Construction of the project was initiated in February 1971. 
Work completed to date includes construction of roads and the 
main dam structure and outlet works to elevation 1563 
(approximately 1/3 proposed height). All lands for the project 
have been acquired with the exception of the clearing of water 
rights for a seemingly abandoned irrigation canal which 
originates within the project boundaries. Environmental 
statements were filed with Council of Environmental Quality 
June 15, 1972 and Supplement No. 1 addressing water quality 
and social/demographic information was filed with EPA on 
December 24, 1980. Estimated federal cost of project is 
$174,000,000. 
In October 1985, the Corps was advised by Oregon Natural 
Resources Council (ONRC), an environmental group, they 
intended to file suit against the government to halt construction 
of Elk Creek, on specific environmental issues. A hearing on 
the motion for a preliminary injunction was scheduled before 
Oregon Federal District Court December 16, 1986. On that 
date, the Court refused to grant the injunction to halt 
construction and bids were opened and the contract 
subsequently awarded to Ohbayashi Corp. An appeal was filed 
by ONRC in March, 1986 and heard by the 9th Circuit Court 
in July, 1986. 
On June 23, 1987, the Circuit Court reversed the decision 
of the District Court and returned the case to the District Court 
for appropriate injunctive relief. The resulting District court 
order issued in August and September 1987 allowed 
construction of the dam to El. 1563 ft. (approximately 1/3 the 
height of the dam), backfilling of the foundation key trench, 
aggregate processing, quarry restoration, and other 
miscellaneous work. The construction of the main dam to 
elevation 1563 was reached in mid-January 1988. The 
Department of Justice petitioned the 9th Circuit Court for a 
rehearing. On December 10, 1987 the 9th Circuit Court rejected 
the petition for a rehearing, requiring the termination of the 
existing main dam and reservoir clearing contracts. The 
Department of Justice petitioned with the U.S. Supreme Court 
for a review of the decisions made by the 9th Circuit Court. 
The hearing before the U.S. Supreme Court was held May 1, 
1989. The U.S. Supreme Court remanded the case back for 
injunctive relief. In September 1989, the District Court was 
requested by the Corps to remand the case back to the Corps 
for preparation of a supplemental EIS. 
To lift the injunction against the dam a Supplemental 
Environmental Impact Statement (EISS) has been prepared to 
address cumulative effects. Additional studies have been 
conducted in water temperature and turbidity, and fish and 
wildlife. The EISS identified a preferred interim operating 
alternative of operating the project without a conservation pool. 
The reservoir would only temporarily store water during flood 
control operations. 
On July 22, 1992, the Department of Justice filed a motion 
with the court to remove the injunction. A hearing was held on 
May 20, 1993. The ONRC and Department of Justice filed 
appeals with the 9th Circuit Court of Appeals over the issues 
of the legal sufficiency of the EISS and on the authority of the 
U.S. Forest Service and Bureau of Land Management to issue 
a determination of impacts under the Wild and Scenic Rivers 
Act. The Ninth Circuit Court ofAppeals ruled on the two cases 
on April 21, 1995. In a unanimous decision, the Court ruled 
that the U.S. Forest Service and Bureau of Land Management 
do not have a veto authority over purely Federal projects under 
the Wild and Scenic Rivers Act where Congress makes the 
decision to authorize and fund their development. In a 2-1 
decision, the Court also reversed the District Court decision 
that EISS #2 met the requirements of the earlier Ninth Circuit 
opinion and awarded attorney fees to the plaintiffs. The case 
was remanded with instructions to prepare a third supplement 
adequately addressing all issues raisedunder the NEPAprocess. 
In FY 1993, Congress added $2,500,000 for design necessary 
to complete the project pending removal of the injunction. In 
FY97 Congress made the remainder of these funds available 
to plan and implement long term management measures. Due 
to the Ninth Circuit Court of Appeals decision, the Corps will 
not perform the environmental studies under NEPA necessary 
to remove the Federal court injunction. The Corps notified 
Congress of its intention to begin studies of options for long 
term management of the project in its uncompleted state. 
Studies are on hold awaiting funding. 
28-12

PORTLAND, OREGON DISTRICT 
Local cooperation. Authorizing act requires that State of 
Oregon take action prior to construction to insure maintenance 
in stream of flow to be released for fishery. In addition, costs 
allocated to irrigation would have to be repaid in a manner and 
to an extent consistent with the U.S. Bureau of Reclamation 
laws and policies. On February 24, 1966, State of Oregon Water 
Resources Board filed for withdrawal rights of 25 cubic feet 
per second to maintain a minimum flow for fish. Development 
of recreation facilities require a local sponsor willing to cost 
share in recreation development and assume operations and 
maintenance of park facilities. 
Operations during fiscal year. New Work: Operation 
during construction continued. 
27. FALL CREEK LAKE, OR 
Location. On Fall Creek, a tributary of Middle Fork 
Willamette River, about 7 miles above confluence of the streams 
and about 19 miles southeasterly of Eugene, OR. 
Existing project. An earth-and-gravel fill embankment 
about 5,100 feet long at crest and 193 feet high from lowest 
point of the general foundation. A gated concrete gravity 
spillway is in left abutment. Outlet is in right abutment. 
Reservoir provides 115,000 acre-feet of usable flood control 
storage and is operated as a unit of coordinated reservoir system 
to protect Willamette River Valley and increase low waterflows 
for navigation and other purposes. 
Construction of project began May 1962 and was essentially 
complete November 1965. Reservoir storage for flood control 
was effective October 1965. Sky Camp Lodge was completed 
October 1978. Future recreation facilities will be provided in 
accordance with the cost-sharing contract with Bethel School 
District. Bethel School District has a sub-agreement with the 
Springfield Kiwanis Club for management of this facility. The 
Corps manages one park at the project. 
Local cooperation. Fall Creek Lake is included in the Lane 
County multiple project cost sharing agreement. Two parks 
are managed by Lane County under lease agreement. Future 
development will require a supplement to the cost sharing 
agreement. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance continued. Freshets regulated by 
Fall Creek Lake project on Fall Creek, a tributary of the Middle 
Fork, Willamette River are shown in Table 28-K. 
28. FERN RIDGE LAKE, OR 
Location. On Long Tom River, 23.6 miles from the mouth. 
Long Tom River rises in Lane county, OR, on eastern slope of 
Coast Range, flows north for 50 miles, and enters Willamette 
River 147 miles above its mouth. 
Existing project. A maindam 6,624 feet long at crest and 
49 feet high from lowest point of the general foundation and 
two auxiliary dikes, 915 and 3,929 feet long, along northeasterly 
boundary oflake. Main dam consists ofan earthfill embankment 
dam 6,330 feet long, a concrete gravity spillway near left 
abutment with anon-overflow structure 46 feet long, containing 
outlet works, and an overflow structure, 248 feet long, 
controlled by six automatic gates. Project includes rectification 
of channel of Long Tom River downstream of dam. Reservoir 
provides 110,000 acre-feet of usable flood control storage and 
controls runoff of tributary drainage area of 275 square miles. 
Reservoir protects Long Tom River Valley and is operated as a 
unit of coordinated reservoir system to protect Willamette River 
Valley generally and to increase low water-flows for navigation 
and other purposes. Dam was originally constructed in 1941 
to height of 47 feet. Provision of additional storage for flood 
control was obtained in 1965 by raising embankments 2 feet to 
49 feet above lowest point of the general foundation. 
Construction of project initiated April 1940 was completed 
August 1951, except for provision of additional storage for 
flood control authorized in 1962 and completed April 1965, 
and construction of additional recreation facilities funded 
through the Code 710 program. Construction of three waterfowl 
impoundments was completed in 1994 under Section 1135 
authority. Dam and reservoir have been in continuous operation 
since December 1941. Development of future recreation 
facilities will be in accordance with the cost-sharing contract 
with Lane county, and requires a 50 percent contribution by 
the county. Development is subject to availability of funds by 
the Government and the county. 
Local cooperation. Fern Ridge Lake is included in the Lane 
County multiple project cost sharing agreement. Three parks 
are managed by Lane County under lease agreements. Future 
development will require a supplement to the cost sharing 
agreement. The Oregon Department of Fish and Wildlife 
manages 5,000 acres of land and water for migratory waterfowl 
under a lease agreement. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance continued. Freshets regulated by 
Fern Ridge Lake project on Long Tom River are shown in 
Table 28-K. 
29. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Funds appropriated for inspection of completed local flood 
protection works are used to determine maintenance condition 
of completed works and to ascertain whether those works are 
being properly maintained by local interests. Numerous leveed 
areas and 213 bank protection works were inspected at various 
locations along both banks of Lower Columbia River below 
Bonneville Dam, along Oregon Coast, in eastern Oregon, in 
southern Oregon and in Willamette River Basin. Aerial 
inspection of revetments in Willamette River Basin are 
supplemented by an onsite inspection at locations requiring 
maintenance. A representative of sponsoring districts 
accompanied the Portland District representatives performing 
the levee inspections. Deficiencies in maintenance and need 
for repairs were discussed with sponsoring districts' 
representatives and a report was made to each sponsor with 
recommendations for improving maintenance. The program 
to improve maintenance of completed Federal projects initiated 
by House Appropriations Committee on Civil Functions was 
continued. Fiscal year costs were $123,628. 
28-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
30. LOWER COLUMBIA RIVER BASIN BANK 
PROTECTION, ORAND WA 
Location. On Columbia River and tributaries between Sandy 
River, OR, and mouth of Columbia River. 
Existing project. Provides for construction of 224,000 linear 
feet of bank protection works at 96 locations along Lower 
Columbia River below River Mile 125 and along principal 
tributaries in this reach, to protect existing improvements such 
as levees and developed industrial lands from further erosion. 
Existing project is a unit of general comprehensive plan for 
flood control, navigation, and other purposes in Columbia River 
Basin. Construction of project began in July 1961 and is 88 
percent complete. A total of 191,000 linear feet of bank 
protection work at 84 locations has been completed. Estimated 
Federal cost is $28,000,000. 
Local cooperation. Flood Control Act of 1950 provides 
local interests furnish lands and rights-of-way; make necessary 
highway, highway bridge, and utility alterations; hold the United 
States free from damages; and maintain and operate completed 
works. Under Section 103 of the Water Resources Development 
Act of 1986, Local Interests will also be required to make a 
cash contribution for construction of each site. Estimated costs 
for all requirements of local cooperation are $2,000,000. 
Operations during fiscal year. New Work: Coordination 
with sponsors and evaluation of local erosion problems 
continued. 
31. MOUNT ST. HELENS SEDIMENT CONTROL, 
WA 
Location. On the North Fork Toutle River, 2 miles upstream 
from its confluence with the Green River, in Cowlitz County, 
southwest Washington. The river systems impacted by the 
project include Toutle, Cowlitz and Columbia Rivers. Most of 
the population affected by the problems reside in the 
communities ofLongview, Kelso, Lexington, and Castle Rock, 
Washington. 
Existing project. The project was authorized by the 
Supplement Appropriations Act, 1985 (Public Law 88, 99th 
Congress, August 15, 1985). The Act includes authorization 
"... to construct, operate and maintain a sediment retention 
structure near the confluence of the Toutle and Green River, 
Washington, with such design features and associated 
downstream actions as are necessary, in accordance with the 
Feasibility Report of the Chief of Engineers dated December 
1984." The project will provide a permanent solution to 
potential flooding on the Cowlitz River from sedimentation 
problems created by the eruption of Mt. St. Helens. The 
Decision document recommended construction of a single 
sediment retention structure (SRS) with a 125-foot high 
spillway at the Green River site on the North Fork Toutle River, 
improvements to the levee system at Kelso, Washington, and 
dredging downstream from the SRS. 
Local cooperation. Local interests were responsible for 
provision of all lands, easements, and rights-of-way for the 
sediment retention structure, dredging disposal areas, and levee 
improvements. Local interests were also responsible for all 
alterations and relocations of buildings, roads, bridges and other 
structures or utilities made necessary by implementation of 
the project. In addition, operation and maintenance of fish 
facilities, the levee system at Kelso and dredged material 
disposal sites are the responsibility of local interests. Cowlitz 
County offers visitor services in their viewpoint area. Nonfederal 
cash contribution is $3,600,000 and the estimated nonfederal 
land, easements, right-of-ways, and relocations costs 
are $21,000,000. 
Operations during fiscal year. New work: Coordination 
with Federal and local agencies continued. Initiated an 
engineering reanalysis of anticipated erosion and deposition 
of the debris avalanche. 
Maintenance: Routine operation and maintenance 
performed. 
32. SCAPPOOSE DRAINAGE DISTRICT, OR 
Location. Scappoose Drainage District is located in 
Columbia County, Oregon, along the left bank of Multnomah 
Channel opposite Columbia River Miles 90.3 to 97.0. 
Project Description. The project, as originally authorized 
by the Flood Control Act of June 22, 1936, provided for 
reconstruction of the existing levee system. Additional 
improvements, as provided for in the Flood Control Act of 
May 17, 1950, consisted of raising and strengthening 52,000 
feet of levee, construction of toe drains, and additional pumping 
capacity. The project as originally authorized was completed 
in 1941. The additional improvements were completed in 
September 1980. 
The main pumping plant was constructed by the Corps of 
Engineers as part of a comprehensive plan for upgrading the 
flood protection works to provide protection against the 
Standard Project Flood of 850,000 cubic feet per second as 
measured at The Dalles, Oregon. This equates to a flood level 
of 27.8 feet and 26.2 at the upstream and downstream ends, 
respectively, of the drainage district. 
The four pumps at the main pumping plant did not operate 
properly during the February 1996 flood. The problem began 
when the Columbia River exceeded the ordinary high water 
level of 14 feet. At that point, the pumps started to overheat 
and shut down. When the river stage reaches approximately 
22.5 feet, the motor overload protection trips out. Emergency 
measures were taken by rotating the operation of the pumps. 
All pump motors overheated and only one pump at a time in 
rotation could be operated. The reduced pumping capability 
induced interior flooding that caused extensive damage to a 
large plant nursery, flooded residential properties, and cut off 
access to interior drainage channel pump stations. The pumps 
were designed to operate with river stages from +1.0 to 26.6 
feet. The river crested at 26.6 feet during the flood. During the 
February 1996 flood the pumps were tested under major 
flooding conditions for the first time. Corrective action was to 
replace the existing pump impellers having a 17 degree pitch 
with impellers having 14.5 degree pitch. The cost for this 
corrective action was $119,000, which was 100% Federal. 
Local Cooperation. Fully complied with. 
28-14

PORTLAND, OREGON DISTRICT 
Operations during fiscal year. New work: Replaced 
pump bearings and motor heaters. 
33. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Corps of Engineers monitored flood control operations at 
four Bureau of Reclamation projects (Prineville, Ochoco, 
Emigrant, and Scoggins), one local project operated by Douglas 
County (Galesville), and one municipal power project operated 
by Tacoma City Light (Mossyrock). The projects were partially 
constructed with flood control funds, thereby subjecting project 
operation to monitoring by the Corps of Engineers under 
Section 7, Flood Control Act of 1944. 
The four Bureau of Reclamation projects, Douglas County 
project and Mossyrock project were operated during the fiscal 
year within the flood control regulations specified for each 
project. Total cost of monitoring and flood control direction of 
the six projects during the fiscal year was $62,808. 
34. WILLAMETTE RIVER BASIN BANK 
PROTECTION, OR 
Location. On Willamette River and tributaries, between 
Cascade Range and Coast Range, from a point south of Eugene 
to Portland, OR. 
Existing project. Provides for clearing, sloping, and reveting 
riverbanks; construction of pile and timber bulkheads and drift 
barriers; minor channel improvements; and maintenance of 
existing works for control of floods and prevention of erosion 
at various locations along Willamette River and its tributaries. 
The current scope of the project is a total of 510,000 linear feet 
of bank protection at 236 locations. Estimated Federal cost is 
$30,700,000. 
Construction of project began in 1938 and is 96 percent 
complete. A total of 489,795 linear feet of bank protection work 
at 230 locations consisting of revetment of riverbanks, pile 
and timber bulkheads, drift barriers, and channel improvements, 
have been completed on Willamette River and tributaries. 
Local cooperation. Section 3, Flood Control Act of 1936 
and Section 103, Water Resources Development Act of 1986 
applies. Estimated costs for all requirements of local 
cooperation under terms of project authorization were 
$2,300,000. 
Operations during fiscal year. New Work: Coordination 
with potential sponsors and evaluation of local erosion problems 
continued. 
Maintenance: Continued coordination and evaluation of 
local erosion problems. 
35. WILLOW CREEK LAKE, HEPPNER, OR 
Location. On Willow Creek immediately upstream from 
Heppner and just downstream fromjunction of Balm Fork and 
Willow Creek in Section 35, Township 2 South, Range 26 East, 
Willamette Meridian. 
Existing project. Project provides flood protection to the 
city of Heppner and downstream area by controlling runoff 
from a drainage area of 96 square miles. The dam is a roller 
compacted concrete structure 160 feet high at crest elevation 
2,130. Ancillary features include a center uncontrolled spillway 
with a maximum flood capacity of 93,300 cfs (cubic feet per 
second), an outlet works with a capacity of 500 cfs, a minor 
flow works and diversion works. Gross storage capacity of the 
project is 13,250 acre-feet, consisting of 7,750 acre-feet for 
exclusive flood control, 1,750 acre-feet for joint flood control 
and irrigation, 1,750 acre-feet exclusive irrigation, and 2,000 
acre-feet dead storage for fish, wildlife, recreation, sediment 
accumulation, and aesthetics. Limited recreation facilities are 
being provided. 
Willow Creek Parks and Recreation District has leased 
recreation facilities at Willow Creek Lake. A courtesy handling 
dock was constructed by the Recreation District utilizing 
Oregon State Marine Board funds. A playfield area below the 
dam has been leased to the City of Heppner. 
The final Environmental Impact Statement was filed with 
the Environmental Protection Agency on December 20, 1979. 
The provisions of the Clear Water Act were met by a Section 
404(b)(1) Evaluation and a public notice issued January 12, 
1980, and a section 401 certification from the State of Oregon 
on February 15, 1980. Land acquisition is about 99 percent 
complete. 
Local cooperation. Development of additional recreation 
facilities will require a local sponsor willing to cost share and 
assume all operation and maintenance of facilities. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance performed. 
Multiple-Purpose Projects, Including Power 
36. BONNEVILLE LOCKAND DAM - LAKE 
BONNEVILLE, ORAND WA 
Location. Project is on Columbia River, 40 miles east of 
Portland, OR, about 146 miles above mouth of river. For 
description of Columbia River, see Section 3. 
Existing project. A dam, powerplant, and lock for power 
and navigation. Spillway dam extends across main channel 
from Cascade island shore to Bradford Island. Overflow crest 
at 24 feet above mean sea level is surmounted by 18 verticallift 
steel gates, 10 with remote control hoists placed between 
piers which extend to elevation 99 feet where a service roadway 
provides access, and two 350-ton gantry cranes for regulating 
gates. Powerhouse No. 1 extending across Bradford Slough to 
the Oregon shore has an installation of 10 units, consisting of 
one unit of 48,000 kilowatts, one unit of 59,500 kilowatts, and 
eight units of 60,000 kilowatts each, totaling 587,500 kilowatts. 
Ordinary and extreme fluctuations of river at lower lock gate 
are about 21 and 47 feet respectively. Project includes fish 
ladders to serve both main channel, Bradford Slough Channel, 
and Powerhouse II channel. Navigation lock and powerhouses 
are founded on andesite, and main dam rests on solidified 
sedimentary rock of volcanic origin. The pool created by dam 
provides a navigable channel 27 feet deep between Bonneville 
and The Dalles Dams, a distance of 47 river miles. Principal 
data concerning navigation lock, spillway dam, and powerplant 
are set forth in Table 28-N. 
28-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Dam, navigation lock, 10-unit power generating installation, 
fishways, and attendant buildings and grounds cost 
$83,239,395, of which $6,072,480 is for navigation facilities, 
$39,350,824 for power facilities and $37,816,091 for joint 
facilities, consisting of dam, fishways, buildings and grounds, 
and headwall section of power units 0 to 6, cost of which 
$2,106,000 is allocated to dam and lake facilities. 
In response to flow regulations and peakings from upstream 
plants operating under conditions of Canadian storage and 
Pacific Northwest-Southwest Intertie, two modifications were 
undertaken at the Bonneville project. The modification for 
peaking project was undertaken to minimize adverse 
environmental effects under rapidly changing flow conditions 
from upstream dams. The project was completed in 1978 at a 
cost of $27,195,000. The second modification provided for 
increased power installation by building a second powerhouse 
located on the Washington shore adjacent to the end of the 
existing spillway. The new powerhouse contains eight units of 
66,500 kilowatts each and two fish attraction turbine generator 
units of 13,100 kilowatts each for a combined capacity of 
558,200 kilowatts, bringing the entire Bonneville capacity to 
1,145.7 megawatts. Additional fish facilities consist of the 
powerhouse collection system, second fish ladder on the 
Washington shore, transportation channel connecting the 
Cascade Island fish ladder with new exit control section, and 
fingerling bypass facilities which include fish screens in both 
the powerhouses. To provide for the anticipated increased visitor 
use, onsite visitor facilities are included. Under authority of 
the Bonneville Project Act (August 20, 1937), a letter from 
Bonneville Power Administration to North Pacific Division 
dated January 21, 1965, requested construction of a second 
powerhouse. 
Construction ofproject started October 1933, was completed 
February 1943. Modification ofpowerhouse control equipment 
started March 1957, was completed September 1958. First two 
power units were placed in operation during fiscal year 1938. 
Powerhouse with complete installation of 10 units, was in 
operation December 1943. 
Construction of modification for peaking work commenced 
in September 1970 and was completed in September 1978. 
Construction of second powerhouse complete. Final 
environmental impact statement was filed with Council on 
Environmental Quality inApril 1972. In response to increasing 
visitation which now exceeds 800,000 a year at the dam site 
itself and 2,700,000 project wide, a visitor center with windows 
into the fish ladders, a 60-seat theatre, exhibits and displays 
was completed in 1975. Units 11 through 18 were on-line by 
October, 1982. The visitor facility for the new powerhouse 
(which does not require cost-sharing) is an integral part of that 
structure. The total cost for construction of the second 
powerhouse is $678,945,000. 
In June 1993 work began on the rehabilitation of the First 
Powerhouse. In the first phase the existing circuit breakers and 
ten transformers were replaced and the switchyard was 
rehabilitated. Circuit breaker work was completed in 1995. The 
remaining work was completed in 1997. Phase I cost was 
$24,120,000. The second phase consists of replacing the 
windings of five generators and replacing ten turbines. Second 
phase work was contracted in 1994 and is scheduled to be 
completed in 2009. Phase II will cost an estimated 
$104,600,000. 
The first powerhouse, spillway, navigation lock and 
associated facilities have been designated as aNational Historic 
District. 
Development of recreation facilities at Home Valley was 
completed in FY 1989. 
Through September 1999, power generation totaled 256.4 
billion kilowatt-hours. Of the gross income from sale of this 
power by Bonneville Power Administration, $671.0 million 
was reimbursed to the U.S. Treasury to recover Corps of 
Engineers project investment and operating costs. 
Local cooperation. None required, except for non-federal 
cost-sharing for development of recreational facilities. 
Operations during fiscal year. New work: Real estate 
actions regarding highway, railroad, and City of North 
Bonneville relocations were completed. The remaining deeds 
were officially turned over to the City of North Bonneville. 
Maintenance: Increased activities to protect and enhance 
the anadromous fisheries in the Northwest were performed. 
Repair of Unit 16 stator winding and rewedge repairs were 
initiated. Initiated navigation lock gate retensioning. Routine 
operation and maintenance was performed with enhanced 
maintenance on the turbines. During the fiscal year 
5,946,491,000 kilowatt-hours of electrical power energy were 
generated, of which 5,918,077,000 kilowatt-hours were 
delivered to Bonneville Power Administration, the marketing 
agency. 
Major Rehabilitation: A contract to rehabilitate the 
generators and turbines in the first powerhouse is in progress. 
Initiated bridge crane repair. 
37. COLUMBIA RIVER FISH MITIGATION, OR 
AND WA 
Location. At Bonneville, The Dalles, and John Day Dams 
on the Columbia River in the states of Oregon and Washington. 
This project encompasses work at five other locations within 
Walla Walla District. 
Existing project. The eight Corps hydroelectric projects 
on the lower Columbia and Snake Rivers have been identified 
as a major contributing factor in causing mortality to migrating 
salmon and steelhead. Without adequate bypass facilities to 
guide juvenile fish away from the power turbines at the dams, 
mortalities incurred through project passage severely impact 
the commercial, recreational, and Indian fisheries. The Corps 
has recognized the need to reduce juvenile mortality and has 
undertaken bypass measures that include mechanized fish 
bypass systems with barge and truck transportation. Spill as 
an additional bypass route over the spillways has been used to 
divert fish from entering turbine units, but it is a significant 
adverse economic factor due to lost power revenues. Congress 
28-16

PORTLAND, OREGON DISTRICT 
passed and the President signed the FY 1989 Energy and Water 
Development Appropriations Act (PL 100-371) which 
mandated the expenditure of funds for the design, testing, and 
construction of new or improved fish bypass facilities for the 
Columbia River Juvenile Fish Mitigation projects. Completion 
of the bypass and transportation facilities will significantly 
increase the survival of migrating downstream juvenile fish. 
The mitigation study will determine the overall scope of the 
juvenile and adult fish bypass facilities for these Columbia and 
Snake River dams. 
The plan of improvement within Portland District includes 
the following: (a) Bonneville - new juvenile fish monitoring 
facilities, and outfall relocation; (b) The Dalles - submerged 
extended fish screens and bypass system, new gantry crane 
and maintenance facility; (c) John Day - new juvenile fish 
monitoring facility, and planning and design for potential 
drawdown of the reservoir to minimum operating pool; (d) a 
mitigation study that analyzes long-term alternatives including 
impacts of federal Columbia River system and other activities 
on estuary habitat, surface bypass technology, gas abatement 
and improved turbine passage to improve fish passage and 
survival through Corps dams on the Columbia and Snake 
Rivers. 
The current fully funded total estimated Federal project cost 
is $1,386,000,000 which includes $778,400,000 for 
improvements in Walla Walla District, $597,817,000 in Portland 
District and $9,783,000 provided by the Bonneville Power 
Administration for design of the Bonneville juvenile fish 
monitoring facility. For information on the planned 
improvements in the upper Columbia and Snake Rivers, see 
Walla Walla District's Annual Report. 
Local cooperation. None required. 
Operations during fiscal year. New work: General: 
Continued to collect biological and hydraulic data at all projects, 
and develop alternatives to improve existing anadromous fish 
bypass methodology and systems, to reduce excess dissolved 
gas entrainment associated with use of the spillways and to 
improve turbine passage survival. Bonneville Dam: Completed 
construction of new juvenile bypass outfall for the second 
powerhouse, construction of bypass improvements inside the 
powerhouse, a transportation flume to the new outfall, continued 
construction of the juvenile fish monitoring facility. Initiated 
evaluation of improvements for fish guidance efficiency at 
Bonneville Second Powerhouse. Performed biological analysis 
of a surface collection prototype system at the first powerhouse. 
The Dalles Dam: Continued sluiceway and spillway juvenile 
survival studies in conjunction with development of future 
bypass system alternatives, continue design for relocating 
sluiceway outfall and for provision of emergency auxiliary water 
for adult fishways. John Day Dam: Continued testing of 
extended length (40 ft.) bypass screens for potential replacement 
of existing 20 ft. screens associated with the existing juvenile 
bypass system. Initiated Phase I of the John Day drawdown 
study. 
38. COLUMBIA RIVER TREATY FISHING 
ACCESS SITES, OR & WA 
along the Columbia River on Bonneville pool, John Day pool, 
and The Dalles pool. 
Existing project. Congress has provided authority through 
public law to implement a wide range of land management, 
transfer, acquisition and development actions to provide fishing 
access for Indian tribes who exercise treaty fishing rights on 
the Columbia River. The law designates certain federal sites 
on Bonneville, John Day, and The Dalles pools for fishing 
access. The improvements required at the access sites are 
specified in the authorizing legislation. They include all weather 
access roads, camping facilities, boat ramps, docks, sanitation, 
and fish cleaning facilities. Construction of these facilities will 
greatly improve access by the four tribes which have fishing 
rights along this reach of the Columbia River. 
Local cooperation. None required. 
Operations during fiscal year. New work: Land 
acquisition and work on plans and specifications for Phase II 
sites continued. Construction of the second phase sites 
continued. A total of 16 sites have been completed. 
39. COUGAR LAKE, OR 
Location. At mile 4.4 on South Fork McKenzie River which 
joins McKenzie River about 56.5 miles above its confluence 
with Willamette River. Project is about 42 miles east of Eugene, 
OR. 
Existing project. A rockfill dam with an impervious earth 
core, about 1,738 feet long at crest and 445 feet high above the 
streambed. Reservoir is 6 miles long with storage capacity at 
full pool of 219,000 acre-feet and controls runoff of tributary 
drainage area of 210 square miles. Spillway is on right abutment 
and outlet and power tunnels in left abutment. Outlet tunnel is 
provided with a chute and stilling basin. Powerplant consists 
of two 12,500 kilowatt units with minimum provisions for 
installing a third unit of 35,000 kilowatts for future peaking 
capacity. Improvement functions as a unit in coordinated system 
of reservoirs for multiple-purpose development of water 
resources in Willamette River Basin. Recreation facilities are 
provided by the U.S. Forest Service. Also authorized (but 
unconstructed) is a reregulating dam, Strube Lake, below 
Cougar Lake, which would permit Cougar to operate as a 
peaking powerplant. The Strube dam would contain two units 
totalling 4,600 kilowatts. Estimated Federal cost of Strube Lake 
and Cougar Additional Units is $114,000,000. 
Construction of project initiated June 1956 is complete, 
excluding Strube Lake and Cougar Additional Unit for which 
planning is essentially complete. Also, plans and specifications 
for the first construction contract (relocations) have been 
completed. Generating units 1 and 2 were placed in commercial 
operation March23 and February 4,1964, respectively. Physical 
in-service date for flood control was November 29, 1963. 
Through September 1999 power generation totaled 4.8 
billion kilowatt-hours. Of the gross income from sale of this 
power by Bonneville PowerAdministration, $26.8 million was 
reimbursed to the U.S. Treasury to recover Corps of Engineers 
project investment and operating costs. 
Location. This project provides for construction of 31 sites 
28-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
The addition of water temperature control to the intake tower 
is authorized. Water temperature control will enhance fish 
passage and incubation in the McKenzie River. Work on the 
PreEngineering and Design Phase continued. 
Local cooperation. None required. 
Operations during fiscal year. New work: Preparation of 
plans and specifications for the intake tower modifications 
continue. 
Maintenance: Routine operation and maintenance continued. 
During fiscal year, 178,052,000 kilowatt-hours of electrical 
energy were generated at project, of which 177,188,000 
kilowatt-hours were delivered to Bonneville Power 
Administration, the marketing agency. Freshets regulated by 
Cougar Lake on South Fork McKenzie River are shown on 
Table 28-K. 
40. DETROIT LAKE -BIG CLIFF, OR 
Location. On North Santiam River with dam 50 miles from 
mouth 40 miles southeast of Salem, OR. North Santiam River 
flows north and west for 85 miles, and unites with South 
Santiam River to form Santiam River, which 10 miles 
downstream enters Willamette River 108 miles above its mouth. 
Existing project. Main dam and a reregulating dam, both 
with power-generating facilities. Detroit Dam is a concrete 
gravity structure about 1,522 feet long and 454 feet high from 
lowest point of the general foundation to roadway deck. 
Spillway is a gate-controlled overflow section, and outlet works 
are gate-controlled conduits through dam. Powerhouse with 
two units having a capacity of 50,000 kilowatts each is in right 
abutment immediately below dam. Reservoir has a storage 
capacity at full pool of 454,900 acre-feet and controls runoff 
of tributary drainage area of 438 square miles. It is being 
operated as a unit in coordinated reservoir system to protect 
Willamette Valley from floods, to increase low water flows in 
interest of navigation and irrigation, to generate power, and for 
other purposes. Reregulating dam 3 miles downstream at Big 
Cliff site is concrete gravity type, about 191 feet high from 
lowest point of the general foundation to roadway deck. Power 
installation consists of one unit with a capacity of 18,000 
kilowatts. Reservoir has a storage capacity of 5,930 acre-feet 
at full pool. Project is a unit of comprehensive plan for flood 
control and other purposes in Willamette Basin. Recreation 
facilities are provided by the U.S. Forest Service, Oregon State 
Park System and the town of Detroit. 
Construction of project begun in May 1947 was completed 
December 1960. The two powerhouse generating units were 
placed in commercial operation June and October 1953. At 
Big Cliff powerhouse, single generating unit was placed online 
June 1954. Use of Big Cliff Dam for reregulating 
fluctuating flow from Detroit units was effected October 1953. 
Through September 1999 power generation totaled 22.6 
billion kilowatt-hours. Of the gross income from sale of this 
power by Bonneville PowerAdministration, $80.8 million was 
reimbursed to the U.S. Treasury to recover Corps of Engineers 
project investment and operating costs. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance continued. Refurbished Big Cliff 
gantry crane. During fiscal year 609,498,000 kilowatt-hours 
of electrical energy were generated at project of which 
606,717,000 kilowatt-hours were delivered to Bonneville 
PowerAdministration, the marketing agency. Freshets regulated 
by the Detroit Lake project on North Santiam River are shown 
in Table 28-K. 
41. GREEN PETER-FOSTER LAKES, OR 
Location. At approximate mile 5.5 on Middle Santiam River 
which joins South Santiam River about 56.8 miles above its 
confluence with Willamette River. Dam is about 30 miles 
southeast of Albany in Linn County, OR. 
Existing project. Main dam and a reregulating dam, both 
with power-generating facilities. Green Peter Dam is a concrete 
gravity structure, 1,400 feet long and 385 feet high above the 
lowest point of the general foundation with a gate-controlled 
spillway. Outlet works consist of two conduits through spillway, 
discharging into a stilling basin. Powerplant, on right bank 
adjacent to spillway stilling basin, consists of two units with 
an installed capacity of 80,000 kilowatts. Reservoir provides 
storage capacity at full pool of 430,000 acre-feet, extending 
6.5 miles up Quartzville Creek and some 7.5 miles up Middle 
Santiam River above creek junction, forming a Y-shaped pool. 
Reservoir controls runoff of tributary drainage area of 277 
square miles. 
Foster Dam, 7 miles downstream from Green Peter Dam is 
located on South Santiam River about 38 miles above its 
confluence with Santiam River and 1.5 miles below its 
confluence with Middle Santiam River. Foster Dam consists 
of an earth, gravel, and rock-filled embankment, 146 feet high 
from lowest point of the general foundation and a concrete 
gravity gate controlled spillway and stilling basin for a total 
length of 4,800 feet. Power installation consists of two units 
with capacity of 20,000 kilowatts. Foster Lake has a storage 
capacity, at full pool, of 61,000 acre-feet. Project functions as 
a unit in coordinated system of reservoirs for multiple-purpose 
development of water resources in Willamette River Basin. 
All construction on Green Peter-Foster Lakes project 
initiated June 1961 is completed. Green Peter Lake was placed 
in operation for useful flood control June 1967 as a unit of 
coordinated reservoir system for protection of the Willamette 
River Basin. First power-generation unit was placed on the 
line June 9, 1967 and second, June 28, 1967. Use of Foster 
Lake for reregulating fluctuating flows from Green Peter units 
was effective December 1967. First power generation unit was 
placed on-line August 22, 1968 and second, September 6,1968. 
Through September 1999 power generation totaled 11.0 
billion kilowatt-hours. Of the gross income from sale of this 
power by Bonneville PowerAdministration, $68.1 million was 
reimbursed to the U.S. Treasury to recover Corps of Engineers 
project investment and operating costs. 
Local cooperation. Future recreation development at Foster 
or Green Peter will require cost sharing. Recreation facilities 
28-18

PORTLAND, OREGON DISTRICT 
at Foster Lake includes 4 parks and 2 parks at Green Peter 
Lake. Five of these parks were developed by the Corps and are 
operated by Linn county under lease agreement. One park is 
operated by the Corps. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance continued. Rewind Green Peter Unit 
1 and Unit 2 continued. During the fiscal year 278,547,000 
kilowatt-hours of electrical energy were generated at project 
of which 276,224,000 kilowatt-hours were delivered to 
Bonneville Power Administration, the marketing agency. 
Freshets regulated by Green Peter Lake project on Middle 
Santiam River are shown in Table 28-K. 
42. HILLS CREEK LAKE, OR 
Location. On the Middle Fork, Willamette River, 47.8 miles 
from mouth and 26.5 miles upstream from Lookout Point Dam. 
Middle Fork, Willamette River rises on west slope of Cascade 
Range and flows northwesterly to its junction with Coast Fork, 
Willamette River. Dam is about 45 miles southeast from 
Eugene, OR. 
Existing project. An earth-and-gravel-fill dam about 2,150 
feet long at the crest and 338 feet above lowest point of the 
general foundation. A gate-controlled concrete gravity chutetype 
spillway is in right abutment. Diversion tunnel, outlet 
tunnel and power tunnel are in same abutment. Powerhouse 
with two 15,000 kilowatt units is located next to spillway. Hills 
Creek Lake is about 8.5 miles long and provides storage 
capacity at full pool of 356,000 acre-feet. Project controls runoff 
of drainage area of 389 square miles and is an integral unit of 
comprehensive plan for development of water resources of 
Willamette River Basin. Hills Creek Lake and Lookout Point 
Lake are operated as a unit for control of floods and generation 
of power on Middle Fork Willamette River. These projects, in 
conjunction with Dexter reregulating dam and Fall Creek Lake 
flood control system, will effectively control floods on Middle 
Fork and provide maximum efficient generation of 
hydroelectric power. Recreation facilities are provided by the 
U.S. Forest Service. Hills Creek power units are remote 
controlled from Lookout Point. 
Construction of project, initiated May 1956, was completed 
June 1963. The project was placed in service for useful flood 
control in November 1961. On May 2, 1962, the two power 
units were placed on-line. 
Through September 1999, power generation totaled 5.9 
billion kilowatt-hours. Of the gross income from sale of this 
power by Bonneville Power Administration, $24.8 million was 
reimbursed to the U.S. Treasury to recover Corps of Engineers 
project investment and operating costs. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance continued. During fiscal year, 
184,226,000 kilowatt-hours of electrical energy were generated 
atproject, of which 183,584,000 kilowatt-hours were delivered 
to Bonneville Power Administration, the marketing agency. 
Freshets regulated by Hills Creek Lake on Middle Fork 
Willamette River are shown in Table 28-K. 
43. JOHN DAY LOCKAND DAM -LAKE 
UMATILLA, OR AND WA 
Location. On Columbia River about 3 miles downstream 
from mouth of John Day River and about 215 miles above 
mouth of Columbia River. 
Existing project. A dam, powerplant, navigation lock, fish 
ladders, and appurtenant facilities with a slack-water lake about 
75 miles long extending to McNary Lock and Dam. Included 
is relocation of railroads, highways, utilities, and communities 
affected by the impoundment. The project as originally 
authorized would have provided 2,000,000 acre-feet of flood 
control storage. As modified, the project provides 500,000 acrefeet 
of flood control storage between elevations 257 and 268. 
The structure is 5,900 feet in length and stands about 161 feet 
above streambed. Powerhouse has space for 20 generating units 
of 135,000 kilowatts each; 16 units have been installed for a 
present capacity of 2,160,000 kilowatts. Principal project data 
are set forth in Table 28-N. 
A detailed description of project as authorized and modified 
is on pages 1992 and 1993 of Annual Report for 1962 under 
the Walla Walla District. 
Construction began July 1958 and the project was opened 
to navigation April 1968. The main dam contract is complete. 
Lock rehabilitation work begun in FY 1980 was completed in 
FY 1986. 
Through September 1999 power generation totaled 326.5 
billion kilowatt-hours. Of the gross income from sale of this 
power by Bonneville Power Administration, $465.8 million 
was reimbursed to the U.S. Treasury to recover Corps of 
Engineers project investment and operating costs. 
Local cooperation. Recreation facilities at 5 parks are 
operated and maintained by local agencies under lease 
agreement with the Corps. Six developed recreation areas are 
operated and maintained by the Corps of Engineers. Any future 
recreation development will require cost sharing. 
Operations during fiscal year. Maintenance: Increased 
activities to protect and enhance the anadromous fisheries in 
the Northwest were performed. Construction and 
implementation of the data acquisition control system 
continued. Routine operation and maintenance continued. 
During fiscal year 11,727,274,000 kilowatt-hours of electrical 
power were generated by the 16 generating units of which 
11,707,647,000 kilowatt-hours were delivered to Bonneville 
Power Administration, the marketing agency. 
Rehabilitation: Completed fiscal close-out. 
44. LOOKOUT POINT- DEXTER LAKES, OR 
Location. On Middle Fork, Willamette River at Meridian 
site, 21.3 miles from mouth. Middle Fork, Willamette River, 
rises in Lane County on western slope of Cascade Range and 
flows northwesterly to its junction with Coast Fork, which is 
head of mainstem Willamette River. Dam is about 22 miles 
southeast from Eugene, OR. 
28-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Existing project. A main dam at Meridian site and a 
reregulating dam 3 miles downstream at Dexter site. Both dams 
are earth-and-gravel-fills with concrete spillways and have 
power generating facilities. Main dam is 258 feet high from 
lowest point of the general foundation to deck and is 3,381 feet 
long at crest forming a reservoir 14.2 miles long providing 
storage of 456,000 acre-feet at full-pool level. Reservoir 
controls runoff of tributary drainage area of 991 square miles. 
Spillway, 274 feet long, is a gate-controlled overflow type, 
forming right abutment. Outlet works consisting of slide-gatecontrolled 
conduits pass through spillway section. Powerhouse 
has three main generating units with a capacity of 120,000 
kilowatts. Dexter reregulating dam has a maximum height of 
107 feet above lowest point of the general foundation and is 
2,765 feet long at crest, forming a full pool of 27,500 acre-feet 
extending upstream to main dam and providing pondage to 
regulate Lookout Point powerhouse water releases to a uniform 
discharge. Spillway consists of a gate-controlled overflow 
section 509 feet long forming right abutment. 
Flow regulation is accomplished by use of spillway gates 
and releases through powerhouse, which contains one 15,000- 
kilowatt unit. Lookout Point and Dexter Lakes are operated as 
a single unit of a coordinated system of reservoirs to protect 
Willamette River Valley against floods, to provide needed 
hydroelectric power, and to increase low water flows for 
navigation, irrigation, and other purposes. Existing project 
authorized as a unit of comprehensive plan for flood control 
and other purposes in Willamette River Basin. 
Construction of project initiated May 1947 was completed 
June 1961, except for construction of additional recreation 
facilities funded through the Code 710 program. Future 
recreation facilities will be provided in accordance with the 
cost-sharing contract with Lane County and will require a 50 
percent contribution by Lane County and is subject to funding 
availability by the Government and the County. At Lookout 
Point powerhouse, generating units 1,2, and 3 were placed in 
commercial operation December 1954, February 1955, and 
April 1955, respectively. At Dexter powerhouse the single unit 
was placed on-line May 1955. Dexter was placed in operation 
for reregulation in December 1954. 
Through September 1999 power generation totaled 17.9 
billion kilowatt-hours. Of the gross income from sale of this 
power by Bonneville Power Administration, $90.5 million was 
reimbursed to the U.S. Treasury to recover Corps of Engineers 
project investment and operating costs. 
Local cooperation. A multiple project cost sharing 
agreement has been in force with Lane County since September 
1976. It includes 4 projects and 13 parks. All these parks are 
managed by Lane County under lease agreement. Recreation 
opportunities are provided at 2 parks on Dexter Lake which 
are operated by Lane County via the multi-project cost-sharing 
agreement and lease instruments. The north shore of Lookout 
Point Lake is also leased to Lane County for recreation 
purposes; there is essentially no development. Future 
development will require a supplement to the cost sharing 
agreement. 
Operations during fiscal year. Maintenance: Contract 
work to install new exciters at Lookout Point and Dexter 
initiated. Routine operation and maintenance continued. During 
fiscal year 436,262,000 kilowatt-hours of electrical power 
energy were generated at project of which 433,670,000 
kilowatt-hours were delivered to Bonneville Power 
Administration, the marketing agency. Freshets regulated by 
Lookout Point Lake project on Middle Fork Willamette River 
are shown in Table 28-K. 
45. LOST CREEK LAKE, ROGUE RIVER BASIN, 
OR 
Location. On Upper Rogue River at mile 153.6 about 30 
miles northeasterly from Medford, OR. 
Existing project. A rock and gravel-fill embankment dam 
about 327 feet high from streambed to crest, with an overall 
length of 3,750 feet with an impervious earth core and a gatecontrolled 
concrete spillway. Powerhouse is on right abutment 
and houses two Francis-type turbines with installed capacity 
of 24,500 kilowatts each. Regulating outlet facility was 
provisions for temperature regulation for releases in interest of 
fishery enhancement is also on right bank. Reservoir 10 miles 
long provides 315,000 acre-feet of usable storage. Project 
provides control ofrunoffofdrainage area of 674 square miles. 
In addition to hydroelectric power generation, project provides 
flood control, irrigation, future municipal and industrial (M&I) 
water supply, fish and wildlife enhancement, water quality 
control and recreation benefits. 
Construction of project initiated July 1967 is complete. 
Generating units 1 and 2 were placed in commercial operation 
July 6 and July 13, 1977, respectively. Physical in-service date 
for flood control was February 18, 1977. Final environmental 
statement was filed with Council on Environmental Quality in 
June 1972. Recreation opportunities are provided by 4 parks at 
the project. The State of Oregon operates 2 parks, including a 
200 unit campground, part of Stewart State Park. 
Through September 1999, power generation totaled 6.4 
billion kilowatt-hours. Of the gross income from sale of this 
power by Bonneville Power Administration, $36.3 million was 
reimbursed to the U.S. Treasury to recover Corps of Engineers 
project investment and operating costs. 
Local cooperation. Authorizing act required that local 
agencies furnish assurances prior to construction that demands 
will be made for future use of water supply storage within a 
period that will permit repayment of costs, including interest, 
allocated to water supply within life of the project; that State 
of Oregon take action, prior to construction to insure 
maintenance in stream of flows to be released for fishery; in 
addition, costs allocated to irrigation would have to be repaid 
in manner and to an extent consistent with reclamation laws 
and policies; and costs allocated to power will be repaid on a 
system basis by revenue from sales of power in Pacific 
Northwest Federal system by Bonneville PowerAdministration. 
A survey in September, 1980 of M&I water supply needs 
showed nine communities with water supply needs. A contract 
for M&I supply has been completed with one of the 
communities. Assurances for municipal and industrial water 
supply were obtained from six communities in Rogue River 
28-20

PORTLAND, OREGON DISTRICT 
Valley. On February 26, 1966 Oregon State Department of Fish 
and Wildlife agreed to operate Cole M. Rivers Fish Hatchery 
for mitigation and enhancement of fish. The Corps provides 
full funding for the operation and maintenance of the hatchery. 
The hatchery became operational in 1972. 
Operations during fiscal year. Maintenance: Routine 
operation and maintenance continued. During fiscal year 
320,461,000 kilowatt-hours of electrical power energy were 
generated by the project of which 316,405,000 kilowatt-hours 
were delivered to Bonneville Power Administration, the 
marketing agency. Freshets regulated by Lost Creek Lake on 
Rogue River are shown in Table 28-K. 
46. THE DALLES LOCKAND DAM - LAKE 
CELILO, WAAND OR 
Location. On Columbia River at head of pool behind 
Bonneville Dam, about 192 miles above mouth of river and 88 
miles east of Portland, OR. 
Existing project. A dam, powerplant, navigation lock, and 
appurtenant facilities. Improvement provides for navigation 
and hydroelectric power generation. Dam is designed for a 
normal pool at elevation 160 feet at mean sea level. Normal 
pool forms a reservoir extending upstream about 23 miles 
providing slackwater to John Day Dam site. The Dalles Dam 
is 8,700 feet long and consists of a rock, gravel, and sand river 
closure section from Oregon shore connecting to a nonoverflow 
section which in turn joins powerhouse, then concrete 
nonoverflow sections connecting spillway with powerhouse 
and spillway with navigation lock at right abutment on 
Washington shore. Fish-passing facilities including two ladders 
and a fish lock are provided. Powerhouse was constructed for 
14 units initially with substructure for eight additional units, 
an ultimate total of 22 units. Initial installation, excluding two 
13,500 kilowatt fish-water units, is 1,092,000 kilowatts. With 
eight units installed for a capacity of 687,800 kilowatts. The 
total generating capacity is 1,806,800 kilowatts. Structures are 
founded on Columbia River basalt. Principal data concerning 
lock, spillway, and powerhouse are set forth in Table 28-N. 
Major construction of project initiated February 1952, was 
completed October 1960 when unit No. 14 was placed in 
commercial operation. Initial contract for additional units 15- 
22 was awarded in September 1967. Additional 8-unit phase 
was completed when unit 22 was placed in commercial 
operation in November 1973. Basic recreation facilities were 
developed with construction funds at 4 parks on Lake Celilo. 
These parks were further expanded with code 710 funds in the 
late 60's and ea, " 0's. Two parks are operated by Washington 
State Park Comnussion under a lease agreement. Studies for 
adding power generation facilities to the North Shore Fish 
LadderAuxiliary Water supply System were initiated in October 
1979 and completed in December 1980. These facilities would 
provide baseload generation (3.5 megawatts) and would not 
impactthe present operation of the North Fish Ladder. However, 
it was determined that it was not within the Chief of Engineer's 
authority to add these power facilities. A local interest, North 
Wasco County Public Utility District pursued the construction 
of these power facilities through the FERC license processes 
and awarded a construction contract in September 1989. Seufert 
Visitor Center was completed in September 1980. 
In October 1996 work began on major rehabilitation of 
powerhouse units 1-14. Work includes rewind of nine 
generators, replacement of blades on twelve turbine units, 
refurbishment of blades on two turbine units, and refurbishment 
of two bridge cranes. The total cost for major rehabilitation is 
estimated at $94,000,000 with completion in September 2008. 
Through September 1999, power generation totaled 299.6 
billion kilowatt-hours. Of the gross income from sale of this 
power by Bonneville Power Administration, $427.4 million 
was reimbursed to the U.S. Treasury to recover Corps of 
Engineers project investment and operating costs. 
Local cooperation. Further recreation development will 
require cost sharing and assumption of operation and 
maintenance by local, non-federal sponsor. 
Operations during fiscal year. Maintenance: continued 
work on the data acquisition control system and installation of 
fish unit exciters. Increased activities to protect and enhance 
the anadromous fisheries in the Northwest were performed. 
Routine operation and maintenance continued. During fiscal 
year 7,898,934,000 kilowatt-hours of electrical power energy 
were generated at project of which 7,881,453,000 kilowatthours 
were delivered to Bonneville Power Administration, the 
marketing agency. 
Major Rehabilitation: Completed powerhouse bridge cranes 
contract, continued rewind of Unit 2 generator, initiated 
construction of two additional generator rewinds, initiated 
procurement of 12 additional exciters, initiated preparation of 
design for five remaining generator rewinds. 
Work Under Special Authorities 
47. PROJECTS NOT SPECIFICALLY 
AUTHORIZED 
A. Continuing Authorities Program (CAP): General 
Requirements: Individual projects have specific requirements 
pursuant to the statutes which provide their authorization. In 
general, however, each project selected must be complete in 
itself, technically feasible, economically justified, 
environmentally acceptable, and limited to a federal statutory 
cost. The local sponsor must agree to provide without cost to 
the Department of Army, all lands, easements, and rights-ofway, 
including highway, highway bridge, and utility relocations 
and alterations required for project construction; provide a cash 
contribution; operate, maintain, repair, replace, and rehabilitate 
the project upon completion; hold and save the Department of 
the Army free from damages arising from the construction, 
operation, and maintenance of the completed project; and 
assume all project costs in excess of the federal statutory cost 
limit. Specific requirements by statute for the authorization of 
each type of CAP project are discussed in detail below. 
See Table 28-L for expenditures under CAP during the fiscal 
year. 
28-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Navigation Activities Pursuant to Section 107 of the 1960 
Rivers and Harbors Act, Public Law 645, 86th Congress, 
as Amended: 
In addition to the above general requirements, each project 
selected is limited to a federal statutory cost of not more than 
$4,000,000. The local sponsor must agree to provide an amount, 
in cash, not less than 10 percent or more than 50 percent of 
total project cost for navigation depending upon the planned 
depth of channel or basin; pay an additional 10 percent of the 
construction costs in cash over a period not to exceed 30 years 
after project completion. The non-federal sponsor must also 
agree to provide, maintain, and operate an adequate public 
parking, landing or wharf, service facilities, berthing areas, 
floats, pier, slips and similar marina and mooring facilities. 
The remaining portion of the project, such as the access channel 
or breakwater structure, is maintained by the Corps of Engineers 
at Federal expense within a limited amount. Federal 
expenditures for operation and maintenance under the Section 
107 authority are administratively limited to the greater of 
$4,500,000, or 2.25 times the Federal costs of the project 
including costs for the feasibility through the construction 
phases. 
No projects were under construction. 
Flood Control Activities Pursuant to Section 205 of the 
1948 Flood Control Act, Public Law 858, 80th Congress, as 
Amended: 
In addition to the above general requirements, each project 
selected is limited to a federal statutory cost of not more than 
$7,000,000. The local sponsor must agree to provide an amount 
not less than 35 percent or more than 50 percent of total project 
cost, at least 5 percent of which will be cash; and operate, 
maintain, repair, replace, and rehabilitate the project upon 
completion. 
One project was under construction as follows: 
Peninsula Drainage District No. 1, OR: 
Location. Peninsula Drainage District is located in Portland, 
Oregon along the Columbia River near river mile 106. 
Project Description. The Peninsula Drainage District is 
surrounded by 6.8 miles of levees, flood walls, and railroad 
and highway embankments. The weak links in the flood protect 
works are the railroad embankment and the outlet pipe of the 
pumping plant located on the Columbia Slough levee. The 
project consists of reinforcing the flood protective system in 
order to protect against the 100-year reoccurrence frequency 
flood event. This will be accomplished by reinforcing 2,000 
linear feet of the landward side of the railroad embankment at 
the southwest corner of the drainage district and raising the 
outlet pipes of the pumping station to above-design flood level 
of 28.7 feet Portland Datum. The railroad embankment will 
be reinforced by constructing a sand embankment structure 
against the landward slope of the railroad embankment having 
a 12-foot wide crown and 1 vertical to 5 horizontal side slopes. 
The catch point along a portion of this fill is in a golf course 
water hazard and the embankment will cover existing golf 
course tees. As a consequence, a 200 linear foot gabion retaining 
wall will confine the fill and allow construction of a flat bench 
so the tees can be re- established. The height of the retaining 
wall will vary from 2 to 9 feet. The estimated cost for 
preparation of plans and specifications and construction of the 
project is $1,484,000, of which $1,113,000 is federal and 
$371,000 is non-federal. 
Local cooperation. The Peninsula Drainage District 
Number 1, Oregon, the non-federal sponsor, signed a Project 
Cooperation Agreement on July 3, 1997. 
Operations during fiscal year. The project was modified 
to address safety issues. A boat barrier was added to preclude 
access to the outlet. The contract for this task was awarded on 
Sept 1, 1999 and was physically complete Nov 10, 1999. 
Emergency Streambank Protection Activities Pursuant 
to Section 14 of the 1946 Flood Control Act, Public Law 
526, 79th Congress, as Amended: 
In addition to the general requirements, each project selected 
is limited to a federal statutory expenditure of not more than 
$1,000,000 in any one year. The local sponsor must agree to 
provide an amount not less than 35 percent or more than 50 
percent of total project cost, at least 5 percent of which will be 
cash; and operate, maintain, repair, replace, and rehabilitate 
the project upon completion. 
No projects were under construction. 
B. Modifications to Structures and Operations of 
Constructed Corps Projects to Improve the Quality of the 
Environment, Pursuant to Section 1135 of the 1986 Water 
Resources Development Act, Public Law 662, 99th 
Congress, as Amended. 
The Section 1135 program provides the authority for the 
U. S. Army Corps of Engineers to modify existing civil works 
projects to restore the environment. A non-federal entity is 
required to sponsor the project. The project must accomplish 
restoration by modifying a Corps project or operation of a Corps 
project, or be located on Corps project lands. The project must 
be feasible and consistent with the authorized purpose. The 
non-federal sponsor generally must assume responsibility of 
the operation and maintenance associated with the project. 
Planning studies, detailed design, and construction costs are 
shared by the Corps 75 percent and non-federal sponsor 25 
percent. Total project costs cannot exceed $6.7 million with 
the federal share limited to $5,000,000 without specific 
congressional authorization. 
See Table 28-L for expenditures under Section 1135 during 
the fiscal year. 
Two projects are under construction as follows: 
Fern Ridge Marsh, OR 
Location: This project modification is located at the Fern 
Ridge Lake project on the Long Tom River, a Tributary of the 
28-22

PORTLAND, OREGON DISTRICT 
Willamette River approximately 6 miles west of Eugene, 
Oregon. 
Project Description: The Fern Ridge Marsh Restoration 
Project entails marsh restoration and management actions on 
347 acres in the western portion of the Fisher Butte 
Management Unit (West Fisher Butte sub-unit) at Fern Ridge 
Lake Project. The restoration will restore and provide for 
management of 347 acres of marsh habitat via construction of 
7 water control structures, 15,900 lineal feet of dikes and rock 
dikes (carp excluders) within the drawdown zone of Fern Ridge 
Lake Project. The general intent of the proposed action is the 
restoration of a more diverse and productive marsh plant and 
wildlife community in areas currently dominated by reed 
canarygrass. This species is an exotic plant found in extensive 
stands in shallow water areas around the reservoir perimeter. 
The total project cost, including lands, is estimated at 
approximately $540,000. 
Local Cooperation: The Oregon Department of Fish and 
Wildlife signed a local cooperation agreement for the project 
on July 19, 1999. 
Operations During fiscal Year: Construction was initiated 
in August 1999. The material for the dikes was placed in rough 
sections. Due to adverse weather conditions, construction was 
halted prior to completion of the project and will be resumed 
in the Fall of 2000. 
Lower Amazon Creek Wetlands Restoration 
Location: This project modification is located along 
Amazon Creek at the western edge of the city of Eugene, 
Oregon. Amazon Creek is a major drainage channel for Eugene, 
conveying flows into the Long Tom River, a tributary of the 
Willamette River. 
Project Description: Prior to settlement in the 1850's, 
seasonal wet prairie habitat dominated the landscape of the 
lower Amazon Creek basin and much of the Willamette Valley. 
Since then, nearly all of this wetland type has been lost to 
agriculture and urban uses. The Amazon Creek Flood control 
Project built by the Corps in the 1950's further degraded the 
wetland hydrology when the creek and connecting drainages 
were channelized and lined with levees. It is estimated that 
less than one percent of the Willamette Valley's historic wet 
prairies remains today. The lower Amazon Creek Wetlands 
Project will restore the historic hydrology and vegetation 
community to almost 400 acres of wet prairie. All of the land 
within the project area is owned by the City of Eugene and 
BLM, having been acquired for wetland protection and 
restoration purposes. The total project cost, including lands, is 
estimated at approximately $4.2 million. 
Local Cooperation: The City of Eugene signed a local 
cooperation agreement for the project on October 26, 1998. 
The project is also supported by the Bureau of Land 
Management under it's West Eugene Wetlands Project. 
Operations During fiscal Year: Phases I and II were 
initiated in July and completed in November 1999. Phase I 
involved removing existing levees along Amazon Creek and 
associated drainages and restoring the channels more natural 
meandering stream configurations.. New levees were set back 
around the margin of the wetland restoration area to maintain 
the flood control function of the project. Interior wetland areas 
will now be subject to the high frequency flooding that occurred 
prior the flood control project. The new levees were seeded 
with a combination of native upland grass species. A slotted 
weir was constructed to maintain the complex flow relationship 
between the connected channels. Culverts, some gated, were 
also installed to maintain drainage and to allow manipulation 
of surface hydrology for wetland management purposes. In 
Phase II, disturbed areas along the stream channels and the old 
levee footprints were seeded and planted with native wet prairie, 
emergent marsh and vernal pool species. The total cost for 
these phases was approximately $1.5 million. 
Construction will continue with Phase III in FY 2000 and 
2001. Phase III will involve removal of non-native plant 
materials throughout the entire project area and replacement 
with native wet prairie plants. A major portion of this effort 
will be propagation of native plants and seeds. Phase II will 
also include modification of surface hydrology. 
48. EMERGENCY RESPONSE ACTIVITIES 
PROGRAM 
Disaster Preparedness Program. This program 
encompasses all the activities associated with preparedness 
(including publication of plans and policy documents), 
exercises, training, coordination with outside agencies and 
governments, maintaining supplies and equipment, and the like. 
Significant activities included a briefing to all employees on 
district's Earthquake Response Plan, and an emergency 
communications exercise for branch chiefs. This exercise 
included hands-on radio training, and an exercise conducted at 
assembly areas, which required the setup and operation of HF/ 
SSB radios. 
Public law 84-99. FY 1998 was a relatively quiet flood 
year, with no significant flood response activities. The district 
accomplished one post-flood activity on the Millicoma River 
in Coos County, to remove a logjam that threatened a highway 
bridge. 
Continuing Eligibility Inspections. The district completed 
all scheduled annual inspections of flood control works. As 
part of these inspections, sector engineers discussed and gave 
advice to local sponsors regarding their local flood plans and 
application of Public Law 84-99 as it pertains to them. 
Catastrophic Disaster Response Planning. This initiative 
was begun in FY98. It requires that a comprehensive set of 
Operations Plans be developed to cope with a subduction 
earthquake off the Oregon/Washington coast in the Richter 
range of 8 to 8.5. The district has begun planning for this event 
in coordination with several other Corps commands. 
See Table 28-M for expenditures during the fiscal year. 
28-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
General Investigations 
49. SURVEYS 
Fiscal year costs were $1,648,050 of which $402,870 was 
for navigation studies, $151 for flood damage prevention 
studies, $385,042 for Special Studies, $164,724 for 
comprehensive studies, $549,182 for miscellaneous activities, 
and $146,081 for coordination with other agencies. Contributed 
funds in the amount of $601,406 were expended of which 
$36,432 was contributed by the Association of Lower Columbia 
River Ports for the Columbia River Channel Deepening Study, 
$94,354 was contributed by the State of Oregon for the 
Willamette River Basin Review study, $104,414 was 
contributed by the City of Portland Bureau of Environmental 
Services for the Columbia Slough Ecosystem Restoration 
Study, $4,359 was contributed by the Tillamook Soil and Water 
Conservation District for the Tillamook Ecosystem Restoration 
Study, and $32,848 was contributed for the Planning Assistance 
to States Program. 
50. COLLECTION AND STUDY OF BASIC DATA 
Flood plain management services. Flood Plain Management 
Services Program comes under Section 206 of the 1960 Flood 
Control Act, PL 86-645, as amended. Through technical 
services and planning guidance, the program encourages 
comprehensive flood plain management planning at all levels 
to reduce the potential for losses to life and property from floods. 
Federal and non-Federal agencies and the private sector are 
assisted with planning and development information for flood 
hazard areas. This assistance is in the form of local flood plain 
regulations, Federal Insurance Program requirements, and 
Executive Order 11988 guidelines. Such assistance may include 
factual flood information (available or determined) and 
interpretation on flood frequencies, extent of flooding, floodwater 
velocity, duration of flooding and floodway limits. 
Fiscal year costs totaling $220,172 were associated with 
the following tasks under the Flood Plain Management Services 
Program: FPMS Unit $40,502; Technical Services $43,175; 
Quick Responses $6,904; National Flood Proof Committee 
$7,415; and special studies $122,176. 
51. PRECONSTRUCTION ENGINEERING AND 
DESIGN 
Willamette River Temperature Control, OR 
The project plan consists of improving downstream water 
temperatures by modifying the existing intake towers at Cougar 
and Blue River projects. Restoring pre-project temperatures 
will improve survival rates and increase populations of three 
important native fish species: the wild stock of Willamette 
spring chinook salmon, the bull trout, and the rainbow trout. 
These fisheries once provided important recreational and 
commercial benefits to the region. Preconstruction engineering 
and design is estimated to cost $4,596,000 and be completed 
by March 2000. The construction phase is estimated to cost 
approximately $70.6 million. 
Continued design and geotechnical explorations work in 
support of the intake tower modifications. Fiscal year 
expenditures were $1,205,203. 
Columbia River Channel Improvements Study, 
OR & WA 
The project plan consists of deepening a segment of the 
Columbia and Willamette Rivers by 3 feet to 43 feet. The 
project area begins at the mouth of the Columbia River and 
extends upstream to the vicinity of the Port of Vancouver, 
Washington (approximately river mile 105), and also includes 
the Lower Willamette River from its confluence with the 
Columbia River (river mile 101.5) upstream to the vicinity of 
downtown Portland (approximately river mile 11). Project 
cost sharing will include requirements for non-Federal interests 
to pay 25 percent of the project cost during construction, and 
an additional 10 percent to be repaid over a period not exceeding 
30 years. Cost of construction is estimated at $188,319,000. 
Fiscal year expenditures were $10,000. 
28-24

PORTLAND, OREGON DISTRICT 
TABLE 28-A COST AND FINANCIAL STATEMENT 
See Total Cost 
Section Project Funding FY96 FY97 FY98 FY99 to 
In Text Sep.30, 1999 
1. Bonneville Navigation 
Lock, Bonneville Dam, 
OR and WA 
(Federal Funds) 
(Inland Waterway 
Trust Fund) 
2. Chetco River, OR 
3. Columbia and Lower 
Willamette Rivers 
Below Vancouver, 
WA and Portland, OR 
(Federal Funds) 
(Contributed Funds) 
4. Columbia River at 
Baker Bay, WA 
5. Columbia River 
Between Chinook, 
WA, and Head of 
Sand Island 
6. Columbia River at 
The Mouth, OR and 
WA 
7. Columbia River 
Between Vancouver,WA 
and The Dalles, OR 
8. Columbia River, 
Seafarers Memorial, 
Hammond, OR 
9. Coos Bay, OR 
(Federal Funds) 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
275,000 250,000 17,500 
265,846 459,423 34,063 
3,000 175,449,807 50 
7,985 175,438,370 50 
275,000 250,000 17,500 4,693,885 180,140,385 
265,846 353,704 30,558 4,700,058 180,126,632 
2,043,713 ' 
2,043,713 
350,000 400,000 426,000 443,000 
463,980 393,612 432,929 443,781 
10,240,673 
10,240,137 
28,349,304 2 
28,349,304 2 
17,039,000 22,278,000 14,280,550 16,136,000 406,538,846 3 
17,041,834 20,387,161 14,105,152 18.209,097 406,514,942 3 
665,954 4 
665,954 4 
941,252 
941,252 
6,000 14,000 
1,599 17,973 
882,000 13,000 
1,037,172 12,526 
4,000 14,000 
4,646 13,784 
4,000 286,000 
7,733 285,994 
4,674,087 
4,673,741 
220,283 5 
220,283 5 
7,910,877 
7,910,126 
24,913,661 6 
24,913,661 6 
6,651,000 2,880,000 6,325,000 6,361,500 166,202,353 7 
6,661,664 3,006,465 6,307,009 6,381,320 166,201,959 7 
7,322,878 
7,322,878 
5,989,509 8 
5,989,509 S 
247,000 636,000 657,000 290,000 
249,834 635,048 657,103 290,041 
15,195,359 9 
15,193,436 9 
150,000 
52,024 
2,860,000 4,407,000 849,000 
2,810,065 4,413,093 24,288 868,554 
37,866,092 10 
37,866,092 10 
28-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-A COST AND FINANCIAL STATEMENT 
(CONTINUED) 
See Total Cost 
Section Project Funding FY96 FY97 FY98 FY99 to 
In Text Sep.30, 1999 
(Contributed Funds) 
10. Coquille River, OR 
11. Depoe Bay, OR 
12. Port Orford, OR 
14. Rogue River Harbor 
At Gold Beach, OR 
15. Siuslaw River, OR 
(Federal Funds) 
(Contributed Funds) 
16. Skipanon Channel, OR 
Maint 
Approp. 
Cost 
Major Rehab 
Approp. 
Cost 
New Work 
Contrib 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
2,545,000 3,006,000 3,181,000 5,678,200 
2,635,306 3,018,236 3,182,478 5,666,808 
1,133,000 1,730,000 637,000 
1,131,911 1,724,174 47,439 471,853 
154,000 329,000 127,000 224,000 
160,933 325,948 130,912 224,184 
43,000 
39,365 
3,000 32,000 10,000 
10,925 30,512 12,741 
495,000 411,000 509,000 767,000 
465,941 439,767 511,626 768,999 
1,007,000 898,000 1,072,000 87,000 
998,183 909,712 993,486 165,547 
420,000 198,000 283,000 262,000 
394,964 230,940 279,350 267,734 
41,000 132,000 189,000 159,000 
15,893 158,565 189,237 159,623 
114,588,918 "1 
114,572,905 " 
2,335,966 
2,335,966 
3,986,680 
3,862,057 
693,366 12 
693,366 12 
8,954,987 13 
8,954,875 13 
367,364 
367,364 
1,757,717 
1,757,241 
758,692 14 
758,692 14 
7,181,217 
7,178,715 
4,156,252 15 
4,156,252 15 
19,286,394 16 
19,278,254 16 
635,783 
635,783 
29,502,212 17 
29,502,212 17 
17,262,384 18 
17,262,339 18 
879,285 
879,285 
493,611 
493,611 
280,854 
280,854 
4,143,064 
4,142,845 
28-26

PORTLAND, OREGON DISTRICT 
TABLE 28-A COST AND FINANCIAL STATEMENT 
(CONTINUED) 
See Total Cost 
Section Project Funding FY96 FY97 FY98 FY99 to 
In Text Sep.30, 1999 
17. Tillamook Bay and 
Bar, OR 
18. Umpqua River, OR 
19. Willamette River at 
Willamette Falls, OR 
20. Yaquina Bay and 
Harbor, OR 
21. Yaquina River, OR 
22. Applegate Lake, 
Rogue River Basin 
OR 
23. Blue River Lake, OR 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor Rehab 
Approp 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Costl 
Major Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
13,000 
7,209 
3,000 
4,981 
5,000 21,000 
8,807 21,804 
714,000 436,000 1,392,000 977,000 
707,807 443,911 1,393,683 976,853 
1,303,000 786,000 690,000 487,200 
1,242,935 696,184 865,491 498,267 
1,688,000 2,487,000 2,268,000 6,410,000 
1,725,476 2,499,188 2,259,405 6,420,500 
481,000 -278,000 -67,000 
328,104 -118,579 -65,116 
583,000 837,000 769,000 807,000 
601,219 835,902 755,008 818,099 
240,000 230,000 251,000 215,000 
224,466 250,095 246,491 220,207 
28-27 
22,434,827 19 
22,434,827 19 
6,806,082 20 
6,805,462 20 
2,839,799 
2,839,799 
17,718,877 21 
17,718,877 21 
34,605,093 
34,649,542 
2,500,677 
2,500,677 
520,005 22 
520,005 22 
24,340,018 23 
24,335,262 23 
234,794 
234,794 
19,242,046 24 
19,242,046 24 
50,581,758 25 
50,580,671 25 
12,005 
12,005 
28,800 
28,800 
--- 1,463,694 51 
--- 1,462,781 51 
91,642,489 
91,642,489 
10,331,115 48 
10,321,530 48 
32,038,225 26 
32,038,225 26 
4,678,299 53 
4,667,912 53

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-A COST AND FINANCIAL STATEMENT 
(CONTINUED) 
See Total Cost 
Section Project Funding FY96 FY97 FY98 FY99 to 
In Text Sep.30, 1999 
24. Cottage Grove Lake, 
OR 
25. Dorena Lake, OR 
26. Elk Creek Lake, 
Rogue River Basin, 
OR 
27. Fall Creek Lake, OR 
28. Fern Ridge Lake, OR 
(Federal Funds) 
(Contributed Funds) 
30. Lower Columbia River Basin 
Bank Protection, OR & WA 
(Federal Funds) 
(Contributed Funds) 
31. Mt. St. Helens 
Sediment Control, WA 
(Federal Funds) 
(Contributed Funds) 
32. Scappoose Drainage 
District, OR 
34. Willamette River 
Basin Bank Protection, 
OR 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp 
Cost 
691,000 931,000 696,000 819,000 
667,752 954,616 680,606 828,078 
425,000 458,000 935,000 653,000 
416,996 482,749 893,215 700,441 
700,000 473,000 
987,398 1,203,214 
74,000 302,000 
887,209 495,882 
507,000 583,000 1,175,000 432,000 
496,088 601,053 1,131,573 467,066 
1,024,000 1,324,000 1,210,000 807,700 
1,012,831 1,343,905 1,165,721 856,142 
50,000 130,000 -10,000 
32,203 111,318 28,260 
10,200
0 
3,650
0
0 
25,000 34,000 300,000 
-310 10,160 57,549 243,182 
515,000 1,364,000 308,000 281,100 
478,952 1,390,176 311,026 304,912 
161,000 
2,517 
86,000 30,000 
80,337 18,600 
0 -29,000 
116,030 11,382 
-10,000 
7,227 2,790 
257,000 805,000 181,000 355,000 
176,742 881,075 198,469 351,834 
28-28 
4,013,123 27 
4,013,123 27 
17,079,288 28 
17,057,873 28 
14,568,262 29 
14,568,262 29 
11,459,460 
11,447,662 
109,399,579 
109,269,766 
22,118,264 30 
22,118,264 30 
10,973,671 
10,960,111 
8,685,635 31 
8,685,635 31 
23,491,898 32 
23,481,822 32 
52,666 
52,666 
21,202,745 
21,192,244 
10,200
0 
112,028,000 
111,970,041 
3,703,112 
3,703,112 
4,273,100 
4,272,572 
4,123,558 
4,121,487 
24,971,816 33 
24,971,325 "3 
5,698,709 
5,695,377

PORTLAND, OREGON DISTRICT 
TABLE 28-A COST AND FINANCIAL STATEMENT 
(CONTINUED) 
See Total Cost 
Section Project Funding FY96 FY97 FY98 FY99 to 
In Text Sep.30, 1999 
35. Willow Creek Lake, OR 
36. Bonneville Lock and 
Dam - Lake Bonneville 
OR and WA 
37. Columbia River 
Fish Mitigation, 
OR and WA 
38. Columbia River Treaty Fishing 
Access Sites, OR & WA 
39. Cougar Lake, OR 
40. Detroit Lake - Big Cliff, 
OR 
41. Green Peter-Foster 
Lakes, OR 
42. Hills Creek Lake, OR 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor Rehab 
Approp 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
563,000 528,000 530,000 555,000 
552,081 536,019 512,150 581,009 
37,260,114 
37,260,114 
7,409,051 
7,402,446 
25,000 718,000 70,000 32,396 789,837,000 34 
400,129 676,103 96,720 50,475 789,827,369 34 
18,889,000 15,894,000 16,114,000 16,604,100 315,955,763 35 
19,131,888 15,966,594 15,637,786 17,009,763 315,622,296 35 
7,299,000 7,140,000 10,960,000 13,238,604 
8,125,408 6,944,705 11,092,955 12,870,401 
60,289,604 
59,753,184 
21,536,000 47,391,000 57,719,000 58,749,000 224,445,000 52 
22,663,087 44,279,324 58,545,415 49,673,014 212,678,596 52 
2,970,000 2,729,000 7,460,079 7,774,442 
4,664,175 2,538,734 6,520,182 8,797,936 
1,142,000 1,443,000 1,272,000 1,366,200 
1,134,127 1,456,129 1,217,890 1,416,843 
2,293,000 2,107,000 2,537,000 2,538,200 
1,989,106 2,410,295 2,406,655 2,660,104 
2,398,000 2,828,000 2,683,000 2,929,600 
2,405,634 2,823,012 2,643,533 2,953,897 
678,000 668,000 743,000 901,900 
676,849 672,351 728,183 914,229 
23,700,521 
23,229,027 
58,636,393 36 
58,636,393 36 
23,773,396 49 
23,742,283 49 
62,729,698 
62,729,698 
48,348,807 47 
48,304,304 47 
363,086 
363,086 
84,005,788 37 
84,005,788 "7 
49,763,303 38 
49,714,148 38 
45,700,619 
45,700,619 
15,748,275 39 
15,742,166 39 
28-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-A COST AND FINANCIAL STATEMENT 
(CONTINUED) 
See Total Cost 
Section Project Funding FY96 FY97 FY98 FY99 to 
In Text Sep.30, 1999 
43. John Day Lock and New Work 
Dam - Lake Umatilla, Approp. 512,400,246 40 
OR and WA Cost 0 512,400,246 40 
Maint. 
Approp. 11,881,000 11,850,000 12,427,000 13,386,500 233,284,227 41 
Cost 12,202,888 12,122,437 12,196,731 13,530,020 233,110,089 41 
Major Rehab. 
Approp. 2,534,000 1,591,000 0 --- 44,005,128 54 
Cost 2,551,108 720,230 889,761 4,463 44,005,128 54 
44. Lookout Point - Dexter New Work 
Lakes, OR Approp. 88,238,395 42 
Cost 88,238,395 42 
Maint. 
Approp. 6,274,000 6,109,000 4,663,000 4,402,500 87,312,032 43 
Cost 5,881,268 5,593,477 5,257,357 4,747,792 87,246,159 43 
45. Lost Creek Lake, New Work 
Rogue River Approp. 136,408,150 
Basin, OR Cost 136,408,150 
Maint 
Approp. 3,876,000 3,831,000 3,988,000 3,910,300 60,225,918 44 
Cost 3,865,540 3,864,327 3,820,931 4,050,722 60,176,156 44 
46. The Dalles Lock and New Work 
Dam - Lake Celilo, Approp. 303,260,288 45 
WA and OR Cost 303,260,288 45 
Maint. 
Approp. 12,865,000 11,820,000 11,728,000 12,323,000 213,651,670 46 
Cost 12,243,654 12,609,899 11,614,994 12,508,235 213,567,179 46 
Major Rehab. 
Approp. 1,893,000 4,637,000 5,560,000 12,090,000 
Cost 1,741,337 4,297,713 5,741,481 11,780,531 
1. Excludes $17,742 contributed funds for new work. 
2. Includes $1,529,413 for previous project. 
3. Includes $150,955 allotted from deferred maintenance 
funds, Code 700, $62,296 for public works accelerated program repair, and 
$1,214,865 for previous project.Excludes $24,320 expended from 
contributed funds prior to 1964. 
4. Excludes $31,636 contributed by city of Astoria and Bumble Bee Sea 
Foods, Astoria, OR (not part of regular project). Includes $223,026 expended 
from contributed funds prior to 1964 and $428,136 contributed by Port of 
Portland and $14,792 by Port of Vancouver. 
5. Includes $84,930 rehabilitation funds. 
6. Includes $1,986,253 for previous project and $608,111 allotted and 
expended under Code 710, recreation facilities at completed project. 
Excludes $500,000 contributed funds. 
7. Includes $2,186,000 for previous project and $1,188,625 under deferred 
maintenance, Code 700. 
8. Includes funds under Code 721 (small authorized projects) $30,393. 
Entrance to Oregon slough; $161,897, Camas-Washougal Turning Basin; 
$227,908, Hood River Small Boat Basin; $157,470, Bingen, WA, Barge 
Channel; and $140,619, The Dalles Small Boat Basin. 
9. Includes $2,033,408 under code 700 (Deferred Maintenance). 
10. Includes $802,096 for previous project, Excludes contributed funds. 
11.Includes $178,801 for previous project and $1,444,640 under Code 700, 
Deferred Maintenance. Excludes $8,387 contributed funds. 
12. Includes $340,726 for previous project. Excludes $72,891 contributed 
funds. includes $36,000 under Code 711. 
13. Includes $41,467 for previous project and $78,500 under Code 700, 
Deferred Maintenance. 
14. Excludes $9,900 contributed funds. 
15. Excludes $13,779 (other funds) contributed for additional landfill and 
extension of drainage lines. 
16. Includes $21,000, Wedderburn Study Funds. 
17. Includes $1,159,357 for previous project. 
18. Includes $10,611 for previous project and $188,000 under code 700, 
Deferred Maintenance. 
19. Includes $77,209 for previous project and $57,767 under Code 720 (Small 
Authorized Projects) Garibaldi Boat Basin. Excludes $592,622 contributed 
funds and $300,000 channel dredging by local interest. 
20. Includes $71,498 for previous project. Excludes $6,450 expended from 
contributed funds. 
21. Includes $39,242 for previous project. Excludes $6,450 expended from 
contributed funds. 
22. Excludes $300,000 contributed funds. 
23. Includes $452,110 on operation and care from permanent indefinite 
appropriation and $150,000 under maintenance and operation of dams and 
other improvements of navigable waters. 
24. Includes $707,313 for previous project and $170,000 appropriated from 
public works acceleration program for north jetty rehabilitation. 
28-30

PORTLAND, OREGON DISTRICT 
25. Includes $6,026 for previous project. 
26. Includes $96,000 pro rata share of site selection costs in lieu of Quartz 
Creek Lake. 
27. Includes $1,639,828 allotted and expended under Code 710, recreation 
facilities at completed project. 
28. Includes $167,878 special recreation use fees. Includes $79,818 under 
maintenance and operation of dams and other improvements to navigable 
waters. 
29. Includes $1,038,790 allotted and expended under Code 710, recreation 
facilities at completed project. 
30. Includes $1,026,264 allotted and expended under Code 710, recreation 
facilities at completed project. 
31. Includes $3,894,673 allotted and expended under Code 710, recreation 
facilities at completed project and $136,482 allotted under 721 (small 
authorized project) reservoir modification. Excludes $2,100 (other funds 
contributed). 
32. Includes $9,750 allotted under Code 700, deferred maintenance. Includes 
$66,678 under maintenance and operation of dams and other improvements 
to navigable waters. 
33. Excludes $93,733 contributed funds. 
34. Includes $12,200,000 Public Works Administration funds, $20,240,700 
National Recover Act Funds, $27,195,400 modification for peaking funds, 
$136,457 Code 710, recreation facilities at completed project funds and 
$6,000 power units funds. 
35. Includes $540,000 deferred maintenance funds, Code 700 and $1,692,148 
maintenance and operation of dams and other improvements of navigable 
waters. Excludes 96-89X4045 funds. 
36. Includes $96,000 pro rata share of site selection costs in lieu of Quartz 
Creek Lake. Includes $1,789,988 allotted and $1,789,954 expended for 
Strube Lake and Cougar Additional Unit. 
37. Includes $113,000 pro rata share of site selection costs in lieu of Quartz 
Creek Lake. 
38. Includes $983,934 under maintenance and operation of dams and other 
improvements of navigable waters. Excludes 96-89X4045 funds. 
39. Includes $82,408 under maintenance and operation of dams and other 
improvements of navigable waters. Excludes 96-89X4045 funds. 
40. Includes $25,984 allotted and expended under 710, recreation facilities 
at completed projects. 
41. Includes $1,361,900 for O&M and fish evaluation of Spring Creek 
Hatchery (funds revoked and paid to USFWS at OCE level, but a cost to 
project); includes $423,800 special recreation use fees. Includes $933,438 
under maintenance and operation of dams and other improvements of 
navigable waters. Excludes 96-89X4045 funds. 
42. Includes $457,611 allotted and expended under 710, recreation facilities 
at completed projects. 
43. Includes $991,562 under maintenance and operation of dams and other 
improvements of navigable waters. Excludes 96-89X4045 funds. 
44. Includes $978,478 under maintenance and operation of dams and other 
improvements of navigable waters. Excludes 96-89X4045 funds. 
45. Includes $1,140,747 allotted and expended under 710, recreation facilities 
at completed projects, and $52,997,220 allotted and expended additional 
units 15 - 22 funds. 
46. Includes $721,490 under maintenance and operation of dams and other 
improvements of navigable waters. Excludes 96-89X4045 funds. 
47. Includes $936,376 under maintenance and operation of dams and other 
improvements of navigable waters. Excludes 96-89X4045 funds. 
48. Includes $66,678 under maintenance and operation of dams and other 
improvements of navigable waters. 
49. Includes $861,852 under maintenance and operation of dams and other 
improvements of navigable waters. Excludes 96-89X4045 funds. 
50. Includes $24,307 under code 422 General Investigation. 
51. Excludes $3,000 contributed funds. 
52. Excludes 96-89X4045 funds. 
53. Includes $5,694 under maintenance and operation of dams and other 
improvements of navigable waters. 
54. Excludes 96-89X4045 funds. 
28-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
1. BONNEVILLE NAVIGATION LOCK, BONNEVILLE DAM, OR AND WA 
Aug 15, 1985 
Nov 17, 1986 
Mar 02 , 1945 
Oct 27, 1965 
Dec 04, 1981 
Oct 31, 1992 
Feb 27, 1911 
Jul 25, 1912 
Jul 27, 1916 
Aug 08, 1917 
Sep 22, 1922 
Mar 04, 19232 
Mar 03, 1925 
Mar 03, 1927 
Jul 03, 1930 
Construction of a new navigation lock just south P.L. 99-88 
of existing lock. 
Construction to be funded 50% from fuel taxes paid P.L. 99-662 
into Inland Waterways Trust Fund. 
CHETCO RIVER, OR 
To provide for the stabilization of the channel, by 
constructing jetties and dredging. 
Modification of channel entrance and channel 
improvements. 
Deepen channel 2 feet to 16 feet, extend the existing jetty 
system 750 feet for the North, and 1,250 feet for the 
South jetty. 
Assume responsibility for O&M of the approximately 
200-foot-long access channel to the south commercial 
boat basin consistent with authorized project depths. 
COLUMBIA AND LOWER WILLAMETTE RIVERS BELOW 
VANCOUVER, WA AND PORTLAND, OR 
2 pipeline dredges and accessories. 
Increasing main channel to 30 feet. 
Consolidating improvement below Portland, OR and 
between Vancouver, WA and mouth of Willamette. 
For the Cathlamet channel. 
Construct an additional dredge (dredge was not built) 
and accessories for better maintenance, and construct 
contraction works. 
Channel from deep water in Willamette Slough to deep 
water in Columbia River. 
Depth of 25 feet and width of 300 feet from mouth of 
Willamette River to Vancouver, WA. 
Closing east channel at Swan Island in Willamette River 
on condition that main channel to be opened to project 
dimensions on west side of island by Port of Portland. 
For a 35-foot channel 500 feet wide from Portland to 
the sea. 
Sep 06, 19331 A channel 28 feet deep and 300 feet wide from mouth of 
Willamette River to Vancouver, with 2 turning basins, 
each generally 28 feet deep by 800 feet wide by 
2,000 feet long. 
Aug 30, 1935 A channel in Columbia River from mouth of Willamette 
to interstate highway bridge at Vancouver, WA, 
30 feet deep and 300 feet wide, with 2 turning 
basins at Vancouver. 
Aug 30, 1935 Maintenance of not to exceed 35 foot depth at low water 
in Portland Harbor and Willamette River between its 
mouth and Broadway Bridge at Portland. 
Aug 30, 1935 Auxiliary channels, 30 feet deep, 300 feet and 500 
feet at St. Helens. 
Aug 26, 1937 Extension of lower turning basin at Vancouver, WA, 
1,000 feet downstream. 
Aug 26, 1937 An auxiliary channel 24 feet deep and 200 feet wide 
along waterfront at Rainier, OR. 
Mar 02, 1945 Improvement of old mouth of Cowlitz River. 
Mar 02, 1945 An auxiliary channel in vicinity of Longview, WA. 
Jul 24, 1946 A small-boat mooring basin at Astoria, OR. 
Oct 23, 1962 A channel 35 feet deep and 500 feet wide from mouth 
of Willamette River to interstate highway bridge at 
Vancouver, WA, with 2turning basins of same depth. 
Oct 23, 1962 A channel 40 feet deep and 600 feet wide from Vancouver, 
WA, to mouth of Columbia River; a turning basin at 
Vancouver, WA, a turning basin at Longview, WA, and a 
channel 40 feet deep in Willamette River from mouth to 
Broadway Bridge which encompasses Portland Harbor area. 
Aug 17, 1999 Deepen the existing navigation channel by three feet. 
H. Doc. 817, 77th Cong., 2d Sess 
S. Doc. 21, 89th Cong., 1st Sess. 
S. Doc. 10, 96th Cong., 1st Sess. 
P.L. 102-580, 102nd Cong. 
H. Doc. 1278, 61st Cong., 3d Sess.' 
H. Doc. 1278, 61st Cong., 3d Sess.' 
No Prior Report 
H. Doc. 120, 63d Cong., 1st Sess.' 
H. Doc. 1009, 66th Cong., 3d Sess. 
H. Doc. 156, 67th Cong., 2d Sess. 
H. Doc 126, 68th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 10 
69th Cong., 2d Sess. 
H. Doc. 195, 70th Cong., 
1st Sess. and Rivers and Harbors 
Committee Doc. 8, 71st Cong., 
1st Sess.' 
H. Doc. 249, 72d Cong., 2d Sess.' 
Rivers and Harbors 
Committee Doc. 1, 
74th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 6, 
73d Cong., 1st Sess.' 
H. Doc. 235, 72d Cong., 1st Sess.' 
Rivers and Harbors 
Committee Doc. 81, 
74th Cong., 2d Sess.' 
H. Doc. 203, 75th Cong., 1st Sess.' 
H. Doc. 341, 77th Cong., 1st. Sess.' 
H. Doc. 630. 77th Cong., 2d Sess.' 
H. Doc. 692, 79th Cong.,2d Sess.' 
H. Doc. 203, 87th Cong., 1st Sess. 
H. Doc. 452, 87th Cong., 2d Sess.' 
P.L. 106-53 
28-32 
2.

PORTLAND, OREGON DISTRICT 
TABLE 28-B AUTHORIZING LEGISLATION 
(CONTINUED) 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
4. COLUMBIA RIVER AT BAKER BAY, WA 
East Channel 
Main channel 
West channel 8 feet deep. 
West channel 10 feet deep and mooring basin with 
protecting breakwaters. 
Public Works Administration 
H. Doc. 44, 73d Cong., 1st Sess. 
H. Doc. 443, 76th Cong., 1st Sess. 
S. Doc. 95, 81st Cong., 1st Sess. 
COLUMBIA RIVER BETWEEN CHINOOK, WA AND HEAD OF SAND ISLAND 
Channel 8 feet deep. Rivers and Harbors Committee 
Doc. 50,75th Cong., 2d Sess. 
Channel 10 feet deep and mooring basin. S. Doc. 8, 83d Cong.,lst Sess.' 
COLUMBIA RIVER AT THE MOUTH, OR AND WA 
Extend South Jetty and construct North Jetty and dredging. 
Construction, operation, and maintenance of recreation 
facilities. 
Bar channel of 48-foot depth and spur jetty on north shore.' 
Deepening the northernmost 2,000 feet of the channel 
cross section to 55 feet. 
Lower a 500' section of south jetty at river mile 7. 
Dec 11, 1933 
Aug 30, 1935 
Mar 02, 1945 
May 17, 1950 
Jun 20, 1938 
Sep 03, 1954 
Mar 03, 1905 
Dec 22, 1944 
Sep 03, 1954 
Jul 30, 1983 
May 24, 1995 
Aug 26, 1937 
Mar 02, 1945 
Jul 24, 1946 
Jul 24, 1946 
Jul 24, 1946 
Jul 24, 1946 
Nov 5, 1990 
COLUMBIA RIVER BETWEEN VANCOUVER, WA, AND THE DALLES, OR 
Construct a channel 27 feet deep by 300 feet from H. Committee Doc. 94, 
Vancouver, WA, to Bonneville, OR. 74th Cong., 2d Sess.' 
Construct Camas-Washougal turning basin. H. Doc. 218, 76th Cong., 1st Sess. 
Construct a channel 27 feet deep by 300 feet wide H. Doc. 704, 79th Cong., 2d Sess. 
from Bonneville, OR, to The Dalles, OR. 
Construct a boat basin at Hood River, OR, 10 feet deep, H. Doc. 704, 79th Cong., 2d Sess. 
500 feet wide, by 1,300 feet long. 
Construct a barge channel at Bingen, WA, 10 feet deep, H. Doc. 704, 79th Cong., 2d Sess. 
200 feet wide, by 1 mile long, and an access channel 
7 feet deep, 100 feet wide, by 1,000 feet long to natural 
mooring basin. 
Construct The Dalles Harbor 8 feet deep, 400 feet wide S. Doc. 89, 79th Cong., 1st Sess.' 
by 800 feet long. 
COLUMBIA RIVER, SEAFARERS MEMORIAL, HAMMOND, OR 
Engineering, design, acquisition and construction of a P. L. 101-514; H. R. 101-889, 101st 
support structure to serve as the foundation for the Cong, 2d Sess. 
Seafarer's Memorial in the Columbia River, in cooperation 
with the City of Hammond, Oregon. 
COOS BAY, OR 
Jun 25, 1910 Dredging the Ocean Bar Channel. 
Mar 02, 1919 A channel 22 feet deep to Smith's Mill. 
Sep 22, 1922 Restore North Jetty 9,600 feet long, construct a South 
Jetty about 3,900 feet long, extend 22-foot bay channel 
from Smith's Mill to Millington. 
Jan 21, 1927 Extend jetties to such lengths as may be practicable 
within estimate of total cost of jetties, $3,250,000 given 
in H. Doc. 150, 67th Cong. 
Jul 03, 1930 A channel 24 feet deep and 300 feet wide, through 
Pigeon Point Reef, following a location along westerly 
side of bay. 
Aug 30, 1935 For 24-foot channel from Pigeon Point Reef to 
Smith's Mill and a turning basin above Marshfield. 
Jul 24, 1946 Increased dimensions of channel across bar and to 
Isthmus Slough and turning basin opposite Coalbank 
Slough and at city of North Bend; anchorage basins at 
mile 3.5 and near mile 7. 
Jun 30, 1948 A mooring basin and connecting channel at Charleston. 
Dec 31, 1970 Increase dimensions to provide for bar channel 45 feet deep, 
inner channel 35 feet deep to mile 15, and deepening and 
widening existing turning basins and anchorage area. 
Nov 13, 1995 Deepening the authorized channel by 2 feet and expanding one 
turningbasin. The entrance would be 47 feet deep to River Mile 
(RM) 1 and the inner channel 37 feet between RM 1 and 15. 
H. Doc. 958, 60th Cong.,lst Sess. 
H. Doc. 325, 65th Cong., 1st Sess. 
H. Doc. 150, 67th Cong., 2d Sess. 
H. Doc. 320, 69th Cong., 1st Sess. 
H. Doc. 110, 70th Cong., 1st Sess.' 
S. Committee Print, 
73d Cong., 2d Sess.' 
S. Doc. 253, 79th Cong., 2d Sess. 
H. Doc 646, 80th Cong.,2nd Sess. 
H. Doc. 151, 91st Cong., 2d Sess. 
P.L. 104-46 
28-33 
H. Doc. 94, 56th Cong., 1st Sess. 
Sec. 4, Flood Control 
Act of 1944 as amended 
H. Doc. 249, 83d Cong., 2d Sess.' 
P.L. 98-63 
Sec. 1135, P.L. 99-662, as amended 
5. 
7. 
8. 
9.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-B AUTHORIZING LEGISLATION 
(CONTINUED) 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Jun 25, 1910 
Mar 02, 1919 
Jul 03, 1930 
Aug 30, 1935 
Dec 22, 1944 
Mar 02, 1945 
COQUILLE RIVER, OR 
Dredging shoals between mouth and Riverton, and 
removing obstruction between mouth of North Fork 
and Bandon. 
For a 13-foot channel from ocean to Bandon. 
Deepen channel to 16 feet between sea and eastern end 
of North Jetty. 
Present project depth between sea and eastern end of 
North Jetty. 
Construction, operation, and maintenance of 
recreation facilities. 
For 13-foot depth from sea to a point 1 mile above Coquille 
River Lighthouse and snagging to State Highway Bridge. 
DEPOE BAY, OR 
Aug 26, 1937 Construction of an inner basin 375 feet long, 125 feet wide 
and 5 feet deep, with an entrance channel of same depth 
and 30 feet wide. 
Mar 2, 1945 Construction of an inner basin 750 feet long, 390 feet wide 
and 8 feet deep, with entrance channel at same depth and 
30 feet wide. 
July 14, 1960 Construction of entrance channel 8 feet deep and 50 feet wide, 
concrete breakwater and stone spending beach. 
Oct 27, 1965 
Dec 31, 1970 
Oct 31, 1992 
Sep 03, 1954 
PORT ORFORD, OR 
Extension of existing breakwater by 550 feet. 
Dredging of turning basin 340 feet long, 100 feet wide, 
16 feet deep. 
Maintain the authorized navigation channel including 
those portions of the channel within 50 feet of the 
port facility. 
ROGUE RIVER HARBOR AT GOLD BEACH, OR 
Two jetties at entrance and improvement of channel. 
SIUSLAW RIVER, OR 
Sep 19, 1890 Build two high-tide stone jetties. 
Jun 25, 1910 Extends North Jetty 3,700 feet from old work constructed 
under previous project and provides for 4,200 foot 
south jetty. 
Mar 03, 1925 12-foot deep channel. 
Jul 03, 1958 
Oct 22, 1976 
Oct 01, 1980 
Jul 03, 1930 
Aug 26, 1937 
Jun 30, 1948 
18-foot bar channel and 16-foot river channel and a 600-foot 
extension of north Jetty. (600-foot extension classified 
deferred.) 
Phase I advance engineering and design for north 
and south jetty extensions. 
Extending north and south jetties about 2,000 and 
2,500 feet, respectively. 
SKIPANON CHANNEL, OR 
Channel from deep water in Columbia River to railroad 
bridge, 30 feet deep. 
Channel extending upstream from railroad bridge a 
distance of 4,500 feet. 
Mooring basin 12 feet deep at Warrenton. 
TILLAMOOK BAY AND BAR, OR 
Jul 26, 1912 Construct North Jetty 5,700 feet long and dredging 
Mar 04, 1913 channel 16 feet deep, 200 feet wide, to Bay City. 
Mar 02, 1919 Abandon that portion of project above Bay City. 
Mar 03, 1925 Abandon Bay City Channel and present project dimension 
of channels and turning basins with regulating works 
as needed. 
Mar 02, 1945 Repair damage and check erosion on Bayocean Peninsula 
caused by storm Jan. 1939. 
H. Doc. 673, 61st Cong., 2d Sess. 
H. Doc. 207, 65th Cong.,lst Sess.' 
H. Doc. 186, 70th Cong., 1st Sess. 
S. Committee Print, 
74th Cong., 1st Sess. 
Sec. 4, Food Control 
Act of 1944 as amended 
H. Doc. 672, 76th Cong., 2d Sess.' 
H. Doc. 202, 75th Cong. 
1st Sess. 
H. Doc. 350, 77th Cong. 
1st Sess. 
Sec. 107 of R&H Act 1960, approved 
Feb. 1965. 
S. Doc. 62, 88th Cong.,2d Sess 
H. Doc 151, 91st Cong.,2d Sess. 
P.L. 102-580, 102nd Cong. 
S. Doc. 83, 83d Cong. 2d Sess. 
H. Doc. 71, 51st Cong., 1st Sess. 
H. Doc. 648, 61st Cong., 2d Sess. 
S. Committee Print, 
Serial, 68th Cong., 1st Sess. 
H. Doc. 204, 85th Cong.,lst Sess.' 
Final Report of Chief 
of Engineers 
P.L. 96-367 
H. Doc. 278, 70th Cong., 1st Sess. 1 
H. Doc. 201, 75th Cong., 1st Sess. 
S. Doc. 93, 80th Cong., 1st Sess.' 
H. Doc. 349, 62d Cong., 2d Sess. 
H. Doc. 760, 65th Cong., 2d Sess 
H. Doc. 562, 68th Cong., 2d Sess. 
S. Doc. 35, 79th Cong., 1st Sess.4 
28-34 
10. 
11. 
12. 
14. 
15. 
16. 
17.

PORTLAND, OREGON DISTRICT 
TABLE 28-B AUTHORIZING LEGISLATION 
(CONTINUED) 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Jun 30, 1948 
Sep 03, 1954 
Oct 27, 1965 
Dredging small-boat basin and approach at Garibaldi, OR, 
to depth of 12 feet. 
Closure of breach in Bayocean Peninsula. 
Construct South Jetty, 8,000 feet long. 
UMPQUA RIVER, OR 
Sep 22, 1922 North Jetty, 7,500 feet long 
Jan 21, 1927 Present project dimensions of North Jetty and dredging 
ocean bar. 
Jul 03, 1930 A short south jetty 
Aug 30, 1935 A full length south jetty and maintenance dredging 
to a 26-foot depth. 
Jun 20, 1938 Channel 22 feet deep and 200 feet wide from mouth 
to Reedsport. 
Mar 02, 1945 Channel 22 feet deep and 200 feet wide from river channel 
to Gardiner, and turning basin 22 feet deep, 500 feet wide 
and 800 feet long. 
Mar 02, 1945 Channel 10 feet deep and 100 feet wide from river channel 
to dock in Winchester Bay with mooring and turning basin 
10 feet deep, 175 feet wide, and 300 feet long at inner end. 
Jun 30, 1948 Channel 12 feet deep and 100 feet wide from river channel 
to dock in Winchester Bay with mooring and turning basin 
12 feet deep, 175 feet wide, and 300 feet long at inner end. 
Sep 03, 1954 Channel 12 feet deep, Scholfield River. 5 
Jun 25, 1910 
Aug 08, 1917 
Jun 26, 19346 
Mar 02, 19458 
WILLAMETTE RIVER AT WILLAMETTE FALLS, OR 
For purchase and rehabilitation of system and 
construction of concrete division wall. 
Deepening of locks. 
Operation and care of canal and locks provided for with 
funds from War Department appropriations for Rivers 
and Harbors. 
Construction of New Willamette Falls Locks. 
YAQUINA BAY AND HARBOR, OR 
Mar 02, 1919 Restoration and extension of jetties constructed under 
previous projects, rock removal at entrance, and 
dredging in bay up to railroad terminus at Yaquina. 
Aug 26, 1937 Extension of north jetty seaward 1,000 feet. 
Mar 02, 1945 
Jul 24, 1946 
Jul 03, 1958 
Jul 14, 1960 
Mar 4, 1913 
26-foot channel of suitable width across entrance bar, as far 
as rock bottom will allow, a 20-foot channel 300 feet wide 
along south side of bay to and including a turning basin 
22 feet deep, 1,000 feet wide and 1,200 feet long. 
Construct a small-boat mooring basin at Newport, OR. 
40-foot bar channel and 30-foot river channel 
extension of jetties at entrance. 
A small boat basin, south shore. 
YAQUINA RIVER, OR 
Construction of channel 10 feet deep and generally 150 feet 
wide on Yaquina River and 200 feet wide in Depot Creek. 
APPLEGATE LAKE, ROGUE RIVER BASIN, OR 
Oct 23, 1962 Authorizes a rockfill embankment dam. 
Mar 07, 1974 Authorizes construction of project but no operation for 
irrigation until local interests agree to repay cost allocated. 
May 17, 1950 
Nov 17, 1986 
Jun 28, 1938 
Dec 22, 1944 
BLUE RIVER LAKE, OR 
Authorizes gravel-filled embankment dam. 
Authorizes Construction of hydroelectric power facilities 
COTTAGE GROVE LAKE, OR 
Earthfill dam. 
Construction, operation, and maintenance of recreation 
facilities. 
18. 
28-35 
H. Doc. 650, 80th Cong., 1st Sess. 
S. Doc. 128, 83d Cong., 2d Sess.' 
S. Doc. 43, 89th Cong., 1st Sess.' 
H. Doc. 913, 65th Cong., 2d Sess. 
H. Doc. 320, 69th Cong., 1st Sess. 
H. Doc. 317, 70th Cong., 1st Sess' 
Rivers and Harbors Committee 
Doc. 9,72d Cong., 1st Sess. 
S. Doc. 158, 75th Cong.,3d Sess.' 
S. Doc. 86,76th Cong., 1st Sess.' 
S. Doc. 191, 77th Cong., 2d Sess.' 
S. Doc. 154, 80th Cong., 2d Sess.' 
S. Doc. 133, 81st Cong., 2d Sess.' 
H. Doc. 202, 56th Cong., 1st Sess. 
and Annual Report, 1900, P. 4374 
H. Doc. 1060, 62d Cong., 3d Sess.' 
H. Doc. 544, 75th Cong.,3d Sess. 
H. Doc. 109, 65th Cong., 
1st Sess. 
S. Committee Print, 75th Cong., 
1st Sess. 
S. Doc. 119, 77th Cong., 1st Sess.' 
S. Doc. 246, 79th Cong., 2d Sess. 
S. Doc. 8, 85th Cong., 1st Sess.' 
Section 107, P.L. 86-645 
Authorized by Chief of Engineers, 
Mar. 4, 1977 
Doc. 579, 62d Cong., 2d Sess. 
H. Doc. 566, 87th Cong., 2d Sess. 
P.L. 93-251 
H. Doc. 531, 81st Cong., 2d Sess. 
P.L. 99-662 
H. Doc. 544, 75th Cong., 3d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 
19. 
20. 
21. 
22. 
23. 
24.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-B AUTHORIZING LEGISLATION 
(CONTINUED) 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
DORENA LAKE, OR 
Jun 28, 1938 Earthfill dam. 
Dec 22, 1944 Construction, operation, and maintenance of recreation 
facilities. 
Oct 23, 1962 
Oct 07, 1970 
May 17, 1950 
Dec 22, 1944 
Jun 28, 1938 
Dec 22, 1944 
Oct 23, 1962 
Jun 4, 1993 
May 17, 1950 
ELK CREEK LAKE, ROGUE RIVER BASIN, OR 
Roller compacted concrete dam. 
Authorized construction but not operation for irrigation 
until local interests agree to repay cost allocated. 
FALL CREEK LAKE, OR 
Earth and gravel fill embankment dam. 
Construction, operation, and maintenance of recreation 
facilities. 
FERN RIDGE LAKE, OR 
Earthfill embankment dam 
Construction, operation, and maintenance of recreation 
facilities. 
Raise height of dam to obtain additional storage. 
Construction of waterfowl impoundments. 
LOWER COLUMBIA RIVER BASIN BANK PROTECTION, 
Provides bank protection on Columbia River below 
river mile 125 and along principal tributaries. 
MT. ST. HELENS SEDIMENT CONTROL, WA 
Aug 15, 1985 Authorized construction of sediment and retention structures. 
Jun 22, 1936 
May 17, 1950 
Jun 22, 1936 
Jun 28, 1938 
May 17, 1950 
Oct 27, 1965 
SCAPPOOSE DRAINAGE DISTRICT, OR 
Construction of levee system. 
Raising and strengthening levee. 
WILLAMETTE RIVER BASIN BANK PROTECTION, OR 
Bank protection works, with channel clearing. 
Provide additional protection against flooding. 
Addition of 77 locations to scope of projects. 
WILLOW CREEK LAKE, HEPPNER, OR 
Storage project for flood control, recreation, and fish 
and wildlife. 
H. Doc. 544, 75th Cong., 3d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 
H. Doc. 566, 87th Cong.,2d Sess. 
P.L. 91-439 
H. Doc. 531, 81st Cong., 2d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 
H. Doc. 544, 75th Cong. 3d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 
H. Doc 403, 87th Cong. 2d Sess. 
Sec 1135, P.L.99-662 as amended 
OR AND WA 
H. Doc. 531, 81st Cong., 2d Sess. 
P.L. 99-88 
F.C. Act 1936 
H. Doc. 531, 81st Cong.,2d Sess. 
F.C. Act 1936 
H. Doc. 544, 75th Cong., 3d Sess. 
H. Doc. 531, 81st Cong.,2d Sess. 
H. Doc. 233, 89th Cong., 1st Sess. 
BONNEVILLE LOCK AND DAM -- LAKE BONNEVILLE, OR AND WA 
Existing project was originally authorized Sep. 30, 1933, by 
Federal Emergengy Administration of Public Works. 
Aug 30, 1935 Existing project authorized by Congress. S. Committee Print, 73d Cong., 
2d Sess., (Report of Chief of Engineers 
dated Aug 21, 1933) 
Aug 20, 1937 Completion, maintenance, and operation of Bonneville 
project under direction of Secretary of War and 
supervision of Chief of Engineers, subject to certain 
provisions herein relating to powers and duties of 
Bonneville Power Administrator. 
Dec 22, 1944 Construction, operation, and maintenance of recreation Sec 4, Flood Control Act of 1944, 
facilities, as amended 
Mar 07, 1974 Authorizes relocation of town of North Bonneville P.L. 93-251 
to new towri site. 
Aug 22, 1984 Acquisition of Steigerwald Lake wetland area. P.L. 98-396 
Oct 1992 Authorizes transfer of lands to town of North Bonneville. P.L. 102-396, Sec. 9147 
COLUMBIA RIVER FISH MITIGATION, OR and WA 
Jul 19, 1988 Design, test, and construct fish bypass facilities. P. L. 100-371 
Nov 1, 1988 
Oct 12, 1996 
COLUMBIA RIVER TREATY FISHING ACCESS SITES, OR & WA 
Authorizes project for mitigation of lost treaty fishing Title IV of P.L. 100-581 
access resulting from construction of Bonneville Dam. 
Boundary adjustments. P.L. 104-303, Sec. 512 
28-36 
25. 
26. 
27. 
28. 
30. 
31. 
32. 
34. 
35. 
36. 
37. 
38.

PORTLAND, OREGON DISTRICT 
TABLE 28-B AUTHORIZING LEGISLATION 
(CONTINUED) 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
COUGAR LAKE, OR 
Rockfill dam. 
Addition of power 
Strube Lake reregulating dam. 
DETROIT LAKE - BIG CLIFF, OR 
Authorizes concrete gravity structure. 
Addition of power and regulating Big Cliff Dam with power. 
GREEN PETER-FOSTER LAKES, OR 
Authorized Green Peter Dam in lieu of originally 
authorized Sweet Home Lake (1938). 
Addition of power at Green Peter and White Bridge 
Reregulating Dam. 
Changes location of reregulating dam from White 
Bridge location to Foster. 
HILLS CREEK LAKE, OR 
Earth and gravel fill dam. 
H. Doc. 531, 81st Cong., 2d Sess. 
P.L. 83-780. 
P.L. 87-874 
H. Doc. 544, 75th Cong.,3d Sess. 
P.L. 858, 80th Cong.2d Sess. 
H. Doc. 531, 81st Cong., 2d Sess. 
P.L. 83-780, E C. Act 1954 
S. Doc. 104, 86th Cong., 2d Sess. 
H. Doc. 531, 81st Cong., 2d Sess. 
39. 
40. 
41. 
May 17, 1950 
Sep 03, 1954 
Oct 23, 1962 
June 28, 1938 
Jun 30, 1948 
May 17, 1950 
Sep 03, 1954 
Jul 14, 1960 
May 17, 1950 
May 17, 1950 
Dec 22, 1944 
Mar 24, 1965 
Jun 28, 1938 
Dec 22, 1944 
May 17, 1950 
Sep 21, 1962 
Oct 15, 1966 
May 17, 1950 
Dec 22, 1944 
Oct 12, 1996 
Aug 17, 1999 
H. Doc. 544, 75th Cong., 3d Sess. 
Sec 4, Flood Control Act of 1944, 
as amended 
H. Doc. 531, 81st Cong., 2d Sess. 
H. Doc. 566, 87th Cong., 2d Sess. 
P.L. 89-689, Public Works 
Approp. Act, 1967 
THE DALLES LOCK AND DAM -- LAKE CELILO, WA AND OR 
Multiple-purpose dam, flood control, navigation and power. H. Doc. 531, 81st Cong., 2d Sess. 
Construction, operation, and maintenance of recreation Sec 4, Flood Control Act of 1944, 
facilities. as amended 
WILLAMETE RIVER TEMPERATURE CONTROL, OR 
Authorized modifications to intake towers to benefit fish habitat. 
Increased authorized cost. 
P.L. 104-303 
P.L. 106-53 
1. Contains latest published maps. 
2. Public Resolution 105, 67th Cong. 
3. Public Works Administration 
4. Includes following work, classified inactive. A channel to 
Hobsonville 200 feet wide and 16 feet deep, with a turning 
basin 500 feet wide at Hobsonville, and regulating works 
as needed. 
5. Inactive. 
6. Permanent appropriations Repeal Act. 
7. Flood Control Act 
8. Classified Deferred. 
9. Spur Jetty "B" classified inactive. 
28-37 
LOOKOUT POINT - DEXTER LAKES, OR 
Earth-and-gravel filled dam. 
Construction, operation, and maintenance of recreation 
facilities. 
Addition of power and authorization of Dexter Lake 
as reregulating dam. 
LOST CREEK LAKE, ROGUE RIVER BASIN, OR 
Rock and gravel fill embankment dam, including power. 
Authorizes construction of project but not operation for 
irrigation until local interests agree to repay cost allocated. 
42. 
43. JOHN DAY LOCK AND DAM -- LAKE UMATILLA, OR AND WA 
Multiple-purpose dam, flood control, navigation and power. H. Doc. 531, 81st Cong., 2d Sess. 
Construction, operation, and maintenance of recreation Sec 4, Flood Control Act of 1944, 
facilities. as amended 
John Day waterfowl management area. S. Doc. 28, 89th Cong., 1st Sess. 
44. 
45. 
46. 
51.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
Alsea River, OR 
AstoriaTurning Basin, OR' 
Bandon Small Boat Basin, Coquille, OR' 
Bridges, Columbia River, Cascade Locks 
and Hood River, OR (Alteration) 
Cathlamet, WA' 
Charleston Channel, Coos Bay, OR' 
Clatskanie River, OR2 
Columbia River, Illwaco, WA' 
Coos & Millicoma Rivers, OR 
Cowlitz River, WA 
Cushman-Mapleton Channels 
(Siuslaw River), OR' 
Deep River, WA2 
Depoe Bay, OR' 
Elochoman Slough, WA2 
Grays River, WA2 
Hammond Small Boat Basin, OR' 
Interstate Bridge, Columbia River, 
Portland, OR to Vancouver WA (Alteration) 
Interstate Highway Bridge(Barge Channel), OR' 
Kalama Turning Basin, Kalama, WA' 
Lake River, WA 
Lewis River, WA 
Long Tom River, OR 
Mooring for Battleship Oregon, OR 
Multnomah Channel, OR2 
Nehalem Bay, OR 
Nestucca River, OR 
Oregon Slough, (North Portland Harbor), OR2 
Salmon River, OR2 
Smith River, OR2 
Skamokawa Creek, WA 
South Channel, Government Island, OR' 
South Slough (Charleston), OR' 
The Cascades Canal, Columbia River, OR' 2 
The Dalles-Celilo Canal, OR and WA' 3 
Tongue Point, OR' 
Umatilla Harbor, OR' 4 
Westport Slough, OR2 
Willamette River above Portland and 
Yamhill River, OR 
Winchester Bay, Umpqua River, OR 
Yaquina Bay and Harbor Small Boat Basin, OR' 
Yaquina River, OR' 
Youngs and Claskanie River, OR 
Youngs Bay and Youngs River, OR2 
7.5 MCY Standby Time 
1. Authorized by Chief of Engineers (sec. 107). 
2. Channel adequate for present commerce. 
3. Includes $15,537 for previous project 
4. Includes $23,489 for previous project. 
5. Excludes $42,000 contributed funds. 
6. Includes $239,529 for Sec. 107 project. 
7. Excludes $75,000 contributed funds. 
8. Non-Federal funds, $1,204,100. 
9. Includes $419,557 for Sec. 107 project. 
10. Excludes $304,826 contributed funds. 
11. Excludes $102,000 contributed funds. 
12. Project abondoned due to flooding by Bonneville Dam pool. 
13. Project abandoned due to flooding by The Dalles Dam pool. 
14. Project transferred to Portland District from Walla Walla District FY 
1974 and abandoned due to flooding by the John Day Dam pool. 
15. Excludes $969,342 contributed funds. 
16. Excludes $50,565 contributed funds 
17. Excludes $86,586 contributed funds. 
18. Excludes $80,000 contributed funds; includes $8,000 for previous project. 
19. Excludes $1,776,008 contributed funds. 
28-38 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Abandoned 
Abandoned 
Completed 
Abandoned 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
1977 
1985 
1944 
1971 
1985 
1969 
1986 
1991 
1985 
1975 
1963 
1971 
1990 
1941 
1977 
1961 
1963 
1986 
1983 
1985 
1982 
1987 
1963 
1949 
1974 
1991 
1985 
1970 
1939 
1957 
1992 
1952 
1966 
1985 
1985 
1979 
1971 
1979 
1996 
2,000 
870,139 
1,173,524 
1,081,806 
171,467 
1,197,300 
19,2403 
1,589,231 
350,238 18 
277,436 6 
329,423 
15,384 
145,588 5 
18,641 '17 
2,500 
519,090 7 
1,154,162 8 
15,281 
302,000 
2,700 
58,132 
437,669 
302,006 '10 
16,881 
2,145 
143,120 
2,400 
119,800 " 
26,821 
3,903,780 
4,716,205 
2,807,876 '" 
16,276 
862,918 
1,616,369 
891,695 '5 
195,313 16 
2,000 
9,348 
26,237 
16,648 
194,896 4 
2,152,914 
1,474,036 
32,768 
196,864 
35,670 
58,127 
685,677 
4,000 
25,000 
55,195 
6,000 
90,514 
205,130 
436,185 
559,858 
2,833,888 
171,909 
17,900,293 
34,449 
4,314,000

PORTLAND, OREGON DISTRICT 
TABLE 28-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
COLUMBIA RIVER BASIN 
Blind Slough Diking District, Clatsop County, OR Completed 1939 163,397 
Consolidated Diking and Improvement District 1, 
Cowlitz County, WA Completed 1941 163,291 
Deep River Area, Wahkiakum County, WA Completed 1942 69,724 
Deer Island Area, Columbia County, OR Completed 1943 574,123 
Diking District 2, Clatsop County, OR Completed 1940 25,609 
Diking District 5, Clatsop County, OR Completed 1940 25,609 
Diking and Improvement District 5, 
Cowlitz County, WA Completed 1940 161,381 
Diking District 1 and 3 (Puget Island) and 
Little Island, Wahkiakum County, WA Completed 1941 258,795 
Diking Improvement District 1, Pacific County WA Completed 1941 26,810 
Diking and Improvement District 4, 
Wahkiakum County, OR Completed 1951 169,542 
Drainage District 1, Clatsop County, OR Completed 1939 240,939 
John Day River Area, Clatsop County, OR Completed 1942 33,080 
Karlson Island, Clatsop County, OR Completed 1941 25,773 
Knappa Area, Clatsop County, OR Completed 1942 18,789 
Lewis and Clark River Area, Clatsop County, OR Completed 1942 158,419 
Lower Cowlitz River Area, Clatsop County, OR Completed 1961 91,652 
Magruder Drainage District, Columbia County, OR Completed 1940 61,186 
Marshland Drainage District, 
Columbia County, OR Completed 1940 39,475 
Midland Drainage District Columbia County, OR Completed 1939 77,774 
Multnomah Drainage District 1, OR Completed 1951 593,034 4 
Peninsula Drainage District 1, Multnomah 
County, OR Completed 1942 241,148 
Port of Kalama, WA' Completed 99,844 
Rainier Drainage District, Columbia County, OR Completed 1942 47,662 
Sauvie Island Areas A and B, Multnomah 
County, OR Completed 1951 1,623,505 
Skamokawa Creek Area, Wahkiakum County, WA Completed 1946 178,885 
Wahkiakum County Consolidated 
Diking District No. 1, WA Completed 1985 5,289,833 
Tenasillahe Island, Clatsop County, OR Completed 1939 133,778 
Upper Grays River Area, WA Completed 1947 61,263 
State Hwy 101 & 401, Columbia River, WA' Completed 1985 504,642 " 
Walluski River, Clatsop County, OR Completed 1942 66,932 
Warrenton Diking District, 1, Clatsop County, OR Completed 1940 69,503 
Warrenton Diking District 2, Clatsop County, OR Completed 1940 74,596 
Webb District Improvement Co.,Columbia 
County, OR Completed 1940 84,592 
Westland District Improvement Co., 
Columbia County, OR Completed 1940 205,531 
Westport District Columbia and Clatsop 
Counties, OR Completed 1943 40,658 
Woodson Drainage District, Columbia County, OR Completed 1940 22,797 
Youngs River Dikes, Clatsop County, OR Completed 1942 248,802 
LEWIS RIVER BASIN 
Diking and Improvement District 11, 
Cowlitz County, WA Completed 1943 172,521 
COWLITZ RIVER BASIN 
Cowlitz County Drainage Improvement 
District 1,WA Completed 1939 42,978 
Diking Improvement District 13, Cowlitz 
County, WA Completed 1939 28,592 
Huntington Avenue, Castle Rock, WA' Completed 1985 250,000 
Mt. St. Helens and Vicinity, WA Completed 1995 42,036,000 
LOWER COLUMBIA RIVER BASIN 
Beaver Drainage District, OR Completed 1984 3,131,944 
Cowlitz County Consolidated Diking Improvement 
District No. 2, WA Completed 1977 1,661,367 
Cowlitz County Diking Improvement District 2, WA Completed 1967 363,000 
Cowlitz County Diking Improvement District 13, WA Completed 1967 65,345 
Cowlitz County Diking Improvement District 15, WA Completed 1967 304,794 
Cowlitz River, Hopkins Creek, WA' Completed 236,860 
Hayden Island, OR Inactive 
Midland Drainage District, OR Completed 1971 304,511 
28-39

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(CONTINUED) 
For Last Cost to Sep. 30, 1999 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
Multnomah County Drainage District 1, OR 
Peninsula Drainage District 2, OR 
Rainier Drainage District, OR 
Sandy Drainage District, OR 
Sauvie Island Drainage District, OR 
Vancouver Lake Area, WA 
Wahkiakum Co. Diking District 4, WA 
Washougal Area Levees, Clark County, OR 
Woodson Drainage District, OR 
WILLAMETTE RIVER BASIN 
Amazon Creek, OR 
Mill Creek, Salem, OR 
Sandy River and Sleepy Hollow, OR' 
Whelton Ditch, OR 
ALL OTHER FLOOD CONTROL 
Arlington, Alkali Canyon, OR7 
Bear Creek, Medford, OR' 
Beaver Creek Near Tillamook, OR2 
Castle Rock, Cowlitz River, WA 
Catching Inlet Drainage District Coos River, OR2 
Chewaucan River, Paisley, OR' 
Clackamas River at Dixon Farm Location, OR 
Days Creek Lake, OR (Phase I) 
Depoe Bay, Lincoln County, OR' 
Deschutes River, Bend, OR2 
John Day River (West), OR' 
Johnson Creek, OR 
McDonald Dike Road, Nehalem River, OR' 
McKenzie River Near Walterville, OR2 
Miami River, OR' 
Mill Four Drainage District, Yaquina River, OR 
Molalla River at Milk Creek Location, OR 2 
Molalla River at Ressel Location, OR2 
Nestucca River, Condor Road, OR' 
Nestucca River, Vicinity Pacific City, OR' 
Pendleton Levees, Umatilla River, OR9 
(a) Riverside Area Units 
(b) State Hospital and City Areas (Zone 1) 
(c) State Hospital and City Areas (Zone 2)2 
Pendleton, Umatilla River, OR9 
Reedsport Levees, Umpqua River, OR2 
Rogue River, OR' 
Salmon Creek at Oakridge, OR2 
Salmon Creek Near Vancouver, WA' 
Sandy River, City of Troutdale, OR' 
Siuslaw River, Lane County, OR' 
Stillwell Drainage District, Tillamook Bay, OR2 
Sumner Parker Airport, OR' 
Trask River, Tillamook County, OR' 
Tualatin, OR 
Umatilla River, Stanfield, OR' 
Umatilla River, Thorn Hollow, OR' 
Umpqua River and Tributaries, OR 
Vicinity of Nehalem, Nehalem River, OR 
West Makinster Rd., Wilson River, OR' 
Wilson River, Vicinity Highway 101, OR' 
1. Authorized by Chief of Engineers (Sec. 14). 
2. Authorized by Chief of Engineers (Sec. 205). 
3. Includes $26,241, Emergency Relief Act Funds 
4. Excludes $25,000 contributed funds 
5. Previous completed project, $138,956; $15,056 engineering costs project 
constructed by local interests. 
6. Excludes $154,751 contributed funds. 
7. Project transferred from Walla Walla District FY 1974 and abandoned 
due to flooding by the John Day Dam pool. Includes $3,328 FY 1960 
preauthorization costs, Sec. 205, P.L. 80-85. See FY 1960 Annual Report, 
page 1887 
8. Excludes $2,520 contributed funds 
9. Reported by Walla Walla District prior to 1974 
10. Excludes $230,070 contributed funds for new work and $31,284 
Government furnished sheet steel pile. 
11. Includes $254,642 contributed funds. 
12. Includes $185,000 contributed funds. 
13. Excludes $5,822 contributed funds. 
14. Excludes $31,031 contributed funds. 
15. Excludes $98,313 contributed funds. 
28-40 
Completed 
Active 
Completed 
Completed 
Completed 
Deferred 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Abandoned 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Deferred 
Completed 
Completed 
Completed 
Active 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Deferred 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
1964 
1961 
1967 
1954 
1966 
1981 
1971 
1973 
1964 
1960 
1993 
1967 
1950 
1967 
1957 
1959 
1952 
1982 
1988 
1986 
1981 
1985 
1966 
1948 
1955 
1952 
1960 
1959 
1960 
1939 
1971 
1960 
1985 
1994 
1961 
1984 
1985 
1985 
1952 
1952 
1986 
1,499,186 
35,265 
593,945 
154,012 
674,137 
889,391 
48,619 
1,803,488 
162,500 
1,214,300 6 
175,800 14 
276,700 
39,624 
23,439 
23,050 
106,198 
104,921 
182,655 
42,761 
70,845 8 
1,307,216 
22,963 
106,250 ' 
127,800 
170,245 
29,500 
148,358 
15,321 
118,433 
55,007 
55,189 
11,690 
16,000 
9,100 
267,748 
161,540 
143,263 
968,716 'o 
86,230 
288,447 
435,000 12 
365,000 '5 
215,939 
176,351 
92,500 
121,273 
1,803,094 
33,835 
154,600 
428,881 
45,677 
176,000 
30,000 
- -

PORTLAND, OREGON DISTRICT 
TABLE 28-F OTHER AUTHORIZED MULTIPLE PURPOSE PROJECTS, 
INCLUDING POWER 
For Last Cost to Sep. 30, 1999 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
Restoration of Indian Fishing Grounds Completed 1969 185,000 
Bonneville, OR 
Columbia and Snake Rivers Ports Inactive 1994 5,799,926 
Dredging, OR & WA 
TABLE 28-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report for Deauthorized Expended Expended 
Area East of Albany, OR 1977 
Bachelor Island, WA 1977 
Bear Creek, Long Tom River, OR 1966 1971 4,559 
Calapooya River, OR 1959 1965 11,595 
Cascadia Lake, OR 1987 954,114 1 
Chetco River, OR 1997 235,353 
Clatskanie River Area, Columbia County, OR 1960 1965 268 
Clatskanie Drainage Dist. 1, OR 1964 1978 18,543 
Clatsop County Drainage District 1, OR 1960 1974 4,472 
Clatsop County Diking District 3, OR 1938 1961 258 
Clatsop County Diking District 4, OR 1978 
Clatsop County Diking District 6, OR 1961 1978 8,824 
Columbia Drainage District No. 1, OR 1987 
Columbia Slough, OR 1953 1978 21,352 
Coquille River, OR 1948 1953 908 
Cowlitz County Consolidate Diking Improvement 
District 1, OR 1977 
Cowlitz River at Randle, WA 1962 1977 11,095 
Coyote and Spencer Creek, Long Tom River, OR 1960 1970 6,819 
Deer Island Drainage District, OR 1987 
East Muddy and Lake Creek, OR 1959 1970 6,465 
Ferguson Creek Long Tom River, Or 1978 
Flat Creek, Long Tom River, OR 1977 
Floodwall and Levees at Portland, OR 1977 
Gate Creek Lake, OR 1987 745,001 2 
Holley Lake, OR 1963 1987 241,992 3 
John Drainage District, OR 1961 1979 23,754 
John Day River, OR 1974 1974 210,220 
Kalama River (South Area) Levee, Cowlitz County, WA 1969 1978 55,594 
Lake River Delta Area, WA 1977 
Lewis River Area, WA 1978 
Magruder Drainage District, OR 1940 1974 774 
Mud and Basket Slough Rickreall Creek, OR 1977 
Pendleton Levees, Riverside Area, OR 1987 9,000 
Peninsula Drainage District 1, OR 1942 1977 43,292 
Pilot Rock, Birch Creek, OR 1963 1968 4,558 
Prescott Area, Columbia County, OR 1941 1978 125 
Prineville Area, Crooked River and Ochoco Creek, OR 1962 1977 11,318 
Pudding River, OR 1950 1979 5,000 
Shelton Ditch, Marion County, Or 1967 1987 39,624 
Skamokawa (Steamboat Slough), WA 1939 1979 
Soap Creek, WA 1977 
Turner Prairie, Mill Creek, OR 1978 
Umatilla River (Echo), OR 1960 1964 24,145 
Umpqua River-Scholfield River, OR 1987 4,000 
Waldo Lake Tunnel, OR 1958 
West Muddy Creek and Mary's River, OR 1962 1970 4,056 
28-41 
1. Excludes Pro-rata share of $112,000 for Sweet Home Reservoir. 3. Excludes $100,000 preauthorization study costs. 
2. Excludes Pro-rata share of $95 000 for Quartz Creek Reservoir

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-G DEAUTHORIZED PROJECTS 
(CONTINUED) 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report for Deauthorized Expended Expended 
Westport Slough, OR (Modification for 32-foot channel) 1966 1977 
Wiley Creek Lake, OR 1960 112,000 
Willamette River above Portland and Yamhill 
River, OR (uncompleted portions) 1987 
Willamette Falls Fishladder, OR 1961 
Willamette River at Willamette Falls, OR 1948 1987 142,883 
TABLE 28-H COLUMBIA AND LOWER WILLAMETTE RIVER 
BELOW VANCOUVER, WA, AND PORTLAND, OR 
TOTAL COST OF EXISTING PROJECT TO SEP. 30, 1999 
(SEE SECTION 3 OF TEXT) 
Funds New Work Maintenance Total 
Regular 28,349,304 406,514,942 434,864,246 
Public Works 446,296 14,414 460,710 
Emergency Relief Administration 138,449 98,668 237,117 
Total U.S. 28,934,049 406,628,024 435,562,073 
Contributed Prior to 1964 223,026 24,320 247,346 
Contributed (1975) 35 to 40-foot Channel 442,928 442,928 
Total Contributed 665,954 24,320 690,274 
Total All Funds 29,600,003 406,652,344 436,525,347 
TABLE 28-I PROJECT CONDITION SURVEYS 
(SEE SECTION 13 OF TEXT) 
Project Date Survey Conducted 
Baker Bay, WA Jun 1999 
Depoe Bay, OR May 1999 
Tillamook, OR Sep 1999 
Hood River Boat Basin, OR Feb 1999 
Chinook, WA Apr 1999 
Siuslaw River - Florence to Mapleton, OR Jun 1999 
Willameette River - Ross Island to Oregon City, OR Jun 1999 
TABLE 28-J WILLAMETTE RIVER AT WILLAMETTE FALLS, OR 
PRINCIPAL FEATURES OF EXISTING CANAL AND LOCKS 
(SEE SECTION 19 OF TEXT) 
Usable Lock Dimensions Series of 4 locks, each 175 feet by 37 feet' 
Lift of each lock Lock 1 (Lower), 22,5 feet; Lock 2, 8.7 feet; Lock 3, 10.9 feet and 
Lock 4 (Upper), 8.1 feet2 
Depth of Miter Sills at Lower Water Lower Lock, 8.4 feet; Upper Lock, 6 feet 
Character of foundation Rock 
Kind of Dam Fixed3 
Type of Construction Concrete 
Year of Completion 1873; Purchased by United States Apr. 26, 1915 
Cost Unknown; purchase price $375,000 
28-42 
1. A guard lock 210 by 40 feet, which is used only at higher states of water, directly from basin and supplied water for powerplants operated by Crown 
is at upper end of canal basin. Zellerbach Corp., and Portland Ry., Light & Power Co., which is now being 
2. A concrete division wall, 1,227 feet long, extending from Lock 4 to Guard operated by Portland General Electric Co. 
Lock, separates upper basin of canal from head race, which formerly led 3. The dam is owned by private parties.

PORTLAND, OREGON DISTRICT 
TABLE 28-K FLOOD CONTROL RESERVOIR OPERATIONS 
See Section Date of Peak Inflow Storage Used 
in Text Project Peak Inflow Cu. FtJSec. Acre/feet 
22. Applegate Lake, OR November 21, 1998 4,636 5,713 
23. Blue River Lake, OR December 28, 1998 9,849 32,260 
24. Cottage Grove Lake, OR December 28, 1998 4,251 10,449 
39. Cougar Lake, OR December 28, 1998 9,877 29,820 
40. Detroit Lake, OR December 28, 1998 26,089 126,520 
25. Dorena Lake, OR December 28, 1998 12,401 31,756 
27. Fall Creek Lake, OR December 28, 1998 9,900 26,988 
28. Fern Ridge Lake, OR December 28, 1998 10,023 43,949 
41. Foster Lake, OR December 28, 1998 16,640 13,174 
41. Green Peter Lake, OR December 28, 1998 31,570 123,605 
42. Hills Creek Lake, OR November 21, 1998 13,470 43,860 
44. Lookout Point Lake, OR December 28, 1998 23,300 82,586 
45. Lost Creek Lake, OR November 21, 1998 7,790 11,705 
28-43

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-L WORK UNDER SPECIAL AUTHORITIES 
PROJECTS NOT SPECIFICALLY AUTHORIZED 
(SEE SECTION 47 OF TEXT) 
Fiscal Year Costs 
Project Status' Federal Non-Federal Total 
Beach Erosion Control Projects Pursuant to Section 103 
of the 1962 Rivers and Harbors Act, Public Law 874, 
87th Congress, As Amended 
Rock Creek, Hwy 101 F 4,508 - 4,508 
US 101, Beverly Beach, OR F 85,172 - 85,172 
Total Section 103 89,680 - 89,680 
Navigation Activities Pursuant to Section 107 of the 1960 Rivers 
and Harbors Act, Public Law 645, 86th Congress, as Amended 
Newport, OR X -2,192 2,279 87 
Port of Brookings (Chetco), OR F 9,117 - 9,117 
Port of Morrow, OR F 70,447 68,953 139,400 
Coordination 7,412 - 7,412 
Total Section 107 84,784 71,232 156,016 
Flood Control Activities Pursuant to Section 205 of the Flood 
Control Act of 1948, Public Law 858, 80th Congress, as Amended 
Keizer, OR F 80,999 73,064 154,063 
Klickitat, WA F 13,081 - 13,081 
Lewis County, WA F 19,580 - 19,580 
Lewis River, Woodland, WA F 13,922 - 13,922 
Little Pudding River, Marion County, OR F 4,576 - 4,576 
Mill Creek, The Dalles, OR F 17,173 - 17,173 
Peninsula Drainage District #1, OR P/C 116,214 130,704 246,918 
Salem, OR F 192,406 45,570 237,976 
Scio, OR F 19,828 - 19,828 
Siuslaw River, Mapleton, OR F 9,971 - 9,971 
Coordination 13,962 - 13,962 
Total Section 205 501,712 249,338 751,050 
Emergency Streambank Protection Activities Pursuant to Section 14 
of the 1946 Flood Control Act, Public Law 526, 79th Congress as amended 
Coordination 13,732 13,732 
Total Section 14 13,732 - 13,732 
Project Modifications for Improvement of the Environment Pursuant to 
Section 1135 of the 1986 Water Resources Development Act, Public 
Law 662, 99th Congress, as Amended 
Amazon Creek Wetlands, OR C 1,600,967 - 1,600,967 
Coos Bay Western Snowy Plover, OR X 1,898 -871 1,027 
Fern Ridge Lake Marsh Restoration, OR C 145,359 - 154,359 
Fox Creek, OR D 18,766 - 18,766 
Lower Columbia Slough, OR F 1,536 - 1,536 
Richardson Park, OR D 44,251 - 44,251 
Trestle Bay, OR X -1,250 62 -1,188 
Willamette Mission State Park, OR F 41,860 - 41,860 
Initial Appraisals 8,545 - 8,545 
Coordination 7,946 - 7,946 
Total Section 1135 1,869,878 -809 1,869,069 
28-44

PORTLAND, OREGON DISTRICT 
Project 
Aquatic Ecosystem Restoration Pursuant to Section 206 
of the 1996 Water Resources Development Act, Public Law 
303,104th Congress, as amended 
Bowers Rock State Park, OR 
Clatskanie River, OR 
Trout Creek, OR 
Upper Rogue Habitat Protection & Restoration, OR 
Preliminary Restoration Plans 
Coordination 
Total Section 206 
Disaster Preparedness Program (Category 100) 
Planning 
Training and Exercise 
Facilities 
National Center for Expertise 
Total Disaster Preparedness Program 
Emergency Operations (Category 200) 
Response Operations 
Post Flood Response 
Acquisition of Supplies/Equip 
Operational Deployment 
Total Emergency Operations 
Rehabilitation (Category 300) 
Federal Flood Control Works 
Non-Federal Flood Control Works 
Field Investigations 
Inspections 
Interagency Levee Activities 
Total Rehabilitation 
Advance Measures 
Advance Measure Assistance 
Field Investigations 
Total Advance Measures 
Reimbursement Activity 
Other Agencies 
Other Corps Offices 
Total Reimbursement Activity 
Status' Federal Non-Fe 
F
DF 
19,296 
55,754 
16,879 
69,698 
54,791 
7,485 
223,903 
293,230 
18,553 
42,134 
290 
354,207 
116,618 
4,899 
121,517 
122,886
00 
19,112 
6,116 
148,114 
47,425 
19,674 
67,099 
863,808 
886633,,880088 
aderal 
0000 
0
0000 
31,276
0000 
31,276
00 
0
00 
0 
28-45 
WORK UNDER SPECIAL AUTHORITIES 
PROJECTS NOT SPECIFICALLY AUTHORIZED 
(SEE SECTION 47 OF TEXT) 
Fiscal Year Costs 
19,296 
55,754 
16,879 
69,698 
54,791 
7,485 
223,903 
TABLE 28-L 
(CONTINUED) 
Total 
1/ Status: C = Construction; D = Planning and Design Analysis; F = Feasibility; P = Plans and Specifications; X=Fiscal Close Out 
TABLE 28-M FLOOD CONTROL ACTIVITIES 
WORK UNDER SPECIAL AUTHORITIES 
EMERGENCY RESPONSE ACTIVITIES 
(SEE SECTION 48 OF TEXT) 
Appropriation Contributed 
96X3125 Funds 
I -, , -

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-N PRINCIPAL DATA CONCERNING 
NAVIGATION LOCK, SPILLWAY DAM, AND POWERPLANT 
Project 
Bonneville Lock and Dam 
OR and WA -- 
Lake Bonneville 
(See Section 36 of Text) 
John Day Lock and Dam, 
OR and WA -- 
Lake Umatilla 
(See Section 43 of Text) 
NAVIGATION LOCK (NEW) 
Dimensions: 
Clear Width of Chamber 
Greatest Length Available for Full Width 
Lift (Vertical): 
At Extreme Low Water and Normal Pool Level 
At Normal River Stage 
At Extreme High Water 
Depth Over Miter Sills at Adopted Low Water 
Character of Foundation 
Open to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Capacity 
Elevation of Gate Sills on Crest of Spillway 
Height above Lowest Foundation 
Length of Dam Proper 
Length of Dam Overall 
Width at Base 
Gate Openings 
Crest Overflow (Above Mean Sea Level) 
Elevation(Normal)(Above Mean Sea Level) 
POWERPLANT 
Length (First Powerhouse) 
Length (Second Powerhouse) 
Width (First Powerhouse) 
Width (Second Powerhouse) 
Height (Roof to Bedrock) (First Powerhouse) 
Height (Roof to Bedrock)(Second Powerhouse) 
Generator (Station Unit) 
Generators (First Powerhouse) 
Generators (Second Powerhouse) 
Fishwater Supply Units (Second Powerhouse) 
Total Rated Capacity 
Speed 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Space for Additional 
Rating, Each 
Total Installed Capacity 
Total Potential Capacity 
86 Feet 
675 Feet 
66 Feet 
59 Feet 
About 30 Feet 
19 Feet 
Andesite 
March 1993 
Concrete Gravity 
1938 
1,600,000 CFS 
23.3 Feet 
About 170 Feet 
1,090 Feet 
1,230 Feet 
200 Feet 
18 
24 Feet Pool 
72 Feet 
1,027 Feet 
953 Feet 
190 Feet 
235 Feet 
190 Feet 
200 Feet 
1 @ 5,000 kw 
1 @ 48,000 kw 
1 @ 59,500 kw 
8 @ 60,000 kw each 
'8 @ 66,500 kw each 
2 @ 13,100 kw each 
1,145,700 kw 
75 Revolutions per Minute 
86 Feet 
669 feet 
97 Feet 
105 Feet 
113 Feet 
15 Feet 
April 1968 
Concrete Gravity 
March 1968 
2,250,000 cfs 
210 Feet 
Tainter 
50 ft. by 58.5 Ft. 
20 
1,975 Feet 
243 Feet 
16 
4
135,000 kw 
2,160,000 kw 
2,700,000 kw 
28-46

PORTLAND, OREGON DISTRICT 
TABLE 28-N PRINCIPAL DATA CONCERNING 
(Continued) NAVIGATION LOCK, SPILLWAY DAM, AND POWERPLANT 
Project 
Maximum Structural Height 
First Power-On-Line 
The Dalles Lock and 
Dam, OR and WA -- 
Lake Celilo 
(See Section 46 of Text) 
IMPOUNDMENT 
Elevations: Normal Operating Range 
Maximum 
Flood Control Storage 
Lake Length 
Lake Water Surface Area At Elevation 268 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Type 
Lift Normal 
Net Clear Length 
Net clear Width 
Normal Depth Over Upper Sill 
Minimum Depth Over Lower Sill 
Opened To Navigation 
SPILLWAY DAM 
Type 
Elevation of Crest 
Top of Crest Gates 
Number of Gates 
Size of Gates 
Height (Foundation to Crest) 
Design Flood 
POWERPLANT 
Powerhouse Dimensions 
Generators Main Units 
268-257 Feet 
276 Feet 
500,000 Ac.-ft. 
76.4 Miles 
55,000 Acres 
15 Ft. by 250 Ft. 
200 miles 
Single Lift 
87.5 Feet 
675 Feet 
86 Feet 
20 Feet 
15 Feet 
March 17, 1957 
Controlled 
121 Ft. msl 
162 Ft. msl 
23 
50 by 43 Feet 
120 Feet 
2,290,000 cfs 
240 by 2,150 feet 
14 @ 78,000 kw each 
8 @ 86,000 kw each 
2 @ 13,500 kw each 
1,807,000 kw 
2 @ 3,000 kw each 
Fishwater Supply Units 
Total Rated Capacity 
Station Service Units 
28-47 
235 Feet 
July 1968

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 28-0 96-89X4045 APPROPRIATION 
BONNEVILLE POWER ADMINISTRATION 
Expenditures Total Cost 
To 
Project FY95 FY96 FY97 FY98 FY99 Sep 30, 1999 
Bonneville 
Columbia River Fish Mitigation 
Cougar 
Detroit 
Green Peter 
Hills Creek 
John Day 
John Day Rehab 
Lookout 
Lost Creek 
The Dalles 
Total 
0 88,179 197,994 
0 6,000,000 0 
0 0 6,558 
0 0 13,116 
0 0 12,124 
0 0 7,544 
19,723 8,277 130,229 
0 0 0 
0 0 15,694 
0 0 702 
0 2,226,139 1,882,171 
19,723 8,322,595 2,266,132 
28-48 
416,161
0 
9,955 
143,205 
85,027 
7,463 
612,077 
157,294 
95,001 
1,621 
2,646,696 
4,174,500 
1,668,674
0 
3,992 
254,025 
835,485 
1,976 
1,813,742 
811,937 
162,810
0 
2,229,793 
7,782,434 
2,371,008 
6,000,000 
20,505 
410,346 
932,636 
16,983 
2,584,048 
969,231 
273,505 
2,323 
8,984,799 
22,565,384

SEATTLE, WASHINGTON DISTRICT* 
This District comprises Washington State except south- Pacific Ocean south of international boundary to Cape 
ern and southeastern portions, northern Idaho, and north- Disappointment, and to the Columbia River above Yakima 
western Montana, embraced in drainage basins tributary to River, inclusively. 
IMPROVEMENTS 
Navigation Miscellaneous 
1. Anacortes Harbor, WA..........................................29-2 
2. Blair Waterway, Tacoma, WA ................................. 29-2 
3. Ediz Hook, W A ....................................................... 29-2 
4. Everett Harbor and Snohomish River, WA .............. 29-2 
5. Friday Harbor, WA ...................................... 29-3 
6. Grays Harbor and Chehalis River, WA .................... 29-3 
7. Lake Crockett, WA................................... .... 29-4 
8. Lake Washington Ship Canal, WA...........................29-5 
9. Neah Bay, WA...................................... 29-5 
10. Olympia Harbor, WA .................................. 29-5 
11. Port Townsend, WA ............ ...................... 29-6 
12. Project Condition Surveys ..................................... 29-6 
13. Puget Sound and its Tributary Waters, WA.............29-6 
14. Quillayute River, WA.................................... 29-7 
15. Seattle Harbor, W A ......................... ...................... 29-7 
16. Swinomish Channel, WA ..................................... 29-8 
17. Willapa River and Harbor and Naselle 
River, W A .......................... ..................... 29-8 
Beach Erosion Control 
18. Lummi Shore Road, WA.............................29-9 
Flood Control 
19. Cedar River, Renton, WA......... ........... 29-9 
20. Flathead River, MT... .................... 29-9 
21. Howard A. Hanson Dam ........... ........ 29-10 
22. Inspection of Completed Flood Control 
Projects ................................ 29-10 
23. Mud Mountain Dam, WA........................ 29-10 
24. Scheduling Flood Control Reservoir 
Operations .................. ................ 29-11 
25. Stillaguamish, River, WA............................ 29-11 
26. Tacoma, Puyallup River, WA....................... 29-11 
Multiple Purpose Power 
27. Albeni Falls Dam, ID .................................. 29-11 
28. Chief Joseph Dam - Rufus Woods Lake, WA ...... 29-12 
29. Libby Dam - Lake Koocanusa, MT ................. 29-12 
30. Deepwater Slough, WA .............................. 29-13 
31. Porter Levee, WA...................................... 29-13 
32. Puget Creek, WA...................................29-13 
33. Sammamish River Weir Restoration, WA.......... 29-14 
34. Thorton Creek, WA .................................. 29-14 
35. Turning Basin #3, Seattle, WA........................29-14 
Other Activities 
36. Other Work under Special Authorization .......... 29-14 
37. National Emergency Preparedness Program 
(NEPP) ................................................. 29-15 
38. General Regulatory Functions Program .......... 29-15 
General Investigations 
39. Surveys ............................... ............... 29-15 
40. Collection and Study of Basic Data................ 29-15 
41. Preconstruction Engineering and Design............ 29-15 
Tables 
Table 29-A Cost & Financial Statement .............. 29-17 
Table 29-B Authorizing Legislation ................. 29-24 
Table 29-C Other Authorized Navigation 
Projects............................... 29-29 
Table 29-D Other Authorized Beach Erosion Control 
Projects .................................... 29-30 
Table 29-E Other Authorized Flood Control 
Projects..................................... 29-31 
Table 29-F Other Authorized Multiple Purpose 
Power Projects........................... 29-34 
Table 29-G Other Authorized Miscellaneous 
Activities.. ................................ 29-34 
Table 29-H Other Preconstruction Engineering and 
Design Projects............................29-34 
Table 29-I Deauthorized Projects ................ 29-34 
Table 29-J Lake Washington Ship Canal, WA, Principal 
Features of Double Lock and Dam........29-35 
Table 29-K Flood Control Activities Pursuant 
to Section 205, Public Law 80-858...... 29-36 
Table 29-L Miscellaneous Activities Pursuant to 
Section 1135, Public Law 99-662.........29-36 
-29-1-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
Navigation 
1. ANACORTES HARBOR, WA 
Location. On northern point of Fidalgo Island in Puget 
Sound, 17 miles south of Bellingham, WA, and 64 miles north 
of Seattle. The main harbor is on Guemes Channel. (See 
NOAA Survey Chart 18427.) 
Existing project. Channel in Capsante Waterway, 12 feet 
deep and 150 to 250 feet wide, between east side of Q Avenue 
and deep water in Fidalgo Bay, a distance of 2,850 feet; a 
mooring basin 12 feet deep, 570 feet wide, and 960 feet long 
adjacent to north side of Capsante Waterway, protected by two 
pile breakwaters, each 470 feet long, east and southeast of 
basin; and a navigation channel 18 feet deep, 150 feet wide, 
extending 5,180 feet from deep water in Guemes Channel to 
the west shore of Fidalgo Bay (construction under authority of 
Section 107, P.L. 86-645. Construction cost for this feature is 
recorded in Table 29-C). Plane of reference is mean lower low 
water. Range between mean lower low water and mean higher 
high water is 8.2 feet. Extreme range is about 15.5 feet. 
Project was completed in January 1977. (For further details, 
see Annual Report for 1977). 
Local cooperation. Fully complied with. 
Terminal facilities. There are 24 piers and wharves in the 
Port of Anacortes, 15 on Guemes Channel, 3 on Capsante 
Waterway, and 7 on Fidalgo Bay. Three wharves on Guemes 
Channel are open for public use; of these, one is publicly 
owned and operated and used for handling general cargo in 
foreign and domestic trade. In addition, two wharves are used 
for ferries plying to the San Juan Islands and to Vancouver 
Island, British Columbia. Both are publicly owned and 
operated. Two of the wharves on Capsante Waterway and 
basin are publicly owned and operated and used for receiving 
petroleum products, and as a moorage for fishing and pleasure 
craft. All other wharves are used for general industrial 
purposes. In addition, there are two oil-refinery wharves 
located to the south of Capsante Waterway which are privately 
owned and operated and used for handling petroleum products 
in foreign and domestic trade. These facilities are considered 
adequate for existing commerce. (See Post Series No. 37 - 
Ports of Port Angeles, Port Townsend, Everett, Anacortes, and 
Bellingham, WA, revised 1987.) 
Operations during fiscal year. Maintenance, hired labor: 
Routine coordination with Port of Anacortes, city of 
Anacortes, and navigation users. 
Maintenance, contract: None. 
2. BLAIR WATERWAY, TACOMA, WA 
Location. The waterway is located within the Port of Tacoma 
on Commencement Bay in south Puget Sound in the northeast 
section of Tacoma, approximately 30 miles south of Seattle, 
WA. 
Existing project. Improvement consists of modifying 2.6 
miles of the existing Federal navigation project for the Blair 
Waterway by deepening the channel and turning basin to -51 
feet mean lower low water. Estimated project cost is 
$4,532,000 ($1,956,000 Federal and $2,576,000 non-Federal), 
with completion in FY 2000. 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (Port of Tacoma) will provide 50% of the 
costs allocated to the general navigation during construction. 
Concurrent with subject project, the contractor will dredge 
berth areas at 100% sponsor cost. A Project Cooperation 
Agreement (PCA) was signed on September 10, 1999. 
Terminal facilities. There are many terminal facilities 
located in Tacoma Harbor which is comprised of 
Commencement Bay and its waterways. 
Operations during fiscal year. New work, hired labor: 
Completed plans and specifications, executed PCA, and 
initiated construction. 
New work, contract: Dredging contract under way. 
3. EDIZ HOOK, WA 
Location. Ediz Hook and city of Port Angeles are on the 
Strait of Juan de Fuca in Clallam County, WA, about 100 
miles northwest of Seattle. (See NOAA Survey Chart 18468.) 
Existing project. Provides for about 16,400 linear feet of 
rock revetment, together with initial beach replenishment and 
periodic nourishment. Project was completed in October 
1978. (For further details, see Annual Report for 1979.) 
Local cooperation. Fully complied with. 
Terminal facilities. Of the 27 waterfront facilities at Port 
Angeles Harbor, 3 are located along the inner side of Ediz 
Hook. Functional uses of the piers include placing logs into 
the water from trucks for shipment by rafting; mooring harbor 
pilot boats, U.S. Coast Guard vessels, Naval Reserve vessels, 
and occasionally, oceanographic research vessels; and fueling 
government vessels. (See Port Series No. 37 - Ports of Port 
Angeles, Port Townsend, Everett, Anacortes, and Bellingham, 
WA, revised 1987.) 
Operations during fiscal year. Maintenance, hired labor: 
Inspection and coordination with local sponsor. 
Maintenance, contract: None. 
4. EVERETT HARBOR AND SNOHOMISH 
RIVER, WA 
-29-2-

SEATTLE, WASHINGTON DISTRICT 
Location. On Port Gardner Bay, at northern end of 
Possession Sound, an arm of Puget Sound at Everett, in 
northwestern Washington; and Snohomish River for 6.3 miles 
above mouth. (See NOAA Survey Chart 18444.) 
Existing project. Training dike extending from a point 
opposite 23rd Street northward 12,550 feet to outlet of 
Snohomish River, with spur dike extending 400 feet to 
pierhead line from north end of main dike; spur dike extending 
1,410 feet westward from Preston Point; removal of a section 
of training dike north of Snohomish River outlet; channel 150 
to 425 feet wide and 15 feet deep from deep water in Port 
Gardner Bay to 14th Street dock; thence a settling basin 700 
feet wide, 1,200 feet long, and 20 feet deep, thence a channel 
150 feet wide and 8 feet deep upriver to head of Steamboat 
Slough, a total distance of about 6.3 miles; settling basin 
within upper channel reach about 1 mile long with a capacity 
of 1 million cubic yards and maintaining East Waterway to 30 
feet deep. Plane of reference is mean lower low water. Range 
between mean lower low water and mean higher high water is 
11.1 feet. Extreme tidal range is about 19 feet. Project was 
completed in April 1963. (For further details, see page 1683 of 
Annual Report for 1963. For details relating to previous 
projects, see page 704 of Annual Report for 1905, page 2005 
of Annual Report for 1915, and page 1883 of Annual Report 
for 1938.) 
Local cooperation. Fully complied with. Requirements are 
described in full on page 38-3 of FY 1981 Annual Report. 
Terminal facilities. There are 42 piers and wharves in the 
Port of Everett, 17 in Port Gardner and 25 on the Snohomish 
River. These include: 19 publicly owned terminals with 4 
berths handling ocean-going vessels and 1 publicly owned 
terminal and small-boat basin handling fishing and pleasure 
craft. A portion of the East Waterway has been deepened and 
modified by the U.S. Navy for a Homeport. (See Port Series 
No. 37 - Ports of Port Angeles, Port Townsend, Everett, 
Anacortes, and Bellingham, WA, revised 1987.) 
Operations during fiscal year. Maintenance, hired labor: 
Channel condition surveys were conducted throughout the 
year. Aerial survey of the Jetty Island habitat development site 
was performed. Prepared plans and specifications for 
maintenance dredging and awarded contract. Monitored 
maintenance dredging contract. 
Maintenance, contract: A continuing contract for pipeline 
maintenance dredging, awarded in FY 1998, was completed in 
December. Dredging of the upstream and downstream settling 
basins resulted in 284,706 cy of shoal material being removed 
at a cost of $906,773. A portion of the material was rehandled 
from the city disposal site to the EPA Superfund cleanup site 
located on the Tulalip Indian Reservation. A continuinmg 
contract for pipeline maintenance dredging of the upstream 
settling basin and channel, awarded in September, is 
underway. 
5. FRIDAY HARBOR, WA 
Location. Friday Harbor is located on the eastern shore of 
San Juan Island on the inland waters of northwestern 
Washington, about 28 nautical miles east of Victoria, British 
Columbia, and 60 nautical miles north of Seattle, WA. San 
Juan Island is one of over 170 islands in the San Juan 
Archipelago. Friday Harbor is the San Juan Island county seat 
and a United States Customs Port of Entry. (See NOAA 
Survey Chart 18425.) 
Existing project. Concrete floating breakwater (1,600 feet) 
to protect the existing port facilities and to allow the Port of 
Friday Harbor to provide 294 additional permanent moorage 
spaces and 44 additional transient spaces. Construction was 
completed in March 1984. 
Local cooperation. Fully complied with. Requirements are 
described in full on page 38-4 of FY 1981 Annual Report. 
Operations during fiscal year. Maintenance, hired labor: 
Routine coordination with the Port of Friday Harbor, U.S. 
Coast Guard, and navigation users. Further coordinated with 
the Port relative to the scheduled breakwater maintenance in 
FY 2000. 
Maintenance, contract: None. 
6. GRAYS HARBOR AND CHEHALIS 
RIVER, WA 
Location. Harbor lies at mouth of Chehalis River, in 
southwestern part of Washington, 45 miles north of entrance to 
Columbia River. Chehalis River rises in southwestern part of 
Washington about 40 miles east of Pacific Ocean, flows 
generally northwesterly and empties into eastern part of Grays 
Harbor. (See NOAA Survey Chart 18502.) 
Existing project (including navigation improvements to 
date). Provides for an entrance channel across the bar and 
through entrance 600 to 1000 feet wide and 38 to 46 feet deep, 
to be secured by a south jetty 13,734 feet long and a north jetty 
17,200 feet long, and by dredging; maintenance of channel 36 
feet deep and 350 feet wide from deep water in Grays Harbor 
14 miles to Cow Point; thence 30 feet deep and 200 feet wide, 
suitably widened at bends, to a point 13,700 feet upstream 
from Union Pacific Railroad bridge at Aberdeen, a distance of 
4.125 miles; a turning basin 30 feet deep, 550 feet wide, and 
1,000 feet long at upstream end of 30-foot channel near 
Cosmopolis; three breakwaters at, and maintenance of entrance 
channel to Westhaven Cove; protection of Point Chehalis for 
an exposed length of about 7,500 feet; and removal of 350- 
foot southwestern extension of the breakwater, replacing it 
with an 865-foot northeastern extension, and adding a 200-foot 
spur breakwater along the southerly entrance, constructed 
under authority of Section 107, P.L. 86-645. Construction cost 
for this feature is recorded in Table 29-C. Plane of reference is 
mean lower low water. Tidal range between mean lower low 
-29-3-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
water and mean higher high water is 8.9 feet at Point Chehalis, 
10.1 feet at Aberdeen, and 8.1 feet at Montesano. Extreme 
range is 17.5 feet at Point Chehalis, 17.8 feet at Aberdeen, and 
23.8 feet at Montesano (river flood of 1935). ( For details 
relating to previous projects, see pages 2002-03 of Annual 
Report for 1915 and page 1863 of Annual Report for 1938.) 
Improved project. Authorized by Section 202 of the Water 
Resources Development Act of 1986. Project construction was 
started in April 1990. Completed project features are: deepen 
and widen 20 miles of existing 30-foot channel across ocean 
bar (46 feet deep and 1,000 feet wide), through the harbor 
entrance (46-38 feet deep and 1,000-600 feet wide), through 
South to Cow Point Reaches (36 feet deep and 350 feet wide); 
expand and deepen Cow Point and Junction City turning 
basins; deepen two downstream local berths; construct fish and 
initial crab mitigation; deepen last four miles of upstream 
existing 30-foot channel to 32 feet; and expand Cow Point 
another 50 feet to accommodate large cruise vessels. 
Modification of Union Pacific Railroad bridge was deleted 
from project scope in 1995. Construction of final crab 
mitigation, the last remaining project feature, was initiated in 
FY 1999 and will be completed in FY 2000. Completion of 
project is currently scheduled for early 2001. Estimated 
project cost is $28,100,000 ($18,200,000 Federal; $9,900,000 
non-Federal). 
Local cooperation. Fully complied with. Local Cooperation 
Agreement with Port of Grays Harbor, local sponsor for 
Improvement project, was executed on February 16, 1990. The 
Port is contributing 35 per cent of improved project cost. In 
complying with terms of local cooperation, the Port is required 
to furnish lands and diked disposal areas and assure relocation 
of utility lines. 
Terminal facilities. There are 20 waterfront facilities (piers, 
wharves, and docks), exclusive of those available to 
recreational craft, at Grays Harbor, of which 5 are publicly 
owned. In foreign and domestic trade, they serve various 
purposes which include the receipt and/or shipment of: logs 
and lumber, paper, wood pulp, aluminum ingots, granite, other 
break bulk commodities, woodchips, conventional general 
cargo, seafood and fishing supplies, sand and gravel, and 
construction materials. Other uses include: mooring and icing 
fishing boats, mooring small vessels for outfitting and repair, 
and mooring company owned tugs. Those piers operated by 
the U.S. Coast Guard moor government owned vessels. 
Operations during fiscal year. New work, hired labor: 
Coordinated with Port of Grays Harbor (local sponsor), 
resource agencies, and Grays Harbor pilots. 
Maintenance, hired labor: Channel condition surveys were 
conducted throughout the year. The Corps hopper dredge 
Yaqumia dredged in the Entrance'and Bar Channels, removing 
249,133 cy and 76,187 cy, respectively at a cost of $944,000 
and $406,000, respectively. Approximately 95,062 cy of the 
sandy material from the Entrance Channel was beneficially 
used as offshore nourishment in Half Moon Bay to reduce 
erosion adjacent to the South Jetty and at Westport. All of the 
material dredged by the Yaquina from the Bar Channel was 
beneficially used to nourish the offshore area of South Beach 
located to the south of South Jetty. Plans and specifications 
were prepared for the maintenance dredging and a 1,900 foot 
reventment extension at Westport. Crab mitigation sites were 
surveyed for juvenile crab to determine mitigation credit. 
Maintenance, contract: The Westport revetment was 
extended 1,900 feet to the west with placement of 106,970 
tons of rock at a cost of $2,414,242. As part of the contract, 
the Westport revetment and the groin west of the viewing 
platform were rehabilitated by placement of 3,000 tons of rock 
at a cost of $143,000. The excavation for the revetment 
extension was used as a disposal site for pumped dredged 
material and later moved onto the Half Moon Bay beach as 
nourishment after the juvenile salmonid out-mitigation. 
Maintenance dredging of the inner harbor by clamshell dredge 
was completed at a cost of $3,637,875 with 1,414,605 cy of 
material being removed. Maintenance dredging of the outer 
harbor by hopper dredge was completed at a cost of 
$2,331,550 with 544,106 cy of material being removed, of 
which 133,408 cy was deposited offshore in Half Moon Bay to 
combat erosion. Contracts were awarded to monitor crab 
presence in the outer harbor and in Half Moon Bay to refine 
the University of Washington crab model used in determining 
crab mitigation requirements due to maintenance dredging and 
to allow offshore nourishment in Half Moon Bay, repectively. 
A contract was awarded to monitor the fish mitigation site. 
7. LAKE CROCKETT, WA 
Location. The harbor is on the west side of Whidbey Island, 
about 35 nautical miles north of Seattle, WA. The lake lies 
parallel to Admiralty Bay and is separated from it by a narrow 
strip of gravel beach. (See NOAA Survey Chart 18441.) 
Existing project. Provides for a basin in Lake Crockett vlith 
an area of about 6 acres and 25 feet deep at mean lower :,<w 
water, connected with Admiralty Bay by a channel of the same 
depth and 200 feet wide, protected by a breakwater; and 
navigation improvement by dredging, constructed under 
authority of Section 107, P.L. 86-645. Construction cost for 
this feature is recorded in Table 29-C (Keystone Harbor, 
Admiralty Inlet). The diurnal tidal range in Admiralty Bay is 
8.4 feet and the extreme range is about 16.5 feet. Project was 
completed in March 1993. (For further details, see Annual 
Report for 1993.) Recreational facilities at project under costsharing 
agreement with Washington State Parks and 
Recreation Commission include the following construction and 
Improvements: construct a 35-unit camping loop and restroom, 
new boat ramp handling facility, breakwater, a restroom in the 
day-use area and porto-potti dumps for boats; and expand dayuse 
facility and add riprap at the construction site. 
-29-4-

SEATTLE, WASHINGTON DISTRICT 
Local cooperation. None required. 
Terminal facilities. One publicly owned passenger and 
automobile ferry landing within the dredged basin is open for 
public use, and is adequate for existing commercial traffic. 
The basin contains two publicly owned boat ramps open for 
public use. The ramps are adequate for recreational craft. 
Operations during fiscal year. Maintenance, hired labor: 
Channel condition surveys were conducted during the year. 
Maintenance, contract: Maintenance dredging was completed 
by clamshell dredging 77,014 cy of material at a cost of 
$153,035. The material was beneficially used to nourish the 
adjacent eroding beach. 
8. LAKE WASHINGTON SHIP CANAL, WA 
Location. Entirely within city of Seattle and extends from 
Puget Sound through Shilshole Bay, Salmon Bay, Lake Union, 
Portage Bay, and Union Bay to deep water in Lake 
Washington. (See NOAA Survey Chart 18447.) 
Existing project. Provides for a double lock and fixed dam 
from gated spillway and necessary accessory works, including 
fishladder, at the Narrows at entrance to Salmon Bay, about 
1.25 miles from deep water in Puget Sound; for a channel 34 
feet deep and 300 feet wide from Puget Sound to Burlington 
Northern Railway bridge, about 5,500 feet, with a passing 
basin 34 feet deep and log basin 8 feet deep at turn below 
railway bridge; then 34 feet deep and 150 feet to 200 feet wide 
to locks, about 900 feet; and a guide pier 600 feet long; for 
revetment of canal banks between locks and Lake Union and 
between Lakes Union and Washington; and for a channel 30 
feet deep with a width of 100 feet from locks to Lake Union, 
200 feet thence to Portage Cut, 100 feet through Portage Cut, 
and thence 200 feet wide through Union Bay to Lake 
Washington. Section included in project is about 10 miles 
long. Plane of reference is mean lower low water. Extreme 
tidal range is 19.3 feet. Range between mean lower low water 
and mean higher high water is 11.3 feet, and between mean 
lower low water and extreme low water is 4.6 feet. Ordinary 
fluctuation in upper pool is 24 inches; extreme fluctuation has 
been 3.6 feet. Principal features of double lock and dam are set 
forth in Table 29-J. Project was completed in 1934. (For 
further details, see Annual Report for 1935. For details 
relating to previous projects, see page 2003 of Annual Report 
for 1915, and page 1880 of Annual Report for 1938.) 
Local cooperation. Fully complied with. 
Terminal facilities. The 18 waterfront facilities at Lake 
Washington Ship Canal are used for fuel oil, seafood, marine 
repair, drydocking, outfitting, mooring fishing vessels and 
repairs to the locks' equipment. Project is a part of Seattle 
Harbor's inner harbor. (See Port Series No. 36, revised 1993.) 
Operations during fiscal year. Maintenance, hired labor: 
Locks were operated and maintained all year, conducting 
18,896 lockings, passing 10,559 commercial vessels, 50,178 
pleasure vessels, and 1,808,834 tons of commerce. The 
fishladder passed more than 76,143 fish and there were 
1,458,242 project visitors. Prepared plans and specifications 
for repaving the maintenance yard and riprap placement in the 
Fremont Cut, and for the large lock machinery upgrade after 
the original contract was terminated. 
Maintenance, contract: Contracts for repaving the 
maintenance yard, pier rehabilitation, and reprap placement in 
the Fremont Cut were completed. 
9. NEAH BAY, WA 
Location. On south side of the Strait of Juan de Fuca, about 
6 miles east of Cape Flattery, at the entrance to the Strait from 
the Pacific Ocean, and about 60 miles west of Port Angeles, 
WA. (See NOAA Survey Charts 18480, 18484 and 18485.) 
Existing project. Provides for a rubblestone breakwater 
about 8,000 feet long between Waada Island and the westerly 
shore of the bay, reinforcement of existing rock revetment 
extending approximately 2,200 feet west from Baada Point, 
and about an 800-foot extension of the revetment westward. 
Tidal range between mean lower low water and mean higher 
high water is 8.2 feet. Project was completed in July 1956. 
(For further details, see Annual Report for 1957.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are six wharves at Neah Bay, 
including two owned by the United States which are used by 
the Coast Guard, and four privately owned wharves, three of 
which are open to general public use to accommodate small 
commercial fishing vessels. In addition to the wharves, there 
is a facility for dumping and rafting logs. Facilities are 
considered adequate for existing commerce. 
Operations during fiscal year. Maintenance, hired labor: 
Inspection of fish gap in boat basin breakwater. 
Maintenance, contract: None. 
10. OLYMPIA HARBOR, WA 
Location. Near southern end of Puget Sound at head of Budd 
Inlet, about 45 miles southwest of Tacoma. (See NOAA 
Survey Chart 18456.) 
Existing project. Provides for a channel between deep water 
in Budd Inlet and port terminal, 30 feet deep at mean lower 
low water and 500 feet wide, with suitable additional width at 
bend; a turning basin adjacent to port terminal 30 feet deep, 
3,350 feet long, and 500 to 960 feet wide; and construction of 
a 656-foot concrete floating breakwater and dredging of the 
-29-5-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
entrance and access channels and turning basin, constructed 
under authority of Section 107, P.L. 86-645. Construction cost 
for this feature is recorded in Table 29-C (East Bay Small 
Boat Basin). Extreme tidal range is 22.5 feet. Range between 
mean lower low water and mean higher high water is 14.4 feet. 
Existing project was completed in 1985. (For details relating 
to previous projects, see page 1369 of Annual Report for 1934 
and page 1873 of Annual Report for 1938.) 
Local cooperation. Fully complied with. 
Terminal facilities. Five port facilities are located in 
Olympia at Budd Inlet, exclusive of the numerous waterfront 
facilities in the ports used by recreational craft. The industrial 
docks are used for conventional general cargo, logs, timber 
products and miscellaneous mooring. (See Port Series No. 35 - 
Ports of Tacoma, Olympia, and Grays Harbor, WA, revised 
1993.) 
Operations during fiscal year. Maintenance, hired labor: 
Maintained project coordination. Performed sediment 
sampling and analysis to confirm the suitability of channel 
shoal material for open water disposal. Performed water 
quality monitoring at East Bay Marina during the seasonal 
periods of poor water quality. A surface inspection of the 
floating concrete breakwater was performed and confirmed the 
breakwater and anchor pile system to be in good condition. 
Further coordinated with the Port of Olympia on proposed 
channel maintenance and minor widening requested by users. 
Maintenance, contract: None. 
11. PORT TOWNSEND, WA 
Location. In northwestern Washington, about 40 miles 
northwest of Seattle, on Olympic Peninsula, at demarcation 
point between Strait of Juan de Fuca and Admiralty Inlet 
which forms northerly part of Puget Sound. (See Coast and 
Geodetic Survey Chart 6405.) 
Existing project. Mooring basin and breakwater, basin with 
an area of 12.5 acres and depths of 10 and 12 feet below mean 
lower low water in inner and outer sections, repectively, and a 
gravel and rockfill breakwater 1,946 feet long. Range between 
mean lower low water and mean higher high water at Port 
Townsend is 8.8 feet. Extreme range is about 16.5 feet. 
Project was completed in November 1964. (For further 
details, see Annual Report for 1965.) 
Local cooperation. Fully complied with. 
Terminal Facilities. There are twelve waterfront facilities 
located at Port Townsend along the northerly shore of Port 
Townsend Bay. Functional uses of the piers, wharves, and 
docks include cargo handling, fueling small vessels, ferry 
accommodation, marine repair, drydocking, and miscellaneous 
Port Townsend, Everett, Anacortes, and Bellingham, WA, 
revised 1987.) 
Operations during fiscal year. Maintenance, hired labor; 
Channel condition surveys were conducted during the year. 
Prepared plans and specifications and awarded contract for 
maintenance dredging. 
Maintenance, contract: Maintenance dredging was completed 
by clamshell dredging 1,986 cy of material from the entrance 
channel at a cost of $27,250. 
12. PROJECT CONDITION SURVEYS 
Hydrographic surveys and inspections to determine 
navigation conditions at boat basins, small navigation projects, 
and channels not funded on a project basis for the current 
fiscal year. Soundings and visual inspections in subject areas 
are conducted in order to evaluate shoaling conditions. 
Hydrographic charts are prepared and distributed. Fiscal year 
costs were $226,973. Total costs to date are $4,150,679. 
SURVEYS CONDUCTED 
Bellingham Harbor, WA August, September 1999 
Lake Crockett, WA March 1999 
Neah Bay, WA July 1999 
Tacoma Harbor, WA November 1998; March, April 1999 
Waterway Connecting Port Townsend July 1999 
and Oak Bay, WA 
13. PUGET SOUND AND ITS TRIBUTARY 
WATERS, WA 
Location. Puget Sound is in the western part of Washington. 
Cities of Seattle, Tacoma, Olympia, Everett, Bellingham, and 
many small towns are on its bays and inlets. (See NOAA 
Survey Charts 18440, 18441, and 18448.) 
Existing project. Maintenance of Puget Sound and its 
tributary waters by snagging and dredging; and removal, in 
cooperation with the U.S. Coast Guard and city of Seattle, of 
floating debris from the Seattle Harbor area. Work consists of 
collecting large pieces of drift, waterlogged pilings, logs and 
other debris considered hazardous to navigation from Puget 
Sound and federally authorized channels. (For details relating 
to previous projects, see page 2003 of Annual Report for 1915 
and page 1869 of Annual Report for 1938.) 
Local cooperation. None required. Cities of Seattle, 
Tacoma, Olympia, Everett and Bellingham and the State of 
Washington are cooperating in a program for control of 
floating debris in their harbors and setting up collection sites 
for our debris vessel. 
mooring. (See Port Series No. 37 - Ports of Port Angeles, 
-29-6-

SEATTLE, WASHINGTON DISTRICT 
Terminal facilities. Terminal facilities at numerous localities 
on Puget Sound and its tributary waters are, in general, 
considered adequate for existing commerce. 
Operations during fiscal year. Maintenance, hired labor: 
The debris vessel Puget operated continuously throughout 
Puget Sound and its tributary waters and removed 
approximately 2,900 tons of floating debris and hazards to 
navigation. Debris was disposed of locally or loaded aboard 
barges and disposed of by contract. Snagging operations were 
accomplished at Blaine Harbor, Bellingham Harbor, 
Swinomish Channel, Skagit River, Everett Harbor, Snohomish 
River (upstream to town of Snohomish), Lake Washington 
Ship Canal, Lake Washington, Tacoma Harbor, Olympia 
Harbor, Duwamish River, and Elliott Bay. 
Maintenance, contract: One thousand tons of harbor debris 
were disposed of at a cost of $87,000. Contractor continues to 
recycle much of the debris, reducing the cost of disposal by 
contract. Remainder of debris is placed in a demolition landfill 
or recycled through other government agencies. 
14. QUILLAYUTE RIVER, WA 
Location. River is formed by junction of Soleduck and 
Bogachiel Rivers, in northwestern Washington, and flows 
westerly 5 miles to Pacific Ocean at La Push, about 30 miles 
south of Cape Flattery. (See NOAA Survey Chart 18480.) 
Existing project. Provides for: jetty 15 feet high on easterly 
side of river mouth and a dike on westerly side, with a view of 
stabilizing entrance; channel 10 feet deep and 100 feet wide 
extending 2,000 feet upstream from deep water; basin 10 feet 
deep, 300 to 425 feet wide, and 2,400 feet long upstream of 
channel; and, maintenance of an ocean spit. Plane of reference 
is mean lower low water. Range between mean lower low 
water and mean higher high water at La Push is 8.3 feet. 
Extreme range is about 15 feet. The spit is nourished with 
dredged material in conjunction with channel dredging. The 
spit was rehabilitated with quarry rock in 1974, in 1979-80, 
and in 1982; in addition, a 500-foot breakwater section 
paralleling the channel and extending the spit was constructed. 
In 1995, the revetment on the downstream end of the ocean 
spit was extended 200 feet. In 1996, after the river breached 
the natural spit, the revetment on the ocean spit was extended 
approximately 1,700 feet to the north and the boat basin 
training wall was raised from elevation +9.0 to elevation +16.0 
- all under O&M authority. Project was completed in February 
1997. 
Local cooperation. Fully complied with. 
Terminal facilities. There is one Quileute Tribe-owned dock 
at La Push, near the mouth of the Quillayute River. There is 
also a protected boat basin owned by the Quileute Tribe Port 
Authority which is used by fishing boats, pleasure craft, and 
the Coast Guard, which has a separate pier. 
Operations during fiscal year. Maintenance, hired labor: 
Condition surveys were made of the river channel. Prepared 
plans and specifications for contract work. Advertised and 
awarded a dredging contract. 
Maintenance, contract: A maintenance dredging contract was 
completed. The entrance channel and boat basin were dredged 
(64,376 cy) at a cost of $634,719. A test settling basin was 
constructed upstream of the navigation project by dragline 
excavation of 76,730 cy at a cost of $421,650. Disposal was 
on the ocean side of the spit as beach nourishment. The object 
is to reduce entrance channel dredging costs. This testing is to 
determine if volumes and gradation size of the entrance 
channel material will be reduced. This would allow smaller 
hydraulic dredges to complete the entrance channel work more 
quickly and at less cost. Juvenile salmonid protection features 
(anchored spruce trees and relocation of rocks onto the spit) 
were constructed at a cost of $34,200. 
15. SEATTLE HARBOR, WA 
Location. Harbor at Seattle, WA, includes all waterways 
within city limits. Chief anchorage basin is Elliott Bay, an arm 
of Puget Sound. (See NOAA Survey Chart 18450.) 
Existing project. Maintenance of East and West Waterways, 
34 feet deep and 750 feet wide for 6,500 and 5,200 feet, 
respectively, from pierhead line in Elliott Bay, the 30-foot by 
200-foot wide channel from West Waterway to 1st Avenue 
South Bridge, and the 20-foot by 150-foot-wide channel from 
1st Avenue South Bridge to 8th Avenue; dredging Duwamish 
Waterway 150 feet by 15 feet from 8th Avenue to a point 
about 1.4 miles above 14th Avenue South Bridge, and turning 
basin 500 by 250 feet and 15 feet deep at the upper end of the 
waterway; maintenance of East Waterway between upper end 
of 750-foot section and Spokane Street, 34 feet deep, 700 feet 
long and 400 feet wide, and a turning basin, including head of 
East Waterway at junction of waterways south of Chicago, 
Milwaukee, St. Paul & Pacific Railroad bridge, to 30 feet 
deep, after these sections of waterway are dredged by local 
interests to full project dimensions. Total length of all 
waterways included in project is about 7.5 miles. Plane of 
reference is mean lower low water. Range between mean lower 
low water and mean higher high water is 11.3 feet. Extreme 
tidal range is 19.3 feet. Project was completed in 1931, 
excluding maintenance of East Waterway above the 750-foot 
section. Turning basin, constructed under authority of R&H 
Act of Mar. 3, 1925, in 20-foot deep waterway was 
deauthorized by P.L. 99-662 dated Nov. 17, 1986. (For further 
details, see Annual Report for 1932.) 
Local cooperation. Fully complied with. Local sponsor has 
no maintenance responsibility. 
Terminal facilities. There are 203 piers, wharves, and docks 
located on the inner and outer harbors at Seattle, WA. Salmon 
Bay, Lake Union, Portage Bay and Lake Washington form the 
-29-7-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
inner harbor; Elliott Bay and East, West and Duwamish 
Waterways form the outer harbor. (Lake Washington Ship 
Canal, a part of the inner harbor, is a separate project in this 
report.) These terminals serve a variety of purposes which 
include cargo handling, bunkering vessels, ferry service 
(vehicular, passenger and rail car), marine repair/ outfitting/ 
drydocking/ conversion, shipbuilding, handling supplies and 
equipment, and mooring company owned equipment, 
excursion vessels, fire boats, fishing vessels, government 
equipment, harbor craft/tugs, and oceanographic research 
vessels. The numerous waterfront facilities in the port used 
exclusively by recreational craft are not included. (See Port 
Series No. 36, revised 1993.) 
Operations during fiscal year. Maintenance, hired labor: 
Condition surveys were made of channels. Sediment 
sampling/testing was conducted in preparation for mid-channel 
maintenance dredging and for deepening the East Waterway. 
Plans and specification were initiated for the East Waterway 
deepening project (Phase I) and prepared for the upstream 
maintenance dredging contract, for which an award was made. 
Maintenance, contract: Maintenance dredging of the 
upstream channel was completed by clamshell dredging of 
165,116 cy of material at a cost of $589,441. Disposal was at 
the Elliott Bay open water site. A contractor-furnished 
disposal site resulted in beneficial use of 9,186 cy at a King 
County CSO (Combined Sewer Outfall) remediation project. 
16. SWINOMISH CHANNEL, WA 
Location. An inland passage, 11 miles long, between 
Saratoga Passage and Padilla Bay, in northwestern part of 
Washington, about 60 miles north of Seattle. (See NOAA 
Survey Charts 18400, 18427 and 18421.) 
Existing project. A channel 100 feet wide and 12 feet deep 
for 11 miles from deep water in Saratoga Passage to deep 
water in Padilla Bay, by dredging and dike construction where 
necessary; and removal of protecting rocky points of McGlinn 
and Fidalgo Islands obstructing navigation at "Hole-in-the- 
Wall". Plane of reference is mean lower low water. Range 
between mean lower low water and mean higher high water is 
11.5 feet at south end of channel, 8.4 feet at north end, and 10 
feet at La Conner. Extreme tidal range is about 19.5 feet at 
south end of channel and about 16 feet at north end. Project 
was completed in March 1965. (For further details, see Annual 
Report for 1965.) 
Local cooperation. Fully complied with. 
Terminal facilities. There are 18 wharves, docks, and piers 
on Swinomish Channel, all but 3 of which are privately owned. 
Of these, one is used for handling general cargo; five are used 
exclusively for moorage, unloading and servicing of fishing 
vessels; two are used for handling petroleum products; three 
facilities are used for log dumps; and two for handling nonmetallic 
minerals. Three publicly owned facilities for 
launching, mooring, and servicing small craft are within the 
city limits of La Conner. 
Operations during fiscal year. Maintenance, hired labor: 
Maintained project coordination with Port of Skagit County, 
Port of Anacortes, U.S. Coast Guard, and navigation users. 
Channel condition surveys were conducted. 
Maintenance, contract: None. 
17. WILLAPA RIVER AND HARBOR AND 
NASELLE RIVER, WA 
Location. Willapa Harbor consists of lower reaches of 
Willapa River and Bay, an inlet of Pacific Ocean about 30 
miles north of mouth of Columbia River in Washington. 
Willapa River rises about 30 miles east of harbor, flows 
generally westerly, and empties into the bay. Naselle River 
enters the bay near its southerly end. (See NOAA Survey Chart 
18504.) 
Existing project. Provides for: channel over bar at mouth of 
Willapa Bay, 26 feet deep and at least 500 feet wide; channel 
24 feet deep and 200 feet wide from deep water in Willapa 
Bay to foot of Ferry Street at South Bend, thence 300 feet wide 
to westerly end of narrows, thence 250 feet wide to forks of 
river at Raymond, including a cutoff channel 3,100 feet long at 
narrows and a closing dike at Mailboat Slough; channel 24 feet 
deep and 150 feet wide up south fork to deep basin above 
Cram Lumber Mill, and up north fork to 12th Street, with a 
turning basin 250 feet wide, 350 feet long, and 24 feet deep at 
latter point; channel 10 feet deep and 40 feet wide from deep 
water in Palix River to Bay Center dock, with widening at 
shoreward end to provide a small mooring basin; mooring 
basin 15 feet deep, 340 feet wide, and 540 feet long adjacent 
to port wharf at Tokeland; entrance channel at Nahcotta 10 
feet deep and 200 feet wide, and mooring basin 10 feet deep, 
500 feet wide, and 1,150 feet long, protected by a 
rubblemound breakwater about 1,500 feet long; and removal 
of snags, piles, and other obstructions in navigable channel of 
Naselle River between Naselle and mouth. Project includes 
about 26 miles of channel from entrance through Willapa 
River forks, 2,800 feet of Palix River-Bay Center channel, and 
9 miles of Naselle River upstream of U.S. Highway 101 
Bridge. Plane of reference is mean lower low water. Tidal 
range between mean lower low water and mean higher high 
water is 8.9 feet at Toke Point, 9.9 feet at Raymond, 8.9 feet at 
Bay Center, and 10.8 feet near Naselle. Extreme range is 18 
feet at Toke Point, 19.3 feet at Raymond, 16 feet at Bay 
Center, and 18 feet near Naselle. Project was completed in 
November 1958. (For further details, see Annual Report for 
1959. For details relating to previous projects, see page 968 of 
Annual Report for 1910, page 2001 of Annual Report for 
1915, and page 1861 of Annual Report for 1938.) 
Local cooperation. Fully complied with. 
-29-8-

SEATTLE, WASHINGTON DISTRICT 
Terminal facilities. There are 24 wharves on Willapa River 
and Harbor, including 5 in Willapa Bay, 4 in Bay Center, 12 in 
Raymond and South Bend, and 1 in Tokeland. Two of the 
wharves at Raymond and South Bend are suitable for use by 
ocean-going vessels. One of these is publicly owned and 
operated as a general cargo terminal, and one is located at a 
sawmill. The other wharves, including three which are publicly 
owned and operated, are used by shallow-draft vessels. These 
facilities are considered adequate for existing commerce. 
Operations during fiscal year. Maintenance, hired labor: 
Frequent condition surveys on the Willapa bar channel were 
performed at the request of the U.S. Coast Guard. The 
alignment of the Willapa bar thalweg continues to be a 
concern for safe navigation. A partnership agreement with the 
Port of Willapa Harbor, executed April 3, 1998, allowed the 
Corps to complete Phase I of a technical study at Willapa Bay 
to determine if a safe, reliable bar navigation channel is 
feasible. Many bar channel alternatives were evaluated with a 
few requiring further evaluation in a Phase II study effort 
before final recommendations are completed. Monitored 
maintenance dredging contract. 
Maintenance, contract: A Toke Point entrance channel 
maintenance dredging contract to remove 27,647 cy of shoal 
material was completed in December. Emergency dredging to 
remove approximately 10,000 cy from the Bay Center entrance 
was incorporated into the Toke Point contract. 
Beach Erosion Control 
18. LUMMI SHORE ROAD, WA 
Location. Project is located just west of the city of 
Bellingham on the Lummi Peninsula, which is within the 
Lummi Indian Reservation in Whatcom County, Washington. 
Existing project. Provides for construction of about 9,185 
linear feet of rock revetment along Lummi Shore Road, which 
is located adjacent to the eastern shoreline of the Lummi 
Peninsula. Lummi Shore Road is in an area of extremely high 
shoreline erosion, and the erosion had caused a partial collapse 
of the road and threatened utilities located within the road 
right-of-way. The project was physically completed in 
February 1999. Total project cost is $2,635,000 ($1,720,000 
Federal and $915,000 non-Federal), with final fiscal 
requirements remaining. 
Local cooperation.Under current cost sharing requirements, 
the local sponsor (Lummi Indian Nation) will pay about 35% 
of project costs. A Project Cooperation Agreement (PCA) was 
executed February 19, 1998. After completion of subject 
project, the Lummi Indian Nation (with help from the Federal 
Highway Administration and Bureau of Indian Affairs) is 
planning to repair and improve about 4.7 miles of Lummi 
Shore Road and Lummi View Drive, bringing the roads up to 
current highway standards. 
Operations during fiscal year. New work, hired labor: 
Supervised construction contract work. 
New work, contract: Construction contract work was 
completed. 
Flood Control 
19. CEDAR RIVER, RENTON, WA 
Location. Project is located along the lower 1 1/4 miles of 
the Cedar River in the city of Renton, King County, WA, 
immediately southeast of the city of Seattle. 
Existing project. Dredging of the lower river channel 
approximately four feet from the mouth upstream to Logan 
Avenue bridge (one mile), gradually decreasing the slope 
upstream another 1/2 mile to meet the existing grade. Raise 
levees and floodwalls along both banks from the mouth to 
Williams Avenue 1 1/4 miles to contain the 100 year flood just 
prior to redredging. The interval for maintenance dredging 
will be approximately 3 years on average. Estimated total 
project cost is $9,442,000 ($5,000,000 Federal and $4,442,000 
non-Federal) with completion in June 2000. 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (city of Renton) will .pay 47% of project 
implementation costs. A Project Cooperation Agreement 
(PCA) was executed May 9, 1998. 
Operations during fiscal year. New work, hired labor: 
Supervised construction contract work. 
New work, contract: Construction work under way. 
20. FLATHEAD RIVER, MT 
Location. Project is located on the north fork of the Flathead 
River in Montana, about one quarter of a mile south of the 
Canadian border. 
Existing project. Reconstruct at a new site 1/4 mile 
downstream a water monitoring station which was destroyed 
by the June 1995 flood. Restoring the station will continue its 
use as a long-record stream gaging site and monitor the quality 
of the water entering the United States from Canada. Seattle 
District requested assistance from U.S. Geological Survey 
agency to perform the work. A new gage recorded data 
beginning in the summer of 1999. Work is complete. Total 
project cost is $79,000, with final fiscal requirements 
remaining. 
Local cooperation. None required. 
-29-9-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
Operations during fiscal year. New work, hired labor: 
U.S. Geological Survey agency completed installation of the 
new gage. 
21. HOWARD A. HANSON DAM, WA 
Location. Green River, in northwestern Washington, flows 
westerly for 40 miles to Auburn, thence northerly 32 miles to 
its mouth in Elliott Bay at Seattle. Dam is at river mile 64, 6 
miles southeast of Kanaskat, and 1 mile downstream from 
mouth of north fork. (See Geological Survey topographic 
sheet, "Cedar Lake Quadrangle, WA".) 
Existing project. Rockfill dam about 235 feet high, with 
gated spillway having a concrete weir at elevation 1,176 feet 
above mean sea level and top of gates at elevation 1,206, 
creating a reservoir with capacity of 106,000 acre-feet. Dam 
along crest is about 675 feet long. Project is designed to 
control flooding in Green River Valley to alleviate agricultural 
and urban flood damage, and make possible further expansion 
of Seattle industrial area. It also supplements Tacoma water 
supply which was included as a betterment. Project was 
completed in June 1963. (For further details, see Annual 
Report for 1963.) Under the dam safety assurance program, 
the reservoir outlet control tower and bridge were strengthened 
to withstand the maximum, credible earthquake. Work was 
completed in FY 1998. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintenance, hired labor: 
Opera:ion continued all year. Routine maintenance was 
accomplished on roads, gages, debris booms, ditches, 
powerline, and other project features. Stilling basin inspection 
was accomplished. Work continued on water quality and 
sediment surveys. Prepared plans and specifications for 
installation of a new elevator in the intake tower and a new 
208V-3 phase ball valve electrical service. 
Maintenance, contract: None. 
22. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspections are made of federally constructed local flood 
protection projects which are maintained by local interests, 
and agencies responsible for their operation and maintenance 
are advised of any needed repairs. During the fiscal year 
inspections were made on Chehalis River at Aberdeen, Green 
River at Tukwila and Kent, Okanogan River at Omak and 
Oroville, Sammamish River at Redmond, Shelton Creek at 
Shelton, Skykomish and Wallace Rivers at Startup, 
Swinomish Channel at LaConner, American Lake, Wynoochee 
Dam and Yakima River at Yakima in Washington State; 
d'Alene River at Coeur d'Alene, and St. Joe River at St.Maries 
in Idaho; and Clark Fork River at Missoula in Montana. Fiscal 
year costs were $138,427. Total costs to date have been 
$1,872,012. 
23. MUD MOUNTAIN DAM, WA 
Location. On White River, principal tributary of Puyallup 
River, near Mud Mountain, 28 miles above its confluence with 
Puyallup River, and 38 miles above mouth of Puyallup River. 
Dam is 6 miles upstream and southeast of Enumclaw, in 
northwestern Washington, and 38 miles east of Tacoma. (See 
Geological Survey topographic sheet "Cedar Lake Quadrangle, 
Washington".) 
Existing project (including dam safety assurance 
improvements to date). Rockfill dam, 700 feet long at crest 
elevation, rises 432 feet above bedrock. Reservoir has storage 
capacity of about 106,000 acre-feet. Flood control outlet 
works are in right abutment and permit an authorized, 
controlled discharge of 17,600 cubic feet per second through 
two concrete-lined tunnels, with a maximum capacity 
discharge of 21,500 cfs. Uncontrolled discharge over the 
spillway is maximum capacity for 245,000 cubic feet per 
second. Project affords flood protection to White and Puyallup 
River Valleys and protects Tacoma industrial district in 
conjunction with Puyallup River project at Tacoma against 
floods about 50 percent greater than maximum discharge of 
record. Original project was completed in June 1953. To date, 
the Corps has constructed two vista areas, 'a picnic area, a 
wading pool, and playground adjacent to the project office, a 
reservoir access point for hunters and fishermen, and a 1,760- 
foot trail leading to the lower vista area. Installation of an 
approximately 400-foot-deep concrete cutoff wall in the core 
of the dam was completed in November 1990 under the major 
rehabilitation program. Under dam safety assurance, spillway 
walls were raised, the dam crest was heightened, river 
diversion facilities required for excavation for the new tower 
were completed, the 9-foot diameter and the 23-foot diameter 
tunnels were refurbished, and a new reservoir outlet tower was 
constructed. 
Local cooperation. None required. 
Operations during fiscal year. Maintenance, hired labor: 
Project features were operated all year. Maintenance was 
accomplished on dam facilities, intake structure, gages, debris 
booms, power lines, roads, ditches, hiking trails, vista 
observation deck, recreation area, and fish facilities. 
Approximately 3,296 fish were transported from the fish 
collection facility to the upstream release point. Project staff 
contmnues to partially renovate the 40-year-old administration 
building. Prepared plans and specifications for rehab of 
project power supply line, repair of stoplog lifting beam, and 
rehab of fish trap facility. 
Lightning Creek at Clark Fork, Placer Creek at Wallace, Coeur 
-29-10-

SEATTLE, WASHINGTON DISTRICT 
Maintenance, contract: Hydraulic gates, lifting cylinders and 
controls were refurbished under contract. 
Dam Safety Assurance. New work, hired labor: Study is 
on-going to identify problem areas with the new dam safety 
features. 
New work, contract: Installed steel armor on the floor of the 
mixing chamber (23-foot tunnel). 
24. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Flood control storage space was available in Hungry Horse 
Reservoir, MT, Flathead Lake, MT (controlled by Kerr Dam), 
Grand Coulee project, WA, Wynoochee Dam, WA, Upper 
Baker and Ross Reservoirs, WA. Issues relating to project 
operations were addressed. Regulation instructions were 
provided for flood control operations. Guidance forecasts were 
made during the flood control season, as required. No Lost 
Valley storage replacement was requested at Rocky Reach, 
Priest Rapids, and Wells Dams. Daily and/or hourly data were 
collected and tabulated as required to check compliance with 
operating criteria. Coordination necessary in preparation or 
revision of reservoir regulation manuals was carried on during 
the year with agencies responsible for the operation of these 
projects. Fiscal year costs were $591,936. Total costs to date 
have been $5,751,391. 
25. STILLAGUAMISH RIVER, WA 
Location. Formed by confluence of its north and south forks 
at Arlington, in northwestern Washington, Stillaguamish River 
flows westerly 22 miles to Puget Sound, entering Port Susan 
through Hat Slough and South Pass, and Skagit Bay through 
West Pass. (See NOAA Survey Chart 18441, and Geological 
Survey Quadrangles Stanwood, Marysville, and Stillaguamish, 
WA.) 
Existing project. Works to reduce bank erosion and channel 
changes on Stillaguamish River 15 miles between Arlington 
and head of Hat Slough, and on Cook Slough, 3 miles long, as 
follows: revetment at 26 places on river and Cook Slough; 
concrete weir (including a fishway) 275 feet long between 
steel sheet pile piers at head of Cook Slough to limit flow 
through Slough; and two cutoff channels, each about 900 feet 
long, to eliminate sharp bends in Cook Slough. Tidal influence 
extends about 3 miles into improved section. Flood stages of 
16 feet above low water at Cook Slough weir have been 
observed. Project was completed in July 1939. (For further 
details, see Annual Report for 1940.) 
Local cooperation. None required. 
Operations during fiscal year. Maintenance, hired labor: 
Utilized in-house labor to supervise removal of brush from the 
entire project along slopes of levee and construct rip rap 
repair. 
Maintenance, contract: Awarded equipment rental contracts 
to achieve removal of brush and repair erosion damage with 
rip rap. 
26. TACOMA, PUYALLUP RIVER, WA. 
Location. Puyallup River has its source in glaciers on 
western slopes of Mount Rainier, flows northwesterly 50 
miles, and empties into Commencement Bay, an arm of Puget 
Sound, at Tacoma, WA. Work covered by this project is on 
Puyallup River, within city limits of Tacoma. (See NOAA 
Survey Chart 18453.) 
Existing project. A channel with a capacity of 50,000 cubic 
feet per second between East 11 th Street Bridge and lower end 
of inter-county improvement, a distance of about 2.2 miles, by 
straightening channel, building levees, revetting channel and 
levees, and making necessary bridge changes. The 11th Street 
Bridge at lower end of project is 0.75 mile above mouth of 
Puyallup River. Diurnal tidal range at mouth of river is 11.8 
feet and extreme range is 20 feet. Project was planned in 
conjunction with Mud Mountain Dam and affords protection 
against floods about 50 percent greater than maximum 
discharge of record. A real estate design memorandum, 
approved by Office of the Chief of Engineers on October 2, 
1985, changed the project boundary to allow the Port of 
Tacoma to create a wetland adjacent to the project. This action 
resulted in the Corps acquiring approximately 2,450 linear feet 
of setback levee in fee simple. Maintenance funds to cover the 
increased length of the project have been provided by the Port 
of Tacoma for the project life. Project was completed in May 
1950. (For further details, see Annual Report for 1950.) 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintenance, hired labor: 
Utilized in-house labor to supervise removal of brush and 
noxious weeds from the entire project along slopes of levee. 
Coordinated annual clean-up with Citizens for a Healthy Bay, 
a tax-exempt, nonprofit organization.. 
Maintenance, contract: Awarded equipment rental contracts 
to achieve removal of brush and noxious weeds. 
Multiple Purpose Power Projects 
27. ALBENI FALLS DAM, ID 
Location. On Pend Oreille River about 25 miles west of 
Sandpoint, in northern Idaho, and 50 miles northeast of 
Spokane, WA. Dam is 838 and 90 miles upstream from 
mouths of Columbia and Pend Oreille Rivers, respectively. 
(See Geological Survey topographic sheets, Sandpoint, ID, and 
Newport, WA.) 
-29-11-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
Existing project. Provides flood control, hydroelectric 
power, and related water uses on Pend Oreille River as a part 
of the multiple purpose plan for development of Columbia 
River Basin, including recreation development. At the dam, 
the river channel was formerly divided by an island and a low 
waterfall of about 7 feet. Dam is a gated, gravity-structure 
spillway in left channel and a powerhouse having an 
installation of 42,600 kilowatts in right channel, creating a 
reservoir with a usable storage capacity of 1,153,000 acre-feet. 
Project was completed in June 1957. (For further details, see 
Annual Report for 1957.) Recreational facilities for public use 
have been provided at Albeni Cove, Priest River, Riley Creek, 
Johnson Creek, Trestle Creek, Strongs Island, and Springy 
Point. (Strongs'Island was closed in FY 1982 to reduce O&M 
costs.) (Refer to Albeni Falls Master Plan dated June 1981 for 
further planned development.) 
Local cooperation. None required. 
Operations during fiscal year. Maintenance, hired labor: 
Reservoir was operated through its annual cycle of storage and 
release." Routine structural, mechanical, and electrical 
maintenance was performed on spillway, dam, powerhouse, 
and equipment. Prescribed testing and replacement of the 
exciters as part of the power system reliability improvements 
continued with funds provided by Bonneville Power 
Administration (Section 2406). 
Maintenance, contract: Contracts for project beautification, 
spillway gate corrosion control, and repairs to the Clark Fork 
debris area and bank protection were completed. The first 
phase of construction was completed on the vista slope failure 
repair. A contract was awarded for the powerhouse exterior 
concrete repairs. 
28. CHIEF JOSEPH DAM - RUFUS WOODS 
LAKE, WA 
Location. On Columbia River in north central Washington, 
at River Mile 545, just upstream from mouth of Foster Creek, 
1.5 miles upstream from town of Bridgeport. (Geological 
Survey topographic sheet, Okanogan, WA, shows general 
locality.) 
Existing project. A concrete gravity structure which consists 
of a 19-gate spillway and a 27-unit powerhouse. The 
powerhouse has sixteen 88,274 kilowatt and eleven 95,000 
kilowatt generators with nameplate capacity of 2,457,384 
kilowatts. Of the current construction project, work has been 
completed (in FY 1992) to bring turbine efficiency for units 
17-27 up to design standards and the data acquisition and 
control system has been upgraded to Bonneville Power 
requirements. Trunnion beam anchorages proved to be 
adequate. All work is complete. Cost of current construction 
project is $395,855,000, with final fiscal requirements 
remaining. 
Local cooperation. None required. 
Operations during fiscal year. New work, hired labor: 
Supervised project close-out. 
Maintenance, hired labor: Routine structural, mechanical, 
and electrical maintenance work was performed on 
powerhouse, spillway, dam and equipment. Prescribed testing 
for power system improvements continued with funds provided 
by Bonneville Power Administration (Section 2406). 
Maintenance, contract: A contract for construction of a preengineered 
metal building was completed. A contract for 
crane modernization work was ongoing. Contracts for the 
north shore water supply and restroom and the powerhouse, 
service and tailrace deck repair were awarded. Contracts for 
the station service transformer replacement and the station 
service governor electronics retrofit were awarded with funds 
provided by Bonneville Power Administration (Section 2406). 
29. LIBBY DAM - LAKE KOOCANUSA, MT 
Location. On Kootenai River in Lincoln County, MT, about 
17 miles upstream from Libby, and 219 miles upstream from 
confluence of Kootenai and Columbia Rivers. (See Geological 
Survey topographic sheet, Thompson Lakes, MT.) 
Existing project. Provides storage for local flood control 
protection in Montana and Idaho, and main stem flood control 
in Lower Columbia River, hydroelectric power generation atsite 
and at downstream plants through storage release. Project 
is operated as a unit of a comprehensive system for 
improvement of Columbia River basin for flood control, 
navigation, hydroelectric power, and other purposes. Lake 
Koocanusa is 90 miles long, backing water 42 miles into 
Canada and has a usable storage capacity of 4,965,000 acrefeet 
at 50 percent drawdown. Construction of dam was in 
accordance with a treaty between United States and Canada 
relating to international cooperation in water resource 
development of the Columbia River basin. Dam is a straight 
concrete gravity overflow type, 420 feet high, 3,055 feet long, 
with normal full pool at elevation 2,459 feet above mean sea 
level. Powerhouse has an initial installed capacity of 420,000 
kilowatts from four hydroelectric generating units. A fifth 
generating unit (Libby Additional Units Project) was 
completed in 1984 with an additional capacity of 105,000 
kilowatts. Fabrication of generators for units 6 through 8 is 
completed and parts have been stored at the site. Project is 
completed with units 1 through 5 operational. Units 6 through 
8 have been reclassified inactive. The Libby Reregulating 
Dam Project provides for construction of a reregulating dam 
about 10 miles downstream of Libby Dam. Funds were 
allocated for a construction start in 1977; however, courts have 
found that Congress did not authorize construction of the dam. 
In FY 1982, all work was terminated due to court direction. 
The Libby Reregulating Dam - Power Units Project 
provides for installation of three hydroelectric generating units 
-29-12-

SEATTLE, WASHINGTON DISTRICT 
at the reregulating dam with 78,900 kilowatt installed capacity. 
(For further details, see Annual Report for 1995). 
Local cooperation. Fully complied with. 
Operations during fiscal year. Maintenance, hired labor: 
Reservoir was operated through its annual cycle of storage and 
release. Routine structural, mechanical, and electrical 
maintenance was performed on spillway, dam, powerhouse 
and equipment. Prescribed testing for power system reliability 
improvements continued with funds provided by Bonneville 
Power Administration (Section 2406). 
Maintenance, contract: Contracts were completed for 
selective withdraWal gate refurbishment and upper and lower 
wicket gate seals. A contract for crane modernization work 
was ongoing. Contracts for the transformer oil containment 
and the project road repair were awarded. 
Miscellaneous 
30. DEEPWATER SLOUGH, WA 
Location. The project is located on the Skagit River (South 
Fork), near Milltown, Skagit County, WA. 
Existing project. Construct approximately 8,300 linear feet 
of new dikes, augment and rehabilitate 10,000 linear feet of 
existing dikes, install two drainage structures, a bridge 
crossing for Deepwater Slough, provide native species 
planting, and placement of large, woody debris. Breach the 
existing dikes in three locations at Milltown Island to restore 
tidal and riverine influence. Completed project will reconnect 
portions of the wildlife area to tidal inundation and periodic 
flooding to re-establish inter-tidal marsh, shrub, and forested 
communities. Estimated project cost is $1,991,000 
($1,282,000 Federal and $709,000 non-Federal), with 
completion in FY 2004. 
Local cooperation. Under current cost sharing requirements 
the local sponsor (Washington Department of Fish and 
Wildlife) will provide 25% of project cost and any project 
betterments. A Project Cooperation Agreement (PCA) was 
signed on May 7, 1999. 
Operations during fiscal year. New work, hired labor: 
Completed plans and specifications, executed PCA, and 
initiated construction. 
New work, contract: Work under way by equipment rental 
contract. 
31. PORTER LEVEE, WA 
Location. The project is located at river mile 35 on the left 
bank of the Green River, 30 miles southeast of Seattle, WA, in 
King County. 
Existing project. Restored flow into and out of existing 
former river meanders/side channels behind the Porter Levee 
isolated by the construction of the levee. Project purpose 
provides for eight acres of off-channel habitat similar to the 
side channel habitat which existed prior to the construction of 
Howard Hanson Dam. Specific features of the project are 1) 
upstream and downstream connections between river and old 
meander/ponds, 2) connections from old meander/pond to 
existing wetland, 3) revegetate riparian zone with native 
plants, and 4) remove culvert at Green Valley Road which was 
blocking fish passage. Project cost is $265,000 ($199,000 
Federal and $66,000 non-Federal). Project was physically 
complete in FY 1999. Monitoring will continue through FY 
2004. 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (King County) has provided 25% of project 
cost. A Project Cooperation Agreement (PCA) was signed on 
June 17, 1999. 
Operations during fiscal year. New work, hired labor: 
Completed plans and specifications, executed PCA, and 
initiated construction. 
New work, contract: Completed construction contract work. 
32. PUGET CREEK, WA 
Location. The project is located behind Kellogg Island at 
river mile 3 on the left bank of the Duwamish River in the city 
of Seattle, WA. 
Existing project. The effort restores about 0.5 acre of 
valuable estuary habitat within the authorized Seattle Harbor 
project. Development plans include creation of inter-tidal mud 
flats and a tidal marsh, with associated riparian buffer. By 
excavating 5,000 cy of materials along the banks of Puget 
Creek, the Duwamish River estuary will return to its natural 
shallow water and low bank condition. Project cost is 
$158,000 ($118,000 Federal and $40,000 non-Federal). 
Project was physically complete in FY 1999. Monitoring will 
continue through FY 2004. 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (Port of Seattle) has provided 25% of project 
cost. A Project Cooperation Agreement (PCA) was signed on 
September 28, 1998. 
Operations during fiscal year. New work, hired labor 
Completed plans and specifications, executed PCA, and 
initiated construction. 
New work, contract: Completed construction contract work. 
-29-13-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
33. SAMMAMISH RIVER WEIR 
RESTORATION, WA 
Location. Project is located near upstream end of the 
Sammamish River in Redmond, WA, 22 miles northeast of 
Seattle, in Marymoor Park. The Sammamish River (length 
13.7 miles) flows downstream from Lake Sammamish into 
Lake Washington. 
Existing project. Sammamish River Channel Improvements 
were constructed in 1965. Project provided major drainage 
improvement and flood protection for floods after March 1. 
The river channel was deepened an average of 5 feet and 
widened an average of 20 feet. Mouths of major tributaries 
were also deepened and widened. A previous Section 1135 
project was completed in FY 1995 at three locations 
downstream of Redmond, WA. Features included regrading of 
banks, placement of low flow habitat enhancement elements, 
and planting of riparian trees and shrubs. Current project 
provides for modification of the grade control sill (weir) and 
the right bank of the river adjacent to the sill and upstream for 
1,200 .feet. Work provides fish passage improvements at the 
sill; and a connected fish and wildlife habitat corridor from 
Lake Sammamish to the sill. Bank improvements additionally 
reduce severe bank erosion and water quality problems by 
channeling public access to designated areas. Total project 
cost is $248,000 ($186,000 Federal and $62,000 non-Federal). 
Construction work was physically complete in August 1998, 
with monitoring to continue for 5 years. 
Local cooperation. The local sponsor (King County) 
provided 25% of the project costs and is responsible for all 
operation and maintenance activities. A Project Cooperation 
Agreement (PCA) was executed on May 21, 1998. 
Operations during fiscal year. New work, hired labor: 
Monitoring was conducted for year one in FY 1999 by Corps 
staff. 
New work, contract: None. 
34. THORNTON CREEK, WA 
Location. Project is located in King County, at Lake 
Washington, in northeast Seattle, WA. 
Existing project. The project area consists of the portion of 
Matthews Beach Park which is south of Thornton Creek and 
which is frequently saturated. Restoration features include: 1) 
restoration of native riparian vegetation along lower 300 feet 
of the creek, 2) creation of a fish rearing pond adjacent to the 
creek with outflow to the creek, 3) diversion of water from a 
small creek at south end of the park in surface channel to 
supply pond, 4) planting of native vegetation around pond and 
along diversion (inflow) channel, 5) "softening" over a 
lakeshore bulkhead with fill, root wads and rocks, and 6) 
human access and viewing areas. Total project cost is 
$488,000 ($366,000 Federal and $122,000 non-Federal). 
-29-14- 
Project was completed in September 1999 and will enter 
monitoring phase in FY 2000. 
Local cooperation. Under current cost sharing 
requirements, the local sponsor (city of Seattle, Parks and 
Recreation Department) provided 25% of project costs. A 
Project Cooperation Agreement (PCA) was executed 
September 4, 1998. 
Operations during fiscal year. New work, hired labor: 
Supervised contruction contract. 
New work, contract: Completed construction contract work. 
35. TURNING BASIN #3, SEATTLE, WA 
Location. The restoration site is just south of the city of 
Seattle in King County, WA, near turning basin #3, which is 
near river mile 6.2 on the left bank of the Duwamish River. 
Existing project. Restore 6.2 acres of fish and wildlife 
habitat at the upstream limit of the Seattle Harbor project. 
Habitat development includes creation of inter-tidal mud flats, 
a tidal marsh, a new meandering stream channel, and 
"daylighting" the mouth of Hamm Creek into the Duwamish 
River. The downstream Hamm Creek stream length will be 
increased from the current 800 linear feet to 2,300 linear feet. 
Hamm Creek improvements will facilitate fish passage. 
Estimated project cost is $3,353,000 ($2,515,000 Federal and 
$838,000 non-Federal), with completion in FY 2000. 
Local cooperation. Under current cost sharing requirements, 
the local sponsor (King County Department of Metropolitan 
Services (METRO)) will provide 25% of project cost. A 
Project Cooperation Agreement (PCA) was signed on May 17, 
1999. 
Operations during fiscal year. New work, hired labor: 
Completed plans and specifications, executed PCA, and 
initiated construction. 
New work, contract: Work under way by equipment rental 
contract. 
Other Activities 
36. OTHER WORK UNDER SPECIAL 
AUTHORIZATION 
Navigation activities pursuant to Section 107, Public Law 
86-645 (preauthorization). 
Fiscal year costs were: Nahcotta, WA, $960 (terminated); 
Oak Harbor, WA, $0 (ternunated); Port of Edmonds, WA, 
$16,974 (terminated); Port of Port Townsend, WA, $32,897;

SEATTLE, WASHINGTON DISTRICT 
Section 107 Coordination, $6,889; and Tulalip Bay, WA, $0 
(terminated), a total of $57,720. 
Flood control activities pursuant to Section 205, Public 
Law 858, 80th Congress, as amended (preauthorization). 
See Table 29-K 
Flood control activities pursuant to Section 14, Public 
Law 526, 79th Congress as amended (preauthorization). 
Fiscal year costs were: Section 14 Coordination, $12,915; 
Upper Hoh Road, Forks, WA, $20,235; and Willapa Bay, 
WA, $5,593, a total of $38,743. 
Emergency flood control activities - repair, flood fighting, 
and rescue work (Public Law 99, 84th Congress, and 
antecedent legislation). 
Fiscal year costs were $1,524,130. This amount excludes 
$-658 contributed funds expended. 
Project modifications for improvement of environment 
(Section 1135, Public Law 99-662, as amended). 
See Table 29-L. 
Aquatic Ecosystem Restoration (Section 206, Public Law 
104-303). 
Fiscal year costs were: Coordination account, $6,866; 
Goldsborough Creek, WA, $484,511; and Preliminary 
Restoration Plans, $18,417, a total of $509,794. 
37. NATIONAL EMERGENCY 
PREPAREDNESS PROGRAM (NEPP) 
Fiscal year costs were $130,286, provided for activities 
required for local and national preparedness. 
38. GENERAL REGULATORY FUNCTIONS 
PROGRAM 
Permit Evaluation 
Enforcement 
Other Navigation Regulations 
Environmental Impact Statements 
TOTAL 
$2,571,775 
617,389 
3,983 
986 
$3,194,133 
General Investigations 
39. SURVEYS 
Fiscal year costs were $306,688 for navigation studies, 
$189,601 for flood damage prevention studies, $35,340 for 
shoreline protection studies, $415,203 for special studies, 
$129,762 for review of authorized projects, $228,404 for 
miscellaneous activities, and $237,013 for coordination with 
other agencies and non-Federal interests, a total of $1,542,011. 
In addition, contributed funds were expended for the 
following: $256,908 for navigation studies, $185,662 for flood 
damage prevention studies, $146,034 for special studies, 
$41,598 for review of authorized projects, and $41,370 for 
coordination with other agencies and non-Federal interests, a 
total of $671,572. 
40. COLLECTION AND STUDY OF BASIC 
DATA 
The work programmed for collection and study of basic data 
covers international water studies, flood plain management 
services, and hydrologic studies. Work on international water 
studies included checking Kootenay Lake storage 
computations to determine compliance of West Kootenay 
Power & Light Co. with orders of International Joint 
Commission, and coordination with International Kootenay 
Lake and Osoyoos Lake Boards of Control in enforcement of 
International Joint Commission orders. Technical assistance 
was provided other Federal and non-Federal agencies and 
Indian tribes in flood hazard evaluation, flood reduction 
methods, and related services as requested. Fiscal year costs 
were $28,896 for international water studies, $202,174 for 
flood plain management services, and $7,061 for hydrologic 
studies, a total of $238,131. 
41. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
See Table 29-H. 
Centralia, WA 
The city of Centralia lies in west central Washington at the 
confluence of the Chehalis and Skookumchuck Rivers, about 
midway along the Chehalis River from its source in the 
Willapa Hills to its mouth at Aberdeen at Grays Harbor. 
Floods of record on Skookumchuck, Newaukum, and 
Chehalis Rivers occurred in February 1996. 
The plan of improvement authonzed in P.L. 99-662 would 
substantially reduce flooding in the Skookumchuck River 
valley for the 22 miles between Skookumchuck Dam and the 
river mouth, including a major portion of Centralia, and 
provide minor reductions along the Chehalis River 
downstream from Centralia for about 20 miles to Oakville. 
The improvement, as recommended in the feasibility report, 
consisted of structural modifications (flood control outlet 
tunnel and spillway gate) which would enable the existing, 
private water supply dam to provide flood control storage 
during winter months. 
-29-15-

REPORT OF TIlE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
Preconstruction Engineering and Design (PED) was started in 
FY 1988 to refine the project design recommended in the 
feasibility report. In FY 1990, refinement of project design to 
a less costly, gated spillway sluice and reevaluation of 
hydrology, existing local levees and embankments, estimated 
flood damages, and potential flood reduction benefits were 
completed. Studies determined that the Skookumchuck Dam 
modification no longer appeared economically justifiable and 
further work was suspended. In FY 1992 a wrap-up report 
presenting results of the technical analyses completed to date 
was provided to local governments. 
Following the severe flooding in the Centralia-Chehalis area 
in 1996 there was a renewed public interest in flood damage 
reduction. Using state and local funding sources, Lewis 
County reviewed past study efforts and developed a revised 
flood damage reduction plan that would combine the 
authorized dam modification with overbank excavation and 
flow bypass measures. The revised project would provide 
substantial benefits to both Centralia and Chehalis and 
appeared to be economically justified. In July 1998, Lewis 
County requested resumption of PED for the project with a 
view toward preparing a General Reevaluation Report and 
Environmental Impact Statement for an expanded project. 
Work resumed soon thereafter. 
Accomplishments during the fiscal year included completion 
of the draft Project Study Plan which identified the scope, cost, 
and schedule for preparing the GRR/EIS. Also completed was 
the ground control and photo flight required to produce 
detailed topographic mapping of the flood plain from just west 
of Oakville to just south of Pe Ell on the Chehalis River, the 
Skookumchuck River from Centralia to Skookumchuck Dam, 
and the Newaukum River from Chehalis to its forks. Formal 
scoping of the EIS was begun. Fiscal year costs were 
$369,631. Total costs to date have been $1,929,824. 
Howard Hanson Dam, WA 
Howard Hanson Dam is an existing earthfill and rockfill 
structure located at river mile 64.5 on the Green River, King 
County, WA, 35 miles southeast of Seattle and 35 miles 
northeast of Tacoma. 
Work under Preconstruction Engineering and Design (PED) 
commenced in FY 1998 to refine the project design 
recommended in the feasibility report. 
Accomplishments during the FY include coordination with 
the local sponsor (city of Tacoma Water Division), and 
execution of a Project Cooperation Agreement (PCA) which 
was signed on March 12, 1999. Work began on the tower, fish 
passage, and habitat mitigation/restoration sites. Site surveys 
and a general model study were initiated. Fiscal year costs 
were $849,139. Total costs to date have been $859,759. In 
addition, $625 contributed funds were expended in FY 1999. 
-29-16-

SEATTLE, WASHINGTON DISTRICT 
TABLE 29-A 
See 
Section 
In Text Project 
1.. Anacortes Harbor, WA 
(Federal Funds) 
(Contrib. Funds) 
2. Blair Waterway, 
Tacoma, WA 
(Federal Funds) 
(Contrib. Funds) 
3. Ediz Hook, WA 
(Federal Funds) 
(Contrib. Funds) 
4. Everett Harbor and 
Snohomish River, 
WA 
(Federal Funds) 
(Contrib. Funds) 
5. Friday Harbor, WA 
(Federal Funds) 
COST AND FINANCIAL STATEMENT 
FY 96 FY 97 FY 98 
_ 1,000 
8,866 
FY99 
- 15 
2,119 
Funding 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
5,000 569,000 
5,315 561,741 
87,549 
25,988 
10,000 
12,160 
-22 
5,192 
44,124 
1,052,000 815,117 1,559,000 1,533,569 
912,490 933,473 1,562,712 1,550,729 
-29-17 - 
Total To 
Sen. 30_ 1990 
222,345 
222,345 1 
1,207,484 
1,207,484 
59,524 
59,524 
5,000 
5,000 
165,000 
157,784 
95,000 
95,000 
5,878,740 
5,878,740 
2,085,838 
2,085,838 
385,850 
385,850 
251,314 
229,501 
1,723,745 
1,723,745 
18,054,493 
18,053,035 
116,618 
116,618 
548,090 
548,090 
1,575,500 
1,575,500 
. .. - - - vim. " -F %F i / ! / 
165,000 
157,784 
95,000 
95,000

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
TABLE 29-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
See 
Section Total To 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
(Contrib. Funds) 
6. Grays Harbor and 
Chehalis River, WA 
(Federal Funds) 
(Contrib. Funds) 
7. Lake Crockett, WA 
8. Lake Washington 
Ship Canal, WA 
(Federal Funds) 
(Contrib. Funds) 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor Rehab. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
75,000 
70,823 
29,000 
71,525 
6,000 
2,624 
76,000 
45,369 
2,581 
49,225 
38,064 
7,385,000 5,731,000 9,173,000 
7,560,155 5,802,808 6,127,575 
13,084 
18,885 
1,006,167 
563,491 
10,597,000 
13,627,581 
174,036 
174,036 
1,267,881 
1,267,881 
23,359,353 5 
22,866,905 6 
157,658,023 
157,630,347 
9,592 
9,592 
4,606,145 
4,606,145 
25,000 29,000 
25,841 14,073 12,766 
14,856 216,000 
2,060 17,270 204,294 
6,552,000 7,349,000 6,345,750 
6,419,843 7,427,043 6,364,615 
40,000 
200,000 
201,984 
-334 
11,371 
6,873,858 
6,917,916 
39,964 
6,296,000 
6,280,424 
55,889 
55,889 
377,990 
377,990 
1,179,275 
1,179,275 
4,611,436 
4,611,436 
136,930,703 
136,816,207 
7,465,230 
7,465,230 
250,000 
250,000 
40,000 
39,964 
10 
11 
12 
13 
-29-18 -

SEATTLE, WASHINGTON DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total To 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
9. Neah Bay, WA 
10. Olympia Harbor, WA 
11. Port Townsend, WA 
(Federal Funds) 
(Contrib. Funds) 
13. Puget Sound and its 
Tributary Waters, WA 
14. Quillayute River, WA 
(Federal Funds) 
(Contrib. Funds) 
15. Seattle Harbor, WA 
(Federal Funds) 
(Contrib. Funds) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
20,000 209,000 
11,273 215,328 
16,000 
16,223 
4,000 
2,479 
35,000 
33,177 
2,398 
2,057,266 
2,057,266 
2,083,058 
2,083,057 
337,709 
337,709 
1,055,522 
1,055,522 
480,899 
480,899 
217,927 
221,721 
39,869 
39,869 
771,000 1,000,000 898,000 
756,492 954,534 962,993 
4,426,000 6,663,584 1,206,000 
4,373,188 6,641,436 1,245,470 
626,351 
630,755 
891,202 
897,390 
14 
15 
118,656 
118,656 
92,423 
92,423 
43,337 
43,337 
26,313,101 
26,311,551 
521,850 
521,850 
25,600,094 
25,561,688 
16 
17 
20,000 
20,000 
170,335 
170,335 
608,000 529,000 1,230,000 
622,598 543,729 1,180,241 
1,794,091 
1,800,724 
TABLE 29-A 
(Continued) 
-2,120 
14,254,464 18 
14,203,596 19 
69,333 
69,333 
94,475 
94,475 
-29-19 -

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
TABLE 29-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total To 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
16. Swinomish Channel, WA 
(Federal Funds) 
(Contrib. Funds) 
17. Willapa River and Harbor 
and Naselle River, WA 
(Federal Funds) 
(Contrib. Funds) 
18. Lummi Shore Road, WA 
(Federal Funds) 
(Contrib. Funds) 
19. Cedar River, Renton, WA 
(Federal Funds) 
(Contrib. Funds) 
20. Flathead River, MT 
21. Howard A. Hanson 
Dam, WA 
(Federal Funds) 
(Contrib. Funds) 
23. Mud Mountain 
Dam, WA 
(Federal Funds) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
238,000 238,000 
728 234,383 239,049 
91,108 
93,261 
127,000 546,383 2,490,000 1,215,172 
137,329 553,263 1,487,978 2,222,054 
808,332 
808,332 
8,627,081 
8,625,581 
32,000 
32,000 
379,248 
379,248 
1,386,955 
1,386,955 
19,288,915 
19,288,579 
20 
22 
78,372 
78,372 
43,000 102,000 1,677,000 
89,449 52,978 513,059 
36,200 
47,483 
271 972,600 
16,215 154,966 
135,000 77,500 2,480,011 
149,242 88,897 1,315,128 
121,800 31,900 1,617,000 
111,316 137,287 833,290 
50,000 
15,000 
900,000 
50,399 936,177 
-55,000 
1,142,389 
729,432 
2,035,300 
2,931,585 
1,365,260 
1,293,232 
31,500 
3,773 
4,474 
1,133,000 1,100,000 924,426 
1,099,914 1,123,583 972,991 
13,700 
1,447,743 
1,472,651 
-3,958 
-3,958 
-695,000 271,000 842,227 3,780,000 
729,832 181,214 867,658 1,866,410 
1,947,000 
1,928,350 
1,064,347 
976,146 
4,999,311 
4,724,629 
3,310,260 
2,454,304 
50,000 
46,500 
38,311,834 
38,311,834 
21,961,498 
21,941,067 
24 
25 
2,009,742 
2,009,742 
85,138,075 26 
83,724,664 27 
-29-20 -

SEATTLE, WASHINGTON DISTRICT 
COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total To 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
(Contrib. Funds) 
25. Stillaguamish River, WA 
(Federal Funds) 
(Contrib. Funds) 
26. Tacoma, Puyallup River, WA 
(Federal Funds) 
(Contrib. Funds) 
27. Albeni Falls Dam, ID 
28. Chief Joseph Dam- 
Rufus Woods Lake, WA 
29. Libby Dam - Lake 
Koocanusa, MT 
(Federal Funds) 
(Contrib. Funds) 
Approp. 
Cost 
Minor Rehab. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
1,908,000 1,909,000 1,774,823 
1,891,311 1,857,312 1,790,974 
2,289,429 
2,380,528 
38,130,568 
38,112,485 28 
285,908 
285,908 
_ 30,437,500 
30,437,500 
3,928 
3,928 
134,595 
134,595 
132,000 145,000 183,000 
130,130 146,279 184,132 
174,000 
174,684 
29 
3,655,524 
3,655,350 
21,000 
21,000 
3,947,853 
3,947,853 
79,000 106,000 71,000 
77,377 105,642 71,934 
425 24,055 
66,000 
66,961 
12,900 
30 
1,193,367 
1,193,219 
54,405 
44,716 
31,741,561 
31,741,561 
4,567,000 5,366,568 5,011,487 
4,330,034 5,277,760 4,587,411 
182,000 246,000 -176,000 
774,334 173,193 -108,174 
11,953,000 12,592,890 12,716,493 
11,718,716 12,285,641 12,647,268 
31 
4,553,193 84,250,718 32 
4,744,550 83,552,084 33 
-5,000 540,341,235 34 
20,303 540,340,993 35 
16,576,485 213,148,406 36 
15,907,903 211,674,112 37 
297,630 
297,630 
543,726,140 
543,726,140 
6,195,000 8,623,021 6,926,169 
6,329,562 8,562,756 6,943,323 
38 
8,917,402 97,409,153 39 
8,800,690 97,102,294 40 
1,458,252 
1,458,252 41 
-29-21 - 
TABLE 29-A

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
TABLE 29-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
See 
Section Total To 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
3u. ueepwater Sliougn, WA 
(Federal Funds) 
(Contrib. Funds) 
31. Porter Levee, WA 
(Federal Funds) 
(Contrib. Funds) 
32. Puget Creek, WA 
(Federal Funds) 
(Contrib. Funds) 
33 Sammamish River Weir 
Restoration, WA 
(Federal Funds) 
(Contrib. Funds) 
34. Thornton Creek, WA 
(Federal Funds) 
(Contrib. Funds) 
35. Turning Basin #3 
Seattle, WA 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
165,000 
120,738 
30,000 
8,509 
6,000 68,000 112,000 
2,216 64,299 77,479 
38,250 
25,764 
77,000 49,000 162,500 
84,402 39,472 30,768 
106,700 
160,000 40,000 
122,067 67,664 
1. Excludes $2,000 Coast Guard funds expended. 
2. Includes $418,209 appropriated and expended for 
previous project. Excludes $43,000 Coast Guard funds 
expended. 
3. Includes $5,869 for previous project and $120,000 for 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters, appropriated and 
expended. 
4. Includes $1,180,500 expended under Productive 
Employment Appropriation Act of 1983 (P.L.98-8). 
5. Includes $23,121,274 appropriated for all projects (current 
project is $18,239,392 including $3,530,000 PED), 
$124,945 for recreation facilities at completed project 
(Code 710), and $113,134 for previous project. Excludes 
$161,909 Navy funds and $6,000 Coast Guard funds. 
6. Includes $22,628,826 expended for all projects (current 
project is $17,746,944 including $3,530,000 PED), 
$124,945 for recreation facilities at completed project 
(Code 710), and $113,134 for previous project. Excludes 
$161,909 Navy funds and $6,000 Coast Guard funds. 
7. Includes $37,415 appropriated and expended for previous 
project. Excludes $409,660 Emergency Relief funds and 
$57,000 Public Works Administration funds expended. 
8. Excludes $111,000 Public Works Acceleration Act funds 
expended. 
9. Excludes $3,418,000 contributed by Port of Grays Harbor 
in fulfilling requirements of local cooperation. 
10. Includes $117,750 appropriated and expended for 
recreation facilities at completed project (Code 710). 
11. Includes $779,655 for recreation facilities at completed 
project (Code 710) and $485,002 for previous project, 
appropriated and expended. Excludes $246,567 expended 
by State of Washington and $742,071 expended by King 
County. Excludes $192,516 Public Works Administration 
funds expended. 
12. Includes $1,631,195 (1916 to 1936) and $338,163 
subsequently appropriated and expended under 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters. 
13. Previous project. 
14. Includes $183,257 appropriated and expended for previous 
projects. Excludes $105,467 Public Works Administration 
funds expended. 
15. Includes $14,418 appropriated and expended for previous 
project. 
16. Includes $64,996 appropriated and expended for previous 
project. 
-29-22 - 
845,000 
740,930 
263,000 
75,641 
162,800 
115,992 
24,000 
6,972 
81,000 
90,417 
9,000 
4,650 
-6,000 
33,346 
11,176 
-40,500 
83,546 
35,445 
836,200 
678,468 
1,010,000 
961,668 
263,000 
75,641 
162,800 
115,992 
24,000 
6,972 
111,000 
98,925 
9,000 
4,650 
180,000 
177,340 
38,250 
36,941 
258,000 
240,266 
106,700 
35,445 
1,036,200 
868,199 
- I --

SEATTLE, WASHINGTON DISTRICT 
17. Excludes Navy funds expended on dredging river channel 
in 1944 and Coast Guard funds expended for channel 
dredging in 1948 and 1949. 
18. Includes S36,332 appropriated for East Waterway. 
19. Includes $31,594 expended for East Waterway. 
20. Excludes $1,000 Coast Guard funds expended. 
21. Includes $228,084 appropriated and expended for previous 
project. Excludes $40,000 Coast Guard funds and 
$192,314 Emergency Relief funds expended. 
22. Includes S309,177 appropriated and expended for previous 
projects. Excludes $78,532 Public Works Administration 
funds expended. 
23. Includes $6,597 expended for previous projects. 
24. Includes S37,048,061 appropriated and expended for 
original project and $1,263,773 appropriated and expended 
for Dam Safety Assurance. 
25. Includes $66,678 appropriated and expended under 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters. 
26. Includes $13,182,063 appropriated for original project, 
$87,785 appropriated for recreation facilities at completed 
project (Code 710) and $71,868,227 appropriated for Dam 
Safety Assurance. Excludes $26,000 Emergency Relief 
funds. 
27. Includes $13,182,063 expended for original project, 
$87,785 expended for recreation facilities at completed 
project (Code 710) and $70,454,816 expended for Dam 
Safety Assurance. Excludes $26,000 Emergency Relief 
funds expended. 
28. Includes $198,578 appropriated and expended under 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters. 
29. Excludes $281,000 Works Progress Administration funds 
and $85,999 Emergency Relief funds expended. 
30. Includes $5,035 appropriated and expended for recreation 
facilities at completed project (Code 710). 
31. Includes $30,769,614 for original project and $971,947 for 
recreation facilities at completed project (Code 710), 
appropriated and expended. Excludes $136,736 Public 
Works Acceleration Act funds expended for recreation 
facilities at completed project (Code 710). 
32. Includes funds appropriated for project O&M 
($78,268,300), Special Recreation Use Fees ($174,776), 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters ($1,875,446), 
BPA/COE Merged, CAT 390 ($3,181,532) and BPA-4045 
Large Capital Subagreements, CAT 300 ($750,664). 
33. Includes funds expended for project O&M ($78,253,343), 
Special Recreation Use Fees ($174,776), Maintenance and 
Operation of Dams and Other Improvements of Navigable 
Waters ($1,875,446), BPA/COE Merged, CAT 390 
($3,169,776) and BPA-4045 Large Capital Subagreements, 
CAT 300 ($78,743). 
34. Includes $144,338,252 appropriated for original project, 
$395,855,000 for additional units, and $147,983 for 
recreation facilities at completed project (Code 710). 
Excludes $58,000 Public Works Acceleration Act funds for 
recreation facilities at completed project (Code 710). 
35. Includes S144,338,252 expended for original project, 
$395,854,758 for additional units, and $147,983 for 
recreation facilities at completed project (Code 710). 
Excludes $58,000 Public Works Acceleration Act funds for 
recreation facilities at completed project (Code 710). 
36. Includes funds appropriated for project O&M 
($196,128,943), Maintenance and Operation of Dams and 
Other Improvements of Navigable Waters ($774,561), 
BPA/COE Merged, CAT 390 ($13,463,519), and BPA- 
4045 Large Capital Subagreements, CAT 300 
($2,781,383). 
37. Includes funds expended for project O&M ($196,105,846), 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters ($774,561), BPA/COE 
Merged, CAT 390 ($13,417,316), and BPA-4045 Large 
Capital Subagreements, CAT 300 ($1,376,389). 
38. Includes $484,753,143 appropriated and expended for 
original project, $42,221,634 for additional units, 
$16,276,363 for reregulating dam, and $475,000 for power 
planning. 
39. Includes funds appropriated for project O&M 
($88,561,842), Maintenance and Operation of Dams and 
Other Improvements of Navigable Waters ($774,561), 
BPA/COE Merged, CAT 390 ($7,463,060), and BPA-4045 
Large Capital Subagreements, CAT 300 ($609,690). 
40. Includes funds expended for project O&M ($88,556,059), 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters ($774,561), BPA/COE 
Merged, CAT 390 ($7,446,273), and BPA-4045 Large 
Capital Subagreements, CAT 300 ($325,401). 
41. Excludes $161,849 expended by Federal Aviation Agency, 
$32,000 expended by Lincoln County- City of Libby Joint 
Airport Board, $8,000 expended by Bonneville Power 
Administration, and $379,555 expended by U.S. Forest 
Service. 
-29-23 -

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
ANACORTES HARBOR, WA 
Channel in Capsante Waterway. 
Mooring Basin. 
Navigation Channel. 
BLAIR WATERWAY, TACOMA, WA 
July 14, 1960 Deepen channel and turning basin to -51 feet mean lower low 
as amended water. 
Mar. 7, 1974 
June 25, 1910 
July 3, 1930 
June 20, 1938 
Sep. 3, 1954 
July 14, 1960 
July 14, 1960 
as amended 
June 3, 1896 
Mar. 2, 1907 
Mar. 2, 1907 
June 25, 1910 
June 25, 1910 
Aug. 8, 1917 
Jan. 21, 1927 
Aug. 30, 1935 
Aug. 30, 1935 
Dec. 22, 1944 
as amended 
Mar. 2, 1945 
June 30, 1948 
Sep. 3, 1954 
EDIZ HOOK, WA 
Construction of 10,000 linear feet of rock revetment, together with 
initial beach replenishment and annual nourishment. Emergency 
interim measures necessary to prevent breaching of Ediz Hook 
prior to construction of authorized project. 
EVERETT HARBOR AND SNOHOMISH RIVER, WA 
Training dike 10,500 feet long extending across bar at 
outlet of old river channel. 
Raise 6,000 feet of training dike, extend spur dike, widen 
gap in dike as required, maintain East Waterway and 
channel to gap. 
Abandon project for Snohomish River and redesignate as 
Everett Harbor and Snohomish River. Provide settling 
basin near 14th Street. 
Construct spur dike at Preston Point, remove training dike 
north of river outlet, enlarge channel to 14th Street, and deepen 
settling basin. 
Widen channel from settling basin to gap; extend channel 
to head of Steamboat Slough; and a settling basin within 
upper channel reach. 
FRIDAY HARBOR, WA 
Construction of 1,600 feet of concrete floating breakwater. 
GRAYS HARBOR AND CHEHALIS RIVER, WA 
South jetty. 
A north jetty 9,000 feet long. 
The 18-foot channel. 
Extend north jetty 7,000 feet; length of south jetty 
fixed at 13,734 feet. 
A 6-foot channel above Cosmopolis. 
Dredging in bar channel. 
Dredging in bar channel. 
Reconstruct north and south jetties to an elevation of 
16 feet above mean lower low water. 
Maintain 26-foot channel below Aberdeen (as authorized 
by Public Works Administration Dec. 11, 1933) and 
combining projects for Grays Harbor and bar entrance and 
Grays Harbor, inner portion, and Chehalis River under 
a modified project for Grays Harbor and Chehalis River. 
Construction, operation, and maintenance of recreation 
facilities. 
Maintain 30-foot depth in channel from deep water in Grays 
Harbor to Port of Grays Harbor Commission terminal 
which was deepened from 26 to 30 feet with Navy funds. 
14-foot channel to Bay City; breakwater at Westhaven; 
and maintenance of Westhaven entrance channel. 
Dredging and maintenance of a 30-foot channel and 
Documents 
TABLE 29-B 
See Date 
Section Authorizing 
in Text Act 
1. 
Mar. 2, 1919 
Sep 3, 1954 
July 14, 1960 
as amended 
Sec. 107, P.L. 86-645. 
Authorized by Chief of Engineers 
July 9, 1981. 
Annual Report, 1895, pp. 3517-3533. 
Rivers and Harbors Committee 
Doc. 2, 59th Cong., 2d Sess. 
H. Doc. 507, 59th Cong., 1st Sess. 
Rivers and Harbors Committee 
Doc. 29, 61st Cong., 2d Sess. 
H. Doc. 1125, 60th Cong., 2d Sess. 
H. Doc. 1729, 64th Cong., 2d Sess. 
H. Doc. 582, 69th Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 2, 74th Cong., 1st Sess. 
H. Doec. 53, 73rd Cong., 1st Sess. 
Rivers and Harbors Committee 
Doc. 2, 74th Cong., 1st Sess. 
P.L. 78-534 
Report in Office, Chief of Engineers 
H. Doc. 635, 80th Cong., 2d Sess. 
H. Doc. 412, 83d Cong., 2d Sess. 
-29-24 - 
H. Doc 1117, 64th Cong., 1st sess. 
S. Doc. 102, 83rd Cong., 2d sess. 
Sec. 107, P.L.86-645. 
Authorized by Chief of Engineers 
Dec. 31, 1974 
Sec. 107, P.L. 86-645. 
Authorized by Chief of Engineers 
Sep. 17, 1999 
H. Doc. 101, 93d Cong., Ist Sess., 
P.L. 93-251 
H. Doc. 1108, 60th Cong., 2d Sess. 
H. Doc. 377, 71st Cong., 2d Sess. 
H. Doc. 546, 75th Cong., 3d Sess. 
H. Doc. 569, 81st Cong., 2d Sess. 
H. Doc. 348, 86th Cong., 2d Sess.

TABLE 29-B 
(Continued) 
See Date 
Section Authorizing 
in Text Act 
Sep. 3, 1954 
July 14, 1960 
as amended 
Nov. 17, 1986 
7. 
Mar. 2, 1945 
Dec. 22, 1944 
as amended 
July 14,1960 
as amended 
June 25, 1910 
Mar. 4, 1913 
Aug. 8, 1917 
Sep. 22, 1922 
June 26, 1934 1 
Aug. 30, 1935 2 
Dec. 22, 1944 
as amended 
July 24, 1956 
June 20, 1938 
Sep. 3, 1954 
Jan. 21, 1927 
July 3, 1930 
Aug. 30, 1935 
Aug. 26, 1937 
July 14, 1960 
as amended 
9. 
10. 
SEATTLE, WASHINGTON DISTRICT 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
turning basin from Aberdeen to Cosmopolis. 
Additional breakwater, 1,400 feet long, at Westhaven Cove. 
Westhaven Cove small boat basin. 
Improve project features with accompanying fish mitigation. 
LAKE CROCKETT, WA 
Small-boat basin. 
Construction, operation, and maintenance of 
recreation facilities. 
Change authorized channel depth from -18 mean lower low 
water to -25 mean lower low water by dredging. 
LAKE WASHINGTON SHIP CANAL, WA 
Provides for a double lock and fixed dam with gated 
spillway and necessary accessory works at entrance to 
Salmon Bay, dredging a channel from locks to deep water 
in Puget Sound, and excavation by local interests of 
a channel from locks into Lake Washington. 
Dredging below locks and revetting canal banks. 
Increased dimensions of channel between Puget Sound 
and locks and a 600-foot extension of lower guide pier. 
Operating and care of locks and dam provided for with 
funds from War Department appropriations for Rivers 
and Harbors. 
Enlarge channel between locks and Lake Washington. 
Construction, operation, and maintenance of recreation 
facilities. 
Government Locks to be known as Hiram M. Chittenden 
Locks. 
NEAH BAY, WA 
Rubblestone breakwater. 
Reinforcement of existing revetment. 
OLYMPIA HARBOR, WA 
Channel 22 feet deep and 150 feet wide. 
Increase channel to 26-foot depth on east side of harbor. 
Elimination from project of 12-foot channel on east and 
west sides of harbor, and for a channel 30 feet deep and 
300 feet wide between Budd Inlet and port terminal, with 
turning basin of same depth. 
Widen outer portion of channel to 500 feet, and widen 
entrance to turning basin. 
656-foot concrete floating breakwater and dredging 
of entrance and access channels and turning basin. 
Documents 
H.Doc. 30, 84th Cong., 1 st Sess. 
Sec. 107, P.L. 86-645. 
Authorized by Chief of Engineers 
Feb. 7, 1979 
P.L. 99-662. 
H. Doc. 303, 77th Cong., 1st Sess. 
P.L. 78-534 
Sec. 107, P.L. 86-645 
Authorized by Chief of Engineers, 
Nov. 7, 1988. 
H. Doc. 953, 60th Cong., 1st Sess. 
H. Doc. 800, 64th Cong., Ist Sess. 
H. Doc. 324, 67th Cong., 2d Sess. 
H. Doc. 140, 72d Cong., Ist Sess. 
P.L. 78-534 
P.L. 84-779 
Rivers and Harbors Committee 
Doc. 51, 75th Cong., 2d Sess. 
H. Doc. 404, 83d Cong., 2d Sess. 
H. Doc. 244, 69th Cong. 1st Sess. 
Rivers and Harbors Committee 
Doc. 5, 71st Cong., Ist Sess. 
Rivers and Harbors Committee 
Doc. 21, 73rd Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 75, 74th Cong., 2d Sess. 
Sec. 107, P.L. 86-645. 
Authorized by Chief of Engineers 
May 13, 1981. 
-29-25 -

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
TABLE 29-B 
(Continued) 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
PORT TOWNSEND, WA 
Mooring basin and breakwater. 
PUGET SOUND AND ITS TRIBUTARY WATERS, WA 
Maintenance of the rivers tributary to Puget Sound by 
snagging and dredging, and removal of floating debris 
from Seattle Harbor. 
QUILLAYUTE RIVER, WA 
Jetty (5 feet high) on easterly side of mouth, and a dike on 
westerly side, to stabilize entrance. 
Maintenance dredging to provide a channel 6 feet deep 
and of suitable width from ocean to within river mouth. 
Raising jetty to 15 feet; channel 10 by 100 feet, 2,000 feet 
long; moorage basin. 3 
SEATTLE HARBOR, WA 
Maintenance of East and West Waterways 750 feet wide 
and 34 feet deep, and of Duwamish Waterway 20 feet deep 
and 150 feet wide as far south as Eighth Avenue South Bridge. 
Enlargement of Duwamish Waterway. 
Maintenance of East Waterway between 750-foot section 
and Spokane Street, and turning basin at junction of East 
and Duwamish Waterways. 
East Waterway channel deepening. 
SWINOMISH CHANNEL, WA 
July 13, 1892 Channel 4 feet deep and 100 feet wide, and dike 
construction. 
Aug. 30, 1935 Enlargement of channel to present project dimensions. 
Removal of navigation hazards at "Hole-in-the-Wall". 
WILLAPA RIVER AND HARBOR AND NASELLE 
RIVER, WA 
July 27, 1916 Channel 24 feet deep, 200 feet wide, in Willapa River, and 
150 feet wide in the forks. 
Aug. 30, 1935 2 Maintenance of channel over bar to a depth of 26 feet 
and minimum width of 500 feet. 
Aug. 30, 1935 4 For cutoff channel at Narrows. 
Channel from deep water in Palix River to Bay Center dock. 
Widen Willapa River channel to 360 and 250 feet between 
South Bend and the forks; Tokeland and Nahcotta basins; 
and Naselle River clearance. Willapa River and Harbor redesignated 
as Willapa River and Harbor and Naselle River. 
H. Doc. 418, 84th Cong. 
2d Sess. 
July' 13, 1892 
July 3, 1930 
Mar. 2, 1945 
Sep. 3, 1954 
Mar. 2, 1919 
Mar. 3, 1925 
July 3, 1930 
Aug. 30, 1935 
Oct. 12, 1996 
-29-26 - 
11. 
July 3, 1958 
13. 
14. 
Annual Report for 1893, page 3425 
H. Doc. 125, 71st Cong., Ist Sess. 
H. Doc. 218, 78th Cong., 1st Sess. 
H. Doc. 579, 81st Cong., 2d Sess 
S. Doc. 313, 65th Cong., 3d Sess. 
H. Doc. 108, 68th Cong., Ist Sess. 
H. Doc. 126, 71st Cong., 2d Sess. 
H. Doc. 211, 72d Cong., 1st Sess. 
P.L. 104-303 
H. Doc. 31, 52d Cong., ist Sess. and 
Annual Report for 1892, p. 2752 
S. Committee Print, 73rd Cong., 
Ist Sess. 
H. Doc. 499, 87th Cong., 2d Sess. 
H. Doc. 706, 63d Cong., 2d Sess. 
Rivers and Harbors Committee 
Doc. 41, 72d Cong., Ist Sess. 
Rivers and Harbors Committee 
Doc. 37, 73rd Cong., 2d Sess. 
H. Doc. 481, 76th Cong., 2d Sess. 
H. Doc. 425, 83d Cong., 2d Sess. 
15. 
16. 
Oct. 23, 1962 
17. 
Mar. 2, 1945 
Sep. 3, 1954

SEATTLE, WASHINGTON DISTRICT 
AUTHORIZING LEGISLATION 
Act Project and Work Authorized 
LUMMI SHORE ROAD, WA 
Oct. 23, 1962 Construction of 9,400 linear feet of rock revetment along 
as amended Lummi Shore Road. 
June 30,1948 
as amended 
Oct 12, 1996 
May 17, 1950 
Aug. 6, 1958 
June 22, 1936 
Dec. 22, 1944 
as amended 
June 22, 1936 
June 28, 1938 
CEDAR RIVER, RENTON, WA 
Dredging of lower river channel 
and raising of levees and floodwalls 
along both river banks. 
FLATHEAD RIVER, MT 
Complete the reestablishment of an operational monitoring 
station on the north fork of the Flathead River. 
HOWARD A. HANSON DAM, WA 
Eagle Gorge flood control dam on Green River. 
Redesignation of project as Howard A. Hanson Dam. 
MUD MOUNTAIN DAM, WA 
Flood control dam on White River. 
Construction, operation, and maintenance of 
recreation facilities. 
STILLAGUAMISH RIVER, WA 
Improvement of flood channel by clearing and bank revetment 
at 26 sites; concrete weir at head of Cook Slough; 
and 2 cutoff channels in Cook Slough. 
Maintenance of improvements. 
TACOMA, PUYALLUP RIVER, WA 
June 22, 1936 Channel improvement to protect people and industrial 
section of city of Tacoma. 
Dec. 22, 1944 Construction, operation, and maintenance of 
as amended recreation facilities. 
May 17, 1950 
Dec 22, 1944 
as amended 
July 24, 1946 
June 30, 1948 
July 9, 1952 
Dec. 22, 1944 
as amended 
ALBENI FALLS DAM, ID 
Multi-purpose dam with powerhouse. 
Construction, operation, and maintenance of 
recreation facilities. 
CHIEF JOSEPH DAM - RUFUS WOODS LAKE, WA 
Multi purpose dam and powerhouse on Columbia River 
at Foster Creek. 
Redesignation of the project as Chief Joseph Dam. 
Designation of reservoir as Rufus Woods Lake. 
Construction, operation, and maintenance of 
recreation facilities. 
Documents 
Sec. 103, P.L. 87-874. 
Authorized by Chief of Engineers 
June 22, 1998 
Sec. 205, P.L. 80-858 
Authorized by Chief of Engineers 
June 1, 1998 
P.L. 104-303 
H. Doc. 271, 81st Cong., Ist Sess. 
P.L. 85-592 
S. Committee Print, Puyallup 
River, WA, 74th Cong., 2d Sess. 
P.L. 78-534 
H. Doc. 657, 71st Cong., 3d Sess. 
P.L. 75-761 
S. Committee Print, Puyallup 
River, WA, 74th Cong., 2d Sess. 
P.L. 78-534. 
S. Doc. 9, 81st Cong., 1st Sess. 
P.L. 78-534. 
H. Doc. 693, 79th Cong., 2d Sess. 
P.L. 858, 80th Cong., 2d Sess. 
P.L. 469, 82d Cong., 2d Sess. 
P.L. 78-534. 
-29-27 - 
TABLE 29-B 
(Continued) 
See Date 
Section Authorizing 
in Text 
18. 
- --

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
TABLE 29-B 
(Continued) 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Oct. 22, 1976 School facilities for education of dependents of P.L. 94-587 
construction personnel. 
P.L. 95-26 
29. 
H. Doc. 531, 81st Cong., 2d Sess. 
P.L. 89-789 
P.L. 90-239 5 
P.L. 90-483 6 
P.L. 91-282 7 
P.L. 91-625 
P.L. 91-611 
as amended 
May 4, 1977 
May 17, 1950 
Nov. 7, 1966 
Jan. 2, 1968 
Aug. 13, 1968 
June 19, 1970 
Dec. 31, 1970 
Dec. 31, 1970 
Mar. 7, 1974 
Mar. 7, 1974 
Mar. 7, 1974 
Mar. 7, 1974 
Mar. 7, 1974 
Oct. 22, 1976 
Nov. 17, 1988 
LIBBY DAM - LAKE KOOCANUSA, MT 
Multi-purpose dam and powerhouse, and reregulating 
facilities. 
School facilities for education of dependents of construction 
personnel, Libby project. 
Airport facility at Kelley Flats, MT. 
Design standards for relocation of Montana State 
Highway 37 to be those adopted by State of Montana 
pursuant to provisions of Highway Safety Act of 1966. 
Participation with State of Montana in construction, 
operation and maintenance of fish hatchery facilities. 
Designation of lake formed by the waters impounded 
by Libby Dam as Lake Koocanusa. 
Design and construction of sewage collection and sewage 
treatment facility as part of relocation of municipal 
facilities of Rexford, MT; and compensation for railroad 
employees suffering long-term economic injury through 
reduction of income as result of the relocation of rail 
transportation facilities due to the construction of 
Libby Dam. 
Phase I design memorandum stage for installation of 
power generating facilities at Libby Reregulating Dam. 
Construction of fish production measures to compensate 
for fish losses attributed to the project, and for acquisition 
of necessary real estate, construction of access roads and 
utilities (amends P.L. 91-282 by increasing limitation from 
$750,000 to $4,000,000). 
Acquisition of land (not to exceed $2,000,000) for prevention 
of wildlife grazing losses caused by the project. 
Reimbursement (not to exceed $350,000) to Boundary 
County, ID, for reconstruction of Deep Creek Bridge 
made necessary by duration of high flows during drawdown 
operations at Libby Dam. 
Compensation (not to exceed $1,500,000) to Drainage 
Districts and owners of leveed and unleveed lands in 
Kootenai Flats, Boundary County, ID, for damages caused 
by duration of higher flows during drawdown operations 
at Libby Dam. 
Amends P.L. 93-251 by increasing limitation from $350,000 
to $380,000 for reimbursement to Boundary County, ID, 
for reconstruction of Deep Creek Bridge. 
Alleviate low water impact on existing facilities and protect 
Indian archeological sites exposed during course of 
operations, at an estimated cost of $750,000. 
P.L. 93-251 
P.L. 93-251 
P.L. 93-251 
P.L. 94-587 
H. Doc. 1098, 100th 
P.L. 100-676 
Cong., 2d Sess. 
DEEPWATER SLOUGH, WA 
Environmental restoration. Sec. 1135, P.L. 99-662 
Authorized by Chief of 
Engineers June 24, 1999 
-29-28 - 
S.Doc. 29, 93d 
P.L. 93-251 
P.L. 93-251 
Cong., 1st Sess., 
30. 
Nov. 17, 1986

SEATTLE, WASHINGTON DISTRICT 
TABLE 29-B AUTHORIZING LEGISLATION 
(Continued) 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
31. PORTER LEVEE, WA 
Nov. 17, 1986 Environmental restoration. Sec. 1135, P.L. 99-662 
Authorized by Chief of 
Engineers July 9, 1999 
32. PUGET CREEK, WA 
Nov. 17, 1986 Environmental restoration. Sec. 1135, P.L. 99-662 
Authorized by Chief of 
Engineers Oct. 9, 1998 
33. SAMMAMISH RIVER WEIR RESTORATION, WA 
Nov. 17, 1986 Modification of the grade control sill (weir) and the right Sec. 1135, P.L. 99-662 
bank of the river adjacent to the sill and upstream for 1,200 feet. Authorized by Chief of 
Engineers June 1, 1998 
34. THORNTON CREEK, WA 
Nov. 17, 1986 Restoration features include planting vegetation, Sec. 1135, P.L. 99-662 
creating a fish pond, water diversion, "softening" Authorized by Chief of Engineers 
over a bulkhead, and provide human access and viewing areas. Sep. 21, 1998 
35. TURNING BASIN #3, SEATTLE, WA 
Nov. 17, 1986 Environmental restoration. Sec. 1135, P.L. 99-662 
Authorized by Chief of 
Engineers July 26, 1999 
1. Permanent Appropriations Repeal Act. 5. Supplemental Appropriations Act of 1968, 
2. Included in Public Works Administration program. Section 502. 
3. Maintenance of these items, as well as sandspit north of 6. Flood Control Act of 1968, Section 212. 
James Island, is included in this modification. 7. River Basin Monetary Authorization and Miscellaneous Civil 
4. Included in Emergency Relief program, May 28, 1935. Works Amendments Act of 1970, Section 7. 
TABLE 29-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report Operation 
See Annual And 
Project Status Report For Construction Maintenance 
Anacortes Navigation Channel, WA 1 
Bellingham Harbor, WA 
Bellingham Harbor, WA (I&J Street Waterway)1 
Blaine Harbor, WA 
Columbia River, Wenatchee to Kettle Falls, WA 
East Bay Small Boat Basin, Olympia, WAI 
Edmonds Harbor, WA2 
Flathead River, MT 
Grays Harbor, Point Chehalis, WA3 
Hammersley Inlet, WA 
Hoquiam River, WA 
Kenmore Navigation Channel, WAI 
Keystone Harbor, Admiralty Inlet, WAI 
Kingston Harbor, WA 
Kootenai River, ID and MT 
Mats Mats Bay, WAI 
Neah Bay, WA I 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
1977 
1996 
1966 
1958 
1923 
1985 
1987 
1901 
1998 
1950 
1950 
1998 
1993 
1967 
1933 
1970 
1997 
825,263 
1,566,839 
125,634 
346,650 
274,391 
1,619,956 
9,811 
1,421,000 
9,000 
18,921 
946,000 
264,000 
262,570 
9,255 
137,679 
3,874,920 
6
79 
10 
11 
3,090,256 
7,693 
224,756 
10,683 
5,316 
925,342 
5,000 
5,643 
12 
13 
14 
16 
17 
8 
15 
-29-29 -

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
TABLE 29-C 
Cntin 
dfi 
OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report Operation 
See Annual And 
Project Status Report For Construction Maintenance 
Okanogan and Pend Oreille Rivers, WA Abandoned 1913 63,879 7,634 
Poison Bay, Flathead Lake, MT Completed 1918 4,491 259 
Port Angeles Harbor, WA4 Completed 1960 470,873 
Port Gamble Harbor, WA Completed 1953 11,911 18 13,337 
Port Orchard Bay, WA5 Completed 1928 42,804 
Prototype Breakwater Test Program, WA I Completed 1985 1,461,590 
Shilshole Bay, Seattle, WA Completed 1962 2,575,091 19 
Skagit River, WA Completed 1950 102,330 20 36,258 
Squalicum Small Boat Harbor, Bellingham, WAl Completed 1981 1,744,025 21 
Tacoma Harbor, WA Completed 1992 2,383,891 22 1,537,150 
Waterway Connecting Port Townsend 
and Oak Bay, WA Completed 1987 73,322 378,753 
Westhaven Cove Small Boat Basin, WA 1 Completed 1981 2,000,000 24 
I. Authorized by Chief of Engineers under authority of Section 
107, Public Law 86-645. 
2. Constructed by local interests at a cost of $415,000. Excludes 
$1,000 Coast Guard funds expended for new work. Corps of 
Engineers is responsible for maintenance. 
3. Authorized by Chief of Engineers under authority of Section 
111, Public Law 90-483. 
1. Maintenance by Port of Port Angeles. 
No maintenance required. 
Excludes $457,200 contributed funds expended. 
Includes $56,582 appropriated and expended for previous 
project. Excludes $13,000 Coast Guard funds and $29,421 
contributed funds expended. 
8. Includes $1,092 appropriated and expended for previous project. 
Excludes $9,103 contributed funds expended. 
9. Excludes $2,500 Coast Guard funds expended. 
10. Includes $8,005 appropriated and expended for previous project. 
11. Excludes $2,184,766 contributed funds expended. 
12. Excludes $32,373 Emergency Relief funds expended. 
13. Excludes $114,272 contributed funds expended. 
14. Excludes $390,753 contributed funds and $3,000 Coast Guard 
funds expended. 
15. Mitigation of shore damages study. 
16. Excludes $28,288 contributed funds and $9,000 Coast Guard 
funds expended. 
17. Excludes $528,188 contributed funds expended. 
18. Excludes $21,260 contributed funds expended. 
19. Excludes $15,000 Coast Guard funds expended. 
20. Includes $2,500 appropriated and expended for previous project. 
21. Excludes $1,570,886 contributed funds expended. 
22. Includes $159,585 appropriated and expended for previous 
project. Excludes $51,609 Public Works Administration funds 
expended and $1,147,208 contributed funds expended. 
23. Includes $5,347 appropriated and expended for previous 
projects. Excludes $222,500 contributed funds expended. 
24. Excludes $1,230,035 contributed funds expended. 
TABLE 29-D OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report Operation 
See Annual and 
Project Status Report For Construction Maintenance 
Lincoln Park Beach, Seattle, WAI Completed 1997 $925,500 2 
1. Authorized by Section 103, Public Law 87-874. 2. Excludes $391,126 contributed funds expended. 
-29-30 - 
23

SEATTLE, WASHINGTON DISTRICT 
TABLE 29-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report 
See Annual Contributed 
Project Status Report For Construction Funds 
American Lake, Vicinity of Fort Lewis, WAl Completed 1957 59,582 10,000 
Bear Creek, Flathead CountyBridge, near Essex, MT2 Completed 1971 1,424 - 
Bitterroot River, Florence, MT2 Completed 1990 180,950 49,759 
Blackfoot River, Matt Little Road, MT2 Completed 1964 17,836 
Bogachiel River, Highway 101, near Forks, WA2' Completed 1981 156,000 
Bogachiel River, Undie Road, Forks, WA2 Completed 1981 57,000 
Cedar River, King County, WA3 Completed 1953 3,229 
Cedar River, Renton, WA2 Completed 1949 32,264 
Chehalis River, City of Chehalis Raw Water 
Pumphouse, WA2 Completed 1966 35,454 
Chehalis River, Independence Road, Thurston 
County, WA2 Completed 1965 47,916 
Chehalis River, Montesano, WA2 Completed 1977 140,080 - 
Chehalis River at South Aberdeen and Cosmopolis, WA Completed 1998 8,301,833 5 1,538,784 
Clallam Bay, Sekiu, WA2 Completed 1977 48,698 - 
Clallam Bay at Sekiu, Clallam County, WA2 Completed 1994 178,800 39,818 
Clallam River, Highway 112, WA2 Completed 1981 43,500 - 
Clark Fork River, near Garrison, MT2 Completed 1993 80,611 16,973 
Clark Fork River, Drummond, MT2 Completed 1978 18,660 - 
Clark Fork River, Missoula, MT2 Completed 1978 31,548 - 
Clark Fork River, Superior, MT2 Completed 1971 28,357 - 
Clark Fork River, Vicinity of Plains, MT2 Completed 1950 27,947 - 
Clearwater River, Jefferson County Road, WA2 Completed 1968 50,000 24,728 
Clearwater River, Queets River Bridge, WA2 Completed 1950 49,165 
Coeur d'Alene, Spokane River, ID Completed 1941 152,872 - 
Coeur d'Alene River, Springston, ID2 Completed 1950 25,452 
Coffee Creek, WA3 Completed 1966 15,000 - 
Columbia River Basin, Local Protection Projects, 
ID, MT, and WA: 
Clark Fork River, Missoula, MT Completed 1983 384,862 6 13,500 
Lightning Creek, Clark Fork, ID Completed 1959 42,726 - 
Deschutes River, Gleason Road Bridge near 
Tumwater, WA2 Completed 1965 26,292 
Deschutes River, Rich Road Bridge, near East 
Olympia, WA2 Completed 1967 22,956 - 
Dungeness River, Area 5, WA2 Completed 1950 2,155 2,155 
Dungeness River, Area 8, WA2 Completed 1950 2,895 2,895 
Dungeness River, Clallam County, WA1 Completed 1964 52,040 7- 
Dungeness River, Sequim, WA2 Completed 1981 99,000 - 
Dungeness River, Clallam County, WA2 Completed 1986 47,500 - 
Dungeness River, Taylor Cut-off Road, WA2 Completed 1961 14,093 3,314 
Elwha Klallam Reservation, Elwha River, WAI Completed 1991 1,455,023 119,449 
Elwha River, Clallam County, WA2 Completed 1951 17,303 - 
Entiat River, WA3 Completed 1971 49,300 - 
Entiat River, Chelan County, WA2 Completed 1978 38,000 - 
Flathead River, MT2 Completed 1972 20,940 
Flathead River, Bradley Channel Area, MT2 Completed 1955 26,265 - 
Flathead River, near Kalispell, MTI Completed 1995 81,500 13,467 
Flathead River, near Kalispell, MT2 Completed 1948 33,347 - 
Flathead River, Old Steel Bridge, near Kalispell, MT2 Completed 1964 13,438 
Flower and Parmenter Creeks, MT 3 Completed 1950 2,320 
Foster Creek, West Fork, WA 2 Completed 1958 19,513 
Foster Creek Road, Douglas County, WA2 Completed 1962 50,000 - 
Green River between Kent and Auburn, WA and 
Allentown, WA2 Completed 1972 24,605 
Green River, State Highway 181, WA2 Completed 1976 27,001 
Henderson Bay, Purdy, WA2 Completed 1977 37,359 
Hoh River, County Road 216, WA2 Completed 1980 143,000 
Hoh River, U.S. Highway 101, WA2 Completed 1980 194,000 
Hoh River Road, Jefferson County, WA (HO 1360)2 Completed 1956 22,082 21,807 
Hoh River Road, Jefferson County, WA (HO 1361)2 Completed 1961 11,916 
-29-31 -

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
TABLE 29-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
(Continued) 
For Last Cost to Sep. 30, 1999 
Full Report 
See Annual Contributed 
Project Status Report For Construction Funds 
Hoh River Road, Jefferson County, WA (HO 1362)2 Completed 1964 41,622 
Hoh River, near Forks, WA2 Completed i83 173,000 8 
Hoko River, Sekiu, WA2 Completed 1977 21,083 
Hood Canal, Hoodsport, WA2 Completed 1977 59,812 - 
Hoquiam River, WA2 Completed 1977 52,600146 
Horseshoe Bend, WAI Completed 1997 204,989 9,146 
Jackman Creek, Skagit River, WA 3 Completed 1962 24,000 - 
Kootenai River, Bonners Ferry, ID2 Completed 1950 42,325 - 
Kootenai River, Kootenai Flats Area, District #1, ID2 Completed 1965 14,885 - 
La Conner, Swinomish Channel, WA2 Completed 1979 40,525 
Lower Green River, King County, WA 1 Completed 1993 912,000 120,518 
Lummi Shore Road, Whatcom County, WA2 Completed 1995 482,000 134,772 
Methow River, WA (MET 1-74)2 Completed 1974 15,700 - 
Methow River, WA (MET 2-74)2 Completed 1974 11,200 - 
Methow River, WA (MET 3-74)2 Completed 1974 13,450 - 
Methow River, Barclay Canal, WA2 Completed 1976 19,810 - 
Methow River, State Highway No. 16 Bridge, 
Twisp, WA2 Completed 1949 31,783 - 
Methow River, Twisp-Carlton Highway, Vicinity of 
Twisp, WA2 Completed 1951 33,300 6,786 
Methow River, Vicinity of Pateros, WA2 Completed 1951 11,726 11,726 
Mineral Creek, Lewis County, WA2 Completed 1972 11,836 - 
Missoula, MT (Sewage Treatment Plant)2 Completed 1965 50,000 - 
Moclips River, Moclips, WA2 Completed 1977 17,608 - 
Naches River, Naches, WA2 Completed 1982 59,000 - 
Neah Bay, Clallam County, WA2 Completed 1991 253,995 78,433 
Newaukum River, Lewis County, Hamilton, WA2 Completed 1972 24,792 - 
Nisqually River, near Elbe, WA2 Completed 1948 37,636 - 
Nisqually River, Thurston County, WA2 Completed 1960 26,790 - 
Nisqually River, Vicinity of Elbe, WA2 Completed 1952 19,345 - 
Nooksack River, WA3 Completed 1948 24,006 - 
Nooksack River, Acme, WA2 Completed 1985 77,300 - 
Nooksack River, Guide Bridge Location, WA2 Completed 1950 6,075 6,075 
Nooksack River, Middle Fork, Deming, WA2 Completed 1986 79,000 - 
Nooksack River, above Highway 12 Bridge, WA2 Completed 1960 10,807 - 
Okanogan River, WA2 Completed 1974 10,100 - 
Okanogan River at Outlet of Osoyoos Lake, WA3 Completed 1949 52,100 - 
Okanogan River, Tonasket Creek and Osoyoos Lake, 
WA3 Completed 1953 7,987 - 
Okanogan River, Omak, WA1I Completed 1981 2,231,030 - 
Okanogan River, Oroville, WAI Completed 1982 1,787,630 - 
Pilchuck River, WA3 Completed 1948 25,401 - 
Pilchuck River, WA2 Completed 1985 81,000 - 
Pilchuck River, WA2 Completed 1971 10,713 - 
Pilchuck River, Everett, WA2 Completed 1980 54,000 - 
Pilchuck River, State Highway 92, Granite Falls, WA2 Completed 1971 30,973 - 
Placer Creek, ID Completed 1986 5,865,000 - 
Powell County High School, Deer Lodge, MT2 Completed 1964 11,291 
Puyallup River, WA Completed 1937 50,000 9- 
Pysht River, Sekiu, WA2 Completed 1977 86,160 
Queets River, Jefferson County Sewage Lagoon, WA2 Completed 1981 125,000 - 
Quillayute River, Quileute Tribal Float and Bridge, WA2 Completed 1972 39,300 - 
Quinalt River, Grays Harbor, WA2 Completed 1981 208,000 - 
Quinalt River Road, Jefferson County, WA2 Completed 1961 15,928 4,943 
Rock Creek, Granite County, MT2 Completed 1974 49,657 - 
Rock Creek, Missoula County, MT2 Completed 1973 31,565 - 
Rock Creek Road, MT2 Completed 1980 50,000 
Rye Creek, MT2 Completed 1973 22,819 
St. Maries, St. Joe River, ID Completed 1942 357,698 
St. Regis River, MT3 Completed 1942 7,234 10 
St. Regis River at St. Regis, MT3 Completed 1951 2,983 
Sammamish River, WA Completed 1967 2,582,536 11 696,923 
Sauk River, WA2 Completed 1974 20,860 
Sauk River, Skagit County, WA2 Completed 1989 119,600 32,778 
-29-32 -

SEATTLE, WASHINGTON DISTRICT 
TABLE 29-E 
(('in, vrld 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Project 
Shelton Creek, WA1 
Skagit River at Burlington Bend, WA2 
Skagit River, Cape Horn Road, WA2 
Skagit River, Deadman's Slough, WA2 
Skagit River, Pressentin Creek, WA2 
Skagit River, South Skagit Highway, WA2 
Skagit River, South Skagit Highway, WA (Job 66-1)2 
Skagit River, South Skagit Highway, WA (Job 67-1)" 
Skykomish River, North Fork, Index, WA2 
Snohomish River, Lowell-Snohomish River Road, WA2 
Snohomish River, Snohomish, WA2 
Snoqualmie River, West Snoqualmie, WA2 
Soleduck Riyer Bridge, WA2 
Soleduck River, near Mora Road Bridge, WA2 
Spokane River, Spokane, WA 2 
Startup, Skykomish and Wallace Rivers, WA1 
Stillaguamish River, South Fork, Mountain Loop 
Highway, near Robe, WA2 
Stillwater River, MT2 
Stillwater and Whitefish Rivers, MT2 
Strong Creek, Hope, ID2 
Tahola, WA2 
Upper Puyallup River, WA4 
Wynoochee Lake, WA 
Wynoochee River, County Road 141, WA2 
Wynoochee River, near Montesano, WA2 
Wynoochee River, near Montesano, WA (WR-1-72)2 
Yakima, Yakima River, WA 
Yakima River, Cle Elum, WA2 
Yakima River, below mouth of Teanaway River 
near Cle Elum, WA2 
Yakima River, West Richland, WA2 
Yakima River, Yakima WA2 
Status 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
For Last Cost to Sep. 30, 1999 
Full Report 
See Annual 
Report For 
1979 
1949 
1966 
1980 
1980 
1963 
1966 
1967 
1981 
1969 
1970 
1977 
1961 
1963 
1989 
1970 
1964 
1973 
1977 
1970 
1979 
1938 
1994 
1976 
1969 
1972 
1948 
1949 
50,000 
17,457 
34,513 
8,442 
223,893 
71,495 
23,494,445 
111,072 
50,000 
50,000 
381,961 
8,047 
48,272 
36,768 
125,500 
12 
13 
14 
15 
1. Authorized by Chief of Engineers under authority of Section 
205, Public Law 858, 80th Congress, as amended. 
2. Authorized by Chief of Engineers under authority of Section 
14, Public Law 526, 79th Congress, as amended. 
3. Authorized by Chief of Engineers under authority of Section 
2, Public Law 406, 75th Congress, as amended 
4. Authorized by Works Progress Administration Project No. 
OP 65-93-917. 
5. Includes $2,212,000 for Preconstruction Engineering and 
Design, appropriated and expended. 
6. Includes $7,850 appropriated and expended for recreation 
facilities at completed project (Code 710). 
7. Excludes $340,066 Public Works Acceleration Act funds 
expended. 
8. Productive Employment Appropriation Act of 1983 (P.L. 98- 
8). Excludes $189,000 Federal Highway Administration funds 
expended.. 
9. Emergency Relief funds, Works Progress Administration. 
10. Excludes amount expended by Works Progress 
Administration which is not available. 
11. Excludes $1,000 Coast Guard funds expended. 
12. Emergency Relief funds, Works Progress Administration. 
13. Includes $102,200 appropriated and expended for recreation 
facilities at completed project (Code 710). Excludes 
$17,070,670 for project maintenance and $66,678 for 
Maintenance and Operation of Dams and Other 
Improvements of Navigable Waters, appropriated and 
expended. 
14. Excludes $17,988 Office of Emergency Planning funds 
expended. 
15. Includes $118,000 expended under Productive Employment 
Appropriation Act of 1983 (P.L. 98-8). 
-29-33 - 
Contributed 
Funds 
24,488 
14,307 
1,960 
79,311 
46,182
- 
13,704 
21,311 
t%-U11U11IUC U J __ 
Construction 
872,021 
50,000 
46,489 
93,000 
137,000 
40,753 
17,719 
50,000 
222,500 
44,227 
60,900 
15,565 
16,437 
11,433 
122,138 
271,713 
1947 
1977 
1983 
- --

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
TABLE 29-F OTHER AUTHORIZED MULTIPLE PURPOSE POWER 
PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report Operation 
See Annual and 
Project Report For Construction Maintenance 
Priest Rapids Dam, Columbia River, WA 1954 350,000 1 
I. For partnership planning. Excludes funds expended for acquisition of lands under partnership arrangement for Priest Rapids and Wanapum 
Dams, in accordance with Public Law 544, 83d Congress. Project constructed by Grant County Public Utility District. 
TABLE 29-G OTHER AUTHORIZED MISCELLANEOUS PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report 
See Annual Contributed 
Project Status Report For Construction Funds 
Aquatic Plant Control 1 Completed 1997 6,023,906 
La Conner, WA 2 Completed 1996 955,000 3 246,889 
Sammamish River Restoration, WA 4 Completed 1995 326,900 64,333 
1. Authorized by Section 302, Public Law 89-298. 3. Includes $183,000 for Preconstruction Engineering and 
2. Authorized by Public Law 99-662. Design, appropriated and expended. 
4. Authorized by Chief of Engineers under authority of Section 
1135, Public Law 662, 99th Congress. 
TABLE 29-H OTHER PRECONSTRUCTION ENGINEERING AND DESIGN 
PROJECTS 
For Last 
Full Report Federal 
See Annual Funds 
Project Status Report For Expended 
Blair and Sitcum Waterways, Tacoma Harbor, WA Inactive 1989 1,310,000 
East, West and Duwamish Waterways, Seattle Harbor, WA Deferred 1988 663,000 
Grays Harbor, Chehalis and Hoquiam Rivers, WA Under 1989 5,670,000 2 
Construction 
Yakima River at Union Gap, WA Deferred 1988 502,000 
1. Includes $300,000 appropriated and expended under Section 2. $3,530,000 of which is included in construction costs. 
101( c). 
TABLE 29-I DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Calispell Creek, WA 1 1968 1968 25,000 14 
Columbia River Basin, Local Protection Projects, 
ID, MT, and WA 
Crab and Wilson Creeks, WA2 1958 1964 9,000 14 
-29-34 -

TABLE 29-I 
f nntinil 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Entiat River, WA3 
Methow River, WA3 
Okanogan River, WA3 
St. Regis River, MT4 
Wenatchee River, WA4 
Yakima River at Ellensburg, WA3 
Everett Harbor and Snohomish River, WA (RH 68) 6 
Flathead River at Kalispell, MT7 
Grays Harbor and Chehalis River, WA (RH 48) 
(Unconstructed Portion) 6,8 
Grays Harbor and Chehalis River, WA (RH 30) 6,9 
Hammersley Inlet, WA (RH 30) (Unconstructed Portion)4,10 
Hoquiam, Aberdeen, and Cosmopolis, Chehalis River, WA 5 
Olympia Harbor, WA (RH 45) 6 
Port Angeles Harbor, WA (RH 35) 4 
Port Gamble Harbor, WA) (RH 35)4 
Quillayute River, WA(RH 30) (Unconstructed Portion)3,11 
Seattle Harbor, WA (RH 30) (Unconstructed Portion) 3,12 
Skagit River, WA (RH 10) (Unconstructed Portion) 4,13 
Skagit River, WA (RH 19) 4 
Skagit River, WA (Avon Pass) 6 
Skagit River, WA (Levee and Channel Improvements)7 
Spokane River, Spokane, WA3 
Stillaguamish River, WA (RH 45)3 
Wenatchee, Canyons 1 and 2, WA 6 
Willapa River at Raymond, WA7 
1. Authority for project expired October 27, 1968. 
2. Authority for project expired July 1964. 
3. Deauthorized under authority of Section 1002, P.L. 99-662 
dated November 17, 1986. 
4. Deauthorized under authority of Section 12, P.L. 93-251 
dated March 7, 1974. 
5. Authority for project expired in October 1952. 
6. Deauthorized under authority of Section 1001 (b) (1), P.L. 
99-662 dated November 17, 1986. 
7. Deauthorized under authority of Section 1001 (b) (2), P.L. 
99-662 dated November 17, 1986. 
8. 2200 linear feet of revetment at Point Chehalis. 
9.
10. 
11. 
12. 
13. 
14. 
15. 
16. 
17. 
18. 
16-foot channel from Cosmopolis to Montesano. 
Deepening shoal area near Cannery Point from 10 to 13 feet. 
Groin feature of the project. 
Settling basin at upper end of existing Duwamish Waterway, 
about 1.4 miles above 14th Avenue South Bridge. 
5500-foot extension of training dike. 
Preconstruction planning only. 
Includes $14,300 expended for restudy, 
FY 1970. 
Includes $18,700 expended for restudy, FY 1968-1973. 
Economic restudy only. 
Includes $8,888 expended for restudy, FY 1967-1972. 
TABLE 29-J LAKE WASHINGTON SHIP CANAL, WA PRINCIPAL 
FEATURES OF DOUBLE LOCK AND DAM 
(SEE SECTION 8) 
Section Large Lock Small Lock 
Miles above mouth 
Clear width of chamber 
Maximum available length 
Lift 
Depth on upper miter sill 
Depth on intermediate miter sill 
Depth on lower miter sill 
Character of foundation 
Kind of dam 
Feet 
Feet 
Feet 
Feet 
Feet 
Feet 
1 '/4 
80 
760 
26 
33 '/2 
29 
29 
Clay 
Fixed dam with 
gated spillway 
Concrete 
1916 
Type of construction 
Year completed 
Cost 
1'/A 
28 
123 
26 
16 
16 
Clay 
Fixed dam with 
gated spillway 
Concrete 
1916
3 
-29-35 - 
SEATTLE, WASHINGTON DISTRICT 
DEAUTHORIZED PROJECTS 
1958 
1958 
1958 
1958 
1958 
1980 
1973 
1981 
1962 
1933 
1950 
1948 
1973 
1960 
1953 
1986 
1986 
1950 
1950 
1968 
1982 
1939 
1946 
1978 
1982 
1986 
1986 
1986 
1978 
1978 
1986 
1990 
1995 
1990 
1990 
1978 
1952 
1990 
1977 
1977 
1986 
1986 
1978 
1978 
1990 
1995 
1986 
1986 
1990 
1995 
1,100 
1,400 
44,300 
52,000 
300,000 
35,834 
83,631 
21,606 
54,468 
1,934,792 
2,944 
4,234 
544,331 
508,130 
14 
14 
14, 15 
14 
14 
35,834 
-
-
-
-
-
- 
14 
14,16
14 
14 
17 
14 
14, 18

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
TABLE 29-J LAKE WASHINGTON SHIP CANAL, WA PRINCIPAL 
FEATURES OF DOUBLE LOCK AND DAM 
(SEE SECTION 8) 
(Continued) 
1. Low water in upper pool. 3. Cost of double lock and dam was $2,382,200 and the 
2. Mean lower low water in Puget Sound. emergency gates, completed In 1923, $262,300. 
TABLE 29-K FLOOD CONTROL ACTIVITIES PURSUANT TO SECTION 205, 
PUBLIC LAW 858, 80TH CONGRESS, AS AMENDED 
(PREAUTHORIZATION) 
Study Identification Fiscal Year Costs (1999) 
Lincoln County, MT 9,987 
Long Road, F.C. District, Chehalis River, WA 41,346 1 
Nooksack River, WA 25,689 2 
Section 205 Coordination 13,213 
Snoqualmie River, WA 24,963 3 
Stillaguamish River Valley, Stanwood, WA 48,953 
St. Maries, ID 16,938 
TOTAL 181,089 
1. Excludes $-64 contributed funds expended 3. Excludes $17,271 contributed funds expended. 
2. Terminated. 
TABLE 29-L MISCELLANEOUS ACTIVITIES PURSUANT TO SECTION 1135, 
PUBLIC LAW 662, 99TH CONGRESS 
(PREAUTHORIZATION) 
Study Identification Fiscal Year Costs (1999) 
Bear Creek Restoration, WA 60,380 
Deepwater Slough, WA 0 1 
Hanson Anadromous Fish and Wildlife, WA 19,374 
Initial Appraisals, General 13,843 
Lake Washington Ship Canal, WA 238,311 
Metzler/O'Grady Side Channels, WA 8,220 
Puget Creek Estuary Restoration, 0 1 
Section 1135 Coordination 7,564 
Turning Basin #3 Restoration (Duwamish R), WA 0 1 
Union Slough, WA 31,404 
Wynoochee Anadromous Fish, WA 534 
TOTAL 379,630 
I. Construction initiated in FY 1999. 
-29-36 -

WALLA WALLA, WA, DISTRICT *
This District consists of all Columbia River 
drainage and tributaries thereto between the head of 
the McNary pool (river mile 345.4) and Umatilla 
Bridge (river mile 290.5) below McNary Lock and 
Dam, except the Yakima River Basin above the Van 
Giesen Street Bridge (river mile 8.4) near 
IMPROVE 
Flood Control 
1. Columbia River Basin, Local Flood 
Protection Projects........................... ............ 30-1 
2. Inspection of Completed 
Flood Control Projects.................................... . 30-1 
3. Jackson Hole, W Y ........................................... 30-1 
4. Lucky Peak Lake, ID ...................................... . 30-2 
5. Mill Creek, Bennington Lake, WA ................... 30-2 
6. Scheduling Flood Control 
Reservoir Operations ...................................... . 30-3 
Multiple-Purpose Projects, Including Power 
7. Columbia River Juvenile Fish 
Mitigation Program (Walla Walla Projects), 
OR, WA, and ID ............ ...................... 30-3 
8. Dworshak Dam and Reservoir, ID .................. 30-4 
9. Ice Harbor Lock and Dam, 
Lake Sacajawea, WA............................... 30-6 
10. Little Goose Lock and Dam, 
Lake Bryan, WA.................................. 30-6 
11. Lower Granite Lock and Dam, 
Lower Granite Lake, WA ................................ 30-7 
12. Lower Monumental Lock and Dam, 
Lake Herbert G. West, WA ............................. 30-8 
13. Lower Snake River Fish and Wildlife 
Compensation Plan, WA, 
OR, and ID ...................................... 30-9 
14. McNary Lock and Dam, Lake 
W allula, OR and W A.......................................... 30-9 
15. Snake River Downstream from 
Johnson Bar Landing, OR, 
WA, and ID ................................................ 30-10 
Richland, Washington. The primary tributary 
drainage area is the Snake River which includes more 
than 107,000 square miles in six states: Washington, 
Oregon, Idaho, Wyoming, and small portions of 
Nevada and Utah. 
EMENTS 
16. Miscellaneous Work Under 
Special Authorization ...................................... 30-10 
General Investigations 
17. Surveys ........................... .......................... 30-11 
18. Collection and Study of Basic Data................. 30-11 
19. Preconstruction, Engineering, 
and Design........................... ..... 30-12 
Tables 
Table 30-A Cost and Financial Statement.............. 30-13 
Table 30-B Authorizing Legislation ...................... 30-15 
Table 30-C Other Authorized Navigation 
Projects............................ 30-19 
Table 30-D Not Applicable 
Table 30-E Other Authorized Flood 
Control Projects .................................. 30-20 
Table 30-F Other Authorized Multiple- 
Purpose Projects, Including 
Pow er .......................... ........................ 30-21 
Table 30-G Deauthorized Projects ............................ 30-21 
Table 30-H Columbia River Basin, Local 
Flood Protection Projects .................... 30-22 
Table 30-I Inspection of Completed 
Flood Control Projects ........................ 30-22 
Table 30-J Principal Data Concerning 
Navigation Lock, Spillway Dam, 
Powerplant, and Impoundment .............. 30-23 
Table 30-K Snake River Downstream from 
Johnson Bar Landing, OR, 
WA, and ID ......................... ...... 30-28 
30-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
Flood Control 
1. COLUMBIA RIVER BASIN, LOCAL 
FLOOD PROTECTION PROJECTS 
Location. Improvements included in this 
project are along the Columbia River and its 
tributaries. 
Existing project. The Flood Control Act of 
1950 approved a general comprehensive plan for the 
Columbia River Basin for flood control and other 
purposes based on plans in H. Doc. 531, 81st 
Congress, 2nd Session, and authorized $75 million to 
be appropriated for partial accomplishment of certain 
projects. From that authorization, an amount (not to 
exceed $15 million) was allotted for construction of 
local flood protection works throughout the 
Columbia River Basin, subject to conditions that all 
work undertaken pursuant to authorization would be 
economically justified prior to construction, and local 
cooperation specified in the Flood Control Act of 
1936, as amended, should be required (see Tables 30- 
B and H, for projects in the U.S. Army Corps of 
Engineers (Corps), Walla Walla District). 
Local cooperation. Section 3, Flood Control 
Act of June 22, 1936, applies. 
Operations during the fiscal year. No 
projects were deauthorized. 
2. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Federal law requires local interests to maintain 
and operate completed local protection projects in 
accordance with regulations prescribed by the 
Secretary of the Army. Inspections were made to 
determine the extent of compliance and to advise 
local interests, as necessary, of measures required to 
correct deficiencies (see Table 30-I for inspections 
made during the fiscal year). 
Fiscal year costs were $22,948. Total costs to 
September 30, 1999, were $2,924,740. 
3. JACKSON HOLE, WY 
Location. On the banks of the Snake River, 
Teton County, west of Jackson, WY. 
Existing project. On the Snake River, 
approximately 23.5 miles of Federally constructed 
levees consisting of the following: (1) On the right 
bank: a series of levees, off-set levees, and bank 
protection structures, all with full riprap protection 
from 10 miles upstream of the Jackson-Wilson 
Bridge to 3.5 miles below the bridge for a total of 
13.5 miles; (2) On the left bank: a series of Federally 
constructed levees and bank protection structures, all 
with full riprap protection, extending from 10 miles 
upstream of the Jackson-Wilson Bridge to 5 miles 
upstream. It resumes 1.5 miles immediately 
upstream of the same bridge and continues to 3.5 
miles below the bridge for a total of 10 miles. In 
addition, a series of Federal and non-Federal 
constructed levees, with a total length of 
approximately 5 miles, most having some or full 
riprap protection, are interspersed along both banks 
of the Snake River from Highway 26 Bridge to 
4 miles downstream of the Jackson-Wilson Bridge. 
On the Gros Ventre River, approximately 
2 miles of riprap protected levees on the left bank 
from 1.5 miles west of Cattlemen's Bridge and 
extending to 0.5 miles east of the same bridge. On 
the right bank, a series of levees extending from 
0.5 miles west of Cattlemen's Bridge to 
approximately 0.3 miles east of the same bridge. 
Project authorized by Public Law (PL) 81-516, 
Flood Control Act of 1950, for flood control 
protection by channel improvements consisting of 
channel rectification, levees, and revetments along 
the Snake River in the vicinity of Wilson, WY. The 
PL 104-303 modified the original PL 81-516 to 
ensure the operation, maintenance, modifications, 
and additions to the project become Federal 
responsibility. 
Local cooperation. Non-Federal sponsors pay 
the initial $35,000 in cash or materials of any such 
costs expended in any 1 year, plus inflation as of the 
date of enactment of the Water Resources 
Development Act of 1986. 
Since 1978, $57,784,000 (adjusted to October 
1999 price index) in potential flood damage has been 
prevented by the levees. 
Operations during fiscal year. Teton County, 
under their Local Cooperative Agreement, worked 
with the Corps performing levee maintenance. Fiscal 
year costs were $842,552. 
4. LUCKY PEAK LAKE, ID 
Location. On the Boise River in southwestern 
Idaho about 10 miles southeast of the city of Boise, 
ID. 
30-2

WALLA WALLA, WA, DISTRICT 
Existing project. The project includes a 
rolled-earthfill dam about 250 feet above the 
streambed and 1,700 feet long at the crest, with a 
lake providing a total storage at upper operating lake 
level of 306,000 acre-feet. The project provides for 
flood control, irrigation, and recreation (for details, 
see page 2,000 of the 1962 Annual Report). 
Construction of the existing project was 
initiated in November 1949 and completed in June 
1961. Since 1961, $470,387,000 (adjusted to 
October 1999 price index) in potential flood damages 
have been prevented by the project. 
During a detailed study of outlet capacity and 
potential for adding hydropower to the existing 
project, a need for an auxiliary outlet became 
apparent. Construction of an auxiliary outlet was 
authorized in the Water Resource Development Act 
of 1976. In fiscal year 1978, an Interim Feasibility 
Report on Modification of Lucky Peak Dam and Lake 
(power facilities) was submitted to the Board of 
Engineers for Rivers and Harbors and approved. 
States, agencies, and the Chief of Engineers 
commented on the report to the Secretary of the 
Army. The report was forwarded to the Office of 
Management and Budget in February 1982. 
A license to construct and operate power 
facilities at the project was issued by the Federal 
Energy Regulatory Commission (Project #2832) to 
the Boise Project Board of Control on June 10, 1980, 
and modified on October 9, 1980, and in 1982. 
Construction of the auxiliary outlet facility began in 
May 1984 and was completed in August 1986. 
Construction of modifications to the existing outlet 
tunnel and powerhouse excavation began in 
August 1986 and was completed January 1987. 
Powerhouse general contract construction began in 
April 1986. The project was completed and 
dedicated on October 7, 1988. Power on-line for all 
units was August 18, 1988. Federally authorized 
second outlet was deauthorized in FY 90. 
Recreation facilities at Lucky Peak Lake consist 
of 20 picnic/day-use areas, 4 boat launch ramps, and 
3 swimming areas. Fiscal year visitation to Lucky 
Peak Lake was 750,900. 
Local cooperation. None required. 
Operations during fiscal year. Operation and 
Maintenance: Normal operation and maintenance, 
which included the dam structures and recreation 
areas continued. Fiscal year costs were $1,076,698. 
5. MILL CREEK, BENNINGTON LAKE, WA 
Location. In and upstream from Walla Walla, 
WA, on Mill Creek, a tributary of the Walla Walla 
River.
Existing project. The project includes an offstream 
earthfill storage dam, about 125 feet above the 
streambed and 3,200 feet long at the crest, two 
concrete-lined outlet channels, an earthfill diversion 
dam, and diversion structures. Project provides for 
flood control and recreation. Authorizing legislation 
to provide a channel through the city of Walla Walla 
was added to the project in 1941. Recreation was 
added to the project purposes through the Federal 
Water Project Recreation Act of 1965. 
Construction of the dam and appurtenant works 
was completed in 1942. Paving of the channel 
through the city of Walla Walla was completed in 
1966 (for details, see page 2,005 of the 1962 Annual 
Report). Since 1942, $46,259,000 (adjusted to 
October 1999 price index) in potential flood damage 
has been prevented by the combined storage and 
channel operation. 
Rehabilitation of the existing project was 
initiated in FY 78 and completed in FY 79. The plan 
of rehabilitation included action to correct the 
seepage and internal erosion which has occurred 
during each subsequent filling of the reservoir. A 
cutoff wall was constructed, but did not alleviate the 
seepage problem, thus requiring limited flood control 
use of the project. The seepage and internal erosion 
create a high vulnerability for dam failure. 
Mill Creek/Bennington Lake offers visitors 
three day-use/picnic areas and one boat launch ramp. 
Visitation to Mill Creek/Bennington Lake for the 
fiscal year was 168,300. 
Local cooperation. Fully complied with (for 
details, see page 2,006 of the 1962 Annual Report). 
Operations during fiscal year. Operation and 
Maintenance: Normal operation and maintenance 
continued, which included regulation of water control 
structures and care of recreation areas. Initiated right 
abutment test grouting contract. Fiscal year costs 
were $1,546,048. 
6. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Functional regulation of non-Corps projects 
was accomplished under several authorities. 
Regulation was accomplished as authorized under 
30-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
Section 7, Flood Control Act of 1944, and 
coordinated with the Bureau of Reclamation for 
Palisades, Little Wood, and Anderson Ranch 
Reservoirs, ID; and Bully Creek, Warm Springs, 
Agency Valley, and Mason Reservoirs, OR. 
Flood control operations at Jackson Lake, WY, 
Arrowrock Reservoir, and Lake Lowell, ID, were in 
accordance with formal agreements with the Bureau 
of Reclamation. Flood control regulation was 
accomplished under informal agreements for the 
Owyhee Reservoir, OR; and American Falls, Magic, 
Mackay, Cascade, and Deadwood Reservoirs, ID. 
Brownlee, Oxbow, and Hells Canyon Reservoirs 
provided flood control regulation in accordance with 
provisions of the Federal Power Commission license 
to Idaho Power Company. Fiscal year costs were 
$314,009. 
Multiple-Purpose Projects, Including Power 
7. COLUMBIA RIVER JUVENILE FISH 
MITIGATION PROGRAM (WALLA WALLA 
PROJECTS), OR, WA, AND ID 
Location. At Ice Harbor, Lower Monumental, 
Little Goose, and Lower Granite Dams on the Lower 
Snake River in the State of Washington and McNary 
Lock and Dam on the Columbia River in the States of 
Oregon and Washington. 
Existing project. The eight Corps 
hydroelectric projects on the Columbia and Lower 
Snake Rivers have been identified as a major 
contributing factor in causing mortality to 
downstream migrating juvenile salmon and steelhead. 
Without adequate bypass facilities to guide these 
juvenile fish away from the power turbines at the 
dams, mortalities incurred through project passage 
severely impact the commercial, recreational, and 
Indian fisheries. The Corps has recognized the need 
to reduce juvenile fish mortality and has undertaken 
bypass measures that include mechanized fish bypass 
systems with barge and truck transportation. Spill as 
an additional bypass route over the spillways has 
been used to divert fish from entering turbine units, 
but it is a significant adverse economic factor due to 
lost power revenues. Congress passed and the 
President signed the FY 89 Energy and Water 
Development Appropriation Act (PL 100-371), 
which mandated the expenditure of funds for the 
design, testing, and construction of new or improved 
fish bypass facilities for the Columbia River fish 
mitigation projects. Completion of bypass and 
transportation facilities will significantly increase the 
survival of migrating downstream juvenile fish. The 
mitigation study will determine the overall scope of 
the fish mitigation facilities for these Columbia and 
Lower Snake River dams. The mitigation study 
project was added to the President's FY 91 budget. 
The plan of improvement includes the 
following facilities: (1) Ice Harbor Lock and Dam: 
screens, new gantry crane, collection by-pass facility, 
intake gate raise, spillway deflectors, surface bypass, 
and fish ladder temperature control; (2) Lower 
Monumental Lock and Dam: hold/load and collection 
bypass facility, screens, Passive Integrated 
Transponder Tag (PIT-Tag) facility, barge load 
facility modifications, barges, gate raise 
modifications, gantry crane, fish ladder temperature 
control, and surface bypass; (3) Little Goose Lock 
and Dam: screens, gantry crane modification, 
collection bypass facility, outfall pipe, fish ladder 
temperature control, fallout fences, gate raise, deck 
screen modifications, and surface bypass; (4) Lower 
Granite Lock and Dam: juvenile fish facility, gantry 
crane, gate raise, outfall pipe, fish barges, screens, 
additional moorage facility, fish slot closures, 
juvenile fish facility improvements, barge exit 
modifications, deck screen modifications, fish ladder 
temperature control, surface bypass, and fallout 
fences; and (5) McNary Lock and Dam: gantry crane, 
screens, hold/load facility, gate raise modifications, 
tilted weirs fish ladder, maintenance facility, fish 
ladder exits, hold/load facility, and gantry crane 
modifications. 
In response to the 1995 Biological Opinion 
issued by the National Marine Fisheries Service, the 
Walla Walla District is conducting a feasibility study 
(Lower Snake River Juvenile Salmon Migration) to 
evaluate salmon migration problems on the Lower 
Snake River. The objective of the study is to 
improve salmon migration conditions through the 
four Corps operated dams and reservoirs on the 
Lower Snake River. The study focuses on how these 
dams can be changed to improve survival and 
recovery prospects for Snake River salmon stocks 
under the Endangered Species Act. The total 
estimated cost of the study is $20 million. 
Expenditures to date are $16 million. 
The Walla Walla District is currently managing 
a surface bypass and collection technology 
development effort that focuses on improving 
juvenile fish passage for endangered and threatened 
salmon migration past all Corps hydroelectric 
projects on the Columbia and Lower Snake Rivers. It 
is an aggressive, non-traditional approach to 
prototype development that involves fast-track 
design, construction, testing, and evaluation. 
30-4

WALLA WALLA, WA, DISTRICT 
The fully-funded Federal project cost is 
estimated at $778,400,000 for Walla Walla projects. 
Local cooperation. None required. 
Operations during fiscal year. At Ice 
Harbor, work was completed on Phase II of the 
spillway deflector contract and on the completion 
contract. A contract was awarded for McNary 
juvenile fish collection channel bulkheads. At Little 
Goose Dam, a contract was awarded for the trash 
boom, and a mechanical and biological test was 
completed on the new extended length bar screens 
(ESBS) perforated plate design. At Little Goose and 
Lower Granite, handrail work was completed, and 
fishway orifice backflush automation was completed 
at Lower Granite. 
Several Columbia River fish mitigation studies 
continued, including the Turbine Model Study at 
McNary Dam, and the System Gas Abatement Study. 
In addition, field studies and physical modeling work 
were initiated on several projects related to design of 
additional or modified flow deflectors. 
For the fourth consecutive year, a prototype 
surface collection test was conducted at Lower 
Granite Lock and Dam. 
The technical analysis continued for the Lower 
Snake River Juvenile Salmon Migration Feasibility 
Study. The public involvement aspects of the study 
were expanded to meet the intense regional interest. 
This involvement included a number of public 
information meetings, focus meetings, workshops, 
newsletters, newspaper inserts, traveling displays, 
and pamphlets. Coordination efforts continued with 
a number of established regional recovery groups, as 
well as tribal consultation efforts. Work continued in 
many other areas, including cultural resources, 
National Environmental Policy Act, Coordination 
Act Report, wildlife, and water quality. 
Fiscal year costs were $28,949,699. Total 
project costs are $308,713,523. 
8. DWORSHAK DAM AND RESERVOIR, ID 
Location. The dam is on the North Fork of the 
Clearwater River, 1.9 miles above its junction with 
the Clearwater River, near Orofino, ID, and about 
35 miles east of Lewiston, ID. 
Existing project. The project includes a dam, 
powerplant, and appurtenant facilities. Project 
provides for flood control, navigation, hydroelectric 
power generation, recreation, and area 
redevelopment. The reservoir has a normal operating 
range between the elevations of 1,600 and 1,445 
mean sea level (msl). The reservoir has a gross 
storage capacity of 3,468,000 acre-feet 
(2 million acre-feet of which are effective for both 
local and regional flood control and for at-site and 
downstream power generation). In addition, the 
reservoir, extending 53 miles into rugged and 
relatively inaccessible timberland, provides important 
transportation savings in connection with movements 
of marketable logs. The reservoir is habitat for elk, 
deer, and other wildlife. The dam structure is about 
3,287 feet long and about 717 feet above the 
streambed. Fish passage is not feasible due to the 
height of the dam. A hatchery has been built below 
the dam to assure continuance of anadromous fish 
runs. The powerhouse has two 90,000 kilowatts 
(kW) and one 220,000 kW generating units in 
operation for a capacity of 400,000 kW. Provisions 
had been made for three additional 220,000 kW 
generating units for an ultimate installed capacity of 
1,060,000 kW. A reconnaissance report justifying the 
feasibility and cost benefits for the addition of a 
200,000 kW fourth generating unit was completed in 
FY 78. However, environmental and economic 
studies on additional generating units have been 
curtailed due to public opposition. Unit 4 is 
undeveloped. Units 5 and 6 were deauthorized FY 
90, Unit 4 was deauthorized in FY 95. Principal 
project data are set forth in Table 30-J. 
Construction of the project began in July 1966. 
It was placed in operation in 1972 and was completed 
in 1986. Since the project became operational in 
June 1972, it has prevented about $2,836,000 
(adjusted to October 1999 price index) in potential 
flood damages. Power generation through September 
1999 was 44.55 billion kW hours. 
At Dworshak Reservoir, recreation facilities 
consist of 12 day-use/picnic areas, 6 camp areas, 
6 boats launches and 2 swim areas. Total visitation 
to Dworshak Reservoir for the fiscal year was 
227,600. 
Local cooperation. None required. 
Operations during fiscal year. Operation and 
Maintenance: Management of wildlife habitat 
browse continued on project lands to provide winter 
browse for elk and deer. Initiated paving contract at 
recreation areas. During the fiscal year, 2.0 billion 
kW hours of electrical power were generated by the 
30-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
three generating units. Fiscal year costs were 
$9,752,198. 
Brood Year 1998 Steelhead 
Approximately 2.1 million brood year (BY) 
1998 steelhead smolts released from Dworshak 
National Fish Hatchery (DNFH) in April 1999. 
These fish averaged 192 millimeters (mm) in total 
length, slightly under the 200 mm target size. 
Reduced size was due to cold water releases from 
Dworshak Dam in the summer and an Ichthyopthirius 
(ICH) outbreak that was controlled with Formalin 
treatment and a reduction in water temperature. A 
total of 318,000 pounds of steelhead was released in 
1999 compared with 353,000 pounds in 1998 and 
398,000 pounds in 1997. 
Brood Year 1999 Steelhead 
A total of 5,419 adult steelhead returned to 
DNFH in the fall of 1998 and spring of 1999 
compared with 3,601 the previous BY. A total of 
2.5 million eyed eggs went into the DNFH 
production program. The DNFH provided 890,000 
eyed eggs for Clearwater Hatchery, and 1.8 million 
green eggs were shipped for rearing at Magic Valley 
Hatchery. No problems with Hematopoietic Necrosis 
Virus (IHNV) were reported, the eighth year since 
the 6,400 gallons per minute (gpm) water supply was 
installed from Dworshak Reservoir. The steelhead in 
this BY also made the transition from inside rearing 
tanks to outside rearing ponds with water from the 
North Fork of the Clearwater River. Eight outside 
Burrows Ponds (BP) were confirmed or presumed 
positive for IHNV, but mortality was low. There 
were 2,475 adult steelhead outplanted from DNFH 
during the return run of BY 99 adults. 
Brood Year 1997 Spring Chinook Salmon 
The DNFH released 1,044,500 BY 97 spring 
chinook salmon weighing 49,787 pounds on March 
29 and April 7-8, 1999. This is very close to the 
programmed goal of 1.05 million smolts under the 
Lower Snake River Compensation Plan. 
Brood Year 1998 Spring Chinook Salmon 
There were 1,323 adult spring chinook 
salmon that returned to the combined stations (DNFH 
and Kooskia NFH) in 1998. These adults produced 
approximately 1.98 million eyed eggs. At the end of 
FY 99, there were 941,000 BY 98 spring chinook 
fingerlings at DNFH and 101,000 at Kooskia NFH. 
Brood Year 1999 Spring Chinook Salmon 
There were 957 spring chinook salmon that 
returned to the combined stations (DNFH and 
Kooskia NFH). Of this number, 752 were jacks, 
which left 215 for spawning. Some mortality 
occurred, and 195 adults were actually spawned for 
both stations. Only 338,000 eyed eggs were 
produced for BY 99 spring chinook salmon. 
Brood Year 1997 Coho Salmon 
In a cooperative agreement with the Nez Perce 
Tribe (NPT), DNFH reared 239,438 BY 97 coho 
salmon. These coho salmon were transferred from 
DNFH to Kooskia NFH for final rearing and were 
released on April 1, 20, and 21. 
Brood Year 1998 Coho Salmon 
In a cooperative agreement with NPT, DNFH is 
rearing approximately 284,046 BY 98 coho salmon. 
In July, an additional 23,828 coho were outplanted 
by the NPT to the Selway River. 
Brood Year 1998, 1999 Rainbow Trout 
Approximately 8,805 BY 97 and 98 and 14,176 
BY 99 rainbow trout were reared at DNFH during 
FY 99. Of these rainbow trout, 1,422 were caught by 
children participating in Dworshak's annual Open 
House on June 11. Additional rainbow trout were 
taken to Kooskia NFH for children to catch at their 
Open House. Approximately 5,400 catchable 
rainbow trout were put in Nez Perce and Coeur 
d'Alene tribal lakes and Idaho fishery waters. At the 
end of FY 99, DNFH has 14,176 BY 99 rainbow 
trout on station. Due to concerns about disease 
(IHNV), the U.S. Fish and Wildlife Service plans to 
rear 95,000 9-inch rainbow trout at Hagerman NFH 
to be stocked into L. Camas Reservoir in May; 
11,000 10-inch trout to be stocked into Oxbow 
Reservoir in October; 12,000 10-inch trout to be 
stocked into Hells Canyon Reservoir in May; 11,000 
10-inch fish stocked into C.J. Strike Reservoir; and 
11,000 9-inch fish stocked into Lucky Peak 
Reservoir. In exchange, the Idaho Department of 
Fish and Game will rear 30,000 10- to 12-inch trout 
at Nampa Fish Hatchery to be stocked into Dworshak 
Reservoir in May. 
9. ICE HARBOR LOCK AND DAM, LAKE 
SACAJAWEA, WA 
30-6

WALLA WALLA, WA, DISTRICT 
Location. On the Snake River, 9.7 miles above 
river mouth at head of Lake Wallula (McNary 
Reservoir) and 12 miles east of Pasco, WA. 
Existing project. The project includes a dam, 
powerplant, navigation lock, two fish ladders, and 
appurtenant facilities. The project provides 
navigation, hydroelectric power generation, 
recreation, and incidental irrigation. The reservoir 
has a normal operating range between elevations 440 
and 435 msl. Lake Sacajawea extends upstream 
about 31.9 miles and provides slack water to Lower 
Monumental Lock and Dam. The dam structure is 
about 2,822 feet long and about 130 feet above the 
streambed. The fish passage facilities include two 
fish ladders. Powerhouse has three 90,000 kW units 
and three 111,000 kW generating units in operation 
for a capacity of 603,000 kW. 
The spillway dam is 590 feet long, and 
overflow crest at elevation 391 msl is surmounted by 
10 tainter gates, 50 feet wide and 52.9 feet high, that 
provide the capacity to pass a design flood of 
850,000 cubic feet per second (cfs). The deck is at 
elevation 453 msl and provides a service road and 
track for a gantry crane. The navigation lock is a 
single-lift type with clear plan dimensions of 86 by 
675 feet and a 16-foot minimum depth over the sills. 
A navigation channel 250 feet wide, 14 feet deep, 
and 41.6 miles long is provided from the mouth of 
the Snake River to the dam and from the dam to 
Lower Monumental Lock and Dam. Principal data 
are set forth in Table 30-J. 
Construction of the original project began in 
December 1955. It was placed in operation in 1961 
and completed in 1971. Construction of the 
additional generating units was started in 1971 and 
completed in 1981. Power generation through 
September 1999 was 80.92 billion kW hours. 
Recreation areas on Lake Sacajawea include 
11 picnic/day-use sites, 4 camping areas, 7 areas with 
boat launching, and 4 swimming areas. Total 
visitation on Lake Sacajawea for the fiscal year 
was 464,500. 
Local cooperation. None required. 
Operations during fiscal year. Operation and 
Maintenance: During the fiscal year 2.21 billion kW 
hours of electrical power were generated by the six 
generating units. Traffic through the navigation lock 
consisted of grains, petroleum products, fertilizer, 
wood products, and miscellaneous cargo and 
amounted to 4,570,876 tons during calendar year 
1998. Fiscal year costs were $9,452,036. 
10. LITTLE GOOSE LOCK AND DAM, LAKE 
BRYAN, WA 
Location. The dam is 70.3 miles above the 
mouth of the Snake River and at the head of Lake 
Herbert G. West (Lower Monumental Reservoir), 
about 40 miles northerly of Walla Walla, WA, and 50 
miles westerly of Lewiston, ID. 
Existing project. The project includes a dam, 
powerplant, navigation lock, fish ladder, and 
appurtenant facilities. The project provides for 
navigation, hydroelectric power generation, 
recreation, and incidental irrigation. The reservoir 
has a normal operating range between elevations 638 
and 633 msl. Lake Bryan extends upstream about 
37.2 miles and provides slack water to Lower Granite 
Lock and Dam. The dam structure is 
2,655 feet long and about 165 feet above the 
streambed. Fish passage facilities include one ladder 
with entrances on both shores and a fish channel 
through the spillway, which connects to the 
powerhouse fish collection system and south shore 
ladder. The powerhouse has six 135,000 kW 
generating units in operation for a capacity of 
810,000 kW. Spillway dam is 512 feet long and the 
overflow crest at elevation 581 msl is surmounted by 
eight tainter gates, 50 feet wide and 60 feet high, that 
provide the capacity to pass a design flood of 
850,000 cfs. The navigation lock is a single-lift type 
with clear plan dimensions of 86 by 668 feet and a 
15-foot minimum depth over the sills. A navigation 
channel 250 feet wide, 14 feet deep, and 37.2 miles 
long is provided from the dam to Lower Granite 
Lock and Dam. Relocations along the lake included 
32 miles of Camas Prairie Railroad, 6.8 miles of 
county roads, 2.2 miles of state highways, and the 
Central Ferry Bridge. Principal project data are set 
forth in Table 30-J. 
Construction of the original project began in 
1963. It was placed in operation in 1970 and 
completed in 1976. Construction of additional 
generating units started in 1974 and was completed 
in 1984. Power generation through September 1999 
was 73.18 billion kW hours. 
Lake Bryan provides seven day-use sites, five 
campgrounds, five boat launching areas, and two 
swimming areas. Total fiscal year visitation was 
195,800 for Lake Bryan. 
Location cooperation. None required. 
30-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
Operations during fiscal year. Operation and 
Maintenance: The paving contract was completed in 
recreations areas. During the fiscal year, 3.2 billion 
kW hours of electrical power were generated by the 
six generating units. Traffic through the navigation 
lock consisted of grains, petroleum products, 
fertilizer, wood products, and miscellaneous cargo 
and amounted to 3,553,860 tons during calendar year 
1998. Fiscal year costs were $6,199,714. 
11. LOWER GRANITE LOCK AND 
DAM, LOWER GRANITE LOCK, WA 
Location. At river mile 107.5 on the Snake 
River at the head of Lake Bryan (Little Goose 
Reservoir) and about 33 miles downstream from 
Lewiston, ID. 
Existing project. The project includes a dam, 
powerplant, navigation lock, fish ladder, appurtenant 
facilities, and required about 8 miles of slack water 
levees along the Snake and Clearwater Rivers at 
Lewiston, ID. The project provides for slack water 
navigation, hydroelectric power generation, 
recreation, and incidental irrigation. The reservoir 
has a normal operating range between elevations 738 
and 733 msl in Lewiston, ID, and Clarkston, WA. 
Lower Granite pool extends upstream about 38 miles 
and provides slack water to the confluence of the 
Snake and Clearwater Rivers. The dam structure is 
about 3,200 feet long and about 146 feet above the 
streambed. Fish passage facilities include one ladder 
with entrances on both shores with a fish channel 
through the spillway that connects to the powerhouse 
fish collection system and south shore ladder. The 
powerhouse has six 135,000 kW generating units in 
operation for a capacity of 810,000 kW. The 
spillway dam is 512 feet long, and the overflow crest 
at elevation 681 msl is surmounted by eight tainter 
gates, 50 feet wide and 60 feet high, which provide 
the capacity to pass a design flood of 850,000 cfs. 
Navigation lock is single-lift type with clear plan 
dimensions of 86 by 674 feet and 15-foot minimum 
depth over the sills. A navigation channel 250 feet 
wide, 14 feet deep, and 39.3 miles long is provided 
from the dam to the confluence of the Snake and 
Clearwater Rivers. Principal data are set forth in 
Table 30-J. 
Construction of the original project started in 
July 1965. It was placed in operation in 1975 and 
completed in 1984. Construction of additional 
generating units was started in 1974 and completed 
in 1979. Power generation through September 1999 
was 64.43 billion kW hours. Approximately 
$16,746,000 (adjusted to October 1999 price index) 
in potential flood damage has been prevented since 
the levees became functional. 
Lower Granite Lake offers visitors 16 dayuse/
picnic sites, 6 sites with camping, 12 boat launch 
ramps, and 4 swimming areas. Total recreation 
visitation to Lower Granite Lake for the fiscal year 
was 989,700. 
Local cooperation. None required. 
Operations during fiscal year. Operation and 
Maintenance: The paving contract was completed in 
the recreations areas. During the fiscal year, 
3.14 billion kW hours of electrical power were 
generated by the six generating units. Traffic 
through the navigation lock consisted of grains, 
petroleum products, fertilizer, wood products, and 
miscellaneous cargo and amounted to 2,226,112 tons 
during calendar year 1998. Fiscal year costs were 
$10,294,807. 
Juvenile Fish Transportation Program. 
As the first collector dam on the Snake River, 
Lower Granite is a primary component of the 
Juvenile Fish Transportation Program. Transport 
began in the late 1960's as a research program on 
how to bypass juvenile salmon and steelhead around 
the Corps' Columbia and Lower Snake River dams 
and reservoirs. Transport became an operational 
program in 1981 with collection and transport from 
Lower Granite, Little Goose, and McNary Dams. 
Transport was expanded in 1993 to include Lower 
Monumental Dam. Development and improvement 
of collection and bypass systems continues with a 
new collection system completed at McNary Dam in 
1994, a new bypass system completed at Ice Harbor 
Dam in 1996, and extended-length submersible bar 
screens installed at Lower Granite, Little Goose, and 
McNary Dams in 1996 and 1997. 
The 1999 juvenile fish transport season was 
marked by above average flows after three either 
average or very high flow years. Juvenile fish 
collection at Lower Granite was 5,879,114 compared 
with 6,977,250 in 1998 and 4,700,325 in 1997. 
Collection in 1999 was up due to an increase in 
voluntary spill for juvenile fish passage and the 
operation of the prototype surface bypass collector. 
A total of 399,354 fish were bypassed back to the 
river in 1999 and 5,466,071 were transported. At 
Little Goose Dam, a record total of 7,004,421 
juvenile salmon and steelhead were collected in 1999 
compared to 2,527,245 in 1998. A total of 182,295 
30-8

WALLA WALLA, WA, DISTRICT 
fish were bypassed back to the river compared to 64 
in 1998. The larger number of fish bypassed in 1999 
was due to collection numbers exceeding barging 
capacity on 2 days in late May. A total of 6,789,775 
juvenile fish were transported from Little Goose Dam 
in 1999. At Lower Monumental Dam, 4,068,558 
juvenile salmon and steelhead were collected 
compared to 1,487,417 in 1998. A total of 407,965 
fish were bypassed from Lower Monumental Dam in 
1999 compared to 19,798 in 1998. At McNary Dam, 
all fish collected were bypassed until late June, in 
keeping with fishery agency requirements. A total of 
7,841,978 juvenile salmon and steelhead were 
collected in 1999 compared to 8,031,328 in 1998. 
Approximately 4,350,349 of the fish collected were 
bypassed back to the river to meet fishery agency 
requirements. A grand total of 24,794,071 juvenile 
salmon and steelhead were collected in 1999 
compared to 21,316,125 in 1998. A total of 
19,359,379 fish were transported in 1999, 78 percent 
of those collected. Of the fish transported, 
18,043,237 were transported by barge (93 percent) 
and 1,316,142 were trucked (7 percent). 
12. LOWER MONUMENTAL LOCK AND 
DAM, LAKE HERBERT G. WEST, WA 
Location. On the Snake River at the head of 
Lake Sacajawea (Ice Harbor Reservoir), about 
45 miles northeast of Pasco, WA, and 41.6 miles 
above the river mouth. 
Existing project. The project includes a dam, 
powerplant, navigation lock, two fish ladders, and 
appurtenant facilities. The project provides for 
navigation, hydroelectric power generation, 
recreation, and incidental irrigation. The reservoir 
has a normal operating range between elevations 540 
and 537 msl. Lake Herbert G. West extends 
upstream about 28.7 miles and provides slack water 
to Little Goose Lock and Dam. The dam structure is 
about 3,791 feet long and about 135 feet above the 
streambed. The fish passage facilities include two 
fish ladders, one at each end of the dam. The 
powerhouse has six 135,000 kW generating units in 
operation for a capacity of 810,000 kW. The 
spillway dam is 572 feet long and the overflow crest 
at elevation 483 msl is surmounted by eight tainter 
gates, 50 feet wide and 60 feet high, that provide 
capacity to pass a design flood of 850,000 cfs. Deck 
is at elevation 553 msl and provides a service road 
and track for a gantry crane. The navigation lock is a 
single-lift type with clear plan dimensions of 86 by 
666 feet and a 15-foot minimum depth of the sills. A 
navigation channel 250 feet wide, 14 feet deep, and 
28.1 miles long is provided from the dam to Little 
Goose Lock and Dam. Relocations along the lake 
included railroads and highways. Principal data are 
set forth in Table 30-J. 
Construction of the original project started in 
June 1961. It was placed in operation in 1969 and 
completed in 1976. Construction of the additional 
generating units started in 1975 and was completed 
in 1981. Power generation through September 1999 
was 87.14 billion kW hours. 
Lake West offers seven day-use areas, five 
areas offering camping, five boat launch areas, and 
one designated swimming beach. Total visitation on 
Lake West for the fiscal year was 151,576. 
Local cooperation. None required. 
Operations during fiscal year. Operation and 
Maintenance: During the fiscal year, 3.54 billion kW 
hours of electrical power were generated by the six 
generating units. Traffic through the navigation lock 
consisted of grains, petroleum products, fertilizer, 
wood products, and miscellaneous cargo and 
amounted to 4,631,997 tons during calendar year 
1998. Fiscal year costs were $6,157,881. 
13. LOWER SNAKE RIVER FISH AND 
WILDLIFE COMPENSATION PLAN, WA, OR, 
AND ID 
Location. At various locations within the 
Columbia and Snake River drainages in the States of 
ID, OR, and WA. 
Existing project. The project consists of a 
series of fish hatcheries, wildlife development areas, 
and purchase of off-site project lands for fishing, and 
hunting access. The project will compensate for loss 
of wildlife habitat and anadromous and resident 
fishery inundated as a result of construction of four 
multiple purposes dams and reservoirs on the Lower 
Snake River (Ice Harbor, Lower Monumental, Little 
Goose, and Lower Granite Locks and Dams). 
The real estate design memorandum and feature 
design memorandums on all hatcheries and satellites, 
the off-project wildlife lands, and the site selection 
report have all been approved. A final 
Environmental Impact Statement was filed with the 
Council on Environmental Quality on November 2, 
1977. The DNFH Expansion: Irrigon, Hagerman, 
Lyons Ferry, Lookingglass, McCall, Sawtooth, 
Magic Valley, Tucannon, Wallowa, and Clearwater 
hatcheries (including their respective satellite 
facilities) are all in operation. Transfer actions have 
been completed except for Irrigon, Clearwater, and 
30-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
Captain John Rapids acclimation facility. Transfer 
for these remaining facilities is scheduled to be 
complete by the end of FY 00. Fencing is complete 
at all wildlife development areas. Off-project land 
acquisition is 100 percent complete. Habitat 
development continues at many of these sites. 
Development of fall chinook salmon acclimation 
facilities and Lookingglass Hatchery water treatment 
has progressed, in accordance with Senate 
Conference Report (103-672, page 7). The 
compensation plan is scheduled for completion in FY 
02. 
Estimated Federal cost for the project is 
$232,000,000. 
Local cooperation. None required. 
Operations during fiscal year. Different 
alternatives for water treatment at Lookingglass 
Hatchery have been coordinated with U.S. Fish and 
Wildlife Service, Oregon Fish and Wildlife, and 
Confederated Tribes of the Umatilla Indian 
Reservation. An amendment to the design 
memorandum will be completed based on the 
recommended alternative. 
14. McNARY LOCK AND DAM, LAKE 
WALLULA, OR AND WA 
Location. On the Columbia River, 292 miles 
above mouth, near Umatilla, OR, and 3 miles above 
the mouth of the Umatilla River. 
Existing project. The project includes a dam, 
powerplant, navigation lock, two fish ladders, 
appurtenant facilities, and a system of levees and 
pumping plants. The project provides for slack water 
navigation, hydroelectric power generation, 
recreation, and incidental irrigation. The reservoir 
has a normal operating range between elevations 340 
and 335 msl. Lake Wallula extends upstream about 
64 miles and provides slack water to Ice Harbor Lock 
and Dam. The dam structure is 7,365 feet long and 
about 183 feet above the streambed. Fish passage 
facilities include two fish ladders. The powerhouse 
has fourteen 70,000 kW generating units in operation 
for a capacity of 980,000 kW. The spillway dam is 
1,310 feet long, and the overflow crest is at elevation 
291 msl and is surmounted by 
22 vertical lift gates, 50 feet wide and 51 feet high, 
which provide the capacity to pass a design flood of 
2.2 million cfs. The navigation lock is a single-lift 
type with clear plan dimensions of 86 by 683 feet and 
a 15-foot minimum depth over the sills. A 
navigation channel (250 feet wide, 14 feet deep, and 
32 miles long) is provided from the dam to the mouth 
of the Snake River. Relocations along the lake 
included railroad bridges over the Columbia and 
Snake Rivers in order to eliminate hazards to 
navigation. Principal project data are set forth in 
Table 30-J. 
Construction began in May 1947. It was placed 
in operation in 1953 and was completed in 1982. 
Power generation through September 1999 was 
273.20 billion kW hours. 
Local cooperation. None required. 
Operations during fiscal year. Operation and 
Maintenance: During the fiscal year, 6.61 billion kW 
hours of electrical power were generated by the 14 
generating units. Traffic through the navigation lock 
consisted of grains, petroleum products, fertilizer, 
wood products, and miscellaneous cargo and 
amounted to 8,591,046 tons during calendar year 
1998. Fiscal year costs were $14,908,297. 
Recreation areas on Lake Wallula include 19 
sites offering day-use or picnicking, 5 campgrounds, 
14 boat launching ramps, and 9 swimming areas. 
The Pacific Salmon Visitor Information Center at 
McNary Lock and Dam, staffed by park rangers, 
provides a regional overview of Corps efforts in 
salmon recovery issues. Total visitation on Lake 
Wallula for the fiscal year was 4,237,800. 
15. SNAKE RIVER DOWNSTREAM FROM 
JOHNSON BAR LANDING, OR, WA, AND ID 
Location. On the Snake River, downstream 
from Johnson Bar Landing, river mile 230. The 
Snake River, which is the largest tributary of the 
Columbia River, rises in Yellowstone National Park 
in western WY, flows generally westerly for about 
1,000 miles, and empties into the Columbia River, 
near Pasco, WA, 324 miles from the Pacific Ocean. 
Existing project. The River and Harbor Act of 
1945 authorized construction of dams, as necessary, 
for power, incidental irrigation, and open channel 
improvements for purposes of providing slack water 
navigation and irrigation between the mouth of the 
Snake River and Lewiston, ID. That authorization 
modified previous authorizations only for the portion 
of improvement below Lewiston, ID. Acts of 
June 13, 1902, and August 30, 1935, as they pertain 
to open river improvement from Lewiston, ID, to 
Johnson Bar Landing, remain part of the existing 
project. 
30-10

WALLA WALLA, WA, DISTRICT 
Improvements included in existing projects are 
Ice Harbor Lock and Dam, Lake Sacajawea; Little 
Goose Lock and Dam, Lake Bryan; Lower Granite 
Lock and Dam; Lower Monumental Lock and Dam, 
Lake Herbert G. West; and open-river improvement, 
Lewiston to Johnson Bar Landing. Each of the four 
locks and dams is described in an individual report, 
and cost and financial data for the entire project are 
shown on Table 30-A and K. 
Ice Harbor, Lower Monumental, Little Goose, 
and Lower Granite Locks and Dams are in full 
operation (see individual reports for details). For 
further details, see the following Annual Reports: 
page 2,246 for 1903; page 1,986 for 1906; page 
1,991 for 1915; and page 1,981 for 1962. 
Local cooperation. None required. 
Terminal Facilities. On the Snake River from 
the mouth to Johnson Bar Landing, there are 
18 privately-owned barge terminals in use for 
shipping grain, petroleum products, fertilizers, wood 
products, cement, and other general cargo. There are 
also 5 marinas and 28 small-boat launching ramps, 
all open to the public. The facilities serve slack 
water navigation to river mile 140, the site of 
Lewiston, ID. That slack water reaches the Lewiston, 
ID, and Clarkston, WA, area since the lake behind 
Lower Granite Lock and Dam was filled in February 
1975.
Operations during fiscal year. See individual 
reports for Ice Harbor, Lower Monumental, Little 
Goose, and Lower Granite Locks and Dams. On 
Snake River from Lewiston, ID, to Johnson Bar 
Landing, reconnaissance and condition surveys were 
conducted and survey markers were maintained. No 
costs were incurred this fiscal year. 
16. MISCELLANEOUS WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 
205, PL 858, 80th Congress, as amended: 
Fiscal year costs were $152,802 with three 
continuing flood control activities: (1) Section 205 
coordination ($13,666); (2) Goose Creek, Oakley ID 
($16,616); and (3) Negro Creek, Sprague, WA 
($44,360). Three new flood control activities: 
Lawyers Creek, Kamiah, ID ($10,004); (2) Coppei 
Creek, WA ($12,412); and (3) Mill Creek, WA 
($55,744). 
Emergency flood control activities-repair, 
flood fighting, and rescue work (PL 99, 84th 
Congress, and antecedent legislation): 
There were no Federal costs this fiscal year. 
Emergency Bank Protection (Section 14, 
Flood Control Act of 1946, PL 526, 79th 
Congress): 
Fiscal year costs were $90,253 for continuation 
of four feasibility studies: (1) Section 14 
Coordination ($12,784); (2) Big Wood River, Deer 
Creek, Bridge, ID ($13,709,); (3) Little Wood River, 
Gooding School, ID ($15,017); and (4) Payette 
River, Payette, ID ($48,743). 
Snagging and clearing of navigable streams 
and tributaries in interest of flood control (Section 
208, Flood Control Act of 1954, PL 780, 83rd 
Congress): 
There were no Federal costs this fiscal year. 
Project modification for the Improvement of 
the Environment pursuant to Section 1135(b), PL 
99-662, as amended: 
Fiscal year costs were $605,623 for 
continuation of two studies, one new study, and 
initial appraisal and coordination funds including: 
(1) Initial Appraisals, General ($2,138); 
(2) Coordination Account ($9,566); (3) Walla Walla 
River, OR and WA ($349,655); and (4) Grande 
Rhonde River, OR ($81,270). New study: Milton- 
Freewater, OR ($162,994) 
General Investigations 
17. SURVEYS 
Jackson Hole River and Wetland Restoration 
and Flood Control, WY. The Water Resources 
Development Act of 1986 authorized the Corps to 
operate and maintain a system of Federal and non- 
Federal levees along the Snake River in the vicinity 
of Jackson Hole, WY. A draft reconnaissance study 
of the potential for improving the system with levee 
raises, extensions, or relocations was completed in 
FY 90. The final reconnaissance study was 
combined with the Jackson Hole Restoration study. 
The Jackson Hole River and Wetland Restoration and 
Flood Control Reconnaissance Study was initiated to 
restore fish and wildlife habitat in the 500-year 
floodplain of the leveed reach of the Snake and Gros 
Ventre Rivers at Jackson, WY. The study evaluated 
30-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
losses resulting from levee construction over the past 
30 years and determined restoration measures for 19. PRECONSTRUCTION, ENGINEERING, 
these losses. The report was approved in FY 94. A AND DESIGN 
4-year feasibility study was initiated in FY 96. The 
feasibility study is in its final year. The report will No preconstruction, engineering, and design 
identify preferred alternative restoration actions for studies were conducted during the fiscal year. 
four reaches of the Snake River. 
Lower Boise River and Tributaries, ID. A 
reconnaissance study was initiated for the Lower 
Boise River and Tributaries in June 1994. An interim 
reconnaissance report was completed in May 1995. 
Although the report included economically feasible 
alternatives for flood control and environmental 
restoration, the Sponsor (Idaho Department of Water 
Resources) opted to pursue non-Federal actions. 
Until an appropriate sponsor is identified, the study 
has been reclassified to "inactive" status, as of 
September 6, 1995. 
Walla Walla River Watershed Study, OR, and 
WA. A reconnaissance study was initiated on 
August 29, 1996. The study objectives are riparian 
and wetland restoration, fish and wildlife restoration 
and enhancement, flood damage reduction, water 
quality improvements, water supply, erosion control, 
low flow augmentation, and recreation. 
Fiscal year cost for surveys was $450,808, 
including Special Studies (Jackson Hole Restoration, 
and Walla Walla River Watershed, $238,929); 
Miscellaneous Activities [Special Investigations, 
Federal Energy Regulatory Commission (FERC) 
Licensing Activities, North American Waterfowl 
Management Plan, Interagency Water Resource 
Development ($147,116)]; Coordination with other 
Federal Agencies ($20,152); and Planning Assistance 
to States ($44,611). In addition, $92,691 contributed 
funds were expanded for Jackson Hole Restoration. 
Floodplain management service ($156,842). 
18. COLLECTION AND STUDY OF BASIC 
DATA
During the fiscal year, flood hazard data for a 
number of locations in the District were collected and 
analyzed. Flood information was provided to several 
Federal agencies; to the States of ID, OR, and WA; to 
various cities and counties in those states; and to 
some private organizations. 
Total cost of collection and study of basic data 
during the fiscal year was $156,842, which included: 
Flood Plain Management Services ($19,985); 
Technical Services ($39,533); Quick Responses 
($4,959); and Special Studies ($92,365). 
30-12

WALLA WALLA, WA, DISTRICT 
TABLE 30-A COST AND FINANCIAL STATEMENT 
See Total to 
Section Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 1999 
In Text 
3. Jackson Hole, WY New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
(Contributed funds) Maint. 
Contrib. 
Cost 
4. Lucky Peak Lake, ID New Work 
Approp. 
Cost 
5. Mill Creek, WA 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab 
Approp. 
Cost 
7. Columbia River Fish New Work 
Mitigation Approp. 
Program, OR, WA, Cost 
and ID 
8. Dworshak Dam and New Work 
Reservoir, ID Approp. 
Cost 
Maint. 
Approp. 
Cost 
9. Ice Harbor Lock and New Work 
Dam, WA Approp. 
Cost 
Maint. 
Approp. 
Cost 
10. Little Goose Lock and New Work 
Dam, WA Approp. 
Cost 
Maint. 
Approp. 
Cost 
11. Lower Granite Lock New Work 
and Dam, WA Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
12. Lower Monumental New Work 
Lock and Dam, Approp. 
WA Cost 
Maint. 
Approp. 
Cost 
$-5,800 
1,620 
741,000 1,047,000 
732,877 851,718 
29,200 
15,925 
998,000 
974,531 
47,822 
806,417 
846,762 
907,000 1,140,500 
805,150 818,871 
- $2,525,070 
- 2,525,069 
671,761 
864,762 
48,182 
48,182 
943,300 
907,880 
852,890 
1,281,659 
827,918 
842,552 
6,523,1791 
7,218,0941 
48,906 378,798 
48,906 412,909 
- 19,652,0812 
- 19,648,9812 
1,039,123 23,471,7043 
1,076,698 23,461,5243 
- 2,258,4954 
- 2,258,4954 
1,613,387 17,126,717 
1,546,048 17,032,030 
- - - - 17,714,102 
- - - - 17,714,102 
52,490,000 42,149,000 37,281,000 34,851,000 315,468,00019 
53,665,872 39,338,812 39,581,675 28,949,699 308,713,52319 
S- - - 327,482,1965 
- - - - 327,482,1975 
9,369,000 13,877,500 8,036,175 9,652,318 150,630,0236 
9,108,391 11,009,351 11,076,208 9,752,198 150,497,7856 
- - - - 168,028,7577 
- - - - 168,029,7567 
13,255,000 7,844,600 7,045,100 9,419,807 152,409,9128 
12,918,690 8,233,742 7,064,312 9,452,036 152,308,0968 
- - - - 233,361,0219 
- - - - 233,361,0109 
4,740,000 4,275,800 4,232,800 6,230,953 105,317,11110 
4,534,634 4,468,078 4,190,318 6,199,714 105,095,32810 
- - - - 374,836,315" 
- - - - 374,836,31511 
8,723,000 8,960,400 9,365,300 10,052,838 147,551,00612 
8,602,507 8,990,729 9,219,308 10,294,807 147,436,03312 
- - - - 20,000 
- - - - 20,000 
- - - - 238,612,73213 
- - - - 237,222,73313 
6,956,000 4,791,900 5,048,600 6,250,690 107,286,19914 
6,546,960 5,165,048 5,039,295 6,157,881 107,115,13214 
30-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
TABLE 30-A (Continued) COST AND FINANCIAL STATEMENT 
See Section Total to 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 1999 
13. Lower Snake Fish New Work 
and Wildlife Approp. 5,917,000 4,238,000 2,907,000 1,304,000 228,729,241 
Compensation, Cost 6,524,909 4,162,680 2,653,234 1,620,153 228,335,987 
ID, OR, and WA 
New Work 
(Contributed Contrib. - - - - 223,965 
Funds) Cost - - - - 223,965 
14. McNary Lock and New Work 
Dam, Lake Approp. - - - - 326,293,7055 
Wallula, OR, and Cost - - - - 360,103,408's 
WA 
Maint. 
Approp 12,353,935 11,958,900 12,627,724 14,193,157 270,449,78516 
Cost 12,398,730 11,990,155 11,696,358 14,908,297 269,985,69016 
(Contributed Funds) Maint. 
Contrib. - - - - 43,707 
Cost - - - - 43,707 
15. Snake River New Work 
Downstream Approp. 18,645,000 11,266,000 5,932,000 8,491,000 1,128,908,58917 
from Johnson Cost 17,672,647 12,057,266 6,373,000 6,555,000 1,126,926,587 7 
Bar Landing, 
OR, WA, and ID 
Maint. 
Approp. 33,706,066 25,872,702 25,691,800 31,954,288 513,156,73118 
Cost 32,606,119 26,857,597 25,513,233 32,104,438 512,543,00718 
From the county, $39,000 of the cost-sharing funds were received in FY 
90, but were not expended until FY 91. 
2 Includes $570,831 appropriated and expended for Code 710, Recreation 
Facilities at Completed Projects. 
3 Includes $66,700 allotted and expended under Maintenance and 
Operation of Dams and Other Improvements of Navigable Waters. 
4 Excludes $80,000 contributed funds, but includes $96,340 appropriated 
and expended for Code 710, Recreation Facilities at Completed 
Projects. 
s Includes $2,046,100 regular project construction funds appropriated for 
and expended by Department of Interior in FYs 69 through 72 for 
hatchery operations. Includes $655,000 appropriated and expended 
for additional unit. 
6 Includes $20,137,847 regular project operation and maintenance funds 
expended by Department of Interior starting FY 72 for hatchery 
operations. FYs 72 through 78, funds of $6,097,000 were charged to 
project as a cost, but not as an expenditure for accounting purposes. 
Includes $48,182 appropriated and expended under Special Recreation 
Use Fees. After FY 92, special recreation use fees included with 
O&M. Includes $1,310,750 appropriated and expended under 
Maintenance and Operation of Dams and Other Improvements of 
Navigable Waters. 
Excludes $82,500 contributed for artificial spawning channel. Includes 
$36,748,021 appropriated and expended for additional Units 4 through 
6. Includes $914,256 appropriated and expended for Code 710, 
Recreation Facilities at Completed Projects. Includes $789,000 
appropriated and $788,999 expended for Columbia River Fish 
Mitigation Program. 
8 Includes $48,919 appropriated and expended under Special Recreation 
Use Fees. After FY 92, special recreation fees included with O&M. 
Includes $641,063 appropriated and expended under Maintenance and 
Operation of Dams and Other Improvements of Navigable Waters. 
Excludes $178,000 appropriated and expended - Bonneville Power 
Administration funds. 
9 Includes $60,941,807 appropriated and expended for additional Units 4 
through 6. Includes $12,006,000 appropriated and $12,006,000 
expended for Columbia River Fish Mitigation Program. 
1o Includes $621,063 appropriated and expended under Maintenance and 
Operation of Dams and Other Improvements of Navigable Waters. 
Excludes $31,000 appropriated and expended - Bonneville Power 
Administration funds. 
" Includes $46,212,534 appropriated and expended for additional Units 4 
through 6. Excludes $405,819 contributed funds on lock and dam 
project. Includes $63,800 appropriated and expended for Code 710, 
Recreation Facilities at Completed Projects. Includes $10,645,966 
appropriated and $7,056,001 expended for Columbia River Fish 
Mitigation Program. 
12 Includes $338,163 appropriated and expended under Maintenance and 
Operation of Dams and Other Improvements of Navigable Waters. 
Excludes $32,000 appropriated and expended - Bonneville Power 
Administration funds. 
13 Includes $51,661,371 appropriated and expended for additional Units 4 
through 6. Includes $2,239,000 appropriated and $2,239,000 
expended for Columbia River Fish Mitigation Program. 
14 Includes $372,376 appropriated and expended under Maintenance and 
Operation of Dams and Other Improvements of Navigable Waters. 
Excludes $36,000 appropriated and expended - Bonneville Power 
Administration funds. 
i5 Includes $1,976,586 appropriated and expended for Code 710, 
Recreation Facilities at Completed Projects. Includes $3,778,000 
appropriated and $3,778,000 expended for Columbia River Fish 
Mitigation Program. 
16 Includes $28,851 appropriated and expended under special recreation use 
fees and $1,035,860 appropriated and expended under Maintenance 
and Operation of Dams and Other Improvements of Navigable Waters. 
After FY 92, Special Recreation Use Fees included with O&M. 
Excludes $505,500 appropriated and $301,258 expended - Bonneville 
Power Administration funds. 
17 Includes $400,150 for new work on previous projects (Pasco to 
Lewiston), and $34,613 for new work appropriation used for 
maintenance prior to 1953. Excludes $167,500 contributed funds for 
new work consisting of $85,000 for new work on existing projects 
(Pasco to Riparia), plus $82,500 for new work on existing artificial 
spawning channel. 
30-14

WALLA WALLA, WA. DISTRICT 
s8 Includes $186,570 appropriated and expended for maintenance of 
previous projects (Pasco to Lewiston) and $401,019 appropriated and 
$390,527 expended open river Pasco to Lewiston and Lewiston to 
Johnson Bar Landing. 
'9 This does not include the appropriations and cost from the mitigation 
analysis under the Columbia River Fish Program, which will be 
allocated at the conclusion of the analysis. 
30-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
TABLE 30-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing Project and Work Authorized Documents 
In Text Act 
1. 
H. Doc 531, 81st Congress, 
2nd Session 
30-16 
COLUMBIA RIVER BASIN, LOCAL FLOOD 
PROTECTION PROJECTS 
17 May 50 Blackfoot Area, Snake River, Idaho. Levee left bank. 
Blackfoot River, Idaho. Levees, channel improvement, 
and rectification works. 
Boise Valley, Boise River, Idaho. Channel improvement 
and enlargement, levees, and revetments in Ada 
County. Canyon County unit was deauthorized 
April 18, 1967. Ada County Unit was deauthorized in 
1986. 
Camas Creek, Idaho. Channel deepening and 
rectification of a 20-mile reach of Camas Creek. 
Deauthorized in 1965. 
Gooding Area, Little Wood River, Idaho. Channel 
improvement. 
Grande Ronde Valley, Oregon. Levees and channel 
clearing, straightening and realignment; would 
complement stream regulation by upstream storage 
projects. Deauthorized in 1986. 
Heise-Roberts Extension, Snake River, Idaho. Channel 
clearing and rectification, levees, and bank protection. 
Henrys Fork Unit deauthorized in 1986. 
Jackson Hole, Snake River, Wyoming. Flood protection. 
Kendrick, Potlatch River, Idaho. Revetted levee. 
Little Wood River, Idaho. Flood protection in immediate area. 
Deauthorized in 1965. 
Malheur River, Oregon. Channel rectification, levees, and 
bank protection at Vale. Willow Creek unit was 
deauthorized on October 14, 1969. 
Mud Lake, Idaho, Idaho Falls Area. Flood protection. 
Deauthorized in 1990. 
Palouse River, Washington. Flood protection for urban and 
rural areas at Garfield and near Malden. Deauthorized in 
1986. 
Payette Valley, Idaho. Channel rectification, levees, and 
bank protection along 38 miles of Payette River below 
Black Canyon Dam. Payette Valley was deauthorized on 
October 3, 1978. 
Portneuf River and Marsh Creek, Idaho. Concrete-lined 
channel through Pocatello. Inkom-Marsh Creek unit was 
deauthorized on October 14, 1969. 
Shelley Area, Snake River, Idaho. Bank protection. 
South Fork Clearwater River, Idaho. Emergency 
construction of levees and revetments. Deauthorized in 
1986. 
Teton River, Idaho. Flood protection. Deauthorized in 1986. 
Tomanovich-Salmon City, Salmon, Idaho. Channel 
improvement. 
Weiser River, Weiser Area, Idaho. Intermittent channel 
realignment and improvement, levees, and bank 
protection, lower river area. Project deauthorized in 1990. 
Whitebird Creek, Idaho. Flood protection. Deauthorized in 
1986.

WALLA WALLA, WA DISTRICT 
TABLE 30-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section In Authorizing Project and Work Authorized Documents 
Text Act 
Table 30-G 
Table 30-E 
Table 30-E 
Table 30-E 
4. 
28 Jul 38 
as amended 
18 Aug 41 
MILL CREEK LAKE, WALLA WALLA, 
WASHINGTON 
Off-stream storage project upstream from Walla Walla. 
Channel improvement through Walla Walla; concrete-lined 
Channel. 
31 Oct 92 Redesignation of reservoir to the Virgil B. Bennington Lake. 
OWYHEE RIVER, OREGON 
24 Sep 54 Gravel, brush and small tree removal from 12 miles of 
as amended Owyhee River. 
ZINTEL CANYON DAM, WASHINGTON 
27 Oct 65 Local protection reservoir to provide flood protection to 
portions of the City of Kennewick, Washington. 
COLUMBIA RIVER FISH MITIGATION PROGRAM 
19 Jul 88 Design, test and construction of fish bypass facilities at 
Lower Monumental, Ice Harbor, Little Goose, Lower 
Granite, and McNary Dams. 
CATHERINE CREEK LAKE, OREGON 
27 Oct 95 Flood control and multipurpose dam on Catherine Creek 
near Union, Oregon. Project deauthorized in 1990. 
CATHERINE CREEK, OREGON 
24 Sep 54 Organic debris removal along Catherine Creek. 
CLEAR AND BURNT RIVER, OREGON 
24 Jul 46 Construction of riprap bank protection at city of Huntington 
Waste Water Lagoon. 
COLFAX, PALOUSE RIVER, WASHINGTON 
22 Dec 44 Provides for flood control works in vicinity of and through 
Colfax, Washington, by channel enlargement and 
modification, levees, floodwalls, revetments, and 
modification of railroad bridges. 
LUCKY PEAK LAKE, IDAHO 
24 Jul 46 Dam for flood control, irrigation, and recreation. 
22 Oct 76 Second outlet for streamflow maintenance. Deauthorized 
in 1990. 
22 Dec 44 Construction, operation, and maintenance of recreation 
as amended facilities. 
30-17 
H. Doc. 280, 89th Cong., 
1st Session. 27 Oct 65 
Sec 208, PL 83-780, 
Authorized by Chief 
Engineers. 3 Sep 85 
Sec 14, PL 79-526, 
Authorized by Chief of 
Engineers. 10 Jul 85 
Flood Control Act of 1944 
H. Doc. 888, 77th Cong., 
2nd Session 
PL 79-526, Chief of 
Engineers Report, dated 13 
May 46. 
PL 94-587 
Sec. 4, Flood Control Act 
of 1944 
H. Doc. 578, 75th 
Cong., 3rd Session 
H. Doc. 719, 76th Cong. 
Sec 377, PL 77-228, Cong. 
3rd Session 
Sec. 118 PL 102-580 102nd 
Cong. 
Sec. 208, PL 83-780 
Authorized by Chief of 
Engineers. 11 Feb 85 
PL 89-298, Sec. 201 
PL 100-371 
Table 30-E 
Table 30-E 
7.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
TABLE 30-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section In Authorizing Project and Work Authorized Documents 
Text Act 
(BRUCES EDDY) DWORSHAK DAM AND 
RESERVOIR, IDAHO 
3 Jul 58 Preparation of detailed plans. 
23 Oct 62 Bruces Eddy Dam and reservoir for flood control, navigation, 
power, recreation, and area redevelopment. 
15 Aug 63 Redesignation of project as Dworshak Dam and Reservoir. 
23 Oct 62 Dworshak added Units 4, 5, and 6, Idaho. Units 5 and 6 
were deauthorized in Fiscal Year 1990. Unit 4 was 
deauthorized in Fiscal Year 1995. 
ICE HARBOR LOCK AND DAM, LAKE SACAJAWEA, 
WASHINGTON 
2 Mar 45 Unit 1 of 4, Lower Snake River Project. Lock and dam for 
navigation, power, recreation, and incidental irrigation. 
22 Dec 44 Construction, operation, and maintenance of recreation 
as amended facilities. 
LITTLE GOOSE LOCK AND DAM, LAKE BRYAN, 
WASHINGTON 
2 Mar 45 Unit 3 of 4, Lower Snake River Project. Lock and dam for 
navigation, power, recreation, and incidental irrigation. 
31 Dec 70 Designation of reservoir as Lake Bryan. 
LOWER GRANITE LOCK AND DAM, WASHINGTON 
2 Mar 45 Unit 4 of 4, Lower Snake River Project. Lock and dam for 
navigation, power, recreation, and incidental irrigation. 
LOWER MONUMENTAL LOCK AND DAM, LAKE 
HERBERT G. WEST, WASHINGTON 
2 Mar 45 Unit 2 of 4, Lower Snake River project. Lock and dam for 
navigation, power, recreation, and incidental irrigation. 
25 May 78 Designation of reservoir as Lake Herbert G. West. 
13. 
22 Oct 76 
as amended 
17 Nov 86 
LOWER SNAKE RIVER FISH AND WILDLIFE 
COMPENSATION PLAN, WASHINGTON, OREGON, 
AND IDAHO 
Fish hatcheries and replacement of wildlife habitat. 
Changes to land acquisition authority. 
McNARY LOCK AND DAM, LAKE WALLULA, 
OREGON AND WASHINGTON 
2 Mar 45 Lock and dam for navigation, power, recreation, and 
irrigation. 
22 Dec 44 Construction, operation, and maintenance of recreation 
as amended facilities. 
17 Nov 86 Construction, operation, and maintenance of a second 
powerhouse. 
McNary Second Powerhouse automatically deauthorized on 
16 Nov 91. 
S. Doc. 51, 84th Cong., 1st 
Session 
H. Doc. 403, 87th, PL 87- 
874 Cong., 2nd Session 
PL 88-96 
PL 87-874 
H. Doc. 704, 75th Cong., 
3rd Session 
Sec. 4, Flood Control Act 
of 1944 
H. Doc. 704, 75th Cong., 
3rd Session 
PL 91-638 
H. Doc. 704, 75th Cong., 
3rd Session 
H. Doc. 704, 75th Cong., 
3rd Session 
PL 95-285 
PL 94-587 
H.R. 6 PL 99-662 
H. Doc. 704, 75th Cong., 
3rd Session 
Sec. 4, Flood Control Act 
of 1944 
H.R. 6, PL 99-662 
Sec. 1001, PL 99-362 
30-18 
9. 
10. 
11. 
12. 
14.

WALLA WALLA, WA DISTRICT 
TABLE 30-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section In Authorizing Project and Work Authorized Documents 
Text Act 
LEWISTON-CLARKSTON BRIDGE, IDAHO AND 
WASHINGTON 
Four-lane highway bridge and approaches. 
Increase of authorized amount to $23,200,000. 
Approach roadway from bridge to Sixteenth Avenue in 
Clarkston, Washington. Increase of authorized amount to 
$24,000,000. 
15. SNAKE RIVER TO JOHNSON BAR, OREGON, 
WASHINGTON, AND IDAHO 
13 Jun 02 Open-river navigation Riparia to Pittsburg Landing. 
25 Jun 10 Mouth to Riparia. 
30 Aug 35 Pittsburg Landing to Johnson Bar 
2 Mar 45 Supersedes previous legislation mouth to Lewiston, Idaho, 
only. See Ice Harbor, Lower Monumental, Little Goose, 
and Lower Granite Locks and Dams. 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Table E 18 Aug 41 Dayton, Touchet River, Washington. Flood protection. 
Milton-Freewater, Walla Walla River, Oregon flood 
protection. 
17 Nov 86 Malheur Lake, Oregon, Flood Damage 
Table E 22 Dec 44 Heise-Roberts Area, Snake River, Idaho. Channel 
improvement. 
Malheur Improvement District, Snake River, Oregon. Flood 
Protection. 
Table E 11 Jul 56 Esquatzel Coulee, Connell, Washington. Levees and 
protective work. 
Lower Dry Creek, Lowden, Washington. Channel 
improvement. 
Mission and Lapwai Creeks, Idaho. Construction of levee. 
Table E 23 Oct 62 Bear Creek, Kendrick, Idaho. Channel improvement. 
Lapwai Creek Culdesac, Idaho. Construct left bank levee 
Lyman Creek near Rexburg, Idaho. Channelization 
Tucannon River, Camp Wooten, Washington. Levee and 
channel work. 
23 Oct 62 Ririe Lake, Willow Creek, Idaho. Storage for flood control. 
3. and 17 May 50 Jackson Hole, Wyoming. Flood control protection by 
Table E channel improvement consisting of channel rectification, 
levees, and revetment along Snake River in vicinity of 
Wilson, Wyoming. 
17 Nov 86 Also operation, maintenance, modifications, and 
additions are Federal responsibility. 
17 Nov 86 Little Wood River, Idaho. Flood protection. 
H. Doc. 127, 56th Cong, 
2nd Session 
H. Doc. 411, 55th Cong, 
2nd Session 
Rivers and Harbors 
Committee, Doc. 25, 72nd 
Cong, 1st Session 
H. Doc. 704, 75th Cong., 
2nd Session 
H. Doc. 662, 76th Cong., 
3rd Session 
H. Doc. 719, 76th Cong., 
3rd Session 
PL 99-662 
H. Doc. 452, 77th Cong., 
1st Session 
PL 87-685 
PL 87-874 
PL 87-874 
PL 81-188 
PL 99-662 
PL 99-662 
30-19 
Table F 
22 Oct 76 
29 Dec 81 
30 Jul 83 
PL 94-587 
PL 97-140 
PL 98-63

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
TABLE 30-B (Continued) AUTHORIZING LEGISLATION 
See Date 
Section In Authorizing Project and Work Authorized Documents 
Text Act 
Table G 23 Oct 62 Blackfoot Reservoir, Blackfoot River, Idaho. Modification to PL 87-874 
increase spillway capacity. Authorized in Oct 1962 and 
17 Nov 86 deauthorized in 1986. PL 99-662 
27 Oct 65 Grande Ronde Lake, Oregon. Flood control, irrigation, PL 89-298 
and water. 
Supply, anadromous fish, downstream and resident trout PL 89-298 
fishery, recreation, and downstream power. 
17 Nov 86 Deauthorized in 1986. 
Table G 17 Nov 86 Cottonwood Creek Dam, Idaho. Protection to highly- PL 99-662 
Developed urban and suburban areas against flash floods. 
Authorized Oct 1962, PL 89-298. Deauthorized in 1986. 
Table G 22 Dec 44 Pullman, Palouse River, Washington. Flood protection. H.D. 452, 77th Cong., 1st 
Authorized Dec 1944. Deauthorized in 1986. Session 
Table G 7 Nov 66 Stuart Gulch Dam, Idaho. Protection to highly-developed PL 89-789, Section 201 
urban and suburban areas against flash floods. Authorized 
7 Nov 66. Deauthorized in 1979. 
OTHER AUTHORIZED 
TABLE 30-C NAVIGATION PROJECTS 
For Last Full Cost to Sep 30, 1999 
Report See Operation and 
Project Status Annual Report Construction Maintenance 
For: 
Columbia River and Tributaries above Completed 1968 $1,851,195 
Celilo Falls to Kennewick, Washington 
1. Obviated by The Dalles, John Day, and 
McNary Projects. 
30-20

WALLA WALLA, WA DISTRICT 
OTHER AUTHORIZED 
TABLE 30-E FLOOD CONTROL PROJECTS 
For Last Full Cost to Sep 30, 1999 
Project Status Report See Annual Construction Operation and 
Report For: Maintenance 
Asotin Creek, Asotin, ID' Completed 1951 $12,019 
Bear Creek, Kendrick, ID' Completed 1970 133,518 
Big Wood River, ID5 Completed 1985 784,930 
Boise River, ID5 Completed 1985 236,500 
Catherine Creek, OR Completed 1990 28,800 
Clear and Burnt River, OR Completed 1990 99,500 
Colfax, Palouse River, WA Completed 1990 5,810,240 
Connell, WA' Completed 1967 60,000 
Cottonwood Creek Community Church, Completed 1984 23,400 
Culdesak, ID2 
Dayton, Touchet River, WA Completed 1966 380,617 
Dry Creek, WA' Completed 1961 384,426 
Esquatzel Coulee, Connell, WA' Completed 1967 293,092 
Esquatzel Coulee, Mesa, WA' Completed 1969 38,631 
Gooding Area, ID' Completed 1954 86,126 
Graves Creek, ID' Completed 1953 75,469 
Heise-Roberts Area, Snake River, ID Completed 1955 1,586,439 
Jackson Hole, Snake River, WY Completed 1978 2,504,245 
Lapwai Creek, Culdesac, ID' Completed 1972 176,833 
Lava Hot Springs, Portneuf River, ID' Completed 1973 113,296 
Little Wood River, ID6 Active 1993 353,534 
Lower Dry Creek, Lowden, WA' Completed 1972 17,600 
Lyman Creek, ID' Completed 1971 230,315 
Malheur Lake Project, OR7 Completed 1990 4,729,348 
Malheur Improvement District, Snake Completed 1957 138,608 
River, OR 
Milton-Freewater, Walla Walla River, OR3 Completed 1968 2,327,578 
Mission and Lapwai Creeks, ID' Completed 1965 54,538 
Orofino Creek and Clearwater River, Inactive 1949 23,050 
Orofino, ID 2 
Owyhee River, OR Completed 1990 69,316 
Rapid Creek, ID5 Completed 1985 19,500 
Pataha Creek, Pomeroy, WA2 Completed 1977 110,815 
Pataha Creek at Pomeroy, WA2 Completed 1993 308,511 
Payette River, Emmett Sewage Lagoon, ID2 Completed 1967 39,172 
Riverside Area, Pasco, WA' Completed 1972 28,839 
Ririe Lake, ID Completed 1983 39,677,448 
Sewage Lagoon, Vale, OR2 Completed 1985 75,000 
Shobe Canyon, Heppner, OR' Completed 1970 5,000 
Snake River, Blackfoot, ID' Completed 1980 131,700 
Snake River, Heise Bridge Location, ID2 Completed 1952 8,501 
Snake River, Stevens, Blackfoot, ID' Completed 1968 32,425 
South Fork, Boise River, IDS Completed 1985 44,400 
South Fork Clearwater River, Completed 1973 61,055 
Kooskia-Sites, ID 
Tomanovich-Salmon City, ID' Completed 1955 128,635 
Touchet River, Waitsburg, WA' Completed 1973 72,140 
Tucannon River, Wooten, WA' Completed 1971 74,305 
Umatilla River, OR' Completed 1961 161,540 
Wallowa River, Weaver Bridge, OR2 Completed 1960 16,118 
Weiser River, ID 5 Completed 1985 293,739 
30-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
OTHER AUTHORIZED 
TABLE 30-E FLOOD CONTROL PROJECTS (Continued) 
For Last Full Cost to Sep 30, 1999 
Project Status Report See Annual Construction Operation and 
Report For: Maintenance 
Willow Creek, ID' Completed 1963 976 
Willow Creek Lake, OR Completed 1985 37,231,332 
Yakima River, West Richland, WA",4 Completed 1964 229,890 
Zintel Canyon Dam, WA' Completed 1995 6,801,788 
1 Authorized by Chief of Engineers pursuant to Section 205, 
PL 80-858. 
2 Authorized by Chief of Engineers pursuant to Section 14, 
PL 79-526. 
3 Exclusive of $6,300 contributed funds. 
4 Exclusive of $9,000 contributed funds. 
5 Authorized by Chief of Engineers pursuant to Section 208, 
PL 83-780. 
6 Authorized by Chief of Engineers pursuant to PL 99-662. No 
funds authorized until Fiscal Year 1990. 
7 Exclusive of $853,712 contributed funds. 
8 Authorized by Chief of Engineers pursuant to PL 89-298. 
Construction began in 1992. 
OTHER AUTHORIZED 
TABLE 30-F MULTI-PURPOSE PROJECTS, INCLUDING POWER 
For Last Full Cost to Sep 30, 1999 
Project Report See Annual Construction Operation and 
Report For: Maintenance 
Lewiston-Clarkston Bridge, ID and WA 1990 23,409,832 
TABLE 30-G DEAUTHORIZED PROJECTS 
For Last Full Contributed 
Project Report See Annual Date Federal Funds Funds 
Report For: Deauthorized Expended Expended 
Asotin Dam, Snake River, ID and WA 
Blackfoot Reservoir, ID 
Boise Valley, ID 
Ada County Unit 
Canyon County Unit 
Camas Creek, ID 
Catherine Creek Lake, OR 
Cottonwood Creek Dam, Boise, ID 
Dworshak Unit 4 
Dworshak Units 5 and 6, ID 
Grande Ronde Lake, OR 
Grande Ronde Valley, OR 
Heise-Roberts Extension, ID 
Henrys Fork Unit 
Little Wood River, ID 
Lower Walla Walla River, WA 
Lucky Peak 2nd Outlet, ID 
Malheur River, OR 
Willow Creek Unit 
McNary Second Powerhouse, OR and WA 
Mill Creek, WA 
1964 
1980 
1963 
1963 
1960 
1978 
1972 
1993 
1990 
1966 
1958 
1968 
1960 
1953 
1988 
1961 
1991 
1958 
1975 
1986 
1986 
1967 
1965 
1990 
1986 
1995 
1990 
1986 
1986 
1986 
1965 
1986 
1990 
1969 
1991 
1977 
267,626 
46,084 
10,600 
9,080 
1,552,000 
195,686 
655,000 
169,195 
21,334 
4,000 
13,000 
5,671,000 
3,537 
30-22

WALLA WALLA, WA DISTRICT 
TABLE 30-G DEAUTHORIZED PROJECTS (Continued) 
For Last Full Contributed 
Project Report See Annual Date Federal Funds Funds 
Report For: Deauthorized Expended Expended 
Mud Lake Area, ID 1957 1990 5,994 - 
Palouse River, WA 1958 1986 2,000 - 
Payette Valley, ID 1960 1978 23,178 - 
Portneuf River, Inkom-Marsh Creek, ID 1969 1969 - - 
Pullman, Palouse River, WA 1964 1986 289,109 - 
S. Fork Clearwater River, ID 1973 1986 3,899 - 
Stuart Gulch Dam, Boise, ID 1974 1979 234,100 - 
Teton River, ID 1955 1986 10,387 - 
Touchet River, WA 1957 1977 11,198 - 
Weiser River, Weiser Area, ID 1960 1990 112,757 - 
Whitebird Creek, ID 1957 1986 1,896 - 
COLUMBIA RIVER BASIN, LOCAL FLOOD PROTECTION 
TABLE 30-H PROJECTS (SEE SECTION 1 OF TEXT) 
Estimated Cost to 
Project Status Federal Sep 30, 1999 
Cost 
Blackfoot Area, Snake River, ID Completed - $209,403 
Blackfoot River, ID Completed - 391,143 
Heise-Roberts Extension, ID, Snake River Unit Completed - 3,402,958 
Kendrick, Potlatch River, ID Completed - 85,873 
Malheur River, OR, Vale Unit Completed - 333,581 
Mud Lake, ID Inactive 1,187,000 5,996 
Portneuf River and Marsh Creek, ID, Pocatello Unit Completed - 6,456,032' 
Shelley Area, Snake River, ID Completed - 32,348 
TOTAL 10,917,334 
Exclusive of $36,800 contributed funds. 
INSPECTION OF COMPLETED FLOOD CONTROL 
TABLE 30-I PROJECTS (SEE SECTION 3 OF TEXT) 
Inspection 
Project Complete 
Big Wood River, ID August 1999 
Blackfoot River, ID July 1999 
Boise River, ID September 1999 
Clearwater River, ID July 1999 
Columbia River, WA August 1999 
Little Wood River, ID September 1999 
Lyman Creek, ID September 1999 
Palouse River, WA July 1999 
Payette River, ID August 19989 
Portneuf River, ID September 1999 
Potlatch River, ID August 1999 
Salmon River, ID August 1999 
Snake River, ID August 1999 
Touchet River, WA August 1999 
Tucannon River, WA August 1999 
Walla Walla River, OR September 1999 
Walla Walla River, WA September 1999 
Yakima River, WA August 1999 
30-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
PRINCIPLE DATA CONCERNING NAVIGATION LOCK, 
TABLE 30-J SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
Project 
Dworshak Dam and 
Reservoir, ID 
(see Section 8 of text) 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
Concrete Gravity 
September 1974 
150,500 cfs 
1,545 feet 
Tainter 
50 ft by 56.4 ft
2 
POWERPLANT 
Length 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Space for Additional 
Rating, Each 
Total Potential Capacity 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Flood Control Storage 
Lake Length 
Lake Water Surface Area at Elevation 1,600 
Length of Shoreline 
Ice Harbor Lock and Dam, WA 
(see Section 9 of Text) 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Open to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
428 feet 
2 @ 90,000 kw 
1 @ 220,000 kw 
400,000 kw
3 
3 @ 220,000 kw 
1,060,000 kw 
717 feet 
March 1973 
1,600 - 1,445 feet 
1,605 feet 
2,000,000 ac-ft 
53.6 miles 
17,090 acres 
175 miles 
86 feet 
675 feet 
97 feet 
100 feet 
105 feet 
16 feet 
May 1962 
Concrete Gravity 
January 1962 
850,000 cfs 
391 feet 
Tainter 
50 ft by 52.9 ft 
10 
30-24

WALLA WALLA, WA DISTRICT 
TABLE 30-J (Continued) 
PRINCIPLE DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
Project 
POWERPLANT 
Length 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line 
Little Goose Lock and Dam, WA 
(see Section 10 of text) 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 440 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
671 feet 
6 
3 @ 90,000 kw 
3 @ 111,000 kw 
603,000 kw 
226 feet 
December 1961 
440-437 feet 
446 feet 
31.9 miles 
8,375 acres 
14 ft by 250 ft 
80 miles 
86 feet 
668 feet 
93 feet 
98 feet 
101 feet 
15 feet 
May 1970 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line 
Concrete Gravity 
January 1970 
850,000 cfs 
581 feet 
Tainter 
50 ft by 60 ft
8 
656 feet 
243 feet 
6 
135,000 kw 
810,000 kw 
226 feet 
March 1970 
30-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
TABLE 30-J (Continued) 
Project 
PRINCIPLE DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
Lower Granite Lock and Dam, WA 
(see Section 11 of text) 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 738 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operation Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 738 
Navigation Channel, Depth by Width 
Length of Shoreline 
638-633 feet 
646.5 feet 
37.2 miles 
10,025 acres 
14 ft by 250 ft 
92 miles 
86 feet 
674 feet 
95 feet 
100 feet 
105 feet 
15 feet 
May 1975 
Concrete Gravity 
February 1975 
850,000 cfs 
681 feet 
Tainter 
50 ft by 60 ft 
8 
656 feet 
243 feet 
6 
135,000 kw 
810,000 kw 
228 feet 
April 1975 
738-733 feet 
746.5 feet 
39.3 miles 
8,900 acres 
14 ft by 250 ft 
91 miles 
30-26

WALLA WALLA, WA DISTRICT 
TABLE 30-J (Continued) 
PRINCIPLE DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM. POWERPLANT, AND IMPOUNDMENT 
Project 
Lower Monumental Lock and Dam, 
WA (see Section 12 of text) 
McNary Lock and Dam, OR 
and WA (see Section 14 of text) 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Opened to Navigation 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Width 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 540 
Navigation Channel, Depth by Width 
Length of Shoreline 
NAVIGATION LOCK 
Clear Width 
Clear Length 
Lift: 
Minimum 
Average 
Maximum 
Minimum Water Depth Over Sills 
Open to Navigation 
86 feet 
666 feet 
97 feet 
98 feet 
103 feet 
15 feet 
April 1969 
Concrete Gravity 
March 1969 
850,000 cfs 
483 feet 
Tainter 
50 ft by 60 ft
8 
656 feet 
243 feet 
6 
135,000 kw 
810,000 kw 
242 feet 
May 1969 
540-537 feet 
548 feet 
28.7 miles 
6,590 acres 
14 ft by 250 ft 
78 miles 
86 feet 
683 feet 
67 feet 
75 feet 
83 feet 
15 feet 
November 1953 
30-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
TABLE 30-J (Continued) 
PRINCIPLE DATA CONCERNING NAVIGATION LOCK, 
SPILLWAY DAM, POWERPLANT, AND IMPOUNDMENT 
Project 
SPILLWAY DAM 
Type of Construction 
Completed 
Maximum Capacity 
Crest Elevation 
Control Gates: 
Type 
Size, Width by Height 
Number 
POWERPLANT 
Length 
Generating Units: 
Number Installed 
Rating, Each 
Total Capacity Installed 
Maximum Structural Height 
First Power-On-Line 
IMPOUNDMENT 
Elevations: 
Normal Operating Range 
Maximum 
Lake Length 
Lake Water Surface Area at Elevation 340 
Navigation Channel, Depth by Width 
Length of Shoreline 
Concrete Gravity 
October 1953 
2,200,000 cfs 
291 feet 
Vertical Lift 
50 ft by 51 ft 
22 
1,348 feet 
14 
70,000 kw 
980,000 kw 
220 feet 
November 1953 
340-335 feet 
356.5 feet 
64 miles 
38,800 acres 
14 ft by 250 ft 
242 miles 
30-28 
-- 'i---- 
-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 99 
SNAKE RIVER DOWNSTREAM FROM 
JOHNSON BAR LANDING OR, WA, AND ID 
TABLE 30-K (SEE SECTION 15 OF TEXT) 
Estimated 
Cost (Corps New Work Maintenance to 
of Engineers to September 30, 1999 September 30, 1999 Percent Constr. 
Project Funds Only) Approp. Cost Approp. Cost Completed Started 
Ice Harbor Lock & Dam 
Initial Project $129,578,480 $129,578,4804 $129,578,4804 $152,409,912 $152,308,096 100 FY 56 
Code 710 Rec Facilities 914,256 914,256 914,256 0 0 100 FY 57 
Power Units 4-6 36,748,021 36,748,021 36,748,021 0 0 100 FY 71 
Fish Bypass Program 85,397,0003 38,762,000 38,762,000 0 0 45 FY 91 
Totals 252,637,757 206,002,7574 206,002,7574 152,409,912 152,308,096 82 
Little Goose Lock & Dam 
Initial Project 160,413,215 160,413,2155 160,413,215 105,317,111 105,095,328 100 FY 63 
Power Units 4-6 60,941,807 60,941,807 60,941,807 0 0 100 FY 74 
Fish Bypass Program 94,341,0003 35,262,000 33,380,000 0 0 35 FY 89 
Totals 315,696,022 256,617,0225 254,735,0225 105,317,111 105,095,328 81 
Lower Granite Lock 
& Dam 321,503,981 321,503,9816 321,503,9796 147,551,006 147,436,033 100 FY 65 
Initial Project 63,800 63,800 63,800 0 0 100 FY 84 
Code 710 Rec Facilities 46,212,534 46,212,534 46,212,534 0 0 100 FY 74 
Power Units 4-6 107,454,0003 30,430,000 30,330,000 0 0 28 FY 88 
Fish Bypass Program 475,234,315 398,210,3156 398,110,3136 147,551,006 147,436,033 84 
Totals 
Lower Monumental Lock 
& Dam 184,712,361 184,712,3617 184,712,361' 107,286,199 107,115,132 100 FY 61 
Initial Project 51,661,371 51,661,371 51,661,371 0 0 100 FY 75 
Power Units 4-6 109,241,000 31,270,000 31,270,000 0 0 29 FY 90 
Fish Bypass Program 345,614,7323 267,643,732 267,643,732 107,286,199 107,115,132 77 
Totals 
Open River Lewiston to 
Johnson Bar Landing 34,613 34,6131 34,613 401,5832 397,498 
Open River Pasco to 
Lewiston 0 0 0 4,350 4,350 
Totals Existing Project 1,389,217,439 1,128,508,439 1,126,526,437 512,970,161 512,356,437 74 
Previous Projects Pasco to 
Lewiston 400,150 400,150 400,150 186,570 186,570 
Totals Authorized Project 1,389,617,589 1,128,908,5898 1,126,926,5873 513,156,731 512,543,007 
' New work appropriations used for maintenance prior to 1953. 
2 Includes $2,064 appropriated and $3,180 expended in FY 96 for 
project condition survey cost. 
3 Does not include mitigation analysis. 
4 Includes $203,000 appropriated and $201,931 expended for 
Columbia River Fish Mitigation Program. 
5 Includes $370,000 appropriated and $358,589 expended for 
Columbia River Fish Mitigation Program. 
6 Includes $1,628,000 appropriated and $1,626,084 expended for 
Columbia River Fish Mitigation Program. 
7 Includes $11,132,000 appropriated and $10,949,493 expended for 
Columbia River Fish Mitigation Program. 
8 Includes $13,333,000 appropriated and $13,136,097 expended for 
Columbia River Fish Mitigation Program. 
30-29

HONOLULU ENGINEER DISTRICT 
The civil works responsibilities of the Honolulu District 
encompasses the State of Hawaii, the Territory of 
Guam, the Territory of American Samoa, and the 
Commonwealth of the Northern Mariana Islands. The 
division is unique in that its area of responsibility is 
totally comprised of islands dispersed over an ocean 
environment exceeding 6 million square miles. 
IMPROVEMENTS 
Navigation Page 
1. Kikiaola Small Boat Harbor, 
Kauai, Hawaii ........................................... 31-2 
2. Maalaea Harbor, Maui, Hawaii....................31-2 
3. Reconnaissance and Condition Surveys ...... 31-2 
4. Inspection of Completed Flood Control 
and Beach Erosion Control Projects ............ 31-2 
5. Navigation Work Under Special 
Authorization..................................... 31-2 
Erosion Control 
6. Alii Drive Shoreline Protection, Hawaii 
H aw aii ........................................................ 31-3 
7. Beach Erosion Work Under Special 
Authorization ........................................ 31-3 
Flood Control 
8. Flood Control Work Under Special 
Authorization ..................................... 31-3 
General Investigations 
9. Surveys ..................................... ..... 31-3 
10. Collection and Study of Basic Data.............31-4 
General Investigations (Contd.) Page 
11. Preconstruction Engineering and Design.... 31-4 
Tables 
Table 31-A Cost and Financial 
Statement ................................. 31-5 
Table 31-B Authorizing Legislation .............. 31-6 
Table 31-C Other Authorized Navigation 
Projects .................................... 31-7 
Table 31-D Other Authorized Beach 
Erosion Control Projects............. 31-8 
Table 31-E Other Authorized Flood 
Control Projects ...................... 31-9 
Table 31-F Other Authorized Multiple Purpose 
Projects, Including Power........... 31-9 
Table 31-G Deauthorized Projects ............ 31-10 
Table 31-H Inspection of Completed Flood 
Control and Beach Erosion 
Control Projects ........................ 31-11 
Table 31-I Emergency Streambank and Shoreline 
Protection Activities Pursuant to 
Section 14 ................................. 31-12 
Table 31-J Flood Control Activities Pursuant 
to Section 205 .............................. 31-12 
31-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Navigation 
1. KIKIAOLA SMALL BOAT 
HARBOR, KAUAI, HAWAII 
Location. Kikiaola Harbor is located on the 
southwest coast of the island of Kauai, approximately 1 
mile southeast of Kekaha and approximately 2 miles 
west of Waimea (See NOAA Chart 19386) 
Existing project. The authorized project consists of 
removing a 150-foot long portion from an existing outer 
east stub breakwater; removing and reconstructing a 85- 
foot long inner east stub breakwater; modifying 220- 
foot long portion of the existing west breakwater; 
modifying 820-foot long portion of the existing east 
breakwater; dredging a new 700-foot long entrance 
channel to a depth of 11-feet and varying in width from 
105 to 205-feet; and dredging a 320-foot long access 
channel to a 7-foot depth and varying in width from 70 
to 105-feet. 
Local cooperation. The Project Cooperation 
Agreement (PCA) is being prepared and negotiated with 
the local sponsor. 
Terminal facilities. There is a existing 1280-foot 
long east breakwater with two short stub breakwaters; a 
600-foot long west breakwater; a 150-foot long by 10- 
foot wide wooden wharf; a 50-foot long loading dock 
and adjacent launch ramp, all constructed by the State 
of Hawaii. 
Operations during fiscal year. Work during the 
Fiscal Year included continuation of plans and 
specifications and environmental coordination. The 
plans and specifications phase were approximately 90% 
complete as of September 30, 1999. The General 
Reevaluation Report was approved by HQUSACE in 
December 1998. Total costs incurred during the Fiscal 
Year were $140,237. 
2. MAALAEA HARBOR, MAUI, 
HAWAII 
Location. Maalaea Bay is situated on the southwest 
coast of Maui, approximately 7 miles south of Wailuku, 
the county seat of Maui. (See NOAA Chart 19350) 
Existing project. For a description of the existing 
project, see page 36-3 of the FY89 Annual Report. 
(See Table 36-B for Authorizing Legislation) 
Local cooperation. The Project Cooperation 
Agreement (PCA) is delayed due to resolution of 
environmental concerns as a result of the Supplemental 
Environmental Impact Statement. The PCA is being 
coordinated with the local sponsor for execution prior to 
construction. 
Terminal facilities. There is an existing 1,000-foot 
long south breakwater, a 870-foot long east breakwater, 
300-foot long wharf, 90-foot wide entrance channel, 
and a single lane launch ramp, all constructed by the 
State of Hawaii. 
Operations during fiscal year. Work during the 
Fiscal Year included continuing coordination with the 
local sponsor and various agencies on controversial 
environmental issues and the continuing development of 
acceptable mitigation features for impacts to 
environmental resources. Total costs incurred during 
the Fiscal Year were $330,886. The plans and 
specifications phase was approximately 80% complete 
as of September 30, 1999. 
3. RECONNAISSANCE AND 
CONDITION SURVEYS 
Condition surveys were conducted by contract at 
Manele Bay Small Boat Harbor, Lanai; Agat Small Boat 
Harbor, Guam; Agana Small Boat Harbor, Guam; and 
Rota Harbor, Commonwealth of Northern Marianas in 
September 1999. Total cost to conduct these surveys 
was $56,510. 
4. INSPECTION OF COMPLETED 
FLOOD CONTROL AND BEACH 
EROSION CONTROL PROJECTS 
Inspection of completed local flood protection projects 
is performed periodically in compliance with Section 
208.10, of Title 33, Code of Federal Regulations, which 
contains regulations for operation and maintenance of 
local flood-protection works approved by the Secretary 
of the Army in accordance with authority in Section 3, 
Flood Control Act of June 22, 1936. 
Inspection costs for completed flood control and beach 
erosion control projects incurred during the Fiscal Year 
were $229,747. See Table 31-H for inspections 
performed during this fiscal year. 
5. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 107, Public 
Law 86-645 (Preauthorization). 
Fiscal Year costs were $31,104 for Kahului Small Boat 
Harbor, Maui; $75,555 for Keehi Lagoon, Oahu; 
$83,178 for Hilo Light Draft, Hawaii; $75,070 for Rota 
East Harbor, CNMI; and $4,728 in coordination costs. 
Mitigation of shoreline erosion damage caused by 
Federal navigation projects pursuant to Section 111, 
Public Law 90-483 (Preauthorization). Fiscal Year 
costs were $209 for Lahilahi Beach, Oahu. 
31-2

HONOLULU DISTRICT 
Beach Erosion Control 
6. ALII DRIVE SHORELINE 
PROTECTION, HAWAII, HAWAII 
Location. The project is located along Alii Drive in 
the town of Kailua-Kona on the western coast of the 
Island of Hawaii. The Island of Hawaii is located 
approximately 180 miles southeast of Honolulu, Hawaii 
and approximately 2,600 miles southwest of Los 
Angeles, California. (See NOAA Chart 19320) 
Existing project. The project construction consists of 
pumping concrete into geotextile bags that are placed 
into existing voids along the 700-foot reach Alii Drive 
seawall. 
Local cooperation. The Project Cooperation 
Agreement (PCA) was executed in March 1999. The 
local sponsor, the County of Hawaii, shall: 
(1) Provide a cash contribution equal to 5 percent 
of the total project costs; 
(2) Provide an additional contribution to meet a 
minimum contribution of 35 percent, but not to exceed 
50 percent of total project costs which excludes the first 
$40,000 of the costs for planning, engineering, and 
design; 
(3) Provide all lands, easements, rights of way, and 
suitable borrow and dredged or excavated material 
disposal areas, and perform all relocations that the 
Government determines to be necessary for the 
construction, operation, and maintenance of the project; 
(4) Be responsible for all costs in excess of the 
Government's statutory limitation of $1,000,000. 
Terminal facilities. There is a 700-foot long seawall 
along Alii Drive, constructed by the County of Hawaii. 
Operations during fiscal year. Work during the 
Fiscal Year included completion of plans and 
specifications and initiation of repair work to the Alii 
Drive seawall. A construction contract was awarded in 
June 1999 for $66,688 of which $54,000 was Federal 
funds and $12,688 was non-federal funds. Total costs 
incurred during the Fiscal Year were $95,198. 
7. BEACH EROSION WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency streambank and shoreline protection 
activities pursuant to Section 14, Public Law 79-526 
(Preauthorization). See Table 31-I. 
Beach Erosion control activities pursuant to Section 
103, Public Law 87-874 (Preauthorization). 
Fiscal Year costs were $59,809 for Commercial Port 
Road, Guam; $8,008 for Makaha Coast, Oahu; and $82 
for Micro Beach, CNMI. 
Flood Control 
8. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to Section 205, 
Public Law 80-858. (Preauthorization). 
See Table 31-J. 
Project Modifications for Improvements of 
Environment pursuant to Section 1135, Public Law 
99-662, as amended. (Preauthorization) 
Fiscal Year costs were $50,391 for Kaunakakai Stream, 
Molokai; $3,974 for Kawainui Marsh, Oahu; $3,134 to 
conduct initial appraisal reports; and $2,995 for 
coordination with local agencies. 
Aquatic Ecosystem Restoration pursuant to Section 
206, Public Law 104-303. (Preauthorization) 
Fiscal Year costs included $73,206 for Kaunakakai 
Harbor, Molokai; $9,415 to initiate preliminary 
restoration plans; and $3,136 for coordination with local 
agencies. 
Emergency flood control activities pursuant to 
Public Law 84-99. 
Federal cost during the fiscal year for Flood Control and 
Coastal Emergencies appropriation was $304,399 of 
which $282,226 was for disaster preparedness; and 
$22,173 for emergency operations. 
General Investigations 
9. SURVEYS 
Fiscal year costs were $1,044,422 of which $488,074 
was for navigation studies; $65,119 was for flood 
damage prevention studies; $170,482 for special 
studies; $64,381 for miscellaneous activities; and 
$256,366 for coordination with other agencies. In 
addition, $31,214 in non-Federal funds for coordination 
with other agencies; $7,231 for cost-shared flood 
damage prevention studies; and $156,793 for costshared 
navigation studies. 
10. COLLECTION AND STUDY OF 
BASIC DATA 
Flood plain management services. The Flood Plain 
Management Services Program is authorized and 
implemented under Section 206, PL 86-645, 1960 
Flood Control Act, as amended. Through technical 
services and planning guidance, the program provides 
information on floods and flood related information to 
improve planning for the careful use of the nation's 
31-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
flood plains, thereby reducing the potential for losses to 
life and property from floods and wave actions. Non- 
Federal agencies are assisted with flood hazard 
evaluation and planning information for flood and 
coastal hazard areas without charge. 
As of November 1991, Federal agencies and private 
entities were also offered these services on a cost 
recovery basis. This assistance is in the form of local 
flood plain regulations, National Flood Insurance 
Requirements, and Executive Order 11988 requirements 
for federal agencies. Such assistance may include flood 
information and timing, floodwater velocity, extent of 
flooding, duration of flooding, flood frequency and 
regulatory floodway limits. 
Services accomplished during fiscal year. Requests 
and responses for technical services and planning 
assistance totaled 2,014, which included services to 
Federal agencies, state and local government agencies, 
individuals, realtors, corporations, lending institutions, 
engineers, architects and other private parties. Costs for 
providing these services during the fiscal year were 
$379,706. 
Hydrologic Studies. Storm studies cost was $6,000. 
Total costs for collection and study of basic data during 
the fiscal year were $385,706. 
11. PRECONSTRUCTION 
ENGINEERING AND DESIGN 
Kaumalapau Harbor, Lanai, HI - As directed by the 
Energy and Water Development Appropriations Act of 
1998, preconstruction engineering and design studies 
were continued in Fiscal Year 1999. Work during the 
Fiscal Year consisted of continued coordination with 
local sponsors and other interested parties; continued 
preparation of environmental documentation and 
construction plan and specifications. Total costs 
incurred during the Fiscal Year were $527,689. 
31-4

HONOLULU DISTRICT 
TABLE 31-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
In Text Project Funding FY96 FY97 FY98 FY99 Sept. 30, 1999 
1. Kikiaola Small New Work: 
Boat Harbor, Approp. 126,000 326,000 218,000 100,000 1,220,000 
Kauai, HI Cost 126,213 286,100 183,846 140,237 1,186,145 
(Federal Funds) 
2. Maalaea Harbor New Work: 
Maui, HI Approp. 35,000 359,700 649,000 372,000 3,265,700 
(Federal Funds) Cost 262,036 412,454 575,013 330,836 3,105,420 
6. Alii DriveShore- New Work: 
line Protection Approp. 30,000 50,000 0 103,000 360,000 
Hawaii, HI Cost 30,605 13,783 33,262 95,198 328,187 
(Federal Funds) 
(Contributed Contrib. 0 0 0 126,000 126,000 
Funds) Cost 0 0 0 66,117 66,117 
31-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 31-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
In Text Act Project and Work Authorized Documents 
KIKIAOLA SMALL BOAT HARBOR, KAUAI, HAWAII 
A 700-foot long, 105 to 205-foot wide, and 11-foot deep 
entrance channel; a 320-foot long, 70 to 105-foot wide, and 
7-foot deep access channel; modification of 220-foot portion of 
the existing west breakwater; and modification of 820-foot portion 
of the existing east breakwater; removal and reconstruction of 
a 85-foot long inner east breakwater; removal of a 150-foot long 
portion of the existing outer east stub breakwater. 
MAALAEA HARBOR, MAUI, HAWAII 
A 620-foot long extension of the south breakwater, 
a new 610-foot length, 150 to 180-foot width, 12 to 
15-foot depth entrance channel, a 1.7 acre and 12-foot 
depth turning basin and a 720-foot length, 80-foot 
width and an 8-foot deep access channel. 
Sec 101, PL 90-438 
Cong., 2nd sess. 
Sec 101, PL 90-438 
Cong., 2nd sess. 
31-6 
1. 
2. 
Aug. 3, 1968 
Aug. 3, 1968

HONOLULU DISTRICT 
TABLE 31-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to September 1999 
Full Report 
See Annual Operations and 
Project Status Report for: Construction Maintenance 
Agana Small Boat Harbor, Guam Completed 1978 $ 937,798 1 $ 52,555 
Agat Harbor, Guam Completed 1989 2,000,000 2 
Auasi Harbor, American Samoa Completed 1982 1,033,015 3 141,797 
Aunuu Harbor, American Samoa Completed 1982 1,783,129 4 1,413,179 
Barbers Point Harbor, Oahu, Hawaii Completed 1990 53,519,193 5 2,247,953 
Haleiwa Small Boat Harbor, Oahu, Hawaii Completed 1978 527,047 6 498,402 
Hilo Harbor, Hawaii, Hawaii Completed 1991 5,512,440 4,106,308 
Honokohau Small Boat Harbor, Hawaii, Hawaii Completed 1971 781,036 7 63,693 
Honolulu Harbor, Oahu, Hawaii Completed 1985 16,044,095 8 4,803,796 
Kahului Beach Road, Maui, Hawaii Completed 1976 751,867 9 
Kahului Harbor, Maui, Hawaii Completed 1984 7,203,221 10 8,167,374 
Kalaupapa Harbor, Molokai, Hawaii Completed 1968 157,997 9 3,127 
Kaulana Bay Boat Harbor, Hawaii, Hawaii Inactive 1990 171,400 --- 
Kawaihae Harbor, Hawaii, Hawaii Completed 1998 12,041,918 " 61,800 
Keehi Lagoon, Oahu, Hawaii Completed 1956 3,348,000 12 41,857 
Kikiaola Small Boat Harbor, Kauai, Hawaii Active 1981 193,000 --- 
Laupahoehoe Harbor, Hawaii, Hawaii Completed 1990 3,623,450 13 
Manele Bay Small Boat Harbor, Lanai, Hawaii Completed 1986 372,000 14 495,256 
Nawiliwili Harbor, Kauai, Hawaii Completed 1987 2,127,724 15is 11,047,279 
Nawiliwili Small Boat Harbor, Kauai, Hawaii Completed 1976 584,513 16 30,707 
Ofu Small Boat Harbor, American Samoa Completed 1976 980,018 17 5,054,930 
Pohoiki Bay, Hawaii, Hawaii Completed 1979 432,523 9 
Port Allen Harbor, Kauai, Hawaii Completed 1984 752,645 18 3,081,224 
Rota Harbor, CNMI Completed 1985 2,000,000 19 436,200 
Saipan Small Boat Harbor, CNMI Deferred 1982 194,000 --- 
Tau Small Boat Harbor, American Samoa Completed 1985 1,991,569 20 546,600 
Waianae Small Boat Harbor, Oahu, Hawaii Completed 1979 1,940,011 21 122,400 
Welles Harbor, Midway Island Completed 1950 2,448,056 22 2,111 
1Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $282,474 for Construction. 
21n addition, Contributed Funds of $1,239,364 for Construction. 
3Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $86,563 for Construction. 
4Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $231,437 for Construction. 
5In addition, Contributed Funds of $2,402,909 for Construction. 
6Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $410,077 for Construction and $84,388 for Operation and 
Maintenance. 
7In addition, Contributed Funds of $630,568 for Construction. 
8In addition, Contributed Funds of $201,282 for Construction. 
9Authorized by the Chief of Engineers. 
o0 
In addition, Contributed Funds of $30,200 for Construction. 
11In addition, Contributed Funds of $497,407 for Construction. 
12Abandonment authorized by R & H Act of 1965 (HD 98, 89th 
Congress, 1st Session). 
13Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $364,757 for Construction. 
14In addition, Contributed Funds of $370,845 for Construction. 
15In addition, Contributed Funds of $223,261 for Construction. 
16Authorized by the Chief of Engineers and completed in November 
1974. In addition, Contributed Funds of $405,471 for Construction. 
17Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $61,953 for Construction. 
18In addition, Contributed Funds of $200,000 for Construction. 
19Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $774,373 for Construction. 
20Authorized by the Chief of Engineers. In addition, Contributed 
Funds of $54,034 for Construction. 
21In addition, Contributed Funds of $1,791,068 for Construction. 
22Completed in 1941 and Maintenance transferred to Department of 
Navy. 
31-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 31-D OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
For Last Cost to September 1999 
Full Report 
See Annual Operations and 
Project Status Report for: Construction Maintenance 
Afono Area and Aoa Area, American Samoa Completed 1978 $ 254,015 ' $ --- 
Asquiroga Bay, Guam Completed 1986 227,181 2 
Haleiwa Beach, Oahu, Hawaii Completed 1967 240,148 3 
Kaaawa Beach, Oahu, Hawaii Completed 1976 176,488 4 
Kapaa Town, Kauai, Hawaii Completed 1977 158,916 S 
Kekaha Beach, Kauai, Hawaii Completed 1981 999,996 6 
Kihei Beach, Maui, Hawaii Completed 1972 154,313 7 
Kualoa Regional Park, Oahu, Hawaii Terminated 1982 355,472 8 
Lepua Area, American Samoa Completed 1992 1,706,225 9 
Masefau Bay, American Samoa Completed 1992 500,000 2 
Matafao Shoreline, American Samoa Completed 1984 225,000 2 
Ofu Airstrip, American Samoa Completed 1987 189,500 --- 
Pago Pago Airport, American Samoa Completed 1984 174,941 2 
Pago Pago to Nuuuli, American Samoa Deferred 1978 394,187 10 
Poloa Area, American Samoa Completed 1978 136,040 --- 
Saipan Beach Road, CNMI Completed 1992 176,000 2 
Sand Island, Oahu, Hawaii Completed 1981 301,879 12 
Sand Island Shore Protection, Oahu, Hawaii Completed 1992 1,313,400 13 
Vatia Area, American Samoa Completed 1978 154,309 14 
Waikiki Beach, Oahu, Hawaii Deferred 1979 729,087 15 183,000 
'Authorized by the Chief of Engineers. In addition, $209,549 in 
Contributed Funds. 
2Authorized by the Chief of Engineers. 
3In addition, $160,098 in Contributed Funds. 
4Authorized by the Chief of Engineers. In addition, $97,075 in 
Contributed Funds. 
5Authorized by the Chief of Engineers. In addition, $56,916 in 
Contributed Funds. 
6Authorized by the Chief of Engineers. In addition, $1,672,524 in 
Contributed funds. 
7Authorized by the Chief of Engineers. In addition, $1,672,524 in 
Contributed Funds. 
8Authorized by the Chief of Engineers and terminated in April 1980 
as a Circuit Court ruled sand mining to be illegal. In addition, 
$177,300 in Contributed Funds. 
9Authorized by the Chief of Engineers. In addition, $485,371 in 
Contributed Funds. 
10Authorized by the Chief of Engineers. In addition, $312,480 in 
Contributed Funds. 
11Authorized by the Chief of Engineers. In addition, $101,547 in 
Contributed Funds. 
12Authorized by the Chief of Engineers. In addition, $255,728 in 
Contributed Funds. 
13Authorized for construction by Public Law 100D71. In addition, 
$1,226,486 in Contributed Funds. 
14Authorized by the Chief of Engineers. In addition, $132,075 in 
Contributed Funds 
15In addition $82,000 in Advanced Funds and $17,640 in 
Contributed Funds. 
31-8

HONOLULU DISTRICT 
TABLE 31-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 1999 
Full Report 
See Annual Operations and 
Project Status Report for: Construction Maintenance 
Agana River, Guam Inactive 1989 $ 250,000 $ --- 
Alenaio Stream, Hawaii, Hawaii Completed 1997 11,228,798 7 --- 
Asan Village, Guam Completed 1986 1,275,500 --- 
Hanapepe River, Kauai, Hawaii Completed 1967 784,867 --- 
lao Stream, Maui, Hawaii Completed 1985 12,621,108 356,523 
Kahawainui Stream, Oahu, Hawaii Completed 1998 4,667,432 2 
Kahoma Stream, Maui, Hawaii Completed 1990 10,988,750 3 
Kaneohe-Kailua Area, Oahu, Hawaii r, Guam C 1985 25,552,400 4 
Kaunakakai Stream, Molokai, Hawaii Completed 1950 73,478 5 
Kawainui Marsh, Oahu, Hawaii Completed 1987 4,345,899 8 - 
Kawainui Swamp, Oahu, Hawaii Completed 1967 1,265,567 --- 
Kuliouou Stream, Oahu, Hawaii Completed 1971 1,000,000 6 - 
Namo River, Guam Completed 1982 2,416,314 -- 
Paauau Stream, Hawaii, Hawaii Completed 1985 1,978,514 --- 
Wailoa Stream and Tributaries, Hawaii, Hawaii Completed 1966 1,044,888 --- 
'In addition, $11,953 in Contributed Funds. 5Authorized by the Chief of Engineers. 
2Authorized by the Chief of Engineers. In addition, $648,906 6Authorized by the Chief of Engineers. In addition, $540,335 
in Contributed Funds. in Contributed Funds. 
3In addition, $645,992 in Contributed Funds. 7In addition, $785,103 in Contributed Funds. 
4Includes Non-Federal reimbursement of recreation 6Authorized by the Chief of Engineers. In addition, 
construction cost of $5,668,300. In addition, $8,175 in $1,234,147 in Contributed Funds. 
Contributed Funds. 
TABLE 31-F OTHER AUTHORIZED MULTIPLE PURPOSE 
PROJECTS, INCLUDING POWER 
For Last Cost to September 1999 
Full Report 
See Annual Operations and 
Project Status Report for: Construction Maintenance 
Nanpil River Hydropower, Pohnpei, Completed 1994 $ 8,000,000 $ --- 
Federated States of Micronesia 
31-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 31-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report for: Authority Expended Expended 
Ala Wai Harbor, Oahu, Hawaii 1976 November 1986 $ 40,117 $ --- 
PL 99-662 
Hana Small Boat Harbor, Maui, Hawaii 1967 November 1977 
HD #94-413 
Hanalei Small Boat Harbor, Kauai, Hawaii 1967 November 1981 
HD #97-59 
Hanapepe Bay, Kauai, Hawaii 1965 November 1986 
PL 99-662 
Heeia-Kea Small Boat Harbor, Oahu, Hawaii 1972 January 1990 1,481 
PL 99-662 
Kailua Small Boat Harbor, Oahu, Hawaii 1967 January 1990 
PL 99-662 
Kaimu Black Sand Beach, Hawaii, Hawaii 1975 July 1981 86,235 
Director of 
Civil Works 
Kapaakea Homestead Flood Control, 1979 July 1981 221,500 
Molokai, Hawaii Director of 
Civil Works 
Kaunakakai Deep Draft Harbor, 1966 January 1990 133,188 292,441 
Molokai, Hawaii PL 99-662 
Kaunakakai Small Draft Harbor, --- January 1990 
Molokai, Hawaii PL 99-662 
Kewalo Harbor, Oahu, Hawaii 1976 September 1975 98,800 
Director of 
Civil Works 
Lahaina Small Boat Harbor, Maui, Hawaii 1977 January 1990 186,937 
PL 99-662 
Maunalua Bay Small Boat Harbor, 1972 January 1990 30,378 
Oahu, Hawaii PL 99-662 
Nawiliwili Deep Draft Harbor, Kauai, Hawaii --- January 1990 --- 
PL 99-662 
Rainmaker Hotel, American Samoa --- November 1991 --- 
PL 99-662 
Reeds Bay Small Boat Harbor, Hawaii, Hawaii 1967 January 1990 --- 
PL 99-662 
31-10

HONOLULU DISTRICT 
TABLE 31-G (Contd.) DEAUTHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report for: Authority Expended Expended 
Saipan Harbor, Northern Marianas --- November 1991 
PL 99-662 
Talofofo Bay Shore Protection, Guam --- August 1981 80,764 
Director of 
Civil Works 
Waimea Beach, Kauai, Hawaii --- November 1986 
PL 99-662 
Wake Island Harbor, Wake Island 1950 November 1986 
PL 99-662 
TABLE 31-H INSPECTION OF COMPLETED FLOOD CONTROL 
AND BEACH EROSION CONTROL PROJECTS 
Location Dates of Inspection 
Flood Control Projects 
Alenaio Stream, Hawaii, Hawaii 
Asan Village, Guam 
Namo River, Guam 
Paauau Stream, Hawaii, Hawaii 
Wailoa Stream, Hawaii, Hawaii 
Beach Erosion Control Projects 
Afono Area, American Samoa 
Aoa Area, American Samoa 
Asquiroga Bay, Guam 
Haleiwa Beach, Oahu, Hawaii 
Kahului Bay, Maui, Hawaii 
Kahului Wastewater Facility Shoreline, Maui, Hawaii 
Kapaa Beach, Kauai, Hawaii 
Kekaha Beach, Kauai, Hawaii 
Lepua Area, American Samoa 
Masefau Bay, American Samoa 
Matafao Shoreline, American Samoa 
Ofu Airstrip, American Samoa 
Pago Pago Airport, American Samoa 
Pago to Nuuuli, American Samoa 
Poloa Area, American Samoa 
Saipan Beach Road, CNMI 
Vatia Area, American Samoa 
November 1998 
June 1999 
June 1999 
December 1998 
December 1998 
August 1999 
August 1999 
June 1999 
May 1999 
February 1999 
February 1999 
March 1999 
March 1999 
August 1999 
August 1999 
August 1999 
August 1999 
August 1999 
August 1999 
August 1999 
June 1999 
August 1999 
31-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 31-I EMERGENCY STREAMBANK AND SHORELINE 
PROTECTION ACTIVITIES 
PURSUANT TO SECTION 14, 
PUBLIC LAW 79-526, AS AMENDED 
(PREAUTHORIZATION) 
Study 
Garapan Beach Road, CNMI 
Hauula Highway, Oahu, Hawaii 
Kaaawa Highway, Oahu, Hawaii 
Launiupoko, Maui, Hawaii 
Power Plant Road, Guam 
Punaluu Highway, Oahu, Hawaii 
South Agat, Guam 
Coordination Account 
TOTAL 
Fiscal year Costs 
$10,068 
11,214 
1,466 
4,508 
10,277 
1,158 
19,623 
17,072 
$75,386 
TABLE 31-J FLOOD CONTROL ACTIVITIES 
PURSUANT TO SECTION 205, 
PUBLIC LAW 80-858, AS AMENDED 
(PREAUTHORIZATION) 
Study Fiscal year Costs 
Haleiwa-Wailua Area, Oahu, Hawaii 
Keopu-Hienaloli Stream, Hawaii, Hawaii 
Palai Stream, Hawaii, Hawaii 
Wailele Stream, Oahu, Hawaii 
Coordination Account 
TOTAL 
31-12 
$ 5,640 
21,222 
483 
82,871 
14,549 
$124,765

ALASKA DISTRICT *
This District consists of the State of Alaska. 
IMPROVEMENTS 
Navigation 
1. Anchorage Harbor, AK ................................ 
2. Bethel Small Boat Harbor, AK ......................... 
3. Cook Inlet, AK ........................ 
4. Chignik Harbor, AK. ......... ........... 
5. Dillingham Harbor, AK...... .............................. 
6. Douglas Harbor, AK ............................. ...... 
7. Homer Harbor, AK ................... ........... 
8. K ake H arbor, A K .................... .......................... 
9. Metlakatla Harbor, AK ... ................. 
10. Ninilchik Harbor, AK ................................... 
11. Nome Harbor, AK .................................. 
12. Sitka Harbor, AK ..... ......... ................ 
13. St. G eorge, A K ................................................. 
14. St. Paul Island Harbor, AK........................... 
15. Wrangell Harbor, AK ..... ..... ........... 
32-2 
32-2 
32-2 
32-2 
32-3 
32-3 
32-3 
32-4 
32-4 
32-4 
32-4 
32-5 
32-5 
32-6 
32-6 
Flood Control 
16. Bethel Bank Stabilization, AK ............................ 32-6 
17. Chena River Lakes, AK ...................................... 32-7 
18. Dillingham Emergency Bank Stabilization ........... 32-7 
19. Homer Spit Erosion, AK ................................ 32-7 
20. Flood Control Work Under 
Special Authorization ................................... 32-7 
21. Inspection of Completed Flood 
Control Project ......................... 32-7 
General Investigations 
22. Surveys .................. ...... ........ ................. 32-7 
23. Collection and Study of Basic Data ..................... 32-8 
24. Preconstruction Engineering and Design .............. 32-8 
Tables 
Table 32-A Cost & Financial Statement .... ................ 32-9 
Table 32-B Authorizing Legislation ................... 32-13 
Table 32-C Other Authorized Navigation Projects ....... 32-16 
Table 32-D Not Applicable 
Table 32-E Other Authorized Flood 
Control Projects .................................... 32-17 
Table 32-F Not Applicable 
Table 32-G Deauthorized Projects ............... 32-17 
Table 32-H Navigation Work Under Special 
Authorization .......................................... 32-18 
Table 32-I Project Condition Surveys ..................... 32-18 
Table 32-J Stream Bank Erosion Work Under Special 
Authorization ...................................... ..... 32-19 
Table 32-K Environmental Activities ........ ............... 32-19 
-32-1-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
Navigation 
1. ANCHORAGE HARBOR, AK 
Location. Anchorage is in south-central Alaska on the 
southeast shore of Knik Arm, north of Turnagain Arm near its 
junction with Cook Inlet. (See NOAA Charts 16660 and 
16664.) 
Existing project. Provides for dredging along 3,300 foot 
baseline adjacent to the port of Anchorage dock to a depth of 36 
feet below mean lower low water. The tidal range between 
mean lower low water and mean higher high water is 29 feet 
with an extreme range of 41 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. The Port of Anchorage facility consists 
of two POL terminals at the southern end and three general 
cargo terminals northward. The northernmost terminal, 
completed during 1976 and 1977, was outside the Federal 
project limits. Extension of the limits from 2,070 feet 
northward to 3,000 feet was authorized by Public Law 94-587 
and funded in FY 1978. 
Operations during fiscal year. Maintenance dredging was 
conducted in three periods from May into the first week of 
November. A total of 438,800 cubic yards was removed from 
the project in FY 99. A continuing contract is in place, year 
three of the five year optional contract was carried out by J.E. 
McAmis of Chico, California. 
2. BETHEL SMALL BOAT HARBOR, AK 
Location. Bethel is located in southwestern Alaska on the 
north bank of the Kuskokwim River 65 miles upstream from 
the river mouth and approximately 400 air miles from 
Anchorage. (See USGS Quadrangle Map, Bethel D8.) 
Existing Project. The federal navigation project, at 4 feet 
below mean lower low water, consists of an entrance channel 
31 feet wide by 1270 feet long, a maneuvering and turning 
channel 94 feet wide by 418 feet long, and a portion of the 
boat basin 160 feet wide by 519 feet long. The average tide 
range between mean lower low water and mean higher high 
water is 4.0 feet; the extreme tide range is 10.0 feet. 
Local Cooperation. Fully complied with. 
Terminal Facilities. The protected boat basin is 
accessed by two concrete ramps and served by 5 removable 
finger floats. The numerous small craft are often beached 
around the basin perimeter. Road access and parking are 
available. 
Operations during fiscal year. Maintenance dredging 
was conducted throughout the federal project in April with 
land-based equipment while the water was solidly frozen. 
Faulkner Walsh Constructors carried out the operation; the 
entrance channel was widened to 51 feet and the project 
dredged to at least 2 feet over project depth. Inadequate preand 
post-dredge surveys prevented an accurate assessment of 
the volume of material actually removed. The contractor was 
paid a lump sum for the work as specified in the contract, but 
close out is still pending because of the contractor's claim for 
additional quantity. 
3. COOK INLET NAVIGATION, AK 
Location. Southern flank of Knik Arm Shoal about 6 miles 
southwest of Anchorage, AK. 
Existing project. Navigation channel 310-meters (1,017) 
feet wide, 11.5 meters (38-feet) deep, about 2,000-meters 
(6,500-feet) long. Limiting natural depths along the navigation 
range line are about 9.0 meters for a width of 1,000 meters, an 
additional 60-meters width for advance maintenance is 
authorized (currently a contract option). 
Local cooperation. Fully complied with. 
Terminal facilities. This project would reduce delays for 
the container ships that supply cargo for 80 percent of the 
Alaskan people. Ships have to wait for high tide to safely cross 
the Knik Arm Shoal and would rarely have to wait once the 
authorized channel is complete. 
Operations during fiscal year. The PCA was executed 
on 9 Jan 98. Construction contract was awarded on 2 Dec 98 
for $7,230,000 and is scheduled to be completed in October 
2000. 
4. CHIGNIK HARBOR, AK 
Location. The city of Chignik is located on the south side of 
the Alaska Peninsula about 450 miles southwest of Anchorage. 
Existing project. The city of Chignik is situated on the 
south shore of Alaska Peninsula in Southwestern Alaska. It is 
an active and growing island port whose economy is heavily 
dependent on commercial fishing. The local fleet presently 
anchors in the ice free, but inadequately protected harbor or ties 
up at the exposed city dock. At present boats are subject to 
overcrowding and hazardous mooring conditions between 
fishing periods. The anchorage is exposed to all storms from 
the southeast clockwise to the northwest. The violent southeast 
and northwest storms often damage and sometimes destroy 
boats by forcing them ashore or on the exposed rock reefs at 
low tides. 
Local cooperation. Fully complied with. 
-32-2-

ALASKA DISTRICT 
Terminal facilities. The proposed project would provide a 
protected harbor, which would produce benefits in the form of 
reduced boat damage, increased fish harvest, and a harbor of 
refuge. The average annual navigation benefits attributable to 
the project are currently estimated at $1,695,400. 
Operations during fiscal year. Due to the addition of the 
Steller's Eider to the endangered species list, several surveys 
and studies need to be completed before any other work is 
done. The PCA will be negotiated and a finance plan prepared 
after the Eider study is complete. 
5. DILLINGHAM HARBOR, AK 
Location. Dillingham Harbor is located at the head of 
Nushagak Bay, an arm of Bristol Bay, on the right bank of 
Nushagak River, just below its confluence with Wood River; 
about 470 miles northeast of Dutch Harbor and 300 miles 
southwest of Anchorage. (See NOAA/NOS Chart #16660.) 
Existing project. A small-boat basin 230,000 square feet in 
area with a depth of 0.0 feet mean lower low water along 
Scandinavian Creek with an entrance channel 250 feet long and 
40 feet wide in Scandinavian Creek and a rock sill across its 
outlet. Tidal range between mean lower low water and mean 
higher high water is 19.8 feet. Extreme range is 30 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. There are four docks at the city of 
Dillingham; three privately owned, one owned by the city. 
Four publicly owned small boat floats located in the Harbor 
basin were installed in June 1982. They are removed before 
fall freezeup and replaced each spring. Facilities are inadequate 
for the number of boats using the harbor. 
Operations during fiscal year. Annual maintenance 
dredging was carried out by Nehalem River Dredging in June 
with the removal of 72,769 cubic yards. This was year 1 of a 2 
year continuing contract. 
6. DOUGLAS HARBOR, AK 
Location. The City of Douglas is located about 2 miles 
southeast of Juneau along the Gastineau Channel on Douglas 
Island in southeast Alaska. (See NOAA charts 17315, 17300, 
and 16016.) 
Existing Project. Provides for a 5.2 acre small boat basin 
with an entrance channel both to a depth of 12 feet below 
MLLW. A rock jetty 105 feet in length protects the project 
from wave damage. 
Local cooperation. Fully complied with. 
Terminal facilities. The small boat basin has three main 
floats with power, lighting, and water; a launch ramp is 
available for public use. The city dock is located at the 
harbor entrance. Fuel, repair facilities, and lodging are 
available in Juneau. 
Operations during fiscal year. The last maintenance 
dredging was accomplished by J.E. McAmis in September 
1997. The entrance channel was widened, straightened, and 
dredged to 2 feet over project depth; 24,242 cubic yards were 
removed from the project. The next scheduled project 
condition survey is scheduled for Fiscal Year 2000. 
7. HOMER HARBOR, AK 
Location. In Kachemak Bay, on Kenai Peninsula, 152 miles 
by water, southwest of Anchorage. The harbor site is near the 
extremity of Homer Spit, a narrow extension of land protruding 
southeasterly some 4.5 miles into the bay. (See NOAA/NOS 
Chart #16645.) 
Existing project. Provides for a sheltered small-boat 
harbor, relocated and based within Homer Spit, about 50 acres 
in area. Project depth varies from 10 feet mean lower low water 
in the west end of the harbor to 20 feet below mean lower low 
water in the entrance channel and the east end. The entrance 
channel is protected by a main rock breakwater 1,018 feet long 
and secondary rock breakwater 238 feet long. Tidal range 
between mean lower low and mean higher high water is 18.1 
feet, with an extreme range of 30.4 feet. (For details relating to 
previous projects, see page 1593 of Annual Report for 1964.) 
Local cooperation. Fully complied with. 
Terminal facilities. The facilities consist of one publicly 
owned and operated wharf capable of handling oceangoing 
vessels for passengers and general cargo. Small boat facilities in 
the basin include publicly owned mooring floats, a publicly 
owned wharf, and an industrial wharf. Construction has tripled 
the size of the harbor. The city of Homer has tripled the size of 
its fish dock located at the southern end of the harbor. 
Operation during fiscal year. Maintenance: Annual 
maintenance dredging was conducted by Nehalem River 
Dredging during September. Removed from the project 
entrance were 7,500 cubic yards of material, and 3,000 cubic 
yards were dredged from the Coast Guard berth. 
8. KAKE HARBOR, AK 
Location. Kake a community of 700, is located in 
Southeastern Alaska about 40 miles west of Petersburg and 800 
miles northwest of Seattle. 
-32-3-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
Existing project. Commercial fishing and logging are the 
primary industries in the area. A feasibility report was 
completed in 1968, and the recommended project was 
authorized for construction. The authorized project, adjacent to 
the city, was estimated to cost $13.2 million in 1986 dollars. 
The project includes construction of a rubblemound breakwater. 
The average annual benefits amount to $785 thousand, all for 
commercial navigation. The benefit to cost ratio is 1.5, based 
on the authorized interest rate. The city of Kake is the local 
sponsor, with financial support from the State. 
Local cooperation. A Project Cooperation Agreement was 
signed on 26 Nov 1997. 
Operation during fiscal year. Construction contract was 
awarded on 29 April 1998 to Kake Tribal Logging & Timber 
Corporation for $14,554,257. Fiscal year expenditures were 
$6,580,523. Contract is scheduled to be completed in June 
2001. 
9. METLAKATLA HARBOR, AK 
Location. Metlakatla is located in the southern portion of 
Port Chester, a small bay on the northwest coast of Annette 
Island in southeastern Alaska, 18 miles south of Ketchikan. 
(See Coast and Geodetic Charts 8074, 8075, and 8102.) 
Existing project. Consists of two small boat basins. The 
existing basin is 2.18 acres in extent with a depth of 10 feet 
below mean lower low water, protected by a rubblemound 
breakwater 900 feet long. The new basin consists of two 
rubblemound breakwaters, 1,255 and 1,150 feet long, and an 
entrance channel and maneuvering area, 1,100 feet long, 100 
feet wide, dredged to a depth of 15 feet below mean lower low 
water and a basin area of 6.25 acres dredged to a depth of 15 
feet below mean lower low water. Tidal range between mean 
lower low water and mean higher high water is 14.7 feet, with 
an extreme range of 24 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. Publicly owned facilities consist of one 
general cargo dock, one barge ramp, and a small boat float 
system in existing basin. Privately owned facilities are one oil 
pier and one industrial wharf. Facilities are not adequate for 
mooring the commercial fishing vessels operating from 
Metlakatla. The existing protected harbor area is fully utilized. 
Operations during fiscal year. The project is physically 
complete; contractor claims are pending. 
10. NINILCHIK HARBOR, AK 
Location. Ninilchik Harbor is located at the mouth of Ninilchik 
River in Cook Inlet, at the village of Ninilchik. The 
community of Ninilchik, AK, is about 40 miles upcoast from 
Homer and 112 miles southwest of Anchorage. (See 
NOAA/NOS Chart #16640.) 
Existing project. A small-boat basin 400 feet long by 150 
feet wide is dredged to an elevation of 2 feet above mean lower 
low water, with an approach channel 400 feet long and 50 feet 
wide dredged to an elevation of 9 feet above mean lower low 
water; protected by two rock jetties. Modifications for river 
channel diversion, the 2 armor rock jetties, and beach protection 
were accomplished in 1967 and 1969. Range between mean 
lower low water and mean higher high water is 19.1 feet, with 
an extreme range of 29.3 feet. 
Local cooperation. Fully complied with. 
Terminal facilities. Facilities, which are limited to shallowdraft 
vessels and accessible from Cook Inlet only at half-tide or 
higher, are a cannery dock along Ninilchik River available for 
offloading fish, and small boat floats in the project basin, 
provided by the state of Alaska. Other supplies are landed on 
beach or brought by road from deep draft ports in the vicinity. 
Facilities are extremely inadequate for the number of boats 
presently using the harbor. Expansion of facilities would 
require construction of additional protected harbor area. 
Operations during fiscal year. Maintenance dredging of 
the harbor and entrance channel was accomplished during May 
1996 by Nehalem River Dredging. During that time 5,795 
cubic yards of material was removed. 
11. NOME HARBOR, AK 
Location. Nome Harbor is located at the mouth of the 
Snake River at the city of Nome, AK, on the northerly shore of 
Norton Sound, an arm of the Bering Sea. It is a shallow open 
roadstead, 581 nautical miles north of Dutch Harbor and 545 air 
miles northwest of Anchorage. (See NOAA/NOS Chart 
#16206.) 
Existing project. The federal navigation project, at 8 feet 
below mean lower low water, consists of a dogleg entrance 
channel 75 feet wide by 1550 feet long running form Norton 
Sound to a turning basin 250 feet wide by 600 feet long, located 
at the confluence of the Snake River with Dry and Bourbon 
Creeks. The entrance is flanked to seaward by a 400 foot 
eastern jetty and a 240 foot western jetty and is further 
protected through its length by a steel sheet pile revetment on 
both sides. The eastern waterfront is protected by a 3350 foot 
long seawall that extends from the eastern jetty. Range between 
mean lower low water and mean higher high water is 1.6 feet 
and extreme tidal range is 7.5 feet, but water levels are 
influenced more by wind than tide. Levels of 5 feet below mean 
lower low water have been observed during offshore winds, and 
a level of 14 feet above mean lower low water has been 
observed during a southerly storm. 
Local cooperation. Fully complied with. 
-32-4-

ALASKA DISTRICT 
Terminal facilities. Cargoes and passengers from ocean 
vessels are lightered to and from shore, a distance of about 2 
miles. Traffic enters the dredged channel and is handled over 
revetment, where a lighterage company has transfer facilities 
which are open to the public. Facilities are considered 
inadequate for existing commerce. In July 1984, the city of 
Nome received Department of Army authorization (permit) 
to construct a 3,600-foot gravel filled causeway. Construction 
of the causeway began in July 1985. Due to lack of complete 
funding, the length of the causeway was shortened to 2,700 
feet. Construction was completed in May 1987. Use of this 
causeway for off-loading petroleum products was delayed until 
the September 1987 arrival of a required berthing barge. 
Operations during fiscal year. Received authorization for a 
project consisting of a harbor complex that includes a new 
breakwater that protects the existing causeway docks. Provides 
for a new entrance to the existing small boat harbor and a 
sediment management scheme to keep the channel open. A 
design agreement was fashioned. 
Annual maintenance dredging was carried out in the northsouth 
portion of the entrance channel in June with the removal 
of 3,749 cubic yards. The work was accomplished by Dennis 
Josephson of Vancouver, Washington. 
12. SITKA HARBOR, AK 
Location. The city of Sitka is located in southeastern 
Alaska, about 95 miles south-southwest of Juneau. It is situated 
on the western coast of 1,600 square mile Baranof Island. Sitka 
is about 20 miles from the open Pacific Ocean on the east side 
of Sitka Sound. 
Existing project. The recommended plan, also known as 
the Channel Rock plan, consists of three rubblemound 
breakwaters constructed across the northern end of the western 
anchorage, and an inner harbor facility placed adjacent to 
Thomsen Harbor. This project created a large protected harbor 
in which moorage basins could be developed using minimal or 
no wave protection structures. The three breakwaters are 480 
feet, 1,200 feet, and 320 feet long. Navigation openings in the 
breakwater, 325 feet and 190 feet wide at the design depth, are 
located at natural channels where water depths are 50 to 55 feet 
at mean lower low water. Two gaps allow for vessel traffic 
separation, which may be particularly important when log rafts 
or barges are being towed through the western anchorage. The 
two breakwaters forming the southern opening overlap to minimize 
ocean swell in Thomsen Harbor. The breakwaters are 
placed directly on the submerged rock reefs forming the 
northern boundary of western Anchorage. 
Local cooperation. A Project Cooperation Agreement was 
executed on 7 December 1993. 
Operations during fiscal year. The Channel Rock 
Breakwaters were physically completed in 1995. During 
construction 192,318 cubic yards of core rock, 65,330 cubic 
yards of secondary rock, and 52,867 cubic yards of armor stone 
were placed. Construction was completed in June 1996. A 
study on the breakwater effect on the herring population was 
completed in 1998 and showed no ill effects on the fish 
population. 
13. ST. GEORGE, AK 
Location. The city of St. George is located on St. George 
Island, the southernmost island of the Pribilof Islands, near the 
edge of the southwest Bering Sea shelf. 
Existing project. The project was authorized in the Energy 
and Water Development Appropriations Act of 1993, P.L. 102- 
377. The work consists of excavating the St. George Harbor 
entrance channel to 20 feet below mean lower low water in 
accordance with cost-sharing provisions in P.L. 99-662. 
Local cooperation. The portion of the project was done by 
the Local Sponsor under Section 215, P.L. 90-483 with 
reimbursement to the Local Sponsor by the Government for its 
share on completion. 
Operations during the fiscal year. The Local Sponsor 
completed the portion of the project under the Section 215 
agreement. Work on the remainder of the project is scheduled 
to be initiated in FY 2000. 
14. ST. PAUL ISLAND HARBOR, AK 
Location. St. Paul Island Harbor is located on the shore of 
Village Cove, the southern side of St. Paul Island, the largest 
and most populated island of the Pribilof group in the central 
southeast Bering Sea. 
Local cooperation. The Project Cooperation Agreement 
was submitted for approval. 
Operations during the fiscal year. Congress authorized 
improvements to the breakwater, the entrance channel, and the 
maneuvering area in WRDA of 1996. Model testing and design 
work on these improvements continued during 1998. The 
construction contract for Phase I to build the three underwater 
reefs was awarded 19 March 1999 for $10,411,000 and will be 
completed in FY 2000. The Phase II construction contract for 
dredging the harbor will be awarded in FY 2001. 
A small boat harbor was authorized in WRDA 99 and it will be 
added to the Phase II construction contract. 
15. WRANGELL HARBOR, AK 
-32-5-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
Location. Wrangell Harbor is located on the northwest side 
of Wrangell Island, 824 miles from Seattle and 160 miles from 
Juneau. (See U.S. Coast and Geodetic Survey Charts Nos. 
8164, 8161, and 8201.) 
Existing project. The project consists of a rubblemound 
breakwater 300 feet long to protect the southern portion of the 
outer harbor; a mooring basin 600 feet long, 400 feet wide, and 
10 feet deep below mean lower low water within the protected 
area; an inner basin in the tide flat area east of Shakes Island, 
325 feet wide and 550 feet long; a connecting channel 120 feet 
wide and approximately 530 feet long; a connecting channel 
120 feet wide and approximately 530 feet long from the outer 
mooring basin all at a depth of 10 feet at mean lower low water; 
and construction of a rock mound breakwater 320 feet long on 
the reef north of Shakes Island. The range between mean lower 
low water and mean higher high water is 15.7 feet. The 
extreme tidal range is 26 feet. Heavy swells, dangerous to small 
fishing boats, are caused by the wind, which causes an 
additional rise of about one foot. 
Construction of the breakwater north of Shakes Island was 
placed on inactive status as material to be used from the inner 
basin was unsuitable and the breakwater considered 
unnecessary for safe moorage of vessels. The cost of this 
portion was last revised in 1956 and estimated to be $6,500. 
(See table 40-B for authorizing legislation.) 
The Heritage Harbor was authorized to be built in the Cemetery 
Point site in WRDA 99. This project will consist of two 
breakwaters and dredging an entrance channel and inner harbor 
area. 
Local cooperation. The Project Cooperation Agreement 
will be executed when construction funds are appropriated. 
Terminal facilities. There are eight wharves and floats in 
Wrangell Harbor. Two privately owned wharves serving 
general cargo and passenger terminals, one of which includes a 
cold storage facility, are open for public use. The remaining 
wharves serve various industrial purposes. One of the floats is 
publicly owned and is open for public use for mooring and 
servicing of small craft, and two privately owned floats serve 
oil handling facilities. 
Operations during fiscal year. A feasibility study for a 
new harbor was initiated in FY 97 and was authorized in 
WRDA 99. 
Flood Control 
16. BETHEL BANK STABILIZATION, AK 
Location. Bethel, AK is located in southwestern Alaska on 
the north bank of the Kuskokwim River 400 miles west of 
Anchorage. 
Existing project. The project consists of rock riprap toe 
protection to be installed on the unprotected river bank and 
at locations where existing city construction bulkheads are 
threatened by erosion. This includes 4,000 feet of unprotected 
riverbank and 4,200 feet of previously installed bulkheads. The 
construction contract was awarded on 26 May 1995. 
Emergency erosion protection for the Bethel Cargo Dock and 
the Mission Road Bulkhead began in July 1995 and continued 
through FY 1995 due to accelerated erosion that accumulated 
after spring runoff. 
Location cooperation. A Project Cooperation Agreement 
was signed on 3 March 1994. 
Terminal facilities. The POL tank farm is situated at the 
downstream end of the project and the city's general cargo dock 
is at the upstream end of the project. 
Operations during fiscal year. The project was physically 
complete in September 1997, except for seeding the sloped 
riverbanks. The total project cost was $24,000,000 of which 
Bethel contributed $6,000,000. Credit for land and rights of 
way is pending. Contractor claims are pending. 
17. CHENA RIVER LAKES, AK 
Location. Chena River Lakes is located in the vicinity of 
Fairbanks, AK, and encompassing the Tanana River, Chena 
River, Little Chena River, and their tributaries. (See USGS map 
Fairbanks, C1, D1, D2, and Big Delta D6.) 
Local cooperation. Fully complied with. 
Existing project. Moose Creek is located 17 miles east of 
Fairbanks with control works on the Chena River. The dam 
itself extends from a bluff one mile north of the Chena River 
and south past the control works for approximately seven miles 
to the Tanana River. The dam connects with a completed 22 
mile levee system along the north boundary of the Tanana river 
to a point south and west of Fairbanks. 
Operations during fiscal year. A contract was awarded 
for replacement of underground storage tanks by December 
1998. Engineering and Design was accomplished for 
maintenance dredging of the lower reaches of the Chena River 
in early 1999. 
18. DILLINGHAM EMERGENCY BANK 
STABILIZATION, AK 
Location. Dillingham is located 350 miles southwest of 
Anchorage, Alaska. The project is located along the 
southeastern edge of Dillingham adjacent to the Nushagak 
River. Erosion of the toe of the bluff in this area is endangering 
critical utilities and numerous buildings and homes. 
-32-6-

ALASKA DISTRICT 
Existing project. The authorized project consists of a 
1,600-foot long steel sheetpile bulkhead along the toe of the 
bluff from the Dillingham City Cargo dock to Snag Point. The 
sheetpile wall will be constructed to an elevation of 28 feet 
MLLW. Mitigation measures including emergency access 
ladders and eyebolts for anchoring setnets used for by 
subsistence fishermen are included in the project. 
Local cooperation. A Project Cooperation Agreement was 
signed in January 1998. 
Terminal Facilities. Dillingham has a general cargo dock 
adjacent to the authorized project. 
Operations during fiscal year. A construction contract 
was awarded in September 1998 in the amount of 1,798,850. 
Construction of the project was performed and a mod was 
awarded for $1,389,472. 
19. HOMER SPIT, AK 
Location. The project is located near the town of Homer, 
Alaska, 120 miles southwest of Anchorage. Part of the city is 
located on a 4.5 mile long finger of land that varies in width 
from 30 to 500 yards wide extending into Kachemak Bay. 
Existing Project. The authorized project, which was 
constructed in 1994, consists of 1,400 feet of rock revetment. 
The revetment was extended an additional 3,700 feet along the 
road by the Fiscal Year 1996 Appropriation Bill. 
Local Cooperation. A Project Cooperation Agreement was 
signed detailing cost sharing of the project. 
Operations during fiscal year. The contract for the 
additional 3700 feet of revetment was completed and closed out 
in June 1998. Surveys are scheduled to be done annually and 
the beach replenished in 2004. 
20. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Emergency flood control activities--repair, flood fighting, 
and rescue work (Public Law 99, 84th Congress, and 
antecedent legislation). 
Federal costs for the fiscal year were $448,177 for disaster 
preparedness, and field investigations. 
21. INSPECTION OF COMPLETED FLOOD 
CONTROL PROJECTS 
Inspections were made of the following flood control works: 
Bethel Bank Stabilization at Bethel; Deering Streambank 
Protection at Deering; Metlakatla Erosion Protection at 
Metlakatla; Homer Spit Revetments at Homer; Tanana River 
Levee at Fairbanks, Talkeetna River at Talkeetna; Lowell Creek 
at Seward; Klutina River at Copper Center; Skagway River at 
Skagway; Gold Creek at Juneau; and Yukon River at Galena. 
An inspection was made of the shore protection works at Nome. 
General Investigation 
22. SURVEYS 
Fiscal year costs were $1,454,764 of which $1,000,258 was 
for navigation studies, $16,390 for flood damage prevention 
studies, $249,715 for special studies, $123,414 for 
miscellaneous studies, and $64,987 for coordination studies 
with other agencies. In addition contributed funds in the 
amount of $494,599 were expended: $16,010 from the local 
share for Seward Harbor navigation studies, $36,293 for Nome 
Harbor navigation studies, $206,136 for Wrangell Harbor 
navigation studies, $48,402 for preconstruction engineering and 
design works under Sand Point, and $82,766 for coordination 
studies with other agencies. 
23. COLLECTION AND STUDY OF BASIC 
DATA 
Technical assistance, information, flood plain manage-ment 
guidance, and other flood plain management services have been 
provided to military and nonmilitary Federal agencies, local 
communities, state agencies, Architectural Engineering firms, 
lending institutions, and private individuals at a fiscal year cost 
of $203,919. 
Fiscal year costs for Hydrologic Studies were $18,399. 
24. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
SAND POINT, AK 
Location. Sand Point is a commercial fishing community 
on the Pacific coast off the southwestern Alaska Peninsula. 
Sand Point is about 570 air miles southwest of Anchorage and 
about midway between Kodiak and Dutch Harbor. The harbor 
provides close access to one of the State's most productive 
fishing areas. For the past few years the population has been 
stable at around 1,000. The economy is based almost wholly 
on commercial fishing. 
This study is in partial response to the Rivers and harbors in 
Alaska study resolution, adopted by the U.S. House of 
Representatives Committee on Public Works on 2 December 
1970. The study was requested by the Aleutians East Borough 
to investigate navigation improvements at Sand Point, Alaska. 
-32-7-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
The harbor currently provides no permanent protected 
moorage for vessels larger than 80 feet. In recent years, the 
fleet operating in the Bering Sea/Aleutian Island area, made up 
primarily of vessels ranging from 80 to 160 feet, has grown 
significantly. Skippers fishing in the Sand Point area currently 
travel long distances to secure protected moorage. 
Existing Project. The proposed harbor improvements at 
Sand Point consist of construction of a 570-foot and a 730-foot 
breakwater from shore to form the basin and entrance channel 
of the new harbor. The crest height of the rubblemound 
breakwaters would be +16 ft MLLW. The breakwaters would 
be designed to withstand the forces of a 6.6 foot wave. The 
entrance channel would be dredged to -18 ft MLLW, it would 
be 120 feet wide to allow one-way traffic of vessels 150 feet in 
length with a 34-foot beam and 10.5 foot draft. The mooring 
basin would be dredged to a depth of -17 ft MLLW and would 
provide room for 37 vessels. 
Local Cooperation. A Preconstruction Engineering and 
Design Agreement was signed on 10 July 1998. 
Operations during fiscal year. The feasibility report was 
approved by Pacific Ocean Division on 14 May 1998. Plans 
and specifications were initiated and are scheduled to be 
completed in November 2000. 
SEWARD HARBOR, AK 
Location. Seward, located on the Kenai Peninsula is about 
125 miles south of Anchorage, Alaska by road. The town is 
located at the northern end of Ressurection Bay off the Gulf of 
Alaska and can be reached by air, sea and rail as well as road. 
It lies at about 60 degrees 6 minutes N Latitued and 149 degrees 
2 minutes W longitude. 
Existing Project. The current harbor is filled to capacity 
with a waiting list of more than 330 boats. The Feasibility 
Report recommends expansion of the existing harbor eastward. 
The recommended project would accommodate 339 additional 
vessels and cost $11,930,000. 
Local Cooperation. A Pre-construction Engineering and 
Design Agreement was signed on 23 April 1999. 
Operations during fiscal year. The feasibility study was 
completed 28 September 1998. Plans and specifications were 
initiated and are scheduled to be completed in December 2000. 
-32-8-

ALASKA DISTRICT 
COST AND FINANCIAL STATEMENT 
See 
Section Total to 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 30 Sep 99 
Anchorage Harbor, AK 
(Contrib. Funds) 
Bethel Small Boat 
Harbor, AK 
Cook Inlet 
Navigation, AK 
(Contrib. Funds) 
Chignik Harbor, AK 
(Contrib. Funds) 
Dillingham Harbor, AK 
(Contrib. Funds) 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost. 
533,235 
533,235 
1,493,955 986,000 1,849,400 1,650,210 34,608,722 
1,494,192 967,277 967,277 1,657,733 34,595,447 
638,080 
638,080 
533,235 
533,235 
476,800 
468,498 
19,763 
27,808 
-257 496,306 
496,306 
115,000 104,000 4,488,928 179,000 5,220,928 
71,969 162,013 338,426 3,979,208 4,870,255 
33,447 
36,970 1,681 
100,199 14,500 
46,618 14,772 
8,562 
356,200 364,500 
362,066 357,989 
25,000 
25,000 
166,000 
86 214,978 
701 
369,031 
368,974 
522,699 
513,643 
92,660 
91,258 
383,000 389,076 10,799,058 
386,332 390,355 10,811,701 
1,700 
1,700 
-32-9- 
TABLE 32-A 
2. 
4.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 30 Sep 99 
6. Douglas Harbor, AK New Work 
Homer Harbor, AK 
Kake Harbor, AK 
(Contrib. Funds) 
Metlakatla Harbor, AK 
(Contrib. Funds) 
Ninilchik Harbor, AK 
11. Nome Harbor, AK 
(Contrib. Funds) 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Mamt. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
44,456 
44,456 
670,411 
657,850 
100,000 
35,461 
-10,556 
2,004 
57,831 
100,000 
93,292 
1,101,855 
724,226 
3,512,350 
3,512,350 
186,000 158,000 149,800 194,333 5,992,246 
186,663 161,980 147,221 198,107 5,690,827 
67,974 
67,974 
294,658 3,381,000 6,779,000 10,454,658 
250,469 2,735,073 6,580,523 9,566,065 
580,000 632,000 1,212,000 
53,856 509,710 563,566 
100,000 68,500 
43,116 76,666 
15,000 
25,905 
5,258,941 
36,813 5,257,874 
148,520 
148,520 
890,144 
724,651 
428,720 
428,720 
165,400 152,000 160,800 187,451 5,503,690 
171,619 150,531 159,906 188,825 5,501,576 
144,000 237,230 400,000 197,000 2,326,470 
133,668 195,920 402,428 265,251 2,345,507 
522,800 333,000 290,000 270,408 12,199,614 
523,399 327,227 292,042 273,181 12,279,829 
2,500 276,961 
21,419 
2,500 
21,419 36,293 
286,961 
57,712 
COST AND FINANCIAL STATEMENT 
-32-10- 
TABLE 32-A 
7. 
8. 
10. 
TABLE 32-A 
(Continued) 
See - ~-- I

ALASKA DISTRICT 
Section Total to 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 30 Sep 99 
12. Sitka Harbor, AK 
(Contributed Funds) 
13. St. George, AK 
(Contrib. Funds) 
14. St. Paul Island Harbor, 
AK 
(Contrib. Funds) 
15. Wrangell Harbor, AK 
(Contributed Funds) 
16. Bethel Bank 
Stabilization, AK 
(Contributed Funds) 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost. 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
-109,000 100,000 
163,324 104,333 
380,088 182,888 
3,252 
-23,765 
29,176 
-23,278 
2061 
17,663 
58 
554 
6,639,144 
6,569,280 
1,238,400 
5624 1,240,519 
7,000,000 
5,017,807 
3,004,000 
2,777,682 
339,000 2,313,000 22,287,200 
229,584 1,570,220 21,393,749 
-1,523 
-500 
226,386 
218,632 
4987 
4987 
6,728 
82,500 178,219 269,000 117,600 
81,368 173,840 123,758 156,511 
230,464 
230,464 
226,386 
225,360 
378,319 
411,719 
1,239,380 
6,646,173 
247,290 
26,596 206,136 
247,290 
232,732 
5,898,000 2,384,000 936,000 19,484,854 
4,300,238 9,523,085 2,406,578 957,145 19,245,111 
1,500,000 3,190,000 
1,097,556 3,177,444 
4,690,000 
4,275,000 
TABLE 32-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 30 Sep 99 
-32-11-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
Chena River Lakes, AK 
(Contrib. Funds) 
18. Dillingham Emergency 
Bank Stabilization 
19. Homer Spit Erosion, AK 
(Contrib. Funds) 
17. 
214,063,928 
6,572 214,054,134 
1,243,213 2,229,725 1,825,500 3,066,448 16,725,030 
1,262,375 2,150,698 1,246,709 3,725,421 16,861,492 
2,182,300 
2,145,929 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
3,800,000 
308,798 
100,000 
-84,000 2,400,000 4,762,515 
125,079 3,484,210 4,162,634 
7,540,000 
713,382 12,692 4,165,949 
1,605,522 
24,870 1,274,934 2,781,128 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
ANCHORAGE HARBOR, AK
-32-12- 
89,000 2,130,946 
206,968 259,967 
Table 32-B 
1. 
AUTHORIZING LEGISLATION

ALASKA DISTRICT 
Jul. 3, 1958 
Oct. 22, 1976 
Jul. 14, 1960 
Deep winter harbor, adjacent to docks, dredge to 35 feet 
below mean lower low water, protected by two jetties.' 
Extension of project limits. 
BETHEL SMALL BOAT HARBOR, AK 
Protected harbor in the Kuskokwim River Delta area that 
provides beach moorage for about 1,200 small boats with the 
possibility of a future medium-draft mooring basin. 
COOK INLET NAVIGATION, AK 
Deepen the entrance channel to -30 feet. Enlarge and deepen the 
maneuvering basin to -29.0 feet with an area of 415 by 830 feet. 
Wave spending beach to +4 feet. Three offshore reefs each, 
1,300 feet long, constructed to a depth of-12 feet. Wave 
energy channel 100 feet wide with bottom elevation of +2 feet. 
CHIGNIK HARBOR, AK 
Deepen the entrance channel to -30 feet. Enlarge and deepen the 
maneuvering basin to -29.0 feet with an area of 415 by 830 feet. 
Wave spending beach to +4 feet. Three offshore reefs each, 
1,300 feet long, constructed to a depth of-12 feet. Wave 
energy channel 100 feet wide with bottom elevation of +2 feet. 
DILLINGHAM HARBOR, AK 
Basin 230,000 square feet in area with depth of 2 feet above 
MLLW along Scandinavian Creek, with entrance channel 1,100 
feet long and 40 feet wide. 
DOUGLAS HARBOR, AK 
Basin 5.2 acres with entrance channel both to a depth of -12 feet 
MLLW and protected by a rock jetty about 90 feet long off the 
northerly shore of Juneau Isle adjacent to the basin entrance. 
HOMER HARBOR, AK 
Basin 2.7 acres in area with depth of 12 feet below mean lower 
low water, and rock breakwater 1,260 feet long. 
Relocation and rehabilitation of project destroyed by 
March 27, 1964 earthquake, by construction of basin 10 
acres in area with 12-foot depth over 2.75 acres and 15-foot 
depth over 7.25 acres protected by rock breakwaters, 1,018 feet 
and 238 feet long. 
Increased width and depth of entrance channel and an enlarged 
staging area. Basin enlarged from 16.5 to 50 acres. 
KAKE HARBOR, AK 
Provides for a 1,580 foot long west breakwater and a 900 foot 
long south breakwater enclosing a 7 acre berthing area at -15 feet 
MLLW. 
H.Doc. 34, 85th Cong., 1st Sess. 2 
P.L. 88-451 
Section 107, P.L. 86-645 
Authorized by Chief of Engineers, 
Nov. 13, 1981 
S. Doc. 249, 75th Cong., 1st Sess. 
-32-13- 
H.Doc. 34, 85th Cong., 1st Sess.2 
P.L. 94-587 
Section 107 (P.L. 86-645) as 
Authorized by the Chief of Engineers, 
Jun. 29, 1978 
Section 101(b)(3), P.L. 104-303 
Water Resources Development Act of 
1996. 
Section 101(b)(3), P.L. 104-303 
Water Resources Development Act of 
1996. 
H. Doc. 390, 84th Cong., 2d Sess.2 
H. Doc. 286, 84th Cong., 2d Sess. 2 
Oct. 12, 1996 
Oct. 12, 1996 
Jul. 3, 1958 
6. Jul. 3, 1958 
Jul. 2, 1958 
Aug. 19, 1964 
Jul. 14, 1960 
Aug. 13, 1968

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
Table 32-B 
(Continued) 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
9. 
Mar. 2, 1945 
Oct. 27, 1965 
10. 
Jul. 3, 1958 
11. 
Aug. 8, 1917 
Aug. 30, 1935 
Jun. 16, 1948 
Aug 17, 1999 
12. Aug 17, 1999 
13. Aug 17, 1999 
14. Aug 17, 1999 
15. Oct 31, 1992 
METLAKATLA HARBOR, AK 
Dredging small boat basin 2.18 acre in extent to a depth of 10 
feet below plane of mean lower low water; construction of 
rubblemound breakwater 900 feet long. 
Entrance channel and two rubblemound breakwaters enclosing a 
7.0 acre basin. 
NINILCHIK HARBOR, AK 
Basin 320 feet long by 150 feet wide with depth of 2 feet above 
mean lower low water, approach channel 400 feet long and 50 
feet wide with depth of 9 feet above mean lower low water, 
protected by 410 foot jetty. 
NOME HARBOR, AK 
Two jetties, easterly 335 feet and westerly 460 feet long revetment, 
channel and basin 200 feet wide and 250 feet long. 
Extension of the jetties and enlarging basin to 250 feet wide and 
600 feet long. 3 
Seawall 
New entrance to Nome Harbor; 2,986 feet long breakwater; 230 
feet long causeway spur; 3,450 feet long entrance channel with 
depth to 22 feet; sediment traps and causeway bridge. 
OUZINKIE HARBOR, AK 
Adding approximately 300 ft of breakwater and dredging at the 
entrance channel of rock pinnacles. 
SAND POINT HARBOR, AK 
Construct a mooring basin adjacent and south of the existing 
harbor. It incorporates the southern breakwater and causeway to 
the city dock by extending the existing breakwater. 
SEWARD HARBOR, AK 
Provide more moorage space. Project would accommodate 339 
additional vessels. 
SITKA HARBOR, AK 
Boat harbor consisting of 3 rubblemound breakwates. 
H.Doc. 138, 76th Cong., 91st Sess. 
Section 201, P.L. 89-298 
S. Doc. 92-64, 92d Cong., 2d Sess.2 
Authorized Oct. 12, 1972 
H.Doc. 34, 85th Cong., 1st Sess.2 
H.Doc. 1932, 64th Cong., 1st Sess. 2 
H.Doc. 404, 71st Cong., 2d Sess., 
and Rivers and Harbors Committee 
Doc. 38, 73d Cong., 2d Sess. 
Reports of Chief of Engineers 
dated March 8, 1948 
Report of Chief of Engineers as 
amended, dated August 2, 1999. 
Section 302, P.L. 106-53 
Water Resource Development Act of 
1999, 106th Cong. 
Section 303, P.L. 106-53 
Water Resource Development Act of 
1999, 106th Cong. 
Section 101 (a) (3), P.L. 106-53 
Water Resource Development Act of 
1999, 106th Cong. 
Water Resources Development Act of 
1992, H. Doc. 103-37, 1 0 3rd Cong.,lst 
Sess. 
-32-14-

ALASKA DISTRICT 
Table 32-B 
(Continued) 
See Date 
Section Authorizing 
in Text Act 
AUTHORIZING LEGISLATION 
Project and Work Authorized 
ST. GEORGE, AK 
Dredging the maneuvering area from an average depth of 3 feet 
above mean lower low water to 18 feet below mean lower low 
water and dredging the entrance channel from an average depth 
of 14 feet below mean lower low water to 20 feet below mean 
lower low water. 
ST. PAUL ISLAND, AK 
Add 1,050 feet of breakwater at existing crest height, 37 below 
feet mean lower low water and 1,000 feet long with a crest height 
of 18 above mean lower low water. 
Deepen the entrance channel to -30 feet. Enlarge and deepen the 
maneuvering basin to -29.0 feet with an area of 415 by 830 feet. 
Wave spending beach to +4 feet. Three offshore reefs each, 
1,300 feet long, constructed to a depth of-12 feet. Wave 
energy channel 100 feet wide with bottom elevation of +2 feet. 
WRANGELL HARBOR, AK 
Breakwater 300 feet long to protect southern portion of harbor. 
Mooring basin 600 feet long, 400 feet wide, and 10 feet deep. 
Inner basin and connecting channel from the existing mooring 
basin, both 10 feet deep at mean lower low water, and 
breakwater 320 feet long on the reef north of Snakes Island. 
Project for navigation, Heritage Harbor, AK 
BETHEL BANK STABILIZATION, AK 
Streambank protection by placing riprap along 8,500 feet of 
riverbank. 
CHENA RIVER LAKES, AK 
Provides for construction of a dam and floodway for the Chena 
River (17 miles east of Fairbanks) for a dam and reservoir on the 
Little Chena River, and for a 27 mile long levee system with 
interior drainage works on the north side of the Tanana River. 
DILLINGHAM EMERGENCY BANK STABILIZATION, 
AK 
Install 1,600 feet of steel sheetpile bulkhead along the toe of the 
bluff from the Dillingham city cargo dock to Snag Point. 
HOMER SPIT, AK 
Extension of an existing rubblemound revetment along an 
existing sheetpile wall to provide protection and nourishment 
along a 1400 foot portion of State highway. 
Nov. 17, 1986 
Nov. 17, 1986 
Oct. 12, 1996 
Aug 17, 1999 
Sec. 101, Water Resource Development 
Act of 1990, 
P.L. 101-640, 101st Cong. 
P.L. 104-65, Energy and Water 
Development Appropriation Act of 
1996 
1. Purchase of dredge and deepwater jetties deauthorized 
November 6, 1977 under section 12, Public Law 93-251. 
2. Contains latest published map. 
3. Extension of jetties classified "inactive". 
4. Little Chena Dam deauthorized in 1991. 
-32-15- 
16. 
17. 
Documents 
Section 107 of The Rivers and Harbors 
Act of 1960, Public Law 
86-645, as amended. 
Section 202, P.L. 99-662 
Section 101(b)(3), P.L. 104-303 
Water Resources Development Act of 
1996. 
Section 302, P.L. 106-53 
Water Resource Development Act of 
1999, 106th Cong. 
H.Doc. 161, 67th Cong., 2d Sess. 
H.Doc. 202, 72nd Cong., 1st Sess. 
H.Doc. 284, 76th Cong., 1st Sess. 
Section 101 (a) (3), P.L. 106-53 
Water Resource Development Act of 
1999, 106th Cong. 
Section 202, P.L. 99-662 
H. Doc. 148, 90th Cong., 2nd Sess. 
P.L. 90-483 
Sec. 114 P.L. 99-190 
18. 
19. 
20. 
Sep. 22, 1922 
Aug. 30, 1935 
Mar. 2, 1945 
Aug 17, 1999 
Nov. 17, 1986 
Aug. 13, 1968 
21. Dec. 19, 1985 
22. 
Nov. 28, 1990 
Nov. 13,1995 
--

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
1. Abandonment recommended in H.Doc. 467, 69th Cong., 1st 
Sess. 
2. Authorized by Chief of Engineers (Sec. 107). 
3. In addition, $272,779 of State funds. 
4. Includes $656,240 for Sec. 107 project. 
5. In addition, $925,500 of State funds. 
6. In addition, $973,875 of State funds. 
30, 1994 
peration 
and 
itenance 
2,154 
Project 
Apoon Mouth of Yukon River, AK' 
Bar Point Harbor, AK2 
Bethel Small Boat Harbor, AK 
Cook Inlet Shoals, AK 
Cordova Harbor, AK2 
Cordova, AK 
Craig Harbor, AK 
Douglas Harbor, AK 
Dry Pass, AK 
Egegik River, AK 
Elfin Cove, AK 
Gastineau Channel, AK 
Haines Harbor, AK2 
Homer Harbor, AK2 
Hoonah Harbor, AK 
Humboldt Harbor, AK 
Iliuliuk Harbor, AK 
Juneau Harbor, AK 
Kake Harbor, AK 
Kasilof Harbor, AK2 
Ketchikan Harbor, AK 
Kodiak Harbor, AK 
Mekorykuk, AK 
Myers Chuck Harbor, AK 
Naknek River, AK 
Neva and Olga Straits, AK 
Old Harbor, Kodiak Island, AK 2 
Pelican Harbor, AK 
Petersburg Harbor, AK 
Port Alexander, AK 
Port Lions, AK2 
Rocky Pass, AK 
St. Michael Canal, AK 
Seldovia Harbor, AK 
Sergius Whitestone, AK 
Seward Harbor, AK 
Sitka Harbor, AK 
Skagway Harbor, AK 
Stikine River, AK 
Valdez Harbor, AK 
Wrangell Narrows, AK 
-32-16- 
TABLE 32-C OTHER AUTHORIZED NAVIGATION PROJECTS 
Status 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Active 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
For Last Cost to Sep. 
Full Report O] 
See Annual 
Report for Construction Mair 
1920 128,896 
1983 2,000,0003 
1985 1,520,272 
1977 1,220,000 
1978 843,534 
1986 9,642,000 
1983 1,033,5004 
1963 282,019 
1983 943,351 
1972 4,441 
1959 154,191 
1964 789,461 
1977 1,000,0005 
1987 2,000,000 
1983 4,255,0006 
1977 3,679,6837 
1941 66,037 
1974 1,381,150 
1991 870,700 
1975 109,848 
1979 1,602,417 
1973 1,891,2128 
1986 1,372,139 
1970 9,700 
1961 20,789 
1960 155,009 
1972 370,415 
1964 369,683 
1972 252,932 
1949 17,000 
1986 1,825,311 
1960 337,668 
1916 377,062 
1974 1,051,8839 
1973 1,798,010 
1973 712,36910 
1973 1,611,009 
1972 133,180 
1987 
1968 649,74011 
1979 3,562,343 
7. In addition, $857,000 of State funds. 
8. Includes $594,163 for rehabilitation. 
9. Includes $400,000 for rehabilitation. 
10. Includes $90,026 for rehabilitation and $2,528 Code 710. 
Recreation facilities at Completed projects. 
11. Includes $73,000 for rehabilitation and $2,713 Code 710. 
Recreation facilities at Completed projects. 
5,000 
488,156 
72,500 
23,466 
3,107 
102,701 
260,991 
331,256 
37,946 
132,946 
18,973 
26,800 
560 
5,518 
1,934 
219,789 
15,400 
32,665 
8,804 
221,498 
309,260

ALASKA DISTRICT 
TABLE 32-E 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1994 
Full Report Operation 
See Annual and 
Project Status Report for Construction Maintenance 
Bethel Bank, Kuskokwim Rivers Completed 1985 553,970 
Fairbanks, Tanana River & Chena Slough, AK Completed 1943 557,000 
Gold Creek, AK Completed 1975 876,0062 4,301 
Klutina River, Copper Center, AK 3 Completed 1973 260,681 
Lowell Creek, AK4 Completed 1945 416,3825 30,771 
Salmon River, AK Completed 1963 37,77067 162,9258 
Talkeetna River, AK Completed 1981 516,694 
1. Section 14. 5. In addition $25,000 expended from contributed funds. 
2. In addition, $25,000 expended from contributed funds. 6. Includes $34,197 of PWA funds. 
3. Authorized by Chief of Engineers (Sec. 205). 7. In addition, $7,000 expended from contributed funds. 
4. During FY88, $551,690 was expended from FC and CE. 8. In addition, $27,400 expended from contributed funds. 
TABLE 32-G 
DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report for Deauthorized Expended Expended 
Allison Lake, AK (Valdez Hydropower) 1992 
Anchorage Harbor, AK (Uncompleted Portion) 1967 1977 
Bradley Lake, AK 1983 1983 1982 46,701,000 
Ketchikan Harbor, AK (West Breakwater) 1979 1979 
Port Alexander, AK (Inner Harbor) 1949 1977 
Tolovana River, AK (Snagging) 1931 1977 
Little Chena River Dam 1983 1990 
Long Lake Dam 1975 1990 
Myers Chuck Harbor, AK 1970 1991 9,700 
Scammon Bay, AK 1992 
Skagway River, AK 1966 1991 26,385 
-32-17-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR 1999 
TABLE 32-H 
NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
NAVIGATION ACTIVITIES PURSUANT TO SECTION 107, 
PUBLIC LAW 86-645, AS AMENDED 
(PREAUTHORIZATION) 
Study Identification Fiscal Year Costs 
King Cove, AK 
Larsen Bay, AK 
Metlakatla, AK 
Ouzinkie, AK 
Tatitlek, AK 
Ketchikan, AK 
Haines, AK 
Unalaska, AK 
3,489,933 
2,125,229 
36,813 
851,241 
40,412 
9,427 
61,260 
52,856 
6,667,171 
TOTAL 
TABLE 32-I 
PROJECT CONDITION SURVEYS 
Name of Project Date Date Survey Conducted 
Craig Harbor, South Cove April 1999 
Elfin Cove May 1999 
Juneau Harbors, Aurora and Harris April 1999 
Mekoryuk Breakwater July 1999 
Metlakatla, Old and New Harbors April 1999 
Pelican Harbor May 1999 
Seward Harbor July 1999 
Wrangell Narrows (Mi. 0.0 to 3.0) April 1999 
-32-18- 
-

ALASKA DISTRICT 
TABLE 32-J 
STREAM BANK EROSION WORK UNDER 
SPECIAL AUTHORIZATION 
EROSION ACTIVITIES PURSUANT TO SECTION 14, 
PUBLIC LAW 79-526, AS AMENDED 
(PREAUTHORIZATION) 
Study Identification Fiscal Year Costs 
Emmonak, AK 85,750 
Homer, AK 145 
Glacier Street, Whittier, AK 12,084 
Bering Sea, Shishmaref, AK 17,606 
Noatak, AK 4,573 
TOTAL 120,158 
TABLE 32-K 
ENVIRONMENTAL ACTIVITIES 
PURSUANT TO SECTION 1135, 
PUBLIC LAW 99-662 
Study Identification Fiscal Year Costs 
Valdez Harbor, AK 
Talkeetna, AK 
TOTAL 
-218 
25,311 
25,093 
-32-19-

LOS ANGELES, CA, DISTRICT *
This district (total area about 230,000 square miles) 
comprises those drainage basins tributary to the Pacific 
Ocean that are in California between the Mexican boundary 
and Cape San Martin (about 265 miles north of the entrance 
to the Los Angeles Harbor). The lower Colorado River 
drainage basin (below Lee Ferry, AZ) which is southeastern 
California, southeastern Nevada, southwestern Utah, and all of 
Arizona, except the northeastern corner; that part of the Great 
Basin that is in southern Nevada and southeastern California; 
and the southern Arizona that drain southward into Mexico. 
IMPROVEMENTS 
Navigation 
1. Channel Islands Harbor, CA 
2. LA-LB Harbors (LA Harbor), CA 
3. Marina Del Rey, CA 
4. Morro Bay Harbor, CA 
5. Newport Bay Harbor, CA 
6. Oceanside Harbor, CA 
7. Oceanside Harbor Sand Bypass, CA 
8. Port Hueneme, CA 
9. Port of Long Beach (Deepening), CA 
10. Redondo Beach Harbor (King Harbor), CA 
11. San Diego Harbor, CA 
12. San Diego River and Mission Bay, CA 
13. Santa Barbara Harbor, CA 
14. Santa Monica Breakwater, CA 
15. Surfside, Sunset and Newport Beach, CA 
16. Ventura Harbor, CA 
Flood Control 
17. Alamo Dam, AZ 
18. Clifton, AZ 
19. Hansen Dam, LACDA (Recreation 
Development), CA 
20. Lake Elsinore, CA 
21. Los Angeles County Drainage Area, CA 
22. Los Angeles River (Recreation 
Development), CA 
23. Mojave River Dam, Mojave River Basin, CA 
24. Nogales Wash, AZ 
25. Norco Bluffs, Santa Ana River, CA 
26. Painted Rock Dam (Gila River), AZ 
27. Pine and Mathews Canyons Dam, 
Colorado RB, NV 
28. Rillito River, AZ 
29. Santa Ana River Mainstem, CA 
30. Santa Ana River Basin and 
Orange County, CA 
31. Santa Paula Creek, CA 
32. San Luis Rey River, CA 
33. Sepulveda Dam 
(Recreation Development), CA 
34. Sweetwater River, CA 
35. Tropicana and Flamingo Washes, NV 
Page 
33-2 
33-2 
33-2 
33-3 
33-3 
33-3 
33-4 
33-4 
33-4 
33-4 
33-5 
33-5 
33-5 
33-5 
33-5 
33-6 
33-6 
33-6 
33-6 
33-6 
33-7 
33-7 
33-7 
33-8 
33-8 
33-8 
33-8 
33-8 
33-8 
33-9 
33-9 
33-9 
33-9 
33-10 
33-10 
36. Tucson Diversion Channel 
(Recreation Development), AZ 
37. Whitlow Ranch Dam, Queen Creek, AZ 
38. Inspection of Completed Flood Control 
Projects 
39. Scheduling Flood Control Reservoir 
Operations 
40. Flood Control Work Under Special 
Authorization 
41. Emergency Response Activities Program 
General Investigations 
42. Surveys 
43. Collection and Study of Basic Data 
44. Preconstruction Engineering and Design 
44A. Rio Salado, Phoenix Reach, AZ 
44B. Rio Salado, Tempe Reach, AZ 
44C. Tucson Drainage Area, AZ 
Tables 
Table 33-A Cost and Financial Statement 
Table 33-B Authorizing Legislation 
Table 33-C Other Authorized 
Navigation Projects 
Table 33-D Other Authorized Shore Protection 
(formerly Beach Erosion Control) 
Projects 
Table 33-E Other Authorized Flood 
Control Projects 
Table 33-G Deauthorized Projects 
Table-33-H Reconnaissance and 
Condition Surveys 
Table-33-I Inspection of Completed Beach 
Erosion Control Projects/ 
Flood Control Projects 
Table 33-J Flood Control Work Under Special 
Authorization Flood Control 
Activities Pursuant to Section 205, 
Public Law 80-858, As Amended 
(Preauthorization) 
33-1 
Page 
33-10 
33-10 
33-11 
33-11 
33-11 
33-11 
33-12 
33-12 
33-12 
33-12 
33-12 
33-12 
33-13 
33-17 
33-27 
33-28 
33-29 
33-31 
33-32 
33-33 
33-34

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 1999 
executed March 18, 1997. 
1. CHANNEL ISLANDS HARBOR, CA 
Location. On the coast of southern California about a 
mile northwest of Port Hueneme, 65 miles northwest of 
Los Angeles Harbor, and 345 miles south of San 
Francisco. (See Coast and Geodetic Survey Charts 
5007 and 5202.) 
Existing project. For details see page 33-2 of Annual 
Report for 1981. 
Local cooperation. Fully complied with. 
Terminal facilities. For details see page 33-2 of 
Annual Report for 1989. 
Operations during fiscal year. $2,967,000 was used 
for maintenance dredging under an existing six-year, 
three-cycle contract and began dredging in December 
1998, placing about 1,117,000 cubic yards on Silver 
Strand and Hueneme Beach. Project condition is good. 
2. LOS ANGELES - LONG BEACH 
HARBORS, CA 
Location. On the coast of southern California in San 
Pedro bay about 25 miles south of the city of Los 
Angeles, about 96 miles northwest of San Diego 
Harbor, and about 410 miles southeast of San Francisco 
Harbor. 
Existing project. The project consists of four 
increments of dredging to be constructed in two stages 
- deepening the existing entrance channel for the Port 
of Los Angeles and providing new channels to existing 
and new port facilities. The dredge material will be 
used for fill to create Pier 400. Estimated cost (October 
1998) for existing project is $401,000,000 (includes an 
allowance for estimated inflation through the 
construction period), of which $116,500,000 is Federal 
($116,200,000 Corps and $300,000 U.S. Coast Guard) 
and $284,500,000 is non-Federal. 
Local cooperation. All items of local cooperation 
required under the terms of the previous authorizing 
acts have been fully complied with. See page 33-3 of 
Annual Report for 1981 for requirements under the 
terms of the 1976 Water Resources Development Act. 
The revised recommended project was changed due to 
the withdrawal of the Port of Long Beach on October 1, 
1991. The Port of Los Angeles, the local sponsor, 
received credit, for advance work (Stage 1) performed 
per WRDA 1988. Project Cooperation Agreement 
Terminal Facilities. Of the 82,553 feet of wharves in 
the Los Angeles Harbor, 75,729 feet are owned by the 
city and 6,824 feet are owned by private interests. The 
final report presented and recommended four project 
increments. Increment No. 2 would deepen the existing 
Los Angeles Harbor approach and entrance channels 
to Pier 300 to provide better access to dry bulk 
facilities. Increment No. 3 would further deepen the 
Los Angeles approach and entrance channel to Pier 300 
and part of Pier 400, and deepen a south channel to 
provide access to the eastern side of Pier 400 and liquid 
bulk facilities. Increments No. 4 and 5 would extend 
Increment No. 3 of Los Angeles to provide access to 
container terminals that would be located on part of 
Pier 300 and Pier 400. The material obtained from the 
dredging will be used to create new landfill within the 
port and shallow water habitat for the least tern. 
Operations during fiscal year. Dredging of the LA 
River Estuary was performed with material that is 
unsuitable for ocean disposal being placed in the Port 
of Long Beach Slip 2 at Pier E. A Comprehensive 
Condition Survey of San Pedro Breakwater (west) 
indicated that the structures elevation is below project 
design. It is expected that the current elevation for the 
Middle Breakwater (detached) and Long Beach 
Breakwater (east-detached) will also be lower than the 
original elevation. An Assessment Report was 
initiated. Construction of Stage 2 scheduled for 
completion in Fiscal Year 2000. Project condition is 
fair. 
3. MARINA DEL REY, CA 
Location. Marina del Rey is located on Santa Monica 
Bay, 15 miles west of downtown Los Angeles, 29 miles 
northwest of Los Angeles Harbor and 390 miles southeast 
of San Francisco Bay. 
Existing project. For details see page 33-3 of Annual 
Report for 1981. Existing Federal navigation project 
consists of two jetties a breakwater and navigation 
channels. Contaminated materials, causing costly 
maintenance and a potential threat to navigation, 
complicate a severe shoaling problem in the harbor. 
Local cooperation. County of Los Angeles 
Department of Beaches and Harbors requested a new 
study, and expressed local support by letter dated 
August 5, 1992. Feasibility Cost Sharing Agreement 
signed February 21, 1997. 
33-2 
Navigation

LOS ANGELES, CA, DISTRICT 
Terminal facilities. Marina del Rey is homeport to 
about 15 commercial fishing boats and 50 other transit 
boats with an annual fish catch valued at approximately 
$10 million. There are about ten charter boat and five 
tour boat operations used by over 100,000 people each 
year and over 6,000 berths servicing recreational craft 
within the harbor. Eight yacht clubs call the marina 
homeport. The marina offers sailing instruction, boat 
rental, repair and storage, harbor tours, sport fishing, 
retail facilities, coffee shops, snack bars and fine 
restaurants. The U.S. Coast Guard has a cutter 
permanently assigned to the harbor. 
Operations during fiscal year. There are elevated 
levels of contaminants contained within the marina's 
sediments. Portions of the marina's sediments unsuitable 
for unrestricted open disposal. Efforts were underway to 
identify suitable disposal areas for these sediments and 
investigate potential source of contaminants and establish 
necessary control measures. Congress added $1.5 
million to dredge the harbor. After completion of plans 
and specifications and all necessary environmental 
clearances, a contract was awarded in September 1999. 
Project condition is fair. 
4. MORRO BAY HARBOR, CA 
Location. On coast of southern California 110 miles 
south of Monterey Bay, 120 miles northwest of Santa 
Barbara Harbor, and nearly midway between San 
Francisco and Los Angeles. (see Coast and Geodetic 
Survey Chart 5387). 
Existing project. For details, see page 33-4 of Annual 
Report for 1980. 
Local cooperation. Project Cooperation Agreement 
executed on April 7, 1995. 
Terminal facilities. Facilities which are adequate for 
existing commerce, comprise 640 feet of existing piers 
and 150 feet of floating docks constructed by San Luis 
Obispo County; 263 feet of floating docks constructed by 
California Department of Parks and Recreation; 1,396 
feet of floating docks constructed by the city of Morro 
Bay; 1,398 feet of privately-owned piers; and 5,435 feet 
of privately-owned floating docks. 
Operations during the fiscal year. Congress added 
$1,000,000 to repair the south breakwater. With this 
amount being insufficient and having a great need to 
dredge the entrance channel, we used the Corps' Dredge 
Yaquina in June 1999 to dredge approximately 110,000 
cubic yards. Project condition is good. 
5. NEWPORT BAY HARBOR, CA 
Location. Forty miles southeast of Los Angeles. 
Existing project. Provides rubblemound entrance 
jetties, 920-foot deep and 500-foot wide entrance 
channel and main channel, inner channels, a turning 
basin, and anchorage areas. Upper Newport is a shallow 
800-acre marine estuary. Navigation project is maintained 
by Corps of Engineers. Pursuant to Section 841 
and subject to Section 903(b) of WRDA 1986, the 
project for navigation for the harbor is modified to 
dredge and maintain a 250-foot wide channel in Upper 
Newport Bay to the boundary of Upper Newport Bay 
State Ecological Preserve to a depth of 15 feet. 
Local cooperation. In a resolution dated August 20, 
1996, Orange County Board of Supervisors indicated 
strong support of feasibility study and understanding of 
cost sharing requirements. 
Operations during fiscal year. Supplemental 
Appropriations funding by Congress allowed for the 
initiation of the dredging project at the upper channel in 
Newport Bay Harbor. Dredging was required due to the 
sedimentation from El Nino storms. Contract was 
awarded at the end of the year. Project condition is good. 
6. OCEANSIDE HARBOR, CA 
Location. On the coast of southern California at Oceanside, 
about 30 miles north of city of San Diego and 80 
miles south of Los Angeles. 
Existing project. For details, see page 33-4 of Annual 
Report for 1981. 
Local cooperation. Fully complied with. Oceanside 
Small Harbor Craft District sent letter of support dated 
April 1985 and Letter of Intent in March 1989. Project 
Cooperation Agreement executed in January 1993. 
Terminal Facilities. Berthing for 957 boats, single-tie 
slips, 38 double-tie slips and 136 side-ties, of which 54 
are visitors' slips; 12 dry storage spaces at Oceanside 
Marine Center; a fuel dock; a boat hoist; a launching 
ramp, which can accommodate 4 launchings at the same 
time; parking for 1,732 cars; with temporary parking for 
about 141 boat trailers; a boat-repair facility; a pump-out 
facility; a Coast Guard cutter; restaurants; retail stores; 
yacht brokers; a hotel/motel; condominiums; and a sportfishing 
facility. Navigation improvements include new 
dredging and biannual dredging of expanded entrance 
channel area. 
33-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 1999 
Operations during fiscal year. Annual contract dredging 
was performed and approximately 230,000 cubic yards were 
removed from the approach and entrance channels. Project 
condition is good. 
7. OCEANSIDE HARBOR SAND BYPASS, 
CA 
Location. On the coast of southern California along 
Oceanside Beach near jetty, about 30 miles north of city of 
San Diego and 80 miles south of Los Angeles. 
Existing project. Underwater experimental pumping system 
with the pumps, fluidizers, and submerged pipeline to 
remove sand from harbor entrance and deposit it to downcoast 
beaches, on a continual basis. Phase I and Phase II 
have both been completed and successfully tested. The 
experiment is complete and we have determined the bypass 
technology can be installed with a successful operation but, 
not at Oceanside. 
Local Cooperation. City of Oceanside officials are in full 
support of the closure of the experimental bypass project. 
Operations during fiscal year. Dismantling and 
demobilization have been completed. Lessons Learned 
Report was drafted. Project closeout is being completed. 
8. PORT HUENEME, CA 
Location. On the coast of southern California about 65 
miles northwest of Los Angeles and Long Beach Harbors, 
about one mile southeast of Channel Islands Harbor, 
immediately west of the city of Port Hueneme, four miles 
southwest of the city of Oxnard, and 10 miles southeast of 
the city of Ventura. 
Existing Project. Authorized in 1970 for restudy of 
completed project. The harbor serves both military and 
commercial uses with port facilities consisting of terminals, 
wharves, and warehouses serving a wide variety of products. 
The existing Federal project consists of an approach 
channel, entrance channel, central basin, and two 
rubblemound jetties. The Navy has plans to utilize the 
harbor more extensively for vessel berthing and repair; 
effectively reducing maneuverability in the harbor. Harbor 
District would like to use deeper draft wood pulp carrier 
vessels and possibly tankers. 
Local cooperation. Requirements are described in full on 
page 33-3 of Annual Report for 1976. The Oxnard Harbor 
District reviewed and agreed to sign the Feasibility Cost 
Sharing Agreement on January 3, 1996. 
Operations during fiscal year. Harbor was dredged in 
33-4 
connection with the Channel Islands dredging project. 
Project condition is fair. 
9. PORT OF LONG BEACH (DEEPENING), 
CA 
Location. On the coast of southern California along the 
Pacific Coast in San Pedro Bay about 20 miles south of 
downtown Los Angeles. 
Existing Project. The recommended plan consists of 
deepening the approach channel to -76 MLLW, from 
breakwater seaward, a distance of about 2 miles to 
accommodate deep draft crude tankers. WRDA 1996 
authorized project in accordance with the July 1996 Chief of 
Engineers Report. The estimated cost of the project 
(October 1998) is $43,350,000. 
Local cooperation. The Port of Long Beach is the local 
sponsor. The Project Cooperation Agreement was executed 
in July 1998. 
Operation during the fiscal year. The base contract was 
awarded August 1998 to dredge -69 feet MLLW. Awarded 
option to base contract in July 1999 to dredge -72 feet 
MLLW. 
10. REDONDO BEACH HARBOR (KING 
HARBOR), CA 
Location. On the coast of southern California on the 
southern portion of Santa Monica Bay, about 17 miles 
southwest of Los Angeles. 
Existing project. For details, see page 33-4 of Annual 
Report for 1981. WRDA of 1986 (H.R. 6) Conference Bill, 
Title VIII - Project Modification, Section 809 - King Harbor, 
Redondo Beach, CA, modifies the King Harbor Project in 
order to carry out maintenance dredging and for breakwater 
construction, and authorized the Secretary to restore the 
breakwater to a height of 22 feet and maintain breakwater at 
such height to provide greater protection from heavy wave 
action. 
Local cooperation. City of Redondo Beach officials are in 
full support of the study and have indicated desire to 
construct improvements to reduce continued storm related 
damages. 
Operations during fiscal year. A condition survey of the 
North Breakwater indicated structural support failure to the 
armor stone in areas along the landward side (inner harbor) 
and a sloughed area on the seaward side in the middle of the 
breakwater. Neither condition jeopardizes the structure and 
both will be monitored closely. Emergency supplemental

LOS ANGELES, CA, DISTRICT 
funds provided to repair the North Breakwater. A contract 
was awarded in Fiscal Year 1998 and was completed in 
December 1998(Fiscal Year 1999). Project condition is 
good. 
11. SAN DIEGO HARBOR, CA 
Location. On the coast of southern California just north of 
the Mexican border, about 109 miles southeast of Los 
Angeles and Long Beach Harbors. (See Coast and Geodetic 
Survey Chart 5107). 
Existing project. For details, see pages 33 and 34 of 
Annual Report for 1980. 
Local cooperation. Requirements are described in full on 
pages 33 and 34 of Annual Report for 1980. 
Terminal facilities. Consists of 45,070 feet of wharves, 
exclusive of Government-owned and 24,000 feet are 
privately owned. Government-owned wharves at North 
Island are restricted to military use only. 
Operations during fiscal year. None. Project condition 
is good. 
12. SAN DIEGO RIVER AND MISSION 
BAY, CA 
Location. The project is located at the mouth of the San 
Diego River about six miles northwest of the San Diego 
business district, San Diego County, California. 
Existing project. For details, see page 33-3 of Annual 
Report for 1991. Authorized by the Flood Control Act of 
1944, the existing project consists of a levee channel, 
entrance channel, main channel, altered railroad bridge, 
anchorage basins (West Anchorage and Quivira) and three 
jetties. Construction of a 1,200-foot-long weir restored 
design conveyance capacity at the mouth of the San Diego 
River. A sand plug in mouth of river reduced flood-carrying 
capability from 115,000 cfs to 35,000 cfs, equal to a 100- 
year flood. The temporary timber pile breakwater at Quivira 
Basin was replaced with a permanent rubble mound 
breakwater. 
Local cooperation. The Project Cooperation Agreement 
was executed July 1996 with the city of San Diego. 
Operations during fiscal year. Hydro survey performed 
April 1999. Project condition is good. 
13. SANTA BARBARA HARBOR, CA 
Location. On the coast of southern California, 90 miles 
northwest of Los Angeles Harbor. 
Existing project. For details on original, see page 33-4 
Annual Report for 1983. For reevaluation details see 
WRDA, 1986. The recommended plan includes acquiring a 
permanent dredge for the city and they will assume the 
operation and maintenance of the channel. 
Local cooperation. See page 1015 of Annual Report for 
1969, for items of local cooperation under 1962 authorized 
modification of existing project. The city reaffirmed its 
support on February 8, 1994. 
Operations during fiscal year. Routine annual 
maintenance dredging was performed including associated 
hydro surveys. Project condition is good. 
14. SANTA MONICA BREAKWATER, CA 
Location. Santa Monica Breakwater is located seaward of 
the Santa Monica Pier, approximately 15 miles west of 
downtown Los Angeles. Existing breakwater is 2,000 feet 
long and lies 1,300 feet from the shoreline. 
Existing project. The project plan comprises reconstruction 
of 900 feet of the southern end of the existing breakwater to 
an elevation of +10 feet MLLW for storm damage 
prevention and constructing an offshore boulder-field for 
fish habitat. The local sponsor will provide 12 moorings 
and other boating support facilities to reestablish commercial 
boating opportunities. WRDA 1996 authorized the project. 
The estimated cost of the project is $7,200,000 (Federal cost 
is $4,700,000 which includes $40,000 US Coast Guard; 
Non-Federal cost is $2,500,000). 
Local cooperation. City of Santa Monica, the local 
sponsor, indicated its support for the recommended plan and 
its willingness and intent to execute the Project Cooperation 
Agreement scheduled to be signed October 2000. 
Operations during fiscal year. Negotiate Project 
Cooperation Agreement. 
15. SURFSIDE, SUNSET AND NEWPORT 
BEACH, CA 
Location. Project extends along Orange County coastline, 
17 miles from San Gabriel River mouth down coast to 
Newport Bay Harbor entrance. 
Existing project. Authorization Section 101 of Rivers and 
Harbors Act 1962. Project is a periodic continuing 
construction project. 
33-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 1999 
Local cooperation. State of California, Orange County, 
Cities of Newport and Huntington Beach, and Surfside 
Colony. Letter of Intent dated August 11, 1995 from the 
State of California Department of Boating and Waterways, 
coordinating sponsor. Funding agreement with the State of 
California was executed on April 30, 1996. 
Operations during fiscal year. None. 
16. VENTURA HARBOR, CA 
Location. Located 65 miles northwest of Los Angeles and 
six miles northwest of Channel Islands Harbor. 
Existing project. For details, see page 33-5 of the Annual 
Report for 1981. Reevaluation under WRDA 1990 consists 
of modification to the existing harbor by constructing a 
separate South Beach groin, extending the offshore 
breakwater, adding a spur groin to the north jetty and 
detached breakwater, and deepening and extending the 
entrance channel and sand trap. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Routine annual maintenance 
dredging was performed including associated hydro surveys. 
A contract was awarded for the repair of the south jetty and 
work completed in November 1998. Hydro survey 
performed December 1998. Project condition is good except 
for the damage on the detached breakwater, which occurred 
during El Nino storms. 
Flood Control 
17. ALAMO DAM, AZ 
Location. About 70 miles southeast of Kingman, Arizona on 
the Bill Williams River, Arizona a tributary of the Colorado 
River. 
Existing project. For details, see page 33-7 of Annual 
Report 1981. 
Local cooperation. Fully complied with. 
Operations during fiscal year. The downstream gage 
damaged by flood flows in 1993 and 1994 was repaired. 
Routine operations and maintenance activities were 
performed and a periodic inspection of the project was 
completed. The Alamo Risk Assessment Study initiated in 
Fiscal Year 1998 scheduled for completion in Fiscal Year 
2000 will provide information useful to the Alternate 
Spillway Study. Project condition is good. 
18. CLIFTON, AZ 
Location. Located on San Francisco River approximately 
170 miles northeast of Tucson in Greenlee County, AZ. 
Existing project. The project consists of both structural 
and nonstructural elements, including an earthfill levee 
about 3,000 feet long, with floodgates and floodwalls. 
Implementation will involve flood proofing of 11 businesses, 
flood plain evacuation plans, and recreation development. 
Estimated cost (October 1998) for existing project is 
$24,100,000 (includes $2,600,000 cash contribution and 
$5,400,000 other costs). 
Local cooperation. The State of Arizona, Division of 
Emergency Services, is the local sponsor. Project 
Cooperation Agreement executed on July 30, 1993. 
Operations during fiscal year. Construction of the levee 
and floodwall was completed August 1995 and turned over 
to sponsor December 1996. Completed non-structural 
relocation in December 1998. 
19. HANSEN DAM, LACDA, (RECREATION 
DEVELOPMENT), CA 
Location. In the San Fernando Valley area of the city of 
Los Angeles about 20 miles northwest of downtown Los 
Angeles. Recreation lake and facilities lie within flood 
control basin boundaries. 
Existing project. Original project authorized under Flood 
Control Act 1936, and modified by WRDA 1986, Section 
847 Energy and Water Development Act 1992 (PL 102- 
104). Project consists of two phases. Phase 1 is the 
excavation of the lake, and rough grading of the roadways 
and building pad locations. Phase 2 is the construction of a 
10.5-acre recreation lake, picnic facilities, access roads, 
parking lots, and landscaping. 
Local cooperation. Project is 50/50 cost shared with the 
city of Los Angeles. 
Operations during fiscal year. Phase 1 was completed in 
December 1997. Phase 2 initiated February 1998 was 
completed and dedication ceremony August 28, 1999. 
20. LAKE ELSINORE, CA 
Location. In Riverside County, about 70 miles southeast of 
downtown Los Angeles, and 30 miles southeast of the city 
of Corona. 
Existing project. The project consists of an earthentrapezoid 
outlet channel about 2.5 miles long, with a 30-foot 
to 80-foot base and IV on H. side slopes. The outlet 
33-6

LOS ANGELES, CA, DISTRICT 
channel will relieve flooding at the 100-year-flood level 
around the perimeter of the lake. The project included 
building six bridges and protecting an endangered species 
habitat. The project was completed in September 1993. 
Construction contract closed out September 1997. 
Amendment to Local Cooperation Agreement executed 
August 27, 1998. Confirmation of real estate credit initiated 
August 1998. 
Local cooperation. Riverside County Flood Control Water 
Conservation District signed a Local Cooperation 
Agreement March 27, 1992. Amended August 27, 1998 to 
reflect Federal expenditures for the flood control project at 
$7,500,000. 
Operations during fiscal year. Initiated Section 205 study 
report addressing advisability of modifying the project for 
flood control. Confirmation of real estate credit initiated 
August 1998 and credit reimbursement was completed July 
1999. 
21. LOS ANGELES COUNTY DRAINAGE 
AREA, CA 
Location. Along Los Angeles and San Gabriel Rivers, Rio 
Hondo, and Compton Creek, CA. 
Existing project. Project consists of channel improvement 
to lower Los Angeles, Rio Hondo Rivers, Compton Creek, 
and modification/replacement of as many as 27 bridges 
necessitated by the channel improvements. A map of the 
rehabilitation plan is in "General Design Memorandum, Los 
Angeles River Rehabilitation under the Major Rehabilitation 
Program," dated January 1984 and revised in March 1984. 
Estimated cost (October 1999) for existing project is 
$200,000,000 of which $150,000,000 is Federal and 
$50,000,000 is non-Federal (includes $43,968,000 cash 
contribution and $6,032,000 other costs). 
Local cooperation. In February 1992, the Los Angeles 
County Department of Public Works, the local sponsor, 
affirmed its support and willingness to financially 
participate in the construction of the project at a level 
consistent with the current cost-sharing policy for 
construction. The Project Cooperation Agreement was 
executed August 7, 1995. 
Operations during fiscal year. Routine operations and 
maintenance were conducted. The soft-bottom clean out of 
Compton Creek Channel was completed. Seismic Study of 
Whittier Narrows Dam was conducted. Massive channel 
clean out efforts were being conducted in anticipation of El 
Nino storms. The fencing repair contract for Compton 
Creek Channel was completed. An A/E contract to provide 
for the ERGO Cycle 2 requirements was awarded and work 
began late in Fiscal Year 1998. A contract to excavate 
Haines Canyon Debris Basin was awarded. Project 
condition of dams and channels is good. Pier nose 
extension package #1, which consists of three bridges 
crossing the Los Angeles River at Willow Street, Delano 
Boulevard and a Metro Transit Authority light-rail bridge, 
was awarded in August 1996 and completed November 
1997. Pier nose #2, which consists of 2 bridges crossing the 
Los Angeles River at Atlantic and Artesia Avenues, was 
awarded May 1998 and completed January 1999. Pier 
Nose #3 awarded July 1999, scheduled to complete June 
2000. 
22. LOS ANGELES RIVER, SEPULVEDA 
TO ARROYO SECO, (RECREATION 
DEVELOPMENT), CA 
Location. Upper Los Angeles River from Sepulveda Flood 
Control Basin (located 25 miles northwest of the city of Los 
Angeles) to the confluence of the Arroyo Seco channel, a 
distance of 20 miles. 
Existing project. The Upper Los Angeles River consists 
primarily of a rectangular channel from the Sepulveda Basin 
to a point approximately four miles above the Arroyo Seco 
as a trapezoidal channel of the Arroyo Seco. 
Local cooperation. Project is 50/50 cost shared with City 
of Los Angeles Department of Transportation. 
Operations during fiscal year. This project was funded in 
Fiscal Year 1994, in the amount of $400,000 to initiate and 
complete a master plan. Final Master Plan and NEPA 
completed March 1998. 
23. MOJAVE RIVER DAM, MOJAVE 
RIVER BASIN, CA (MOJAVE RIVER 
RESERVOIR) 
Location. On Mojave River at the Forks site, just downstream 
from the mouth of Deep Creek and about 14 miles 
upstream from Victorville, in Mojave River Basin, CA. 
Existing project. For details, see page 33-8 of Annual 
Report for 1983. 
Local cooperation. None required. 
Operations during fiscal year. A periodic inspection was 
conducted and routine O&M activities were performed. 
Project condition is good. U.S. Forest Service has informed 
the District of a lawsuit filed pursuant to the Endangered 
Species Act by the Southwest Center for Biological 
Diversity on behalf of the endangered Arroyo Toad. The 
33-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 1999 
alleges the USFS is allowing "taking" of the endangered 
species. As a property owner the Corps may be implicated as 
well. Local agencies have indicated interest in operating and 
maintaining recreational development immediately upstream 
and downstream of the dam. This will help in control access. 
24. NOGALES WASH, AZ 
Location. At the Mexican Border, in extreme southern 
Arizona in central and northern portions of the city ofNogales, 
about 60 miles south of Tucson. 
Existing project. Current plan includes a flood warning 
system in Mexico and United States. Estimated cost (October 
1999) for existing project is $560,000, $420,000 of which is 
Federal and $140,000 is non-Federal. 
Local cooperation. Project Cooperation Agreement 
scheduled for execution in the last quarter of Fiscal Year 
2000. Negotiating agreement with Mexico through U.S. 
International Boundary and Water Commission. 
Operations during fiscal year. Limited Reevaluation Report 
prepared to satisfy the requirements of Section 303 and 
Section 404, WRDA 1996. No construction scheduled in 
Fiscal Year 1999. 
25. NORCO BLUFFS, SANTA ANA RIVER, 
CA 
Location. Located approximately 40 miles southeast of Los 
Angeles, in the city of Norco, along a 3.75-mile stretch of the 
south bank of the Santa Ana River. 
Existing Project. The project consists of a structural solution 
of revetted-buttress fill using existing and imported fill 
material one reach, a distance of one mile. The bluff 
stabilization protects a 65-foot-high bluff from further retreat 
into a residential neighborhood, which results when flood 
flows occur in the Santa Ana River. Estimated cost (October 
1999) is $10,700,000 of which $8,025,000 is Federal and 
$2,675,000 is non-Federal. 
Local cooperation. Local sponsor, Riverside County Flood 
Control District. Project Cooperation Agreement executed in 
January 1999. 
Operations during fiscal year. Record of Decision (ROD) 
was signed December 23, 1998. Construction contract 
awarded May 1999. 
26. PAINTED ROCK DAM (GILA RIVER), AZ 
Location. About 20 miles northwest of Gila Bend, and 120 
miles southwest of Phoenix, Arizona. 
33-8 
Existing project. For details, see page 33-9 of Annual 
Report for 1981. 
Local cooperation. Requirements are described in full on 
33-9 of Annual Report for 1981. 
Operations during fiscal year. Routine operations and 
maintenance were performed. The (native American) 
cemetery dike was repaired. Engineering and design for the 
final repair of the damage caused by spillway flow in 1993 
was completed. A Periodic Inspection was initiated. 
Project condition is fair. 
27. PINE AND MATHEWS CANYONS 
DAMS, COLORADO RIVER BASIN, NV 
Location. In Lincoln County, NV, about 100 miles north of 
Hoover Dam and about 17 and 20 miles, respectively, east 
of Caliente, NV. 
Existing project. For details, see page 33-13 of Annual 
Report for 1981. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Routine operations and 
maintenance were performed. Periodic inspection and 
related studies were conducted. Project condition is good. 
28. RILLITO RIVER, AZ 
Location. The project is located in Tucson metropolitan 
area of Pima County, AZ. 
Existing project. Plan of improvement includes: 1) an 
upstream equestrian staging area; 2) an upstream rest area; 
3) a downstream rest area; 4) esthetic treatment planting; 5) 
construction of 16 pedestrian bridges; and 6) continue work 
on the Limited Reevaluation Report for Tanque Verde. 
Estimated cost (October 1998) for existing project is 
$40,000,000 (includes an allowance for estimated inflation 
through the construction period), of which $28,600,000 is 
Federal and $11,400,000 is non-Federal. Flood control 
portion is $34,215,468 and recreation is $5,784,532. 
Local cooperation. Pima County Transportation and Flood 
Control District submitted letters of assurance on February 
24, 1986 and May 6, 1987. Project Cooperation Agreement 
(PCA) was executed in June 1994. Amendment to PCA for 
third increment was executed on September 16, 1998. 
Operations during fiscal year. Phase III construction 
contract was awarded September 1998 and is scheduled for 
completion in Fiscal Year 2000.

LOS ANGELES, CA, DISTRICT 
29. SANTA ANA RIVER MAINSTEM, CA 
Location. Along a 75-mile reach of the Santa Ana River 
in San Bernardino, Riverside, and Orange Counties, 
emptying into the Pacific Ocean between the cities of 
Newport Beach and Huntington Harbor, 50 miles south of 
Los Angeles, and 90 miles north of San Diego. 
Existing project. For details, see page 33-9 of the Annual 
Report for 1987. Plan of improvement: Seven Oaks Dam, 
management of overflow area - Seven Oaks to Prado; raise 
Mill Creek Levee; additional storage at Prado; 
improvements along: Oak Street Drain/Riverside Co., 
Santiago Creek/Orange Co., San Timoteo Creek/San 
Bernardino Co., and Lower Santa Ana River; recreation 
development: mitigation and preservation. Estimated cost 
(October 1999) for existing project is for $1,322,000,000 
(includes an allowance for estimated inflation through the 
construction period), of which $883,000,000 is Federal and 
$439,000,000 is non-Federal ($76,842,000 cash contribution 
and $362,158,000 other cost). 
Local cooperation. Counties of San Bernardino, Riverside, 
and Orange. Project Cooperation Agreement was 
signed on December 14, 1989. 
Operations during fiscal year. Continue engineering and 
design on the Lower Santa Ana River, Santiago Creek, 
Prado Dam and San Timoteo Reach 3B. Completed 
construction on Seven Oaks Dam August 1999. 
30. SANTA ANA RIVER BASIN AND 
ORANGE COUNTY, CA 
Location. On the Santa Ana River and tributaries and on 
other streams in Orange, Riverside, and San Bemardino 
Counties, CA. 
Existing project. For details on units, see Annual Report 
for 1968. 
Local cooperation. Fully complied with. Orange County 
Water District advocated an increase in water conservation 
at Prado Dam up to elevation 505 feet. Prado Basin 
includes significant riparian wetlands, including nesting 
areas of the endangered least Bell's vireo. The basin is 
currently under review as proposed critical habitat for the 
vireo. 
Operations during fiscal year. Routine operations and 
maintenance were performed. Periodic inspections and 
related studies were conducted at Brea, Carbon Canyon, 
and Fullerton Dams. Project condition of dams and 
channels is good. 
31. SANTA PAULA CREEK, CA 
Location. Santa Paula Creek is a tributary of the Santa 
Clara River in the vicinity of the city of Santa Paula, 
Ventura County, about 16 miles from the ocean and 
approximately 60 miles northwest of downtown Los 
Angeles. 
Existing project. Authorized by Flood Control Act of 
1970, Public Law 91-611 (HD 443/80/1) and for details 
see Annual Report Fiscal Year 1991, page 33-10. 
Estimated cost (October 1998) for existing project is 
$37,600,000, of which $36,000,000 is Federal and 
$1,600,000 is non-Federal (includes $0 cash contribution 
and $1,600,000 other costs). 
Local cooperation. Ventura County Flood Control 
District. No authorization is required; therefore, the 
existing Section 221 Agreement is still binding and was 
amended in September 1996. 
Operations during fiscal year. Upstream channel 
contract awarded November 1998, scheduled to complete 
March 2001. 
32. SAN LUIS REY RIVER, CA 
Location. Along the lower 7.2 miles of the San Luis Rey 
River, in and around the city of Oceanside, San Diego 
County, about 86 miles south of Los Angeles. 
Existing project. A double levee, 5.4 miles long; stone 
protected channel with a soft bottom; 1,330 feet of parapet 
walls at the ocean on the north and south levees; six 
interior drainage ponds; and a five-mile bike trail. The 
Water Resources Development Act of 1996 reauthorized 
the project. Estimated cost (October 1998) $81,600,000 
of which $61,100,000 is Federal and $20,500,000 is non- 
Federal (including $4,100,000 cash contribution). 
Local cooperation. Final Local Cooperation Agreement 
signed by city of Oceanside and Secretary of Army May 
13, 1988. 
Operations during fiscal year. Construction contract for 
relief wells awarded September 1999, scheduled to 
complete January 2000. 
33. SEPULVEDA DAM, (RECREATION 
DEVELOPMENT), CA 
Location. The project is located between the communities 
33-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 1999 
of Encino and Van Nuys and 15 miles northwest of Los 
Angeles. 
Existing project. Flood Control Act 1936 and Public Law 
77-387 1941, and 1989-1972. Primary project purpose is 
flood control. Subsequent Act of Congress authorized a 
secondary project purpose for park and recreation. 
Local cooperation. The recreation project is 50/50 cost 
shared with the city of Los Angeles. Federal funds will 
complete Lake Balboa and park with comfort station, trails, 
fencing, irrigation, children's play area and revegetation 
and develop an additional wildlife area. The city will 
continue reclaimed water distribution and develop several 
park areas. 
Operations during fiscal year. Project construction 
physically completed January 1999. 
34. SWEETWATER RIVER, CA 
Location. The project empties into San Diego Bay in the 
city of Chula Vista and National City and unincorporated 
San Diego County, four miles south of the city of San 
Diego, and eight miles north of the Mexican Border. 
Existing project. Construction of 3.2 miles of channel 
improvements along the Sweetwater River from Interstate 
805 to San Diego Bay, in combination with State Route 
54 and Interstate 5 construction; and construction of two 
railroad bridges and 188 acres of preservation and 
mitigation land. 
Local cooperation. San Diego County signed 221 
Agreement in December 1984. 
Operations during fiscal year. None. 
35. TROPICANA AND FLAMINGO 
WASHES, NV 
Location. The project area is located west of and through 
urbanized Las Vegas community along both Tropicana and 
Flamingo Washes in southern Nevada. 
Existing project. The recommended plan will provide 
urban flood reduction, erosion control and wildlife enhancement 
for portions of Las Vegas and the surrounding 
areas to the west and southwest, including the rapidly 
developing alluvial fan immediately west of Las Vegas. 
The plan recommends construction of four debris basins, 
two detention basins, modifications to two existing 
detention basins, 28 miles of channels connecting these 
project elements, 43 miles of lateral collectors, environmental 
mitigation, and recreation facilities. The estimated 
cost (October 1999) for the existing project is 
$284,000,000 (includes an allowance for estimated 
inflation through the inflation period), of which 
$209,700,000 is Federal and $74,300,000 is non-Federal 
(includes $41,300,000 cash contribution and $33,000,000 
other costs). 
Local cooperation. The Clark County Regional Flood 
Control District and the Department of Public Works are 
the local sponsors for flood control. The Clark County 
Recreation Department is the potential local sponsor for the 
recreation feature. The Project Cooperation Agreement 
(PCA) was executed on February 7, 1995. 
Operations during fiscal year. Awarded contract for 
Lower Red Rock Channel, and completed construction of 
Blue Diamond Dam; Blue Diamond Beltway Channel, 
Segment 7A; and Red Rock Beltway, Segment 10A. 
36. TUCSON DIVERSION CHANNEL 
(RECREATION DEVELOPMENT), AZ 
Location. The Tucson Detention Basin and Diversion 
Channel are located in southeast Arizona. The project area 
initiates within the basin and proceeds approximately five 
miles downstream until it meets Interstate 19. 
Existing project. The recreational development consists 
of a bicycle and hiking trail; four rest areas at the basin's 
inlet and outlet areas, near the intersection of Park Avenue 
and Ajo Way, across the street from Wakefield Middle 
School and near Interstate 19, where the project ends; four 
channel under crossing areas at Ajo Way (near the basin's 
outlet), Interstate 10; Kino Parkway; and Benson Highway; 
a restroom facility and five to seven car parking area 
located near the end of the project area; lighting at rest 
areas; benches; pedestrian bridges; and landscaping. The 
flood control channel maintains a 30-40 foot width, with a 
average 30-foot right-of-way on each side of the channel. 
The trail system is primarily located along the north bank 
of the channel. 
Local cooperation. Pima County is the local sponsor. 
Operations during fiscal year. Construction contract was 
completed on September 25, 1998 of above-mentioned 
features. 
37. WHITLOW RANCH DAM, QUEEN 
CREEK, AZ 
Location. Fifty miles southeast of Phoenix, AZ in Pinal 
County, on Queen Creek, Arizona a tributary of Gila River, 
about 10 miles west of Superior, Arizona. 
33-10

LOS ANGELES, CA, DISTRICT 
Existing project. For details see page 33-10 of Annual 
Report 1981. Project element earthfill Dam, circular 
conduit outlet works and reservoir. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Routine operations and 
maintenance were performed. A Spillway Erodibility 
Study was initiated in Fiscal Year 1999 and scheduled to 
complete in Fiscal Year 2000. Project condition is good. 
38. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Inspection of 24 completed local flood control projects 
consisting of the following: 375 miles of channels, six 
dams, and appurtenances, and 23 debris basins. Inspections 
costs for Fiscal Year 1999 were $543,651. 
39. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with Section VII, Flood Control Act of 
1944, studies of reservoir operations for flood control were 
conducted; and preparation of regulations for the use of 
storage allocated for flood control was continued. The 
flood control structures were Hoover, Twitchell, and Tat 
Momolikot Dams. Scheduling costs for Fiscal Year 1999 
were $178,792. 
40. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation Activities Pursuant to Section 107 of the 
1960 Rivers and Harbors Act, Public Law 645, 86th 
Congress, as Amended: 
Federal cost for Section 107, Coordination Account was 
$6,844. 
Flood Control Activities Pursuant to Section 205 of the 
1948 Flood Control Act, Public Law 858, 80th 
Congress, as Amended: 
Federal cost for Section 205 was $3,342,991 of which 
$3,316,702 was used for studies and $26,289 for 
Coordination Account. See Table 33-J for list of projects. 
Emergency Streambank Protection Activities Pursuant 
to Section 14 of the 1946 Flood Control Act, Public Law 
526, 79th Congress, as Amended 
Federal cost for Section 14 was $72,806. 
Snagging and Clearing Navigable Streams and 
Tributaries in interest of Flood Control, Section 208, 
1954 Flood Control Act, Public Law 780, 83d Congress. 
No snagging and clearing activities for 1999. 
Modifications to Structures and Operations of 
Constructed Corps Projects to Improve the Quality of 
the Environment, Pursuant to Section 1135 of the 1986 
Water Resources Development Act, Public Law 662, 
99th Congress, as Amended. 
Federal cost for Section 1135, was $688,152. 
Aquatic Ecosystem Restoration Pursuant to Section 206 
of Water Resources Development Act of 1986 
Federal cost for Section 206 was $144,221 of which $4,384 
was Coordination Account and $139,837 was Preliminary 
Restoration Plans. 
41. EMERGENCY RESPONSE 
ACTIVITIES - FLOOD CONTROL AND 
COASTAL EMERGENCIES 
Emergency Flood Control Activities - repair, flood 
fighting, and rescue work (Public Law 99, 84th Cong., and 
antecedent legislation). 
A. Disaster: This program encompasses all the activities 
associated with preparedness, which includes preparation 
of plans and policy documents, exercises, training, 
coordination with outside agencies and governments, 
maintaining supplies and equipment, and the like. The 
district developed and published an Emergency Operations 
Center (EOC) Standard Operating Procedures, which 
codified the many procedures and processes attendant to 
EOC operations. The district also compiled the 
information for revisions to its Flood Response and 
Earthquake Response Plans. 
B. Operational Program Areas: Fiscal Year cost for 
disaster preparedness was $566,385; emergency operations 
cost was $3,934; repair and restoration of damaged Federal 
flood control works cost was $2,802,776 and $156,532 for 
non-Federal flood control works; inspection ofnon-Federal 
flood control works cost was $42,019. 
C. Emergency Work in Support of Other Federal 
Agencies. 
Support work was performed for Federal Emergency 
33-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FISCAL YEAR 1999 
Management Agency (FEMA) following hurricanes 
George and Dennis and the Oklahoma tornado at a cost of 
$576,188. 
General Investigations 
42. SURVEYS 
Total Fiscal Year costs were $8,629,880 of which 
$942,103 was for navigation studies; $2,323,181 was for 
flood damage prevention studies; $93,730 was for 
shoreline protection studies; $4,110,471 was for special 
studies; $18,189 for review of completed projects; 
$864,968 was for Miscellaneous Activities (includes 
$803,170 for special investigations; $1,669 for FERC 
licensing activities; $47,147 for Interagency Water 
Resources Development; $12,982 for National Estuary 
Studies; $0 for North American Waterfowl Management 
Plan); and $277,238 for Coordination Studies with other 
Agencies and Non-Federal Interests, ($215,632 was for 
Planning Assistance to States - $181,410 for Arizona, and 
$34,222 for California). 
43. COLLECTION AND STUDY OF BASIC 
DATA 
Fiscal Year costs totaling $351,135 were associated with 
the following tasks under the Flood Plain Management 
Services Program, FPMS Unit $50,761; Technical Services 
$94,266; Quick Responses $9,974; and Special Studies 
$149,329 and $46,805 for hydrologic studies. 
44. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
Fiscal Year expenditures were $1,748,111 of which 
$1,740,162 was for projects not yet authorized for construction 
and $7,949 was for projects fully authorized. 
44A RIO SALADO, PHOENIX REACH, AZ 
Location. The project area is located in the city of 
Phoenix, Arizona, along 7 miles of the Salt River. 
Existing project. Two sites have been identified with a 
Federal interest in environmental restoration involving 
riparian habitat restoration, water quality improvement and 
recreation that are incidental or complimentary to the 
primary project purpose. The first site is 1.5 miles on 
Indian Bend Wash, from McKellips Road downstream to 
the confluence with the Salt River in Tempe; the second 
site is located along 7 miles of the Salt River, from the 
Interstate Highway 10 Bridge to 19th Avenue in Phoenix. 
Local cooperation. The city of Phoenix and the Corps of 
Engineers executed the Preconstruction Engineering 
Design Agreement on July 31, 1998. 
Operations during fiscal year. The preconstruction 
engineering and design phase was initiated in August 1998 
and scheduled to complete in Fiscal Year 2000. 
44B RIO SALADO, TEMPE REACH, AZ 
Location. The project area is located along 1.5 miles on 
Indian Bend Wash, from McKellips Road downstream to 
confluence with Salt River in Tempe, Arizona. 
Existing project. There is a Federal interest in 
environmental restoration involving riparian habitat 
restoration, water quality improvement and recreation that 
are incidental or complimentary to the primary project 
purpose. 
Local cooperation. The city of Tempe and the Corps of 
Engineers executed the Design Agreement February 25, 
1999. 
Operations during fiscal year. The preconstruction 
engineering and design phase was initiated March 1999 
and scheduled to complete in Fiscal Year 2000. 
44C TUCSON DRAINAGE AREA, AZ 
Location. Located along Tucson Arroyo/Arroyo Chico 
Watershed, within the Tucson city limits in Arizona. 
Existing project. Both the reconnaissance report and the 
feasibility study identified the Tucson Arroyo/Arroyo 
Chico watershed area (approximately 11.4 square miles) as 
the major drainage channel within downtown Tucson. The 
recommended plan has two main features consisting of two 
detention basin complexes - one on Arroyo Chico in the 
headwaters of the drainage area (referred to as Randolph 
Golf Course Detention Basin Complex), and one on 
Tucson Arroyo/Arroyo Chico in the approximate center of 
the watershed (referred to as Park Avenue Detention Basin 
Complex). The local sponsor completed the Randolph 
Golf Course Detention Basin Complex in May 1996 using 
Section 104 credit consideration. 
Local cooperation. Pima County Flood Control District 
and the Corps of Engineers executed the Design 
Agreement on May 3, 1999. 
Operations during fiscal year. Preconstruction 
engineering and design phase was initiated in May 1999. 
33-12

TABLE 33-A 
See 
Section in 
Text Project 
1. Channel Islands, 
CA 
2. Los Angeles and 
Long Beach 
Harbor, CA 
Model Study: 
3. Marina del Rey, 
CA 
4. Morro Bay 
Harbor, CA 
5. Newport Bay 
Harbor, CA 
6. Oceanside 
Harbor, CA 
7. Oceanside Harbor 
Sand By-Pass, 
CA 
8. Port Hueneme, 
CA 
9. Port of Long 
Beach, CA 
10. Redondo Beach 
(King Harbor) 
LOS ANGELES, CA, DISTRICT 
COST AND FINANCIAL STATEMENT 
Funding 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
Maint: 
Approp. 
Cost 
FY 96 
1,921,000 
1,875,350 
350,000 
314,735 
637,000 
1,001,053 
154,000 
205,602 
1,174,000 
1,177,225 
124,000 
1,300,305 
1,671,000 
1,672,065 
141,000 
140,676 
(238,000) 
(122,393) 
325,000 
317,659 
721,000 
655,221 
70,000 
68,032 
506,000 
452,584
0
0 
FY 97 
1,699,000 
1,650,614 
15,000,000 
14,858,465 
1,569,000 
1,104,714 
162,000 
136,734 
-30,000 
-44,286
0 
9,052 
970,000 
973,031 
1,654,000 
1,654,991 
-62 
-62 
531,000 
400,307
0 
766,469
0
0 
244,000 
245,149
0
0 
FY 98 FY 99 
2,836,000 
2,705,897 
34,975,000 
34,621,306 
1,664,000 
1,690,138 
162,000 
177,125 
1,081,000 
1,065,448
0 
25,539 
3,437,000 
3,361,325 
605,000 
332,009
0
0 
1,014,000 
1,138,823 
-1,400,000 
1,343,660
0
0 
4,135,000 
583,170 
200,000 
101,201 
2,761,065 
2,795,900 
57,000,000 
57,039,881 
1,264,000 
1,777,478 
147,000 
157,751 
2,882,033 
2,863,614
0
0 
1,002,000 
1,034,465 
1,554,000 
1,818,904
0
0 
692,000 
689,545
0 
228,385 
152,935 
160,570 
8,279,000 
4,941,257 
938,000 
1,026,039 
33-13 
Total Cost 
30 Sep 99 
45,571,185 
45,561,808 
111,415,000" 
110,924,386 
14,973,842 
14,925,435 
9,548,887 
9,548,845 
14,232,807 
14,170,647 
1,524,000 
1,474,261 
22,606,471 
22,550,844 
4,523,700 
4,515,149 
3,734,9382/ 
284,938 
13,584,787 
13,567,032 
23,356,900 
23,287,585 
1,634,100 
1,633,104 
13,164,0003 
6,222,160 
6,373,343 
6,362,535

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 33-A COST AND FINANCIAL STATEMENT 
Project Funding FY 96 FY 97 FY 98 FY 99 
Total Cost 
30 Sep 99 
11. San Diego 
Harbor, CA 
12. San Diego River 
and Mission 
Bay, CA 
13. Santa Barbara 
Harbor, CA 
14. Santa Monica 
Breakwater, CA 
15. Surfside, Sunset 
and Newport 
Beach, CA 
16. Ventura Harbor 
(Ventura Marina), 
CA 
17. Alamo Dam, AZ 
18. Clifton, AZ 
19. Hansen Dam, 
LACDA, CA 
(Recreation) 
20. Lake Elsinore, 
CA 
21. Los Angeles 
County Drainage 
Area, CA 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
New Work: 
Approp 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
Maint: 
Approp. 
Cost 
646,000 
650,458 
1,542,000 
401,124
0
0 
1,558,000 
1,543,576 
40,000 
61,678 
155,000 
213,235 
(508,000) 
187,378 
(10,000) 
1,807 
2,050,000 
1,968,562 
887,000 
968,906 
2,463,000 
2,616,117
0 
3,488
0 
16,437 
4,741,000 
4,949,317 
4,186,000 
3,823,778 
142,000 
139,732 
-400,000 
913,897 
19,000 
16,820 
1,318,000 
1,239,512 
10,000 
19,316
0 
5,521 
5,804,000 
5,505,594
0 
-6,633 
2,095,000 
1,973,632 
1,328,000 
857,414 
604,000 
651,722
0
0 
(500,000)
0 
14,424,800 
14,392,147 
5,612,000 
4,791,637 
33-14 
See 
Section 
In Text 
37,000 
30,482
0 
14,014
0
0 
1,235,000 
1,160,838
0 
1,860 
1,409,000 
19,503
0 
184,886 
7,000
0 
6,391,000 
5,729,589 
974,000 
1,389,276 
2,160,000 
824,611 
982,000 
330,598 
68,000 
59,026 
16,941,000 
16,246,471 
7,219,500 
6,817,931 
0 
7,975
0 
14,272
0
0 
1,550,967 
1,719,917
0 
7,665 
-1,099,000 
90,791
0 
65,407 
-787 
12,846 
3,126,000 
3,978,788 
936,000 
1,014,326 
-105,000 
966,059
0 
1,541,652 
2,432,000 
2,439,039 
50,744,000 
50,625,406 
4,727,500 
6,410,108 
5,507,191 
5,499,736 
7,884,345 
7,877,481 
3,580,689 
3,577,546 
23,523,741 
23,517,772 
400,000 
399,347 
535,000w' 
335,293 
21,409,100 
21,329,711 
5,286,213 
5,286,213 
42,218,332 
42,198,951 
17,647,859 
17,589,270 
13,955,000 4/ 
13,685,415 
6,457,000 
6,303,875 
7,500,000 
7,498,065 
97,300,0005' 
96,763,979 
97,004,702 
96,923,179

TABLE 33-A 
See 
Section in 
Text Project 
LOS ANGELES, CA, DISTRICT 
COST AND FINANCIAL STATEMENT 
Funding FY 96 FY 97 FY 98 FY 99 
22. Los Angeles 
River, Sepulveda 
to Arroyo Seco, CA 
(Recreation) 
23. Mojave River 
Dam, Mojave 
River Basin, CA 
24. Nogales Wash, 
AZ 
25. Norco Bluffs, 
CA 
26. Painted Rock, 
AZ (Gila River) 
27. Pine & Mathews 
Canyons Dam, 
Colorado River 
28. Rillito River, 
AZ 
29. Santa Ana River 
Mainstem, CA 
Cost 
30. Santa Ana River 
Basin OC, CA 
31. Santa Paula 
Creek, CA 
32. San Luis Rey 
River, CA 
33. Sepulveda Dam, 
CA, (Recreation) 
34. Sweetwater 
River Basin, CA 
35. Tropicana and 
Flamingo Washes, 
NV 
Maint 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
71,093,106 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
0 
64,438 
109,000 
99,670 
68,000 
57,072
O
0 
4,272,000 
4,293,862 
187,000 
180,857 
6,088,000 
10,055,413 
67,439,000 
64,794,411 
2,272,000 
2,303,725 
1,209,000 
776,660 
1,000,000 
334,752
0 
1,975,587 
2,400,000 
2,517,011 
0 0 
0 28,835 
181,000 
189,578 
-66,800 
42,509 
180,000 
78,176 
1,494,000 
913,109 
106,000 
111,531 
6,000 
1,004,659 
65,346,000 
66,607,143 
2,461,000 
2,287,217 
1,923,000 
1,802,238 
-1,000,000 
354,927 
1,961,000 
1,319,802 
-100,000 
-73,499 
191,000 
187,992 
214,000 
72,279 
1,000,000 
101,739 
2,063,000 
1,547,326 
92,000 
91,424 
757,000 
587,266 
70,916,000 
39,429,995 
3,067,000 
2,802,171 
4,457,000 
4,379,650 
2,371,000 
2,348,438
0 
840,797
0 
22,330 
3,668,000 9,709,061 17,783,000 
8,816,175 9,531,822 14,578,276 
0 
28,751 
182,000 
188,341
0 
83,199 
4,400,000 
2,152,527 
1,102,000 
2,205,677 
228,000 
221,974 
2,600,00 
1,622,868 
37,507,000 
609,256,033 
3,716,000 
4,105,912 
8,519,000 
5,689,913 
220,000 
579,000 
-700,000 
1,359,424
0 
20 
15,987,000 
14,977,745 
33-15 
Total Cost 
30 Sep 99 
400,000 
394,181 
5,985,536 
5,972,046 
592,200 6/ 
532,294 
5,580,00010/ 
2,332,442 
27,242,183 
27,137,650 
2,739,329 
2,727,109 
25,557,000' 
24,278,717 
627,867,0008/ 
50,864,494 
50,722,695 
24,605,020 
21,134,840 
57,291,000 
56,718,633 
16,760,940 
16,441,222 
37,082,503 
37,081,583 
62,798,000 
58,272,529 
-

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 33-A 
Project 
COST AND FINANCIAL STATEMENT 
Funding FY 96 FY 97 FY 98 
36. Tucson Diversion 
Channel, AZ 
(Recreation) 
37. Whitlow Ranch 
Dam, Queen 
Creek, AZ 
Maint: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
0 
321,128 
93,000 
92,188 
0 
396,738 
65,000 
63,606 
0 0 
1,745,123 97,082 
135,000 138,000 
120,083 154,096 
PRECONSTRUCTION ENGINEERING AND DESIGN 
44A Rio Salado, Phoenix 
Reach, AZ 
44B Rio Salado, Tempe 
Reach, AZ 
44C Tucson Drainage 
Area, AZ 
FOOTNOTES: 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
0 330,000 1,725,000 
0 221,962 1,474,974 
0 49,000 225,000 
0 28,221 139,954 
0 30,000 
0 0 
20,000 130,000 
30,264 21,590 
1/ Excludes non-Federal funds and costs; includes PED appropriation of $4,090,000 and cost of $3,833,223. 
2/ Excludes non-Federal sponsors funds $1,913,000 and cost of $1,685,758; includes PED Work Allowance of $647,000 and cost 
of $647,000. 
3/ Excludes non-Federal funds and costs; includes PED appropriation of $750,000 and costs of $739,000. 
4/ Excludes non-Federal funds $376,000 and cost of $367,712; includes PED appropriation $1,600,000 and cost of $1,600,000. 
5/ Includes PED Work Allowance of $9,650,000 and cost of $9,648,146. Excludes non-Federal Work Allowance of $6,191,000 
and cost of $4,299,586. 
6/ Excludes non-Federal funds and costs. Excludes PED appropriation and cost due to portions of the project reclassified 
to "Deferred" and "inactive" categories. 
2/ Excludes non-Federal funds and costs; includes PED appropriation $3,825,000 and cost of $3,825,000 
81 Excludes non-Federal funds and costs; includes PED appropriation $25,643,000 and costs of $25,643,000. 
91 Excludes non-Federal funds and costs; includes PED appropriation $225,000 and costs of $224,756. 
10/ Excludes non-Federal funds and costs; includes PED appropriation $180,000 and costs of $78,176. 
.1/ Excludes non-Federal funds of $612,500 and costs of $70,888. 
33-16 
See 
Section 
In Text FY 99 
Total Cost 
30 Sep 99 
3,050,000 
3,042,442 
1,958,850 
1,955,864 
2,055,000 11 
1,696,936 
274,000 
168,175 
180,000 
51,854

LOS ANGELES, CA, DISTRICT 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Sep 3,1954 
CHANNEL ISLANDS HARBOR, CA 
Harbor for light-draft vessels and shore protection works. 
LOS ANGELES AND LONG BEACH HARBORS, CA 
June 3, 1988 A breakwater 8,500 feet long, east of Point Fermin. 
June 25,1896 Extend said breakwater to shore, making a total length of 11,152 
feet from Point Fermin. 
July 25, 1912 Dredge Los Angeles outer harbor west of entrance channel. 
Aug. 8, 1917 For silt-diversion works. 
Sep. 22, 1922 Triangular area approach to Los Angeles inner harbor entrance 
channel. 
Mar 3, 1925 Dredge Los Angeles Harbor main channel and entrance 35 feet 
deep and 1,000 feet wide; dredge inner harbor turning basin 35 feet 
deep; and reclamation of Reservation Point. 
July 3, 1930 A detached breakwater 12,500 feet long in prolongation of existing 
breakwater (authorized by act of 1896). 
Widen fairway on east side of entrance to Los Angeles inner 
harbor; dredge a channel 35 feet deep and 400 feet wide in Cerritos 
channel from U.S. station 406 to Long Beach turning basin; 
entrance channel to Long Beach Harbor 35 feet deep and 500 feet 
wide; and maintenance of the Long Beach breakwater south of 
outer end pier A. This act provides that in no case shall dredging 
be done within 50 feet of established pierhead lines of existing 
piers and wharves. 
Aug 30, 1935 Dredge 1,000-foot wide entrance channel to Los Angeles outer 
harbor to 40-foot depth and a turning basin 3,500 feet long and 
1,500 feet wide to same depth; and enlarge entrance to inner harbor 
by dredging to 35-foot depth a triangular area at its junction with 
turning basin. 
Oct 17, 1940 Dredge to a depth of 40 feet area A and B adjacent to 40-foot-depth 
entrance channel; construct and maintain a rubble mound 
breakwater of composite type 21,000 feet long in eastward 
therefrom to Belmont pier; maintenance dredging of A and B, and 
at mouth of Los Angeles River diversion channel; all subject to 
such modifications as in discretion of the Chief of Engineers may 
be advisable to meet requirements of the Navy. 
H.Doc.362,83d Cong., 2d sess. 
S.Doc.18, 55th Cong., 1st sess. 
H.Doc. 969, 60th Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc.8, 62d Cong., 2d sess. 
Rivers and Harbors Committee 
Doc.9, 64th Cong.,2d sess. 
H.Doc. 1013, 66th Cong.,3d 
sess. 
H. Doc.349, 68th Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc.33, 71st Cong., 2d sess. 
S.Doc.130, 71st Con.,2d sess. 
S.Committee print, 74th Cong., 
1st sess. 
H.Doc.843, 76th Cong., 3d sess 
33-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Sep 3, 1954 Dredge to a depth of 35 feet in West Basin as a modification of 
existing project. This act provides that the Secretary of the Army is 
authorized to reimburse local interests for work they have done upon 
this project prior to July 1, 1953, at actual cost to local interests so 
far as same shall be approved by Chief of Engineers and found to 
have been done in accordance with the project hereby adopted and 
that such reimbursement shall be subject to appropriations applicable 
thereto or funds available therefore and shall not take precedence 
over other pending projects of higher priority for harbor 
improvements; and that such payments shall not exceed $500,000. 
July 14, 1960 Dredge to a depth of 35 feet in West Basin as a modification of 
existing project. 
Oct 22, 1976 Dredge Los Angeles Harbor entrance channel 45 feet deep, 1,000 
feet wide, and about 5,500 feet long; Los Angeles channel 45 feet 
deep, 750 feet wide, and about 12,500 feet long; inner harbor turning 
basin 45 feet deep, 1,350 feet wide, and about 1,650 feet long; East 
Basin channel 45 feet deep, 400 feet wide, and about 6,000 feet long; 
West Basin 45 feet deep, from 350 to 1,350 feet wide, and about 
3,800 feet long; and East Basin 45 feet deep, from 400 to 950 feet 
wide, and about 2,000 feet long. This act provides that no dredging 
shall be done within 125 feet of established pier head lines, wharves, 
or other structures. 
Oct 17, 1986 Deepen the entry channel to the Los Angeles Harbor and Long Beach 
Harbor to 70 feet and 76 feet respectively, including the creation of 
800 acres of land from the project. 
Nov 17, 1988 If non-Federal interest carry out any work associated with such 
project which is later recommended by the Chief of Engineers and 
approved by the Secretary, the Secretary may credit such non-Federal 
interest an amount equal to the Federal share of the cost of such 
work, without interest. 
Nov 28, 1990 Section 4(d) of WRDA 1988 (102 Stat. 4015) is amended by 
inserting after "approved by the Secretary" in the first sentence the 
following: "or which is carried out after approval of the final report 
by the Secretary and which is determined by the Secretary to be 
compatible with the project". 
Sep 25, 1996 The sewer outfall relocated by the Port of Los Angeles at a cost of 
approximately $12,000,000 shall be considered to be a relocation. 
The cost of such relocation shall be credited as a payment provided 
by the non-Federal interest. 
H. Doc. 161, 83d Cong., 1st 
Sess 
H.Doc.401,86th Cong., 2d sess. 
H.Doc.401,86th Cong., 2d sess. 
WRDA 86, Sec 201. 
WRDA 88, Sec 4 
WRDA 90, Sec 102 
WRDA 96 Sec 307 
33-18

LOS ANGELES, CA, DISTRICT 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
MARINA DEL REY, LOS ANGELES COUNTY, CA 
Sep 3, 1954 Harbor for light-draft vessels. 
Sep 28, 1994 Determine advisable modifications in interest of navigation, hurricane 
and storm damage reduction, environmental restoration and disposal of 
contaminated sediments from the entrance channel at Marina Del Rey 
Harbor 
MORRO BAY HARBOR, CA 
Mar 2, 1945 Adoption and improvement of existing entrance channel to bay, a 
breakwater extending south by west from Morro Rock, and bay 
channels and basins at locations and of dimensions substantially as 
shown on the Navy Department map on file in the Office of the Chief of 
Engineers. 
NEWPORT BAY HARBOR (& REVIEW), CA 
May 22, 1991 Maintenance and improvement of main and inner channels. 
Initiate feasibility phase studies re-environmental preservation benefits 
associated with modification of existing Federal project to extend 
channels into the Upper Newport Bay. 
OCEANSIDE HARBOR, CA 
Oct 27, 1965 Maintenance of general navigation features of Del Mar Boat Basin and 
of Oceanside Harbor. 
Oct 27, 1990 Navigation and storm damage reduction, repair, operate, and maintain 
the extension of south jetty. 
OCEANSIDE HARBOR SAND BY-PASS SYSTEM, CA 
May 22, 1991 Maintenance of general navigation features of Del Mar boat Basin and 
of Oceanside Harbor. 
PORT HUENEME, CA 
Aug 13, 1968 Adoption and maintenance of existing harbor for deep-draft vessels; 
dredged central basin to 35 feet deep, and extend southern-most interior 
channel. 
PORT OF LONG BEACH, CA 
Sep 25, 1996 Navigation project. 
The project for navigation, Port of Long Beach (Deepening), CA; 
Report of the chief of Engineers, dated July 26, 1996, at a total cost of 
$37,288,000 with an estimated Federal cost of $14,318,000 and an 
estimated non-Federal cost of $22,970,000. 
H.Doc.389, 83d Cong., 
2d sess. 
Sec 216, Flood Control 
Act of 1970, supp. by 
House Resolution Sep. 
28, 1994. 
H.Doc.283, 77th Cong., 
1st sess. 
Doc.PL99-662 (WRDA 
1986, Sec841). R&H 
Acts 1937 & 1945 
S. Doc. 138 78th Cong. 
WRDA 1986, Sec. 841 
(PL-9962) 
H.Doc.76, 89th Cong., 
1st sess. 
PL 101-640 (WRDA 
1990) WRDA 1992. PL 
102-580 
EWDA Act 1992 
H.Doc.362, 90th Cong., 
2d sess. 
WRDA 1996, Sec 101(d) 
4. 
33-19 
5. 
7. 
8.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
10. 
Mar 21, 1950 
33-20 
Oct 17, 1986 
Oct 1988 
Mar 3, 1875 
Sep 19, 1890 
Jun 25, 1910 
Mar 4, 1913 
Jul 27, 1916 
Aug 8, 1917 
Aug 8, 1917 
Sep 22, 1922 
Mar 3, 1925 
Jul 3, 1930 
Aug 30, 1935 
Aug 26, 1937 
Oct 17, 1940 
Mar 2, 1945 
Aug 13, 1968 
11. 
REDONDO BEACH HARBOR (KING HARBOR), CA 
Maintain harbor dredging and breakwaters. 
Construct and maintain breakwater to height of 22 feet. 
SAN DIEGO HARBOR, CA 
Diversion dike. 
Jetty on Zuniga Shoal. 
Dredge channel through outer bar 30 feet deep and 600 feet wide, 
and a channel through middle ground to 30 feet deep. 
Dredge channel through outer bar 570 feet wide and 35 feet deep, 
and a channel through middle ground 32 feet deep. 
Widen approach (area B) to San Diego municipal pier by 
dredging area C (north of area B). 
Dredging area A (south of area B). 
Dredge 35-foot channel through middle ground. 
Dredging areas D and E. 
Widen approach (area C) to San Diego municipal pier 1 by 
dredging an portion of area F (north of area C). 
Deepen to 40 feet channel through outer bar; along south and 
north banks, main channel; dredge turning basin, widen area H, 
and dredge a channel to National City and Chula Vista. 
Widen bay channel to 2,200 feet with depth of 35 feet from the 
vicinity of Whalers Bight in lower bay to Naval Air Station 
opposite turning basin. 
Dredging areas Q.Q-1, M, N, and 0. 
Dredge a seaplane basin (area S.) of about 3,000 acres, 10 feet 
deep, and fill an area of about 110 acres adjacent to southern end 
of basin. 
Dredge triangular approaches to 26-and 35-foot anchorages, area 
M. 
Deepen and extend existing navigation channels, delete 
uncompleted parts, and extend maintenance. 
R&H Act 1950 (H.Doc 303 
81st Cong.) PL99-662 (WRDA 
86, Sec 809), Amended in 
WRDA 1988. 
Authorized by Chief of 
Engineers. 
Annual Report. 1873; p. 1- 14 2 
H.Ex.Doc.177, 50th Cong., 1st 
sess. (Annual Report, 1888; 
p.2 1 14). 
H.Doc.961, 60th Cong., 1st 
session. 
H.Doc.1309, 62d Cong., 3d 
sess. 
H.Doc.648, 64th Cong., 1st 
sess. 
Rivers and Harbors Committee 
Doc.8, 64th Cong., 2d sess. 
H.Doc.140, 65th Cong., 1st 
sess. 
H.Doc.1000, 66th Cong., 3d 
sess. 
River and Harbors Committee 
Doc.2, 68th Cong., 1st sess. 
S.Doc.81, 71st Cong., 
2d sess. 
H.Doc.223, 73d Cong., 2d sess. 
Rivers and Harbors Committee 
Doc.89, 74th Cong., 2d sess. 
H.Doc.844, 76th Cong., 3d 
sess. 
H.Doc.390, 77th Cong., 1st 
sess. 
H.Doc.365, 90th Cong., 2d 
sess. 1

LOS ANGELES, CA, DISTRICT 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
SAN DIEGO RIVER AND MISSION BAY, CA 
Modification of existing flood control project for San Diego 
River, CA, to include a multiple-purpose project for flood control 
on San Diego River and small-boat navigation on Mission Bay. 
SANTA BARBARA HARBOR, CA 
Maintenance dredging present depths into harbor formed by 
breakwater constructed by local interests. 
Permits maintenance by means of a fixed sand-intercepting plant 
to be provided and operated by and at expense of local interests. 
United States to contribute to operating expense an amount not to 
exceed $30,000 annually, whenever funds are allotted therefore; 
funds thus contributed to be reduced by actual cost of harbor 
maintenance if and when intercepting plant has been installed. 
Project for navigation; report of the Chief of Engineers, dated 
April 26, 1994 
Modification of existing project. 
Dredging and maintenance by United States. 
Complete plans and specifications. 
SANTA MONICA BREAKWATER, CA 
Hurricane and storm damage reduction act. 
The project for hurricane and storm damage reduction, Santa 
Monica Breakwater, Santa Monica, CA; Report of the chief of 
Engineers, dated June 7, 1996, at a total cost of $6,440,000, with 
an estimated Federal cost of $4,220,000 and an estimated non- 
Federal cost of $2,220,000. 
SURFSIDE, SUNSET & NEWPORT BEACH, CA 
Beach erosion. 
Protective measures that comprise a protective and feeder beach 
at Surfside, and on offshore breakwater at Newport Beach to 
provide and impounding area from which sand would be dredged 
and returned periodically to the feeder beach, all substantially in 
accordance with the plan of the DE. 
VENTURA HARBOR (VENTURA MARINA), CA 
Adoption and maintenance of existing general navigation 
features of harbor, excluding interior basins; construction of an 
offshore breakwater; dredging a sand trap in lieu of breakwater; 
repairing existing north and middle jetties; and construction of 
recreational fishing facilities on jetty crests. 
The Harbor commonly known as Ventura Marina, located in 
Ventura County, CA, and adopted and authorized by section 101 
of Public Law 90-483, shall hereafter be known and designated 
as "Ventura Harbor". 
H.Doc.760, 79th Cong., 2d 
sess. 1 
S.Committee Print, 73d Cong., 
2d sess. 
H.Doc.348, 77th Cong., 1st 
sess. 
H.Doc.518, 87th Cong., 2d 
sess. 1 
None. 
Sec 101, H Doc 1160, Water 
Resources Project 
Authorization. 
WRDA 1996, Sec 101(d)7. 
Sec 101 of R&H Act 1992. 
H.Doc.356, 90th Cong., 2d 
sess. 
Public Law 100-676. 
33-21 
12. 
13. 
Jul 24, 1946 
Aug 30, 1935 
Mar 2, 1945 
Oct 23, 1962 
Dec 31, 1970 
Sep 25, 1996 
Sep 25, 1996 
14. 
15. 
Oct 23, 1962 
16. 
Aug 13, 1968 
Nov 17, 1988

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
ALAMO LAKE, BILL WILLIAMS RIVER, AZ 
Multiple-purpose dam and reservoir. 
CLIFTON, AZ 
Reauthorized the flood control project at a total cost of 
$21,100,000. 
Flood control. 
17. 
18. 
H.Doc.625, 78th Cong., 2d 
sess. 
WRDA 1996 Sec 301. 
WRDA 1990, Sec 101(3a) 
modified WRDA 1986. 
PL 102-377 Energy & 
Water Appropriation Act, 1993. 
Sec 205, 1948 Flood 
Control Act (1). 
None 
Dec 22, 1944 
Jan 3, 1996 
Sep 25, 1990 
Oct 2, 1992 
Feb 24, 1948 
Jun 22, 1936 
May 15, 1992 
Jun 28, 1936 
Aug 18, 1937 
Dec 22, 1944 
Jul 24, 1946 
May 17, 1950 
Sep 3, 1954 
Jul 3, 1958 
Jul 14, 1960 
Oct 23, 1962 
HANSEN DAM, CA 
Develop water conservation on existing spreading grounds. 
LAKE ELSINORE, CA 
Flood Control in downtown area as well as around perimeter of 
lake. 
LOS ANGELES COUNTY DRAINAGE AREA, CA 
Reservoirs and flood channels for flood control and related 
purposes at an estimated construction cost not to exceed $70 
million. 
Added flood channels on Ballona Creek and tributaries to 
project. 
Provision of lands, easements, and rights-of-way and relocations 
by Federal Government instead of by local interests. (Resultant 
Additional cost to the United States, $12,541,000). 
Project extended to include additional flood 
control reservoirs, flood control channels, and debris basins for 
flood control and related purposes. Also authorized to be 
appropriated $25 million for further accomplishment of plan. 
Authorized to be appropriated an additional $25 million for 
prosecution of comprehensive plan approved in Flood Control 
Act of Aug. 18, 1941. 
Authorized to be appropriated an additional $25 million for 
further prosecution of comprehensive plan. 
Rio Hondo channel improvement, Whittier Narrows Reservoir to 
Los Angeles River (in lieu of enlarging channel and bridges on 
San Gabriel River Downstream from reservoir). Also authorized 
to be appropriated an additional $40 million for further 
prosecution of comprehensive plan. 
Authorized to be appropriated an additional $12,500,000 for 
further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $44 million for 
further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $32 million for 
further prosecution of comprehensive plan. 
Authorized to be appropriated an additional $3,700,000 
For further prosecution of comprehensive plan. 
33-22 
None 
19. 
20. 
21. 
H. Doc. 838, 76th Cong., 3d 
Sess. 
None 
None 
None 
None 
None 
None 
None 
None

LOS ANGELES, CA, DISTRICT 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Dec 30, 1963 
Nov 17, 1986 
Nov 17, 1988 
None 
None 
None 
Authorized to be appropriated an additional $30 million for 
further prosecution of comprehensive plan. 
Authorized modifications of Hansen Dam by removing and 
selling dredged material to facilitate flood control, recreation, 
and water conservation. 
The Secretary may convey to the city of South El Monte, CA, 
approximately 7.778 acres of real property, together with 
improvements thereon, located within the Whittier Narrows 
Flood Control Basin. 
The project for flood control, Los Angeles County Drainage 
Area, California, at a total cost of $327,000,000, with an 
estimated first Federal cost of $163,500,000, with an estimated 
first Federal cost of $163,500,000, is authorized to be prosecuted 
by the Secretary in accordance with a final report of the Chief of 
Engineers and with such modifications as are recommended by 
the Secretary. No construction on the project may be initiated 
until such a report of the Chief of Engineers is issued and 
approved by the Secretary. 
Authorized project for flood control. Authorized by Chief of 
Engineers Report. 
LOS ANGELES RIVER (SEPULVEDA DAM TO ARROYO 
SECO), CA 
Recreation development for bicycle/hiking trails along the upper 
Los Angeles River 
MOJAVE RIVER DAM, MOJAVE RIVER BASIN, CA 
Dam and reservoir, and an earthfill dike. 
Evaluate opportunities for water conservation, environmental 
restoration, and enhanced flood control, along the Mojave River 
and Tributaries downstream of the dam. 
NOGALES WASH, AZ 
Flood Control Protection and Flood Warning System. 
Flood warning gauges in Mexico 
NORCO BLUFFS, CA 
The project for bluff stabilization, Norco Bluffs, Riverside 
county, California, at a total cost of $8,600,000, with an 
estimated Federal cost of $6,450,000 and an estimated non- 
Federal cost of $2,150,000. 
PAINTED ROCK DAM (GILA RIVER), GILA RIVER 
BASIN, AZ 
Dam and flood control basin. 
33-23 
WRDA 1990, Sec 101(b)(PL 
101-640), Project Subject to 
Favorable Report of the chief of 
Engineers. 
PL 101-640, WRDA 1990 
Flood Control Act 1936, PL 
77387 1941, PL 103-126 
H.Doc. 164, 86th Cong., 1st 
sess. 
HR 2479, Mar. 7, 1996 
Energy and Water 
Development Appropriation 
bill 1990, H.Doc2696, 101st 
Cong, 1st session 
WRDA 1990, Sec 101 (4) 
WRDA 96, Sec 101(b) 
H.Doc.331, 81st Cong., 1st 
sess. 
Oct 30, 1990 
Nov 28, 1990 
22. 
Jul 14, 1960 
May 17, 1950 
23. 
24. 
Jun 20, 1989 
Oct 27, 1990 
Sep 25, 1996 
25. 
26. 
July 6, 1949

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
27. 
Oct 27, 1965 
33-24 
PHOENIX, AZ, AND VICINITY (INCLUDING NEW 
RIVER), GILA RIVER BASIN 
Detention basins, diversion channels, and channel improvements. 
Cover Arizona canal Diversion channel, east of Central Avenue 
of Phoenix, property line of Arizona Biltmore on Phoenix, and 
east of 32d Street to the Cudia City Wash spillway in Paradise 
Valley. 
PINE AND MATHEWS CANYONS DAMS, COLORADO 
RIVER BASIN, NV 
Dams and flood control basins. 
RIO SALADO (SALT RIVER), PHOENIX AND TEMPE, 
AZ 
Report of the Chief of Engineers dated Aug 20, 1998, at a total 
cost of $88,048,000 with an estimated Federal cost of 
$56,355,000 and estimated non-Federal cost of $31,693,000. 
RILLITO RIVER, AZ 
Flood damage protection. 
Bank erosions control and flood protection. 
Section 114 of Public Law 101-101, Energy and Water 
Development Appropriations Act, 1990, is amended by striking 
"total cost of $19,000,000" and inserting in lieu thereof, "total 
cost of $40,000,000." 
SANTA ANA RIVER MAINSTEM, CA 
Flood control along 75 miles reach of Santa Ana River, 
recreation development, and mitigation and preservation. 
The project for flood control, Santa Ana Mainstem, including 
Santiago Creek, CA, is modified to authorize the Secretary to 
develop recreational trails and facilities on lands between Seven 
Oaks Dam and Prado Dam, including flood plain management 
areas. 
H.Doc.216, 89th Cong., 1st sess 
National Defense Authorization 
Act of Fiscal Year 1992 and 
1993. 
H.Doc.530, 81st Cong., 2d sess. 
WRDA 1999, PL106-53 
Section 101(a) (4) 
Energy and Water 
Development Appropriations 
Act 1990 
WRDA 1986, PL99-662, Sec 
601(a). 
Energy and Water 
Development Appropriations 
Act, 1988 
WRDA 1986, PL 99-662, 
Energy and Water 
Development Appropriations 
Act 1988, and WRDA 1988. 
H.Doc 94-594,94th Cong., 2d 
sess. 
28. 
29. 
May 17, 1950 
Aug 17, 1999 
30. 
June 20, 1989 
Oct 17, 1986 
Sep 26, 1997 
31. 
May 20, 1991 
Nov 28, 1990

LOS ANGELES, CA, DISTRICT 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
32. 
Jun 22, 1936 
Jun 28, 1938 
Aug 18, 1941 
Dec 22, 1944 
Jul 3, 1958 
33. 
34. 
Oct 22, 1976 
Dec 17, 1970 
Sep 25, 1996 
35. Oct 22, 1976 
36. 
Jun 11, 1964 
SANTA ANA RIVER BASIN (AND ORANGE 
COUNTY), CA 
Reservoirs and flood channels for flood 
control and related purposes for protection 
of metropolitan area of Orange County, at 
an estimated construction cost not to exceed 
$13 million. 
San Antonio and Chino Creeks channel portion of improvement. 
Authorized to be appropriated $6,500,000 for initiation and 
partial accomplishment of plans for those creeks. 1936, 
providing that local interests pay for relocations, lands, 
easements, and rights-of-way. (Estimated resultant additional 
cost to United States. $3,500,000). 
Authorized to be appropriated an additional $2,500,000 for 
prosecution of projects approved in above flood control acts. 
Authorized to be appropriated an additional $10 million for 
prosecution of projects adopted in above-mentioned flood control 
acts, including projects on Lytle and Cajon Creeks for local flood 
protection at San Bernardino and Colton, CA. 
Authorized to be appropriated an additional $8 million for 
prosecution of projects approved in abovementioned flood 
control acts. 
SANTA PAULA CREEK, CA 
Flood control improvements and prevention. 
Authorize for flood control. 
SAN LUIS REY RIVER, SAN LUIS REY RIVER BASIN, CA 
Channel and levee, and beautification features. 
The project for flood control of the San Luis Rey river, CA, 
authorized pursuant to section 201 of Flood Control Act of 1965 
(42 U.S.C. 1962d-5; 79 stat 1073-1074) is modified to authorize 
the secretary to construct the project substantially in accordance 
with the report of the corps of Engineers dated may 23, 1996 at a 
total cost of $81,600,000 (Fed $61,100,000, non-Fed 
$20,500,000) 
SEPULVEDA DAM, CA RECREATION FACILITIES 
SWEETWATER RIVER BASIN, CA 
Channel improvement, as part of a combined flood control and 
highway project. 
H. Doc. 688, 75th cong., 
3d sess. 
H.Doc.688, 75th Cong., 3d sess 
None. 
H. Doc. 534, 78th Cong., 
2d sess.1 
None. 
1948 Flood Control Act, 
H.Doc.443,80th Cong., 1st sess 
S.Doc.91-106, 91st Cong., 2d 
sess 
Title III Project Related 
Provisions Sec 301 Project 
Modifications 
FC Act 1936, (Amended 1937, 
1941, 1950) and Fed Water 
Project Recreation Act of 1965 
FC Act 1965,H.Doc. 240 and 
309, 88th Cong., 2d sess 
33-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 33-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
TROPICANA AND FLAMINGO WASHES, NV 
Flood reduction, erosion control, and wildlife enhancement. 
Authorizes project to demonstrate the potential advantages and 
effectiveness of non-Federal implementation of flood control 
projects, and provides that the Secretary shall enter into an 
agreement, pursuant to Section 211 of WRDA 96, with the non- 
Federal interests for development of that project. Proposed 
agreement would allow the non-Federal sponsor to construct any 
discrete segment of the authorized project as approved by the 
Army corps of Engineers. 
TUCSON DIVERSION CHANNEL (RECREATIONAL 
DEVELOPMENT), AZ 
The project for recreational development along the Tucson 
Diversion channel. 
TUCSON DRAINAGE AREA, AZ 
Report of the Chief of Engineers Report dated May 20, 1998, at a 
total cost of $29,900,000, with an estimated Federal cost of 
$16,768,000 and an estimated non-Federal cost of $13,132,000. 
WHITLOW RANCH DAM, QUEEN CREEK, GILA RIVER 
BASIN, AZ 
Dam and flood control basins. 
WRDA 1992, Sec 101 (13) 
WRDA 1996, Sec 211 (f)(5), 
Public Law 104-303 
FC Act 1936 (Amended 1937) 
1941, 1950 and Fed Water 
Project Recreation Act of 1965. 
WRDA 1999, PL106-53 Sec 
101(a) (5) 
H.Doc.220, 80th Cong., 1st 
sess. 
1. Contains latest published map. 
2. Date approved by Chief of Engineers under provisions of section 205. Public Law 80-858, as amended. 
3. Final date of approval by House of Senate Public Works Committees resolution under provisions of Section 201, Public Law 89-298. 
33-26 
37. 
Oct 31, 1992 
Sep 25, 1996 
38. 
Oct 22, 1976 
39. 
Aug 17, 1999 
40. 
Jul 24, 1946

LOS ANGELES, CA, DISTRICT 
TABLE 33-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to 30 Sep 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Dana Point, Harbor, CA Completed 1984 $ 4,737,550' 555,147' 
Harbor office at Morro Bay, CA3 
Los Angeles and Long Beach Active 53,627,729 13,147,957 
Harbors, San Pedro Bay, CA3 
Newport Bay Harbor, CA3 Inactive and 1982 796,897 2,696,2455 
Active (mod) 
Port San Luis, CA Completed and 1984 1,426,0506 1,042,3527 
Active (mod) 
Redondo Beach Harbor Completed and 1984 4,766,8989 5,237,31310 
(King Harbor), CA8 Active (mod) 
Sunset Harbor (Bolsa Chica Bay), CA3 
1. Excludes $4,777,000 required contributed funds and Coast Guard costs. 
2. Includes $45,147 for reconnaissance and condition surveys. 
3. Authorized by Water Resources Development Act of 1986, Public Law 99-662, November 17, 1986, subject to favorable report. 
4. Public Works Administration funds. Excludes $796,897 required contributed funds and $1,100 preauthorization costs. 
5. Includes $137,622 for reconnaissance and condition survey costs since Fiscal Year 1958. Excludes $7,000 other contributed funds. 
6. Includes $568,417 for new work prior to modification by 1965 River and Harbor Act. Excludes Coast Guard costs. Includes $104,031 
expended in Fiscal Year 1987. 
7. Includes $54,715 for maintenance for project prior to modification by 1965, River and Harbor Act, and $18,958 for reconnaissance and 
condition surveys. Includes $90,130 expended in Fiscal Year 1987. 
8. Authorized by Water Resources Development Act of 1986, Public Law 99-662, November 17, 1986. 
9. Excludes Coast Guard costs. 
10. Includes $20,517 for reconnaissance and condition survey costs since Fiscal Year 1958. Includes $293,167 expended in Fiscal Year 1987. 
33-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 33-D OTHER AUTHORIZED BEACH EROSION CONTROL PROJECTS 
For Last Cost to 30 Sep 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Anaheim Bay Harbor Orange Completed 1967 $ 89,119 
County, CA' 
Bird Rock area, La Jolla Completed 1967 25,8813 
San Diego County, CA2 
Coast of California, Point Mugu, Completed 1972 1,253,5944 
to San Pedro breakwater, CA 
Doheny Beach State Park (Doheny Completed 1968 578,7175 
State Beach), CA 
Imperial Beach, CA Active 1986 2,631,4726 
Las Tunas Beach, San Diego County, CA Active 1976 107,484 
Ocean Beach, San Diego County, CA7 Completed 1960 7,912 
Oceanside, San Diego County, CA Completed 1982 4,367,4428 
San Diego (Sunset Cliffs), CA Active 1979 365,0009 
San Gabriel River to Newport Bay Active 1985 9,722,10010 
(Surfside-Sunset and Newport Beach), 
Orange County, CA 
Surfside-Sunset-Newport, CA Active 1997 
Ventura-Pierpont area, CA Completed (part) 1969 715,819" 
and Deferred (part) 
1. The project authorized by the Act of Congress of October 23, 1962, H.Doc.602, 87th Cong., 2d sess., in lieu of part of the original Anaheim Bay Harbor 
project is covered under San Gabriel River to Newport Bay (Surfside-Sunset and Newport Beach), Orange County, CA 
2. Authorized by Chief of Engineers under authority of Section 103, Public Law 87-874. 
3. Excludes 475,614 required contributed funds. 
4. Excludes $1,238,418 required contributed funds. 
5. Excludes $431,260 required contributed funds. 
6. Excludes $919,437 required contributed funds; $66,124 other contributed funds; and Coast Guard costs. 
7. Plant in service. 
8. Excludes $604,817 other contributed funds. 
9. Excludes $180,438 required contributed funds. 
10. Excludes $4,626,638 for required contributed funds. Includes $10,772 expended in Fiscal Year 1987. 
11. Excludes $1117,406 other contributed funds for beach-nourishment betterments and $618,949 required contributed funds. 
33-28

LOS ANGELES, CA, DISTRICT 
TABLE 33-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to 30 Sep 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Allenville, AZ 1 
City Creek levee, San 
Bernardino County, CA 1 
Clifton, San Francisco River, AZ 
Coyote and Berryessa Creeks CA 
Gila River Basin, AZ: 
Camelsback Dam (Gila River) 
Gila and Salt Rivers levee 
and channel improvements 
Indian Bend Wash 
Lower Gila River levee and 
channel improvements (Gila 
River and tributaries downstream 
from Painted Rock Dam) 
Middle Gila River channel 
improvements, upper end of Safford 
Valley to Buttes dam site (Camelsback 
damsite to Salt River) 
Pinal Creek channel improvements 
(Globe) 
Santa Rosa Wash (Tat Momolikot 
Dam and Lake St. Clair) 
Tucson Diversion Channel 
Goleta, CA, and Vicinity 
Hansen Dam, Los Angeles County 7 
Drainage Area, CA (mod) 
Holbrook levee Little Colorado 
River, Colorado River Basin, AZ 
Little Colorado River at Holbrook 7 
Needles, San Bernardino Co. 
Nogales Wash and Tributaries, AZ 
Oceanside Harbor, CA 
Oro Grande Wash channel improvements, 
Mojave River Basin, CA 1 
Phoenix, AZ and Vicinity 
(Gila River) 
Quail Wash levee, Joshua Tree, 
San Bernardino Co. CA 
Ridgecrest, Kern County, CA1 
Rose Creek channel improvements, 
San Diego, CA 1 
San Diego River Basin, CA 
Santa Ana River Basin, CA: 
Devil, East Twin, and Warm 
Creeks channel improvements and 
Lytle Creek levee 
Mill Creek levees 
Riverside levees 
San Jacinto River levee and 
Bautista Creek channel 
Santa Clara River levee improvement, 
Santa Clara River Basin, CA 
Santa Maria Valley levees, Santa 
Maria River Basin, CA 
Completed 
Completed 
Active 
Active 
Deferred 
Active (part) and 
Deferred (part) 
Completed 
Inactive 
Active 
Deferred 
Completed 
Completed 
Active 
Completed 
Completed 
Active 
Active 
Completed 
Completed 
Completed 
Terminated 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
Completed 
33-29 
1984 
1988 
1989 
1963 
1966 
1985 
1975 
1970 
1968 
1982 
1986 
1982 
1950 
1973 
1989 
1989 
1970 
1973 
1972 
1962 
1961 
1959 
1985 
1961 
1984 
$ 3,000,0002 
400,0002 
12,510,000 
56,300,000 
73,2014 
31,809,2945 
2,413,051 
402,867 
121,5094 
10,218,900 
6,922,6336 
500,000 
335,000 
1,000,0008 
11,100,000 
5,100,000 
1,000,0009 
212,745 
195,194 
982,43210 
7,753,93711 
617,89012 
2,104,478 
9,258,20713 
2,126,672 
10,079,92714

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 33-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
Santa Paula Creek channel and 
debris basins (including Mud 
Creek), Santa Clara River Basin, CA 
Sespe Creek at Fillmore, Ventura 
County, CA 1 
South Fork of the Santa Clara 
River, Santa Clarita Valley, CA 1 
Telegraph Canyon Creek, Chula 
Vista, CA1 
Tijuana River Basin, CA 
Ventura Harbor, CA 
Ventura River Basin, CA: 
Stewart Canyon debris basin and 
channel 
Ventura River levee 
Whitewater River, CA: 
Banning Levee-San Gorgonio 
River, Riverside Countyl 
Chino Canyon improvements, Palm 
Springs 1 
Tahchevah Creek detention basin 
and channel improvements 
Tahquitz Creek 
Winslow (tributaries of Little 
Colorado River), Little Colorado 
River Basin, AZ 
Active 
Completed 
Active 
Active 
Completed 
Active 
Completed 
Completed 
Completed 
Completed 
Completed 
Inactive 
Completed (part) 
and Deferred (part) 
1. Authorized by Chief of Engineers under authority 
of Section 205, Public Law 80-858, as amended. 
2. Excludes $187,965 required contributed funds. 
3. Excludes $371,058 other contributed funds. 
4. Advance planning only. 
5. Excludes $304,720 required contributed funds and 
$3,130,762 other contributed funds. Includes $31,071 expanded 
6. Includes $1,158,006 Code 710 funds since Fiscal Year 1977. 
Excludes $749,058 required contributed funds and $394,364 funds. 
7. Authorized by Water Resources Development Act of 
1986, Public Law 99-662, November 17, 1986. 
8. Excludes $619,912 required contributed funds and 
$91,160 other contributed funds. 
9. Excludes $514,806 required contributed funds and 
$176,295 other contributed funds. 
10. Excludes $251,000 required contributed funds and 
$154,733 other contributed funds. 
22. Excludes $74,718 required contributed funds. 
1983 
1984 
1985 
1985 
1979 
1990 
1964 
1950 
1966 
1973 
1967 
1974 
1973 
4,790,17315 
4,000,00016 
632,158 
844,73217 
1,703,03118 
6,455,000 
939,90819 
1,349,63820 
97,868 
819,87821 
1,420,55222 
1,063,600 
1,831,300 
11. Excludes $200,000 required contributed 
funds and $1,641,668 other contributed funds. 
12. Excludes $35,830 other contributed funds. 
13. Excludes $712,000 other contributed funds. 
14. Excludes $106,364 other contributed funds. 
Includes $74 expended in Fiscal Year 1987. 
15. Excludes non-Federal costs of $295,000 for 
local cooperation items for required and $49,458 
16. Excludes $559,525 required contributed other funds. 
17. Includes $3,846 expended in Fiscal Year 1987. Excludes 
$104,941 other contributed funds. 
18. International Boundary & Water Commission funds 
19. Excludes $179,148 other contributed funds. 
20. Includes $6,000 Code 710 funds since Fiscal Year 1977. 
Excludes $17,006 other contributed funds. 
21. Excludes $8,718 required contributed funds; 
$53,470 other contributed funds. 
33-30 
m

LOS ANGELES, CA, DISTRICT 
TABLE 33-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Date Federal Contributed 
See Annual and Funds Funds 
Project Report For Authority Expended Expended 
Hodges Dam, San Dieguito 
River Basin, CA 
Las Vegas Wash tributaries, 
Colorado River Basin, NV 
Santa Ana River Basin (and 
Orange County), CA: 
1958 
1964 
1978 
Sec. 12, Public 
Law 93-251 
1977 
Sec. 12, Public 
Law 93,251 
295,191 
Aliso Creek Dam 
San Juan Dam 
Trabuco Dam 
Villa Park Dam 
Sierra Madre Wash Channel 
Los Angeles County Drainage 
Area, CA 
Lower Mission Creek 
Santa Barbara, CA 
San Diego River Mission 
Valley, CA 
University Wash and Spring 
Brook, Riverside, CA 
1950 
1986 
Sec. 1002 Public 
Law 99-662 
1986 
Sec. 1002, Public 
Law 99-662 
1986 
Sec. 1002, Public 
Law 99-662 
1978 
Sec. 12, Public 
Law 93-251 
1986 
Sec. 1002, Public 
Law 99-662 
1986 
1988 
1978 
1975 
67,361 
1988 1,641,144 
Sec. 1001(A), Public 
Law 99-662 
1978 
Sec 1001 (B) (2), Public 
Law 99-662 1,708,437 
1986 
Sec. 1002, Public 
Law 99-662 
213,313 
33-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 33-H RECONNAISSANCE AND CONDITION SURVEYS 
Project Date 
Channel Islands Harbor Dec 1996 
Dana Point Harbor Jun 1997 
Marina Del Rey, CA Aug 1997 
Oceanside Harbor Mar 1997 
Port Hueneme, CA Jul 1997 
San Diego Harbor, CA Sep 1997 
San Diego River-Mission Bay, CA Oct 1996 
Santa Barbara Harbor, CA Jan 1997 
Ventura Harbor, CA Dec 1996 
33-32

LOS ANGELES, CA, DISTRICT 
TABLE 33-I INSPECTION OF COMPLETED 
BEACH EROSION CONTROL PROJECTS/FLOOD CONTROL PROJECTS 
Project 
Rose Creek Channel Improvements, San Diego, CA 
San Diego River Channel and Levees, San Diego River Basin, CA 
33-33 
Date 
July 1987 
July 1987

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 33-J FLOOD CONTROL WORK UNDER SPECIAL 
AUTHORIZATION FLOOD CONTROL ACTIVITIES 
PURSUANT TO SECTION 205, PUBLIC LAW 80-858, 
AS AMENDED (PREAUTHORIZATION) 
(See Section 40 of Text) 
F&lYear 
Study Stage Cost 
(Federal) 
Arizona State flood Warning, AZ Construction $ 647,662 
Arroyo Grande Creek, AZ Feasibility 9,996 
Bolsa Chica Creek, Garden Grove, CA Feasibility 8 
City of Laguna Beach, CA Feasibility 120,754 
Ephriam Canyon Wash, AZ Feasibility 18,819 
Lake Elsinore, Riverside County, CA Completed 2,439,039 
Little Tijuana River, San Diego County, CA Feasibility 47,054 
Lower Finger Rick Creek, AZ Feasibility 61 
Mission Zanja Redlands, CA Feasibility* 120 
Mohave County Flood Warning, AZ Plans and specifications 1,278 
San Jose Creek Near Hollister, CA Feasibility 31,911 
Section 205 Coordination Account 26,289 
$3,342,991 
* No further Federal interest 
33-34

SAN FRANCISCO, CA, DISTRICT *
This district comprises the Klamath River Basin 
in southern Oregon and portions of northern and 
western California consisting of drainage basins 
tributary to the Pacific Ocean from the Oregon- 
California State line on the north to Cape San 
Martin, CA, on the south except for basins tributary 
to the San Francisco Bay system which lie east of 
the Benecia-Martinez Bridge. 
IMPROVEMENTS 
Navigation Page 
1. Crescent City Harbor, CA ............... 34-1 
2. Humboldt Harbor, CA..............34-2 
3. Oakland Harbor, CA ................. 34-3 
4. Richmond Harbor (Deepening), CA ...... .34-4 
5. San Francisco Bay to Stockton, CA 
(John F. Baldwin and Stockton 
Ship Channels) .................. .. 34-5 
6. Sonoma Baylands Wetlands 
Demonstration Project, CA ............ 34-5 
7. San Francisco Bay and Delta Model, CA. .34-6 
8. San Francisco Bay Long Term 
Management Strategy (LTMS), CA ...... 34-7 
9. Reconnaissance and Condition 
Surveys ............................ 34-8 
10. Navigation Work under Special 
Authorization.........................34-8 
11. Beach Erosion Control Work under 
Special Authorization ................. .34-8 
Flood Control 
12. Corte Madera Creek, CA................ 34-8 
13. Petaluma River, Petaluma, CA......... .34-9 
14. Russian River Basin, including Dry Creek 
(Warm Springs Lake) and Lake 
Mendocino (Coyote Valley Dam), CA ..... 34-10 
15. Inspection of Completed Flood 
Control Projects ................... 34-11 
16. Flood Control Work under Special 
Authorization........................34-12 
Navigation 
1. CRESCENT CITY HARBOR, CA 
Location. The project is located in Crescent 
City, Del Norte County approximately 350 miles 
north of San Francisco and 17 miles south of the 
Oregon border. 
Existing project. There are two existing 
Federally maintained navigation channels at 
Crescent City Harbor. The Entrance Channel 
begins at the outer breakwater and is -15 feet 
MLLW (Mean Lower Low Water), 2,600 feet long, 
Page 
17. Scheduling Flood Control 
Reservoir Operations ................. 34-12 
18. Miscellaneous Work under Special 
Authorization ....................... 34-12 
General Investigations 
19. Surveys ............................ 34-12 
20. Collection and Study of Basic Data ..... 34-12 
21. Preconstruction Engineering 
andDesign ......................... 34-12 
Tables 
Table 34-A Cost and Financial 
Statement ................. 34-16 
Table 34-B Authorizing 
Legislation ................ 34-22 
Table 34-C Other Authorized 
Navigation Projects......... 34-26 
Table 34-D Not Applicable 
Table 34-E Not Applicable 
Table 34-F Not Applicable 
Table 34-G Deauthorized Projects....... 34-26 
Table 34-H Inspection of Completed Flood 
Control Projects ............ 34-27 
Table 34-I Russian River Basin, CA: 
Estimated Cost for New Work .34-28 
Table 34-J Russian River Basin, CA: 
Project Features and 
Estimated Costs............. 34-28 
and 320 to 200 feet wide. The Entrance Channel 
connects to the Inner Harbor Channel, which is 
1,500 feet long and extends from the Entrance 
Channel along the lee side of the inner breakwater. 
The Inner Harbor Channel is authorized at -20 feet 
MLLW and since 1993 maintained at -15 feet 
MLLW due to economic justification. 
The proposed project would extend the 1965 
authorized project approximately 350 feet from the 
Inner Harbor Channel to reach the entrance of the 
Small Boat Basin, which was constructed in 1974. 
The new channel would vary in width from 140 feet 
to 210 feet, extend 1,200 feet in length with a 
channel depth of -14 feet MLLW plus one foot of 
34-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
advanced maintenance. An estimated 38,000 cubic 
yards of dredged material would be disposed at an 
upland site. Present estimated total cost for the 
project is $1,830,000 of which $1,430,000 is Federal 
cost and $400,000 is non-Federal cost. 
Local cooperation. The local sponsor is the 
Crescent City Harbor District. The Project 
Cooperation Agreement is scheduled to be signed in 
February 2000 and would satisfy the requirements 
of the Water Resources Development Act of 1986, as 
amended, PL 99-662. The agreement includes the 
following requirements: 1) provide lands, 
easements, rights-of-way, and dredged material 
disposal areas; 2) pay 10 percent of the costs of 
construction; and 3) pay an additional 10 percent 
plus interest of the project costs allocated to general 
navigation features within a period of 30 years 
following completion of construction. 
Terminal facilities. The Harbor contains a 
commercial small boat basin with 240 permanent 
berths and temporary moorings for approximately 
20 vessels, a 250 slip recreational mooring facility, 
two fish processing plants with docks, a main dock, 
a marine repair facility, a U.S. Coast Guard dock, 
and other auxiliary commercial and recreational 
facilities. 
Operations during fiscal year. New Work: 
Construction is scheduled to begin in April 2000. 
Maintenance: Operations and maintenance includes 
engineering and design for fall dredging on a 5 year 
dredging cycle. No maintenance dredging was 
performed in FY 99. Approximately 18,000 cubic 
yards in the Inner Harbor Basin is scheduled to be 
dredged concurrent with the Channel Improvement 
Project in FY 2000. 
2. HUMBOLDT HARBOR, CA 
Location. The project is located in Humboldt 
Bay, about 280 miles north of San Francisco. 
Existing project. Adopted by Acts of March 
3, 1881, July 5, 1884, August 5, 1886, July 3, 1892, 
March 3, 1889, June 25, 1910, July 3, 1930, August 
30, 1935, August 26, 1937, July 16, 1952, and 
August 1968. The project consists of: 1) a Bar and 
Entrance Channel 40 feet deep, taped from a width 
of 1,600 feet at seaward mile 0.9 to 500 feet at 
seaward mile 0.2 and then 500 feet wide to mile 0.8; 
2) a North Bay Channel 35 feet deep and 400 feet 
wide between mile 0.75 and mile 4.29; 3) an Outer 
Eureka Channel 35 feet deep and 400 feet wide 
between mile 4.29 and mile 5.0; 4) an Inner Eureka 
Channel between mile 5.0 and mile 6.30 which is 26 
feet deep and 400 feet wide; 5) a Samoa Channel 35 
feet deep and 400 feet wide between mile 4.29 and 
mile 5.84; 6) a Turning Basin beyond mile 5.84 at 
the upper end of the Samoa Channel which is 35 
feet deep and 1,000 feet wide by 1,000 feet long; 7) 
an Anchorage Area 35 feet and 1,200 feet wide by 
1,200 feet long in the North Bay between the 
Entrance Channel and Gunther Island (the 
anchorage area is not maintained); 8) a Fields 
Landing Channel 26 feet deep and 300 feet wide and 
a turning basin at mile 3.16 which is 600 feet wide 
and 800 feet long; and 9) Arcata Channel located in 
the extreme North Bay (18 feet deep and 150 feet 
wide) is no longer used for commercial navigation 
and has not been maintained since 1931. 
The Water Resources Development Act of 1996 
authorized deepening the Bar and Entrance 
Channel to a depth of -48 MLLW; deepening the 
North Bay Channel, Samoa Channel, and Samoa 
Turning Basin to a depth of -38 feet MLLW; 
widening the north side of the Entrance Channel an 
additional 200 to 275 feet; moving the southern edge 
of the Entrance Channel away from the South Jetty 
and to the north by 100 feet; and widening and 
realigning the entrance to the Samoa Turning 
Basin. Present estimated total cost for the project is 
$16,800,000 of which $10,820,000 is Federal cost 
(includes $200,000 Coast Guard cost) and 
$5,980,000 is non-Federal cost (includes $1,680,000 
non-Federal reimbursements). 
Local cooperation. The local sponsor is the 
Humboldt Bay Harbor, Recreation and Conservation 
District. The Project Cooperation Agreement is 
scheduled to be signed in March 1999 and would 
satisfy the requirements of the Water Resources 
Development Act of 1986, as amended, PL 99-662. 
The agreement includes the following requirements: 
1) provide lands, easements, rights-of-way, and 
dredged material disposal areas; 2) pay 25 percent 
of the costs of construction; and 3) pay an additional 
10 percent plus interest of the project costs allocated 
to deep draft navigation within a period of 30 years 
following completion of construction. 
Terminal facilities. The harbor serves six 
deep water breakbulk terminals with storage space 
for 120,000,000 FBM of logs/lumber and 100,000 MT 
of woodchips and warehouse space for 1,000,000 
34-2

SAN FRANCISCO, CA, DISTRICT 
FBM of lumber and 51,000 MT of woodpulp and 
particle board. 
Operations during fiscal year. New Work: 
Construction commenced in June 1999 and is 
scheduled for completion in March 2000. 
Maintenance: Normal O&M dredging was 
performed concurrent with the New Work Project. 
A combined total of 4,669,754 cubic yards were 
removed at a cost of $9,693,671. Emergency: On 
January 14, 1999, an "Emergency Declaration" was 
issued by the District Engineer to remove an 
extremely hazardous shoal deposited at the Harbor 
entrance by the effects of harsh winter storms. The 
Corps' hopper dredges Yaquina and Essayons 
mobilized from their homeport of Portland, Oregon 
and immediately commenced emergency dredging 
operations upon arrival. Due to adverse weather 
and severe sea conditions, dredging productivity 
was limited because work could only be 
accomplished during the flood tide cycle...ebb tides 
were unworkable and too dangerous. This 
emergency action re-opened the channel to safe 
navigation and minimized regional economic and 
local commerce impacts. This outstanding mission 
achievement exceeded all expectations and the 
sponsor, maritime community, and congressional 
representative were very appreciative and grateful. 
All dredged material was deposited in the 
permanently designated, Government-furnished, 
Humboldt Open Ocean Disposal Site (HOODS). 
3. OAKLAND HARBOR, CA 
Location. Oakland Harbor is located in the 
City of Oakland, California, on the eastern shore of 
central San Francisco Bay immediately south of San 
Francisco-Oakland Bay Bridge. 
Existing project. Adopted by Acts of June 23, 
1874, June 25, 1910, September 22, 1922, January 
21, 1927, April 28, 1928, July 3, 1930, March 2, 1945 
and October 23, 1962. The project was completed 
February 1975, except for deepening the tidal canal 
to 35 feet from Fortman Basin to Park Street, and to 
25 feet above Park Street which was deauthorized 
November 1977. Reconstruction of the Fruitvale 
Avenue Highway Bridge was completed in 
December 1973 and turned over to local interests 
for operation and maintenance. Project consists of 
entrance channel to Oakland Outer Harbor, 35 feet 
deep from deep water in San Francisco Bay and 800 
feet wide across the shoal southeast of Yerba Buena 
Island, narrowing to 600 feet at Oakland Mole; 
thence, a channel and turning basin 35 feet deep 
and from 600 to 950 feet wide in outer harbor to the 
Army Base. Project also provides entrance channel 
to Oakland Inner Harbor, 38 feet deep and 600 feet 
wide to Howard Terminal and 35 feet deep to west 
end of Government Island, with additional widening 
to within 75 feet of the pierhead line in front of 
Grove and Market Street (formerly municipal) piers 
and along the south side of the channel from 
Harrison Street eastward to harbor line point 119 in 
Brooklyn Basin; a channel 35 feet deep and 500 feet 
wide through Brooklyn Basin; for a triangular area 
35 feet deep about 2,700 feet long and maximum 
width of 300 feet at western end of Brooklyn Basin; 
a channel along north side of Brooklyn Basin which 
is 35 feet deep and 300 feet wide for 1,300 feet, 
thence 25 feet deep and 300 feet wide for 3,700 feet 
to a turning basin at east end of Brooklyn Basin 
which is 35 feet deep, 500 feet wide, and 1,200 feet 
long; a channel in the tidal canal 35 feet deep and 
275 feet wide from Brooklyn Basin to Park Street, 
thence 18 feet deep to San Leandro Bay; a total 
channel length of 8-1/2 miles from San Francisco 
Bay to San Leandro Bay. Project also includes 
parallel rubblemound jetties at entrance to inner 
harbor, north jetty 9,500 feet long and south jetty 
12,000 feet long; three highway bridges across the 
tidal canal, two of which (at Park Street and High 
Street) have been replaced by local interests and the 
Fruitvale Avenue Bridge constructed by Federal 
Government has been transferred to Alameda 
County. The railroad bridge has been transferred to 
the County for operation and maintenance. The 
Federal Government will reimburse the County for 
the cost of operating and maintaining the railroad 
bridge. 
Water Resources Development Act (WRDA) of 
1986 authorized deepening the 4 mile Inner and 3.4 
mile Outer Harbors channels to 42 feet deep and 
widening the entrance channel to 1,000 feet; 
relocation of the Outer Harbor turning basin 3,000 
feet westward; and widening the turning basin to 
1,800 feet and constructing a 1,200 foot turning 
basin in the Inner Harbor, 42 feet deep, at mile 3.7. 
Section 301 of WRDA 1996 combined the Oakland 
Outer Harbor and Inner Harbor into one project and 
designated as the Oakland Harbor, California 
project. Present estimated total cost for the 
authorized improvements is $119,116,000 of which 
$83,586,000 is Federal cost (includes $125,000 
Coast Guard cost) and $35,530,000 is non-Federal 
cost (includes $12,000,000 non-Federal 
34-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
reimbursements). Under WRDA 1986, the Bar 
Channel and Inner Harbor were deepened in 1992 
to 38 feet deep up to Howard Terminal as a 
separable element of the authorized 42-foot deep 
project. 
Local cooperation. The Port of Oakland 
signed a Project Cooperation Agreement on 
December 9, 1994 satisfying the requirements of the 
Water Resources Development Act of 1986, PL 
99-662. The agreement includes the following 
requirements: (1) provide lands, easements, 
rights-of-way, and dredged material disposal areas; 
(2) pay 25 percent of the costs allocated to deep draft 
navigation during construction; and (3) pay 
additional 10 percent plus interests of the costs 
allocated to deep draft navigation within a period of 
30 years following completion of construction. 
Deepening to 42' MLLW was completed in July 
1998. The Port of Oakland completed a feasibility 
study to deepen Oakland Harbor to -50' MLLW at 
100% Port cost under the authority of Section 203 of 
WRDA 86. The estimated project cost is $254 
million with an average annual navigation benefit 
of $178 million. Project was authorized in WRDA 
99. PED is scheduled to begin in October 1999. 
Terminal facilities. The port occupies 19 
miles on the mainland shore of San Francisco Bay. 
There are 550 acres of marine terminal facilities, 28 
deepwater berths and 25 container cranes, including 
5 of the post Panamax type. On-dock covered 
storage space exceeds 600,000 square feet. Three 
major railroads, Santa Fe, Southern Pacific and 
Union Pacific serve the port. 
Operations during fiscal year. New Work: 
Construction of the 42' MLLW deepening project 
was awarded in December 1994. Deepening at the 
Inner and Outer Harbors to 42' MLLW started in 
May 1995 and was completed in July 1998. 
Maintenance: Operations and maintenance of 
Fruitvale Avenue R.R. Bridge including engineering 
and design by hired labor, cost $289,600; operations 
and maintenance of Miller-Sweeney Highway 
Bridge, cost $180,900; and operations and 
maintenance of Oakland Inner 347,763 cubic yards 
removed at a cost of $5,134,170 and the Outer 
Harbor 128,695 cubic yards removed at a cost of 
$2,395,064. 
4. RICHMOND HARBOR, CA 
Location. Richmond Harbor is located in 
central San Francisco Bay, in Contra Costa County 
in the City of Richmond. 
Existing project. The existing navigation 
channel extends from deep water in San Francisco 
Bay into the Port of Richmond. The Southampton 
Shoal Channel and Long Wharf Maneuvering Area, 
at the entrance to the harbor channels are 
maintained to -45 feet MLLW. The Entrance 
Channel, Potrero Reach Channel, Potrero Sharp 
Turn, Inner Harbor and about half of the Santa Fe 
Channel, to -38 feet and the remainder of the Santa 
Fe Channel from the Lauritzen Channel confluence 
to -30 feet. The width of the navigation channel is 
600 feet for most of its length to Point Richmond 
with one maneuvering area: in front of the Long 
Wharf. At Potrero Reach, the 500 foot width flares 
to about 600 feet at Point Potrero with a turn at the 
point, 1,200 feet wide and 38 feet deep. Thence, the 
channel continues into the inner harbor at a width 
of 850 feet in a northerly direction to the entrance of 
the Santa Fe Channel. The Santa Fe Channel 
extends northwesterly at a width of 200 feet into the 
upper basin terminus. A turning basin is provided 
at Point Richmond, and a rubble-mound training 
wall extending 10,000 feet westerly from Brooks 
Island is also provided in the Potrero Reach. For 
details, see page 1977 of Annual Report for 1915 
and page 1646 of Annual Report for 1938. 
Improvements consisted of a construction plan 
involving four and one-half miles of channel 
between Richmond Long Wharf and the Santa Fe 
Channel. The project deepened the existing 35-foot 
channels to 38 feet, and provided a turning basin of 
1,200 feet near Point Potrero. Approximately 
2,200,000 cubic yards of sediment were dredged and 
transported to aquatic and upland disposal sites. 
Construction was completed in August 1998. 
The estimated cost $40,000,000 of which 
$28,300,000 is Federal cost (includes $130,000 Coast 
Guard costs) and $11,700,000 is non-Federal cost 
(includes $1,310,000 non-Federal reimbursements). 
The existing project was authorized on October 
27, 1965. Previous projects were authorized by Acts 
adopted in 1917, 1930, 1935, 1938, 1945 and 1954. 
The proposed improvements are authorized by the 
Water Resources Development Act of 1986, PL 
99-662. 
34-4

SAN FRANCISCO, CA, DISTRICT 
Local cooperation. In accordance with the 
cost sharing and financing concepts reflected in the 
Water Resources Development Act of 1986, the local 
sponsor must comply with the following 
requirements: (1) pay 10 percent of the costs to 20 
feet below mean lower low water and 25 percent of 
costs between 20 and 45 feet below mean lower low 
water and (2) reimburse an additional 10 percent 
with interest of the costs allocated to general 
navigation facility of the project within a period of 
30 years following completion of construction; and 
(3) provide all lands, easements, rights-of-way, 
relocation and dredged material disposal areas 
necessary for the projects. The value of lands, 
easements, rights-of-way and dredge disposal areas 
can be credited toward the payment required under 
item (2) above. 
Terminal activities. The Port of Richmond 
encompasses nine privately-owned terminals and 
seven terminals owned by the Port. 
Operations during fiscal year. New Work: 
Construction project completed in May 1998. 
Maintenance: Operations and maintenance 
dredging of Richmond Outer Harbor was performed 
by the U.S. Hopper dredge Essayons. The Essayons 
removed 262,850 cubic yards of shoal material from 
the Outer Harbor, cost $1,556,640. The Inner 
Harbor portion was deferred because of lack of 
shoaling due to the recent completion of the 
Deepening Project. 
5. SAN FRANCISCO BAY TO 
STOCKTON, CA 
(JOHN F. BALDWIN AND 
STOCKTON SHIP CHANNELS) 
Location. The location is the John F. Baldwin 
Ship Channel. Navigation channels extending from 
entrance to San Francisco Bay to Suisun Bay near 
Martinez through San Francisco, Marin, Contra 
Costa, and Solano Counties. (See National Ocean 
Service Charts 18649, 18654 and 18656 for 
respective areas.) 
Existing project. Project provides for 
modification of the existing San Francisco Harbor, 
Richmond Harbor, San Pablo Bay and Suisun Bay 
Channels to the vicinity of Pt.. Avon to provide 
depths of 55 feet for San Francisco Bar Channel, 45 
feet (currently 35 feet) for main internal bay 
channels upstream to the vicinity of Pt.. Avon; 
enlargement and deepening to 45 feet (currently 35 
feet) of maneuvering areas adjacent to major 
petroleum refinery terminals along the channel 
route. San Francisco Harbor Main Channel was 
completed in February 1974. The South Hampton 
Shoal Channel and the Richmond Long Wharf 
maneuvering area were completed in December 
1986. For the approved cost estimate (1996) of 
Federal cost (Corps), see Sacramento District 
Annual Report. Existing project was adopted by 
1965 River and Harbor Act (H. Doc. 208, 89th Cong., 
1st sess., contains latest published map). Estimated 
volume of dredged material is 9 million cubic yards. 
A new alternative initially proposed by the sponsor 
would create a pipeline terminal north of the 
Richmond/San Rafael Bridge. Dredging of less than 
50k CY and a greatly shortened navigation channel 
2 miles long by 600 feet wide by 45-foot deep would 
eliminate or minimize the serious issues facing 
project construction including salinity intrusion, 
disposal site selection, air quality, and endangered 
species preservation. In February 1999, this 
sponsor withdrew support for a pipeline terminal. 
Local cooperation. See Sacramento District 
Annual Report. The local sponsor, Contra Costa 
County, supports the project. 
Terminal facilities. See Port Series No. 30, 
revised 1991, No. 31, revised 1991, and No. 32, 
revised 1986, titled respectively: "The Ports of San 
Francisco, Redwood City, and Humboldt Bay, 
Calif."; "The Ports of Oakland, Alameda, Richmond, 
and the Ports on Carquinez Strait, Calif."; and "The 
Ports of Sacramento, Stockton, Pittsburg, and 
Antioch, Calif." Facilities are considered adequate 
for existing commerce and will be adequate for 
future commerce upon completion of new terminal 
facilities. 
Operations during fiscal year. New Work: 
Continued planning engineering and design 
activities. 
6. SONOMA BAYLANDS 
WETLANDS DEMONSTRATION 
PROJECT, CA 
Location. The Sonoma Baylands site is 
located in Sonoma County, CA, approximately 25 
miles north of San Francisco near the mouth of the 
34-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Petaluma River, on the northern shoreline of San 
Pablo Bay. 
Existing project. Authorized by Water 
Resources Development Act of 1992. The project 
includes restoration of tidal wetlands on 348 acres 
of diked lands, including construction of 11,645 feet 
of replacement levee around the landward periphery 
of the site, fifteen internal peninsulas for wave 
protection, three weirs for the discharge of dredged 
material supernatant, and modification of three 
existing high voltage electrical towers. Project 
included placement of 207,000 cubic yards of 
maintenance-dredged material from the Petaluma 
River navigation channel in a pilot project area and 
placement of 1.7 million cubic yards of suitable 
dredged material from the Oakland Harbor 
deepening projects on the remainder of the site. 
Placement of material was completed on November 
6, 1995. 
The project cost is $8,900,000, of which 
$6,675,000 is Federal cost and $2,225,000 is 
non-Federal cost. Oakland deepening to -42' MLLW 
was completed in July 1998. 
Local cooperation. The California State 
Coastal Conservancy signed a Project Cooperation 
Agreement on May 6, 1994 satisfying the 
requirements of the Water Resources Development 
Act of 1992, PL 102-580 and signed an amendment 
on December 9, 1994 to include the placement of 
Oakland Harbor dredged material. The local 
sponsor must comply with the following 
requirements: (1) provide lands, easement, and 
right of ways; (2) modify or relocate utilities, roads, 
bridges (except railroad bridges) and other facilities, 
where necessary in the construction of the project; 
(pay 25 percent of the total project cost in 
accordance with Section 106 of the Water Resources 
Development Act of 1992. The local sponsor has 
also agreed to make all required payments 
concurrently with project construction. 
Terminal facilities. N/A 
Operations during fiscal year. The project 
was restored to tidal action on October 25, 1996. 
Monitoring of the project is continuing. Project was 
turned over to California Coastal Conservancy in 
August 1998 for operation, maintenance, repair, 
replacement, and rehabilitation of the functional 
portion of the project. 
7. SAN FRANCISCO BAY-DELTA 
MODEL STRUCTURE, CA 
Location. The model, including a Class A 
regional visitor center, is located in Sausalito, CA, 
adjacent to San Francisco Bay about two miles 
north of the Golden Gate Bridge. 
Existing project. The San Francisco 
Bay/Delta Model, which covers 17 miles of the 
Pacific Ocean beyond the Golden Gate, all of San 
Francisco Bay proper, San Pablo Bay, Suisun Bay, 
and all of the Sacramento-San Joaquin Delta east of 
Suisun Bay to the cities of Sacramento on the 
northeast and Stockton and Tracy on the south, was 
constructed in a rehabilitated warehouse at 
Sausalito, CA, as a part of the San Francisco Bay 
and Tributaries, CA, Study authorized by the River 
and Harbor Act of May 17, 1950 (PL 81- 516, Section 
110). The model was authorized as an operation and 
maintenance project in the Water Resources 
Development Act of 1974 (PL 93-251, Section 8). The 
model successfully reproduces to the proper scale 
the rise and fall of the tide, flow and currents of 
water, salinity intrusion, and trends in disposition 
of sediments. It is a useful tool to examine forces 
existing in the bay and estuarine system and to 
predict results of proposed changes. 
Local cooperation. None required. 
Operations during fiscal year. 
Maintenance: Operations and maintenance of the 
model continues. 
Historical summary. Original model 
construction was initiated 1956 and completed 1957. 
The addition of the Sacramento-San Joaquin Delta 
to the original model was initiated 1966 and 
completed 1969. Annual visitation to the model 
averages between 140,000 to 150,000 people. The 
central exhibits were completed in December 1981. 
Extensive exhibit upgrade for the Visitor Center 
and development of Cooperative Association 
completed September 30, 1989. The Cooperative 
Association provides financial and educational 
support to both engineering operations and visitor 
center programming. An active volunteer program 
exists at the Visitor Center providing approximately 
300 hours of effort monthly. Continued testing of 
proposals affecting the environmental quality of the 
region including, but not limited to: salinity 
intrusion, dispersion of pollutants, water quality, 
improvements for navigation, dredging, bay fill, 
34-6

SAN FRANCISCO, CA, DISTRICT 
physical structures, and other shoreline changes. 
Total cost of regional visitor exhibits and model as 
of September 30, 1999, was $34,772,558 of which 
$14,079,319 was for the regional visitor center, 
$1,383,324 for exhibits, and $19,309,913 for 
maintenance. 
8. SAN FRANCISCO BAY LONG 
TERM MANAGEMENT 
STRATEGY (LTMS), CA 
Location. The San Francisco Bay Long-Term 
Management Strategy (LTMS) for dredged material 
disposal covers deep and shallow draft navigation 
channels of the San Francisco Bay region including 
Central San Francisco Bay, South Bay, San Pablo 
Bay and Suisun Bay environs. 
Existing project. The San Francisco Bay 
region has an annual disposal requirement of 
approximately 6 million cubic yards (mcy) to 
maintain navigation channels. The Bay also has a 
one-time new civil works requirement of 
approximately 16 mcy for the Oakland Harbor, 
Richmond Harbor, and John F. Baldwin Phase III 
ship channel. In January 1990, the Army Corps of 
Engineers, the Environmental Protection Agency, 
Region IX, the San Francisco Bay Water Quality 
Control Board and the San Francisco Bay 
Conservation and Development Commission 
convened with approximately thirty interested 
agencies and organizations with concerns regarding 
dredged material disposal in San Francisco Bay. 
These four agencies have the responsibility for 
regulation of the waters of the US and California for 
disposal of dredged material. 
The four agencies and the concerned navigation 
interests formed the LTMS to develop technically 
feasible, economically prudent, and environmentally 
acceptable long range solutions to the dredging and 
disposal needs for the San Francisco Bay region 
over the next fifty years. In determining acceptable 
dredged material disposal locations, the LTMS is 
evaluating a broad array of potential ocean, in-Bay 
and non-aquatic beneficial uses disposal 
alternatives. 
Local cooperation. Pursuant to their 
regulatory responsibilities, the Division Commander 
of the South Pacific Division, Corps of Engineers; 
the Regional Administrator of the Environmental 
Protection Agency, Region IX; the Chair of the San 
Francisco Bay Regional Water Quality Board and 
the Chair of the San Francisco Bay Conservation 
and Development Commission agreed to jointly 
undertake the development and implementation of 
a Long Term Management Strategy (LTMS) for 
dredging and disposal of dredged materials from the 
region. Based on the outputs from the LTMS, the 
Regional Water Quality Control Board and the Bay 
Conservation and Development Commission will 
consider modifications to the dredging elements of 
their respective Basin and Bay Plans for San 
Francisco Bay. 
Regulatory Streamlining: Besides 
identifying implementable disposal options, the 
LTMS will: (1) develop coordinated regional 
disposal policies between federal and state agencies; 
(2) provide a local decision-making framework for 
dredging and disposal projects; (3) streamline 
existing permit and testing procedures; and (4) 
provide a long term site monitoring apparatus and 
feedback mechanism. 
Operations during fiscal year. In 1994, the 
Environmental Protection Agency (EPA) designated 
a deep ocean disposal site. In 1996, the Corps, EPA, 
and the State of California implemented a joint 
agency Dredged Material Management Office 
(DMMO) for dredging permit processing. 
The Final LTMS EIS is scheduled to be 
released in October 1999. The EIS will identify 
Alternative 3 as the preferred alternative that 
would limit future disposal to 20% in the San 
Francisco Bay, 40% in the ocean, and 40% for 
upland beneficial reuse. Final comments and 
response to comments as well as a Draft Record of 
Decision (ROD) were reviewed by Corps 
Headquarters in July 1999. The Division 
Commander and EPA's Regional Administrator 
signed the Final ROD in August 1999. The signing 
of the ROD initiates implementation for Federal 
agencies, followed by the State in FY 00 after 
amending the San Francisco Bay and Basin Plans. 
The implementation efforts will be finalized 
through the development of a management plan 
detailing the policies and procedures for 
implementing the selected alternative. Adoption of 
the management plan will require amending the 
Bay and Basin Plans. In general, the programmatic 
EIS requires future project-by-project analysis for 
"practicability" in terms of fiscal and environmental 
34-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
impacts that would then be assembled as a regional 
composite EIS. 
9. RECONNAISSANCE AND 
CONDITION SURVEYS 
Reconnaissance and condition surveys of 
channels to be dredged in years other than Fiscal 
Year 1999 and jetty structures were conducted on 
the following projects: Berkeley; Bodega Bay; 
Crescent City Harbor; Islais Creek; Mare Island 
Strait; Monterey Harbor; Moss Landing Harbor; 
Noyo River; Oakland Harbor; Pillar Point; Redwood 
City; Richmond Harbor; San Leandro Marina; San 
Rafael; Santa Cruz; Sausalito Canal; and Suisun 
Channel; all in California. Fiscal year costs were 
$846,654. 
10. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 
107, Public Law 86-645 (preauthorization). 
Fiscal year costs were $3,878 for Section 107 
Coordination Account. 
Mitigation of shore damages activities 
pursuant to Section 111, Public Law 90-483 
(preauthorization). 
None. 
11. BEACH EROSION CONTROL 
WORK UNDER SPECIAL 
AUTHORIZATION 
Beach erosion control activities pursuant 
to Section 103, Public Law 87-874 
(preauthorization). 
Fiscal year costs were $32,120 for East Cliff 
Drive, Santa Cruz, CA. 
Flood Control 
12. CORTE MADERA CREEK, CA 
Location. Creek and tributaries drain an area 
of 28 squire miles in Marin County, CA, and flow 
into west side of San Francisco Bay about 9 miles 
north of Golden Gate. 
Existing Project. Provided for about 11 miles 
of channel improvements, including realignment, 
enlargement, levees, riprap, rectangular concrete 
sections, interior drainage facilities, bridge 
relocations, and debris removal on Corte Madera 
Creek and lower reaches of its tributaries, and a 
continuous channel rights-of-way to deep water in 
San Francisco Bay reserved to assure channel outlet 
in the event of future tideland reclamation. Water 
Resources Development Act of 1986 modified 
existing project to direct construction of Unit 4 from 
Lagunitas Road Bridge to Sir Francis Drake 
Boulevard, and to include construction of flood 
proofing measures as necessary to individual 
properties and other necessary structural measures 
in vicinity of Lagunitas Road Bridge to insure 
proper functioning of completed portions of 
authorized project. Portion of project upstream of 
Sir Francis Drake Boulevard previously classified 
inactive was modified on November 17, 1986 to 
eliminate any channel modification. Current project 
has 3 miles of channel enlargement and levees, 
about 1.8 miles of rectangular concrete channel 
improvements, and 450,000 cubic yards of 
redredging on lower Corte Madera Creek. 
Local Cooperation. Local interests must 
provide lands and rights-of-way, including suitable 
areas for disposal of waste material, modify or 
relocate all bridges and utilities necessary for 
construction and maintenance; hold and save the 
United States free from damages due to the 
construction works; maintain and operate the 
project after completion in accordance with the 
regulations prescribed by the Secretary of the Army, 
and prevent encroachment on flood channels that 
would result in decreasing the effectiveness of 
project for flood control; adjust all claims regarding 
water rights that might be affected by the project; 
and contribute in cash 1.5 percent of Federal 
construction cost of Ross Valley units 1-4 and tidal 
areas. Marin County Flood Control and Water 
Conservation District previously furnished 
resolution of local assurances dated March 29, 1966, 
March 28, 1967, August 15, 1967, and July 8, 1969, 
and Marin County Board of Supervisors reaffirmed 
by letter dated September 28, 1978. Project was 
authorized by the State of California by 1965 
Statute, Chapter 1388. Board of Supervisors of 
Marin County Flood Control and Water 
Conservation District furnished assurances of 
willingness and ability to meet requirements for 
portion of project below Sir Francis Drake 
Boulevard. 
34-8

SAN FRANCISCO, CA, DISTRICT 
On December 13, 1983, Marin County Board of 
Supervisors reconfirmed assurances of local 
cooperation because a Superior Court judgment 
ordered that county to take all steps required by law 
to complete channel downstream of Sir Francis 
Drake Boulevard (Unit 4) and maintain entire 
project as agreed. A Local Cooperation Agreement 
for redredging the lower reach of Corte Madera 
Creek was executed on June 29, 1985. Marin 
County also provided support for Ross Valley Unit 
4 by resolution on March 24, 1987 and by the 
resolution on September 13, 1988. 
Operations during fiscal year. New Work: 
The flood control project has been built in separate 
units. The current project focuses on the design and 
construction of unit 4 with modifications to units 2 
and 3. Unit 4 includes a natural flood control 
channel and a sedimentation basin located at the 
town of Ross. 
The General Reevaluation Report (GRR) and 
Supplemental EIS/EIR was initiated in February 
1999. As long as the originally authorized project 
remains the recommended project, the 1966 
authorized cost sharing and financing requirements 
will be applicable. A community-based Design 
Advisory Committee has been created with 
representatives from Ross, Kentfield, Corte Madera, 
and Larkspur to provide community input on the 
conceptual plan. The conceptual plan is based on 
the Marin County Board of Supervisors' Design 
Guidelines for a consensus plan which was approved 
in 1996. 
The GRR will be developed in two phases. 
Phase I will develop alternatives based on the 
design guidelines and determine if the project 
benefits exceed the costs. Phase II will complete the 
GRR and environmental documentation. Phase I is 
scheduled for completion in July 2000, and Phase II 
in September 2001. Construction of Unit 4 and 
attendant feature in the downstream units is being 
determined. 
Historical summary. Project responsibility 
was transferred to Sacramento District on April 1, 
1982 and back to the San Francisco District on 
October 1, 1996. Resolution 96-26 was passed on 
February 1, 1996 by the Marin County Board of 
Supervisors in support of a 40-year project. 
Project is about 77 percent complete 
considering the portion being held in abeyance 
upstream of Sir Francis Drake Boulevard. Work 
remaining: Design construction of the remaining 
3,000 feet of channel downstream of Sir Francis 
Drake Boulevard and Ross Creek. The portion of 
Corte Madera Creek upstream of intersection of Sir 
Francis Drake Boulevard and Corte Madera Creek 
in Ross, near the city of San Anselmo, was classified 
as "inactive" on July 11, 1984, due to lack of local 
support. 
A Local Cooperation Agreement for redredging 
lower reach of Corte Madera Creek was executed 
June 29, 1985. Construction on Lower Corte 
Madera Creek Channel was completed and 
transferred to Marin County Flood Control and 
Water Conservation Disrict by letter of May 28, 
1987, San Francisco District monitors maintenance 
and operation of the project. The project was 
transferred from Sacramento District in October 
1996. Design process began in the San Francisco 
District to complete Unit 4. 
13. PETALUMA RIVER, PETALUMA, 
CA 
Location. The Petaluma River Basin is 
situated in Sonoma and Marin Counties, California, 
on the northwestern shore of San Pablo Bay. 
Existing project. The project is authorized by 
Section 205 of the Flood Control Act of 1948. The 
project currently under construction consists of a Ushaped 
channel and an earthen trapezoidal channel 
from Lynch Creek to Lakeville Street Bridge, 
replacing two road bridges and two railroad bridges. 
Present estimated total cost for the project 
$33,270,000 of which $5,600,000 is Federal cost and 
$28,270,000 in non-Federal cost. 
Local cooperation. City of Petaluma signed 
a Project Cooperation Agreement in July 1996, 
satisfying the requirements of the Water Resources 
Development Act of 1986, PL 99-662. 
Operations during fiscal year. New work: 
Contract #1 for the U-shaped channel portion of 
construction was completed in December 1998. 
Contract #2 for the trapezoidal section of the 
channel was awarded in May 1999. Most of the 
channel widening and floodwall construction was 
completed in 1999. The local sponsor awarded a 
contract to replace one of the two railroad bridges. 
Schedule completion date is December 2000. 
34-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Maintenance: Operations and maintenance of 
Petaluma River Channel including engineering and 
design. No contract dredging performed in FY99. 
14. RUSSIAN RIVER BASIN, CA 
Location. Russian River rises in Coast Range 
in northwestern California, flows southerly for 87 
miles, and then turns westerly to flow for 23 miles 
to Pacific Ocean at Jenner, 60 miles northwest of 
San Francisco, CA. (For general location see 
Geological Survey map for California.) 
Existing project. Active authorized project 
provides for construction of a dam on East Fork of 
Russian River at Coyote Valley to a height of 160 
feet; a dam on Dry Creek at Warm Springs to a 
height of 319 feet; and channel stabilization works 
on Russian River between mouth and mile 98, on 
lower reaches of several tributaries, and on Dry 
Creek downstream from dam. Project also provides 
for expansion of fish hatchery capacity at Dry 
Creek, Warm Springs, to compensate for fish losses 
on Russian River attributed to operation of Coyote 
Dam component of project. Coyote Valley Dam 
(Lake Mendocino), completed in 1959, is operated 
and maintained by the United States. (See tables 
34-I and 34-J for latest approved estimated costs.). 
Local cooperation. Fully complied with for 
Coyote Valley Dam and channel improvements 
accomplished to date. For the Dry Creek portion, 
local interests are required by the authorizing act to 
comply with the usual a., b., c. requirements for 
channel improvements and, in addition, prevent any 
encroachment in the channel of Dry Creek which 
would interfere with proper functioning of the 
channel improvement works; adjust all claims 
concerning water rights arising from the 
construction and operation of the improvements, 
including acquisition of water rights needed for 
preservation of fish and wildlife resources affected 
by the project; and reimburse the United States in 
accordance with the Water Supply Act of 1958, as 
amended, for that part of the joint-use construction 
cost, (30.2 percent currently estimated at 
$103,760,000) and an ultimate 32.5 percent of the 
annual operation, maintenance, and replacement 
joint-use costs allocated to municipal and industrial 
water supply. The estimated annual cost to local 
interests for maintenance of channel improvement 
works is $80,000. Sonoma County Water Agency 
(formerly Sonoma County Flood Control and Water 
Conservation District) provided assurances of 
willingness and ability to meet requirements by 
Resolutions No. DR 00793-1, September 25, 1961, 
No. DR 4770-1, December 17, 1962 and No. DR 
45759, August 5, 1974, for Dry Creek (Warm 
Springs) Lake and Channel. By letter dated March 
7, 1967, Sonoma County Flood Control and Water 
Conservation District further indicated their 
interest in optimization of the Dry Creek (Warm 
Springs) damsite to provide additional water supply 
storage. Reimbursement to the United States for 
Dry Creek (Warm Springs) Lake and Channel costs 
allocated to 212,000 acre-feet of water supply 
storage is specified in a water supply contract with 
the local sponsor approved in October 1982. Local 
interests have expended approximately $1,000,000 
to provide partial flood protection in project area 
and have constructed facilities at an approximate 
cost of $20,000,000 to distribute water from the 
completed Coyote Valley reservoir. 
Operations and results during fiscal year. 
New work: Coyote Valley Dam: Major work 
includes partial completion of a restroom restoration 
contract at South Boat Ramp. Dry Creek (Warm 
Springs) Lake and Channel: Engineering activities 
continued. The Gualala Redwoods claim that their 
access to Kelly Road was cut off by Corps project 
(Warm Springs) went to trial in October 1992. 
Judgement resulting was a cost of $3,162,000 to the 
Federal Government. Kelly Road was sold in June 
1999 after a $1.5 million road stabilization project 
was completed. Maintenance: Coyote Valley Dam: 
Operation and maintenance continued. Structures 
were maintained in serviceable condition. Runoff of 
East Fork Russian River at Coyote Dam was above 
normal for the year. Maximum storage of 93,967 
acre-feet occurred on April 11, 1999. Maximum 
hourly inflow to reservoir was 6,668 cubic feet per 
second on February 9, 1999. Maximum release of 
4,297 cubic feet per second occurred on February 10, 
1999. During the year, 176,004 acre-feet was 
released for flood control, and 99,227 acre-feet was 
released for irrigation and other purposes. Dry 
Creek (Warm Springs) Lake and Channel: 
Operation and maintenance continued. Structures 
were maintained in serviceable condition. Runoff of 
Dry Creek at Warm Springs Dam was above normal 
for the year. Maximum storage of 261,469 acre-feet 
occurred February 10, 1999. Maximum hourly 
inflow to reservoir was 11,239 cubic feet per second 
on February 9, 1999. Maximum release of 2,139 
cubic feet per second occurred February 10 1999. 
During the year, 81,571 acre-feet was released for 
34-10

SAN FRANCISCO, CA, DISTRICT 
irrigation and other purposes. Releases for flood 
control amounted to 100,052 acre-feet. 
Historical summary. Entire project, 
exclusive of recreation facilities at completed project 
(Lake Mendocino), is about 99 percent complete. 
Coyote Valley Dam, initiated November 1958, was 
completed April 1959 (cost $17,550,000, of which 
$11,952,000 was Federal; and $5,598,000 
contributed). Work, including removal of slides 
resulting from storms in 1958, was completed April 
1959. Bank stabilization work on Russian River 
near Geyserville was completed in 1957 and 
channel improvements in remaining reaches on 
Russian River and East Fork of Russian River were 
completed in 1974 (cost $2,483,900). In April 1982, 
responsibility was transferred to the Sacramento 
District. Responsibility for civil works operations & 
maintenance functions for the two projects was 
transferred back to San Francisco District October 
1, 1996. 
Warm Spring construction completion include 
fish hatchery in December 1980, project overlook in 
May 1981, reservoir clearing in July 1981, 
downstream stabilization sills in October 1981, dam 
closure in October 1982, spillway repair at Warm 
Springs Dam in September 1985, boat launching 
facilities, Phase I, in September 1985, Rockpile Road 
Upgrade, Yorty Creek Beach, and remedial work at 
Liberty Glen camping area in September 1990, fish 
hatchery expansion in September 1992, final control 
tower grouting, dam access road repair, spillway 
stabilization, fish hatchery emergency water supply 
in September 1993, and Liberty Glen wastewater 
system and contaminated soil remediation. Initial 
filing of Warm Springs reservoir was commenced on 
November 1, 1984. Responsibility for construction 
was transferred to Sacramento District in August 
1983. Dam safety assurance studies were initiated 
at Coyote Valley Dam in fiscal year 1984. 
Responsibility for civil works operations and 
maintenance functions for the two projects was 
transferred back to San Francisco District October 
1, 1996. 
15. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Section 3, Flood Control Act of June 22, 1936, 
as amended and supplemented, included a 
requirement that local interests maintain and 
operate completed flood control works in accordance 
with regulations prescribed by the Secretary of War. 
Inspections made throughout the year to determine 
effectiveness of operation and maintenance by local 
interests of completed local protection projects and 
works constructed under emergency and special 
authorities of Sections 205 and 208 of the 1948 
Flood Control Act, Section 14 of the 1946 Flood 
Control Act, and Public Law 99, 84th Congress. In 
addition, encroachments to Federal Projects such as 
new bridges, etc. must be reviewed and approved 
prior to construction by the local sponsor, as well as 
in compliance with the Clean Water Act permit and 
endangered species concerns regarding their 
operations and maintenance activities. Fiscal year 
cost was $250,415. Total cost to September 30, 1998 
was $3,074,268. See Table 34-H for inspections 
made this fiscal year. 
16. FLOOD CONTROL WORK 
UNDER SPECIAL 
AUTHORIZATION 
Flood Control activities pursuant to 
Section 205, Public Law 858, 80th Congress, as 
amended (preauthorization). 
Fiscal year costs were $2,775,812 for 
preauthorization studies of which $1,787,368 were 
for Petaluma River, Sonoma County, CA; $741,705 
for San Pedro Creek, Pacifica, CA; $127,865 for 
White Slough, Solano County, CA; $4,937 for 
Atascadero, CA; $22,167 for Novato Creek 
Tributary, Novato, CA; $81,746 for Coyote Creek at 
Rock Springs, CA; and $10,024 for Section 205 
Coordination Account. 
Emergency flood control activities-repair, 
flood fighting and rescue work (Public Law 99, 
84th Congress, and antecedent legislation). 
Fiscal year cost incurred for emergency flood 
control activities were $10,430,622 of which 
$2,139,616 were for Disaster Preparedness; 
$148,388 for Emergency Operations and $8,142,618 
for Rehabilitation. 
Emergency bank protection (Section 14, 
1946 Flood Control Act, Public Law 526, 79th 
Congress). 
Fiscal year total costs were $26,764 of which 
$20,358 was for Cliff Drive, Capitola, CA; and 
$6,406 for Section 14 Coordination Account. 
34-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
17. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with sec. 7, Flood Control Act of 
1944, summaries of monthly reservoir operations at 
Del Valle, CA were prepared. No water control 
manual revisions were completed due to 
environmental issues. Corps personnel provided 
advice as requested during flood control operations 
at the reservoir. Fiscal year cost was $48,629. 
18. MISCELLANEOUS WORK UNDER 
SPECIAL AUTHORIZATION 
Project Modification for Improvement of 
Environment (Section 1135, PL 99-662). 
Fiscal year total costs were $270,570 of which 
$4,937 were for Coordination Account funds; and 
$265,633 for Wildcat Creek Restoration, CA. 
Aquatic Ecosystem Restoration (Section 
206, PL 104-303). 
Fiscal year total costs were $4,782 of which was 
Coordination Account funds. 
General Investigations 
19. SURVEYS 
Fiscal year costs for surveys were $1,562,163 of 
which $99,606 were for navigation studies; $40,330 
for flood damage prevention; $1,269,909 for special 
studies; $68,402 for miscellaneous activities; and 
$83,916 for coordination studies with other 
agencies. 
20. COLLECTION AND STUDY OF 
BASIC DATA 
Fiscal year total costs of $32,786 were 
incurred, of which $28,369 was for Flood Plain 
Management Service Program and, $4,417 for 
Hydrologic Studies. 
21. PRECONSTRUCTION 
ENGINEERING AND DESIGN 
HAMILTON AIRFIELD 
WETLAND RESTORATION, CA 
Hamilton Airfield is a 700-acre parcel 
consisting of an inactive runway and adjacent taxi 
areas. It is located 4 miles east of the City of 
Novato, on San Pablo Bay, in Marin County, 
California. The area, currently protected by levees, 
has subsided below the elevation of surrounding 
properties, including the tidal wetlands immediately 
adjacent to San Pablo Bay. Storm water runoff from 
adjacent properties is collected on the airfield and 
transferred to San Pablo Bay from the site by a 
drainage system including a pump station and 
concrete ditches. In conjunction with the ongoing 
Base Realignment and Closure (BRAC) cleanup 
process, the Base Reuse Authority would like to 
restore the area to a tidal wetland. Wetlands would 
be created with the use of dredged material from 
San Francisco Bay navigation projects, including 
the Oakland 50' deepening project. 
The Final Feasibility Study and EIS/EIR was 
completed December 15, 1998 with the issuance of 
the Division Engineer's Public Notice followed by 
the Report of the Chief of Engineers in August 1999, 
and authorization in the 1999 Water Resources 
Development Act (WRDA). For the BRAC portion, 
the airfield is being closed with the City of Novato 
acting as the Reuse Authority. The US Army Corps 
of Engineers, Sacramento District, is managing the 
environmental cleanup and closure of the base. 
Remaining tasks in the BRAC process are; 
completing the site risk assessment, remediation, 
and transfer of the airfield property to the state of 
California State Coastal Conservancy by the end of 
FY 2000. The site does have existing contamination 
in the form of hydrocarbon compounds and heavy 
metals, the magnitude of which is being determined 
in the risk assessment. A Memorandum of 
Agreement (MOA) has been formalized between the 
Department of Defense (DOD)/BRAC command and 
the Conservancy to ensure that the clean up of the 
site is suitable for wetland restoration for 
endangered species. 
A Pre-construction Engineering and Design 
(PED) cost sharing agreement was signed in August 
1999 for $1.2 million dollars between the Corps and 
the Conservancy. Construction is scheduled to 
begin in FY 2001. An adjacent State Lands 
Commission owned parcel will be remediated under 
the Formally Used Defense Sites (FUDS) program 
34-12

SAN FRANCISCO, CA, DISTRICT 
at a future unknown date. A second MOA for the 
FUDS parcel will be formalized between DOD and 
the Conservancy before the BRAC transfer of the 
airfield occurs. This MOA will ensure that the clean 
up of the site is suitable for wetland restoration for 
endangered species and occurs at a future date that 
meets the construction schedule for the rest of the 
restoration site. 
An Ecosystem Restoration Initial Appraisal 
(WRDA 1999, Section 204) for another adjacent 
parcel (1600 acre Bel Marin Keys (BMK) property) 
will be completed in March 2000. It will examine 
the federal interest in adding this parcel to the 
Hamilton Wetlands Restoration Project (HAAF). 
The Conservancy has authorized their Executive 
Director to seek funding and negotiate the purchase 
of the BMK parcel. 
NOYO RIVER AND HARBOR, CA 
Noyo River rises in the Coast Range, flows 
westerly, and empties into Noyo Harbor. Noyo 
Harbor is a cove on the California Coast about 87 
miles south of Humboldt Bay and 135 miles 
northwest of San Francisco. The 1962 Rivers and 
Harbors Act, modified by the 1976 Water Resources 
Development Act, authorized up to two breakwaters 
as necessary to provide protection. The 1976 Water 
Resources Development Act, as modified by the 
Water Resources Development Act of 1986, 
authorized construction of additional channel 
improvements. Recommended plans of 
improvement for the breakwater and channel 
improvement were previously considered as a single 
project. Due to significant differences in the time 
required for planning and construction, each part is 
now reported separately. 
The plan of improvement for Noyo River and 
Harbor (Breakwater), CA provides for one detached 
offshore 400-foot breakwater aligned in a 
north-south direction along the southern portion of 
Noyo Cove, west of the entrance channel in Noyo 
Harbor. The plan also provides for a 60-foot wide 
channel, 7 feet deep, for a distance of about 3,000 
feet upstream from the end of the existing Federal 
project to the Dolphin Isle Marina. The June 1995 
draft GDM estimated the breakwater cost at 
$23,312,000 of which $18,712,000 is Federal cost 
and $4,600,000 is non-Federal cost. Subsequent to 
the draft GDM, the Conference Report on H.R. 1905, 
Energy and Water Development Appropriation Act 
of 1996 directs the Corps to investigate the viability 
of a pre-fabricated steel structure in lieu of a rubble 
mound breakwater, including modeling. A special 
report, which documented this evaluation, was 
completed in January 1997. A meeting with the 
Local Sponsor, PG&E and the City of Fort Bragg 
was held 5 February 1997 to discuss the Corps' 
findings. Integrating wave power generation to the 
breakwater does not decrease the Sponsor's 
annualized cost because the Sponsor is required to 
pay all costs associated with power generation. Two 
letters from the Noyo Harbor District, dated 26 
February 1997, requested the Corps finalize the 
GDM and discontinue study of integrating wave 
power generation into the breakwater. Due to 
sponsor's inability to fulfill its cost-sharing 
requirements, preparation of a final GDM was 
terminated. 
This project has been put in an inactive 
category at the request of the sponsor. 
PAJARO RIVER AT 
WATSONVILLE, CA 
The Pajaro River is the dividing line between 
Santa Cruz and Monterey County located 
approximately 100 miles south of San Francisco on 
Monterey Bay. Flooding in the city of Watsonville, 
the town of Pajaro, and surrounding agricultural 
lands prompted a re-examination of flood damage 
prevention in the Pajaro basin. 
The project provides for modification of the 
existing levee system built by the Corps in 1949 and 
includes 2.5 miles of flood control levees and/or 
floodwalls on Salsipuedes Creek and Corralitos 
Creek, tributaries of the Pajaro River, as well as 
pump systems located outside of existing levees on 
the Pajaro River. The tributaries are located 6 
miles from the river mouth. Since the only 
alternative with Federal interest was within the 
existing 1966 Rivers and Harbor Act construction 
authority, the reconnaissance study was certified in 
August 1994 with the recommendation to proceed 
directly to a General Re-evaluation Report (GRR) on 
raising levees along a portion of Corralitos and 
Salsipuedes Creeks. Flooding along the main stem 
of the Parjaro River in January and March 1995 
caused in excess of $65,000,000 in damages. 
Additional damages were incurred during the floods 
of January 1997 and February 1998. It is likely that 
we will incorporate a re-examination of main stem 
alternatives in the ongoing GRR for the creeks. 
34-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Consequently, the Corps will proceed with technical 
tasks, including a geotechnical investigation of the 
Pajaro River levees as part of the GRR. Contingent 
on funding, the GRR is scheduled to be completed in 
FY 2002. If the GRR finds a federal interest in flood 
control improvements along either the Pajaro 
mainstem or Salsipuedes and Corralitos creeks, 
construction contract plans and specifications 
would be prepared in FY 2003. If funded, local real 
estate acquisition and construction could proceed 
the following fiscal year. 
OAKLAND HARBOR 
50', CA 
Oakland Harbor is located in the City of 
Oakland, on the eastern shore of central San 
Francisco Bay, immediately south of the San 
Francisco-Oakland Bay Bridge. Behind Los 
Angeles, Oakland Harbor is the second largest port 
on the West Coast and the fifth largest container 
port in the nation. Traffic consists primarily of 
containers and container ships. Ports around the 
world are increasing channel depths and expanding 
throughput capacity to compete for the next 
generation of deep-draft container ships. The 
project is proposing to deepen the federal channels 
of the Oakland Harbor and Port-maintained berths 
from 42' to depths of 50' below Mean lower Low 
Water (MLLW). In constructing this project, up to 
12.8 million cubic yards of sediment would be 
dredged, which will require disposal. The 
recommended plan has a benefit-cost-ratio greater 
than 6.4 to 1. The estimated construction cost is 
$253 million, including $38 million of local service 
facilities (berth rehabilitation and deepening). 
Approximately 7.0 mcy of dredged material would 
be deposited in the middle harbor enhancement 
area (MHEA); 2.5 mcy of dredged material would be 
transported to the proposed Hamilton Wetlands 
Restoration project (HWRP); 2.9 mcy of dredged 
material would be disposed of at the existing 
Montezuma Wetlands Restoration project (MWRP); 
0.3 mcy of dredged material would be transported to 
the Vision 2000 upland site; and 0.1 mcy of dredged 
material would be sent to an upland land fill. 
The -42' deepening project was completed in 
July 1998. A feasibility study and environmental 
impact statement/report for the -50' projeqt was 
prepared by the Port under the authority of Section 
203 of Public Law 99-662, and submitted to the 
Assistant Secretary of the Army for Civil Works in 
February 1999. Chiefs Report was signed 21 April 
1999 and the Design Agreement for the -50' project 
Pre-construction, Engineering and Design (PED) 
was executed 24 March 1999. This project was 
authorized in the 1999 Water Resources 
Development Act. The PED of the -50' deepening 
project started in April 1999 with completion 
scheduled by the end of FY 2000. Construction 
contract award is scheduled at the end of December 
1999.
SAN RAFAEL CANAL, CA 
San Rafael Canal is located on the 
northwestern shoreline of San Francisco Bay in the 
city of San Rafael, about 17 miles north of the city 
of San Francisco. The Canal is surrounded by San 
Rafael's central business district and dense 
residential areas. The Study was authorized by a 
resolution adopted by the Committee on Public 
Works and Transportation of the United States 
House of Representatives on August 8, 1984, Section 
142 of the Water Resources Development Act 
(WRDA) of 1976 (Public Law 94-587), as 
subsequently amended in Section 705 of WRDA of 
1986 (Public Law 99-662). The project was 
authorized for construction in Section 101 of WRDA 
of 1996. 
The Feasibility Study recommended the South 
Floodwall Plan. This plan consists of approximately 
9,500 linear feet of floodwall constructed along the 
south bank of the canal and 1,600 feet of sheet-pile 
floodwall along the crest of the Bayfront levee on 
the east side of the canalways tract. The South 
Floodwall Plan has a benefit-to-cost ratio of 2.0 to 1. 
Total costs during the fiscal year were $42,351 with 
General Investigations funds. The estimated project 
cost is $32,200,000 of which $20,930,000 is Federal 
cost and $11,270,000 is non-Federal cost. 
Preconstruction Engineering and Design was 
initiated in October 1992. The Corps is proposing a 
continuous floodwall design which is estimated to 
save between $11.6 to $14.1 million compared to the 
South Floodwall Plan, as recommended in the 
Feasibility Study. A letter was sent to the City of 
San Rafael in December 1996 requested Sponsor's 
agreement with the Corps proposal to finalize the 
project design based on the continuous flood wall 
concept. A District Engineer letter to the Mayor, 
City of San Rafael, dated 25 September 1997, 
informed the City that the project has been placed 
in a suspended status. 
34-14

SAN FRANCISCO, CA, DISTRICT 
UPPER GUADALUPE RIVER, CA 
The Upper Guadalupe River Feasibility Study 
area is located in the City of San Jose, Santa Clara 
County, California. The reach of the river proposed 
for improvement begins at interstate Highway 280 
at the edge of downtown San Jose and extends 
south for about 5.5 miles. 
The feasibility study evaluated a variety of nonstructural 
and structural plans of improvement for 
flood protection in the Upper Guadalupe basin. The 
final feasibility study report and Environmental 
Impact Statement/Report was submitted to South 
Pacific Division on January 30, 1998. This report 
recommended Federal participation in a project 
providing a 50-year level of flood protection. The 
locally preferred plan, presently requiring 
additional sponsor (Santa Clara Valley Water 
District) funding, would provide a 100-year level of 
protection. The Division Engineer's Public Notice 
was issued on February 27, 1998 and a Chief of 
Engineer's Report was signed August 19, 1998. The 
project has been authorized for construction in the 
1999 Water Resources Development Act. 
The Design Agreement for the follow-on Preconstruction 
Engineering and Design (PED) phase 
was signed on February 25, 1999. PED was 
initiated in April 1999. PED is scheduled to 
complete by the end of FY 2002. 
34-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 34-A 
See 
Section 
in Text 
COST AND FINANCIAL STATEMENT 
Total Cost to 
FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
Bodega Bay, CA New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major rehab. 
Approp. 
Cost 
12. Corte Madera New Work 
Creek, CA Approp. 
(Federal Funds) Cost 
Required Contrib.. New Work 
unds) Contrib.. 
Cost 
(Contrib.. Funds, New Work. 
Other) Contrib.. 
Cost 
1. Crescent City New Work 
Harbor, CA Approp. 
Cost 
Maint. 
Approp 
Cost 
Major rehab. 
Approp. 
Cost 
Fisherman's Wharf New Work 
Areas, San Francisco Approp. 
Cost 
Maint. 
Approp 
Cost 
Hamilton Airfield New Work 
Wetland Restoration, Approp. 
CA Cost 
2. Humboldt Harbor New Work 
and Bay, CA Approp. 
Cost 
Maint. 
Approp. 
Cost 
Klamath River, New Work 
Klamath Glen Approp. 
Levee, CA Cost 
Moss Landing New Work 
Harbor, CA Approp. 
Cost 
Maint. 
Approp. 
Cost 
Napa River, CA New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Noyo River and New Work 
Harbor, CA Approp. 
Cost 
Maint. 
Approp. 
Cost 
47,132 39,421 
47,132 39,421 
$1,226,765 1240 
1,226,765 1340 
5,423 47,441 1,274,206 440 
5,423 47,441 1,274,206 440 
397,779 5 
397,779 5 
89,000 304,000 565,000 13,416,725 62 
7,276 56,750 232,311 595,772 13,331,603 62 
- - - - 190,355 63 
- - - 190,213 63 
- - - 804,761 64 
- - - 804,761 64 
337,000 
326,886 
121,063 79,707 
121,063 79,707 
511,000 
144,972 
833,791 
644,254 
1,170 
1,170 
410,000 
381,119 
2,515,000 
2,600,453 
690,000 
95,959 
2,525,000 
352,308 
2,655,000 
2,285,181 
(109,000) 
483,298 
40,000 
381,280 
2,398,890 
2,676,508 
(21,439) 
96,000 
268,976 
6,7c 
6,2! 
3,9 
4,01
( 
10,398,972 640 
10,195,806 640 
36,704 25,748,499 740 
X6,230 25,748,488 740 
- 525,000 8 
- 525,000 8 
- 9,199,000 414850 
- 9,199,000 414950 
- 388,488 51 
- 388,488 51 
75,000 75,000 
8,007 8,007 
)9,000 19,746,299 940 
92,068 17,373,726 940 
33,480 88,886,077 10 40 
22,327 88,572,425 10 40 
23,000) 558,000 65 
- 557,818 65 
338,215 1140 
338,215 1140 
785,000 1,061,475 624,030 1,092,591 9,432,726 1240 
778,984 955,370 491,269 1,305,020 9,400,273 1240 
- - - - 1,021,274 1340 
1,021,274 1340 
94,090 
133,314 
364,000 
249,939 
58,155 
41,385 
975,000 476,000 1,335,000 7,759,763 131440 
829,180 280,615 1,627,680 7,705,478 131440 
103,000 (24,000) - 4,121,000 151640 
194,562 8,564 - 4,120,596 151740 
370,997 
324,323 
- 78,899 9,420,135 18 1940 
69,423 79,968 9,420,135 181940 
34-16 
Project Funding 
3 
22

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
3. Oakland Harbor, 
CA 
(Federal Funds) 
(Contrib. Funds) 
Oakland Harbor 
50', CA 
(Federal Funds) 
(Contrib. Funds) 
Pajaro River at 
Watsonville, CA 
13. Petaluma River, CA 
(Contributed Funds) 
Pillar Point 
Harbor, CA 
Redwood City 
Harbor, CA 
Removal of 
Sunken Vessels 
4. Richmond Harbor, 
CA 
(Federal Funds) 
(Contributed Funds) 
Minor rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Minor rehab. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
9,509,000 
9,127,184 
750,860 
733.078 
6,929,971 
8,933,227 
580,000 
595,886 
425,833 
342,860 
429,792 
398,391 
111,251 
111,251 
9,744,000 26,131,000 
10,207,445 26,025,231 634,964 
3,041,973 3,877,727 3,287,279 
3,020,151 3,458,835 3,700,050 
2,447,239 6,995,637 46,000 
5,039,611 8,891,780 517,029 
- - 752,000 
- - 651,580 
- - 824,340 
- - 458,735 
568,000 408,000 141,000 
561,854 380,036 197,039 
978,000 800,000 1,286,166 
405,274 1,012,935 1,787,369 
406,102 1,852,000 (296,000) 
458,020 756,114 799,886 
- 759,000 4,000,000 
1,178,338 2,142,728 
222,810 2040 
222,810 2040 
93,402,684 21 
93,079,877 21 
56,750,574 22 
56,650,954 22 
24,236,142 
24,111,942 
752,000 
651,580 
824,340 
458,735 
2,086,100 
2,081,089 
5,474,751 2340 
5,289,579 2340 
16,679,538 2440 
16,679,538 2440 
4,759,000 
3,321,066 
6,697,396 4344 
6,697,396 4344 
2,744 38,626 4,745 2,353,130 4445 
2,744 38,626 4,745 2,353,130 4445 
1,672,722 2540 
1,672,722 2540 
4,700,000 (312,476) 638,075 2,474,538 21,459,886 26 40 
4,699,998 (362,474) 243,519 2,919,092 21,147,410 2640 
- - - - 283,068 
283,068 
803,400 
943,132 
2,260,954 
2,295,397 
1,235,000 17,809,000 (877,000) 
948,950 16,156,205 619,718 
4,336,736 6,515,445 2,947,219 
4,315,263 6,491,813 2,991,913 
30,310,427 2728 
29,763,148 2728 
50,633,119 29 40 
50,621,775 29 40 
164,689 
164,689 
3,437,000 4,487,200 (5,000) 7,919,200 
1,033,730 6,681,933 20,523 7,736,186 
34-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 34-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
14. Russian River Basin, New Work 
CA, Coyote Valley Approp. 
Dam (Lake Cost 
Mendocino) and Maint. 
Channel Improve- Approp. 
ments (Fed Funds) Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
Dry Creek (Warm New Work 
Springs) Lake Approp. 
and Channel Cost 
Improvements, CA Maint. 
(Federal Funds) Approp. 
Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
San Clemente Maint. 
Creek, CA Approp. 
Cost 
5. San Francisco Bay New Work 
to Stockton, CA Approp. 
(John F. Baldwin Cost 
and Stockton Ship New Work 
Channels) Approp. 
(Contributed Funds) Cost 
7. San Francisco Bay New Work 
and Delta Model, Approp. 
CA Cost 
Maint. 
Approp. 
Cost 
8. San Francisco Bay Maint. 
Long Term Approp. 
Management Cost 
Strategy (LTMS), CA 
San Francisco 
Harbor, CA 
San Francisco 
Harbor and Bay CA 
(Removal of Drift) 
San Leandro 
Marina, CA 
San Pablo Bay 
and Mare Island 
Strait, CA 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
14,435,869 54 
14,435,869 54 
2,692,600 2,834,378 2,869,000 3,023,000 
2,877,136 2,572,324 2,766,987 3,040,923 
55,000 
124,582 
3,338,900 
3,409,978 
53,755,902 55 
53,397,988 s5 
589,911 56 
570,774 57 
333,108,645 58 
333,081,773 58 
4,295,991 5,508,000 4,133,000 
3,661,869 5,069,869 4,923,360 
198,000 (198,000) 
1,450,000 623,000 320,000 
1,379,150 1,091,643 310,637 
-- 88,316 
1,823,000 
1,599,752 
610,000 
711,411 
1,990,000 
1,970,461 
550,000 
367,759 
1,805,000 
1,896,577 
40,000 
29,048 
124,167 
(5,000) 
3,397 
47,131,934 59 
45,760,042 59 
230,574 60 62 
228,732 6163 
38,837,200 42 
38,815,759 42 
88,316 
3,937 
2,042,000 34,978,917 
2,073,435 34,772,558 
- 11,951,000 
214,766 11,951,000 
2,064,202 1,384,000 1,109,542 1,056,480 
2,080,354 1,389,663 1,090,286 1,080,511 
1,836,000 1,960,000 2,067,000 1,498,000 
2,066,074 2,023,648 1,616,890 1,661,854 
917,600 78,000 
837,178 136,106 
51,037 
- 51,037 
303,000 1,027,000 388,341 
299,908 1,034,130 387,584 
2,689,356 28 30 40 
2,689,356 283040 
41,624,679 3140 
41,623,419 3140 
43,428,580 40 
43,061,456 40 
- 4,659,439 32 
22,316 4,659,439 32 
- 1,420,409 28 33 40 
- 1,420,409 28 33 40 
2,602,504 47,238,354 3440 
2,616,786 47,238,354 3440 
34-18

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
San Rafael 
Canal, CA 
San Rafael 
Creek, CA 
Santa Cruz 
Harbor, CA 
(Federal Funds) 
(Contrib. Funds) 
6. Sonoma Baylands 
Wetlands Demo 
Project, CA 
(Contrib.. Funds) 
Suisun Bay 
Channel, CA 
Suisun Channel, CA 
Upper Guadalupe 
River, CA 
(Contrib. Funds) 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
Maint. 
Aprop. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
458,000 (37,000) 
404,344 42,351 
(1,000) (2,000) 2,180,000 
- - 2,179,197 
- - - - 32,359 40 47 
- - - - 32,359 40 47 
66,089 1,222,602 476,413 100,778 6,837,042 40 46 
16,744 1,149,852 535,858 163,428 6,837,042 40 46 
4,126,808 52 
- - - 4,126,808 52 
- - - - 160,000 35 
- - - - 160,000 35 
18,771 
18,771 
(932,400) 
1,026,189 
319,000 
90,198 
4,690 
4,690 
500,000 
872,566 
231,090 
33,205 
33,205 
720,000 
707,798 
75,000 
8,567 
65,563 9,832,217 40 53 
65,563 9,832,217 40 53 
69,876 
97,560 
70,908 
1,101,104 178,400 3,299,252 1,664,500 
960,823 320,469 3,142,611 1,832,423 
98,481 75,505 
98,481 75,505 
- 100,217 
- 100,217 
50,000 233,000 
4,185 261,202 
- 385,000 
- 284,088 
6,320,100 
6,312,064 
901,560 
796,980 
200,928 36 
200,928 36 
14,030,496 37 
14,016,894 37 
217,677 38 
217,677 38 
2,991,231 39 
2,991,231 39 
283,000 
265,387 
385,000 
284,088 
1. Includes $641,800 for jetties, bulkheads, 
main Bodega Bay Channel and turning basin 
completed in 1943. 
2. Includes $585,000 for Preconstruction 
Planning ($456,000 Construction, General funds 
and $129,000 General Investigation funds). 
3. Includes $585,000 Preconstruction 
Planning costs ($456,000 Construction General 
costs and $129,000 General Investigation costs). 
4. Includes $798,163 for reconnaissance and 
condition surveys, FY 1956-1999. Excludes 
contributed funds of $385,134. 
5. Excludes contribution funds of $2,000. 
6. Excludes contributed funds of $271,116 
and $2,138 surplus material from Corps military 
activities. 
7. Excludes contributed funds of $44,340. 
Includes $689,199 for reconnaissance and 
condition surveys, FY 1956-1999. 
8. Excludes $2,000 contributed funds in lieu 
of royalty-free rock. 
9. Includes $2,261,371 for previous project. 
Excludes $95,000 contributed funds for existing 
project. 
10. Includes $98,206 for previous project and 
$26,457 for reconnaissance and condition surveys, 
FY 1956-1999. 
11. Excludes $5,337 previous project costs. 
12. Excludes $8,539 surplus material from 
Corps' military activities. Includes $279,357 for 
reconnaissance and condition surveys, FY 
1956-1999. Excludes contributed funds of 
$180,200. 
13. Excludes previous project costs. 
14. Includes $943,187 for reconnaissance and 
condition surveys, FY 1956-1999. Excludes 
$492,788 contributed funds. 
34-19 
I

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
15. Includes $11,985 for previous project. 
Excludes $7,180 contributed funds for previous 
project. 
16. Includes $4,145,000 for Preconstruction 
Planning ($3,565,000 for Breakwater of which 
$500,000 allocated under Construction, General 
and $3,065,000 under General Investigations); 
($580,000 for Channel Extension of which 
$165,000 allocated under Construction, General 
and $415,000 under General Investigations). 
17. Includes $4,112,031 Preconstruction cost 
($3,532,031 for Breakwater of which $500,000 was 
under Construction, General and $3,032,031 
under General Investigations); ($580,000 for 
Channel Extension of which $165,000 was under 
Construction, General and $415,000 under 
General Investigations). 
18. Includes $32,097 for previous project and 
$202,279 for reconnaissance and condition 
surveys FY 1956-1999. Excludes contributed 
funds of $820 for previous project. 
19. Excludes contributed funds of $4,000 in 
lieu of providing dike disposal areas on existing 
project. 
20. Excludes contributed funds of $1,700. 
21. Includes $2,899,232 for previous projects. 
Excludes $397,266 contributed funds on previous 
projects. 
22. Includes $684,028 for previous projects 
and $136,234 for reconnaissance and condition 
surveys, FY 1956-1999. 
23. Includes $212,083 for previous project. 
Excludes contributed funds of $15,559 for previous 
project. 
24. Includes $314,692 for previous project and 
$366,024 for reconnaissance and condition 
surveys FY 1956-1999. Excludes contributed 
funds of $192,424. 
25. Includes previous project costs $31,443. 
Excludes $119,572 contributed funds for existing 
project. 
26. Includes $711,896 for reconnaissance and 
condition surveys, FY 1956-1999. 
27. Excludes contributed funds of $524,778. 
Includes $105,000 Public Works Administration 
funds. 
28. Excludes modification authorized October 
27, 1965, under project "San Francisco Bay to 
Stockton, CA (John F. Baldwin and Stockton Ship 
Channels)." 
29. Excludes $115,536 contributed funds. 
Includes $178,336 for reconnaissance and 
condition surveys, FY 1956-1999. 
30. Includes $1,030,399 for previous projects. 
Excludes $134,591 contributed funds for existing 
project. Includes $193,000 Public Works 
Administration funds. 
31. Includes $475,321 for previous projects 
and $813,611 for reconnaissance and condition 
surveys, FY 1956-1999. 
32. Authorized by FC Act of 1965 (Sec. 201); 
Maintenance R&H Act of 1970 (Sec. 103). 
Includes $321,488 for reconnaissance and 
condition surveys FY 1979-1999. See FY 1977 
Annual Report for last full report. Excludes 
contributed funds of $879,454. 
33. Includes $1,086,703 for previous projects. 
34. Includes $1,359,380 for previous projects 
and $66,236 for reconnaissance and condition 
surveys, FY 1956-1999. 
35. Excludes $810,046 contributed funds on 
previous project. 
36. See Sacramento District FY 1974 Annual 
Report for detail. 
37. Project maintenance responsibility to Point 
Edith was transferred to San Francisco District 
January 1, 1974. Excludes Sacramento District's 
portion. Includes $48,735 for reconnaissance and 
project condition surveys, FY 1976-1999. 
38. Project maintenance assigned to San 
Francisco District from Sacramento District 
January 1, 1974. See Sacramento District 1972 
Annual Report for full report. 
39. Includes $735,406 for reconnaissance and 
condition surveys, FY 1978-1999. Includes 
$727,510 for previous project. Excludes $121,386 
contributed funds. 
40. See FY 1981 Annual Report for last full 
report. 
41. Excludes Contributed Funds of $709,624. 
42. See Sacramento District FY 1985 Annual 
Report for full report. 
43. Excludes $100,000 contributed funds and 
$105,000 contributed in lieu of royalty-free rock. 
44. See FY 1979 Annual Report for last full 
report. 
45. Includes $199,330 for reconnaissance and 
condition surveys, FY 1970-1999. 
46. Includes $402,221 for reconnaissance and 
condition surveys, FY 1970-1999. Excludes 
$93,500 contributed funds. 
47. Excludes $41,094 contributed funds. 
48. Includes $9,199 000 funds of which 
$8,499,000 was under Construction, General and 
$700,000 under General Investigations. 
49. Includes $9,199,000 costs of which 
$8,499,000 was under Construction, General and 
$700,000 under General Investigations. 
50. See FY 1987 Annual Report for last full 
report. 
51. Includes $65,458 for reconnaissance and 
condition surveys, FY 1989-1999. 
52. See FY 1988 Annual Report for last full 
report. 
53. Includes $149,875 for reconnaissance and 
condition surveys, FY 1993-1999. 
54. Excludes $5,598,000 contributed funds: 
$400,000 for recreation facilities at completed 
projects funded under Public Works Acceleration 
Program; and $1,628,411 for recreation facilities 
at completed projects funded under Code 711 at 
Coyote Valley Dam, Lake Mendocino. 
55. Includes $94,459 special recreation use 
fees and costs (FY 1982-1983), but excludes prior 
special recreation fees and cost for Coyote Valley 
Dam, Lake Mendocino. 
56. Includes $251,911 contributed funds, 
other from City of Ukiah for Coyote Valley Dam, 
Lake Mendocino, hydropower studies; and 
$338,000 from California Department of Boating 
and Waterways for launching facility at Lake 
Mendocino. 
57. Includes $250,117 contributed funds, 
other, costs for Coyote Valley Dam, Lake 
Mendocino, hydropower studies; and $320,657 for 
California Department of Boating and Waterways 
for launching facility at Lake Mendocino. 
58. Includes $253,421,793 previous San 
Francisco construction funds and costs through 
August 1983 for Dry Creek, Warm Springs Dam. 
34-20

SAN FRANCISCO, CA, DISTRICT 
59. Includes $964,114 previous San Francisco 
maintenance funds and costs through April 1982 
for Dry Creek, Warm Springs Dam. 
60. Includes $208,074 contributed funds, 
other, from Sonoma County for Dry Creek, Warm 
Springs, hydropower studies; and $22,500 from 
City of Ukiah for hatchery pump design at Lake 
Mendocino. 
61. Includes $208,074 contributed funds, 
other, costs for Dry Creek, Warm Springs 
hydropower studies; and $20,658 costs for 
hatchery pump design. 
62. Includes $7,303,725 San Francisco District 
construction funds and costs for Corte Madera 
Creek. 
63. $8,695 contributed funds transferred to 
Sacramento District in FY 1983. Includes $97,400 
San Francisco District required contributed funds 
and costs. 
64. Contributed funds, other, and costs, from 
Marin County including $536,921 for 
miscellaneous bridge and road relocations and 
$267,840 for additional expenses for disposal sites 
at Corte Madera Creek. 
65. See FY 1998 Annual Report for last full 
report. 
34-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 34-B AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
1. CRESCENT CITY HARBOR, CA 
Jul. 18, 1918 A breakwater bearing S. 26-1/4 E. from Battery Point 
to Fauntleroy Rock and breakwater from the shore to 
Whaler Island. 
Sep. 22, 1922 Modified condition of local cooperation which required 
that local interests construct a railroad from Grants 
Pass, Oregon to Crescent City so that a State Highway 
to Grants Pass would be an acceptable alternate. 
Jan. 21, 1927 Extension of the breakwater to a length of 3,000 feet 
and a reduced cash contribution required of local 
interests. 
Aug. 30, 1935 Maintaining by dredging of an outer harbor basin, 
1,800 feet long, 1,400 feet wide and 20 feet deep, 
except in rock. 
Aug. 26, 1937 Construction of a sand barrier from Whaler Island to 
the mainland and for maintenance dredging in the 
vicinity of the seaward end of the sand barrier. 
Mar. 2, 1945 Extension of existing breakwater 2,700 feet to Round 
Rock (modified by Chief of Engineers, 1952). 
Mar. 2, 1945 Construction of inner breakwater and removal of 
pinnacle rock and other material from the harbor to a 
depth of 12 feet and a harbor basin with a project depth 
of 10 feet. 
Oct. 27, 1965 Extension of inner breakwater and dredging of T-shaped 
harbor basin to depth of 20 feet. 
HUMBOLDT HARBOR, CA 
Mar. 3, 1881 Channel 10 feet deep by 350 feet wide to be dredged 
along Eureka waterfront, thence 8 feet deep by 200 
feet wide west to natural channel; dredging Mad 
River Shoal to 8 feet deep. 
Jul. 5, 1884 Construct South Jetty and continue channel 
improvements. 
Aug. 5, 1886 $75,000 continued improvement of Harbor with 
provision for title to 12 acres of land to be 
conveyed to the U.S. 
Jul. 3, 1892 Map and cost estimates for continuing Harbor 
improvements with provision for two parallel 
jetties. 
Mar. 3, 1899 Continuing Harbor improvements with provision 
for two parallel jetties. 
Jun. 25, 1910 Rebuilding the jetties and channel improvements 
to Arcata and Hookton. 
Jul. 3, 1930 Eureka Channel 20 feet deep and 300 feet wide; 
Samoa Channel 20 feet deep and 250 feet wide; 
Arcata Channel 18 feet deep and 150 feet wide; 
Fields Landing Channel 20 feet deep and 250 feet wide. 
Aug. 30, 1935 Entrance Channel 30 feet deep and 500 feet wide. 
Aug. 26, 1937 Eureka Channel 26 feet deep and 400 feet wide; 
Samoa Channel 26 feet deep and 300 feet wide; 
Fields Landing Channel 26 feet deep and 300 feet wide; 
34-22 
H. Doc. 434, 64th 
Cong., 1st sess. 
Rivers & Harbors 
Committee Doc. 4, 
67th Congress, 2nd 
sess. 
H. Doc. 595, 69th 
Cong., 2nd sess. 
Rivers & Harbors 
Committee Doc. 
40, 74th Cong. 
Senate Committee 
Print, 75th Cong., 
1st sess. 
H. Doc. 688, 76th 
Cong., 3rd sess. 
Report on file in 
office, Chief of 
Engineers. 
H. Doc. 264, 89th 
Cong., 1st sess. 
H. Doc. 59 
Cong., 3rd sess. 
River & Harbor 
Approp Act of 1884 
River & Harbor 
Approp Act of 1886 
Chief of Engrs 
Annual Report 
(p.3120) Annual 
River & Harbor, 
Approp Acts 1892- 
1899 
H. Doc. 528, 55th 
Cong., 2nd sess. 
H. Doc. 950, 60th 
Cong., 1st sess., 
H. Doc. 204, 61st, 
Cong., 2nd sess., 
H. Doc. 326, 61st 
Cong., 2nd sess. 
H. Doc. 755, 69th 
Cong., 2nd sess. 
Rivers and Harbors 
Committee Doc. 14 
74th Cong.,1st sess 
Rivers & Harbors 
Committee, Doc. 
11, 75th Cong., 1st 
2.

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-B (Cont'd) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Turning Basin (off Fields Landing wharf) channel 
26 feet deep, 600 feet wide and 800 feet long. 
Jul. 16, 1952 Bar & Entrance Channel 40 feet deep, tapered from 
1,600 feet to 500 feet wide; North Bay Channel 30 feet 
deep and 400 feet wide; Eureka Channel 30 feet deep 
to mile 5.0; Samoa Channel 30 feet deep. 
August 1968 North Bay Channel 35 feet deep; Samoa Channel 35 
feet deep; widen turns at mile 0.75 and 2.6; provide 
a 1,200 by 1,200 foot anchorage in North Bay. 
Oct. 12, 1996 Bar and Entrance Channel 48 feet deep; North Bay 
Channel, Samoa Channel and Samoa Turning Basin 
38 feet deep; widen the north side of the Entrance 
Channel an additional 200 to 275 feet; relocate the 
southern edge of the Entrance Channel away from the 
South Jetty and to the north by 100 feet; and widen 
and realign the entrance to the Samoa Turning Basin. 
OAKLAND HARBOR, CA 
June 23, 1874 Jetties. 
June 25, 1910 North channel in Brooklyn Basin, 25 feet deep, 
and tidal canal to 18 feet. 
Sep. 22, 1922 Channel across shoal southeast of Yerba Buena 
Island and thence to Webster St.; South 
channel in Brooklyn Basin; Turning Basin at 
east end of Brooklyn Basin; and channel in 
Tidal Canal from Brooklyn Basin to Park St., 
30 feet deep. 
Jan. 21, 1927 2 Channel from Webster St. to Brooklyn Basin, 
maintain area to within 75 feet of pierhead 
line south of channel from Harrison St. to 
Harbor Line Point 119 in Brooklyn Basin; 
dredge a triangular strip about 2,700 feet long 
and maximum width of 300 feet at western 
end of Brooklyn Basin, 30 feet deep. 
Apr. 28, 1928 Local cooperation requirements modified to 
provide alteration or replacement of bridges by 
local interests shall apply only to that feature of 
project covering deepening tidal canal to 25 feet. 
Drawbridges across Tidal Canal were required by 
1882 Decree of Court in condemnation proceedings 
whereby title was obtained to rightof-
way for tidal canal. 
July 3, 1930 Entrance channel to outer harbor, 800 to 600 
feet wide. 
Mar. 2, 1945 Eliminated requirement that local interests contribute 
10 cents per cubic yard toward deepening 
tidal canal. 
Mar. 2, 1945 Maintenance of 35-foot depth in channel to outer 
harbor and in outer harbor channel and turning 
basin. 
Oct. 23, 1962 3 Deepen inner harbor 35-foot channels and lower 
1,300 feet of north channel in Brooklyn Basin 
to 35 feet. 
Nov. 17, 1986 Deepen Inner and Outer Harbor channels to 42 
feet. Widen entrance channel to 1,000 feet; 
sess. 
Rivers & Harbors 
Committee Doc. 
143, 82nd Cong., 
1st sess. 
H. Doc. 330, 90th 
Cong., 2nd sess. 
1996 WRDA, Public 
Law 104-303, 
Section 101 
Annual Report, 
Part II, 1874, 
Ip. 378. 
. Doc. 647, 61st 
Cong., 2d sess. 
H. Doc. 144, 67th 
Cong., 2d sess. 
H. Doc. 407, 69th 
Cong., 1st sess. 1 
Public Res. 28, 
70th Cong. 
Rivers and Harbors 
Committee Doc. 
43, 71st Cong., 2nd 
sess. 
H. Doc. 466, 77d 
Cong., 1st sess. 
Report on File in 
Office, Chief of 
Engineers 
H. Doc. 353, 87th 
Cong., 2d sess. 1 
1986 WRDA, Public 
Law 99-662 
34-23 
3.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 34-B (Cont'd) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
relocate Outer Harbor turning basin 3,000 feet 
westward and widen turning basin to 1800 feet. 
Construct 1,200 foot turning basin in Inner 
Harbor. 
Aug. 8, 1917 
July 3, 1930 
Aug. 30, 193; 
June 20, 193 
Mar. 2, 1945 
Sep. 3, 1954 
Oct. 27, 1965 
Nov. 17, 198' 
Oct. 23, 1962 
Nov. 7, 1966 
4. 
CORTE MADERA CREEK, CA 
Levees and channel improvements, lower 11 miles 
of Corte Madera Creek and tributaries, as modified 
by Chief of Engineers. 
Local cooperation requirements modified to provide 
1.5 percent cash contribution toward cost of Ross 
Valley unit. 
RICHMOND HARBOR, CA 
Channel 24 feet deep and 600 feet wide from San 
Francisco Bay to Ellis Slough (Santa Fe Channel); 
a turning basin at Point Potrero; a training wall. 
A 30-foot channel with lessened widths; a turning 
basin at head of navigation. 
5 4 Increase project widths in inner harbor, maintenance 
of Santa Fe channel to 30 feet; approach areas 
in outer harbor to 32 feet. 
8 Widen channel at Point Potrero and north thereof; 
enlarge and maintain to 30-foot depth turning 
basin at Terminal No. 1. 
Channel 20 feet deep, 150 feet wide, in San Pablo 
Bay north of Point San Pablo. 
Channel 35 feet deep and 600 feet wide adjacent 
to Southampton Shoal; enlarge and deepen to 35 
feet approach area to Richmond Long Wharf; 
widen and deepen inner harbor and entrance 
channels; deepen turning basin at Point Richmond 
and southerly 2,000 feet of Santa Fe Channel. 
Eliminate restriction that widening north of 
Point Potrero will not be undertaken until local 
interests furnish assurances industries will avail 
themselves of improved navigation facilities. 
and reclamation of Reservation Point. 
West Richmond channel 45 feet deep, 600 feet 
wide; enlarge and deepen to 45 feet maneuvering 
area at Richmond Long Wharf (Sacramento Dist. 
"San Francisco Bay to Stockton, Calif. (John 
F. Baldwin and Stockton Ship Channels)"). 
6 Deepen channel to 38 feet between Richmond 
Long Wharf and Santa Fe Channel. Construct 
1,200 feet turning basin. 
SONOMA BAYLANDS WETLANDS 
DEMONSTRATION PROJECT, CA 
Restoration of tidal wetland on a 348-acre site using 
dredged material and construction of a replacement 
levee around the landward periphery of the site. 
34-24 
H. Doc. 515, 63rd 
Cong., 2d sess. 
Rivers and Harbors 
Committee Doc. 
16, 70th Cong., 1st 
sess. 
Rivers and Harbors 
Committee Doc. 7, 
73rd Cong., 1st 
sess., and 10, 74th 
Cong., 1st sess. 
H. Doc 598, 75th 
Cong., 3rd. sess. 
H. Doc. 715, 76th 
Cong., 3rd. sess. 
H. Doc. 395, 83rd 
Cong., 2nd sess. 
H. Doc. 208, 89th 
Cong., 1st sess. 1 
1986 WRDA, Public 
Law 99-662 
Section 106, 
1992 WRDA, 
Public Law 
102-580 
H. Doc. 545, 87th 
Cong., 2nd sess. 
Sec. 204, 1966 
Flood Control Act 
6. 
Oct. 5, 1992 
12.

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-B (Cont'd) AUTHORIZING LEGISLATION 
See Date of 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
Nov. 17, 1986 Modify existing project to direct construction of Unit Sec. 823, 1986 
4 from Lagunitas Road Bridge to Sir Francis Drake WRDA 
Boulevard, and to include construction of floodproofing 
measures in vicinity of Lagunitas Road Bridge to 
insure proper functioning of completed portions of 
authorized project. Further modify project to eliminate 
any channel modifications upstream of Sir Francis 
Drake Boulevard. 
13. PETALUMA RIVER, PETALUMA, CA 
Jun. 30, 1948 Floodwalls and channel improvements along 3,600 feet Flood Control Act 
of the Petaluma River and tributaries. of 1948, Public 
Law 80-858, 80th 
Cong., 2nd sess. 
14. RUSSIAN RIVER BASIN, CA 
May 17, 1950 Coyote Valley Dam (Lake Mendocino): Channel H. Doc. 585, 81st 
improvements on lower 98 miles of Russian River Cong., 2d sess. 
and lower reaches of tributaries. 
Feb. 10, 1956 Increased appropriation authorization for initial PL 404, 84th Cong., 
stage of project development. 2d sess. 
Oct. 23, 1962 Dry Creek (Warm Springs) Lake; Channel H. Doc. 547, 87th 
Improvements on Dry Creek below dam. Cong., 2d sess. 
Mar. 7, 1974 Dry Creek (Warm Springs) Lake and channel; Sec. 95, 1974 
compensate for fish losses on the Russian River WRDA 
which may be attributed to the operation of the 
Coyote Dam component of the project through 
measures such as possible expansion of the 
capacity of the fish hatchery at the Warm 
Springs Dam component of the project. 
1. Contains latest published map. 
2. Included deepening of tidal canal above 
Park Street Bridge to 25 feet, which was 
deauthorized November 6, 1977. 
3. Reconstruction of Fruitvale Avenue 
Highway Bridge (S. Doc. 75, 87th Cong., 2d sess.) 
which was deauthorized November 6, 1977. 
4. Included in part in Public Works 
Administration Program, September 6, 1933. 
34-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 34-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Berkeley Harbor, CA 1 Completed 1966 $ 155,550 2 $92,512 9 
Berkeley Marina, CA 1 Completed 1979 505,201 3 
Monterey Harbor, CA Completed 1971 1,108,182 4 1,956,552 5 
San Francisco Harbor (Islais 
Creek), CA 1 Completed 1976 848,227 7 148,451 
San Francisco Marina (Gas 
House Cove), CA Completed 1974 180,472 6 88,174 10 
San Leandro Marina (Breakwater), 
CA 1 Completed 1976 210,390 8 108,561 12 
Sausalito Canal, Richardson 
Bay, CA Inactive 1963 103,095 131,409 13 
1. Authorized by Chief of Engineers (Sec. 7. Includes $94,550 preauthorization costs. 
107, Public Law 86-645). 8. Includes $72,000 preauthorization costs 
2. Excludes $155,551 contributed funds. and excludes contributed funds $138,189. 
3. Excludes $378,989 contributed funds. 9. Includes $92,512 for jetty condition 
4. Includes $207,800 Public Works surveys for FY 1987-1999. 
Administration funds and breakwater 10. Includes $88,174 for reconnaissance and 
modifications (1960 Act) placed inactive 1974. condition survey for FY 1990-1999. 
The barrier groin and sandtrap feature of the 11. Includes $148,451 for reconnaissance and 
project was deauthorized November 17, 1986, by condition survey for FY 1994-1999. 
WRDA of 1986. 12. Includes $108,561 for reconnaissance and 
5. Includes $502,318 for reconnaissance and condition survey through FY 1999. 
condition survey for FY 1956-1999. 13. Includes $61,244 for reconnaissance and 
6. Includes preauthorization costs $26,855 condition survey through FY 1999. 
and excludes contributed funds $153,618. 
TABLE 34-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Humboldt Bay (Buhne Point), CA 1958 Jan. 1, 1990 $ 2,000 - 
Lower San Francisco Bay, CA 1935 Jan. 1, 1990 - 
Knights Valley Lake, R.R. 
Basin, CA 1974 Aug. 5, 1977 
Oakland Harbor, CA (Deepen 
Tidal Canal) 1981 Nov. 6, 1977 
Oakland Harbor, CA (Fruitvale 
Avenue Bridge) 1981 Nov. 6, 1977 
San Lorenzo Creek, CA 
(Upper Portion) 1962 Nov. 6, 1977 
San Pablo Bay and Mare 
Island Strait, CA (Approaches 
to Vallejo and South Vallejo) 1982 Nov. 6, 1977 - 
Santa Cruz County, CA 1966 Jan. 1, 1990 245,639 - 
34-26

SAN FRANCISCO, CA, DISTRICT 
TABLE 34-H INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
(See Section 10 of Text) 
Location Dates of Inspection 
Alameda Creek Apr 1999 
Corte Madera Creek Apr 1999 
Coyote Creek, Marin County Apr 1999 
Coyote Creek, Santa Clara County Apr 1999 
Dry Creek Jun 1999 
East Weaver Creek Jun 1999 
Eel River at Sandy Prairie Jun 1999 
Guadalupe River Jul 1999 
Klamath River Jun 1999 
Mad River at Blue Lake Jun 1999 
Pajaro River, Monterey County Mar 1999 
Pajaro River, Santa Cruz County Mar 1999 
Pinole Creek Apr 1999 
Redwood Creek Jun 1999 
Rheem Creek Apr 1999 
Rodeo Creek Apr 1999 
Russian River, Mendocino County Jun 1999 
Russian River, Sonoma County Jun 1999 
San Leandro Apr 1999 
San Lorenzo Creek Apr 1999 
San Lorenzo River Jul 1999 
San Pablo Creek Apr 1999 
Uvas Creek Apr 1999 
Wildcat Creek Aug 1999 
34-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 34-I RUSSIAN RIVER BASIN, CA: ESTIMATED 
COST FOR NEW WORK 
(See Section 15 of Text) 
Estimated Cost 
Non-Federal 
Project Feature Federal Contribution Total 
Coyote Valley Dam (Lake Mendocino): 
Channel Improvements below Dam 
on lower 98 miles of Russian River $ 14,436,000 $ 5,598,000 $ 20,034,000' 
Dry Creek (Warm Springs) Lake and 
Channel Improvements below Dam 259,240,000 103,777,000 2 363,017,000 
Total $273,676,000 109,375,000 $ 383,051,000 
1. Exclusive of $1,628,000 for recreation supply storage to be paid over a period not to 
facilities at completed projects. exceed 50 years after use of storage is initiated 
2. Reimbursements by local interests to and inclusive of lands and damages. 
Federal Government for costs allocated to water 
TABLE 34-J RUSSIAN RIVER BASIN, CA: PROJECT 
FEATURES AND ESTIMATED COST 
(See Section 15 of Text) 
Height of 
Nearest City Distance Dam and Capacity Estimated 
Name (California) Above Mouth Type (Acre-Ft) Cost 
Coyote Valley Dam (Lake Mile 0.8 East Fork 160 Feet- 
Mendocino) Ukiah of Russian River Earthfill 122,500 $ 17,550,000 1 
Channel Improvements (East Mile 0 to 0.8 East 
Fork) Ukiah Fork - - 2,484,000 
below Coyote Valley Dam 
and lower 98 miles of Mile 0 to 98, Russian 
Russian River Guerneville River - 
319 Feet- 
Dry Creek (Warm Springs) Healdsburg Mile 14.4 Dry Creek Earthfill 181,000 363,017,000 
Channel Improvements (Dry 
Creek) below Dry Creek Mile 1 to 14.4 Dry 
(Warm Springs Dam) Healdsburg Creek - - 2,864,000 
1. Exclusive of $1,628,000 for recreation 
facilities at completed projects. 
34-28

SACRAMENTO CA, DISTRICT *
This district comprises basins of Suisun Bay and San 
Joaquin and Sacramento Riv-ers in California; Goose 
Lake in Oregon; basins of the Great Salt Lake and 
Sevier Lake in Utah; an intervening portion of Great 
Basin in northern Nevada, northern California, and 
southeastern Idaho; and the upper Colorado River 
basin, which is in southwestern Wyoming, eastern 
Utah, northeastern Arizona and western Colorado, 
west of the Continental Divide. 
IMPROVEMENTS 
Navigation Page 
1. Sacramento River, CA ........ ..............35-2 
2. Sacramento River, Deep Water 
Ship Channel, CA ................................ 35-3 
3. San Francisco Bay to Stockton, CA 
(John F. Baldwin and Stockton 
Ship Channels) .................................. 35-4 
4. San Joaquin River, CA ......................... 35-4 
Flood Control 
5. American River Watershed, CA 
(Common Elements) ............................ 35-5 
6. Buchanan Dam-H.V. Eastman Lake, 
Chowchilla River, CA .......................... 35-5 
7. Cache Creek Settling Basin, CA ............. 35-6 
8. Calaveras River and Littlejohn Creek and 
Tributaries, including New Hogan Lake 
And Farmington Dam, CA..................... 35-7 
9. Colorado River at Grand Junction, CO ....... 35-8 
10.Corte Madera Creek, CA ...................... 35-9 
11. Coyote and Berryessa Creeks, CA............35-9 
12. Fairfield Vicinity Streams, CA ............ 35-10 
13. Guadalupe River, CA ......................... 35-10 
14. Hidden Dam-Hensley Lake, Fresno 
River, CA ............. ........ ..... 35-11 
15. Isabella Lake, Kern River, CA ............ 35-11 
16. Kaweah and Tule Rivers, including 
Terminus Dam and Success Lake, CA...... 35-13 
17. Little Dell Lake, UT ........................... 35-14 
18. Martis Creek Lake, Martis Creek 
NV and CA ............................... 35-15 
19. Merced County Streams .................... 35-16 
20. Merced County Stream Group, CA ......... 35-17 
21. Pajaro River, CA .................... ......... 35-17 
22. Pine Flat Lake and Kings River, CA ....... 35-17 
23. Redbank and Fancher Creeks, CA .......... 35-19 
24. Russian River Basin, including Dry Creek 
(Warm Springs Lake) and Lake 
Mendocino (Coyote Valley Dam), CA...... 35-20 
25. Sacramento River and Tributaries, CA 
from Collinsville to Shasta Dam ............. 35-21 
26.San Lorenzo, CA ............................ 35-23 
Flood Control (Cont'd) Page 
27. Upper Jordan, UT .......................... 35-24 
28. Walnut Creek, CA .......................... 35-25 
29. West Sacramento, CA ...................... 35-26 
30. Wildcat and San Pablo Creeks, CA......... 35-26 
31. Inspection of Completed Flood 
Control Projects ............................. 35-27 
32. Flood Control Work under Special 
Authorization ................................ 35-28 
33. Scheduling Flood Control 
Reservoir Operations ........................ 35-28 
Multiple-Purpose Projects Including Power 
34. New Melones Lake, CA ................. 35-28 
General Investigation 
35. Surveys ....................................... 35-30 
36. Collection and Study of Basic Data ....... 35-30 
37. Research and Development ................ 35-30 
38. Preconstruction Engineering & Design .... 35-30 
39. Other Work under Special Authority ....... 35-31 
Tables Page 
Table 35-A Cost and Financial 
Statement ....................... 35-33 
Table 35-B Authorizing 
Legislation.................. 35-44 
Table 35-C Other Authorized 
Navigation Projects ......... 35-47 
Table 35-D Not Applicable 
Table 35-E Other Authorized Flood 
Control Projects .......... 35-48 
Table 35-F Not Applicable 
Table 35-G Deauthorized Projects ........ 35-51 
Table 35-H Sacramento River, CA: 
Tidal and Flood Conditions 
Prevailing..................... 35-52 
Table 35-I San Joaquin River, CA: 
Total Cost of New Work 
For Projects ................. 35-52 
Table 35-J San Joaquin River, CA: 
Project Units (1950 Modification) 
Reclassified and Excluded from 
Project Cost ............... 35-53 
35-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Table 35-K Merced County Stream Group, 
CA, Maximum Inflow, Storage, 
And Outflow for Projects .... 35-53 
Table 35-L Russian River Basin, CA: 
Estimated 
Cost for New Work ........... 35-54 
Table 35-M Russian River Basin, CA: 
Project Features and 
Estimated Costs .............. 35-54 
Table 35-N Sacramento River and 
Tributaries, CA, Collinsville 
To Shasta Dam: Project Units 
Units Reclassified and Excluded 
From Cost Estimate ......... 35-55 
Table 35-0 Sacramento River and 
Tributaries, CA, from Collinsville 
To Shasta Dam: Construction 
Accomplished and Contract 
Costs ................. ..... 35-55 
Table 35-P Flood Control Work Under 
Special Authorization Flood 
Control Activities Pursuant 
To Section 205, Public Law 
80-858, as Amended 
(Preauthorization) ............. 35-56 
Table 35-Q Aquatic Ecosystem Restoration 
Under Special Authorization 
Pursuant to Section 206, Public 
Law 104-303 ................... 35-56 
Table 35-R Snagging and Clearing Under 
Special Authorizatin Pursuant to 
Section 208, 1954 Flood Control 
Act Public Law 83-790 ...... 35-57 
Table 35-S Surveys........................ 35-57 
Table 35-T Emergency Streambank and 
Shoreline Protection ............. 35- 
Navigation 
1. SACRAMENTO RIVER, CA 
Location. Rises in Trinity Mountains in 
north-central California, flows generally southerly 
about 374 miles and empties into Suisun Bay, an arm of 
San Francisco Bay, at Collinsville, CA. (See Geological 
Survey topographic map of Sacramento Valley, CA.) 
Previous projects. For details see page 1985 of 
Annual Report for 1915 and page 1708 of Annual 
Report for 1938. 
Existing project. For description of Sacramento 
Deep Water Ship Channel, see Annual Report for 1969. 
Total first cost for completed portion was $43,932,558 
($39,560,558 Federal (Corps), $300,000 (Coast 
Guard), and $4,072,000 non-Federal for lands and 
damages, including relocations) and excludes local 
Interests cost $10,741,000 (June 1963) for 30-foot deep 
connecting canal basic terminal facilities required under 
terms of project authorization. Project also provided 
for a shallow-draft channel 10 feet deep at mean lower 
low water 150 to 200 feet bottom width, from Suisun 
Bay to Sacramento, CA, 60 miles; a depth of 6 feet at 
low water between Sacramento and Colusa, 85 miles; 
a depth of 5 feet at low water between Colusa and 
Chico Landing, 50 miles; and such depths as 
practicable between Chico Landing and Red Bluff, 53 
miles, a total distance of 248 miles. However, 
shallow-draft channel feature Colusa to Red Bluff 
(including Colusa to Chico Landing, 50 miles and 
Chico Landing to Red Bluff, 53 miles) was 
deauthorized by 1986 Water Resources Development 
Act on November 17, 1986 (Public Law 99-662). (See 
table 35-H on tidal and flood conditions prevailing.) 
Local cooperation. Fully complied with for deep 
water ship channel project. None required on 
shallow-draft feature. 
35-2

SACRAMENTO, CA DISTRICT 
Terminal facilities. Piers, wharves, and docks at Port 
of Sacramento for shallow-draft navigation are 
open-pile structures with timber decks, some of which 
are designed to meet extreme high waters of flood 
stages. All main wharves at Sacramento have rail 
connections. Three of above facilities are owned by city 
of Sacramento and remainder by private interests; all 
are privately operated. For full description see "Port 
and Terminal Facilities at the Ports of Sacramento, 
Stockton, Pittsburg and Antioch, Calif., 1986." Deep 
water terminal facilities comprise wharves and piers, 
administration and storage buildings, and belt railroad 
facilities. Majority of these facilities are owned and 
operated by Sacramento-Yolo Port District; remainder 
are privately owned and operated. Facilities are 
considered adequate for existing commerce. 
Operations during fiscal year. New work, Deep 
Water Ship Channel: None. Maintenance: Shallow 
Draft Channel: Maintenance and operation activities 
continued in Sacramento River, Sacramento upstream 
to Colusa. Deep Water Ship Channel: Maintenance and 
operation activities continued. 
Historical summary. Construction of 7-foot 
shallow-draft channel below Sacramento was initiated 
in September 1899 and completed in 1904. Modified 
10-foot shallow-draft channel up to Sacramento was 
initiated in FY 1928 and completed in 1931. 
Shallow-draft channel above Sacramento was begun in 
April 1946 but new work was discontinued when about 
48 percent complete. In February 1974, remaining 
work for shallow-draft portion of project, provision of 
a 5-foot depth between Colusa and Chico Landing (50 
miles), was reclassified as "deferred." Channel is 
navigable all year; however, there is no regular 
navigation above Colusa, 145 miles above river mouth. 
On November 17, 1986, remaining shallow-draft 
feature, Colusa to Red Bluff (including Colusa to Chico 
Landing, 50 miles and Chico Landing to Red Bluff, 53 
miles) was deauthorized by 1986 Water Resources 
Development Act (Public Law 99-662). Construction 
of 30-foot deep water ship channel was initiated in July 
1949; improvement dredging by continuing contracts 
resulted in provision of an operational facility for 
oceangoing vessels during June 1963. Bascule bridge 
was completed in April 1960, barge lock in August 
1961, barge canal in November 1961, and entire deep 
water ship channel in June 1970. 
2. SACRAMENTO RIVER DEEP WATER 
SHIP CHANNEL, CA 
Location. On the Sacramento River between 
Collinsville and the Port of Sacramento, a distance of 
about 43 miles, in the counties of Sacramento, 
Contra Costa, Solano, and Yolo, CA. 
Existing project. Project provides for deepening to 
35 feet the Suisun Bay and Sacramento River Deep 
Water Ship Channels from New York Slough to the 
Port of Sacramento, and the Avon to New York Slough 
reach to 35 feet which will be accomplished under the 
San Francisco Bay to Stockton (John F. Baldwin and 
Stockton Ship Channels) project, and widening the 
channel as necessary. 
Current selected plan also provides for a water 
quality monitoring program, and establishment of 
wetland habitat and upland habitat to mitigate for losses 
of such habitat. 
Project estimate (October 1996 price level) is 
$49,500,000 comprising Federal cost (Corps) of 
$24,600,000; Federal cost (Coast Guard) for navigation 
aids $300,000; and non-Federal cost of $24,600,000 
for lands and damages, relocations, and spoil retention 
dikes, including the cash contribution ($8,210,000) that 
local interests must pay. Existing project was adopted 
by Supplemental Appropriations Act of 1985, August 
15, 1985 (Public Law 99-88), 99th Cong., 1st sess. and 
modified by 1986 Water Resources Development Act, 
November 17, 1986 (Public Law 99-662) 99th Cong., 
2d sess. 
Local cooperation. Local interests, through a public 
body legally authorized and financially capable, must 
give assurances they will furnish lands, easements, 
rights-of-way, and dredged material disposal areas; 
modify or relocate buildings, utilities, roads, and other 
facilities where necessary in the construction of the 
project; and provide retention dikes for dredged 
material disposal area; and pay 25 percent of the costs 
allocated to deep draft navigation during construction, 
presently estimated at $8,210,000. A Local 
Cooperation Agreement (LCA) (Sec. 221) was 
executed June 27, 1986. An LCA modification 
necessitated by the Water Resources Development Act 
of 1986 was executed December 6, 1988. Construction 
has been postponed indefinitely until local interests 
develop a financial plan to obtain non-Federal cash 
contribution. 
35-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Terminal facilities. All main wharves at Sacramento 
have rail connections. Three of above facilities are 
owned by city of Sacramento and remainder by private 
interests; all are privately operated. For full description 
see "Port and Terminal Facilities at the Ports of 
Sacramento, Stockton, Pittsburg and Antioch, Calif., 
1986." Deep water terminal facilities comprise wharves 
and piers, administration and storage buildings, and belt 
railroad facilities. Majority of these facilities are owned 
and operated by Sacramento-Yolo Port District; 
remainder are privately owned and operated. Facilities 
are considered adequate for existing commerce. 
Operations and results during fiscal year. Project 
coordination was continued. 
Historical summary. General Design Memorandum 
was approved and Record of Decision was signed in 
May 1987. Local Cooperation Agreement (LCA) 
modification was approved and was signed by Port of 
Sacramento on August 19, 1987. LCA modification 
was executed December 6, 1988. First construction 
contract was awarded February 2, 1989 and completed 
in July 1990; second contract was awarded September 
12, 1990 and completed in August 1991. 
3. SAN FRANCISCO BAY TO STOCKTON, 
CA (JOHN F. BALDWIN AND 
STOCKTON SHIP CHANNELS) 
Reported on by the San Francisco District. Refer to 
Report of the Secretary of the Army on Civil Works 
Activities for FY 1995. 
4. SAN JOAQUIN RIVER, CA 
Location. Rises in east central California and flows 
westerly and northwesterly about 340 miles to its 
confluence with Sacramento River at head of Suisun 
Bay, 48 miles northeast of San Francisco. Deep water 
channel in San Joaquin River extends 41 miles from its 
mouth in Suisun Bay at Pittsburg to city of Stockton. 
Waterborne access to city provided by Stockton 
Channel, an artificial cut extending from river about 2 
miles into city. (See Coast and Geodetic Survey Sheet 
5527.) 
Existing project. For description of completed 
improvement, modifications, and authorizing acts, see 
Annual Report for 1967. (See table 35-I for total cost 
of new work for project completed in May 1960.) 
Projects units (1950 modification) reclassified and 
excluded from project cost are set forth in table 35-J. 
Modification of existing project is included as one 
unit of San Francisco Bay to Stockton, CA, (John F. 
Baldwin and Stockton Ship Channels) project, 
authorized by 1965 River and Harbor Act (H. Doc. 
209, 89th Cong., 1st sess.); this modification is 
reported in detail under Sacramento District, 
improvement No. 3 and San Francisco District, 
Improvement No. 3. 
Local cooperation. Fully complied with for 
completed portion of project; for details of required 
cash contributions on completed, inactive and deferred 
portions of project, see Existing project paragraph, 
Annual Report for 1967. 
Terminal facilities. For description of harbor 
facilities at Port of Stockton, CA, see Port Series 32, 
"The Ports of Sacramento, Stockton, Pittsburg and 
Antioch, Calif.," revised 1986. Downstream from 
Stockton, traffic is accommodated by bank landings 
and sheds except at Antioch and near Pittsburg, where 
there are wharves for shallow- and deep-draft vessels. 
Terminal transfer facilities at public ocean terminal of 
Port of Stockton are adequate for present and 
immediate future. 
Operations and results during fiscal year. 
Maintenance: Condition studies and miscellaneous 
inspections and reports were accomplished by hired 
labor. Dredging was initiated and completed at contract 
cost of $2,870,625. (Repair or restoration of 
wavewash protection is required by legislation 
authorized by Improvement No. 3.) 
Historical Summary. Active portion of existing 
project was completed in May 1960. Construction of 
project was initiated in December 1877. 
35-4

SACRAMENTO, CA DISTRICT 
Flood Control 
5 . AMERICAN RIVER WATERSHED, 
(Common Elements) 
Location. The project is located in Placer, El Dorado, 
and Sacramento Counties on the North, Middle and 
South Forks of the American River and along the lower 
American River and Sacramento Rivers. 
Existing Project. Recent evaluations indicate that the 
level of flood protection along much of the American 
River and in the Natomas area is less than the 100-year 
level. The project consists of levee improvements 
including a slurry wall along 24 miles of the lower 
American River and levee and berm raising along 12 
miles of the Sacramento River, telemetered gages above 
Folsom Dam, and improving the flood warning system 
for the lower American River. Cost estimate (October 
1997) is $63,300,000 (includes an allowance for 
estimated inflation through the construction period), of 
which $47,600,000 is Federal cost and $15,700,000 is 
non-Federal cost (which includes $9,800,000 cash 
contribution). 
Local cooperation. In accordance with cost sharing 
requirements specified in Water Resources Development 
Act (WRDA) of 1986, local interests are required to 
provide lands, easements, rights-of-way, and borrow and 
excavated or dredged material disposal areas; modify or 
relocate utilities, roads, bridges (except railroad bridges), 
and other facilities, and pay 16 percent of the costs 
allocated to flood control to bring the total non-Federal 
share of flood control costs to 25 percent, and bear all 
costs of operation, maintenance, repair, rehabilitation 
and replacement of flood control facilities. The non- 
Federal sponsor has also agreed to make all required 
payments concurrently with project construction. Project 
cooperation agreement (PCA) was signed July 13, 1998. 
Operations and results during fiscal year. First 
construction contract (Howe Avenue to Watt Avenue 
reach) in the amount of $7,058,316 was awarded July 17, 
1998; continued engineering and design for remaining 
contracts. 
Historical summary. The Defense Appropriations Act 
for FY 1993 authorized construction of the Natomas 
feature of the project, which includes levee 
Local interests have also, over a period of years, 
improvements around the perimeter of the Natomas 
basin, a 300-acre detention area in North Natomas, and 
recreation trails. The local sponsor has already 
constructed much of the project. Federal Construction 
General funds were appropriated in FY 1998 to initiate 
reimbursement to the sponsor for the Federal share of 
the project. The Defense Appropriations Act for Fiscal 
Year 1993 also directed the Corps to reevaluate other 
features recommended in the Feasibility Report and a 
Supplemental Information Report (SIR) was completed 
in March 1996. The Chief of Engineer's Report 
recommended implementation of elements common to 
the final candidate plans presented in the SIR. These 
"common elements," were authorized for construction in 
WRDA 96 and Federal Construction General funds were 
appropriated in FY 1998 for initiation of construction. 
6 . BUCHANAN DAM-H.V. EASTMAN 
LAKE, CHOWCHILLA RIVER, CA 
Location. On Chowchilla River about 36 miles 
above its mouth and about 16 miles northeast of city of 
Chowchilla, CA. (See Geological Survey 
quadrangles for area.) 
Existing project. Provides for construction of a 
205-foot high rockfill dam to create a reservoir with 
gross storage capacity of 150,000 acre-feet for flood 
control, irrigation, recreation, and fish and wildlife. In 
conjunction with dam, project plan provides for about 
12 miles of downstream levee and channel construction 
on Ash Slough to accommodate a project design flow 
of 5,000 cubic feet per second within slough and 7 
miles of levee and channel improvement on Berenda 
Slough. Operation and maintenance of dam and 
reservoir is the responsibility of the Federal 
Government. Total first cost for existing project is 
$28,919,597, of which$27,369,597 is Federal cost, 
including $4,580,000 for basic recreation facilities, and 
$1,550,000 non-Federal costs for lands and damages, 
including relocations for downstream levee and channel 
improvements. Local interests have contracted with the 
Bureau of Rec-lamation for irrigation service. For 
future non-Federal reimbursement, see Local 
cooperation paragraph. 
expended about $500,000 for construction of low 
35-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
levees and clearing downstream channels to provide 
some local flood protection in project area. This work 
is inadequate during major floods. Existing project was 
adopted by 1962 Flood Control Act (S. Doc. 98, 87th 
Cong., 2d sess., contains latest published map). Lake 
formed by Buchanan Dam on Chowchilla River was 
designated "'H.V. Eastman Lake" by Public Law 
93-217. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New 
work: None. Maintenance: Maintenance and operation 
activities were continued. Runoff of Chowchilla River 
above Buchanan Dam was above normal for the year. 
Maximum storage of 111,103 acre-feet occurred May 
10, 1999. Maximum hourly inflow to reservoir was 
2,844 cubic feet per second on February 9, 1999. 
Maximum release of 657 cubic feet per second on June 
16, 1999, was above maximum permissible flood 
release. During the year, a total of 49,898 acre-feet of 
water was released for irrigation and other purposes. 
Releases for flood control purposes totaled 0 acre-feet. 
Historical summary. Construction began in July 
1971 and was completed in May 1979. Construction of 
Buchanan and Hidden dam and appurtenances was 
combined under one contract. Project was completed in 
September 1983, except for installation of piezometers 
(now deferred indefinitely). Dam closure was in March 
1975; dam was completed in January 1976. Reservoir 
clearing and boundary marking were completed May 
1975. Bifurcation structure was completed in February 
1976. Channel improvement, Ash and Berenda 
Sloughs, was completed in March 1976. Recreation 
areas: Phase I was completed in January 1976; Phase II 
was completed in February 1978. Residences, 
administration building, and visitors center contract was 
completed in May 1978. Landscaping was completed in 
May 1979 and erosion control was completed in April 
1979. A resources interpretive display and road 
relocation were completed in FY 1982. Dam safety 
assurance studies were initiated in FY 1981. Solar 
heating was installed at Chowchilla recreation area in 
FY 1984. An hydrilla eradication (spraying) program 
was initiated in FY 1989. Final land audit was 
approved on December 3, 1985. 
7 CACHE CREEK BASIN, CA (CACHE 
CREEK SETTLING BASIN) 
LOCATION. At the mouth of Cache Creek in Yolo 
County where it enters the Yolo Bypass about 2 miles 
east of city of Woodland and about 15 miles northwest 
of city of Sacramento, CA. 
Existing project. Provides for raising the perimeter 
levees of the existing settling basin an average of 12 
feet, extending the levees upstream to County Road 
102 to provide 50-year sediment storage capacity, 
enlarging and reconstructing the cobble weir, and 
degrading existing training levees and rebuilding them 
adjacent to western perimeter levee to provide 50 years 
of sediment storage capacity (340 acre-feet annually.). 
Estimated cost (October 1993) for existing project is 
$20,130,000 (includes an allowance for estimated 
inflation through the construction period), of which 
$11,710,000 is Federal and $8,420,000 is non-Federal 
(which includes $1,010,000 cash contribution). For 
future non-Federal reimbursement, see Local 
cooperation paragraph. Existing project was adopted 
by Water Resources Development Act of 1986, Public 
Law 99-662, November 17, 1986 (HD 98-134, 98th 
Cong., 1st sess., contains published map.) Project as 
authorized included development of a national wildlife 
refuge within the settling basin; however, the 
Department of the Army determined that such refuge 
would be more appropriately funded and developed by 
the U.S. Fish and Wildlife Service. Refuge feature 
was reclassified to deferred category on April 11, 
1988. 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate buildings, 
utilities, roads, bridges (except railroad bridges) and 
other facilities where necessary in construction of the 
project; pay 5 percent of cost allocated to flood control 
to bring total non-Federal share of flood control costs 
to 25 percent of which $1,010,000 is cash contribution, 
and bear all costs of operation, maintenance and 
replacement of flood control facilities. Local interests 
have agreed to make all required payments 
concurrently with project construction.Local 
Cooperation Agreement was executed March 12, 1990. 
35-6

SACRAMENTO, CA DISTRICT 
Operations and results during fiscal year. 
Engineering activities were continued. Levee repair 
contract was awarded in August 1996. Cache Creek 
Settling Basin work was transferred to local interests for 
operation and maintenance in December 1993. 
Historical summary. Local Cooperation Agreement 
was executed March 12, 1990. Cache Creek Settling 
Basin enlargement (multicomponent) construction 
contract was awarded August 5, 1991, completed in 
September 1993, and work was transferred to local 
interests for operation and maintenance on December 2, 
1993. 
8. CALAVERAS RIVER AND 
LITTLEJOHN CREEK AND 
TRIBUTARIES, INCLUDING 
NEW HOGAN LAKE AND 
FARMINGTON DAM, CA 
Location. Streams comprising Calaveras River and 
Littlejohn Creek groups rise in Sierra Nevada and its 
foothills, flow easterly across flatlands of San Joaquin 
Valley and empty into San Joaquin River directly, or 
through various sloughs, in vicinity of Stockton, CA. 
Littlejohn Creek is in Calaveras, Stanislaus, and Sani 
Joaquin Counties. The three principal stream systems of 
the group are, from south to north, Lone Tree Creek, 
Littlejohn Creek, and Duck Creek. Calaveras River 
group is in Calaveras and San Joaquin Counties. The 
two principal streams of the groups are, from south to 
north, Calaveras River and Bear Creek. (See Geological 
Survey Valley Springs quadrangle for New Hogan 
reservoir area and Trigo and Bachelor Valley 
quadrangles for Farmington reservoir area.) 
Existing project. For description of completed 
improvements consisting of Farmington Dam, New 
Hogan Lake, and Bear Creek levee and channel 
improvement, and authorizing act, see Annual Report 
for 1967. (a) Farmington: Total first cost (July 1955) 
for project was $3,995,684, of which $3,676,384 was 
Federal and $319,300 non-Federal for lands and 
damages including relocations. (b) New Hogan: Federal 
cost for project is $15,906,150, including $543,514 for 
basic recreation facilities. For future non-Federal 
reimbursement, see Local cooperation paragraph. 
Federal cost for recreation facilities funded from Code 
710 appropriations is $897,742. (c) Bear Creek: Project 
cost is $6,485,734, of which $3,242,867 is Federal, 
including reimbursement ($488,096) to local interests 
of one-half of excess local interest cost of lands, 
rights-of-way, and relocations over estimated Federal 
construction cost in accordance with section 3, Public 
Law 738, 74th Congress. Non-Federal cost included in 
above amount is $3,242,867 for relocations and lands 
and damages, exclusive of above Federal reimbursement. 
Local cooperation. Fully complied with. New 
Hogan: Local interests must pay portion of first cost 
and annual operation and maintenance costs allocated 
to conservation functions of project. These costs are 
estimated at 36.2 percent of first cost and 38 percent of 
annual costs. In addition, local interests contributed 
land, the (July 1964) market value of which was 
$556,000. For years 1961 through 1970, an interim 
contract between the Bureau of Reclamation and local 
water users provided for storage and payment of 
irrigation water; a long-term contract between that 
agency and local water users was executed August 25, 
1970. Local interests paid $4,514,003 through 
December 31, 1996. A concessionaire at New Hogan 
Marina provided public use facilities in accordance 
with lease agreement with the Secretary of the Army at 
an estimated cost to date of $234,000. 
Operations and results during fiscal year. New 
work: New Hogan Lake, regular funds: None. Code 
710 funds: None. Bear Creek, San Joaquin County: 
None. Maintenance: Farmington Dam Maintenance and 
operation activities continued; structures were 
maintained in serviceable condition. During rainflood 
season, maximum flow of Duck Creek Diversion was 
1,212 cubic feet per second on February 9, 1999. 
Maximum flow of Littlejohn Creek at Farmington was 
2,383 cubic feet per second on February 9, 1999. 
Maximum flow of Duck Creek near Farmington was 
591 cubic feet per second on February 9, 1999. 
Maximum storage in reservoir was 13,287 acre-feet on 
February 10, 1999, and maximum estimated inflow to 
reservoir was 8,302 cubic feet per second on February 
9, 1999. Maximum release of 1,655 cubic feet per 
second on February 10, 1998, was above maximum 
permissible flood release. During the year, 110,800 
acre-feet was released for flood control. New Hogan 
Lake Maintenance and operation activities continued. 
Dam safety assurance studies were continued at a fiscal 
year cost of $2,339. Structures were maintained in 
serviceable condition. Runoff of Calaveras River above 
New Hogan was above normal for the year. Maximum 
storage of 218,474 acre-feet occurred February 10, 
1999. Maximum hourly inflow to reservoir was 16,129 
cubic feet per second on February 9, 1999. Maximum 
35-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
release of 4,103 cubic feet per second on February 14, 
1999, was above maximum permissible flood release. 
During the year, 98,523 acre-feet was released for 
irrigation and other purposes. Release for flood control 
purposes amounted to 118,213 acre-feet. 
Historical summary. Farmington Dam: Construction 
of Farmington project was initiated in July 1949 and 
completed for beneficial flood control operation in 
1952. Duck Creek channel improvement was completed 
in November 1951; and channel improvement on south 
Littlejohn Creek was completed in May 1955. There 
are no recreation facilities or public-use areas. All work 
completed. Dam safety assurance studies were initiated 
in FY 1982. New Hogan Lake: Construction was 
initiated May 1960, main dam closure November 1963, 
project completed for operational use in June 1964, and 
all work completed October 1973. Recreation facilities 
have been provided from Code 710 appropriations. 
Seepage measurement weir constructed in June 1980. 
Dam safety assurance studies were initiated in FY 1980. 
Bear Creek, San Joaquin County: Construction began 
in June 1963 and was completed in June 1967. Final 
cash contribution was made to local interests December 
23, 1970. Solar heating was installed at recreation 
facilities in FY 1984. A cultural resources survey was 
completed in FY 1984. 
9. COLORADO RIVER AT GRAND 
JUNCTION, CO 
Location. On north bank of Colorado River from 
9th Street west to the Denver Rio Grande Western 
Railroad Bridge at city of Grand Junction, CO, in Mesa 
County. 
Existing project. Provides for construction of a 
3,200 foot levee located on north side of Colorado 
River, one road ramp over levee for accessing Watson 
Island, 3 detention basins, a relief well system and a 
550-foot-long impermeable blanket to prevent seepage 
though railroad embankment. Estimated cost 
(September 1994) is $1,651,200, of which $1,086,700 
is Federal cost and $564,500 is non-Federal cost for 
lands and damages and includes a cash contribution of 
$63,000. Existing project was approved by Chief of 
Engineers on February 28, 1994, under provisions of 
section 205, 1948 Flood Control Act, as amended. 
Local cooperation. Local sponsor shall furnish to 
Operations and results during fiscal year. O&M 
the Government all lands, easements, and rights-ofway, 
including suitable borrow and dredged material 
disposal areas, as determined by the Government to be 
necessary for construction, operation, and maintenance 
of the project, and shall furnish to the Government 
evidence supporting local sponsor's legal authority to 
grant rights-of-entry to such lands. Necessary lands, 
easements, and rights-of-way may be provided 
incrementally, but all lands, easements, and 
rights-of-way determined by the Government to be 
necessary for work to be performed under a 
construction contract must be furnished prior to 
advertisement of the construction contract. 
Local sponsor shall provide or pay to the 
Government the cost of providing all retaining dikes, 
wasteweirs, bulkheads, and embankments, including all 
monitoring features and stilling basins that may be 
required at any dredged material disposal areas 
necessary for project construction. 
Upon notification from the Government, local 
sponsor shall accomplish or arrange for 
accomplishment at no cost to the Government all 
relocations (excluding railroad bridges and approaches 
thereto) determined by the Government to be necessary 
for project construction. 
Local sponsor shall comply with all applicable 
provisions of the Uniform Relocation Assistance and 
Real Property Acquisition Policies Act of 1970, Public 
Law 91-646, as amended by Title IV of the Surface 
Transportation and Uniform Relocation Assistance Act 
of 1987 (Public Law 100-17), and the Uniform 
Regulations contained in 49 CFR Part 24, in acquiring 
lands, easements, and rights-of-way for construction 
and subsequent operation and maintenance of the 
project, and inform all affected persons of applicable 
benefits, policies, and procedures in connection with 
said Act. Local sponsor shall provide such 
documentation as contracting officer requires to 
demonstrate compliance. 
The Local Cooperation Agreement (LCA) between 
the Department of the Army and the City of Grand 
Junction, CO, was signed April 8, 1994. 
Manual and As-Built drawings were finalized. Project 
35-8

SACRAMENTO, CA DISTRICT 
audit, close-out activities and fiscal completion 
continued. 
Historical summary. Plans and specifications were 
completed in August 1994. Non-Federal cash 
contribution of $63,000 for construction was received 
September 27, 1994. First construction contract in 
amount of $575,830 was awarded September 30, 1994. 
10. CORTE MADERA CREEK, CA 
Reported on by San Francisco District. Refer to 
Report of the Secretary of the Army on Civil Works 
Activities for FY 1996. 
11. COYOTE CREEK, CA (KNOWN AS 
COYOTE AND BERRYESSA 
CREEKS) 
Location. Project is located in the cities of San Jose 
and Milpitas immediately south of San Francisco Bay in 
Santa Clara County, CA. 
Existing project. Plan of improvement on Coyote 
Creek consists of overflow channels and offset levees. 
Improvement on Berryessa Creek includes two 
sedimentation basins at the upstream end of the concrete 
lined trapezoidal channel and offset levees. Combined 
plan would provide flood protection from Coyote and 
Berryessa Creeks to cities of San Jose and Milpitas, 
which include large industrial complexes and some 
residential development. Estimated cost (October 1998) 
for the Coyote Creek element of the existing project is 
$61,750,000 (includes an allowance for estimated 
inflation through the construction period), of which 
$30,890,000 is Federal and $30,860,000 is non-Federal 
(which includes $3,100,000 cash contribution). For 
future non-Federal reimbursement, see Local 
cooperation paragraph. Estimated cost (October 1998) 
for the Berryessa Creek element of the existing project 
is $16,525,000 (includes an allowance for estimated 
inflation through the construction period), of which 
$12,425,000 is Federal and $4,100,000 is non-Federal 
(which includes $1,830,000 cash contribution). 
Existing project was authorized under Section 101(a)(5) 
of WRDA 1990, Public Law 101-640 (HD 101-126, 
101st Cong., 2d sess.). 
Local cooperation. (Coyote Creek) Local interests 
are required to provide lands, easements, rights-of-way, 
and borrow and excavated or dredged material disposal 
areas, which may be reduced for credit allowed based 
on prior work (Sec. 104 of WRDA 86 ($8,633,000), 
Sec. 26 of WRDA 88 (not to exceed $3,000,000) and 
Sec. 215 of the Flood Control Act of 1968 (not to 
exceed $3,000,000) after reductions for such credit 
have been made in the required cash payments; modify 
or relocate utilities, roads, bridges (except railroad 
bridges), and other facilities, and perform prior work 
under Sec. 104 of WRDA 86, Sec. 26 of WRDA 88, 
and Sec. 215 of the Flood Control Act of 1968, where 
necessary for the construction of the project; and pay 
5 percent of the costs allocated to flood control, and 
bear all costs of operation, maintenance, repair, 
rehabilitation and replacement of flood control 
facilities. Local interests will receive an estimated 
Federal reimbursement of $8,280,000 for one-half of 
non-Federal costs allocated to flood control in excess of 
Federal costs (Sec. 103 of WRDA 86). (Berryessa 
Creek) Local interests are required to provide lands, 
easements, rights-of-way, and borrow and excavated or 
dredged material disposal areas; modify or relocate 
utilities, roads, bridges (except railroad bridges), and 
other facilities, where necessary in the construction of 
the project; and pay 11 percent of the costs allocated to 
flood control to bring the total non-Federal share of 
flood control costs to 25 percent, and bear all costs of 
operation, maintenance, repair, rehabilitation and 
replacement of flood control facilities. The 
non-Federal sponsor has also agreed to make all 
required payments concurrently with project 
construction. 
Operations and results during fiscal year. Coyote 
Creek mitigation contract continued at a fiscal year cost 
of $162,711. 
Historical summary. Separate General Design 
Memorandums were prepared for Coyote and 
Berryessa Creeks. General Design Memorandum for 
Coyote was submitted in May 1993. Local interests 
have completed construction of Reach 1 (Sec 104, 
Water Resources Development Act (WRDA), Reach 2 
(Sec 26, WRDA) and Reach 3A (Sec 215, WRDA). 
National Defense Authorization Act for FY 1994 
directed the Secretary of the Army to construct project 
notwithstanding sec 902, WRDA. Project Cooperation 
Agreement was executed in September 1994. Coyote 
Creek Reach 3B construction contract was completed 
at a final cost of $5,308,925. Preconstruction 
engineering and design cost is $4,410,000. Total 
reimbursement of $7,400,000 for costs in excess of 
50% maximum requirement and credit payments of 
$14,633,000 for prior integral work, have been made 
35-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
to the local sponsor as of September 30, 1997. 
12. FAIRFIELD VICINITY STREAMS, CA 
Location. On five streams in vicinity of cities of 
Fairfield and Suisun, Solano County, CA. 
Existing project. See Annual Report for 1996, 
p. 3 5 -8 . 
Local cooperation. Fully complied with. In 
accordance with FY 1985 Supplemental Appropriations 
Act (Public Law 99-88) and sec. 117 of the Further 
Continuing Appropriations Act for FY 1986 (Public 
Law 99-190), a Local Cooperation Agreement for flood 
control and recreation (Sec. 221) was executed June 3, 
1986. 
Operations and results during fiscal year. Project 
close-out activities were on-going. 
Historical summary. Construction was initiated in 
October 1986. Enlargement of McCoy Creek and 
construction of Laurel Creek Diversion Channel, Phase 
I, was transferred to local interests in July 1987; Laurel 
Creek Diversion Channel, Phase II, was transferred to 
local interests in November 1988; Laurel Creek 
Diversion Channel, Phase III, was transferred to local 
interests in April 1990; and Laurel Creek Diversion , 
Phase IIA, was transferred to local interests in 
December 1990 for maintenance. Channel 
improvement contract for Ledgewood Creek Channel, 
Phase IV, was completed and transferred to local 
interests in December 1991 for maintenance. 
Mitigation planting on Ledgewood Creek was 
completed in April 1993; maintenance inspection has 
been completed. Construction of Laurel Creek 
pedestrian bridge overcrossing was completed and 
transferred to local interests on July 8, 1993. 
13. GUADALUPE RIVER, CA 
Location. On Guadalupe River in downtown area of 
city of San Jose, Santa Clara County, CA. 
Existing project. Authorized plan provides for 
widening and deepening one or more sides of 
Guadalupe River for 2.5 miles from Interstate Highway 
280 to Interstate Highway 880 in downtown San Jose, 
CA, and channel modifications with provisions for fish 
and wildlife mitigation, as necessary. Non-Federal 
sponsor must pay 100 percent of incremental 
construction cost of locally preferred plan. Project is 
an integral component of a much larger regional park 
plan being undertaken by the San Jose Redevelopment 
Agency. 
Estimated cost (October 1997) is $182,800,000 
(which includes an allowance for estimated inflation 
through the construction period) of which $78,500,000 
is Federal and $104,300,000 is non-Federal including 
reimbursement, see Local cooperation paragraph. 
Existing project was adopted by Water Resources 
Development Act of 1986, Energy and Water 
Development Appropriation Act of 1990 which directed 
the Secretary of the Army to construct the project 
notwithstanding Sec. 902 of the Water Resources 
Development Act of 1986 regarding project cost 
limitations, and Energy and Water Development 
Appropriations Act of 1992 which directed the 
Secretary of the Army to modify and construct the 
project in accordance with the January 1991 GDM; it 
is consistent with the Guadalupe River Park plan 
requested by the local sponsor and with cost sharing 
policy. 
Local cooperation. Local interests, through a public 
body legally authorized and financially capable, must 
give assurances they will furnish lands, easements, 
rights-of-way, and dredged material disposal areas, 
which are partially offset by a credit ($5,701,000) 
allowed for prior work (Sec. 104, Water Resources 
Development Act of 1986); credit was approved by the 
Assistant Secretary of the Army; modify or relocate 
buildings, utilities, roads, bridges (except railroad 
bridges), and other facilities, where necessary in the 
construction of the project; pay 5 percent of the costs 
allocated to flood control; and bear all costs of 
operation, maintenance, and replacement of flood 
control facilities. Federal reimbursement will be made 
to non-Federal sponsor for one-half of non-Federal 
costs allocated to flood control in excess of Federal 
costs. Local interests have agreed to make all required 
payments concurrently with project construction. 
On June 2, 1989, the local sponsor, the Santa Clara 
Valley Water District, expressed intent to provide all 
needed cost sharing funds. On September 21, 1990, 
the San Jose Redevelopment Agency requested 
modification of project to include recreation facilities 
35-10

SACRAMENTO, CA DISTRICT 
and confirmed that they intend to participate as local 
sponsor for recreation. Local Cooperation Agreements 
for both flood control and recreation were executed 
March 30, 1992. 
Operations and results during fiscal year. 
Construction contract No. 2 (Hedding Street to 
Coleman Avenue), was completed with fiscal year cost 
of $257,000 (Interstate 880 to Hedding Street). Fiscal 
year mitigation costs included Early Plant collection for 
Contract 2 (Hedding Street to Coleman Avenue) of 
$15,000 and River Street Historic Salvage and 
Demolition $560,000.. 
Historical summary. Final General Design 
Memorandum (GDM) reflecting locally preferred plan, 
was approved by the Assistant Secretary of the Army 
on March 26, 1992, with comments. Revision of GDM 
to address comments was completed in July 1993. 
Local Cooperation Agreements for both flood control 
and recreation were executed March 30, 1992. 
Construction contract No. 1 for channel improvement 
(Highway 880 to Hedding Street) was awarded August 
10, 1992; and was essentially completed and transferred 
to local interests for maintenance and operation on 
August 11, 1994. Construction contract No. 2 
(Hedding Street to Coleman Avenue) was awarded July 
8, 1994, and was essentially completed and transferred 
to local interests for maintenance and operation on 
October 25, 1996. 
14. HIDDEN DAM-HENSLEY LAKE, 
FRESNO RIVER, CA 
Location. On Fresno River about 50 miles above its 
mouth and about 15 miles northeast of Madera, CA 
(See Geological Survey quadrangles for area.) 
Existing project. Provides for construction of a 
163-foot high earthfill dam to create a reservoir with 
gross storage capacity of 90,000 acre-feet for flood 
control, irrigation, recreation and other purposes. In 
conjunction with the dam, the project provides for 
about 13 miles of downstream levee and channel 
improvements on Fresno River immediately upstream 
of Chowchilla Canal crossing to accommodate project 
design flow of 5,000 cubic feet per second. Operation 
and maintenance of dam and reservoir is the 
responsibility of the Federal Government. Total first 
cost for existing project is $31,785,426, of which 
$30,555,426 is Federal cost, including $3,564,168 for 
basic recreation facilities, and estimated $1,230,000 
non-Federal cost for lands and damages including 
relocations for downstream levee and channel 
improvements. Local interests have contracted with the 
Bureau of Reclamation for irrigation service. For 
future non-Federal reimbursement, see Local 
cooperation paragraph. Local interests have also, over 
a period of years, expended about $300,000 for 
construction of low levees and clearing downstream 
channels to provide some local flood protection in the 
project area. This work is inadequate during major 
floods. Existing project was adopted by 1962 Flood 
Control Act (S. Doc. 37, 87th Cong., 1st sess., 
contains latest published map). Lake created by 
Hidden Reservoir project on Fresno River was 
designated "Hensley Lake" by Public Law 93-603. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New 
work. None. Maintenance: Maintenance and operation 
activities were continued. Runoff of Fresno River 
below Hidden Dam was above normal for the year. 
Maximum storage of 56,087 acre-feet occurred April 
27, 1999. Maximum hourly inflow to the reservoir was 
2,166 cubic feet per second on February 9, 1999. 
Maximum release of 896 cubic feet per second on 
February 10, 1999, was above maximum permissible 
flood release. During the year, 70,728 acre-feet was 
released for irrigation and other purposes and 9,477 
acre-feet was released for flood control. 
Historical summary. Construction began in July 
1971 and was completed in January 1979. Dam closure 
was in March 1975; dam was completed November 
1975. Instrumentation was completed in January 1976. 
Downstream channel improvement, Fresno River, was 
completed April 1976. Recreation areas: Phase I was 
completed in March 1976; Phase II was completed in 
June 1978. Residences, administration building, 
grounds, and utilities contract was completed in 
February 1978. Landscaping was completed in 
December 1978 and erosion control was completed in 
January 1979. Project was completed in September 
1980. Final land audit was approved February 5, 1980. 
Dam safety assurance studies were initiated in FY 
1980. Piezometer installation was completed in 
September 1982. Solar heating was installed at 
County relinquished all administration of recreation and 
development and maintenance of public use areas at the 
recreation areas in FY 1984. 
35-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
15. ISABELLA LAKE, KERN RIVER, CA 
Location. About 35 miles northeast of city of 
Bakersfield, CA, near confluence of north and south 
forks of Kern River; auxiliary dam is about one-half 
mile east of main dam. (See Geological Survey 
quadrangles of area.) In 1991, Isabella Lake and 16,000 
acres of surrounding land was transferred to the Forest 
Service in exchange for about 2,500 acres of Forest 
Service land near Pine Flat Lake. 
Existing project. For description of completed 
improvement and authorizing act, see Annual Report 
for 1967. Federal cost for new work is $22,027,452. 
For future non-Federal reimbursement see Local 
cooperation and Licenses paragraphs. Federal cost 
funded from Code 710 appropriations is $2,199,085. 
Operation and maintenance of dam and reservoir is 
Federal responsibility. 
Local cooperation. California officially adopted 
project by chapter 1514 of statutes of 1945, State of 
California. Local interests, represented by North Kern, 
Buena Vista, and Tulare Lake Basin Water Storage 
Districts and La Hacienda Water District, were required 
to reimburse the Federal Government the portion of 
first cost and annual operation and maintenance costs 
allocated to irrigation functions of project. These costs, 
based on a cost allocation study completed in December 
1955, are $4,573,000 of first cost and 21.7 percent of 
annual operation and maintenance cost. For the years 
1956 through 1964, an interim contract between the 
Bureau of Reclamation and local water users provided 
for storage and payment of irrigation water. Under 
provisions of this interim contract, local interests paid 
$1,936,229 through December 31, 1964. A long-term 
contract between the Bureau and local water users was 
executed October 23, 1964. Balance due on allocated 
first cost of $4,573,000 was paid by the water users on 
March 31, 1965. Kern County assumed administration 
of recreation and development and maintenance of 
public use areas at project in accordance with a 25-year 
license February 15, 1955. The agreement with Kern 
County provided for joint operation and development 
by the Corps and Kern County including permits 
granted to concessionaires by the county to provide 
certain services. As of September 30, 1971, Kern 
project. A State law permitting the Department of 
Boating and Waterways (known as the Department of 
Navigation and Ocean Development prior to January 
1979) to participate in inland water development with 
Federal agencies was signed by the Governor on 
August 11, 1972. Isabella Lake and surrounding land, 
16,000 acres around the lake currently being used for 
park and recreation purposes, was turned over to the 
Forest Service by the Corps on May 15, 1991, in 
exchange for approximately 2,500 acres of Forest 
Service recreation land near Pine Flat Lake. This was 
accomplished by using a memorandum of 
understanding (MOU) between the Secretary of the 
Army and the Secretary of Agriculture (Forest 
Service). The MOU requires an exchange of land 
between departments. Three Corps maintenance 
employees, under supervision of the Success Lake park 
manager, will stay at Isabella to operate the dam for 
flood control and water conservation purposes. 
Authority for new concessionaire operating permits to 
be issued, as well as those previously granted by the 
Corps, will be transferred to the Forest Service. 
Total cost to date of present recreation facilities 
developed by the county and the marina 
concessionaires is about $965,000; $235,000 of this 
was a grant from the California Wildlife Conservation 
Board and about $534,000 is investment by marina 
concessionaires. 
Licenses. In accordance with Federal Power 
Commission Docket No. E-6578, issued April 1, 1963, 
payment of $377,426 was made to the Federal 
Government by Pacific Gas and Electric Co. 
($108,352) and Southern California Edison Co. 
($269,074) for headwater benefits to downstream 
existing plants from Isabella Dam to cover benefits 
from April 15, 1954, to December 31, 1962. Between 
1962 and 1982, the power companies have in the 
aggregate made annual payments of $44,650 for 
headwater benefits. That amount was to be paid each 
year until changes in operation, development, or costs 
indicated some modification to be advisable. Federal 
Power Commission Docket No. E-6578 was revised by 
Docket No. HB07-75-4-000 (order issued July 11, 
1983 under 24 FERC, paragraph 62052) which 
modified cumulative use charges after 1974, effective 
retroactively. Such charges will now vary each year. 
An adjustment (years 1974 through 1984) was included 
in 1984 payment of $244,790. The 1985 payment was 
$52,747; 1986 payment was $51,905. No payment was 
received in 1987. The 1988 payment was $58,187. No 
payment was received in 1989. Two payments 
($60,894 and $55,443) were received in 1990; $60,983 
was received in 1991; $65,975 in October 1991 (FY 
35-12

SACRAMENTO, CA DISTRICT 
1992) $77,577 in October 1992 (FY 1993), and 
$62,231 in October 1993 (FY 1994). Cumulative use 
charges collected by the Federal Power Commission 
(known as the Federal Energy Regulatory Commission 
since January 9, 1978) and returned to the U. S. 
Treasury through period ending September 30, 1995, 
amounted to $2,150,458. 
Operations and results during fiscal year. New 
work, regular funds: None. Code 710 funds: None. 
Maintenance: Maintenance and operation continued. 
Structures were maintained in good condition. Runoff 
of Kern River above Isabella Dam was above normal 
for the year. Maximum storage of 366,328 acre-feet 
occurred October 1, 1998. Maximum hourly inflow to 
the reservoir was 4,715 cubic feet per second on May 
23, 1999, and maximum outflow of 1,857 cubic feet 
per second occurred November 11, 1998. During the 
year, 606,691 acre-feet was released for irrigation and 
0 acre-feet was released for flood control. 
Historical summary. Construction began in March 
1948 and was completed in June 1968. Main dam, 
Borel Canal outlet works and appurtenances, and 
auxiliary dam were completed in April 1953. Storage 
impoundment began December 1952. Piezometer was 
installed in August 1982. Project is operating to provide 
flood protection and irrigation benefits for which it was 
designed. Recreation facilities were provided by Code 
710 funds. Dam safety assurance studies were initiated 
in FY 1979. A cultural resources survey was completed 
in FY 1984. On May 15, 1991, Isabella Lake and 
surrounding land, 16,000 acres around the lake 
currently being used for park and recreational purposes, 
was turned over to the Forest Service by the Corps in 
exchange for approximately 2,500 acres of Forest 
Service recreation land near Pine Flat Lake. A 
memorandum of understanding (MOU) between the 
Secretary of the Army and the Secretary of Agriculture 
(Forest Service) was used. The MOU requires an 
exchange of land between departments. Three Corps 
maintenance employees, under supervision of the 
Success Lake park manager, will stay at Isabella to 
operate the dam for flood control and water 
conservation purposes. 
16. KAWEAH AND TULE RIVERS, 
INCLUDING TERMINUS DAM 
AND SUCCESS LAKE, CA 
Location. Terminus Dam is on Kaweah River about 
20 miles east of Visalia, CA. Success Lake is on Tule 
River about 5 miles east of Porterville, CA. (See 
Geological Survey quadrangles of area.) 
Existing project. Terminus Dam: For description of 
completed improvement and authorizing act, see 
Annual Report for 1975. Federal cost of new work is 
$19,302,957, including $242,605 for basic recreation 
facilities and excluding spreading works constructed by 
local interests at an estimated (July 1957) cost of about 
$750,000. Spreading works portion of project has been 
deauthorized. The 90-day Congressional project review 
period, required by sec. 12, Public Law 93-251, as 
amended, ended August 5, 1977, and resulted in 
deauthorization of that portion of project. Federal cost 
of recreation facilities funded from Code 710 
appropriations is $700,004. Success Lake: For 
description of completion improvement and authorizing 
act, see Annual Report for 1975. Federal cost of new 
work for Success Lake is $14,247,221, including 
$253,697 for basic recreation facilities. Federal cost of 
recreation facilities funded from Code 710 
appropriations is $747,048. For future non-Federal 
reimbursements, see Local cooperation paragraph. 
Operation and maintenance of reservoirs is Federal 
responsibility. 
Local cooperation. California officially adopted 
projects by chapter 1514 of statutes of 1945, State of 
California. Local interests for Terminus Dam are 
represented by Kaweah Delta Water Conservation 
District. Local interests for Success Lake are 
considered to be represented by the Vandalia, 
Porterville, and Lower Tule River Irrigation Districts, 
the Tulare Lake Basin Water Storage District, and 
Pioneer Water Co., which represent over 90 percent of 
irrigated land and water-right holders along Tule River 
below damsite. Local interests must reimburse the 
Federal Government the portion of first cost and annual 
operation and maintenance costs allocated to irrigation 
functions of projects. These costs are estimated at 14.1 
percent of first and annual costs for Terminus and 9.5 
percent of first and annual costs for Success. Local 
interests for Terminus stated they will continue to 
operate and maintain spreading works and downstream 
channel systems to provide required capacity for 
disposal of floodwaters. Local interests for Success 
stated they will continue to maintain downstream 
channel systems to provide required capacity for 
disposal of floodwaters. Repayment contracts between 
the Bureau of Reclamation and local water users for 
irrigation supply from Terminus and Success reservoirs 
were executed January 11, 1965, and April 30, 1965, 
35-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
respectively. Reservoirs are being operated for 
irrigation storage as well as flood control and incidental 
recreation use. Tulare County acquired water for 
recreation pools at the projects. Local interests paid the 
following total amounts for irrigation services from the 
reservoirs through December 31, 1999: Terminus, 
$2,370,459 and Success, $1,176,239. Tulare County 
was granted a 25-year license for planning, 
development, and management of public recreation 
areas at Success, July 10, 1960, and at Terminus, June 
5, 1961. Basic public-use facilities constructed by 
Corps at the Success reservoir were transferred to 
jurisdiction of Tulare County on January 18, 1962; 
facilities at Terminus were transferred June 20, 1962. 
In March 1967, an amendment to the license 
agreements was approved by the Assistant Secretary of 
the Army. Under these amended licenses, Tulare 
County retained administration of only specified land 
areas and operation and maintenance of recreation 
facilities in these areas. In addition, they continued their 
program of water safety, boat inspection, and law 
enforcement at both reservoirs. The Corps took over 
the administration of the remainder of the project land 
areas and the operation and maintenance of recreation 
facilities in these areas. Calif. Department of Fish and 
Game expended funds to improve fishery resources of 
the Terminus reservoir. As of April 1, 1972, Tulare 
County relinquished all planning, development, and 
management of public recreation areas at Terminus 
Dam. Tulare County by expenditure of county funds 
and by a lease to a marina concessionaire has aided in 
the development of recreation facilities at an estimated 
cost of $199,000. Calif. Department of Fish and Game 
expended funds in conjunction with Tulare 
Sportsman's Council and developed a habitat for upland 
game birds at Success Lake. As of April 1, 1972, 
Tulare County relinquished all planning, development, 
and management of public recreation areas at Success 
Lake, except for the Bartlett Park recreation area. 
Tulare County has aided in development of recreation 
facilities. Total cost to date of present recreation 
facilities developed by the county ($360,000) and the 
marina concessionaires ($373,000) is about $733,000. 
Operations and results during fiscal year. New 
work: Terminus Dam, regular funds: None. Code 710 
funds: None 
Success Lake, regular funds: None. Code 710 funds: 
None. 
Maintenance: Terminus Dam: Maintenance and 
operation continued. Dam safety assurance studies were 
continued at a fiscal year cost of $107,154. Structures 
were maintained in serviceable condition. Runoff of 
Kaweah River above Terminus Dam was above normal 
for the year. Maximum storage of 137,819 acre-feet 
occurred on June 2, 1999. Maximum hourly inflow to 
the reservoir on May 26, 1998, was about 2,263 cubic 
feet per second. Maximum outflow of 1,425 cubic feet 
per second occurred June 28, 1999. Irrigation and 
spreading releases totaled 268,025 acre-feet. Releases 
for flood control totaled 15,000 acre-feet. Success 
Lake: Maintenance and operation continued. Dam 
safety assurance studies were continued at a fiscal year 
cost of $94,226. Structures were maintained in 
serviceable condition. Runoff of Tule River above 
Success Dam was above normal during the year. 
Maximum storage of 47,722 acre-feet occurred on May 
26, 1999. Maximum hourly inflow to the reservoir 
was 1,062 cubic feet per second on February 9, 1999, 
and maximum outflow of 418 feet per second occurred 
on August 2, 1999. Irrigation and spreading releases 
amounted to 103,472 acre-feet. Releases for flood 
control amounted to 5,000 acre-feet. 
Historical summary. Terminus Dam: Construction 
of project began in July 1957 and was completed in 
June 1968. Final land audit was approved on April 20, 
1987. Construction of main dam and appurtenances, 
initiated in February 1959, was completed in June 
1962. Dam has been operating since November 1961 to 
provide flood protection for which it was designed; 
conservation impoundment was commenced May 1962. 
Appurtenances are in good condition. Recreation 
facilities were provided by Code 710 funds. Dam 
safety assurance studies were initiated in FY 1979 and 
completed in FY 1989. Piezometer installation and a 
cultural resources survey were completed in FY 1984. 
Success Lake: Construction of project began in 
November 1956, was completed in June 1968, and 
final audit of historical land record was approved 
December 17, 1979. Construction of main dam and 
appurtenances, initiated in October 1958, was 
completed in May 1961. Dam has been operating since 
October 1960 to provide flood protection for which it 
was designed; conservation impoundment was 
commenced March 1962. Recreation facilities were 
survey was completed in FY 1984. 
17. LITTLE DELL LAKE, UT 
Location. On Dell Creek, a tributary of Parleys 
Creek, about 8 miles east of Salt Lake City upstream of 
35-14

SACRAMENTO, CA DISTRICT 
Mountain Dell Reservoir in Salt Lake County, UT. 
Existing Project. Project providing for construction of 
a dam about 253 feet high to create a reservoir with a 
gross capacity of 30,000 acre-feet for flood control, 
municipal and industrial water supply, recreation and 
fish and wildlife was authorized by the 1968 Flood 
Control Act (S. Doc. 53, 90th Cong., 1st sess., 
contains published map) as modified by sec. 170, Water 
Resources Development Act of 1976, Public Law 
94-587, October 22, 1976. Facility would be operated 
in conjunction with existing downstream 3,200 
acre-foot Mountain Dell Reservoir on Parleys Creek for 
flood control and water supply. 
Authorized project has been reexamined and scaled 
down to reflect local interests' ability to pay. Current 
plan of improvement includes only flood control and 
water supply purposes. Recreation was deferred as of 
May 30, 1986, and Emigration Creek Diversion was 
deleted and placed in an inactive status. Recreation was 
reactivated in 1995 and the Recreation DM approved in 
1996. The project includes an earthfill dam 224 feet 
high, a 20,500 acre-foot reservoir, and 10,035 feet of 
pipeline to divert water from Parleys Creek. Estimated 
project cost (September 1997) is $65,300,000 (includes 
an allowance for estimated inflation through the 
construction period) of which $41,215,000 is Federal 
and $24,085,000 is non-Federal for lands and damages 
and includes a cash contribution of $19,955,000. 
Project is included in FY 1985 Supplemental 
Appropriations Act (Public Law 99-88) August 15, 
1985. 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate buildings, 
utilities, roads, bridges (except railroad bridges), and 
other facilities where necessary in the construction of 
the project; pay all costs allocated to municipal and 
industrial water supply; pay 13 percent of costs 
allocated to flood control to bring total non-Federal 
share of flood control costs to 25 percent, bear all costs 
of operation, maintenance, and replacement of flood 
control facilities; and pay a cash contribution presently 
1986, and January 24, 1986, the Metropolitan Water 
Districtallocated to flood control to bring total 
non-Federal share of flood control costs to 25 percent, 
bear all costs operation, maintenance, and replacement 
of flood control facilities; and pay a cash contributiop 
presently estimated at $19,995,000. By letters of 
January 22 1986, and January 24,1986. The 
Metropolitan Water District of Salt Lake City and Salt 
Lake County indicated their support and willingness to 
proceed with a reduced scale project based on their 
"ability to pay." A Local Cooperation Agreement (Sec. 
221) was executed on June 10, 1986. Water Revenue 
Bonds were issued August 27, 1986, and proceeds 
from the sale in the amount of $14,300,000 have been 
deposited in the Little Dell Construction Fund Account. 
Operations and results during fiscal year. 
Engineering activities continued. 
Historical summary. A Local Cooperation 
Agreement (Sec. 221) was executed June 10, 1986. 
Construction was initiated in April 1988. Construction 
of core trench and test fill was completed in February 
1989. Main dam and appurtenances contract was 
awarded May 12, 1989 and completed in September 
1993. Project was transferred to the local sponsor for 
maintenance and operation on March 26, 1993. Dam 
was dedicated on August 5, 1993. 
18. MARTIS CREEK LAKE, MARTIS 
CREEK, NV AND CA 
Location. Reservoir is on Martis Creek a tributary 
of Truckee River, near Truckee, CA; intermittent 
channel improvements are on Truckee River in Reno, 
NV. (See Geological Survey quadrangles for areas.) 
Existing project. For description of completed 
improvement and authorizing act, see Annual Report 
for 1975. Federal cost for project was $8,503,789 
including $289,506 for basic recreation facilities. 
Federal cost of recreation facilities funded from Code 
710 appropriations was $1,200. Construction of 
recreation facilities under Code 710 was determined to 
be infeasible. Operation and maintenance of reservoir 
is Federal responsibility. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. New 
work: None. Maintenance: Maintenance and operation 
of project, including recreation facilities, was 
continued. Structures were maintained in serviceable 
condition. Runoff above Martis Creek Dam was above 
normal for the year. Maximum storage of 3,241 
acre-feet occurred on May 14, 1999. Maximum 
inflow to the reservoir was 285 cubic feet per second 
on February 7, 1999, and maximum outflow of 205 
35-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
cubic feet per second occurred May 14, 1999. During 
the year, 3,289 acre-feet was released for irrigation 
purposes. Releases for flood control amounted to 
25,780 acre-feet. 
Historical summary. Project construction began in 
August 1967; dam closure was in October 1971; dam 
completed in August 1972; basic recreation facilities 
were completed in December 1972; and project was 
completed in June 1974. Recreation facilities under 
Code 710 funding were considered infeasible. Dam 
safety assurance studies were initiated in FY 1981. 
19. MERCED COUNTY STREAMS, CA 
Location. In vicinity of city of Merced, CA, on 
streams draining from Mariposa County foothills of the 
Sierra Nevada into Merced County. Streams lie easterly 
of and drain into the San Joaquin River between 
Chowchilla River on the south and Merced River on the 
north. Drainage area represents about 1,000 square 
miles; nearly 700 square miles of foothills and 
mountains in Mariposa County and about 300 square 
miles of flood plain in Merced County. (See Geological 
Survey quadrangles for area.) 
Existing project. Project is a modification of 
Merced County Stream Group, Calif., Improvement 
No. 18, authorized by 1944 Flood Control Act (H. 
Doc. 473, 78th Cong., 2d sess.) and completed in FY 
1957. Existing project provides for construction of 
three new reservoirs Castle, Haystack Mountain, and 
Marguerite on Canal, Black Rascal, and 
Deadman-Dutchman Creeks, respectively, and 
enlargement of four existing reservoirs Bums, Bear, 
Owens, and Mariposa, providing a total capacity of 
126,700 acre-feet for multipurpose storage; and about 
52 miles of levee and channel improvements in lower 
reaches of Bear, Black Rascal, Mariposa, and Deadman 
Creeks, thereby tying the existing project channels into 
Eastside Bypass of San Joaquin River flood control 
system. Haystack Mountain, Bear, and Owens projects 
would provide flood control only; Castle and Burns 
projects, flood control and recreation; Marguerite 
project, flood control and irrigation; and Mariposa 
project, all three purposes. Existing project was adopted 
by 1970 Flood Control Act. 
Current plan of improvement would defer 
enlargement of existing Burns reservoir, Mariposa 
reservoir, construction of Marguerite Dam, and the 
irrigation function associated with the latter two 
facilities, enlargement of existing Owens reservoir and 
about 32 miles of levee and channel improvement on 
Owens, Mariposa, and Deadman-Dutchman Creeks. 
Estimated total project cost (October 1996) is 
$132,700,000 (includes an allowance for estimated 
inflation through the construction period), of which 
$91,800,000 is Federal and $40,900,000 is non-Federal 
(which includes a $6,855,000 cash contribution). 
Local cooperation. Local interests are required to 
provide lands, easements, and rights-of-way and 
dredged material disposal areas; modify or relocate 
buildings, utilities, roads, and other facilities, where 
necessary in the construction of the project; pay 
one-half of the separable and joint costs allocated to 
recreation, presently estimated at $282,000, of which 
$240,000 is a cash contribution and $42,000 is for 
lands; and bear all costs of operation, maintenance, and 
replacement of flood control facilities. Total 
non-Federal share of Castle Dam first cost is 
$5,230,000 and includes cash contribution of 
$595,000. 
The California Reclamation Board and the City of 
Merced are the local sponsors of the authorized project. 
The Reclamation Board will serve as sole sponsor for 
the Castle Dam Unit. Merced County Board of 
Supervisors reaffirmed their support for the project by 
letter of April 4, 1986. City of Merced by letter of 
March 13, 1986, reaffirmed its support for and intent 
to furnish assurances for recreation aspects of the 
project. California Reclamation Board reaffirmed its 
support for total project by letter of April 9, 1986. A 
Local Cooperation Agreement (Sec. 221) was executed 
for Castle Dam Unit on June 27, 1986. State of 
California legislation (AB3369) was enacted on 
September 14, 1986 which enabled the Reclamation 
Board to financially participate in the project. A new 
Local Cooperation Agreement (LCA) was signed by 
the Assistant Secretary of the Army November 30, 
1988, in accordance with the Water Resources 
Development Act of 1986. The California Reclamation 
Board, the Merced County Board of Supervisors and 
the city of Merced have indicated support for balance 
of the project by letters of intent dated August 29, 1991 
and August 20, 1991, respectively. This support was 
again reaffirmed in letters of support as provided by the 
California Reclamation Board on January 9, 1996. 
Operations and results during fiscal year. 
35-16

SACRAMENTO, CA DISTRICT 
Engineering activities continued for Bear Creek Dam 
Unit. Engineering activities continued at Castle Dam to 
prepare plans and specifications for one final contract 
(advertised for construction on August 26, 1997) to 
enable Edendale Turnout to provide the flow capacity 
as identified in the Check Structure Hydrology Report 
Criteria. Castle was transferred to sponsor for 
maintenance and operation in April 1995. 
Historical summary. Castle Dam multicomponent 
construction contract was awarded February 26, 1991, 
and construction was completed in March 1993. Castle 
Dam check structure contract was initiated in April 
1993 and completed in January 1994. Castle Dam was 
transferred to the sponsor on April 12, 1995. 
20. MERCED COUNTY STREAM 
GROUP, CA 
Location. Reservoirs and channel improvements are 
on Bear, Burns, Mariposa, and Owens Creeks, in 
foothills of Sierra Nevada about 15 to 20 miles east of 
city of Merced, CA. (See Geological Survey Haystack 
Mountain quadrangle for Burns and Indian Gulch 
quadrangle for Bear, Owens, and Mariposa areas.) 
Existing project. For description of completed 
improvements and authorizing act, see Annual Report 
for 1962. Improvements consist of reservoirs at 
Mariposa, Owens, Burns and Bear Creeks and 
diversions from Black Rascal Creek to Bear Creek and 
from Creek to Mariposa Creek. Total first cost for 
project was $3,899,259, of which $2,751,259 was 
Federal and $1,148,000 non-Federal for lands including 
relocations and channel improvement. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. 
Maintenance: Ordinary maintenance and operation of 
the four completed reservoirs continued. Structures 
were maintained in a serviceable condition. Runoff 
from drainage areas below Merced County stream 
group reservoirs was above normal for the year. See 
Table 35-K for maximum inflow storage and outflow 
for the projects. Outflows were less than channel 
capacity rates in the project streams. 
Historical summary. Construction was initiated 
March 1948, with construction of Mariposa project, 
which was completed in November 1948. Construction 
of Owens project, initiated in March, was completed in 
October 1949; Burns project, initiated in July 1949, 
was completed in January 1950; and Bear project 
initiated in April, was completed in December 1954. 
Black Rascal and Owens Creek diversion channels and 
stream-gaging stations were completed in April 1956. 
Local interests completed channel enlargement and 
restoration of channel capacities of Miles, Burns, 
Owens, and Mariposa Creeks in 1956 at their expense. 
Improvement of Bear Creek and Black Rascal Slough, 
below their confluence, was deferred pending possible 
improvements downstream, outside limits of project. 
21. PAJARO RIVER, CA 
Location. In the Uvas-Carnadero and Llagas Creeks 
watersheds of the upper Pajaro River Basin in south 
Santa Clara County in vicinity of the city of Gilroy 
about 75 miles south of San Francisco, CA. 
Existing project. See Annual Report for 1996, pg. 
35-15. 
Local cooperation. Fully complied with. Local 
Cooperation Agreement (LCA) for flood control was 
executed with the Santa Clara Valley Water District on 
June 25, 1987, and LCA for recreation was executed 
with the City of Gilroy on July 27, 1987. 
Operations and results during fiscal year. 
project is fiscally completed. 
The 
Historical summary. Responsibility for remaining 
portions of advance engineering and design, plans and 
specifications, and construction was transferred to 
Sacramento District in April 1982. Construction began 
in October 1987. Construction for the first contract 
(levee work and bike path upstream of Thomas Road 
Bridge), second contract (levee work and hiking trails), 
and third and final contract (landscaping) has been 
transferred to local interests for operation and 
maintenance. Total reimbursement of $5,583,369 has 
been made to the local sponsor. 
22. PINE FLAT LAKE AND KINGS 
RIVER, CA 
Location. Reservoir is on Kings River, about 25 
miles east of Fresno, CA, and channel improvements are 
on Kings River downstream from Lemoore weir, about 
25 miles south of Fresno. (See Geological Survey 
quadrangles of area.) Project also includes 2,500 acres 
of Forest Service recreation land near Pine Flat Lake. 
35-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Existing project. Improvement is a unit in 
comprehensive plan for flood control and other related 
purposes for Sacramento-San Joaquin Basins. Project 
consists of a 429-foot high concrete gravity dam, 
including a gated overflow section with a maximum 
discharge capacity of 391,000 cubic feet per second, 
creating a reservoir with gross storage capacity of 1 
million acre-feet, for flood control, irrigation, and related 
purposes. Outlet provisions for future power 
development are included in dam, but Federal 
construction of power-generating facilities is not 
authorized. Improvement also includes levee and channel 
work on Kings River and its tributaries on valley floor 
about 25 miles south of Fresno. Channel improvement 
work will enlarge channel capacities and regulate flows 
in lower branches of the Kings River. There are nine 
public-use and recreation areas: One maintained by the 
Corps, four by the Forest Service, three jointly by the 
Corps and concession, and one by Fresno County. Also, 
five boat access-only areas are maintained by the Corps 
on the south side of the reservoir. Project cost is 
$42,072,330, of which $41,502,330 is Federal (including 
$13,700 for basic recreation facilities) and $570,000 
non-Federal for rights-of-way for downstream channel 
improvements. For future non-Federal reimbursement, 
see Local cooperation paragraph. Federal cost of 
recreation facilities for Pine Flat Lake, funded from 
Code 710 appropriations is $1,595,100 exclusive of 
recreation facilities previously provided at a cost of 
$13,700. In addition, Federal cost of recreation facilities 
for Pine Flat Lake, funded from Public Works 
Acceleration Executive Act of 1962 appropriations, was 
$239,235 (July 1963). Operation and maintenance of 
dam and reservoir is Federal responsibility. Existing 
project was adopted by 1944 Flood Control Act (H. Doc. 
630, 76th Cong., 3d sess., contains latest published map). 
Local cooperation. Local interests must reimburse 
the Federal Government for first costs allocated to 
irrigation functions of reservoir portion of project in 
accordance with reclamation law. Under provision of 
War Department Civil Appropriations Act of 1947, the 
Secretary of War, with concurrence of the Secretary of 
units with capacities of 55 megawatts each for a total of 
165 megawatts. Conservation District would make useof 
the three existing 13.5-foot diameter penstocks that were 
installed in Pine Flat Dam when constructed in 1954. 
Licenses. License No. 1988, effective April 1, 1955, 
was issued by Federal Power Commission to Pacific Gas 
and Electric Co. for hydroelectric power development of 
the Interior, determined allocation of cost to irrigation 
should be set at an amount not to exceed $14,250,000. 
In addition, local interests must pay 37.4 percent of 
annual maintenance, operation, and replacement costs of 
dam and reservoir allocated to irrigation function. 
Repayment contracts between the Bureau of 
Reclamation and the local water users for the irrigation 
use of the reservoir were executed December 23, 1963. 
The Bureau is administering the contracts in accordance 
with reclamation law as amended by the Reclamation 
Reform Act of October 12, 1982. That act generally 
exempts the limitations under the early reclamation laws 
as being applicable to projects constructed by the Corps 
with two exceptions; however, all existing contracts to 
share construction and maintenance costs remain in 
effect. Prior to execution of the final contracts, the 
Bureau provided conservation water to local interests 
under an interim contract. Irrigation interests paid 
$14,450,234 for irrigation services through December 
31, 1999. With respect to the downstream channel 
improvements, sec. 3, Flood Control Act of June 22, 
1936, applies. King River Conservation District 
represents local interests; assurances were accepted 
November 20, 1959. Local interests have furnished all 
requirements for construction rights-of-way for 
construction of channel improvements required to date. 
Three concessionaires each at Lakeridge Marina (Deer 
Creek), Pine Flat Marina and Trimmer Marina provided 
public-use facilities in accordance with lease agreements 
with the Secretary of the Army. Estimated cost to date 
of facilities installed by these concessionaires is 
$1,727,000. Fresno County developed public-use 
facilities on an 85-acre tract immediately downstream 
from dam for picnicking, camping, swimming, and 
playground activities, at an estimated cost of $476,000 
under provisions of a license agreement. The U.S. Forest 
Service developed and operates a picnic area at the 
upper end of reservoir. Cost of site development is about 
$37,500. Installation of a hydroelectric powerplant, 
located at the downstream toe of the Corps Pine Flat 
Dam, was completed in January 1984 by Kings River 
Conservation District. Project consists of an 
outdoor-type powerhouse containing three generating 
North Fork Kings River by the company upstream from 
the Pine Flat reservoir. Under interim Contract No. 
DA-04-167-eng-1182 with the Department of the Army, 
Pacific Gas and Electric Co. paid for storage of power 
water in the Pine Flat reservoir May 15, 1954, through 
March 31, 1955. Current Contract No. 
DA-04-167-eng-1328 with the Department of the Army 
provides for storage of power water at the rate of 0.1375 
35-18

SACRAMENTO, CA DISTRICT 
per acre-foot; the contract covers April 1, 1955, through 
March 31, 2005. By an agreement of January 1972, 
supplementing the December 1954 contract, Pacific Gas 
and Electric Co. transferred ownership of most of its 
Kings River system water to the Kings River Water 
Association. Accordingly, no further significant storage 
service to Pacific Gas and Electric Co. by the reservoir 
at Pine Flat is anticipated. Total payment under these 
contracts through June 30, 1972, (last year of payment), 
amounts to $2,478,798; these funds were paid to 
Sacramento District and deposited for return to the 
Treasury. License No. 2741, effective September 25, 
1979, was issued by the Federal Energy Regulatory 
Commission to the Kings River Conservation District for 
hydropower development at the downstream toe of the 
Corps Pine Flat Dam. Payment to the Department of the 
Army for construction and installation of the penstocks 
in the amount of $1,044,685 was made to Sacramento 
District and deposited for return to the Treasury in 
November 1985. 
Operations and results during fiscal year. New 
work, regular funds: None. Code 710 funds: None. 
Maintenance: Maintenance and operation activities 
continued. Dam safety assurance studies were continued 
at a fiscal year cost of $18,235. Structures were 
maintained in serviceable condition. Runoff of Kings 
River above Pine Flat Dam was above normal for the 
year. Maximum storage of 890,910 acre-feet occurred 
on June 3, 1999. Maximum hourly inflow to the 
reservoir was 9,148 cubic feet per second on May 23, 
1999, and maximum outflow of 6,754 cubic feet per 
second occurred on July 14, 1999. During the year, 
1,573,564 acre-feet was released for irrigation and 
spreading. Releases for flood control amounted to 
24,000 acre-feet. 
Historical summary. Construction began in April 
1947 and project, including channel improvement, was 
completed in September 1977. Main dam was initiated in 
January 1950, completed in June 1954, and has been 
operating since February 1954 to provide flood 
protection for which it was designed. Total of 35.2 miles 
of new and reconstructed levees and 13.2 miles of 
channel clearing have been transferred to the Kings 
River Conservation District for maintenance. Recreation 
facilities for various recreation areas under Code 710 
appropriation are complete. Completed preliminary 
design and cost estimates for Pine Flat fish barrier were 
reviewed by the State, but the State was unable to 
provide necessary assurances of local cooperation. Dam 
safety assurance studies were initiated in FY 1982. A 
cultural resources survey was completed in FY 1984. 
On May 15, 1991, Pine Flat Lake acquired additional 
acreage as part of a memorandum of understanding 
(MOU) between the Secretary of the Army and 
Secretary of Agriculture (Forest Service). The Corps 
exchanged Isabella Lake and the 16,000 acres around 
that lake currently being used for park and recreational 
purposes for approximately 2,500 acres of Forest 
Service recreation land near Pine Flat Lake. 
23. REDBANK AND FANCHER 
CREEKS, CA 
Location. Northeast and adjacent to the Fresno- 
Clovis Metropolitan Area in Fresno County about 170 
miles southeast of Sacramento, CA. 
Existing project. Provides for flood control 
detention basins on Redbank Creek, Pup Creek, and 
Alluvial Drain; construction of a dam 45.5 feet high to 
create a reservoir with gross capacity of 10,300 acre-feet 
for flood control on Fancher Creek; and enlargement of 
Big Dry Creek project to provide increased flood 
protection and recreational development. Since the local 
sponsor does not support recreational development at 
this time, the recreation feature of the project is 
considered to be inactive. The Authorization Act states 
"measures determined appropriate by the Secretary of 
the Army to minimize benefits to groundwater recharge" 
shall be included in the project. Estimated cost (October 
1997) for existing project is $73,710,000 (includes an 
allowance for estimated inflation through the 
construction period), of which $47,460,000 is Federal 
and $26,250,000 is non-Federal (which includes 
$3,670,000 cash contribution). For future non-Federal 
reimbursement, see Local cooperation paragraph. 
Existing project was adopted by Sec. 401, Water 
Resources Development Act of 1986, Public Law 
99-662, November 17, 1986. (HD 98-147, 98th Cong., 
2d sess., contains published map.) 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate buildings, 
utilities, roads, bridges (except railroad bridges) and 
other facilities where necessary in construction of the 
project; pay 5 percent of cost allocated to flood control 
to bring total non-Federal share of flood control costs to 
25 percent, of which $3.680,000 is cash contribution, 
and bear all costs of operation, maintenance and 
replacement of flood control facilities. Local interests 
have agreed to make all required payments concurrently 
35-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
with project construction. 
Operations and results during fiscal year. 
Engineering activities, real estate crediting, and project 
auditing were continued. 
Historical summary. Local Cooperation Agreement 
was executed on August 1, 1987. Project construction 
was begun in September 1987 with initiation of 
archaeological work on Cultural Resources Preservation. 
Construction contract for Dry Creek Crossing was 
completed and transferred to local interests for operation 
and maintenance on January 10, 1989. Construction at 
Redbank Creek Detention Basin was completed and 
transferred to local interests for operation and 
maintenance on August 23, 1990. Construction contract 
for Fancher Creek Dam awarded May 23, 1990, was 
completed and transferred to local interests for operation 
and maintenance on March 13, 1992. Construction 
contract for Big Dry Dam, Pup and Alluvial detention 
basins was awarded March 18, 1992. Big Dry Creek 
Dam and Pup Creek Detention Basin were transferred to 
local interests on June 22, 1994. Last piece of completed 
work, Alluvial Drain Detention Basin, was transferred to 
local interests for maintenance and operation on July 18, 
1994. 
24. RUSSIAN RIVER BASIN, CA 
Location. Russian River rises in Coast Range in 
northwestern California, flows southerly for 87 miles, 
and then turns westerly to flow for 23 miles to Pacific 
Ocean at Jenner, 60 miles northwest of San Francisco, 
CA. (For general location see Geological Survey map for 
California.) 
Existing project. Active authorized project provides 
for construction of a dam on East Fork of Russian River 
at Coyote Valley to a height of 160 feet; a dam on Dry 
Creek at Warm Springs to a height of 319 feet; and 
channel stabilization works on Russian River between 
mouth and mile 98, on lower reaches of several 
tributaries, and on Dry Creek downstream from dam. 
Project also provides for expansion of fish hatchery 
capacity at Dry Creek, Warm Springs, to compensate for 
fish losses on Russian River attributed to operation 
of Coyote Dam component of project. Coyote Valley 
Dam (Lake Mendocino), completed in 1959, is operated 
and maintained by the United States. (See tables 35-L 
and 35-M for latest approved estimated costs.) 
Local cooperation. Fully complied with for Coyote 
Valley Dam and channel improvements accomplished to 
date. For the Dry Creek portion, local interests are 
required by the authorizing act to comply with the usual 
a., b., c. requirements for channel improvements and, in 
addition, prevent any encroachment in the channel of 
Dry Creek which would interfere with proper 
functioning of the channel improvement works; adjust 
all claims concerning water rights arising from the 
construction and operation of the improvements, 
including acquisition of water rights needed for 
preservation of fish and wildlife resources affected by 
the project; and reimburse the United States in 
accordance with the Water Supply Act of 1958, as 
amended, for that part of the joint-use construction cost, 
(30.2 percent currently estimated at $103,760,000) and 
an ultimate 32.5 percent of the annual operation, 
maintenance, and replacement joint-use costs allocated 
to municipal and industrial water supply. The estimated 
annual cost to local interests for maintenance of channel 
improvement works is $80,000. Sonoma County Water 
Agency (formerly Sonoma County Flood Control and 
Water Conservation District) provided assurances of 
willingness and ability to meet requirements by 
Resolutions No. DR 00793-1, September 25, 1961, No. 
DR 4770-1, December 17, 1962, and No. DR 45759, 
August 5, 1974, for Dry Creek (Warm Springs) Lake 
and Channel. By letter dated March 7, 1967, Sonoma 
County Flood Control and Water Conservation District 
further indicated their interest in optimization of the Dry 
Creek (Warm Springs) damsite to provide additional 
water supply storage. Reimbursement to the United 
States for Dry Creek (Warm Springs) Lake and Channel 
costs allocated to 212,000 acre-feet of water supply 
storage is specified in a water supply contract with the 
local sponsor approved in October 1982. Local interests 
have expended approximately $1,000,000 to provide 
partial flood protection in project area and have 
constructed facilities at an approximate cost of 
$20,000,000 to distribute water from the completed 
Coyote Valley reservoir. 
Operations and results during fiscal year. New 
work: Coyote Valley Dam: None. Dry Creek (Warm 
Springs) Lake and Channel: Engineering activities 
continued. The Gualala Redwoods claim that their 
access to Kelly Road was cut off by Corps project 
(Warm Springs) went to trial in October 1992. 
Judgement resulting was a cost of $3,162,000 to the 
Federal Government. Major items of contract work 
included: Completion of Liberty Glen wastewater 
35-20

SACRAMENTO, CA DISTRICT 
system at fiscal year cost of $353,795 and initiation and 
completion of contaminated soil remediation, $83,000. 
Maintenance: Coyote Valley Dam: Operation and 
maintenance continued. Dam safety assurance studies 
were continued at a fiscal year cost of $14,327. 
Structures were maintained in serviceable condition. 
Runoff of East Fork Russian River at Coyote Dam was 
above normal for the year. Maximum storage of 93,967 
acre-feet occurred on April 11, 1999. Maximum hourly 
inflow to reservoir was 6,668 cubic feet per second on 
February 9, 1999. Maximum release of 4,297 cubic feet 
per second occurred on February 10, 1999. During the 
year, 176,004 acre-feet was released for flood control, 
and 99,227 acre-feet was released for irrigation and other 
purposes. Dry Creek (Warm Springs) Lake and 
Channel: Operation and maintenance continued. 
Structures were maintained in serviceable condition. 
Runoff of Dry Creek at Warm Springs Dam was above 
normal for the year. Maximum storage of 261,469 
acre-feet occurred February 10, 1999. Maximum hourly 
inflow to reservoir was 11,239 cubic feet per second on 
February 9, 1999. Maximum release of 2,139 cubic feet 
per second occurred February 10, 1999. During the year, 
81,571 acre-feet was released for irrigation and other 
purposes. Releases for flood control amounted to 
100,052 acre-feet. 
Historical summary. Entire project, exclusive of 
recreation facilities at completed project (Lake 
Mendocino), is about 99 percent complete. Coyote 
Valley Dam, initiated November 1958, was completed 
April 1959 (cost $17,550,000, of which $11,952,000 was 
Federal; and $5,598,000 contributed). Work, including 
removal of slides resulting from storms in 1958, was 
completed April 1959. Bank stabilization work on 
Russian River near Geyserville was completed in 1957 
and channel improvements in remaining reaches on 
Russian River and East Fork of Russian River were 
completed in 1974 (cost $2,483,900). In April 1982, 
responsibility was transferred to the Sacramento District. 
Warm Springs construction completions include fish 
hatchery in December 1980, project overlook in May 
of Moulton weir and Ord Bend; construction of new 
levees from present levee terminus to vicinity of Chico 
Landing; construction of a weir near Chico Landing, 
extension of Moulton weir, and construction of a bypass 
through Upper Butte Basin; construction of new levees 
in Lower Butte Basin; enlargement of existing levees in 
Sutter, Tisdale, Sacramento, and Yolo Bypasses; and 
levee construction and/or channel enlargement on 
following minor tributaries of Sacramento River: 
Antelope Creek; Chico and Mud Creeks and Sandy 
Gulch; Butte and Little Chico Creeks; Cherokee Canal; 
1981, reservoir clearing in July 1981, downstream 
stabilization sills in October 1981, dam closure in 
October 1982, spillway repair at Warm Springs Dam in 
September 1985, boat launching facilities, Phase I, in 
September 1985, Rockpile Road Upgrade, Yorty Creek 
Beach, and remedial work at Liberty Glen camping area 
in September 1990, fish hatchery expansion in 
September 1992, final control tower grouting, dam 
access road repair, spillway stabilization, fish hatchery 
emergency water supply in September 1993, and Liberty 
Glen wastewater system and contaminated soil 
remediation. Initial filling of Warm Springs reservoir 
was commenced on November 1, 1984. Responsibility 
for construction was transferred to Sacramento District 
in August 1983. Dam safety assurance studies were 
initiated at Coyote Valley Dam in fiscal year 1984. 
25. SACRAMENTO RIVER AND 
TRIBUTARIES, CA, FROM 
COLLINSVILLE TO SHASTA DAM 
Location. Rises in Trinity Mountains in north-central 
California, flows generally southerly about 374 miles 
and empties into Suisun Bay, an arm 
of San Francisco Bay at Collinsville, CA. Works 
covered by this improvement are on Sacramento River 
and tributaries from Collinsville to Shasta Dam, about 
mile 312. Drainage area above Rio Vista is 26,500 
square miles (See Geological Survey quadrangles of 
area for Sacramento River and Upper Butte Basin; 
Flournoy and Fruto quadrangles for Black Butte Lake; 
and Tuscan Buttes, Tehama, Redding, and Hooker 
quadrangles for Table Mountain Lake.) 
Existing project. Improvement of Sacramento River 
and tributaries, from Collinsville to Shasta Dam was 
authorized as a unit of a comprehensive plan for flood 
control and other related purposes in Sacramento River 
Basin. (a) Sacramento River and major and minor 
tributaries, for flood control purposes: Enlargement of 
existing levees on Sacramento River between vicinity 
Elder Creek; Deer Creek (Tehama County); Thomes 
Creek; and Willow Creek. Improvement provides for 
about 155 miles of channel improvement and about 294 
miles of levees with an average height of 12 feet and a 
freeboard of 3 feet. Improvement also provides for 
revetment as required for protection of bypass levee 
slopes against erosion. Total first cost for project is 
$18,300,000 (October 1988), of which $11,900,000 is 
Federal, and $6,400,000 non-Federal for lands and 
damages, including relocations. (See table 35-N on 
project units classified and excluded from cost estimate.) 
35-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
(b) Sacramento River, Chico Landing to Red Bluff, CA: 
An extension of the existing Sacramento River Flood 
Control project which provides for construction of bank 
protection works and minor channel improvements as 
required on Sacramento River between Chico Landing 
and Red Bluff for flood control purposes. Estimated first 
cost (October 1987) for project work in Tehama, Butte, 
and Glenn Counties is $31,000,000, of which 
$25,700,000 is Federal cost and $5,300,000 non-Federal 
cost for lands and damages including relocations and 
cash contribution of $3,435,000. (c) Sacramento River, 
CA, Bank Protection Project: Includes initial phase 
covering 430,000 lineal feet of bank protection and a 
second phase covering 405,000 lineal feet of bank 
protection under a long range program of bank 
protection, erosion control works, and setback levees at 
critical locations within limits of authorized or existing 
levees included in the Sacramento River Flood Control 
project to protect integrity of levee system for flood 
control purposes. Total estimated (October 1997) first 
cost for project is $249,400,000, (includes an allowance 
for estimated inflation through the construction period) 
of which $179,900,000 is Federal and $69,500,000 
non-Federal comprised of lands and damages including 
relocations $26,671,000 and required cash contribution 
$42,829,000 toward first cost. Total estimated cost for 
recreation facilities, $2,874,000 (includes both Federal 
and non-Federal). Construction in (a), (b), and (c) above 
supplements program of levee improvements as 
accomplished pursuant to 1917 Flood Control Act, as 
amended by subsequent acts, including 1941 Flood 
Control Act, and which are reported on page 35-3A 
under Sacramento River, CA, flood control. (d) 
Authorization also provided for Black Butte Lake. For 
description of completed project see Annual Report for 
1975. Federal first cost for project is $14,508,820, 
including $475,507 for basic recreation facilities. For 
future non-Federal reimbursement, see Local cooperation 
paragraph. Federal cost for recreation facilities funded 
from Code 710 appropriations is $1,000,162. A 
concessionaire at Black Butte Marina provided public 
use facilities in accordance with lease agreement with 
the Secretary of the Army at an estimated cost to date of 
$87,000. (e) Authorization also provided for construction 
of Table Mountain (Iron Canyon) project, an earthfill 
dam on Sacramento River about 3 miles north of Red 
Bluff, CA. This project unit was deauthorized August 5, 
1977. For details, see Annual Report for 1978. 
Local cooperation. (a) Sacramento River and major 
and minor tributaries: Sec. 3, Flood Control Act of June 
22, 1936, applies. Fully complied with for all work 
completed or under contract, and local interests 
indicated they will be able to fulfill requirements for 
remaining work as scheduled. Levee construction (107 
miles) total requirement for the "active" project has been 
completed, transferred to, and accepted by the State. (b) 
Sacramento River, Chico Landing to Red Bluff: Sec. 3, 
Flood Control Act of June 22, 1936, applies; local 
interests must also assume responsibility for flood plain 
zoning. Fully complied with for portions completed in 
Tehama, Butte, and Glenn Counties; completed work, 
bank protection at 36 sites, was transferred to and 
accepted by the State. (c) Sacramento River Bank 
Protection Project: Sec. 3, Flood Control Act of June 22, 
1936, applies. Local interests must also contribute an 
amount in cash that, when added to costs of lands, 
easements, rights-of-way and utility modifications, 
equals one-third of cost of each unit of remedial work; 
this contribution is estimated (October 1997) at 
$27,740,000. Water Resources Development Act of 
1986 applies. Local interests must also contribute an 
amount in cash, that when added to the cost of lands 
easement, rights-of-way and utility modifications, equal 
one-quarter of each unit of remedial work; this 
contribution is estimated (October 1997) at $40,970,000, 
First phase mitigation equals thirty-seven percent for 
acquisition of land and establishment and maintenance 
of fish and wildlife habitat, this contribution is estimated 
(October 1997) at $790,000. Local interests fully 
complied with requirements for all work completed or 
under contract, and indicated they will be able to fulfill 
requirements for remaining work as scheduled. In 
addition, for reaches where local interests request bank 
stabilization in lieu of more feasible levee setbacks, 
local interests will contribute costs over and above costs 
of setbacks, and provide local contribution. Completed 
units transferred to and accepted by the State. (d) Black 
Butte Lake: None required for construction. Local 
interests must pay the portion of first cost and annual 
operation and maintenance costs allocated to the 
conservation functions of the project; these costs are 
estimated at 39.9 percent of first cost and 40.2 percent 
of annual costs. From March 2, 1960, to October 22, 
1970, contract between the Bureau of Reclamation and 
the State of California provided for repayment of 
irrigation storage costs; Bureau administered contract in 
accordance with reclamation law. Local interests paid a 
35-22

SACRAMENTO, CA DISTRICT 
total of $77,205 for irrigation services during this period. 
Public Law 502, 91st Cong., 2d sess., October 23, 1970, 
provided that Black Butte project be financially 
integrated with the Central Valley project, coordinated 
operationally with other Central Valley project storage 
units by the Bureau under the Secretary of the Interior, 
and that dam and reservoir at Black Butte be physically 
operated and maintained by the Corps in a manner 
compatible with recreational use of the reservoir. 
Operations and results during fiscal year. New 
work: (a) Sacramento River and major and minor 
tributaries None. (b) Sacramento River Bank Protection 
Project Complete construction of Contract 40A, with a 
fiscal year cost of $675,000. Complete the first Lower 
American River construction contract 1A-2 with a fiscal 
year cost of $733,000. Lower American River 
construction contract was IB awarded July 10, 1998 
with a fiscal year cost of $563,772. Engineering and 
design activities continued. (See table 35-0 for 
construction accomplished and contract costs.) (c) 
Sacramento River, Chico Landing to Red Bluff. None. 
(d) Black Butte Lake, regular funds: None. Code 710 
funds: None. Maintenance: Maintenance and operation 
activities continued. Structures were maintained in 
serviceable condition. Runoff above Black Butte Dam 
was above normal for the year. Maximum storage of 
138,694 acre-feet occurred April 19, 1999. Maximum 
hourly inflow to Black Butte reservoir was 11,008 cubic 
feet per second on March 25, 1999, and maximum 
outflow of 6,120 cubic feet per second occurred on 
March 25, 1999. During the year, 190,011 acre-feet was 
released for flood control and 218,524 acre-feet was 
released for irrigation and other purposes. (e) Table 
Mountain (Iron Canyon) Lake: None. 
Historical summary. (a) Sacramento River and 
major and minor tributaries (active portions): 
Construction was initiated in May 1949 on Deer Creek 
and Butte Creek units; Cherokee Canal, Elder Creek, 
Chico and Mud Creeks, and Sandy Gulch units have 
been completed. Active portion of this improvement is 
about 99 percent complete. Work remaining is bypass 
levee revetment as required, which will accomplished 
under Sacramento River Bank Protection project. (b) 
Sacramento River Bank Protection Project: Construction 
of first unit was initiated in June 1963; initial phase of 
project was completed in November 1974. Phase II is 
underway, and overall project is about 91 percent 
complete. (c) Sacramento River, Chico Landing to Red 
Bluff: Active portion of project, bank protection in 
Tehama County, was initiated in June 1963 and 
completed in March 1964. Project was reopened in June 
1968 to place additional necessary bank protection. 
Work at 36 sites was completed in Tehama, Butte, and 
Glenn Counties as of September 1985 and transferred to 
State for maintenance. Bank protection on Sacramento 
River, Tehama Countyone site, mile 215, (Unit 5), was 
completed November 1982, two sites, mile 209.5 and 
mile 217.5, (Unit 6), were completed in November 
1983, and four sites, 241.0, 237.9, 237.7, and 237.5 
(Unit 7) were completed in February 1985. (d) Black 
Butte Lake: Construction began in March 1960 and 
project is complete. Final land acquisition was 
completed in December 1966. Construction of main dam 
was initiated in June 1960 and completed in December 
1963. Dam has been operating since November 1962 to 
provide the flood protection for which it was designed. 
Final cost allocation approved May 3, 1977. Dam safety 
assurance studies were initiated in FY 1980 and 
completed in FY 1986. Piezometer installation and slope 
for protection at dam were completed in FY 1983. A 
cultural resources survey was completed in FY 1984. (e) 
Table Mountain (Iron Canyon) Lake: Project unit 
deauthorized as of August 5, 1977. 
26. SAN LORENZO, CA 
Location. Project is located within the city limits of 
Santa Cruz, CA, in Santa Cruz County, about 70 miles 
south of city of San Francisco and includes the lower 2.5 
miles of San Lorenzo River which terminates at the 
Pacific Ocean. 
Existing Project. Flood control features of the 
authorized project consist of construction of 13,000 1.f. 
of levee embankment raise or floodwalls on top of 
various portions of the existing project levees on both 
sides of San Lorenzo River from the Southern Pacific 
Railroad bridge to Highway 1. Habitat restoration 
measures include revegetating the land-side slopes of 
the levees. The maximum flood of record occurred in 
1955 which inundated 410 acres and caused damages of 
approximately $7.6 million. Project was authorized by 
the Water Resources Development Act of 1996 for flood 
control and habitat restoration purposes. Cost estimate 
(October 1998) is $17,600,00 (includes an allowance for 
estimated inflation through the construction period), of 
which $13,230,000 is Federal cost and $4,370,000 is 
non-Federal cost. 
Local cooperation. Local interests are required to 
35-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate utilities, 
roads, bridges (except railroad bridges), and other 
facilities where necessary in construction of project; pay 
10 percent of cost allocated to flood control to bring the 
total non-Federal share of costs to 25 percent, as 
determined under Section 103(m) of the Water 
Resources Development Act of 1986 to reflect the non- 
Federal sponsor's ability to pay as reduced for credit 
allowed based on prior work ($450,000 authorized under 
Section 215 of the Flood Control Act of 1968); pay 25 
percent of costs allocated to nonstructural flood control; 
pay 25 percent of costs allocated to fish and wildlife 
habitat; and bear all costs of operation, maintenance, 
repair, rehabilitation, and replacement. Local sponsor, 
City of Santa Cruz, expressed their continued support for 
project by letter dated October 8, 1997. The Project 
Cooperation Agreement (PCA) was executed October 
15, 1998. 
Operations and results during fiscal year. Energy 
and Water Development Appropriations Act, 1997 
provided initial construction funds of $200,000. 
Engineering and design continued, including revisions of 
plans and specifications to incorporate habitat restoration 
features into project. Construction General funds were 
used for fiscal year costs of $820,000. 
Historical summary. A flood control project, 
consisting of levee and channel improvements, was 
completed in 1959 by the Corps of Engineers. The 
project was to provide a standard project flood level of 
protection (about a 200-year event). Since that time, 
excessive sediment deposition in the streambed has 
reduced the flood carrying capacity of the existing 
project. Sediment accumulation and the resultant peak 
flows during a flood event in January 1982 caused the 
river to flow near design capacity, even though the storm 
had a recurrence level of only approximately 25-years. 
As a result of the flood threat, the City of Santa Cruz and 
the Corps of Engineers initiated a feasibility study of the 
San Lorenzo River with the signing of a final Feasibility 
Cost Sharing Agreement (FCSA) on August 18, 1989. 
Chiefs Report was signed June 30, 1994. 
Preconstruction engineering and design phase was 
initiated in March 1994 and completed at a cost of 
$934,000. 
27. UPPER JORDAN RIVER, UT 
Location. Project is located in Salt Lake County, 
Utah just south of Salt Lake City corporate limit. 
Existing Project. The project includes construction of 
a flood control diversion and sediment control structure 
on Mill Creek, a 1.4 mile underground conduit from the 
diversion structure to a detention basin, and construction 
of a 100 acre foot Hillview Detention Basin. The 
project will divert flood flows from Mill Creek to the 
detention basin and ultimately into Big Cottonwood 
Creek. The project will provide 100 year flood 
protection on Mill Creek above State Street. 
Local Cooperation. Local interests are required to 
provide lands, easements, rights of way, and borrow and 
excavated or dredged material disposal areas. Modify or 
relocate utilities, roads, bridges (except railroad 
bridges), and other facilities where necessary in the 
construction of the project. Pay 6 percent of the costs 
allocated to flood control and bear all costs of operation, 
maintenance, repair, rehabilitation and replacement of 
flood control facilities. The non-Federal sponsor has 
also agreed to make all required payments concurrently 
with project construction. Salt Lake County will act as 
the local sponsor for the project. A Project Cooperation 
Agreement is pending completion of a limited 
reevaluation report (LRR) and required funding. 
Operations and results during fiscal year. PED was 
completed at a cost of $1,576,000. At the request of Salt 
Lake County, the design is being reevaluated to address 
potential downsizing of the diversion structure and other 
project features. Results of the reevaluation will be 
presented in the LRR. 
Historical Summary. A feasibility report was 
completed in 1987 and PED was completed in 
December 1994. Funds were added in FY 1997 to 
initiate construction. There has been a long history of 
flooding which is most commonly associated with 
snowmelt. The most recent flooding occurred in 1982, 
1983, and 1984. A General Design Memorandum 
(GDM) was approved in December 1994. A project 
Authorization Change (PAC) report was submitted in 
January 1996 to obtain Congressional reauthorization on 
a Section 902 (WRDA 86) new cost limit. The project 
was reauthorized in WRDA 96. 
28. WALNUT CREEK, CA 
35-24

SACRAMENTO, CA DISTRICT 
Location. Project is on Walnut Creek and lower 
reaches of its principal tributaries, Pacheco, Grayson, 
San Ramon, Las Trampas, Galindo, and Pine Creeks in 
Contra Costa County, CA. Improvement will extend 
from Suisun Bay to head of project about 1 mile above 
southern limits of city of Walnut Creek. City of Walnut 
Creek is about 10 miles south of Suisun Bay. (See 
Geological Survey quadrangles for area.) 
Existing project. Comprises extension of existing 
levees, construction of new levees and concrete 
channels, channel rectification and enlargement, and 
utilization of improvements constructed or planned by 
local interests. Plan provides for about 21.8 miles of 
channel improvement, two reinforced-concrete drop 
structures, two stilling basins, and 13.8 miles of levees. 
Cost estimate (October 1996) is $97,100,000 (includes 
an allowance for estimated inflation through the 
construction period), of which $71,900,000 is Federal 
cost and $25,200,000 is non-Federal cost (includes 
$19,360,000 for lands and damages and relocations 
except railroad facilities, and $5,840,000 required cash 
contribution for land enhancement benefits provided by 
the project). Local interests have expended about $3 
million for flood control in the project area during the 
period 1955-1965, including the concrete conduits 
constructed through the city of Walnut Creek at an 
estimated cost of $1,000,000 considered a preproject 
condition to be incorporated in the Corps project. In 
addition, local developers have made channel 
improvements for Upper Pine Creek valued at 
$5,050,000. The cost thereof is not included in above 
costs of local cooperation. Improvement adopted by 
1960 Flood Control Act (H. Doc. 76, 86th Cong., 1st 
sess., contains latest published map). 
Local cooperation. Section 3, Flood Control Act of 
June 22, 1936, applies, except that relocation of railroad 
facilities is a Federal responsibility. In addition, local 
interests must make a cash contribution to the United 
States, in amount of 7.4 percent of cost of construction 
for land enhancement benefits provided by project. Cash 
contribution is estimated (October 1992) at $5,840,000. 
Local interests are represented by Contra Costa County 
Flood Control and Water Conservation District; formal 
assurances, including evidence of financial and legal 
ability to fulfill requirement for the cash contribution, 
were accepted by the Sacramento District Engineer on 
November 15, 1963. The Flood Control District 
furnished all rights-of-way required to date and indicated 
that it will furnish all requirements as needed for future 
construction. The Flood Control District arrange d for 
highway bridge modifications and utility relocations 
before start of work by the Corps contractor. Payment of 
required contributed funds will be made in installments 
in amounts equal to 7.4 percent of the estimated 
construction expenditure for each fiscal year. Flood 
Control District and city of Walnut Creek requested that 
recreation be added as a project purpose and will share 
costs in accordance with Water Resources Development 
Act of 1986. Post Authorization Change for recreation 
was approved July 27, 1987. In 1995, the city of Walnut 
Creek, decided not to proceed with the recreation 
project. 
Operations and results during fiscal year. New 
work: None. 
Historical summary. Construction was initiated 
June 1964; project is about 98 percent complete. Total 
of 17.7 miles of channel improvement, 9.2 miles of 
levee construction, part of channel improvement 
landscaping, Drop Structures No. 1 and 2 and 
construction under San Ramon Bypass Contract No. 1, 
Contract No. 2 and Contract No. 3 and Upper Pine 
Creek Channel contact have been transferred to local 
interests for operation and maintenance. Due to 
difficulties with Contract No. 1 part of the contract work 
was completed under Contract No. lA with a different 
contractor. A contract for remedial work on San Ramon 
Bypass Contract No. 2 channel cover was completed in 
August 1993. The 9-acre mitigation contract was 
completed in June 1993. Work remaining consists of 
completion of erosion control mitigation (8-acre 
Construction responsibility was transferred from San 
Francisco District on April 1, 1982. 
29. WEST SACRAMENTO, CA 
Location. Project is located in West Sacramento, Yolo 
County, in north-central California. 
Existing Project. Project consists of raising 4.9 miles 
of levees up to 5.0 feet along the Sacramento and Yolo 
Bypasses; constructing 0.9 miles of slurry cut-off wall 
approximately 50 feet deep at the waterside toe along 
the east levee of the Yolo Bypass extending into the 
south levee of the Sacramento Bypass; constructing 
concrete wing walls with stop logs at the Union Pacific 
Railroad; constructing a concrete wing wall and flow 
35-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
cut-off wall on each side of Interstate 80; and developing 
approximately 40 acres of mitigation lands for riparian 
and upland habitat loss. Project was authorized by the 
Water Resources Development Act (WRDA) of 1992. 
Project was reauthorized by the Energy and Water 
Development Appropriations Act, 1999 (P.L. 105-245) 
at a total cost of $32,900,000 with an estimated first 
Federal cost of $24,700,000 and an estimated first non- 
Federal cost of $8,200,000 (October 1998 price level). 
Local cooperation. Local interests are required to 
provide lands, easements, rights-of-way, and dredged 
material disposal areas; modify or relocate utilities, 
roads, bridges (except railroad bridges), and other 
facilities where necessary in construction of project; pay 
16 percent of cost allocated to flood control to bring the 
total non-Federal share of costs to 25 percent, and bear 
all costs of operation, maintenance, repair, rehabilitation, 
and replacement of flood control facilities. The non- 
Federal sponsor has also agreed to make all required 
payments concurrently with project construction. A 
Project Cooperation Agreement (PCA) with the local 
sponsor, the California State Reclamation Board, was 
executed in May 1996. 
Operations and results during fiscal year. 
Engineering and design continued, including revisions of 
plans and specifications. First construction contract in 
the amount of $5,217,225 was awarded June 19, 1998. 
Fiscal year costs were $2,931,338 (Federal) and 
$158,190 (non-Federal contributed funds). 
Historical summary. Funds were appropriated in FY 
1992 to initiate preconstruction engineering and design 
(PED) for the combined American River Watershed and 
Sacramento Metropolitan studies. The two projects were 
separated when WRDA 92 authorized the West 
Sacramento Project (Sacramento Metropolitan) 
independently of the American River Watershed Project. 
Funds to initiate construction for the West Sacramento 
Project were appropriated in FY 1995. Design 
Memorandum was approved in March 1996. PED was 
completed at a cost of $1,847,000. 
30. WILDCAT AND SAN PABLO 
CREEKS, CA 
Location. Project is located in vicinity of San Pablo 
and Richmond, Contra Costa County, CA, about 20 
miles northeast of San Francisco, CA. 
Existing project. Current plan of improvement 
reflects only Reach 1, which is from San Pablo Bay to 
AT&SF Railroad tracks on both Wildcat and San Pablo 
Creeks; Reach 1 consists of 9,900 lineal feet of channel 
improvements on Wildcat Creek and 10,000 lineal feet 
of channel improvements on San Pablo Creek. 
Improvements include channel deepening, levees, 
stilling basins, and flow control weirs. Additionally, 
about 20 acres will be planted for mitigation of fish and 
wildlife. Reach 2, which is upstream of AT&SF 
Railroad tracks and consists of 9,400 lineal feet of 
channel and levee work on Wildcat Creek, 1,800 lineal 
feet of channel and levee work on San Pablo Creek, and 
mitigation for fish and wildlife on 8 acres, was 
determined to be economically infeasible, excluded from 
total project cost, and reclassified as inactive. Project 
also includes recreation features on Wildcat Creek. 
Approved estimated cost of new work (1996) is 
$35,200,000 (includes an allowance for estimated 
inflation through the construction period), of which 
$20,200,000 is Federal cost, and $15,000,000 is 
non-Federal cost (includes $1,593,000 cash 
contribution). Improvements adopted by House and 
Senate Public Works Committee Resolutions June 9 and 
15, 1976, respectively, under provisions of Sec. 201 of 
Flood Control Act of 1965 (H. Doc. 511, 94th Cong., 2d 
sess., contains latest published map).For details on units, 
see Annual Report for 1968. 
Local cooperation. In accordance with cost sharing 
and financing concepts reflected in the Water Resources 
Development Act of 1986, local interests are required to 
provide lands, easements, rights of way, and dredged 
material disposal areas; modify or relocate buildings, 
utilities, roads, bridges (except railroad bridges), and 
other facilities, where necessary in the construction of 
project; pay one-half of the separable costs allocated to 
recreation and bear all costs of operation, maintenance, 
and replacement of recreation facilities; pay 5 percent of 
the costs allocated to flood control and bear all costs of 
operation, maintenance, and replacement of flood 
control facilities. Local interests have agreed to make 
all required payments concurrently with project 
construction. The Board of Supervisors of Contra Costa 
County by Resolution 73-466, June 25, 1973, agreed to 
assume obligations of local cooperation. On November 
9, 1976, the Board reaffirmed sponsorship by Resolution 
35-26

SACRAMENTO, CA DISTRICT 
76-960. Contra Costa County Flood Control and Water 
Conservation District Board of Supervisors formed an 
Assessment District, August 3, 1982, which assures 
availability of funds for local share of non-Federal 
portion of flood control project costs for a modified plan 
of improvement. A flood control Local Cooperation 
Agreement satisfying all requirements of Sec. 221, Flood 
Control Act of 1970 (Public Law 91-661) and consistent 
with the Water Resources Development Act of 1986 
(Public Law 99-662), was executed on June 20, 1986 
between the Department of the Army and the Contra 
Costa County Flood Control and Water Conservation 
District. By Resolution No. 1985-12-351, adopted 
December 17, 1985, the East Bay Regional Park and 
Recreation District stated support for development of 
trail and recreational improvements for the project and 
indicated its intent to share in 50 percent of the cost of 
such improvements and perform operation and 
maintenance responsibility. A recreation Local 
Cooperation Agreement (LCA) was signed by the 
Assistant Secretary of the Army on April 15, 1992. 
Operations and results during fiscal year. 
Engineering and construction continued. 
Historical summary. Contact 3C completed. Local 
interests withdrew support of project in 1979. Project 
responsibility was transferred from San Francisco 
District on April 1, 1982. After 1982-1983 floods, locaJ 
interests again indicated support of the project, and in 
October 1983, project work was resumed by Sacramento 
District. A revised final environmental impact statement 
was filed March 28, 1986, and a General Design 
Memorandum was approved May 29, 1986. Flood 
Control Local Cooperation Agreement was executed 
June 20, 1986. Recreation Design Memorandum was 
approved on February 19, 1992, and the recreation LCA 
was signed on April 15, 1992. Construction work under 
Contract No. 1 and Contract No. 2 for Reach No. 1 of 
Wildcat and San Pablo Creeks has been transferred to 
local sponsor for operation and maintenance. In March 
1990, Reach 2 was declared infeasible and is now 
inactive. All costs have been deleted from project cost 
estimate. Flood control construction of the project is 
about 100 percent complete. Final accounting of project 
is underway. Recreation features are 50 percent 
complete. 
31. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Approved regulations for operation and maintenance 
of flood control works, part 208, title 33, Code of 
Federal Regulations, provide for inspection of 
completed projects transferred to local interests for 
operation and maintenance to determine status of project 
and insure compliance with regulations. During fiscal 
year, inspections were made of: Completed units of 
Fairfield Vicinity Streams; completed units of 
Sacramento River and major and minor tributaries; 
completed units of Sacramento River, Chico Landing to 
Red Bluff; completed units of Sacramento River flood 
control project, Kings River Channel Improvement (Pine 
Flat Lake project), and Walnut Creek project; American 
River levees; Merced County Stream group; Middle 
Creek (Lake County); Chester, North Fork Feather 
River; levee and channel improvements on Chowchilla 
River (Buchanan project) and Fresno River (Hidden 
project); Duck Creek diversion, Green Valley Creek, 
Littlejohn Creek, Mormon Slough, Bear Creek, Kern 
River-California Aqueduct Intertie, and North Fork, Pit 
River at Alturas, all in California; Truckee River, CA 
and NV; completed units of lower San Joaquin River 
and tributaries, CA; completed units of Red Bank and 
Fancher Creeks including Big Dry Creek Dam and 
diversion, and Fancher Dam and Redbank, Alluvial 
Drain and Pup Creek detention basins, CA; Reese River, 
Battle Mountain, NV; Sevier River, Redmond and 
vicinity, Jordan River, Big Wash near Milford, and Kays 
Creek, all in Utah; various emergency flood control 
works under authority of Sec. 208, Flood Control Act of 
June 30, 1948, and September 3, 1954; Public Law 99, 
June 28, 1955, and antecedent legislation; and Sec. 14 of 
Flood Control Act of July 24, 1946. Maintenance 
inspections conducted indicate that existing agreements 
and regulations are being complied with on completed 
flood control works. Continuing effort is required to 
improve maintenance practices and active steps are 
being taken by responsible State and local agencies to 
achieve desired results. Local agencies were advised, as 
necessary, of measures required to maintain these 
projects in accordance with standards prescribed by 
regulations. Total cost of inspection for fiscal year of 
$234,854 included continuation of dam safety assurance 
program for Folsom Lake, CA for $108,033. 
32. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to sec. 205, Public 
35-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Law 858, 80th Congress, as amended 
(Preauthorization). 
Costs for preauthorization studies for fiscal year were 
$627,038. See Table 35-P for list of studies. 
Aquatic Ecosystem Restoration activities pursuant 
to sec 206, Public Law 303,104th Congress. 
Cost for studies for fiscal year were $858,586. See 
Table Q for list of studies. 
Emergency flood control activities-repair, flood 
fighting, and rescue work (Public Law 99, 84th 
Cong., and antecedent legislation). 
Federal cost for fiscal year was $15,161,667, $507,632 
was for disaster preparedness and $14,654,035 for 
emergency flood repairs. 
Emergency bank protection (Sec. 14, 1946 Flood 
Control Act, Public Law 526, 79th Cong.). 
Federal cost for fiscal year was $19,960,494, 
$19,935,208 was for emergency operations and $25,286 
for emergency streambank and shoreline protection. 
Snagging and clearing navigable streams and 
tributaries in interest of flood control (Sec. 208, 1954 
Flood Control Act, Public Law 780, 83d Cong.). 
Federal cost for fiscal year was $251,722 all of which 
was used for snagging and clearing activities. See Table 
R for list of studies. 
Flood insurance activities (Sec. 1301-1377, 1968 
Housing and Urban Development Act, Public Law 
90-448 as amended). 
In coordination with flood control activities, four 
flood insurance studies were continued. Inter-Agency 
Agreements EMW-96-1A-0294, EMW-96-1A-0195- 
FEMA, EMW-96-IA-0195, and EMW-97-IA-0140, at a 
fiscal year cost of $101,670 under Federal Emergency 
Management Agency reimbursable order. 
33. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
In accordance with sec. 7, Flood Control Act of 1944, 
summaries of monthly reservoir operations at Big Dry 
Creek, Boca, Camanche, Del Valle, Folsom, Friant 
(Millerton Lake), Indian Valley, Los Banos Detention, 
New Bullards Bar, New Don Pedro, New Exchequer 
(Lake McClure), New Melones, Oroville, Prosser, 
Shasta, and Stampede, CA; East Canyon, Echo, 
Jordanelle, Little Dell, Lost Creek, Pineview, Red Fleet, 
Starvation, and Wanship, UT; and Blue Mesa, Lemon, 
Paonia, Ridgway, and Vallecito, CO, were prepared. No 
water control manual revisions were completed due to 
environmental issues. Corps personnel provided advice 
Sec. 7 as requested during flood control operations at all 
c. 7 reservoirs. Fiscal year cost was $1,758,197. Total 
cost to September 30, 1999, was $12,990,282. 
Multiple-Purpose Projects including Power 
34. NEW MELONES LAKE, CA 
Location. On Stanislaus River about three-quarters 
mile downstream from existing Melones Dam and about 
35 miles northeast of city of Modesto. (See Geological 
Survey quadrangles of the area.). 
Existing project. Provides for construction of (a) an 
earth and rockfill dam about 625 feet high to create a 
reservoir with gross storage capacity of about 2,400,000 
acre-feet for flood control, irrigation, power, general 
recreation, fish and wildlife, and other purposes, and (b) 
a powerplant below the dam with an installed capacity 
of 300,000 kilowatts. Upon completion of construction 
of dam and powerplant by the Corps, the project became 
an integral part of Central Valley project and is being 
operated and maintained by the Secretary of the Interior 
pursuant to Federal reclamation laws, except that the 
flood control operation of the project shall be in 
accordance with rules and regulations prescribed by the 
Secretary of the Army. Maintenance of Stanislaus River 
channel from Goodwin Dam to San Joaquin River to a 
capacity of at least 8,000 cubic feet per second will also 
be Corps responsibility. Estimated (October 1996 price 
level) Federal cost is $402,000,000. For future 
non-Federal reimbursement, see Local cooperation 
paragraph. In addition, local interests expended 
$300,000 for levees along lower reaches of Stanislaus 
River. Existing project was adopted by 1962 Flood 
35-28

SACRAMENTO, CA DISTRICT 
Control Act (H. Doc. 453, 87th Cong., 2d sess., contains 
latest published map). This act modified original 
authorization adopted by 1944 Flood Control Act. (H. 
Flood Control Committee Doc. 2, 78th Cong., 2d sess., 
contains latest published map.) The 1944 Flood Control 
act established $8 million monetary limitation for partial 
accomplishment of project. Further monetary 
authorizations of $2.5 million, $5 million, $13 million, 
$2 million, $17 million, $18 million, $44 million, $83 
million, $46 million, $6 million, and $61 million were 
provided for this project by Public Laws 235 and 780, 
83d Cong., and 85-500, 90-17, 90-483, 91-282, 92-222, 
93-251, 94-397, 95-104, and 95-189, making a total 
monetary authorization of $305,500,000 available for the 
basin plan comprising Lower San Joaquin River and 
tributaries, including Tuolumne and Stanislaus Rivers, 
CA. Since FY 1979, appropriations have not been 
subject to the river basin monetary limitation. 
Local cooperation. Based on approved preliminary 
cost allocation studies (July 1965) local interests will be 
required to pay 35.2 percent of first cost and 12.7 percent 
of annual operation and maintenance costs allocated to 
irrigation. In addition, 31.1 percent of first cost and 62.5 
percent of annual cost would be allocated to power. 
Local interests must also maintain existing private levees 
along Stanislaus River from Goodwin Dam to San 
Joaquin River and prevent encroachment on channel and 
floodway between levees to preserve safe carrying 
capacity throughout the reach of at least 8,000 cubic feet 
per second. Recovery of costs allocated to irrigation and 
power will be the responsibility of the Bureau of 
Reclamation. Reimbursement of costs will be in 
accordance with Bureau policies and procedures for the 
Central Valley project. State of California officially 
adopted project by chapter 918 of statutes of 1963, and 
by chapter 1438 of those statutes authorized State 
Reclamation Board to furnish required assurances. The 
Board, by letter dated December 13, 1963, stated it 
would furnish required assurances when formally 
requested to do so. Assurances were requested by letter 
of December 30, 1977. On October 2, 1979, the Board 
reaffirmed its intent to furnish the required assurances. 
On January 6, 1983, the Board provided formal 
assurances of local cooperation. 
Operations and results during fiscal year. New 
work: Project close-out and flowage easement 
acquisition along the Lower Stanislaus River were 
continued. Maintenance: Maintenance and operation 
activities continued on Lower Stanislaus River. 
Historical summary. Construction was initiated in 
August 1966. Main dam contract which was awarded in 
March 1974 has been completed; dam dedication 
ceremonies were held July 14, 1979. Cultural resources 
preservation, water intake facilities, flood control and 
irrigation tailrace modification, reservoir area clearing, 
Tuttletown Phase I recreation area, Oakdale recreation, 
Glory Hole Phase I and Phase II recreation area, and 
operations access road contracts have all been 
completed. Glory Hole minimal recreation facilities 
contract has been completed. Boundary fencing, Lower 
Stanislaus Phase I and Phase II minimal recreation 
facilities, Lower Stanislaus Corporation Yard, and 
Lower Stanislaus Administration Building contracts 
have been completed. Tuttletown minimal recreation 
facilities, McHenry recreation area, Tuttletown 
wastewater treatment, Knights Ferry recreation area, 
Knights Ferry Covered Bridge, Glory Hole recreation 
area sanitary system, Two-Mile Bar recreation, 
administration building, and Glory Hole recreation area 
force main contracts have been completed. Parrotts 
Ferry Bridge modification (Nov 93), Widening Highway 
49 Intersection (Aug 94); Tuttletown Recreation 
Campgrounds, and Tuttletown and Glory Hole 
Improvement (Jan 94) have been completed. Remaining 
recreation facilities were unscheduled pending 
development of cost sharing agreements and/or specific 
Congressional appropriation of funds. A Memorandum 
of Understanding between the Department of the Interior 
and the Department of the Army transferring the New 
Melones dam and reservoir from the Corps of Engineers 
to the Bureau of Reclamation was executed on 
November 20, 1979. Agreement provides that the Corps 
complete land acquisition actions and retain budgeting, 
design, and construction responsibility for reservoir 
clearing and recreation development; completion of 
cultural resources mitigation in project area was vested 
in the Department of the Interior. The California State 
Water Resources Control Board's Decision 1422 of 
April 1973 established conditions which impacted on 
the planned filling and operation of the project by the 
Department of the Interior. As a result, the Department 
of Interior brought suit against the State of California 
claiming State limitations on project operation were 
contrary to Congressional intent and authority. The case 
was heard before the U.S. District Court in Fresno, CA, 
and in early March 1981, a Federal judge ruled that the 
Federal Government could fill the New Melones 
reservoir for purpose of generating electrical power, but 
not for agricultural or other purposes. Both the 
35-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Government and the California State Resources Control 
Board appealed this decision to the 9th Circuit Court of 
Appeals in San Francisco, CA. 
On December 20, 1982, the Court upheld all 25 
requirements placed on the Federal Government by the 
State Water Resources Control Board. The decision 
reversed the lower court's decision to permit filling of the 
reservoir for generating electrical power. The Bureau of 
Reclamation subsequently filed for a permit from the 
State Water Resources Control Board to fill the 
reservoir. Permit was approved. The Bureau had 
originally started generating power on a limited basis on 
July 1, 1979; however, after the filling of the reservoir in 
spring of 1983, full power generating benefits have been 
attained. Project is about 99.9 percent complete. 
General Investigations 
35. SURVEYS 
See Table 35-S. 
36. COLLECTION AND STUDY OF 
BASIC DATA 
Technical assistance was performed for other Federal 
agencies as well as non-Federal agencies in connection 
with Flood Plain Management Services Program at fiscal 
year costs of $358,768. No Flood Plain Information 
Studies were prepared after FY 1980. 
Fiscal year costs for hydrologic studies were $49,147. 
37. RESEARCH AND DEVELOPMENT 
The Hydrologic Engineering Center was designated as 
a separate Field Operating Agency as of January 1, 1979, 
in accordance with OCE permanent orders 1-1, January 
10, 1979, but Sacramento District is continuing to 
provide advisory and administrative support services to 
HEC as specified in local support agreement 
DACW05-79-A-0038 of March 1979. Fiscal year costs 
were $1,290,182, of which $51,540 was for collection 
and study of basic data (including flood plain 
management service), $1,298,819 was for research and 
development, and $1,239,535 was for operation and 
maintenance activities. 
38. PRECONSTRUCTION ENGINEERING 
AND DESIGN 
AMERICAN RIVER WATERSHED, CA 
(COMPREHENSIVE PLAN) 
The project is located in Placer, El Dorado, and 
Sacramento Counties on the North, Middle and South 
Forks of the American River and along the lower 
American River and Sacramento Rivers. 
Recent evaluations indicate that the level of flood 
protection along much of the American River and in the 
Natomas area is less than the 100-year level. The 
Supplemental Information Report (SIR) was completed 
in March 1996 as directed by the Defense 
Appropriations act for FY 1993. The Chief of 
Engineer's Report recommended implementation of 
elements common to the final candidate plans 
presented in the SIR. These "common elements", were 
authorized for construction in the Water Resources 
Development Act (WRDA) of 1996. Other alternatives 
addressed in the SIR include: Folsom outlet 
modifications, Folsom Dam raising, downstream levee 
raising along the American and Sacramento Rivers, and 
upstream storage. Efforts are being continued to define 
plans for alternatives leading to higher levels of flood 
protection for the Sacramento area and vicinity. 
The Feasibility Report for the American River 
Watershed Investigation was completed in December 
1991 and the Division Engineer's Report was issued in 
February 1992. Funds were appropriated in FY 1992 to 
initiate preconstruction engineering and design (PED) 
for the combined American River Watershed and 
Sacramento Metropolitan studies. The two projects 
were separated when WRDA 92 authorized the 
American River Watershed Project independently of the 
West Sacramento Project (Sacramento Metropolitan). 
Estimated preconstruction planning cost is 
$30,000,000. 
TRUCKEE MEADOWS, NV 
35-30

SACRAMENTO, CA DISTRICT 
Project is located in metropolitan area of Reno and 
Sparks in Washoe County, NV. 
Current plan of improvement consists of about 7 miles 
of levees, 5 miles of floodwalls, 3 bridge replacements 
along Truckee River and includes limited channel 
excavation, a detention dam on Steamboat Creek at 
Huffaker Narrows, and backwater levees along 
Steamboat Creek, Boynton Slough, and the North 
Truckee Drain just north of the Interstate Highway 80 
crossing. Plan also includes recreation facilities with 
bicycle and pedestrian paths, river overlooks, and picnic 
sites; mitigation measures (31 acres of riparian plantings 
to replace vegetation losses); and fish and wildlife 
features. Project will provide flood protection from 
Truckee River to cities of Reno and Sparks and Truckee 
Meadows urban areas. 
Project was deferred and preconstruction planning had 
been terminated as project is economically infeasible. 
Coordination with local agencies and sponsors was 
continued. Flooding remains an issue and locals 
requested a review of the project. A reconnaissance 
study is reassessing the flood control 
needs. 
NAPA RIVER, CA 
Project is located in city and county of Napa, CA. 
Current plan of improvement consists of geomorphic 
channel design setback, floodwalls and levees, training 
dike, a dry bypass channel, and related environmental 
mitigation measures. The improvements on Napa River 
would extend about 7 miles, from Trancas Street to 
Highway 29. Approximately one mile of Napa Creek, 
from the confluence of Jefferson, would be improved to 
increase flood protection. 
The project will provide 100-year level of flood 
protection from Napa River and Napa Creek to city of 
Napa. 
A hazardous, toxic and radioactive waste preliminary 
evaluation was conducted. The Final Supplemental 
General Design Memorandum and Supplemental 
Environmental Impact Statement/Environmental Impact 
Report were completed in October 1998. Estimated 
preconstruction planning cost is $15,000,000. 
39. OTHER WORK UNDER 
SPECIAL AUTHORITY 
VIC FAZIO WILDLIFE AREA, CA (the project 
previously known as) YOLO BASIN WETLANDS, 
SACRAMENTO RIVER, CA (Section 1135) Project 
Modification for Improvement of Environment 
Energy and Water Development Appropriations Act. 
1999, Sec 508 changed the project name from "Yolo 
Basin Wetlands" to "Vic Fazio Yolo Wildlife Area" 
The Yolo Basin Wetlands area is primarily located 
within the boundaries of the Yolo Bypass, an operative 
feature of the Sacramento River Flood Control Project. 
Yolo Bypass extends 43 miles from Fremont Weir on 
the Sacramento River, south to the town of Rio Vista 
where it rejoins the river.Project includes restoration of 
wetlands and contributes to a larger program now in the 
planning stage, proposed by an interagency group of 
state and local governments and organizations. Yolo 
Basin Wetlands work includes physical improvements 
to help create a mixture of native marsh, permanent and 
seasonal wetlands, and riparian forest through 
modification of existing drainage canals or construction 
of small dikes and weirs to redirect available water 
sources to proposed wetland areas. Also to be included 
is preparation of a flood plain hydraulic management 
model to assess hydraulic impacts of wetland projects 
proposed in the Yolo Bypass and construction of an 
administrative and maintenance facility. Estimated 
project cost is $17,194,000. Project was authorized by 
the Water Resources Development Act (WRDA) of 
1986, Public Law 99-662, Sec. 1135(b), as amended by 
Sec. 304 of WRDA 1990. 
The California State Department of Fish and Game is 
the project sponsor for 3,480 acres located within the 
Yolo Bypass. 
A Project Modification Report and an Environmental 
Assessment/Initial Study were completed in April 1992. 
Three existing sites have been identified for wetlands 
restoration: Putah Creek Sink (3,000 acres), Yolo 
Causeway (182 acres) and Willow Slough Bypass (345 
acres). Willow Slough Bypass site was later withdrawn 
due to difficulty in acquiring lands. A flood plain 
hydraulic management model was continued. Local 
Cooperation Agreement (LCA) for Putah Creek Sink 
35-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
site was executed on December 23, 1993. 
Fiscal year costs were $273,498. 
YOLO WETLANDS BASIN, DAVIS SITE, 
SACRAMENTO, CA (Section 1135) Project 
Modification for Improvement of Environment 
Project is located contiguous to boundaries of Yolo 
Bypass and Willow Slough Bypass, which is a leveed 
tributary of Sacramento River on west side of Yolo 
Bypass. Yolo Bypass and Willow Slough Bypass are 
operative features of the Sacramento River Flood 
Control Project. 
Project include a 396-acre site that consists of 212 
acres of permanent wetland, 64 acres of riparian 
woodland, 64 acres of grassland/upland, and 56 acres of 
seasonal wetland, dikes, roads, gates, ponds and islands. 
Water for wetlands site is available from City of Davis 
waste water treatment plant and from its storm drain 
system. Estimated project cost is $6,000,000. 
A previous Davis site was included under Yolo Basin 
Wetlands, Sacramento River project, but was with 
drawn for consideration by local sponsor due to 
difficulty in obtaining lands. Current project is 
proceeding under authority of Sec. 1135(b) of Water 
Resources Development Act (WRDA) of 1986. 
Fiscal year costs were $193,265. 
35-32

SACRAMENTO, CA DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
1. Sacramento River New Work 
CA (Federal Approp. 
Funds) 
(Contrib. Funds. 
Other) 
2. Sacramento River 
Deep Water Ship 
(Required Contrib. 
Funds) 
(Contrib. Funds, 
Other) 
3. San Francisco Bay 
to Stockton, CA 
(John F. Baldwin 
and Stockton Ship 
Channels 
4. San Joaquin 
River, CA 
Cost 
Maint. 
Approp. 
Cost 
Maint 
Contrib. 
Cost 
New Work 
Approp. 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
40,331,192 1 
40,331,192 1 
558,000 1,454,000 2,167,000 5,139,000 1,055,000 
520,153 1,535,676 2,145,480 3,652,774 2,560,678 
32,785 
-170,000 
22,270 
1,300,000 
1,019,962 
92,000 -50,000 
23,158 18,947 
- 30,000 
14,196 6,316 
100,000 
57,322,678 2 
08,613 3 
85,000 4 
- 57,000 7,816,474 5 
1,912 37,339 7,775,007 
- - 2,610,000 
310 6,773 2,589,472 
- - 15,000 
14,578 
- 22,000 25,000 64,696,000 6 
62,622 18,236 18,096 64,188,615 7 
New Work 
Approp. 
Cost 
Maint. 
5,833,117 8 
5,833,117 9 
Approp. 1,162,000 762,000 5,293,000 4,260,000 351,000 27,095,382 
Cost 1,216,824 822,849 5,252,863 3,002,863 1,633,119 27,838,846 
5. American River New Work 
Watershed Approp. 
(Common Elements Cost 
New Work 
Contrib. 
Cost 
6. American River New Work 
Watershed Approp. 
(Natomas) Cost 
New Work 
5,828,000 6,738,000 
4,104,812 6,639,672 
1,325,000 6,099,000 
167,572 977,941 
12,566,000 
10,744,484 
7,424,000 
1,145,513 
- 3,886,000 11,429,000 15,315,000 
- - 15,163,184 15,163,184 
35-33

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
Contrib. 
Cost 
7. Buchanan Dam- New Work 
H.V. Eastman Lake Approl. 
Chowchilla River, Cost 
CA (Federal Maint 
Funds) Approp. 
(Contrib. Funds 
Other) 
8 Cashe Creek 
Settling Basin, CA 
(Federal Funds) 
(Required Contrib. 
Funds) 
(Contrib. Funds, 
Other) 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
9. Calaveras River New Work 
and Littlejohn Approp. 
Creek and Trib- Cost 
utaries including Maint 
New Hagon Lake Approp. 
& Farmington Dam Cost 
CA (Federal Funds) 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
10. Colorado River at New Work 
Great Junction, CO Approp. 
(Federal Funds) Cost 
New Work 
(Required Contrib. Contrib. 
Funds) Cost 
11. Corte Madera 
Creek, CA 
(Federal Funds) 
New Work 
Approp. 
Cost 
27,369,597 
27,369,597 
1,525,000 1,413,000 1,314,000 1,463,000 1,288,000 23,537,393 
1,464,048 1,527,612 1,310,283 1,276,810 1,457,826 23,501,633 
-- - - - 111,187 10 
111,187 10 
-235,000 
-245,384 
3,550,000 -150,000 
566,356 2,921,834 
- 180,000 
6,389 3,500 
3,500 
- 120,000 
161,564 32,400 
1,766,000 1,882,500 1,834,000 4,453,000 1,969,000 
1,781,777 1,561,355 1,830,517 3,951,498 2,423,645 
101,700 
39,046 
456,700 
373,358 
2,325 
446,400 
253,407 
7,276 
203,594 38,802 3,828 
-23,566 
9,910 
5,113 
55,856 
13,611,000 
13,608,917 
- 1,279,000 
29,114 1,169,814 
- 724,000 11 
676,755 12 
- 23,723,144 13 
23,723,144 13 
38,525,611 
38,036,160 
- 1,499,951 15 16 
38,456 1,475,753 15 17 
908,100 
872,989 
79,484 
397 66,163 
12,458,725 
12,451,883 
35-34

SACRAMENTO, CA DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
(Required Contrib. New Work 
Funds) Contrib. 
(Contrib. Funds, 
Other) 
12. Fairfield Vicinity 
Streams, CA 
(Federal Funds) 
(Required Contrib. 
Funds) 
(Contrib. Funds, 
Other) 
13. Guadalupe River, 
CA 
(Required Contrib. 
(Funds) 
(Contrib. Funds. 
Other) 
14. Hidden Dam 
Hensley Lake, 
Fresno River, CA 
(Federal Funds) 
(Contrib. Funds 
Other) 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
190,355 19 
190,213 19 
804,761 20 
804,761 20 
-35,000 
-40,088 
59,012 
59,016 
16,894 5,036 
- -5,000 14,739,000 
1,255 - 14,716,289 
592,382 
592,381 
-4,979 
New Work 
Approp. 6,073,000 
Cost 2,499,041 
New Work 
Contrib. -291,080 
Cost 2,004,712 
New Work 
Contrib. 3,147,640 
Cost 2,310,761 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
7,428,000 -403,000 1,844,000 6,509,000 
4,719,421 2,781,245 2,767,767 4,562,080 
2,299,000 
2,519,808 
142,000 
907,965 
690,000 
670,259 
3,779,000 21 
3,770,497 22 
45,628,000 
37,280,709 
- 970,000 6,956,920 
124,797 249,832 5,655,964 
170,000 - 1,322,000 
284,000 104,222 582,338 
1,624,000 1,600,300 1,593,000 1,335,000 1,516,000 
1,535,064 1,727,862 1,541,262 1,243,242 1,599,132 
5,421,640 23 
4,534,438 24 
24,889,818 
24,825,046 
165,112 25 
165,112 25 
15, Isabella Lake, Kern New Work 
River, CA Approp. 
(Federal Funds) Cost 
Maint 
Approp. 
24,450,537 26 
24,450,537 26 
673,000 1,047,200 1,372,455 5,167,000 967,000 46,886,717 27 28 
35-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
Contrib. Funds, 
Other) 
Cost 
New Work 
Contrib. 
Cost 
16. Kaweah and Tule New Work 
Rivers including Approp, 
Terminus Dam and Cost 
Success Lake, CA Maint 
(Federal Funds) Approp. 
Cost 
Contrib. Funds, New Work 
Other) Contrib. 
Cost 
17. Little Dell New Work 
Lake, UT Approp. 
(Federal Funds) Cost 
(Required Contrib. New Work 
Funds) Contrib. 
Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
633,458 952,773 1,087,352 5,443,327 1,107,423 
-2,122 269 
46,871,337 27 28 
753,000 29 
747,718 30 
34,997,230 31 
34,997,230 31 
4,253,000 4,270,700 3,727,000 3,530,000 4,678,000 
3,487,774 4,695,841 3,761,806 3,198,416 5,082,328 
61,378,574 32 
61,294,286 32 
633,420 2234 
632,695 3335 
500,000 1,010,000 3,213,000 1,014,000 -190,000 41,146,900 
723,860 1,391,999 2,513,831 1,883,994 -160,062 40,989,102 
480,000 
356,950 
474,500 
769,610 
- - - 19,954,500 
36,172 108,704 -484,863 19,264,189 
4,300,147 36 
4,300,147 37 
8,504,989 38 
8,504,989 38 
18. Martis Creek Lake, New Work 
Martis Creek, NV, Approp. 
and CA Cost 
Maint 
Approp. 629,000 443,000 506,000 471,000 422,000 8,695,383 
Cost 648,017 459,909 493,233 365,486 507,462 8,659,005 
19. Merced County New Work 
Streams, CA Approp. 
(Federal Funds) Cost 
(Required Contrib. New Work 
Funds) Contrib. 
Cost 
(Contrib. Funds 
Other) 
New Work 
Approp. 
Cost 
599,000 
463,374 
422,000 497,000 1,734,000 357,000 19,921,000 
608,354 451,434 1,573,751 557,234 20,226,062 
104,505 
84,712 288 
614,505 
595,000 
285,272 40,000 109,545 -64,000 72,000 4,519,938 39 40 
65,590 39,909 250,636 12,150 119,417 4,763,046 3940 
20. Merced County New Work 
Stream Group, CA Approp. 
35-36 
2,751,259 41

SACRAMENTO, CA DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
Cost - - - - 2,751,259 41 
Maint. 
Approp. 146,000 100,500 230,000 237,000 13,000 3,188,340 
Cost 176,222 130,403 205,951 118,890 154,700 3,187,283 
21. Pajaro River Basin New Work 
CA (Federal Funds) Approp. 
Cost 
(Required Contrib. New Work 
Fund Contrib. 
Cost 
- 480,000 
1,930 480,317 
22. Pine Flat Lake and New Work 
Kings River, CA Approp. - 
(Federal Fund) Cost - 
Maint. 
Approp. 4,125,764 
Cost 3,996,316 
(Contrib. Funds, New Work 
Other) Contrib. - 
Cost - 
23. Redbank and New Work 
Fancher Creeks, CA Approp. 
(Federal Funds) Cost 
(Required Contrib. New Work 
Funds) Contrib 
Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
24. Russian River New Work 
Basin, CA, Coyote Approp. 
Valley Dam (Lake Cost 
Mendocino) and Maint 
Channel Improve- Approp. 
ments (Federal Cost 
Funds) 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
Dry Creek (Warm New Work 
Springs) Lake Approp. 
and Channel Cost 
Improvements, CAMaint 
(Federal Funds) Approp. 
Cost 
450,000 
549,457 
3,920 
-5,190 
43,356,265 45 
43,356,265 45 
2,997,000 2,999,000 2,361,000 3,822,000 
3,065,477 3,104,571 2,247,942 3,904,638 
550,000 -90,000 
433,457 62,466 
100,000 
43,474 
-3,900 
-4,020 
2,516,000 2,692,600 
2,407,709 2,877,136 
7,677 
48,830,046 46 
48,750,659 46 
110,000 47 
110,000 47 
- 47,516,065 48 
4,579 49,511,727 48 
- - - 3,354,920 
3,312 15,271 12,917 3,251,549 
759,580 49 
701,546 
14,435,869 50 
14,435,869 50 
44,777,546 51 52 
44,777,546 51 52 
-251,978 
-240,208 
11,000 
741,000 85,000 90,000 
889,811 124,582 37,063 
3,284,000 3,338,900 -279,391 
2,236,709 3,409,978 -268,282 
589,911 53 
581,744 54 
- 35,000 333,233,645 55 
67,617 25,978 333,212,431 55 
-- 32,915,552 56 
-- 31,836,635 57 
35-37 
179 
8,686,968 42 
8,686,968 42 
37,250 43 
37,250 44

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
(Contrb. Funds, 
Other) 
New Work 
Contrib. 
Cost -581,744 
230,574 58 
228,732 59 
25. Sacramento River New Work 
and Tributaries, CA Approp. 3,900,000 
from Collinsville to Cost 3,434,929 
Shasta Dam Maint 
(Federal Funds) Approp. 1,649,000 
Cost 1,623,025 
(Required Contrib. New Work 
Funds) Contrib. 190,000 
(Contrib. Funds, 
Other) 
Cost 
New Work 
Contrib. 
Cost 
707,149 
5,500 
5,533 
3,251,000 4,870,000 4,315,000 5,400,000 
2,901,135 5,478,886 3,216,875 6,133,628 
1,738,000 1,600,000 1,448,000 1,721,000 
1,782,894 1,600,525 1,355,079 1,804,978 
1,225,950 1,350,000 442,500 2,057,500 
774,787 1,214,896 768,924 1,671,788 
6,000 
2,024 1,337 -,925,131 
146,360,000 60 61 
145,415,177 60 
32,328,128 62 
32,304,624 62 
29,424,354 
28,504,547 
2,927,796 63 64 
2,925,131 636465 
26. San Lorenzo, CA New Work 
(Federal Funds) Approp. 
Cost 
(Required Contrib. New Work 
Funds) Contrib. 
Cost 
27. Upper Jordan 
UT 
New Work 
Approp. 
Cost 
200,000 1,194,000 1,606,000 3,000,000 
123,699 820,003 1,620,688 2,564,390 
572,000 
41,470 
500,000 103,000 -70,000 
149,865 109,046 172,173 
572,000 
41,470 
533,000 
431,084 
28. Walnut Creek, CA New Work 
(Federal Funds) Approp. 
Cost 
(Required Contrib. New Work 
Funds) Contrib. 
Cost 
(Contrib. Funds, New Work 
Other) Contrib. 
Cost 
29. West Sacramento New Work 
CA Approp. 
(Federal Funds) Cost 
(Required Contrib New Work 
Funds) Approp 
Cost 
-67,615 
-16,800 
212,900 
500,000 
473,664 
- 100,000 
70,899 47,659 
70,791 
7,904 
70,791 
66,058 
- 350,000 71,842,430 66 
45,505 21,804 71,505,814 67 
8,304 
- 5,683,472 68 
91 5,677,857 69 
14,783,553 70 
14,783,553 70 
499,000 209,000 6,944,000 618,000 
422,983 308,824 2,931,333 4,000,899 
1,020,000 300,000 2,500,000 
147,589 158,191 744,195 
8,770,000 
8,137,708 
3,820,000 
1,049,975 
30. Wildcat and San New Work 
Pablo Creeks, CA Approp. 4,057,000 
(Federal Funds) Cost 2,978,994 
(Required Contrib. New Work 
637,000 -100,000 
1,476,552 179,737 11,245 
20,373,000 
20,372,073 
35-38

SACRAMENTO, CA DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
Funds) Contrib. 485,000 235,338 - - - 1,620,000 
Cost 399,235 270,875 15,102 11,496 3,214 1,588,236 
(Contrib. Funds, New Work 
Other) Contrib. 170,000 141,000 - - - 1,937,000 71 
Cost 65,000 257,042 2,518 - - 1,906,943 72 
34. Lower San New Work 
Joaquin River Approp. 150,000 - - - - 371,142,996 73 74 
and Tributaries, Cost 706,876 81,618 49,515 3,252 2,473 371,114,855 74 
CA including Maint 
Tuolumne and Approp. 1,079,000 980,400 1,182,000 3,001,000 957,000 15,807,716 
Stanislaus Rivers, Cost 1,087,982 1,025,681 1,163,364 1,366,453 2,550,742 15,732,624 
CA, New Melones 
Lake, CA 
(Federal Funds) 
(Contrib. Funds, New Work 
Other) Contrib. - - - - - 80,000 75 
Cost - - - - - 80,000 75 
1. Includes the following amounts for new work: 
Regular Funds: Previous project, $185,198; existing 
project, $585,436 for shallow-draft and $39,650,558 
for deep-draft. 
2. Includes the following funds for maintenance: 
Regular Funds: Previous project, $553,720; existing 
project, $17,026,432 for shallow-draft and $38,617,526 
for deep-draft; and deferred maintenance funds, 
$70,000 for shallow -draft. 
3. Includes the following costs for maintenance: 
Regular Funds: Previous project, $553,720; existing 
project, $17,005,354 for shallow-draft and $37,118,861 
for deep-draft; and deferred maintenance funds, 
$70,000 for shallow draft. 
4. Includes $85,000 contributed funds, other, from 
Sacramento-Yolo Port District for clearing and 
grubbing on dredged material deposit areas to be used 
on ship channel maintenance dredging work. 
5. Includes unobligated carryover for continuation 
of planing and engineering (CP&E) funds as of 
September 30, 1985 ($33,474) for Sacramento River 
Deep Water Ship Channel to be included in project cost 
(for cost sharing) per TWX of September 9, 1985. 
6. Includes $28,326,800 funds for Sacramento 
District. 
7. Includes $28,298,863 costs for Sacramento 
District. 
8. Includes $1,158,348 public work funds, of 
which $207,198 was for work done along 30-foot 
channel in Suisun Bay Channel; excludes $19,000 
expended for engineering for inactive portion of 1950 
modification. In addition, $1,342,500 was expended 
from required contributed funds 
9. In addition, $1,250 was expended from 
required contributed funds for maintenance. 
10. Contributed funds, other, from State of 
California for design and construction of downstream 
channel improvements on Ash and Berenda Sloughs 
below Buchanan Dam. 
11. Includes $724,000 contributed funds, other, 
from State of California for relocation activities 
including demolition or salvage of various pipes and 
facilities, constriction of ramps, turnouts, pipe gates 
and bank protection at Cache Creek Settling Basin. 
12. Includes $676,755 contributed funds, other, 
costs for relocation activities for State of California. 
13. Includes code 710 funds and costs for 
recreation facilities at New Hogan lake: total to date 
$897,742. 
14. Includes $99,000 special recreation use fees 
and costs at New Hogan Lake, and $826,600 
maintenance and operation of dam funds and costs 
(96X5125) at New Hogan Lake beginning in FY 1988. 
15. For miscellaneous construction under local 
cooperation requirements, primarily for Bear Creek, 
San Joaquin County; includes $108,056 as related to 
Duck and Littlejohn Creeks channel improvements as 
part of Farmington Dam project unit. 
16. Includes $393,195 contributed funds, other 
from California Department of Boating and Waterways 
35-39

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
for design and construction of boat launching and 
related facilities, and $30,000 for design and 
construction of a boarding float at North Shore 
recreation area at New Hogan Lake. 
17. Includes $104,000 contributed funds, other, 
and costs from Calaveras County Water District for 
New Hogan hydropower studies. 
18. Includes $6,999,725 San Francisco District 
construction funds and costs for Corte Madera Creek. 
19. $8,695 contributed funds transferred to 
Sacramento District in FY 1983. Includes $97,400 San 
Francisco District required contributed funds and costs. 
20. Contributed funds, other, and costs, from 
Marin County including $536,921 for miscellaneous 
bridge and road relocations and $267,840 for additional 
expenses for disposal sites at Corte Madera Creek. 
21. Includes $3,643,000 contributed funds, other, 
from the State of California for relocation (automotive 
type bridge) at Laurel Creek Diversion near Fairfield, 
$113,000 from City of Fairfield for Phase III contract 
for channel development on Laurel Creek, and $23,000 
from City of Suisun for Phase IIA contract for widening 
of Railroad Avenue 
22. Includes $3,638,022 contributed funds, other 
costs for relocations at Laurel Creek Diversion, 
$19,537 contributed funds, other costs for Phase III 
contract, and $112,939 for Phase IIA contract. 
23. Includes contributed funds, other: $2,278,000 
for recreation betterment, $1,589,640 for NED 
relocation and $70,000 for incremental relocations at 
Guadalupe River. 
24. Includes contributed funds, other costs: 
$2,227,251 for recreation betterment, $1,496,809 for 
NED relocations and $0 for incremental relocations at 
Guadalupe River, and $232,039 for flood control 
betterments. 
25. Contributed funds, other from the State of 
California for miscellaneous design and construction at 
Hidden Dam. 
26. Includes $2,199,085 code 710 funds and costs 
for recreation facilities at Isabella lake and $224,000 
Code 713 funds and costs for improvement at Tillie 
Creek and Live Oak campgrounds. 
27. Includes $407,640 special recreation use fees 
and costs at Isabella Lake. 
28. Includes $131,900 maintenance and operation 
of dam funds and costs (96X5125) at Isabella Lake 
beginning in FY 1985. 
29. Includes $438,000 contributed funds, other, 
from California Department of Boating and Waterways 
for design and construction of boat launching and 
related facilities at Old Isabella Road and Isabella 
Peninsula and $337,500 for Isabella Dam hydropower 
studies. 
30. Includes $438,000 contributed funds, other, 
costs for boat launching and related facilities at Old 
Isabella Road and Isabella Peninsula, and $309,808 
costs for Isabella Dam hydropower studies. 
31. Includes code 710 funds and costs for 
recreation facilities: Success Lake: Total to date 
$747,048. Terminus Dam: Total to date: $704,000. 
32. Includes $165,000 special recreation use fees 
and costs at Success Lake. 
33. Includes contributed funds, other, from State 
of California Department of Boating and Waterways 
and costs for acquisition of a boarding float at Success 
Lake, $30,000 and at Terminus Dam, $12,420. 
34. Includes contributed funds, other, from 
Kaweah River Power Authority, Visalia, California for 
Terminus Dam hydropower studies, $423,000; and 
from DITT, Inc., Paris, France, for Success Lake 
hydropower studies, $168,000. 
35. Includes contributed funds, other, costs for 
Terminus Dam hydropower studies, $422,697, and for 
Success Lake hydropower studies, $167,579. 
36. Includes $4,300,147 contributed funds, other 
from the Metropolitan Water District of Salt Lake City 
for relocation of State Highway 65 at Little Dell Lake. 
37. Includes $4,300,147 contributed funds, other, 
costs for relocation of State Highway 65 at Little Dell 
Lake.
38. Includes $1,200 initiation of plans for 
specifications for Code 710 recreation facilities, for FY 
1978. Construction of recreation facilities at Martis 
Creek Lake under Code 720 was determined to be 
infeasible. 
39. Includes contributed funds, other $4,454,938, 
for lands, easements and rights-of-way for Castle Dam 
from State of California and contributed funds, other 
costs for lands, easements and rights-of-way for Castle 
Dam. 
40. Includes $274,000 contributed funds, other, 
relocation and $227,968 costs. 
41. In addition, $66,532 expended for new work 
from contributed funds, other, miscellaneous 
construction under local cooperation requirements as 
35-40

SACRAMENTO, CA DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
related to acquisition of right-of-way and utility 
alterations for Merced County Stream Group. 
42. Includes $1,949,968 San Francisco 
construction funds and costs and $260,000 Sacramento 
general investigation funds and costs for Pajaro River. 
43. Includes $37,250 contributed funds, other, 
from Santa Clara Valley Water District for bridge 
relocation at Pajaro River. 
44. Includes $37,250 contributed funds, other, 
costs for bridge relocation at Pajaro River. 
45. Includes code 710 funds and costs for 
recreation facilities at Pine Flat Lake: Total to date: 
$1,595,100. Includes Public Work Acceleration, 
Executive (PL 87-68) (Transfer to Corps of Engineers, 
Civil) 1963 funds and costs ($239,235) for recreation 
facilities and $19,600 Code 713 funds and costs for 
Pine Flat fish barrier. 
46. Includes $158,300 special recreation fees and 
costs at Pine Flat Lake and $699,785 maintenance and 
operation of dam funds and costs at Pine Flat Dam. 
47. Miscellaneous construction and engineering 
and design services (non-project) accomplished at 
expense of State of California under local cooperation 
requirements in connection with acquisition of rights-ofway 
and utility alterations at Pine Flat Lake. 
48. Includes unobligated carryover for 
continuation of planning and engineering (CP&E) funds 
as of September 30, 1985 ($29,065) and FY 1986 
allocation for Redbank and Fancher Creeks to be 
included in project cost (for cost sharing) per TWX of 
September 9, 1985. 
49. Includes contributed funds, $759,580 other, 
from Fresno Metropolitan Flood Control District for 
road relocation and betterment's (Nees Avenue) at 
Fancher Dam and includes $701,546 contributed funds, 
other costs for road relocation (Nees Avenue) and 
betterments at Fancher Dam. 
50. Excludes $5,598,000 contributed funds: 
$400,000 for recreation facilities at completed projects 
funded under Public Works Acceleration Program; and 
$1,628,411 for recreation facilities at completed 
projects funded under Code 711 at Coyote Valley Dam, 
Lake Mendocino. 
51. Includes $94,459 special recreation use fees 
and costs (FY 1982-1983), but excludes prior special 
recreation fees and cost for Coyote Valley Dam, Lake 
Mendocino. 
52. Includes $1,625,280 maintenance and 
operation of dam funds and costs at Coyote Valley 
Dam, Lake Mendocino for FY 1985 through FY 1996. 
53. Includes $251,911 contributed funds, other 
from City of Ukiah for Coyote Valley Dam, Lake 
Mendocino, hydropower studies; and $338,000 from 
California department of Boating and Waterways for 
launching facility at Lake Mendocino. 
54. Includes $250,117 contributed funds, other, 
costs for Coyote Valley Dam, Lake Mendocino, 
hydropower studies; and $320,657 for California 
Department of Boating and Waterways for launching 
facility at Lake Mendocino. 
55. Includes $253,421,793 San Francisco 
construction funds and costs through August 1983 for 
Dry Creek, Warm Springs Dam. 
56. Includes $964,114 San Francisco maintenance 
funds and costs through April 1982 for Dry Creek, 
Warm Springs Dam. 
57. Includes $75,400 maintenance and operations 
of dam funds and costs at Dry Creek, Warm Springs 
Dam.
58. Includes $208,074 contributed funds, other, 
from Sonoma county for Dry Creek, Warm Springs, 
hydropower studies; and $22,500 from City of Ukiah 
for hatchery pump design at Lake Mendocino. 
59. Includes $208,074 contributed funds, other, 
costs for Dry Creek, Warm Springs hydropower 
studies; and $20,658 costs for hatchery pump design. 
60. Excludes $614,608 for Table Mountain (Iron 
Canyon) project, deauthorized August 5, 1977, and 
$531,000 for Sacramento River and Major and Minor 
Tributaries portions which are considered inactive and 
deferred. 
61. Includes Code 710 funds and cost for 
recreation facilities at Black Butte lake: Total to date 
$1,000,162. 
62. Includes $104,100 special recreation use fees 
and costs at Black Butte Lake. 
63. Miscellaneous construction and engineering 
and design services (non-project) accomplished at 
expense of State of California under local cooperation 
requirements in connection with acquisition of rights-ofway 
and utility alterations (primarily for Sacramento 
River and Major and Minor Tributaries project) 
Includes State Highway Commission payment, 
$789,008, for use of excess excavation from Chico and 
Mud Creeks and Sandy Gulch (Sacramento River and 
Major and Minor Tributaries) for freeway embankment 
35-41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
through the city of Chico. 
64. Includes $41,984 contributed funds, other, 
from State of California for required modification of 
existing private facilities and salmon rearing habitat, 
Sacramento River, Chico Landing to Red Bluff; 
$15,977 contributed funds, other, from State of 
California Department of Boating and Waterways for 
replacing a boarding float at Orland Buttes boat 
launching ramp at Black Butte Lake; $392,000 
contributed funds, other, from the City of Santa Clara 
for hydropower studies at Black Butte Lake; and 
$59,334 contributed funds, other from State of 
California for relocation. 
65. Includes $389,335 contributed funds, other, 
costs for Black Butte hydropower studies; and $59,334 
costs for relocations. 
66. Includes $8,849,825 San Francisco 
construction funds for Walnut Creek. 
67. Includes $9,049,609 San Francisco 
construction costs for Walnut Creek. 
68.Includes $450,268 San Francisco required funds 
for Walnut Creek. 
69. Includes $525,846 San Francisco required costs 
for Walnut Creek. 
70. Includes $400,348 San Francisco contributed 
funds, other, and contributed funds costs for Walnut 
Creek. 
71. Includes $1,937,000 contributed funds, other, 
from Contra Costa Flood Control and Water 
Conservation District for replacement of sewerline in 
Richmond for Wildcat and San Pablo Creeks project. 
72. Includes $1,906,943 contributed funds, other, 
costs for replacement of sewerline in Richmond for 
Wildcat and San Pablo Creeks project. 
73. Excludes funds applicable to other units of this 
basin authorization (Lower San Joaquin River and 
Tributaries, and Tuolomne River Basin, California). 
(See Table 35-E). 
74. Includes $110,000 utilized for preparation of 
1957 Economic Feasibility Report and of Revised 
Feasibility Report (FY 1960, 1961, and 1962) 
applicable to 1962 reauthorization of project. 
75. Includes $80,000 contributed funds, other, and 
costs, from the Bureau of Reclamation for visitors 
center at Mark Twain area, New Melones Lake. 
35-42

SACRAMENTO, CA DISTRICT 
TABLE 35-A COST AND FINANCIAL STATEMENT 
PRECONSTRUCTION ENGINEERING AND DESIGN 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
American River 
Watershed CA, 
New Work 
Approp. 
Cost 
3,780,000 2,223,000 
3,500,283 2,495,692 
2,127,000 
2,004,798 
1,181,000 166,375 18,469,375 
814,296 642,786 18,422,214 
Caliente Creek CANew Work 
Approp. 
Cost 
Coyote and New Work 
Berryessa Creeks, Approp. 
CA Cost 
Napa River, CA 
Kaweah River 
Yuba River, 
CA 
New Work 
Approp. 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
South Sacramento New Work 
Approp 
San Lorenzo River, New Work 
CA Approp. 
Cost 
Truckee Meadows New Work 
NV Approp. 
Cost 
Tule River Basins New Work 
Approp. 
Cost 
Upper Jordan 
River, CA 
60,000 
60,000 
-41,000 
-41,111 12 
4,368,900 
4,368,900 
1,600,000 1,017,000 1,125,000 1,161,000 1,294,000 13,070,000 
1,432,375 1,010,877 1,263,905 1,138,074 1,082,132 12,791,754 
- 8,000 527,000 1,182,930 1,182,070 2,900,000 
5,938 508,419 970,790 1,210,598 2,695,745 
11,000 39,000 
3,338 41,628 
161,000 788,000 
63,108 788,291 
479,000 164,000 
454,285 106,030 27 
50,000 
41,966 
949,000 
851,399 
813,000 
730,243 
662,800 1,237,000 5,687,330 
380,752 1,260,208 5,428,490 
30,000 
7,913 
New Work 
Approp. 292,000 134,000 
Cost 258,987 169,404 9,265 
30,000 
7,913 
1,576,000 
50 1,576,000 
35-43

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
PRECONSTRUCTION ENGINEERING AND DESIGN 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
West Sacramento New Work 
CA Approp. 252,000 - - - - 1,817,000 
Cost 284,343 358 15 - - 1,817,000 
1. Beginning in FY 1982, Advance Engineering and 
Design (Preconstruction, Engineering and Design) programs 
are funded under General Investigations Appropriations. 
2. Includes FY 1985 unobligated carryover and FY 1986 
3. Excludes $2,639,955 funds and costs for a previous 
flood control project on Napa River. (See Table 35-E). 
allocation for CP&E funds and all AE&D funds to be included 
in project cost (for cost sharing) per TWX of September 9, 
1985. 
35-44

SACRAMENTO, CA DISTRICT 
TABLE 35-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
1. SACRAMENTO RIVER, CA 
Mar 3, 1899 A depth of 7 feet below Sacramento 
works. 
July 25,1912 For work above Sacramento. 
Jan 21, 1927 The 10-foot channel up to Sacramento 
Aug 30, 1935 
Aug 30, 1935 
Aug 26, 1937 
July 24, 1946 
Nov 17, 1987 
A depth of 6 feet between Sacramento and Colusa 
and 5 feet between Colusa and Chico Landing 
at a cost of $390,000 provided flow of rivers 
is increased to minimum flow of 5,000 cubic 
feet per second after Shasta Reservoir is built. 
Authority for a special direct participation of 
Federal Government of $12 million in cost 
of Shasta Reservoir. 
Transfer of authority for expenditure of above $12 
million from Secretary of War to Secretary of the 
Interior. 
Modified existing navigation project for Sacramento 
River, CA, to provide for construction of a ship 
channel 30 feet deep apd 200 to 300 feet wide 
from deep water in Suisun Bay to Washington Lake, 
including such works as may be necessary to compensate 
for or alleviate any detrimental salinity 
conditions resulting from ship channel; a triangular 
basin of equal depth, 2,400 by 2,000 by 3,400 feet 
at Washington Lake; and connecting channel 13 feet 
deep and 120 feet wide, with lock and drawbridge, 
thence to Sacramento River. 
Deauthorization of shallow-draft channel, Colusa 
to Red Bluff, feature of project for navigation, 
Sacramento River, California. 
H. Doc. 186, 55th Cong., 
2d sess., and 48 55th 
Cong., 3d sess. (Annual 
Report 1898, p. 2844 
and 1899, p. 3171). 
H. Doc. 76, 62d Cong., 
1st sess. 1 
H. Doc. 123, 69th cong., 
1st sess. 
Rivers and Harbors 
Committee Doc. 35, 
73d Cong., 2d sess. 
Rivers and Harbors 
Committee Doc 35, 
73d Cong., 2d sess. 
S. Doc. 142, 79th Cong., 
2d sess. 
Sec. 1002, 1986 WRDA 
10. Oct 23, 1962 CORTE MADERA CREEK, CA 
Levees and channel improvements, lower 11 miles of 
Corte Madera Creek and tributaries, as modified bu 
Nov 7, 1966 Chief of Engineers. 
Local cooperation requirements modified to 
provide 1.5 percent cash contribution toward 
H. Doc. 545, 87th Cong., 
2d sess. 
Sec. 204, 1966 Flood 
Control Act. 
35-45

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-B (Cont'd) AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
cost of Ross Valley unit. 
Modify existing project to direct construction of Unit 
4 from Lagunitas Road Bridge to Sir Francis Drake 
Boulevard, and to include construction of floodproofing 
measures in vicinity of Lagunitas Road 
Bridge to insure proper functioning of completed 
portions of authorized project. Further modify 
project to eliminate any channel modifications 
upstream of Sir Francis Drake Boulevard. 
Sec 823, 1986 WRDA 
RUSSIAN RIVER BASIN, CA 
May 17, 1950 Coyote Valley Dam (Lake Mendocino): Channel 
improvements on lower 98 miles of Russian River 
and lower reaches of tributaries. 
Feb 10, 1956 Increased appropriation authorization for initial 
stage of project development. 
Oct 23, 1962 Dry Creek (Warm Springs) Lake: Channel 
Improvements on Dry Creek below dam. 
Mar 7, 1974 Dry Creek (Warm Springs) Lake and channel; 
compensate for fish losses on the Russian River 
which may be attributed to the operation of the 
Coyote Dam component of the project through 
measures such as possible expansion of the 
capacity of the fish hatchery at the Warm 
Springs Dam component of the project. 
H. Doc. 585, 81st Cong., 
2d sess. 
PL 404, 84th cong., 
2d sess. 
H. Doc. 547, 87th Cong., 
2d sess. 
Sec. 95, 1974 WRDA 
SACRAMENTO RIVER AND 
TRIBUTARIES, CA, FROM 
COLLINSVILLE TO SHASTA DAM 
Dec 22, 1944 Modify Sacramento River Flood Control Project 
to provide for extensions in levees and other 
structures along Sacramento River and major 
and minor tributaries; construct Black Butte 
Dam and Reservoir; construct low-level Table 
Mountain Dam and Reservoir with power 
facilities; and provision of monetary authorization 
of $15 million for initiation of modification. 
May 17, 1950 Improvements for protection of Upper Butte Basin 
(included full monetary authorization). 
Jul 3, 1958 Extend existing Sacramento River Flood Control 
Project to Keswick Dam for purposes of zoning 
H. Doc. 649, 78th Cong., 
2d sess. 2 
H. Doc. 3667, 81st cong., 
1st sess. 2 
H. Doc. 272, 84th Cong., 
2d sess. 2 
35-46 
Nov 17, 1986 
23. 
24.

SACRAMENTO, CA DISTRICT 
TABLE 35-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
area below dam and modification of project by 
construction of bank protection and incidental 
channel improvements between Chico Landing 
and Red Bluff (included full monetary authorization). 
Jul 3, 1958 Additional authorization of $17 million for comprehensive 
plan approved in act of December 22, 
1944. 
Jul 14, 1960 Further modification of Sacramento River Flood 
Control Project by construction of initial 10- 
year phase of bank erosion control works and 
setback levees on Sacramento River and 
authorization of $14,240,000 for prosecution 
of modification. 
May 12, 1967 Additional authorization of $7 million for bank 
protection approved in act of July 14, 1960. 
Mar 7, 1974 Initiation of construction of second phase of bank 
erosion control works and setback levees on 
Sacramento River as approved in act of July 14, 
1960, and additional authorization of $16 
million for such purpose. 3 
Jun 19, 1975 Deauthorization of Table Mountain Dam and 
Reservoir. 4 
1. Contains latest published map of section above 
Sacramento. For map of section below Sacramento, see 
H. Doc. 1123, 60t Cong., 2d sess. And S. Doc. 142, 79! 
cong., 2d sess. 
2. Contains latest published map. 
3. Total monetary authorization available, exclusive 
S. Doc. 103, 80th Cong., 
PL 90-17 
PL 93-251 
H. Doc. 94-192, 94th 
Cong., 1st sess. 
of preauthorization studies from general investigations 
appropriations,amountsto$72,740,000 
4. The 90-day Congressional project review period, 
required by sec. 12, PL 93-251, as amended by sec. 157, 
PL 94-587, ended August 5, 1977, and resulted in 
deauthorization of project unit. 
35-47

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Feather River, CA 1951 - $5,752 12 
Middle River and Connecting 
Channels, CA Completed 1974 $8,354 3 93,494 4 
Mokelumne River, CA Completed 1974 8,500 189,152 
Navajo Reservoir, NM Completed - 2,132 5 6 
Old River, CA Completed 1970 23,185 7 9631,128 
Stockton and Mormon 253,151 8 
Channels, CA Completed 1970 200,928 9 10 11 218,854 
Suisun Bay Channel, CA Completed 1974 217,677 3,316,622 1213 
Suisun Channel, CA Completed 1973 191,728 s 15 733,489 
Suisun Point Channel, CA Completed 1965 
1. Maintenance project, channels adequate for 
commerce. 
2. Includes $10 for maintenance for previous 
project. Excludes $6,160 for previous project and 
$3,840 for existing project for maintenance expended 
from contributed funds. 
3. Includes $1,600 for previous project. 
4. Includes $790 for previous project. 
5. Authorized by Chief of Engineers under 
authority of sec. 107, Public Law 86-645, as amended. 
6. All costs transferred from Los Angeles District 
in FY 1968. 
7. Estimated cost to local interests was $3,6000 for 
lands, damages and public landings. Remaining portion 
of project, consisting of side channel at Orwood and 
completion of project channels from mouth of Old River 
to Lammers Ferry rod and from Crocker Cut to Holly 
Sugar Factory was deauthorized November 17, 1986, by 
WRDA of 1986. 
8. Upon completion of Mormon Slough, Calaveral 
River, CA in February 1970, local interests accepted 
maintenance responsibility for Mormon Slough as well 
as for Stockton and Mormon Channels CA, and Federal 
maintenance was discontinued. No Federal maintenance 
costs have been incurred since FY 1969. 
9. Includes $58, 901 for previous project. 
10. Excludes $59,551 expended from required 
contributed funds for previous project. 
11. Excludes work accomplished under existing 
project at a cost of $207,198 from Public Works 
Administration funds allotted to San Joaquin River, CA. 
12. Includes $59,817 for previous projects. 
Excludes $5,449 expended from required contributed 
funds for previous project. 
13. Maintenance responsibility transferred to San 
Francisco District, January 1, 1974. 
14. Includes reconnaissance and condition surveys 
of $5,496 and $483 for fiscal year 1963 and 1964, 
respectively. 
15. Estimated cost (July 1964) to local interests was 
$12,000 for lands, damages, and spoil retention dikes. 
35-48

SACRAMENTO, CA DISTRICT 
TABLE 35- E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Alameda Creek, CA Completed 
American River, CA Completed 
Aquatic Plant Control, CA Completed 
Big Dry Creek Dam and 
diversion, CA Completed 
Big Wash, Milford, Beaver 
County, UT Completed 
Burch Creek, Weber County, UT 
Cache Creek Basin, CA Active/no FY 95 
(Outlet Channel) Expenditures 
Chester, CA Active/no FY 95 
Expenditures 
Cottonwood Creek, CA Active/no FY 95 
Expenditures 
Coyote Creek, CA Completed 
Duck Creek, San Joaquin 
County, CA Completed 
East Weaver Creek, CA Completed 
Folsom Lake, American River, CA Completed 
Green Valley Creek, Solano 
County, CA Completed 
Kays Creek, UT Completed 
Kern River-California Aqueduct 
Intertie, CA Completed 
Klamath River, CA Completed 
Lake Camanche, CA Completed 
Lake Oroville, CA Completed 
Lower San Joaquin River and 
Tributaries, including Tuolumne 
and Stanislaus Rivers, CA Completed 
Marysville Lake, CA Active/no FY 9 
Merced River, CA 
Middle Creek, CA 
Mormon Slough, CA 
Napa River Basin, CA 
1978 
1959 
1967 
1955 
1961 
1964 
1993 
1981 
1991 
1968 
1967 
1965 
1957 
1963 
1973 
1977 
1972 
1976 
1981 
1976 
1980 
1976 
1967 
1976 
1979 
1972 
1972 
1968 
1970 
1969 
1962 
1966 
5 
Expenditures 
Completed 
Completed 
Completed 
Active/no FY 95 
Expenditures 
New Bullards Bar, CA Completed 
North Fork, Pit River at 
Alturas, CA Completed 
Pinole Creek, CA Completed 
Redwood Creek, Humboldt 
County, CA Completed 
Reese River, Battle Mountain, NV Completed 
Rheem Creek, CA Completed 
Rodeo Creek, CA Completed 
$26,995,350 
2,125,818 3 
1,000 
1,369,931 4 
217,879 56 
26,049 s 
- 7 
3,570,000 8 
15,765,000 
705,622 15 
664,825 59 
220,636 15sio 
63,014,810 11 
136,026 512 
407,989 513 
1,503,073 514 
4,838,000 s 
10,252,950 15 
70,425,470 16 
27,835,263 17 
- 18 
10,918,796 19 
2,643,499 20 
2,965,402 21 
2,639,955 122 
12,890,625 23 
904,278 52425 
885,750 15 
4,620,070 126 
133,339 527 
400,000 1528 
974,100 15 
35-49 
$54,778 12

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35- E (Cont'd) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to Sep. 30, 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Salinas River, CA Inactive 1952 94,213 129 
Salt Lake City, Jordan River, UT Completed 1961 1,227,570 30 
San Leandro Creek, CA Completed 1973 1,000,000 131 
San Lorenzo Creek, CA Completed 1962 5,130,821 132 
San Lorenzo River, CA Completed 1966 4,314,406 133 
Sevier River near Redmond, UT Completed 1952 919,000 134 
Sonoma Creek, CA Inactive 1973 781,500 135 
Truckee River and Tributaries, Active/no FY 95 1968 1,038,960 
CA and NV Expenditures 
1. Project responsibility transferred from San 
Francisco District to Sacramento District April 1, 1982. 
2. Scheduling of reservoir operations costs. 
3. Excludes $54,919 other contributed funds for 
miscellaneous construction for local interests pursuant to 
requirements of local cooperation were $951,000 (1959) 
for lands and relocations. 
4. Excludes $44,008 other contributed funds for 
construction in connection with bridge construction 
pursuant to requirements of local cooperation. Total cost 
to local interests for all requirements of local cooperation 
was $370,000 (9159) for lands and relocations. 
5. Authorized by Chief of Engineers under 
authority of sec. 205, Public Law 80-858, as amended. 
6. Excludes $22,000 for preauthorization studies. 
7. Project not economically feasible; preconstruction 
planning was terminated in FY 1993. 
8. Excludes $69,262 other contributed funds from 
State of California for two low water crossings and 
appurtenances at Chester. A fish ladder modification 
project was continued under sec. 1135 in FY 1995 at 
fiscal year cost of $172,565. 
9. Excludes $50,000 for preauthorization studies. 
Estimated costs to local interests were $665,000 for 
lands and damages including relocations. 
10. Includes $174,938 Public Works Acceleration 
Program Funds. 
11. Transferred to Bureau of Reclamation in May 
1956 for operation and maintenance by that agency in 
conjunction with other units of Central Valley project. 
12. Excludes $20,000 for preauthorization studies. 
13. Includes $30,000 for preauthorization studies. 
Estimated costs (FY 1973) to local interest for all 
requirements of local cooperation were $150,117 for 
lands and damages including relocation. 
14. Includes $73,000 for preauthorization studies. 
Non-Federal (Kern County Water Agency) cost for road 
relocation was $18,260 (required contributed funds). 
15. Constructed by East Bay Municipal Utility 
District. Final Federal contribution of $51,202 made 
July 18, 1978 (total $10,111,684). Non-Federal costs 
$34,988,53616. 
16. Constructed by State of California. Final 
Federal contribution of $64,186 was made on February 
9, 1981 (total $69,994,105) for flood control reservation. 
17. Cherry Valley and New don Pedro Reservoirs 
constructed by local interests. Federal contribution of 
$9,000,000 and $5,464,000, respectively, for flood 
control reservation. Final Federal contribution of 
$308,898 was made on January 18, 1972, for New don 
Pedro. Excludes $3,004,946, contributed funds, other, 
for miscellaneous engineering and construction (nonproject) 
at local interest expense under local cooperation 
requirements for acquisition of rights-of-way for levee 
and channel improvement on Lower San Joaquin River 
and Tributaries. Unconstructed portion of snagging and 
clearing project modification of Lower San Joaquin 
River and Tributaries) was classified as Adeferred@ on 
April 9, 1993. For full report see Annual Report for FY 
1993.
18. Planning and any future development is 
uncertain awaiting State of California's position on 
support of Marysville project. 
19. Constructed by Merced Irrigation District, Final 
Federal contribution of $839 was made December 2, 
1975 (total $10,818,638) for flood control reservation. 
20. Estimated costs (FY 1967) to local interests for 
all requirements of local cooperation were $1,340,000 
for lands and damages including relocation. 
21. Non-Federal cost $2,965m402 (FY1976) for 
35-50

SACRAMENTO, CA DISTRICT 
TABLE 35- E (Cont'd) OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
lands and relocations. Federal contribution of 
$599,336 made to State Reclamation Board. 
22. This project was reclassified as "active" on 
August 3, 1987. 
23. Constructed by Yuba County Water Agency. 
Final Federal contribution of $33,470 was made in FY 
1972 (total $12,759,127) for flood control reservation. 
24. Includes $41,800 for preauthorization studies. 
25. Excludes $146,000 other contributed funds f6r 
miscellaneous construction and engineering and design 
services under local cooperation requirements in 
connection with acquisition of rights-of-way, relocation 
and utility alterations. 
26. Includes $107,000 costs for remedial work to 
drainage system completed in FY 1977. 
27. Includes $52,549 contributed funds. 
29. Cost includes engineering and design prior to 
June 30, 1952 and costs of $4,288 (FY 1962-1963) to 
determine if project classification to an active category 
was justified. 
30. Estimated cost to local interest for all 
requirements of local cooperation were $463,000 (July 
1962) for lands and damages including relocations. 
Project prevented $4,544,000 in damages from the April- 
May 1994 snowmelt runoff. 
31. Excludes $285,329 contributed funds. 
32. Excludes $200,000 estimated value of work 
performed in lieu of cash contribution. 
33. Excludes $421,182 contributed funds. 
34. Excludes $48,000 required contributed funds 
toward first cost. Costs to local interests for all 
requirements of local cooperation, including required 
contributions, were $118,000 (1951). Project prevented 
$9,000 in damages from the April-May 1994 snowmelt 
runoff. 
35. Place inactive 1974. 
35-51

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Federal Contributed 
See Annual Date Funds Funds 
Project Report For Deauthorized Expended Expended 
Alhambra Creek, CA 1981 1986 $300,000 
Bear River, CA 1980 1986 
Cottonwood Creek 1991 1998 15,765,000 
Eel River, CA 1971 1986 1,272,816 
Gleason Creek, NV 1977 1986 215,826 
Humbolt River and 
and Tributaries, NV 1982 1986 1,532,932 
Lakeport Lake, CA i 1976 1993 2,353,000 
Little Valley Wash, Magna, UT 1951 1977 
Lower San Joaquin River 
and Tributaries, CA 1993 1998 27,835,263 
Mad River Basin, CA 1973 1986 4,243,750 
Sacramento River, Chico 
Landing to Red Bluff, CA 1997 1998 
Sacramento River Major 
and Minor Tributaries 1997 1998 
Spanish Fork River, UT 1955 1977 20,000 
Weber River and Tributaries, UT 1974 1972 75,120 
(Morgan County) 
Wildcat and San Pablo Creek 
Reach 2, CA 1997 1998 
1. Lakeport Lake was deauthorized on November 17, 
1988; and deauthorized November 18, 1993. 
35-52

SACRAMENTO, CA DISTRICT 
TABLE 35-H SACRAMENTO RIVER, CA: 
TIDAL AND FLOOD CONDITIONS PREVAILING 
(See Section 1 of Text) 
Range in Feet 
Miles from Mean Extreme Ordinary Extreme 
Mouth of Tidal 1 Tidal 2 Flood 3 Flood 4 
Place River 
Collinsville 0 4.3 7 8 10 
Sacramento 59 2.0 2 3 20 28 
Verona (Mouth of Feather River) 80 - Trace 22 30 
Colusa 144 - - 26 32 
Chico Landing 193 - - 20 25 
Red Bluff 248 - - 24 30 
1. Mean lower low water to mean higher high water. 
2. Tide at low water season only. 
3. Mean lower low water to flood stage. 
4. Extreme low water to indicated flood condition. 
TABLE 35-I SAN JOAQUIN RIVER, CA: 
TOTAL COST OF NEW WORK FOR PROJECT x 
(See Section 4 of Text) 
Federal Non-Federal 2 
Corps of Coast Required Lands and 
Engineers Guard Cash Damages (includ- Total Total 
Modification (Construction) (Construction) Contribution ing Relocations) Project 
Prior to 1950 
Modification $4,009,938 $80,000 $1,307,500 $1,042,000 $2,349,500 $6,439,438 
1950 Modification 1,823,179 - 35,000 135,00 170,000 1,993,170 
Total 5,833,117 80,000 1,342,500 1,177,000 2,519,500 8,432,617 
1. Completed in May 1960. 
2. Excludes $5,865,000 (Feb 1954) local interests costs 
for Stockton Deep Water Channel terminal facilities 
required under terms of project authorization. 
35-53

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-J SAN JOAQUIN RIVER, CA: 
PROJECT UNITS (1950 MODIFICATION) RECLASSIFIED AND 
EXCLUDED FROM PROJECT COSTi 
(See Section 4 of Text) 
Non-Federal 
Federal Required Lands and 
Corps of Cash Damages (includ- Total 
Unit Engineers Contributions ing Relocations) Total Project 
Settling Basin above head 
of Burns Cutoff i $1,073,000 $30,000 $200,000 $230,000 $1,303,000 
Burns Cutoff improvement; 
new turning basin; dredging 
Mormon Channel 25 7,882,000 3 431,000 1,455,000 1,886,000 9,768,000 
Upper Stockton Channel 
enlargement 45s 535,000 34,000 15,000 49,000 584,000 
1. July 1959 price index. Deauthorized August 5, 1977. of San Francisco Bay to Stockton Channel, Sacramento 
2. Deferred; July 1960 price index. District, Improvement No. 3. 
3. For lands and construction. 5. Deauthorized November 17, 1986. 
4. Deleted by 1965 River and Harbor Act authorization 
TABLE 35-K MERCED COUNTY STREAM GROUP, CA 
MAXIMUM INFLOW, STORAGE, AND OUTFLOW FOR PROJECTS 
(See Section 19 of Text) 
Maximum 
Inflow Maximum Maximum 
(c.f.s.) Storage Outflow 
Stream (hourly) (acre-feet) (c.f.s.) 
Burns 
Bear 
Owens 
Mariposa 
1,650 
2,675 
102 
942 
273 
600 
156 
2,575 
1,170 
1,115 
85 
473 
35-54

SACRAMENTO, CA DISTRICT 
TABLE 35-L RUSSIAN RIVER BASIN, CA: ESTIMATED 
COST FOR NEW WORK 
(See Section 23 of Text) 
Estimated Cost 
Non-Federal 
Project Feature Federal Contribution Total 
Coyote Valley Dam (Lake Mendocino): 
Channel Improvements below Dam 
on lower 98 miles of Russian River 14,436,000 $5,598,000 $20,034,000 
Dry Creek (Warm Springs) Lake and 
Channel Improvements below Dam 259,240,000 103,777,000 2 363,017,000 
Total $273,676,000 $109,375,000 $383,051,000 
1. Exclusive of $1,628,000 for recreation facilities at to be paid over a period not to exceed 50 years after use 
completed projects. of storage is initiated and inclusive of lands and 
2. Reimbursement by local interests to Federal damages. 
Government for costs allocated to water supply storage 
TABLE 35-M RUSSIAN RIVER BASIN, CA: ESTIMATED 
FEATURES AND ESTIMATED COSTS 
(See Section 23 of Text) 
Height of Reservoir 
Nearest City Distance Dam and Capacity Estimated 
Name (California) Above Mouth Type (Acre-Ff) Cost 
Coyote Valley Dam (Lake Ukiah Mile 0.&East Fork 160 Feet- 122,500 $17,550,000 1 
Mendocino) of Russian River Earthfill 
Channel Improvements (East Ukiah Mile 0 to 0.8 East - - ,484,000 
Fork) Fork 
below Coyote Valley Dam Guerneville Mile 0 to 98,Russia 
and lower 98 miles of River 
Russian River) 
Dry Creek (Warm Springs) Healdsburg Mile 14.4 Dry Creek 319 Feet- 381,000 $363,017,000 
Earthfill 
Channel Improvements Healdsburg Mile 1 to 14.4 Dry - - 2,864,000 
(Dry Creek) below Dry Creek Creek 
(Warm Springs Dam) 
1. Exclusive of $1,628,000 for recreation facilities at 
completed projects. 
35-55

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-N SACRAMENTO RIVER AND TRIBUTARIES, CA, 
COLLINSVILLE TO SHASTA DAM: 
PROJECT UNITS RECLASSIFIED AND EXCLUDED FROM COST ESTIMATE 
(See Section 24 of Text) 
Current Estimated Cost 
Unit Classification Federal Non-Federal 1 Total 
1944 Modification: 
Antelope Creek 2 
Lower Butte Basin 3 
Thomas Creek 2 
Willow Creek 2 
Bypass Levees 4 
Bypass Levees 4 
1950 Modification: 
Upper Butte Basin 2 
1. For lands and damages, including relocation. 
2. July 1960 price level. 
3. Excludes work applicable to extension of Moulton 
weir (July 1954 price level). 
4. July 1961 price level. 
TABLE 35-0 SACRAMENTO RIVER AND TRIBUTARIES, CA, 
COLLINSVILLE TO SHASTA DAM: 
CONSTRUCTION ACCOMPLISHED AND CONTRACT COSTS 
(See Section 24 of Text) 
Required 
Contract Federal Contributed Total 
Contract 42A continuation (Bank protection, 
miles 88.8-143.3, Sacramento River, 
Sacramento, Colusa, Sutter and 
Yolo Counties) 
Lower American River - River Park 
initiation (Bank Protection, 
Sacramento County). 
Inactive 
Deferred 
Deferred 
Inactive 
Deferred 
Inactive 
Deferred 
$1,400,000 
7,286,000 
1,140,000 
1,290,000 
7,100,000 
3,010,000 
3,530,000 
$340,000 
2,285,000 
140,000 
120,000 
940,000 
1.787,000 
$1,740,000 
9,571,000 
1,280,000 
1,410,000 
8,040,000 
3,010,000 
5,317,000 
$803,695 $152,641 
500,000 
$956,336 
500,000 
35-56 
-7 " - 7

SACRAMENTO, CA DISTRICT 
TABLE 35-P FLOOD CONTROL WORK UNDER SPECIAL 
AUTHORIZATION FLOOD CONTROL ACTIVITIES 
PURSUANT TO SECTION 205, PUBLIC LAW 80-858 
AS AMENDED (PREAUTHORIZATION) 
(See Section 32 of Text) 
Fiscal Year 
Cost 
Study Stage (Federal) 
Colorado River at Grand Junction, CO 1 Construction $ 3,828 
Magpie and Don Julio Creeks, CA Plans and Specifications 268,318 
Battle Mountain, NV Plans and Specification 26,338 
Fallon, NV Reconnaissance/Feasibility 45,244 
Hamilton City, CA Reconnaissance 0 
Legewood Creek, Fairfield, CA Reconnaissance 23,724 
Reno Flood Warning System Reconnaissance/Feasibility 80,934 
Rock Creek and Keefer Slough Reconnaissance 161,262 
Tehama, CA Reconnaissance 14,022 
Winters, CA Plans and Specification 3,368 
$ 627,038 2 
1. See Improvement No. 8 for construction. 
2. Excludes Coordination Account. 
TABLE 35-Q AQUATIC ECOSYSTEM RESTORATION 
(SECTION 206, PUBLIC LAW 104-303) 
(See Section 32 of Text) 
Fiscal Year 
Cost 
Study Stage (Federal) 
City Creek Ecoysystem 
Lower Truckee River Paiute 
Penn Mine Aquatic Ecosystem 
Restoration 
Upper Jordan River Ecosystem 
Restoration 
Upper Truckee River 
West Jordan River, Utah 
1. Excludes Coordination Accounts 
Reconnaissance 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
Reconnaissance/Feasibility 
Reconnaissance/Feasiblity 
35-57 
$ 532 
897 
191,698 
479,526 
148,086 
37,847 
$ 858,586 1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-R SNAGGING AND CLEARING 
UNDER SPECIAL AUTHORIZATION 
PURSUANT TO (SECTION 208, 1954 FLOOD CONTROL ACT PUBLIC LAW 83-780) 
Fiscal Year 
Cost 
Study Stage (Federal) 
Blackwood Creek Planning Design Analysis $ 113,470 
San Joaquin River Firebaugh Planning Design Analysis 9,718 
Walker River, NV Planning Design Analysis 19,646 
Ward Creek Planning Design Analysis 108,888 
$ 251,722 
TABLE 35-S SURVEYS 
(See Section 34 of Text) 
Fiscal year costs were as follows: 
Flood Damage Prevention Studies $1,423,004 
Required Cost Contributions 1,907,313 
Non-Federal Contributions (not required) 0 
Special Studies 4,201,186 
Special Investigations 86,280 
Review of FERC Licenses 12,326 
Interagency Water Resources Development 42,573 
National Estuary Program 6,583 
American Waterfowl Management Plan 4,673 
Coordination with Other Water Resource Agencies 195,267 
CAL-FED 910,815 
Planning Assistance to States 75,720 
National Marine Fisheries Service $815 
TABLE 35-T EMERGENCY STREAMBANK & SHORELINE PROTECTION 
(SECTION 14, 1946 FLOOD CONTROL ACT) 
Fiscal Year 
Cost 
Study (Federal) 
Skyrocket Creek, Ouray, CO $25,286 
35-58

PROJECTS SPECIFICALLY AUTHORIZED UNDER THE FORMER CALIFORNIA 
DEBRIS COMMISSION 
The California Debris Commission, consisting of 
three Corps officers appointed by the President with the 
consent of the Senate, created by act of March 1, 1893 
(27 Stat. L., p. 507), was organized in San Francisco, 
CA, on June 8, 1893, and has jurisdiction and duties 
extending over drainage area of Sacramento and San 
Joaquin Rivers, comprising great central valley of 
California and extending from crest of the Sierra Nevada 
on the east to that of the Coast Range on the west, and 
from Mount Shasta and Pit River Basin on the north to 
Tehachapi Mountains on the south. These rivers empty 
into head of Suisun Bay ultimately discharging into the 
Pacific Ocean through connecting bays and straits and the 
Golden Gate. Duties of the Commission comprise 
regulation of hydraulic mining in drainage area of 
Sacramento and San Joaquin Rivers, CA, so that debris 
will not be carried into navigable waters or otherwise 
cause damage; jurisdiction over construction and control 
of water storage facilities for domestic, irrigation, and 
power development purposes; and direction of 
improvements for control of floods on Sacramento River. 
On November 19, 1986, the Commission was abolished 
by the Water Resources Development Act of 1986 (PL 
99-662) and all authorities, powers, functions, and duties 
were transferred to the Secretary of the Army. All 
acquired lands and other interests presently under 
jurisdiction of the Commission were authorized to be 
retained and administered under direction of the 
Secretary. 
IMPROVEMENTS 
Page Tables 
1. Regulation of hydraulic mining and 
preparation of plans ............... 35-1A 
2. Sacramento River and tributaries, CA 
(debris control). ................. 35-2A 
3. Treatment of Yuba River debris 
situation-restraining barriers, CA ...... 35-3A 
Flood Control 
4. Sacramento River, CA............... 35-4A 
Table 35-AA Cost and Financial 
Statement ............. 35-7A 
Table 35-BB Authorizing 
Legislation .............. 35-10A 
Table 35-CC Sacramento River, CA: Total 
Cost of Existing Project ... .35-12A 
Navigation 
1. REGULATION OF HYDRAULIC 
MINING AND PREPARATION 
OF PLANS 
Location. Operations largely limited to territory 
between Mount Lassen on the north and Yosemite Valley 
on the south, on western watershed of Sierra Nevada. 
(See Geological Survey sheets for the area, 25 in 
number.) 
Existing project. Provided for regulating hydraulic 
mining operations, planning improvement of conditions 
upon Sacramento and San Joaquin Rivers and their 
tributaries affected by such operations, and preparation of 
plans to enable hydraulic mining to be resumed in their 
drainage areas. In addition, the Secretary of the Army is 
authorized to enter into contracts to supply storage for 
water and use of outlet facilities from debris-storage 
reservoirs for domestic and irrigation purposes and 
power development upon such conditions of delivery, 
use, and payment as he may approve. Applications of 
prospective miners were fully investigated by the former 
California Debris Commission and permits to operate 
were issued to those who provide satisfactory 
debris-restraining basins by construction of suitable dams 
where necessary or agree to make payment for storage in 
Government-constructed debris-restraining reservoirs 
constructed under act of June 19, 1934, as set forth 
35-1A 
Navigation Page

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
below. For location and description of Government-
constructed, debris-restraining reservoirs for 
general hydraulic mining, see Improvement 2. 
Local cooperation. Mineowners bore all expenses 
incurred in complying with orders of the former 
Commission for regulation of mining and restraint of 
debris. 
Operations and results during fiscal year. Minor 
administrative duties were accomplished. Administrative 
work overlaps that of improvements 2, 3, and 4, 
hereunder, and that of Sacramento District. 
Historical summary. The former Commission 
received 1,292 applications for hydraulic mining licenses; 
1 mine is licensed, but does not use storage 
behind Government debris dams. Work remaining is, in 
general, continuation of above or similar operations. 
2. SACRAMENTO RIVER AND 
TRIBUTARIES, CA (DEBRIS 
CONTROL) 
Location. Project reservoirs are to be constructed 
in watersheds of Yuba, Bear, and American Rivers, CA 
(See Geological Survey sheets for basin areas, seven in 
number.) 
Existing project. For description of completed 
North Fork and Harry L. Englebright projects and 
authorizing act, see Annual Report for 1975. Initial 
recreation facilities were provided in FY 1959. 
Recreation areas at Harry L.Englebright Dam are 
maintained by the Corps. Recreation areas at North Fork 
Dam are no longer maintained and operated by Auburn 
Recreation Park and Parkway District, but have been 
turned over to the Bureau of Reclamation (known as the 
Water and Power Resources Service between November 
6, 1979, and May 18, 1981) on a permit basis. Total 
Federal cost of new work for construction of these 
reservoirs was $4,646,872, including $40,000 and 
$25,000, respectively, for basic recreation facilities at 
Englebright Dam and North Fork Dam. Reservoir project 
sites on Middle Fork of American River and on Bear 
River have been deauthorized and excluded from 
foregoing cost. The 90-day Congressional project review 
period, required by Sec. 12, Public Law 93-251, as 
amended, ended August 5, 1977, and resulted in 
deauthorization of that portion of the project. Estimated 
cost of that portion is $1,820,000 (1935). 
Local cooperation. Fully complied with. 
Improvements made to facilities at North Fork Dam by 
Auburn Recreation Park and Parkway District under a 
lease agreement with the Secretary of the Army and 
Auburn Boat Clubs (concessionaire) at an estimated cost 
of $46,000 since September 1953. On March 1, 1979, 
lands and waters at North Fork Dam were turned over to 
the Bureau of Reclamation on a 5-year renewable basis. 
Permit No. DACW05-4-79-527 was renewed for 5 years 
on March 1, 1984, March 1, 1989, and on March 1, 
1994. Bureau will operate and maintain such use until 
Auburn project is completed, then a fee transfer will be 
made. Actual operation and maintenance of the recreation 
resource is being done by State of California by contract 
with the Bureau. 
Licenses. Under provisions of Contract No. 
W-1105-eng-2998 with Pacific Gas and Electric Co., 
(PG&E) (a 1941 contract which expired July 31, 1991) 
payment was made to Federal Government of $18,000 
per year for first 30 years and $48,000 per year for the 
next 20 years in return for use of head at Englebright 
Dam and generation of hydroelectric power. Total 
payment through September 30, 1999, amounts to 
$1,767,109; these funds are now paid to the Secretary of 
the Army and deposited for return to the Treasury. 
PG&E has obtained a new license, Federal Energy 
Regulatory Commission License No. 1403-004, issued 
February 11, 1993, for continued operation of Narrows 
No. 1 Hydroelectric Project and has entered into a new 
storage agreement and an operation agreement with the 
Federal Government (Corps). Total payment of $66,070 
was received in FY 1994, but only $48,000 was 
reallocated to the District. In FY 1995, $18,070 was 
reallocated to the District. Payments under new 
agreement are effective as of Fiscal Year 1993 and will 
be 8.2 percent of previous fiscal year's total costs for 
operation and maintenance. License No. 2246, effective 
April 9, 1970 (date New Narrows powerplant was put in 
operation) was issued by Federal Power Commission 
(known as the Federal Energy Regulatory Commission 
since January 9, 1978) to Yuba County Water Agency for 
hydroelectric power development of Yuba River by the 
company upstream from Englebright Dam. Under 
provisions of Contract No. DA-04-167-CIV-ENG-66-95 
with Yuba County Water Agency, payment is to be made 
to the Federal Government of $100,000 per year for no 
more than 50 years. First payment (partial) of $73,151 
was made April 1, 1971; total payment through 
September 30, 1997, amounts to $2,509,066. These 
35-2A

SACRAMENTO, CA DISTRICT 
funds are paid to Sacramento District and deposited for 
return to the Treasury. 
Operations and results during fiscal year. New 
work: Maintenance: Maintenance and operation activities 
continued at Harry L. Englebright Dam at a cost of 
$3,538,005, including recreation facilities. Dam safety 
assurance studies at Englebright Dam have been 
completed. 
Historical summary. Construction of dams was 
initiated in 1937; North Fork project was completed and 
in use at end of FY 1939, and Harry L. Englebright 
project was completed in January 1941. The two 
debris-control structures are in good condition. Public 
use of these reservoir recreation areas greatly overtaxes 
present capacities. Dam safety assurance studies were 
initiated at Englebright Dam in FY 1981 and were 
completed in FY 1987. 
3. TREATMENT OF YUBA RIVER 
DEBRIS SITUATION-RESTRAINING 
BARRIERS, CA 
Location. Works are on Yuba River between 
Marysville and where the river emerges from the 
foothills, near Hammonton, some 10 miles easterly from 
Marysville, or about 9 miles below the Narrows. (See 
Geological Survey Topographic map of Sacramento 
Valley, CA) 
Existing project. For description of completed 
project and authorizing act, see Annual Report for 1975. 
Total cost of new work was $723,259, of which 
$361,482 was U.S. funds and $361,777 required 
contributed funds by State of California. (For details of 
project in its original form, see Annual Report, 1917, p. 
1810.) In February 1963, center section of dam failed and 
major rehabilitation of structure was completed in 
December 1964. Total cost for required rehabilitation 
was $1,660,000, of which $830,000 was Federal cost and 
$830,000 required contribution by State of California 
toward rehabilitation cost. During the December 24, 
1964, floodflows on the Yuba River, the rehabilitated 
Daguerre Point Dam sustained considerable damage. 
(See 1965 Annual Report, p. 1647 "Operations and 
results during fiscal year.") The reconstructed portion of 
the dam completed earlier in December 1964 was 
undamaged by the flood. Permanent repair of Daguerre 
Point Dam abutment and fish facilities was completed in 
October 1965 at a cost of $447,808 with Federal and 
required State contributed funds on a matching basis. 
Local cooperation. Fully complied with for new 
work and major rehabilitation work. Total first cost to 
local interests for new work was $361,777 (required 
contribution by State of California). In addition, training 
walls were built on each bank below Daguerre Point for 
11,250 feet and just above Daguerre Point, on the south 
bank, for 11,000 linear feet by two gold-dredging 
companies in connection with their dredging operations. 
To build these training walls would have cost the United 
States $450,000 (1902 estimate). Flood channels were 
also built by gold-dredging companies within confines of 
project works. Cost to the United States of equally 
effective works to restrain debris movement would have 
been more than $776,000 (1926 estimate). Total costs to 
local interests for initial and permanent major 
rehabilitation works were $830,000 and $223,904, 
respectively, (required contribution by State of 
California). State of California must contribute annually 
an amount equal to the Federal allotment for 
maintenance. 
Operations and results during fiscal year. 
Maintenance: Operations consisted of condition and 
operation studies by hired labor on Yuba River. 
Historical summary. Construction of project 
works was initiated in November 1902. Construction of 
Daguerre Point Dam was completed in May 1906; 
diversion of river over dam was completed in 1910; 
training walls and dikes were completed in 1935. About 
149 million cubic yards of debris are held in lower 7 
miles of Yuba River between Marysville and downstream 
end of training walls. About 20 million cubic feet, are 
confined in river channel by Daguerre Point Dam. 
Additional millions of yards of loose material are in mine 
tailing fields adjacent to project training walls in upper 
7-mile reach of project. Initial rehabilitation of Daguerre 
Point Dam begun in July 1963 was completed in 
December 1964. Contract for permanent rehabilitation of 
structure was initiated in July and completed in October 
1965. 
Flood Control 
4. SACRAMENTO RIVER, CA 
Location. Works covered by this improvement are 
on Sacramento River and tributaries in north-central 
California from Collinsville to Ordbend, a distance of 184 
miles. 
35-3A

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Previous project. For details see page 1815 of 
Annual Report for 1917, page 1995 of Annual Report for 
1938, and page 2262 of Annual Report for 1907. 
Existing project. Sacramento River flood control 
project is a comprehensive plan of flood control for 
Sacramento River and lower reaches of its principal 
tributaries. Improvement extends along Sacramento River 
from Ordbend in Glenn County, CA, 184 miles 
downstream to its mouth at Collinsville at upper end of 
Suisun Bay, and comprises a system of levees, overflow 
weirs, drainage pumping plants, and flood bypass 
channels or floodways designed to carry surplus 
floodwaters without inundation of valley lands. About 
980 miles of levee construction, with an average height 
of 15 feet and 98 miles of bank protection are involved in 
project. For further details, see Annual Report for 1962, 
page 2115. (See table 35-BB for authorizing legislation.) 
Estimated (October 1987) cost for original project 
(exclusive of supplemental levee improvements), 
including new work and maintenance, is $163,925,000 of 
which $68,925,000 is Federal cost and $95 million 
non-Federal ($90,050,562 for lands and damages and 
relocations and $4,949,438 required contributed funds 
for levee construction, bank protection works, and levee 
setbacks). Of this amount, $4,939,752 was for new work 
and $9,686 for maintenance. Estimated October 1996 
total project cost is $171,950,000, of which $76,322,000 
is Federal and $95,628,000 is non-Federal. Total 
estimate now includes remedial levee work for Yolo 
Bypass and Cache Slough (Unit 109) and land 
acquisition for Little Holland Tract as hydraulic and 
environmental mitigation in potential projects impacting 
stages of the Sacramento River, but excludes Sacramento 
Urban Area; Marysville/Yuba City Area; Mid-Valley 
Area; Lower Sacramento Area; and Upper Sacramento 
Area Levee Reconstruction Projects. Colusa Basin Drain 
and Knights Landing (West Levee) are not incrementally 
economically feasible, but these sites have been 
transferred to Upper Sacramento Area. Knights Landing 
(East Levee) has been included with Mid-Valley Area. 
In addition to project requirements, local interests 
constructed several pumping plants for drainage of 
agricultural and urban land protected by project levees. 
Some channel clearing work was accomplished by State 
of California and other local interests to supplement 
project levee construction. Dredging below Cache Slough 
and reconstruction of Cache Creek settling basin weir are 
considered deferred and excluded from foregoing cost 
estimate. Estimated cost (July 1962) of these project units 
is $2,560,000 and $520,000, respectively, a total of 
$3,080,000 plus U.S. costs, for construction. Operation 
and maintenance of completed project will be 
responsibility of local interests; as units of project are 
completed, they are transferred to agencies of State of 
California for operation and maintenance. Existing 
project was adopted by 1917 Flood Control Act (H. Doc 
81, 62d Cong., 1st sess., as modified by Rivers and 
Harbors Committee Doc. 5, 63d Cong., 1st sess.), 1928 
Flood Control Act (S. Doc. 23, 69th Cong., 1st sess.), 
River and Harbor Act of 1937 (S. Committee print 75th 
Cong., 1st sess.), and 1941 Flood Control Act (H. Doc. 
205, 77th Cong., 1st sess.). 
Phase I - Sacramento River Flood Control System 
Evaluation recommended reconstruction of 32 miles of 
Sacramento area levees. Report was approved and in 
March 1989, Sacramento Urban Area Levee 
Reconstruction project was established under authority of 
Sacramento River Flood Control Project. New project is 
located within boundaries of Sacramento River Flood 
Control System in highly urbanized area around city of 
Sacramento, near confluence of Sacramento and 
American Rivers. It includes Natomas area levees from 
Natomas Cross Canal Bypass through Reclamation 
District 900 and portions of the Yolo Bypass east levee 
in West Sacramento; and, in South Sacramento, the east 
bank of Sacramento River from Miller Park to town of 
Freeport. Estimated (October 1995) cost for Sacramento 
Urban project is $42,900,000 of which $28,215,000 is 
Federal and $14,685,000 is non-Federal (including a 
cash contribution of $2,135,000). 
Sacramento River Flood Control Project 
(Glenn-Colusa Irrigation District) (G.C.I.D.) is part of the 
fishery/irrigation enhancement project being developed 
by G.C.I.D. Project is located at River Mile 206 on 
Sacramento River near the Glenn-Tehama county line. 
The Corps riffle restoration project includes multiple 
sheet piles coupled with stone to replicate natural riffle 
and bank protection to restore river hydraulic gradient to 
pre-1970 conditions. This will stabilize river hydraulics. 
Estimated (October 1995) project cost is $26,000,000, 
of which $20,000,000 is Federal and $6,000,000 is 
non-Federal. Project was established under authority of 
the 1917 Sacramento River Flood Control Project (see 
Energy and Water Development Appropriations Act of 
1990 and Water Resources Development Act of 1996 
and 1999). 
3 5-4A

SACRAMENTO, CA DISTRICT 
Phase II - Marysville/Yuba City Area Levee 
Reconstruction. Project is located within boundaries of 
the Sacramento River Flood Control System in Butte, 
Sutter and Yuba counties in north-central California. 
Area includes Feather and Yuba Rivers and their 
tributaries, Sutter Bypass, cities of Marysville and Yuba 
City and communities of Linda and Olivehurst. An 
evaluation of about 134 miles of Sacramento River Flood 
Control Project levees in Marysville/Yuba City area 
identified about 22 miles of levees as being structurally 
unstable. Project consists of reconstructing those levees 
by installing about 17 miles of toe drains, installing about 
4 miles of slurry cut-off walls and backfilling about 1 
mile of a drainage ditch to rectify structural stability; also 
consists of raising about 10 miles of levees to restore 
design freeboard and developing about 76 acres for fish 
and wildlife mitigation. Estimated (October 1998) 
project cost is $42,970,000, of which $32,260,000 is 
Federal and $10,710,000 is non-Federal (including a cash 
contribution of $5,190,000). Project was established 
under authority of Sacramento River Flood Control 
Project. 
Phase III - Mid-Valley Area Levee Reconstruction. 
Project is located within the boundaries of the 
Sacramento River Flood Control System in Placer, 
Solano, Sutter, Yolo and Yuba Counties in north-central 
California. Area includes the Sacramento and Feather 
Rivers, Knights Landing Ridge Cut, Sutter and Yolo 
Bypasses and portions of the Bear River including 
Yankee Slough, Dry, Cache, Putah Creeks and the 
Natomas Cross Canal. Communities in the area include 
Knights Landing, Robbins, Davis and Woodland. An 
evaluation of about 240 miles of the Sacramento River 
Flood Control Project levees in the Mid-Valley area 
identified about 18 miles of levees that are structurally 
deficient. Project consists of reconstructing about 18 
miles of levees by installing about 6.9 miles of landside 
berms with toe drains, relocation of ditches, about 11.2 
miles of embankment modifications, about .2 miles of 
slurry cut-off walls, the restoration of levee height, and 
developing land for about 52 acres of fish and wildlife 
mitigation. Estimated (October 1998) project cost is 
$19,900,000, of which $14,900,000 is Federal and 
$5,000,000 is non-Federal (including a cash contribution 
of $2,454,000). Project was established under authority 
of the Sacramento River Flood Control Project. 
Phase IV - Lower Sacramento Area Levee 
Reconstruction. Project is located within the boundaries 
of the Sacramento River Flood Control System in 
Sacramento County in north-central California. Area 
includes the lower Sacramento River and its distributary 
sloughs and the city of Clarksburg. An evaluation of 
about 295 miles of the Sacramento River Flood Control 
Project levees in the Lower Sacramento area identified 
about 47 miles of levees that are structurally deficient. 
Project consists of reconstructing about 2.6 miles of 
levees by installing landside berms with toe drains, 
backfilling of existing drainage collector systems, slurry 
cut-off walls, the restoration of levee height, and 
developing land for about 2 acres of fish and wildlife 
mitigation. Estimated (October 1998) project cost is 
$6,200,000, of which $4,660,000 is Federal and 
$1,540,000 is non-Federal (including a cash contribution 
of $1,090,000). Project was established under authority 
of Sacramento River Flood Control Project. 
Phase V - Upper Sacramento Area Levee 
Reconstruction. Project is located within the boundaries 
of the Sacramento River Flood System in Colusa County 
in north-central California. Area includes the upper 
Sacramento River and its tributaries and the city of 
Colusa. An evaluation of about 315 miles of the 
Sacramento River Flood Control Project levees in the 
Upper Sacramento area identified about 12 miles of 
levees that are structurally deficient. Project consists of 
reconstruction of about 3.7 miles of levees by installing 
landside berms with toe drains, slurry cut-off walls, the 
restoration of levee height, and developing land for about 
1.3 acres of fish and wildlife mitigation. Estimated 
October 1999 project cost is $7,600,000, of which 
$5,720,000 is Federal and $1,880,000 is non-Federal 
(including a cash contribution of $856,000). Project was 
established under authority of Sacramento River Flood 
Control Project. 
Local cooperation. Local interests have fully 
complied with requirements for all work completed and 
indicated they will be able to fulfill requirements for 
remaining work. 
Operations and results during fiscal year. New 
work: (a) Sacramento Urban Area Levee Recontruction: 
Construction is complete, however, final 
payment and contract close-out activities remain. (b) 
Sacramento River Flood Control Project (Glenn Colusa 
Irrigation District (G.C.I.D.)): Engineering was 
continued on riffle restoration on Sacramento River 
including building of multiple sheet piles coupled with 
stone to replicate natural riffle and bank protection to 
restore river hydraulic gradient to approximate pre-1970 
conditions. (c) Marysville/Yuba City Area Levee 
Reconstruction: Completed contract 2a awarded July 
35-5A

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
1995 and continued the mitigation contract awarded 
August 1995. (d) Mid-Valley Area Levee 
Reconstruction: Completed Contract 1A awarded in 
September 1996 and continued contract 1B awarded in 
July 1997. Engineering continued for the second Project 
Cooperation Agreement for Areas 2, 3 and 4. (e) Lower 
Sacramento Area Levee Reconstruction: Engineering 
continued. (f) Upper Sacramento Area Levee 
Reconstruction: Engineering continued. In accordance 
with Section 215 agreement signed September 22, 1997, 
local sponsor constructed 1,000 lineal feet of 
seepage/stability berm along the Sacramento River 
(Site E). 
Completed contract 3a awarded September 1997, 
continued contract 2b awarded August 1997, continued 
contract 3 awarded July 1988, and continued 
maintenance period for mitigation contract awarded 
August 1995. 
Historical summary. Construction of existing 
project began in FY 1918 and is about 99 percent 
complete. Channel improvement to date has produced a 
channel with a capacity of 579,000 cubic feet per second 
in Sacramento River below Cache Slough. In addition, 
discharges up to 21,000 cubic feet per second can be 
diverted from Sacramento River through Georgiana 
Slough. Completed major project items include about 
977 miles of levees; five weirs with a combined 
discharge capacity of 602,000 cubic feet per second; two 
cutoff channels; two sets of outfall gates; channel 
improvement and clearing in Sacramento River, Butte 
Creek, Putah Creek, and Sutter and Tisdale Bypasses; 
construction of two main bypasses or floodways and 
secondary bypasses at Tisdale and Sacramento weirs and 
at Wadsworth Canal; construction of Knights Landing 
ridge cut and of Cache Creek settling basin; installation 
of gaging stations; and enlargement of Sacramento River 
below Cache Slough. Cutoffs at Collins Eddy and 
between Wild Irishman and Kinneys Bends were made in 
1918 and 1919, respectively. Sacramento weir was 
completed in 1917, Fremont weir in 1924, Tisdale and 
Moulton weirs in 1932, and Colusa weir in 1933. Outfall 
gates at Knights Landing were constructed in 1930 and at 
mouth of Butte Slough in 1936. Pumping plants on Sutter 
Bypass were completed in 1944. Work items with 
reference to clearing, snagging, rectification of channels, 
and bank protection on Sacramento River and tributaries 
in Tehama County and from Red Bluff southerly, 
provided for by 1941 Flood Control Act were 
accomplished in fiscal years 1947, 1948, 1949, and 
1951. Yolo Bypass and Cache Slouth (Unit 109) was 
completed in 1990. Work remaining comprises 
completion of levee stage construction Marysville/Yuba 
City Area levees; Mid-Valley Area; Lower Sacramento 
Area; and Upper Sacramento Area Levees. (See Table 
35-CC for total cost of existing project to September 30, 
1996.) 
35-6A

SACRAMENTO, CA DISTRICT 
TABLE 35-A (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
1. Regulation of 
Hydraulic Mining 
and Preparation 
of Plans 
2. Sacramento River 
and Tributaries. 
CA (Debris 
Control) 
(Contributed 
Funds Other) 
3. Treatment of 
Yuba River 
Debris Situation 
Restraining 
Barries, CA 
(Federal Funds) 
(Required 
Contributed 
Funds) 
(Contributed 
Funds, Other) 
4. Sacramento 
River, CA 
including 
Sacramento River 
Flood Control 
Project (Federal 
Funds) 
Maint. 
Approp. 
Cost 
New York 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New York 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Rehab. 
Approp. 
Cost 
New Work 
Contrib 
Cost 
Maint. 
Contrib. 
Cost 
Rehab. 
Approp. 
Cost 
New York 
Contrib. 
Cost 
New York 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
821,325 
821,325 
5,093,999 1 2 
5,093,999 1 2 
952,741 782,352 1,287,915 1,216,222 984,716 
877,077 1,277.023 1,277,023 926,127 1,208,560 
18,207,678 
18,126,575 
323,420 
315,777 
361,482 
361,482 
29,000 
22,524 
4,500 307,000 530,000 -141,000 2,548,531 1 
14,287 179,182 322,815 193,428 2,547,860 1 
56,000 
70,008 
3,700,000 
1,329,635 
235,326 61,310 
218,084 245,765 
92,000 
1,053,904 
1,053,904 
361,777 
361,777 
1,989,338 
1,865,183 
1,053,904 
1,053,904 
36,000 8 
34,000 
- 1,500,000 82,239,471 9 
55,419 48,158 78,610,942 9 
1,979,104 
1,979,104 
35-7A

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-AA (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
(Contributed 
Funds) 
Sacramento 
Urban Area Levee 
Reconstruction 
(Federal Funds) 
(Required 
Contributed 
Funds) 
(Contributed 
Funds, Other) 
Sacramento 
River Flood 
Control 
(G.C.I.D), 
CA (Federal 
Funds) 
Sacramento 
River Flood 
Control 
(Marysville/Yuba 
City Area levees). 
New Work 
Contrib. 
Cost 
Maint. 
Contrib. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Contrib. 
Cost 
New Work 
Approp 
Cost 
New Work 
Approp. 
Cost 
CA (Federal Funds) 
(Required Contributed 
Funds) New Work 
Contrib. 
Cost 
(Contributed Funds, New Work 
Other) Contrib. 
Cost 
Sacramento New Work 
River Flood Approp. 
Control Cost 
(Mid-Valley Area New Work 
Levee Reconstruction) Approp. 
(Federal Funds) Cost 
10,724,085 10 
10,724,085 10 
9,686 11 
9,686 11 
3,663,000 
3,760,711 
247,327 
115,402 
200,000 
-38,548 
700,000 72,000 
143,950 803,419 
129,714 
-101,735 
147,387 
437,408 
11,352 
11,066 16,725 
28,075,000 
28,071,933 
- 3,157,613 
4,516 2,066,665 
5,867,175 
5,867,175 
400,000 300,000 820,000 763,000 750,000 5,226,000 
241,207 660,133 692,144 817,877 792,332 5,091,550 
1,479,000 2,445,000 7,174,000 18,994,794 -2,537,000 
525,117 2,826,445 4,930,067 15,711,402 3,421,799 
1,350,000 3,872,015 - 
180,098 2,319,549 1,626,654 
736,210 521,200 
87,518 2,230,045 1,856,474 
28,782,794 
28,607,446 
5,742,015 
4,594,593 
2,969,410 
4,210,151 
820,310 1,938,690 2,859,000 221,000 5,839,000 
626,781 1,960,224 2,472,155 726,907 5,786,067 
350,000 335,000 327,500 748,000 1,760,500 
- 357,952 502,623 243,794 1,104,369 
35-8A

SACRAMENTO, CALIFORNIA, DISTRICT 
TABLE 35-AA (Cont'd) COST AND FINANCIAL STATEMENT 
See 
Section Total Cost to 
in Text Project Funding FY 95 FY 96 FY 97 FY 98 FY99 Sep. 30, 1999 
Sacramento New Work 
River Flood Approp. - 604,365 273,000 378,000 380,000 1,635,365 
Control Cost - 485,276 352,102 389,522 370,195 1,597,095 
(Lower Sacramento 
Area Levee 
Reconstruction) 
(Federal Funds) 
BE377 
Sacramento New Work 
River Flood Approp. - - 354,000 572,226 222,000 1,148,206 
Control Cost - - 319,791 490,759 281,808 1,092,358 
(Upper Sacramento 
Area Levee 
Reconstruction) 
(Federal Funds) 
1. Exclusive of $644,503 appropriation and cost on 
inactive portion of project. 
2. Includes $477,127 for recreational facilities at 
North Fork ($32,473) and Harry L. Englebright 
($414,654), Code 710 appropriations and costs. 
3. Includes $15,414,051 from regular funds and 
$1,808,911 from Hydraulic Mining in California funds. 
4. Includes $15,180,476 from regular costs and 
$1,737,540 from Hydraulic Mining in California costs. 
5. Includes $12,420 contributed funds, other, from 
State of California Department of Navigation and Ocean 
Development for acquisition of a boarding float; and 
$311,000 funds from State of California Department of 
Boating and Waterways for refurbishing restrooms and 
launching facilities at Englebright Dam. 
6. Includes $12,420 costs for acquisition of 
boarding float and $280,317 costs for refurbishing 
restrooms and launching facilities at Englebright Dam. 
7. Includes deferred maintenance funds in amount of 
$207,500. 
8. Miscellaneous engineering and construction 
accomplished at expense of local interests in connection 
with rehabilitation of Daguerre Point Dam necessitated 
by December 1964 floodflows. Includes $2,000 from 
Yuba County Water Agency in May 1994. 
9. Includes appropriation and cost of $680,000 for 
new work for previous project and $1,486,469 public 
works funds for new work for existing project. 
10. Includes $680,000 required contribution for 
previous project;$4,939,752 required contributed funds 
for existing project; and $310,801 voluntary contribution 
for bank protection for existing project. 
11. Includes $9,686 required contributed funds for 
existing project. 
12. Includes contributed funds, other, from the State 
of California for relocation of utilities, irrigation ditch, 
access ramps, and miscellaneous small structures in the 
Natomas, Greenhaven Pocket and West Sacramento 
areas. (Sacramento Urban Area). 
13. G.C.I.D. construction funds received in FY 
1991, but no costs were incurred. Includes $493,000 
total funds and costs under General Investigations for 
Preconstruction Engineering and Design. 
14. Not reflected in actual annual accounting 
records for Marysville/Yuba City are $1,710,000 costs 
for FY 91 and FY 92 incurred under Sacramento River 
Flood Control Project for design effort. These costs are 
considered part of Marysville/Yuba City cost-shared 
project. 
35-9A

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35-BB AUTHORIZATION LEGISLATION 
See Date of 
Section Authorization 
in Text Act Project and Work Authorized Documents 
Mar. 1, 1983 
Feb 27, 1907 
June 19, 1934 
June 25, 1938 
Ex. Doc. 267, 51st 
Cong., 2d sess., Ex. 
Doc. 98, 4 7th Cong., 
1st sess. 1 
(Amendment of sec. 13, 
Act of Mar. 1, 1893.) 1 
35-10A 
REGULATION OF HYDRAULIC MINING 
AND PREPARATION OF PLANS 
Created California Debris Commission and authorized: 
(a) Hydraulic mining under its regulation in 
drainage areas of Sacramento and San Joaquin Rivers, if 
possible without injury to navigability of these river 
systems or to lands adjacent thereto; and (b) preparation 
of plans by Commission for improvement of navigability 
of these river systems, and flood and debris-control 
therein. 
Authorized California Debris Commission to permit 
hydraulic mining without construction of impounding 
works, provided there is no injury to navigability of 
above river systems or lands adjacent thereto. 
Amended act of Mar. 1, 1893, which provides for 
construction of debris dams or other re- straining works 
by California Debris Commission and 
collection of a 3-percent tax on gross proceeds of each 
mine using such facilities, so as to eliminate this tax and 
substitute an annual tax per cubic yard mined, 
obtained by dividing total capital cost of each dam, 
reservoir, and rights-of-way, by total capacity of 
reservoir for restraint of debris; and authorized revocation 
of Commission orders permitting such mining, 
for failure to pay this annual tax within 30 days after its 
due date; and also authorized receipt of money 
advances, from mineowners to aid such construction, 
to be refunded later from annual payments of yardage 
taxes on material mined. 
Added at end of sec. 23 of above act, a provision that 
the Secretary of the Army is authorized to enter into 
contracts to supply storage for water and use of outlet 
facilities from debris-storage reservoirs for domestic 
and irrigation purposes and power development, upon 
such conditions of delivery, use, and payment as he may 
approve, these payments are to be deposited to credit of 
such reservoir project, reducing its capital cost to be 
repaid by tax on mining operations.

SACRAMENTO, CA DISTRICT 
TABLE 35-BB (Cont'd) AUTHORIZATION LEGISLATION 
See Date of 
Section Authorization 
in Text Act Project and Work Authorized Documents 
Nov. 17, 1986 Abolished the California Debris Commission and Sec. 1001, 1986 WRDA 
transferred all authorities, powers, functions, and duties 
to the Secretary of the Army. Authorized all acquired 
land and other interests presently under jurisdiction of 
the Commission to be retained and administered under 
direction of the Secretary. 
4. 
Dec. 22, 1944 SACRAMENTO RIVER, CA H. Doc. 649, 78t h 
And May 17, 1950 Additional levee construction and reconstruction, Cong., 2d sess., and 
367, 81st Cong., 
Bank protection and incidental channel improvements, 1s t sess. 
July 3, 1958 Sacramento River from Chico Landing to Red Bluff, H. Doc. 272, 84t 
and local interests flood plain zoning above Chico Cong., 2d sess. 
Landing. 2 
Bank protection works at critical locations, S. Doc. 103, 86th 
July 14, 1960 Sacramento River. 2 Cong., 2d sess. 
Acquiring and permanently restoring Little Holland H. Doc. 533, 108th 
May 24, 1994 Tract to tidal lands with seasonal and emergent Cong., 2d sess. 
marshlands would not only have substantial 
environmental benefits, but measurable flood control 
benefits as well. 
1. For latest published map, see Annual Report for 
1913, p. 3170, and Rivers and Harbors Committee 
Document 50, 74t Cong., 1st sess. 
2. This supplemental work is reported in detail 
under Sacramento District, Improvement No. 23. 
35-11A

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 35- CC SACRAMENTO RIVER CA: TOTAL COST 
EXISTING PROJECT TO SEPTEMBER 30, 1999 
(See Section 4 of Text) 
Funds New Work Maintenance Total 
Regular $74,143,882 $1,979,104 $76,122,986 
Public Works 1,486,469 - 1,486,469 
Total U.S. 75,630,351 1,979,104 77,609,455 
Contributed Project Work 4,939,752 9,686 4,949,438 
Contributed, Other 5,104,333 - 5,104,333 
Total All Funds $85,674,436 1,988,790 $87,663,226 
1. Includes $429,671 representing book value of plan 
purchased with previous project funds and transferred 
to existing project without reimbursement. 
2. Excludes financial information for Sacramento 
Urban Area Levee Reconstruction, Glenn-Colusa 
Irrigation District (G.C.I.D.), Marysville/Yuba city 
Area Levee Reconstruction and Mid-Valley Area 
Levee Reconstruction, Lower Sacramento Area Levee 
Reconstruction and the Upper Sacramento Area Levee 
Reconstruction Projects, all authorized under the 
Sacramento River Flood control Project (See Table 35- 
AA). 
35-12A

ALBUQUERQUE, NM, DISTRICT* 
The district comprises the watershed of the Canadian River 
and its tributaries in New Mexico; the watershed of Arkansas 
River and its tributaries in Colorado; the watershed of Rio 
Grande and its tributaries including the Pecos River and its 
tributaries upstream of Amistad Lake; and the San Juan River 
Basin in New Mexico; and the watersheds of the Gila, San 
Francisco and Mimbres Rivers and its tributaries in New Mexico. 
Note: The district watershed boundaries were revised in June 1986 
to include the portion of New Mexico west of the Continental 
Divide. 
IMPROVEMENTS 
Flood Control 
1. Acequias Irrigation System, NM ........... 
2. Alamogordo, NM ...................... 
3. Alamosa, CO ........................ 
4. Conchas Lake, NM ...................... 
5. El Paso, TX ............................ 
6. John Martin Reservoir, CO ................ 
7. Las Cruces, NM ....................... 
8. Rio Grande Basin, NM ................... 
8A. Abiquiu Dam, NM ..................... 
8B. Cochiti Lake, NM ....................... 
8C. Galisteo Dam, NM ..................... 
8D. Jemez Canyon Dam, NM .................. 
8E. Middle Rio Grande Flood Protection, 
Bernalillo to Belen, NM ................. 
8F. Rio Grande Floodway, NM ................ 
8G. San Acacia to Bosque del Apache Unit, NM ... 
Page 
32-1 
32-2 
32-2 
32-2 
32-3 
32-3 
32-4 
32-4 
32-4 
32-5 
32-5 
32-5 
32-6 
32-6 
32-7 
Flood Control (Continued) ...................... 
9. SantaRosaDam and Lake, NM .............. 
10. Trinidad Lake, CO ........................ 
11. Two Rivers Dam, NM ..................... 
12. Inspection of completed flood 
control projects ......................... 
13. Scheduling flood control 
reservoir operations ...................... 
14. Other authorized flood 
control projects .......................... 
15. Flood control work under 
special authorizations ..................... 
General Investigations 
16. Surveys ................................ 
17. Collection and study of basic data ............ 
18. Environmental Data Studies ................ 
19. Preconstruction Engineering and Design ....... . 
Flood Control 
1. ACEQUIAS IRRIGATION SYSTEM, NM 
Location. There are about one thousand acequias throughout 
the state of New Mexico, most of which are located in northcentral 
New Mexico. 
Proposed project. Authorized by the Water Resources 
Development Act of 1986, Section 1113, the project consists of 
about one thousand acequias throughout the state of New 
Mexico. These community ditch systems provide irrigation 
water to about 160,000 acres on an estimated 12,000 farms. 
Acequias have been in existence since the early Spanish 
Colonization period of the 17th and 18th Centuries and represent 
one of the oldest forms of cooperative institutions in the United 
States. They are an integral part of the culture and heritage of 
New Mexico. Diversion structures, many of which are constructed 
of available materials such as rock and brush, are frequently 
destroyed by flows greater than normal resulting from spring 
runoff or summer thunderstorms. Disruption of the 
ditches usually occurs during peak irrigation season and severely 
impacts crop production. The Water Resources Development Act 
of 1986 directs the U.S. Army Corps of Engineers to undertake 
measures, without regard to economic analysis, as are necessary to 
protect and restore the river diversion structures and associated 
canals. 
Local Cooperation. The local sponsor, the State of New 
*All costs and financial statements for projects are listed at the end of this chapter. All other tables are referenced in text and also appear at the end of this chapter. 
36-1 
Page 
32-7 
32-8 
32-8 
32-9 
32-9 
32-10 
32-10 
32-10 
32-10 
32-10 
32-10

Report of the Secretary of the Army on Civil Works Activities for FY 1999 
Mexico, has a law whereby the State of New Mexico provides 
17.5% of the project costs, and low interest loans to the local 
Acequias for the remaining 7.5%. The State of New Mexico has 
appropriated, and will appropriate on an annual basis, the funds 
necessary to meet the requirements of local sponsorship. 
Operation and results during fiscal year. Funds to initiate 
construction were received in Fiscal Year 1988. Construction 
contracts have been awarded in every year since FY 1988. 
Condition at end of fiscal year. There are several projects in 
various stages of design and construction. In the traditional 
Acequia program, El Pueblo and La Joya Phase III are currently 
being designed with construction scheduled for 2001. Tularosa 
was completed this year under the Section 215 program and El 
Vado de Juan Paiz and La Joya Phase II are under construction. 
2. ALAMOGORDO, NM 
Location. The project is located in south central New Mexico 
in Otero County, in and near Alamogordo, NM. The city is 
situated at the foot of the Sacramento Mountains near the eastern 
edge of the Tularosa Basin. 
Proposed Project. The authorized project consists of a 
concrete and rip-rap lined diversion channel with 100 year flow 
capacity, which will intercept flows from the Sacramento 
Mountains east of the City. For a description of the complete 
improvement and authorizing legislation see page 694 of Annual 
Report for 1966. 
Local Cooperation. The Water Resources Development Act of 
1986 applies. 
Operation and Results during fiscal year. The GRR, was 
approved by April 1999 with the PCA executed July 1999. A 
document report for all Railroad Relocation began in August 
1999 and is to be completed by December 2001. Plans & 
Specifications for the South Diversion Channel Phase I began in 
July 1999. 
Condition at the end of the fiscal year. The District will be 
completing the Phase I South Diversion Channel. The Local 
Sponsor will be acquiring easements for construction. 
3. ALAMOSA, CO 
Location. The project lies in south central Colorado along the 
Rio Grande, in the community of Alamosa, CO. 
Project. The project consists of a levee system which will 
replace and augment the existing spoil bank levees. (See Table 
32-B for authorizing legislation.) 
Local Cooperation. The Water Resources Development Act of 
1992 applies. 
Operation and results during fiscal year. 
activities were completed, September 1998. 
mitigation ongoing. 
Condition at the end of the fiscal year. 
completed. Environmental mitigation ongoing. 
Construction 
Environmental 
Construction 
4. CONCHAS LAKE, NM 
Location. The dam is located in San Miguel County, NM, on 
the Canadian River, just below the confluence of the Canadian and 
Conchas Rivers. (See Geological Survey State map of New 
Mexico, scale 1:500,000, and Geological Survey topographic map, 
Tucumcari quadrangle, scale 1:250,000.) 
Existing project. This dam consists of a concrete gravity main 
section 1,250 feet long with a maximum height of 200 feet above 
streambed located in the Canadian River Canyon together with 
earth dikes on each side having an overall length of about 3.7 
miles. The main section contains conduits in its base for the 
release of water from the reservoir, and an overflow, ungated 
spillway 300 feet long. The earth dikes vary in height up to 100 
feet and the north dike contains a concrete ogee-type emergency 
spillway 3,000 feet long. The reservoir has a gross storage 
capacity of 513,900 acre-feet (198,170 for flood control, 254,200 
for water conservation and irrigation, and 61,530 dead storage). 
The dam controls 7,409 square miles of drainage area. (See page 
17-16 of Annual Report of 1973 for authorizing legislation.) 
Local cooperation. None Required. 
Operations and results during fiscal year. The reservoir was 
operated for storage of floodwater and releases for irrigation 
purposes. Sediment damages of $391,900 were prevented during 
FY 1999. There were no flood damages prevented in FY 1999. 
Estimated total accumulated flood and sediment damages 
prevented by the project through FY 1999 were $4,670,800. 
Estimated irrigation benefits for FY 1999 were $266,000. 
Estimated total accumulated irrigation benefits through FY 1999 
were $11,213,000. The pool elevation at the start of FY 1999 was 
4,191.52 feet with corresponding storage of 234,562 acre-feet. 
Total releases for this reporting period were 214,383 acre-feet. 
Releases of 95,665 acre-feet were made to Arch Hurley 
Conservancy District and 1,843 acre-feet to Bell Ranch and 
116,875 acre feet to the Canadian River channel. The pool 
elevation on September 30, 1999 was 4,199.16 feet with 
corresponding storage of 298,440 acre-feet. Sediment deposition 
during the fiscal year was 3,499 acre-feet. 
Condition at end of fiscal year. The existing project was 
essentially complete in 1939. Irrigation of some lands downstream 
from the project began in November 1945. A cost sharing agree- 
36-2

ALBUQUERQUE, NM, DISTRICT 
ment between the Government and the State of New Mexico for 
additional Recreation Development at Conchas Lake was 
completed in August 1977. Costs of the facilities are 50 percent 
State of New Mexico and 50 percent Federal. Construction of 
recreation facilities was initiated in FY 1978 and completed in 
FY 1983. Projects structures are in good condition and in 
operation. 
5. EL PASO, TX 
Location. The project is located at El Paso, El Paso County, 
TX, which is on the left bank of the Rio Grande in the reach that 
forms part of the international boundary between the United 
States and the Republic of Mexico. (Geological Survey map for 
El Paso, TX; New Mexico quadrangle, scale 1:250,000.) 
Existing project. This project consists of a single-purpose 
flood control system of detention dams, diversion dikes, conduits 
and channels to collect, regulate and discharge arroyo runoff into 
the Rio Grande. Runoff from the tributary arroyos on the 
eastern, southern, and western slopes of the adjacent Franklin 
Mountains often inundates sections of the city and its outlying 
suburban developments. The project is divided into three 
independent elements: Northwest area, Central area, and 
Southeast area. The project plan satisfies the 1933 U.S. and 
Mexico agreement on limited tributary discharge into the Rio 
Grande in El Paso, Texas. (See Table 32-B for authorizing 
legislation.) 
Local cooperation. Section 2 of the Flood Control Act of June 
28, 1938 applied for the Northwest and Central areas. The Local 
Cooperation Agreement for the Southeast area reflects the cost 
sharing requirements contained in the Water Resources 
Development Act of 1986. 
Operations and results during fiscal year. Flood control 
dams in operation during FY 1998 and dates of completion of 
construction are as follows: Northgate and Range Dams 
(February 1973); Sunrise and Mountain Park Dams (October 
1974); and Pershing Dam (March 1977); Fort Bliss Diversion 
Channel (November 1978); Oxidation Pond and Buena Vista 
Diversion and Oxidation Pond Outlet Conduit (November 1980); 
Mulberry and Thorn Drive Dams (June 1982); Mesa Dam (September 
1982); McKelligon Canyon Dam (October 1982); 
Keystone Dam (September 1983); Keystone Outlet Conduit 
(March 1984); Highway Diversion Channel (May 1985); Dam 
Safety Assurance Program to the existing Range and Northgate 
Dams (May 1986); Borderland Diversion Channel (September 
1986); and Phelps Dodge Basin (January 1990), and Americas 
Basin (Mar 93). During FY 1996 flood flows and flood control 
storage were minimal, however, damages which would have 
resulted from these flows were prevented. 
Condition at end of fiscal year. At the end of 1999, all work 
in Central and Northwest areas were complete. 
Construction was completed in January 1990 on the Phelps 
Dodge Basin, in June 1992 on Phelps Dodge Channel, in March 
1993 on Americas Basin, in October 1998 on Bluff Channel on 
December 1999. Construction is underway for the Lomaland 
System. 
6. JOHN MARTIN RESERVOIR, CO 
Location. The project is located on the Arkansas River, in Bent 
County, 1,159 miles upstream from its mouth, 300 miles downstream 
from its source, about 18 miles upstream from the city of 
Lamar, CO. (See Geological Survey maps for Lamar and Las 
Animas, CO quadrangles, scale 1:125,000.) 
Existing project. The project consists of a concrete and earthfill 
structure about 2.6 miles long with a maximum height of 106 feet 
above streambed and an overflow, gated spillway 1,174 feet long. 
Total capacity of the reservoir at the top of flood control is 605,115 
acre-feet (259,417 for flood control and 345,698 for conservation 
and recreation storage). This reservoir controls a contributing 
drainage area of 18,130 square miles and is operated as a unit of 
the coordinated reservoir system for flood control in the Arkansas 
River Basin. Public Law 89-298 modified the act of June 22, 1936 
(49 Stat. 1570) to authorize 10,000 acre-feet of reservoir flood 
control storage space for fish and wildlife and recreation purposes. 
For details of the completed improvement and authorizing 
legislation see page 17-16 of Annual Report for FY 1973. 
Local cooperation. Section 3 of the Flood Control Act of June 
22, 1936, applies. 
Operations and results during fiscal year. Operation of the 
dam and reservoir continued. Regulation of conservation storage 
continued under rules and regulations of the Arkansas River 
Compact. Sediment damages of $538,200 were prevented during 
FY 1999. Estimated total flood and sediment damages prevented 
by this project through FY 1999 were $139,065,100. Estimated 
irrigation benefits for FY 1999 were $414,600. Estimated total 
accumulative irrigation benefits were $28,237,600. Maximum 
pool elevation of 3,860.42 feet with corresponding storage of 
455,649 acre-feet occurred on May 09, 1999. Total releases for FY 
1999 were 486,955 acre-feet. Releases attributed to irrigation 
benefits amounted to 159,611 acre-feet. Sediment deposition was 
4,805 acre-feet in FY 1999. 
Condition at end of fiscal year. Storage and operation of the 
reservoir for irrigation began in March 1943. The project 
structures are in good condition and operational. 
36-3

Report of the Secretary of the Army on Civil Works Activities for FY 1999 
7. LAS CRUCES, NM 
Location. The project is located in Las Cruces, NM, 40 miles 
north of El Paso, TX. 
Proposed Project. The project is authorized by the Water 
Resources Development Act of 1996. The project consists of 
enlargement and modifications of two existing detention basins 
and a irrigation ditch in order to provide increased flood 
protection to the downtown commercial and residential district 
of Las Cruces. The proposed project will be constructed at an 
estimated cost of $8,800,000 ($6,600;000 Federal and 
$2,200,000 non-federal) 1 Oct 96 price levels. 
Local Cooperation. Water Resources Development Act of 
1986 applies. The City of Las Cruces is the non-Federal Local 
sponsor. 
Operations and results during the fiscal year. Plans and 
Specifications for the project were completed in March 1998. 
The construction contract for the project was awarded in January 
2000. Construction will be complete in September 2001. 
8. RIO GRANDE BASIN, NM 
Location. Improvements are located on the Rio Grande and 
tributaries in New Mexico. More definite locations and 
descriptions of individual projects are in following paragraphs 
and individual reports by projects. 
Existing project. The Flood Control Act of 1948 authorized 
the flood control phase of the comprehensive plan of 
development of water resources of the Rio Grande Basin in New 
Mexico (H. Doc 243, 81st Cong., 1st sess.) with the exception of 
Chiflo Dam and Reservoir and spillway gate structure at 
Chamita Dam. Although recommended, Chiflo Dam and 
Reservoir was deleted from the authorized plan. It was excluded 
without prejudice from future consideration by Congress. It was 
requested at that time, by the States of Colorado and Texas, that 
the project be deferred for restudy regarding required storage and 
methods of operation. By the same act, Congress also authorized 
for the construction irrigation phase of the comprehensive plan 
as recommended by the Bureau of Reclamation (H. Doc. 653, 
81st Cong., 2nd sess.). The act also stipulated that work should 
be prosecuted in accordance with a joint agreement approved by 
the Secretary of the Army and Acting Secretary of the Interior on 
November 21, 1957. In addition, under that agreement the 
Bureau of Reclamation was given responsibility for construction, 
operation, and maintenance of channel rectification, and 
drainage rehabilitation and extension phases of the unified plan 
of improvement. Authority for the Chamita Dam and Reservoir 
was abrogated when Cochiti Dam and Reservoir was authorized. 
(See Table 32-B for authorizing legislation and Table 32-C for 
existing projects.) 
All operations and costs for projects contained in the authorized 
plan are reflected in individual reports on the following pages. 
8A. ABIQUIU DAM, NM 
Location. The project is one unit of the flood control plan for 
the Rio Grande and tributaries, New Mexico. Abiquiu Dam is 
located on the Rio Chama near the town of Abiquiu, NM, about 32 
miles upstream from the confluence of Rio Chama and Rio 
Grande. (See Geological Survey Map for plan and profile of Rio 
Chama, NM, from mouth to mile 103, sheet 1, and Army Map 
Service, Aztec, NM; Colorado NJ 13-1, scale 1:250,000.) 
Existing project. This project consists of an earthfill dam 1,540 
feet long, 325 feet high, with a 12-foot diameter controlled outlet, 
and an uncontrolled spillway in a natural saddle about one mile 
north of the left abutment. The reservoir provides 545,784 acrefeet 
of flood control and sediment storage. Total capacity at the 
spillway crest is 1,192,801 acre-feet. For a detailed description of 
the completed improvements and authorizing legislation see 
Annual Report of 1973. A major rehabilitation project was 
completed in September 1980 and the recreation facilities were 
completed in FY 1981. A non-Federal hydropower plant was 
completed in 1990 by the County of Los Alamos. The capacity of 
this plant is 13.2 MW. Drainage adits were completed in 1990 to 
alleviate seepage problems in the north and south abutments. 
Local cooperation. None required. 
Operations and results during fiscal year. Operation of the 
dam and reservoir continued. Storage and flows were regulated in 
accordance with Section 203, Flood Control Act of 1960. On 
October 1, 1998, the pool elevation was 6,211.00 feet. The 
maximum pool (6,220.45 feet) and storage (185,703 acre-feet) 
occurred on March 29, 1999. On September 30, 1999, the pool 
elevation was 6,277.68 feet with a corresponding storage of 
174,682 acre-feet. There was 736 acre-feet of sediment deposition 
during FY 1999. 
There were $178,600 in flood damages prevented during FY 
1999. 
Sediment damages prevented were $82,400. Accumulated flood 
and sediment damages prevented by the project since completion 
were $391,300,100 through FY 1999. 
Condition at end of fiscal year. The project was placed in 
operation in February 1963. The project structures are in good 
condition and operational. 
36-4

ALBUQUERQUE, NM, DISTRICT 
Abiquiu Dam was originally equipped with Emergency Gates, 
however, provisions on initial construction were made for later 
installation. The Water Resources Development Act of 1986 
authorized construction of a set of emergency gates to increase 
safety and enhance flood and sediment control. Funds were 
appropriated under Construction General and in May 1997, 
construction of the gates commenced. Installation of the gates 
does not meet contact specifications. The Corps is attempting to 
work with the contractor and surety to resolve those deficiencies. 
Project structures are in good condition and in operation. 
8B. COCHITI LAKE, NM 
Location. The dam is located at river mile 340 on the Rio 
Grande (river mile 0 being at the intersection of the New 
Mexico-Texas State line with international boundary at El Paso, 
TX), near Pueblo de Cochiti, which is about 50 miles upstream 
from Albuquerque, NM. (See Geological Survey Maps, Cochiti 
Dam, NM, quadrangle and Santo Domingo Pueblo, NM, 
quadrangle, scale 1:24,000.) 
Existing project. This project consists of an earthfill dam 
about 5.4 miles long with a maximum height of 251 feet above 
streambed. The project extends generally in an east-west line 
across the Rio Grande to a point about 2 miles east of the Rio 
Grande and then southward across the Santa Fe River. An 
uncontrolled spillway with a 460-foot-long ogee-weir and a 160- 
foot notch 10.5 feet deep in the center is part of the embankment 
on the south side of the Santa Fe River. Operational releases for 
flood control and irrigation are made through a 3-barrel gated 
conduit in the left abutment on the Rio Grande. The reservoir 
has a storage capacity of 582,019 acre-feet at the spillway crest, 
of which 78,640 acre-feet is dedicated for recreation and 
sediment control. The project controls flood waters from a 
11,695 square mile drainage area. For more improvement 
details see page 17-7 of Annual Report for 1980. See page 17-14 
of fiscal year 1981 Annual Report for authorizing legislation. 
Local cooperation. None required. 
Operations and results during fiscal year. Operation of the 
dam and reservoir continued. The project was completed in June 
1975. On October 1, 1998, the pool elevation was 5,341.81 feet 
with a corresponding storage of 58,791 acre-feet. The maximum 
pool elevation was 5,344.13 feet with a storage of 61,535 acrefeet 
on May 29, 1999. On September 30, 1999 the pool elevation 
was 5,338.78 feet with a corresponding storage of 47,719 acrefeet. 
There was 997 acre-feet of sediment deposition during FY 
1999. There were $0 flood damages prevented during FY 1999. 
Sediment damages prevented were $111,700. Accumulated total 
damages prevented are $435,178,100. 
Conditions at end of fiscal year. The dam and appurtenances 
were placed in operation in 1975. The Cochiti Recreation area 
was completed in 1976, with the Visitors Center completed in 
1977. The Tetilla Peak recreation area was completed in 1981. 
Project structures are in good condition and in operation. 
8C. GALISTEO DAM, NM 
Location. The dam is located at river mile 12 on Galisteo 
Creek, a tributary of the Rio Grande. The reservoir will extend 
upstream 
from the dam for about 4 miles, near the village of Waldo, NM. 
(See Geological Survey Map,. San Pedro 1, NM quadrangle, scale 
1:24,000.) 
Existing project. This project consists of an earthfill dam 2,820 
feet long with a maximum height of 158 feet above the streambed. 
The outlet works consist of a 10-foot diameter uncontrolled outlet 
with maximum discharge capacity of 4,980 cubic feet per second 
with a pool at the spillway crest elevation. The dam was raised 7 
feet and the spillway was widened 575 feet to provided adequate 
discharge capacity to accommodate the revised probable maximum 
flood. The dam safety modification contract was awarded in 
February 1998 and is scheduled to be complete in October 1999. 
The project has 79,600 acre-feet of sediment space. For more 
details of complete improvements and authorizing legislation see 
page 17-17 of Annual Report for 1973. 
Local cooperation. None required. 
Operations and results during fiscal year. Operation of the 
dam and reservoir continued. Operation of the project began on 
October 11, 1970. The reservoir was empty on October 1, 1998. 
No storage occurred during FY 1998. Peak inflow was 1,586 c.f.s. 
and maximum outflow was 1,586 c.f.s. There was 102 acre-feet of 
sediment deposition during the year and the reservoir was empty 
on September 30, 1999. Sediment damages prevented during the 
FY were $11,400 totaling $171,600 through FY 1999. 
Condition at end of fiscal year. The project was placed in 
operation in October 1970. The project structures are in good 
condition and in operation. 
8D. JEMEZ CANYON DAM, NM 
Location. The project is located in Sandoval County, NM, on 
the Jemez River about 2 miles upstream from the confluence of the 
Jemez River and the Rio Grande, about 5 miles northwest of 
Bernalillo, NM. (See Geological Survey map for Bernalillo quadrangle, 
scale 1:125,000.) 
Existing project. This project consists of an earthfill dam 780 
36-5

Report of the Secretary of the Army on Civil Works Activities for FY 1999 
feet long with maximum height of 146.6 feet above streambed, 
and off-channel uncontrolled saddle spillway 400 feet wide, and 
a 13-foot diameter gated outlet in the left abutment with 
discharge capacity of 8,340 cubic feet per second with a pool at 
spillway crest elevation. The dam was raised 14.1 feet and the 
spillway widened 28 feet in 1986 and 1987 to provide adequate 
discharge capability to accommodate the revised probable 
maximum flood. The reservoir has a capacity of 97,425 acre-feet 
at spillway crest (73,000 acre-feet for flood control and 24,425 
acre-feet for sediment control). For more detailed description of 
completed improvements and authorizing legislation see page 
17-17 of Annual Report for 1973. 
Local cooperation. None required. 
Operations and results during fiscal year. On October 1, 
1998, the pool elevation was 5,194.08 feet with a corresponding 
storage of 23,923 acre-feet. The maximum pool elevation was 
5,195.13 feet with a storage of 24,211 acre-feet on May 31, 1999. 
On September 30, 1999 the pool elevation was 5,191.38 feet with 
a corresponding storage of 18,790 acre-feet. The reservoir was 
regulated for sediment control during FY 1999. Sediment 
deposition during FY 1999 was 332 acre-feet. There were $0 
flood damages prevented during FY 1999. Sediment benefits 
during FY 1999 were $36,100. Estimated total accumulated 
flood and sediment damages prevented by the project through FY 
1999 were $25,116,400. 
Condition at end of fiscal year. The project was placed in 
operation in October 1953. Project structures are in good 
condition and all structures are in operation. 
8E. MIDDLE RIO GRANDE FLOOD 
PROTECTION, BERNALILLO 
TO BELEN, NM 
Location. The project is composed of 45 square miles of 
floodplain lying along the Rio Grande from the vicinity of 
Corrales to Belen, New Mexico. 
Proposed project. The project is authorized by the Water 
Resources Development Act of 1986. The project consists of 
raising and rehabilitating 51.5 miles of levees to provide the 270- 
year level of protection, and the creation of 75 acres of wetlands 
from borrow areas within the bosque, and acquisition of 200 
acres to satisfy fish and wildlife mitigation requirements. The 
proposed project will be constructed at an estimated total cost of 
$62,400,000 ($46,800,000 Federal and $15,600,000 non- 
Federal) 1 Oct 97 price levels. (See Table 32-B for authorizing 
legislation.) 
Local cooperation. Water Resources Development Act of 
1986 applies. The Middle Rio Grande Conservancy District is 
the local sponsor. 
Operations and results during fiscal year. The Project 
Cooperation Agreement for the Corrales Unit of the project was 
executed in July 1995. Construction of The Corrales Unit began 
in September 1996, and was completed in July 1997. A Limited 
Reevaluation report is underway for the Belen, Mountainview and 
Isleta Units and is scheduled to be completed in 2003. 
8F. RIO GRANDE FLOODWAY, NM 
Location. This project is one unit of the flood control phase of 
the comprehensive plan of improvement for the Rio Grande 
Basin in New Mexico. It is located on the Rio Grande and covers 
a section of the river commencing near Truth or Consequences 
(formerly Hot Springs) at about river mile 123 and extends 
upstream to Espafiola, NM, about river mile 394. (See Table 32-D 
on Rio Grande Floodway.) 
Existing project. This project consists of flood protection and 
major drainage improvements by channel rectification, levee 
enlargement and construction, and bank stabilization work where 
needed to protect the levees. Construction of the project is a joint 
undertaking by the Bureau of Reclamation and the Corps. Portions 
to be done by the Corps will consist of levee enlargement, 
construction, of bank protection work, with channel-rectification 
and drainage-rehabilitation work being the responsibility of 
Bureau of Reclamation. Levees constructed by local interests exist 
throughout the reach of the river involved, but are not uniform as 
to grade, section, or standard of construction, and in many places 
are threatened by the meandering river. (See Table 32-D on 
existing project and Table 32-B for authorizing legislation.) 
Local cooperation. In addition to the usual requirements, local 
interests are responsible for all highway, bridge, and public utility 
relocations or replacements required in construction of the project. 
Local interests will also be required to comply with requirements 
of Section 221, 1970 Flood Control Act, Section 401, 1986 Water 
Resource Development Act, and PL 91-646 Uniform Relocation 
Assistance Act of 1970. Total costs for all requirements for the 
completed Albuquerque unit under terms of project authorization 
were $75,000. There were no non-Federal costs in connection 
with the construction of the Cochiti to Rio Puerco unit of floodway. 
The Espafiola Valley unit is in the deferred category. However, by 
letter dated 11 November 1998 the City has requested a feasibility 
study be completed to address river and tributary flooding in 
Espafiola. Negotiations are underway to identify a non-Federal 
source of funds to cost share in the study. It is anticipated the 
study can begin in April 2000 and be completed in 2001. For 
more details see page 17-8 of Annual Report for 1980. 
Operations and results during fiscal year. There were 
$287,500 flood damages prevented by the completed floodway 
36-6

ALBUQUERQUE, NM, DISTRICT 
project during FY 1999. Estimated total accumulated flood 
damages prevented by the floodway project through FY 1999 
amounted to $48,759,200. The peak flow of the Rio Grande 
through the middle valley was 5,644 c.f.s. at Albuquerque on 
May 25, 1999. The peak at San Acacia was 10,790 c.f.s. on 
August 04, 1999. 
Condition at end of fiscal year. Construction of the 
Albuquerque unit of the Rio Grande Floodway project is 
complete. The General Design Memorandum for the Bernalillo 
to Belen unit was completed in June 1986. The General Design 
Memorandum for the San Acacia to Bosque del Apache unit was 
approved in August 1990. Construction was completed on the 
Truth or Consequences Unit in fiscal year 1991. 
8G. SAN ACACIA TO BOSQUE 
DEL APACHE UNIT, NM 
Location. The project is located along the Rio Grande, 
extending from the upper end of the Rio Grande low-flow 
conveyance channel at the San Acacia diversion works to the 
head of Elephant Butte Reservoir. 
Proposed project. The project was authorized by the Flood 
Control Act of 1948. The project consists of the reconstruction 
of 42 miles of existing spoil bank levee which separates the Rio 
Grande low-flow conveyance channel from the cleared floodway. 
The proposed project will be constructed at an estimated total 
cost of $65,850,200 ($57,107,730 Federal and $8,231,275 non- 
Federal) 1 Oct 98 price levels. (See Table 32-B for authorizing 
legislation.) 
Local Cooperation. The Water Resources Development Act 
of 1986 and the Water Resources Development Act of 1992 
apply. The Water Resources Development Act of 1992 modified 
the Local Sponsor's required contribution. 
Condition at end of fiscal year. Construction has been 
postponed while preparation of a supplemental EIS and Limited 
Reevaluation Report (LRR) are prepared. The Supplemental EIS 
was required when two species, found within the project area, 
were submitted and listed as endangered species. The proposed 
plan remains the same with features added to address alternatives 
recommended by USFWS under the Endangered Species 
consultation. The supplemental EIS and LRR are scheduled for 
completion in July 2000. 
9. SANTA ROSA DAM AND LAKE, NM 
Location. The project is located on a lake in Guadalupe 
County, on Pecos River, at river mile 766.4 approximately 
7 miles north of Santa Rosa, NM. (See U.S. Geological Survey 
map, Corazon, NM, sheet, scale 1:125,000.) 
Existing project. Operation of the project began in November 
1979. It consists of an earth and rock fill dam 1,950 feet long and 
212 feet maximum height above the streambed. The purposes of 
the project are flood control, irrigation and sediment retention. An 
unlined, open rock cut about 1,000 feet back from the left abutment 
serves as an uncontrolled spillway. The outlet works, located in 
the left abutment, consists of a control tower, intake structure with 
gates, and a 10-foot diameter concrete lined tunnel with a terminal 
flip bucket energy dissipator. Storage capacity at the spillway crest 
is 439,860 acre-feet which includes 72,860 acre-feet sediment 
reserve, 200,000 acre-feet irrigation and 167,000 acre-feet flood 
control storage. The surface area of the reservoir at the spillway 
crest is 10,594 acres. The contributing drainage area at the dam 
site is 2,434 square miles. 
For a more detailed report of the authorized project including the 
modification to existing Sumner Lake see page 17-8 of fiscal year 
1981 Annual Report. For authorizing legislation see page 17-14 
of fiscal year 1981 Annual Report. 
Local cooperation. In addition to first costs, operation and 
maintenance of both reservoirs is the responsibility of the Federal 
Government; however, the Carlsbad Irrigation District is required 
to contribute to operation and maintenance costs an equal amount 
to what they now pay toward Sumner Lake. The Carlsbad 
Irrigation District also agreed to use Sumner Lake for flood 
control. Because they realize equivalent benefits from storage 
capacity in Santa Rosa Lake, they will continue to fulfill their 
repayment obligation. The New Mexico Division of Parks 
manages the recreation facilities. Activities include camping, 
picnicking, boating and hiking. 
For more requirements and details on final approval in 1974 for 
transfer of irrigation storage from Sumner Lake to Santa Rosa 
Dam and Lake (formerly Los Esteros Lake) see page 17-5 of 
Annual Report for 1980. 
Operations and results during fiscal year. Operation of the 
dam and reservoir continued. Pool elevation at the start of the 
fiscal year was 4,717.07 feet with storage of 26,982 acre-feet. 
Total releases for the fiscal year were 37,246 acre-feet. Pool 
elevation on September 30, 1999 was 4,745.08 acre-feet with a 
storage of 97,365 acre-feet. The maximum elevation was 4,746.79 
feet with a storage of 103,780 acre-feet on August 04, 1999. There 
was 633 acre-feet of sediment deposition during the fiscal year. 
There were $2,516,400 flood damages prevented in FY 1999. 
Sediment damages prevented during the fiscal year were $70,900. 
Releases attributed to irrigation benefits were 12,904 acre-feet. 
Irrigation benefits for the fiscal year were $28,200 with an 
accumulative total of $3,401,300 through FY 1999. 
Condition at end of fiscal year. The project was competed in 
36-7

Report of the Secretary of the Army on Civil Works Activities for FY 1999 
late 1979 and reservoir operation for irrigation was started in 
March 1980. Construction of the recreation area was completed 
in October 1980. Design studies for spillway modification were 
initiated in FY 1979 and construction was completed in FY 
1982. The project structures are in good condition and in 
operation. 
10. TRINIDAD LAKE, CO 
Location. This project is located on the Purgatorie River about 
161 miles above its junction with the Arkansas River. The 
Project is about 4 miles upstream from the city of Trinidad, CO. 
(See Geological Survey map, Trinidad, CO, quadrangle, scale 
1:24,000.) 
Existing project. The project consists of an earthfill dam 
6,610 feet long with a maximum height of 200 feet above the 
streambed, an uncontrolled spillway 1,000 feet wide in the left 
abutment, and a 10-foot diameter, gate-controlled conduit in the 
right abutment with discharge capacity of 5,800 c.f.s. with a 
water surface at top of the flood control pool. In 1985, a 3-foot 
high parapet wall on top of the upstream face of the dam and a 
supplemental 700-foot wide rock cut emergency spillway located 
on the right abutment were constructed to provide adequate discharge 
capability and freeboard allowance to accommodate the 
revised probable maximum flood. In 1989 the recreation pool 
was increased from 4,500 to 15,967 acre-feet, utilizing some 
originally unallocated space in the project. The reservoir 
provides for storage of 51,000 acre-feet for flood control, 35,045 
acre-feet for sediment, 20,000 acre-feet for irrigation, and 
17,179 acre-feet for recreation, a total of 123,224 acre-feet. The 
reservoir controls a drainage area of 671 square miles and is 
operated for flood and sediment control, irrigation, and recreation 
purposes. For authorizing legislation see page 17-14 of 
fiscal year 1981 Annual Report. 
Local cooperation. Assurances of local cooperation received 
from City of Trinidad and Purgatorie River Water Conservancy 
District were formally accepted May 11, 1967, after execution of 
irrigation repayment contract. For complete details of 
requirements and costs pertaining to the execution of the 
irrigation repayment contract and the addition of permanent 
storage for recreation facilities see page 17-9 of fiscal year 1980 
Annual Report. 
Operations and results during fiscal year. Operation of the 
dam and reservoir continued. On October 1, 1998 the pool 
elevation was 6,167.33 feet with a corresponding storage of 
13,520 acre-feet. The maximum pool elevation was 6,230.29 
feet with a corresponding storage of 72,664 acre-feet on August 
07, 1999. On September 30, 1999 the pool elevation was 
6,223.42 feet with a corresponding storage of 63,252 acre-feet. 
Sediment deposition during FY 1999 was 347 acre-feet. 
Sediment damages prevented during FY 1999 was $130,500. 
Accrued sediment benefits are $2,679,900. Irrigation benefits for 
FY 1999 were $106,900. Accrued irrigation benefits through FY 
1999 were $2,121,300. Irrigation benefit releases for the year were 
12,497 acre-feet. 
Conditions at end of fiscal year. The project was placed in 
operation in 1977. The recreation facilities were completed in 
1980. The Dam Safety Assurance Contract was completed in May 
1983. The project structures are in good condition and in 
operation. 
11. TWO RIVERS DAM, NM 
Location. The project is located about 14 miles southwest of 
Roswell, NM on the Rio Hondo and the Rocky Arroyo. The Rio 
Hondo is formed at the confluence of the Rio Ruidoso and the Rio 
Bonito, near the village of Hondo, NM, in the foothills region east 
of Sierra Blanca in the southeastern part of Lincoln County, NM, 
and flows generally easterly to its confluence with the Pecos River 
near Roswell, NM. (See Geological Survey map, Hondo Reservoir 
quadrangle, scale 1:24,000.) 
Existing project. The Two Rivers project consists of two dams: 
Diamond "A" and Rocky. The Diamond "A" Dam is an earthfill 
structure, 4,885 feet long and 98 feet high, with a gated outlet. 
The Rocky Dam is an earthfill structure 2,940 feet long and 118 
feet high with an uncontrolled outlet. No provision is made for 
water storage, except for flood control. Flood releases will be 
controlled so that flows through Roswell will not exceed the Rio 
Hondo channel capacity which is about 600 c.f.s. A Dam Safety 
Reconnaissance Report, approved in June 1995, identified need to 
increase the size of the spillway on the left abutment of the Rocky 
Dam by 1,170 feet in order accommodate the revised Probable 
Maximum Flood flows for the Dam. The spillway was widened 
1,170 feet in 1998 to provide adequate discharge capability to 
accommodate the revised probable maximum flood. The capacity 
of the Two Rivers Reservoir at its spillway crest is 163,773 acrefeet, 
of which 13,775 acre-feet are provided for sediment reserve. 
Together these dams regulate runoff from 1,027 square miles of 
drainage area. For details of completed improvement and 
authorizing legislation see page 17-18 of Annual Report for 1973. 
Local cooperation. Section 2 Flood Control Act of 1938 applies 
and compliance is satisfactory. 
Operations and results during fiscal year. Operation of the 
dam and reservoir continued. The reservoir was empty on October 
1, 1998. There were $0 of flood damages prevented during 1999. 
Sediment damages prevented were $0. Estimated total 
accumulated flood and sediment damages prevented through FY 
1999 were $190,604,600. There were 0 acre-feet of sediment 
deposition during FY 1999. The accrued sediment benefits 
through FY 1999 are $1,107,400. 
36-8

ALBUQUERQUE, NM, DISTRICT 
Condition at end of fiscal year. The project is complete and 
was placed in operation July 1963. The project structures are in 
good condition and in operation. 
12. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Included under this heading is inspection of completed flood 
control projects transferred to local interests for operation and 
maintenance. Projects in Texas, Colorado, and New Mexico 
were inspected. Federal costs for fiscal year 1999 were 
$160,000. 
13. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS 
Pursuant to Section 7, Flood Control Act of 1944, five projects 
are operated by others for flood control. These projects are 
Platoro, Pueblo, Sumner, Navajo, and Brantley Dams. 
Platoro Dam on the Conejos River above the town of Platoro, 
Conejos County, CO controls runoff from 40 square miles of 
high mountain area. The authorized purposes are irrigation 
storage and flood control. Platoro is operated by the Conejos 
Water Conservancy District. Total storage is 59,571 acre-feet 
with the top 6,000 acre-feet solely for flood control. The 53,571 
acre-feet is joint use storage with flood control on a forecast basis 
during spring runoff. Platoro Dam was authorized by the 
Interior Appropriation Act of 1941. (See H Doc 693, 76th 
Cong., 3rd Sess.) Construction of this project was completed by 
the Bureau of Reclamation in 1952. 
On October 1, 1998 storage in Platoro Reservoir was 21,844 
acre-feet at elevation 9,986.08 feet. Maximum storage of 40,200 
acre-feet at elevation 10,012.15 feet occurred on July 02, 1999. 
On September 30, 1999, storage was 33,484 acre-feet at 
elevation 10,003.50 feet. There were $0 flood damages 
prevented by the project during FY 1999. Total flood damages 
prevented to date are at $6,094,200. Total cost for activity, by 
the Corps of Engineers, during FY 1999 was $22,300. 
Pueblo Dam is part of the Fryingpan-Arkansas project which 
was authorized under Public Law 87-590, 87th Congress, HR 
2206 on August 16, 1962. The project was completed in August 
1975. Pueblo is operated by the Bureau of Reclamation and is 
located at river mile 1,293.7 on the Arkansas River in Pueblo 
County, Colorado. Pueblo Reservoir has a total capacity of 
349,940 acre-feet at top of the flood pool with 27,000 acre-feet 
exclusive flood space and 66,000 acre-feet joint use space. 
Operation of Pueblo Reservoir began on February 10, 1974. 
Storage on October 1, 1998 was 147,757 acre-feet, elevation 
4,852.03 feet. Maximum storage during the year was 262,048 
acre-feet at elevation 4,881.59 feet on August 07, 1999. Storage 
on September 30, 1999 was 237,895 acre-feet at elevation 4,876.69 
feet. There were $4,778,500 flood damages prevented in FY 1999. 
Total flood damages prevented to date are $11,316,700. Total cost 
for FY 1999 activity, by the Corps of Engineers, was $22,000. 
Sumner Dam is located on the Pecos River at river mile 710.8 in 
DeBaca County, New Mexico. Sumner Dam was authorized as 
Alamogordo Dam by the Secretary of the Interior under a Finding 
of Feasibility approved by the President of the USA on 6 November 
1935, under the Federal Reclamation laws. The original project 
was completed in 1937. Modification work of raising the dam 16 
feet, adding a spillway and limiting the service spillway floor to 
56,000 c.f.s. was completed in 1957. A twenty-four inch bypass 
line was installed in 1977 to pass flows less than 100 c.f.s. 
Sumner is operated by the Carlsbad Irrigation District. Storage on 
October 1, 1998 was 9,024 acre-feet at elevation 4,241.80 feet. 
Maximum storage for FY 1999 was 43,938 acre-feet at elevation 
4,261.06 feet on February 28, 1998. Storage on September 30, 
1999 was 42,342 acre-feet at elevation 4,260.49 feet. Total cost for 
FY 1999 activity, by the Corps of Engineers, was $22,400. 
Navajo Dam and Reservoir is located on the San Juan River at 
river mile 298.6 in San Juan County, New Mexico. Navajo Dam 
was authorized as part of a Colorado River Storage Project by an 
act of 84th Congress, 11 April 1956 (PL 485). The Bureau of 
Reclamation constructed and is responsible for operation of the 
project. Construction was initiated in June 1958 and the project 
was completed and placed in operation in March 1963. Total 
capacity at spillway crest is 1,708,600 acre-feet. The project 
controls a drainage area of 3,230 square miles. Storage on October 
1, 1998 was 1,382,300 acre-feet, elevation 6,062.68 feet. 
Maximum storage for FY 1999 was 1,610,300 acre-feet, elevation 
6,079.03 feet on August 12, 1999. Storage on September 30, 1999 
was 1,558,500 acre-feet, elevation 6,075.50 feet. Total Corps of 
Engineers cost for FY 1999 activity was $21,900. 
Brantley Dam on the Pecos River above the town of Carlsbad in 
Eddy County, NM controls runoff from 13,208 square miles of 
uncontrolled area. The authorized purposes are irrigation, flood 
control, fish and wildlife and recreation and for the elimination of 
the hazards of failure of the McMillan and the Avalon Dams. The 
total storage is 348,544 acre-feet with 189,700 acre-feet for flood 
control. The Brantley Dam was authorized for construction on 20 
October 1972 by Public Law 92-514 with the cost ceiling raised for 
the project in October 1980 by Public Law 96-375. On September 
6, 1988 the conduits were closed and Brantley Dam started its 
initial filling. On September 30, 1998, the storage was 18,696 
acre-feet at elevation 3,248.46 feet. Total Corps of Engineers cost 
for FY 1998 activity was $21,100. 
36-9

Report of the Secretary of the Army on Civil Works Activities for FY 1999 
14. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
See Table 32-D. 
15. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205, Public Law 
858, 80th Congress, as amended (preauthorization). 
Costs during FY 1999 were: Little Puerco River, Gallup, NM, 
$69,529.18; Zuni River at Zuni, NM, $10.34; Raton Creek, 
Raton, NM $15,374.50, Section 205 Coordination Account 
$7,865.71. 
Emergency flood control activities; repair, flood fighting, 
and rescue work. (Public Law 99, 84th Cong., and 
antecedent legislation.) 
There were no Federal costs in FY 1999 for advance 
preparation, none for flood emergency operations, and there were 
no repair and restoration costs. 
Emergency bank protection (Sec. 14, 1946 Flood 
Control Act, Public Law 526, 79th Cong.) 
Section 14 Coordination Account $9,576.11;Camino Alire 
Bridge SF River $(22,949.90); Isidro ED Santa Fe River NM $ 
28,653.03; Madrid Fire Station NM $(17.17); Rio Puerco River, 
1-40 Bridge, Gallup, $16,758.11; Unnamed Arroyo, Hwy 371 
Near Crown Point $21,293.13; Cibola County Road 7, Cubero, 
NM $32,084.99; Paseo Del Norte, Albuquerque, NM $14,916.92; 
Chinook Lane, Fountain Creek, Pueblo, CO $6,737.99. 
Snagging and Clearing for Flood Control (Section 208 of the 
1954 Flood Control Act, 83rd Cong.) 
There were no costs in FY 1999. 
General Investigations 
16. SURVEYS 
Costs for the fiscal year were $8,164.07 for flood damage 
prevention studies, $23,672.58 for special studies (coordination 
studies with other agencies). 
17. COLLECTION AND STUDY 
OF BASIC DATA 
Fiscal year costs were $554,921.89 for flood plain management 
and technical services. 
Hydrologic studies involving collection and study of basic data, 
such as stream flow data, collection of suspended sediment 
samples, recording rain gage data, special study for Pikes Peak 
flood warning systems, hydrometeorological studies, sedimentation 
studies, and environmental data studies continued. Costs during 
the fiscal year were $7,327.47. 
18. ENVIRONMENTAL DATA STUDIES 
There were no Environmental Data Study costs for FY 1999. 
19. PRECONTRUCTION ENGINEERING AND 
DESIGN 
Continuation of Engineering and Design costs in FY 1999 were 
$75,177. 
36-10

ALBUQUERQUE, NM, DISTRICT 
TABLE 32-A COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 Sept. 30, 1999 
1. Acequias Irrigation New Work 
2. 
3. 
4. 
5. 
System, NM 
Alamogordo, NM 
Alamosa, CO 
Albuquerque 
Diversion Channels 
Project, NM 
(Federal Funds) 
(Contributed Funds) 
(Other Contributed 
Funds) 
Conchas Lake, NM 
Approp. 76,000 
Cost 1,234,832 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
322,000 
375,725 
550,000 
537,939 
15,499 
946,000 
480,301 
94,000 465,000 
506,128 690,372 
695,000 456,000 
454,350 633,840 
299,000 
228,541 
95,000 2,998,000 (100,000) 
672,906 2,725,875 455,632 
11,944,000' 
11,539,725' 
4,975,000 
4,854,506 
5,600,0002 
5,518,3122 
17,975,450 
17,762,795 
518,356 
518,356 
854,664 
854,664 
New Work 
Approp. - - - - 
Cost - - - - 
Maint. 
Approp. 1,500,705 1,189,295 1,194,201 1,477,636 
Cost 1,481,417 1,084,458 1,317,562 1,494,868 
13,821,4993 
13,821,4993 
26,505,356 
26,485,122 
(1,424,653) 4,878,422 6,997,000 4,849,000 104,773,0004 
2,038,809 6,507,234 5,702,520 4,824,405 103,250,1184 
36-11 
6. El Paso, TX New Work 
Approp. 
Cost

Report of the Secretary of the Army on Civil Works Activities for FY 1999 
TABLE 32-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 Sept. 30, 1999 
John Martin 
Reservoir 
Las Cruces, NM 
Rio Grande Basin, NM 
Abiquiu Dam, NM 
Cochiti Lake, NM 
Galisteo Dam, NM 
Jemez Canyon 
Dam, NM 
Middle Rio Grande 
Flood Protection, 
Bernalillo to Belen, NM 
New Work 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work 
Approp. 
Cost 
1,480,200 1,398,000 1,718,135 2,811,031 
1,448,594 1,382,201 1,703,666 2,849,179 
82,050 
158,833 
400,000 
281,719 
405,000 
355,964 
450,000 
420,796 
651,000 
537,388 
15,555,3585 
15,555,3585 
36,758,184 
36,718,330 
1,701,0506 
1,472,9816 
646,000 2,840,000 3,319,000 33,950,028 
304,181 2,816,446 3,253,305 33,400,679 
1,322,000 1,420,600 1,322,320 1,185,843 
1,253,079 1,227,406 1,576,201 1,210,038 
1,725,000 1,837,400 1,876,600 1,964,795 
1,577,321 1,743,874 2,123,835 1,985,713 
265,000 
143,405 
202,100 
185,311 
326,000 
294,323 
292,000 2,975,000 
309.791 2,810,773 
250,300 
258,210 
504,000 
380,767 
- 1,231,000 
890,737 3,842,369 
245,335 
253,895 
477,000 
635,640 
562,000 
544,144 
37,944,367 
37,935,716 
96,956,559 
96,956,559 
30,490,962 
30,481,202 
476,000 18,283,053 
674,146 18,213,168 
273,994 
280,130 
4,046,059 
4,044,926 
6,293,972 
6,293,972 
326,310 11,140,042 
332,557 11,139,185 
224,000 
340,297 
8,891,000' 
8,843,8257 
36-12 
7. 
10A. 
10B. 
10C. 
10D. 
10E.

ALBUQUERQUE, NM, DISTRICT 
TABLE 32-A 
(Continued) 
COST AND FINANCIAL STATEMENT 
See Total Cost 
Section to 
In Text Project Funding FY 96 FY 97 FY 98 FY 99 Sept. 30, 1999 
10F. Rio Grande Floodway New Work 
Approp. - - - - 4,794,8688 
Cost - - - - 4,794,8688 
10G. Rio Grande Floodway, New Work 
San Acacia to Bosque Approp. (200,000) 545,000 293,000 337,000 4,550,0009 
del Apache, NM Cost 454,646 570,839 309,015 346,573 4,491,0059 
11. Santa Rosa Dam New Work 
& Lake, NM Approp. - - - - 41,039,741 
Cost - - - - 41,039,056 
Maint. 
Approp. 933,999 926,501 728,388 823,829 12,988,853 
Cost 836,303 853,186 875,497 860,651 12.984,807 
12. Trinidad Lake, CO New Work 
Approp. - - - - 55,774,758 
Cost - - - 55,774,758 
Maint. 
Approp. 435,700 601,000 493,800 544,645 10,170,674 
Cost 376,182 568,476 584,626 548,131 10,165,689 
13. Two Rivers Dam, New Work 
NM Approp. 220,000 237,000 1,475,000 (20,000) 6,759,244 
Cost 192,550 - 179,237 1,483,615 54,973 6,757,619 
Maint. 
Approp. 350,000 304,000 304,000 346,517 5,503,550 
Cost 325,855 155,317 317,039 356,314 5,503.237 
6 'Reflects PED funding appropriations beginning in FY 
include non-Federal contributions of $2,412,000. 
198 5Excludes $59,977 emergency 
Includes $30,000 for Code 710. 
relief funds for new work. 
2PED activities were initiated in FY 1991. 
3Includes $3,492,696 maintenance and improvement costs and 
$869,978 for emergency relief, excludes $2,279,326, cost of 
initiating project under the authority of Emergency Relief Appropriation 
Act of 1935 and $222,669, the cost for work 
performed with funds transferred to the Corps under Public 
Works acceleration Act of 1962. 
4Does not include non-Federal contributions of $2,657,653. 
6Includes $514,741 PED funds. 
7Includes $1,177,000 PED funds. 
8Includes funds for preconstruction planning of Espafiola Valley 
unit. Excludes $1,000,011 appropriated funds transferred to 
Bureau of Reclamation under memorandum of agreement between 
that agency and the Corps. 
'Includes $1,658,000 PED funds. 
36-13

Report of the Secretary of the Army on Civil Works Activities for FY 1999 
TABLE 32-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
In Text Act Project and Work Authorized Documents 
1. Nov. 17, 1986 ACEQUIAS IRRIGATION SYSTEM 
An Irrigation System dating back to the eighteenth century with significant engineering 
works in the settlement and development of the western portion of the United States. 
Restoration and preservation of this system has cultural and historic values to the region. 
Measures are necessary to restore and protect the river division structures and associated 
canals. 
Except that the Federal share of reconnaissance studies carried out by the Secretary under 
this section shall be 100 percent 
ALAMOSA, COLORADO 
Authorized a flood control project for Alamosa, Colorado. 
EL PASO, TX 
A single-purpose flood control system of detention dams, diversion 
dikes and channels to collect, regulate and discharge arroyo runoff in the Rio Grande. 
Consists of four independent units (NW Area, Central Area, and two units, Copper System 
and Bluff Channel of the SE Area.) 
LAS CRUCES, NM 
The project for flood control, Las Cruces, New Mexico: Report of the 
Chief of Engineers, dated June 24, 1996, at total of $8,278,000, with 
an estimated Federal cost of $5,494,000 and an estimated non-Federal 
cost of $2,784,000. 
RIO GRANDE BASIN, NM 
Authorized to be appropriated $3,500,000 to be expended by the 
Dept. of the Army for partial accomplishment of approved general comprehensive plan 
for the Rio Grande Basin in NM and Colorado. 
Authorized to be appropriated an additional $39,000,000 for 
Department of the Army for prosecution of comprehensive plan for the Rio Grande Basin. 
Authorized Cochiti Dam on Rio Grande and Galisteo Dam on 
Galisteo Creek as additions to authorized comprehensive plan for Rio Grande Basin 
(Cochiti Dam was authorized in lieu of Low Chamita Dam of Chamita Reservoir Project 
on Rio Chama under "substitute plan"). Also authorized to be appropriated an additional 
$58,300,000 for Dept. of the Army for this addition to comprehensive plan for the Rio 
Grande Basin. 
Authorized installation of the Abiquiu Dam Emergency Gates by 
the Water Resources Development Act of 1986 (PL 99-662) 
The emergency gate construction project for Abiquiu Dam, New Mexico, authorized by 
section 1112 of the Water Resources Development Act of 1986 (Public Law 99-662, 100 
Stat. 4232) is modified to authorize the Secretary of the Army, acting through the Chief of 
Engineers, to construct the project at an estimated total cost of $7,000,000. The non- 
Federal share of the project shall be 25 percent of those costs of the project attributable to 
an increase in flood protection as a result of the installation of such gates. 
Public Law 662, 
99th Cong., 2nd 
sess. (Sec. 1113) 
Public Law 104-30 10 4 
th 
Cong.,(Sec.334) 
Public Law 102-580 
102d Congress 
(Sec. 101) 
H. Doc. 207, 89th 
Cong., 1st 
sess.' 
Public Law 104-303 
104 Congress 
(Sec. 101) 
H. Doc. 243, 81st 
Cong.,1st sess. 
Public Law 516, 
81st Cong., 2nd 
sess. 
S. Doc. 94, 86th 
Cong. 
Public Law 662 
99th Cong., 2nd sess. 
Public Law 104-206 
(Sec. 112) 
36-14 
3. 
6. 
Oct.12, 1996 
Oct. 31, 1992 
Oct. 27, 1965 
8. 
9. 
Oct. 12,1996 
Jun. 30, 1948 
May 17, 1950 
Jul. 14, 1960 
Nov. 17, 1986 
Sep. 30, 1997

ALBUQUERQUE, NM, DISTRICT 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
In Text Act Project and Work Authorized Documents 
10E. Nov. 17, 1986 MIDDLE RIO GRANDE FLOOD PROTECTION, 
BERNALILLO TO BELEN, NM 
Authorized project for flood control, Middle Rio Grande Flood Protection, 
Bernalillo to Belen, NM. Authorized increase of flood protection through the dredging 
of the bed of the Rio Grande in the vicinity of Albuquerque, NM to an elevation lower 
than existed on the date of enactment of this Act. The project shall include the 
establishment of 75 acres of wetlands for fish and wildlife habitat and the acquisition 
of 200 acres of land for mitigation of fish and wildlife losses. 
RIO GRANDE FLOODWAY, NM 
Channel rectification, levee enlargement and construction, and 
bank stabilization on Rio Grande between river mile 123 and 394 (San Acacia to Bosque 
Del Apache Unit.) 
RIO GRANDE FLOODWAY, SAN ACACIA TO 
BOSQUE DEL APACHE UNIT, NM 
Modified the cost sharing to more equitably reflect the non-Federal 
contribution for the project by that percentage of benefits which 
is attributable to the Federal properties; except that, for purposes 
of this subsection, Federal property benefits may not exceed 50 percent 
of the total project benefits. 
Public Law 662, 
99th Cong., 2nd 
sess. 
Cong., 1st sess.' and 
Public Law 516, 81st 
Cong., 2nd sess. 
Public Law 102-580 
102d Congress 
(Sec. 102(e)) 
36-15 
TABLE 32-B 
(Continued) 
10F. Jun. 30, 1948 
and 
May 17, 1950 
10G. Oct. 31, 1992

TABLE 32-C 
Report of the Secretary of the Army on Civil Works Activities for FY 1999 
RIO GRANDE BASIN, NM 
RIO GRANDE BASIN, NM: EXISTING PROJECT 
(See Section 8 of Text) 
Miles Drainage Total 
Above Nearest Area (square Estimated 
Project River Mouth Town mile) Description Cost 
Abiquiu Dam Rio Chama 32 Espafiola, 2,147 Earthfill 325 feet high, 30,901,0283 
NM 1,212,000 
acre feet capacity 
Jemez Canyon Jemez Dam 2 Bernalillo, 1,034 Earthfill 136 feet high, 106,100 6,293,972 
NM acre-feet capacity 
Rio Grande Rio Grande 123 - - Channel rectification, levee 25,744,0002 
Floodway to 3941 enlargement and 
construction 
Cochiti Lake Rio Grande 340' Cochiti, NM 11,695 Earthfill 251 feet high, 596,300 96,956,559 
acre-feet capacity 
Galisteo Dam Galisteo Creek 8 Waldo, NM 596 Earthfill 158 feet high, 89,000 17,807,053 
acre-feet c apacity 
'River mile 0 is at intersection of New Mexico-Texas State Line with international boundary at El Paso, Texas. 
2Does not include non-Federal costs. 
3Includes $5,383,000 major rehabilitation, $138,900 for recreation facilities and $3,600,000 for emergency gates. 
TABLE 32-D OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last Cost to September 30. 1996 
Full Report 
See Annual Operation & 
Project Report For Construction Maintenance 
Alamogordo Diversion Channel, Tularosa (closed) Basin, New Mexico 1966 189,356 - 
Alpine, Texas3 1977 130,488 - 
Cibolo Creek, Texas' 1983 829,500 - 
Cochiti Wetfields, New Mexico 1994 13,921,290 - 
Colorado Springs, Fountain que Bouille River, Colorado 
(Templeton Gap Floodway)' 1959 881,262 - 
Creede, Willow Creek, Colorado (floodway)' 1952 219,789 - 
Fountain Creek, Pueblo, Colorado' 1993 6,564,399 - 
Highway 12, Colorado' 1985 120,500 - 
Holly, Colorado' 1985 2,021,400 - 
Las Animas, Colorado2 1980 4,956,000 - 
Las Cruces, New Mexico2 1980 4,815,236 - 
Pecos, Texas3 1977 480,273 - 
Pinon Canyon Dam, Trinidad, Colorado (Sec.212)' - 130,678 - 
Pueblo, Arkansas River, Colorado (floodway levee extension)' 1954 201,958 - 
Puerco River, Gallup, New Mexico' 1993 4,678,239 - 
Rio Grande Floodway, T or C Unit, New Mexico' 1994 12,955,052 - 
Santa Fe River and Arroyo Mascaras, New Mexico' 1983 1,123,900 - 
Smith Creek, Colorado' 1985 219,000 - 
Socorro Diversion Channel. Tributaries of Rio Grande. New Mexico' 1965 2.259.328 - 
'Completed. 2Responsibility of local interests. 3 nactive. 4Deferred. 
36-16

LITTLE ROCK, AR DISTRICT *
LITTLE ROCK, ARKANSAS 
The civil works portion of this District covers an 
area of approximately 36,414 square miles in northern, 
western, and southwestern Arkansas and a portion of 
Missouri. This area is within the Arkansas River, Little 
River, and White River basins. In the Arkansas River 
Basin, the District is responsible for planning, design, 
construction, operation and maintenance of the navigation 
portion of the McClellan-Kerr Arkansas River 
Navigation (MKARNS ). The District is also responsible 
for the areas included in the Arkansas River drainage 
basin from above Pine Bluff, AR, to below the mouth of 
the Poteau River, near Fort Smith, AR. In Little River 
Basin, the District is responsible for the portion of the 
Little River and its tributaries that are in the state of Arkansas 
above its mouth near Fulton, AR. In the White 
River Basin, the District is responsible for those portions 
in southern Missouri and northern and eastern Arkansas 
in the White River drainage basin and its tributaries 
above Peach Orchard Bluff, AR. The Memphis District 
is responsible for navigation maintenance on the White 
River below Newport, AR, to the mouth of Wild Goose 
Bayou, in Arkansas County, AR. The White River 
downstream from the mouth of Wild Goose Bayou is 
part of MKARNS. 
IMPROVEMENTS 
Navigation.............................................2 
1. Arkansas River Basin, AR, OK, And KS.............. 2 
2. Arthur V. Ormond Lock & Dam (No.9), AR........ 3 
3. Mcclellan-Kerr Arkansas River Navigation 
System, Bank Stabilization & Channel 
Rectification, Ar ....................................... 3 
4. David D. Terry Lock And Dam (No. 6), AR........ 3 
5. Emmett Sanders Lock And Dam, AR.................. 3 
6. James W. Trimble Lock And Dam (No. 13), AR. 3 
7. Lock No. 2 And Wilbur D. Mills (No. 2), AR...... 4 
8. Joe Hardin Lock And Dam (No. 3), AR ............ 4 
9. Lock And Dam No. 5, AR ................................. 4 
10. Murray Lock And Dam (No. 7), AR.................. 4 
11. Norrell Lock And Dam (No. 1) and 
Entrance Channel, AR .................................... ... 4 
12. Toad Suck Ferry Lock And Dam (No. 8), AR...... 5 
13. Maintenance And Repair Fleet And Marine 
Terminals, Ar................................... ..... 5 
14. Other Authorized Navigation Projects ............... 5 
15. Navigation Work Under Special Authorization.... 5 
Flood Control ........................................ ........... 5 
16. Black River, Poplar Bluff, MO ............................. 5 
17. Blue Mountain Lake, AR.................................... 5 
18. Clearwater Lake, M O......................................... 5 
19. Dequeen Lake, AR............................................. 6 
20. Dierks Lake, AR ..................................... .. 6 
21. Fourche Bayou Basin, Little Rock, AR .............. 6 
22. Gillham Lake, AR............................. .............. 7 
23. Little River Basin, AR ..................................... .. 7 
24. Mill Creek, Fort Smith, AR ............................... 7 
25. M illwood Lake, AR ........................................... 8 
26. Nimrod Lake, AR .............................................. 8 
27. White River Basin (Little Rock District), 
AR & M O ..................... .... .......... ........ 8 
28. White River, Batesville, AR .............................. 9 
29. White River, Jacksonport, AR .............................. 9 
30. Inspection Of Completed Flood 
Control Projects ..................................... .. 9 
31. Other Authorized Flood Control Projects ............. 9 
32. Flood Control Work Under Special 
Authorization .................. ......... 9 
Multiple-Purpose Projects Including Power.............10 
33. Beaver Lake, AR........................... 10 
34. Bull Shoals Lake, AR ......................................... 11 
35. Dardanelle Lock And Dam (No. 10), AR........... 11 
36. Greers Ferry Lake, AR........................................ 11 
37. Norfork Lake, AR........................... 12 
38. Ozark-Jeta Taylor Lock and 
Dam (No. 12), AR ........................................... 12 
39. Table Rock Lake, MO ..................................... 12 
General Investigations .................................................... 13 
40. Surveys ............................................... 13 
41. Preconstruction Engineering & Design (PED)... 13 
42. Collection And Study Of Basic Data ............... 13 
43. Nimrod Fisheries Restoration .......................... 14 
44. Morgan Point Bendway Closure Structure, 
Desha County, AR............................... ........ 14 
45. Coleman Creek Little Rock, AR ...................... 14 
46. Spadra Creek, Clarksville, AR......................... 15 
47. Highway 69 Bridge at Black River, 
Jackson County, AR ...................................... .. 15 
Table 37-A Cost And Financial Statement................16 
Table 37-B Authorizing Legislation .......................... 20 
Table 37-C Other Authorized Navigation 
Projects................................. ..... 22 
Table 37-E Other Authorized Flood 
Control Projects ...................................... 23 
Table 37-G Deauthorized Projects ............................. 24 
Table 37-H Arkansas River Basin: AR, OK, 
and KS: Navigation ................................. 25 
Table 37-I Arkansas River Basin: AR, OK, 
and KS: Lakes .................................... 28 
Table 37-J Little River Basin, AR: Lakes ................ 29 
Table 37-K White River Basin; AR, and 
MO: Lakes ...................................... 29 
37-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Navigation 
1. ARKANSAS RIVER BASIN, AR, OK, 
AND KS 
Location. The headwaters for the Arkansas River are 
in the Rocky Mountains near Leadville, CO. The river 
flows southeastward 1,396 miles through Colorado, 
Kansas, Oklahoma, and Arkansas to join the Mississippi 
River 599 miles above Head of Passes, LA. 
Previous projects. For details see page 1066, Annual 
Report for 1932, and pages 744, 864, and 881, Annual 
Report for 1943. 
Existing project. The MKARNS provides navigation, 
hydroelectric power, flood control, water supply, 
sediment control, recreation, and fish and wildlife 
propagation improvements in the Arkansas River Basin. 
The MKARNS provides a navigation channel 9 feet 
deep and 444.8 miles long. The channel begins at the 
mouth of the White River, which enters the Mississippi 
River 599 miles above Head of Passes, LA, thence 9.8 
miles upstream to the mouth of Wild Goose Bayou; 
thence 9.2 miles by a land cut, designated as Arkansas 
Post Canal to mile 42 (1943 survey) on the Arkansas 
River; thence 376.0 miles to the mouth of the Verdigris 
River at navigation mile 395.0; thence 49.8 miles up the 
Verdigris River to the head of navigation at Catoosa, 
OK.
The waterway is canalized throughout its length by 
17 locks and dams with a total lift of 420 feet. Dardanelle, 
Ozark-Jeta Taylor, Robert S. Kerr, and Webbers 
Falls are multiple purpose projects that include hydropower. 
Lock chambers are 110 by 600 feet. A minimum 
channel width of 150 feet is provided for the Verdigris 
River, 225 feet for San Bois Creek, 250 feet for 
the Arkansas River, and 300 feet for Arkansas Post Canal 
and White River Entrance Channel. 
Other coordinated developments consist of 15 lakes, 
of which 13 are in Tulsa District, in the states of Kansas 
and Oklahoma, and two are in the Little Rock District. 
Pertinent data and estimated Federal cost are summarized 
in Tables 37-H and 37-I, Navigation: Arkansas 
River Basin; AR, OK, and KS. 
Local cooperation. For MKARNS, local interests 
must provide adequate terminal and transfer facilities 
and bear the increased costs of maintenance and operation 
of all altered rail and highway routes, including 
bridges and appurtenances, utilities, and other existing 
improvements, other than federally owned. For lakes 
see requirements for each individual lake. 
Terminal facilities. Public port facilities are in operation 
at Pine Bluff (Jefferson County), Little Rock, 
and Fort Smith, AR, and Muskogee and Catoosa (Tulsa- 
Rogers County), OK. Port authorities have been organized 
to develop public facilities at North Little Rock, 
Dardanelle-Russellville, Morrilton, Clarksville, Ozark, 
and Van Buren, AR, and Sallisaw, OK. Terminal facilities 
are in operation or being built at 35 locations in Arkansas 
and at 25 locations in Oklahoma along the improved 
waterways. 
Operations and results during fiscal year. 
Flood damages prevented by Little Rock District 
projects in the Arkansas River Basin during FY99 are 
estimated at $96,164,000; flood losses prevented 
through FY99 are estimated at $844,163,000. 
Approximately 12.2 million tons of commerce were 
moved on the Arkansas portion of the MKARNS during 
calendar year 1999. Details of the MKARNS and lakes 
in Arkansas are shown on the following pages. 
Withdrawals for water supply purposes were the city 
of Plainview, AR, 98 acre-feet from Nimrod Lake. 
Condition at end of fiscal year. (See Tables 37-H 
and 37-1, Navigation: Arkansas River Basin; AR, OK, 
and KS, for status for individual items, navigation projects, 
lakes, and basin plan.) Work continues on the Arkansas 
River project in this District including construction 
of the Montgomery Point Lock & Dam, a meander 
cutoff levee between the Arkansas and White Rivers, 
and land acquisition studies. 
Installation of tow haulage equipment was completed 
at David D. Terry Lock and Dam (No. 6), Lock 
and Dam No. 5, Emmett Sanders Lock and Dam (No. 4), 
and Joe Hardin Lock and Dam (No. 3) in 1994, at Norrell 
Lock (Lock 1) and Lock No. 2 in 1997, and Murray 
Lock (No. 7) in 1998. 
Montgomery Point Lock and Dam: Montgomery 
Point Lock and Dam (MPLD) is being constructed one 
half mile upstream from the Mississippi River, on the 
White River Entrance Channel, the first reach in the 
MKARNS. Declining water surface elevations on the 
Mississippi River have been observed on the Mississippi 
river for a number of years, resulting in navigation restrictions 
on the White River. Construction of the 
MPLD would allow control of the water level in the entrance 
channel, which would maintain the reliability of 
the navigation system. 
A construction contract for MPLD was awarded to 
the joint venture of J. A. Jones and Guy F. Atkinson 
Construction Companies on 21 July 1997 for $186M. A 
notice-to-proceed was issued on 26 August 1997 and the 
contractor began mobilization on 23 September 1997. 
The contractor suspended work operations on 13 January 
1998 due to exhaustion of funds. Additional funds 
totaling $30M were reprogrammed in April and May 
1998 to continue with construction activities. Coffer- 
37-2

LITTLE ROCK, AR DISTRICT 
dam sheet pile driving operations were started on 23 
June 1998 and were completed on 27 July 1999. Installation 
of the soil-bentonite slurry trenches began in October 
1999 and should be completed in February 2000. 
Clearing and grubbing operations, the diversion channel, 
and the cofferdam are complete. 
An electric utility service contract completed construction 
in January 1999 of a powerline to the project. 
Interim electric rates were signed with C&L Electric 
Cooperative on 24 March 1999. Final rates are still under 
negotiations. 
2. ARTHUR V. ORMOND LOCK & DAM 
(NO.9), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. Rockefeller Lake 
(pool 9) has four developed parks that in 
FY99experienced public visitation exceeding 0.8 million 
visitor-hours. 
Condition at end of fiscal year. Construction began 
in April 1965 and the lock and dam was placed in 
operation in July 1969. Construction of Holla Bend closure 
structure (fish and wildlife mitigation) began in 
July 1986 and was completed in September 1987. Construction 
of a non-Federal hydropower project, under the 
authority provided by the Federal Energy Regulatory 
Commission, was completed and placed into operation 
in August 1993. Construction of a widened downstream 
entrance was completed in 1998. Installation of tow 
haulage equipment was complete in 1999. 
3. MCCLELLAN-KERR ARKANSAS 
RIVER NAVIGATION SYSTEM, 
BANK STABILIZATION & CHANNEL 
RECTIFICATION, AR 
Location. Several bank stabilization and channel 
rectification projects are laid out in various reaches extending 
from fixed point to fixed point on the Arkansas 
River from 33.7 to 362 miles above mouth and across 
the Arkansas-White cutoff, a 4- to 5-mile natural channel 
joining the Arkansas and White rivers about 18 and 
12 miles above their respective mouths. 
Existing project. Bank stabilization and channel 
rectification is a part of the MKARNS. For a complete 
description of reach and location of each bank stabilization 
and channel rectification project, see the FY 81 Annual 
Report. Total Federal cost to date is $119,300,184 
for the existing project in the Little Rock District. 
4. DAVID D. TERRY LOCK AND DAM 
(NO. 6), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Condition at end of fiscal year. Construction began 
in January 1965 and the lock and dam project was 
placed in operation in August 1968. Tow haulage 
equipment was added in June 1993. Currently, the project 
has two developed parks which in FY99 experienced 
public visitation exceeding 2.8 million visitor-hours. 
5. EMMETT SANDERS LOCK AND 
DAM, AR 
Location, existing project, local cooperation and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. Pool 4 has two developed 
parks, which in FY 99 experienced public visitation 
exceeding 1.2 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in May 1964 and the lock and dam project was 
placed in operation in December 1968. Construction of 
a 40-foot wide, 9,600-foot long highway bridge crossing 
the lock and dam was completed in July 1995. The 
Corps of Engineers, as the Federal agency, has jurisdiction 
and custody of the dam (23 U.S.C. 320 [Public Law 
2810]). The project was 100 percent funded by the Arkansas 
State Highway and Transportation Department. 
Tow haulage equipment was placed into operation in 
June 1993. 
6. JAMES W. TRIMBLE LOCK AND 
DAM (NO. 13), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. In FY99, the project's 
three developed parks experienced public visitation 
exceeding 1.3 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in October 1965 and the lock and dam were placed 
in operation in April 1969. The bridge across the dam 
was completed in July 1968. Construction of a non- 
Federal hydropower facility at the project was completed 
in November 1988 under the authority provided 
by the Federal Energy Regulatory Commission. The 
contract to install tow haulage equipment was awarded 
in December 1998. 
37-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
7. LOCK NO. 2 AND WILBUR D. MILLS 
(NO. 2), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Operation 
and maintenance continued. Wilbur D. Mills has 
five developed parks, which in FY 99 experienced public 
visitation exceeding 3.4 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in May 1963. The lock was placed in operation in 
March 1968. Emergency repairs to the scour protection 
features and tainter gates at the dam that resulted from a 
barge accident in December 1982 were completed in 
FY85. The barges that clogged the dam gates during the 
December 1982 flood showed that, with a certain set of 
circumstances (higher than normal head combined with 
the clogged gates resulted in high current velocity that 
caused both upstream and downstream scouring), the 
structure could fail. This condition exists primarily because 
the structure was constructed on piling and designed 
for all of the gates to operate in unison. 
A model study by the Waterways Experiment Station 
determined the most feasible solution to this problem is 
to extend the stilling basin downstream. A contract to 
extend the stilling basin was awarded in June 1990 and 
completed in FY94. Project costs are estimated at $21.6 
million. A contract was awarded in September 1995 to 
add tow haulage equipment at Lock No. 2. Construction 
of a non-Federal hydropower project, under the authority 
provided by the Federal Energy Regulatory Commission 
is complete and was placed into operation in December 
1999.. 
8. JOE HARDIN LOCK AND DAM 
(NO. 3), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. Pool 3 has three developed 
parks which in FY99 experienced public visitation 
exceeding 0.4 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in May 1963 and the lock and dam were placed in 
operation in December 1968. Tow haulage equipment 
was installed and operational in 1993. 
9. LOCK AND DAM NO. 5, AR 
Location, existing project, local cooperation and 
terminal facilities. (See section 1.) 
Operation and results during fiscal year. Continued 
operation and maintenance. Pool 5 has two developed 
parks which in FY99 experienced public visitation 
exceeding 0.9 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in November 1964 and the lock and dam were 
placed in operation in December 1968. Tow haulage 
equipment was installed in June 1993. 
10. MURRAY LOCK AND DAM (NO. 7), 
AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Operation 
and maintenance continued. Murray has five developed 
parks, which in FY99 experienced public visitation 
exceeding 3.2 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in November 1964 and the lock and dam was placed 
in operation in October 1969. Construction of a non- 
Federal hydropower facility at the project was completed 
in May 1988 under the authority provided by the 
Federal Energy Regulatory Commission. 
11. NORRELL LOCK AND DAM (NO. 1) 
AND ENTRANCE CHANNEL, AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Recommended modification. The White River Entrance 
Channel is the first reach in the MKARNS project. 
This is the only reach in the navigation system 
where the minimum stage is controlled by the stages of 
the Mississippi River and not by a downstream dam. 
Water surface elevations on the Mississippi River have 
been declining for years due to changed hydraulic conditions 
and riverbed elevations, resulting in inadequate 
navigation depths in the White River Entrance Channel. 
Construction of the Montgomery Point Lock and 
Dam would eliminate the navigation restrictions. The 
new lock and dam will include "bottom" operated gates 
and a lock chamber of 600 feet by 110 feet with miter 
gates. The navigation pass over the dam (gates down) 
will be approximately 77 percent of the time for present 
conditions and 64 percent of the time for future conditions. 
Operations and results during fiscal year. Operation 
and maintenance continued. The project currently 
has one developed park which in FY 99 experienced 
public visitation exceeding 0.9 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in May 1963, and the lock and dam were placed in 
37-4

LITTLE ROCK, AR DISTRICT 
operation in June 1967. A contract to add tow haulage 
equipment to the lock was completed in 1997. 
12. TOAD SUCK FERRY LOCK AND 
DAM (NO. 8), AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. In FY99, the project's 
five developed parks experienced public visitation 
exceeding 1.1 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in July 1965 and the lock and dam was placed in 
operation in November 1969. The Conway water supply 
project was completed and transferred to the city for 
operation and maintenance in July 1983. Installation of 
tow haulage equipment was complete in 1999. 
13. MAINTENANCE AND REPAIR 
FLEET AND MARINE TERMINALS, 
AR 
Location, existing project, local cooperation, and 
terminal facilities. (See section 1.) 
Operations and results during fiscal year. Operation 
and maintenance continued. 
Condition at end of fiscal year. Construction of 
Pine Bluff Marine Terminal began March 1968 and was 
placed in operation in April 1969. Construction of the 
Dardanelle Marine Terminal began June 1968 and it was 
placed in operation in November 1969. 
14. OTHER AUTHORIZED 
NAVIGATION PROJECTS 
(See Table 37-C for other authorized navigation 
projects.) 
15. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Preauthorization studies under the small project continuing 
authorities program, navigation activities, Section 
107, Public Law 86-645, as amended. Expenditures 
for Sec. 107 activities in FY99 totaled $67,698.37. Coordination 
account, $7,460.95; Russellville Harbor, Arkansas 
River, AR; $60,237.42 
Flood Control 
16. BLACK RIVER, POPLAR BLUFF, MO 
Location. The project is located along the Black 
River, in Poplar Bluff, MO, about 160 miles south of St. 
Louis, MO. 
Existing project. A Detailed Project Report and 
Environmental Assessment, dated November 1995, recommended 
a 1,300-foot long, 3-foot high, reinforced 
concrete floodwall and a stoplog structure. The estimated 
cost is $544,400. Construction is authorized under 
the Continuing Authorities Program, Section 205, 
Flood control Act of 1948, as amended. 
Local cooperation. The project cooperation agreement 
was signed December 2, 1996. 
Operations and results during fiscal year. . Repair 
work for a bank slide was completed in Feb 1999, 
and the project was transferred to the local sponsor, the 
city of Poplar Bluff. 
Condition at end of fiscal year. O&M manuals are 
currently being prepared and the project will be closed 
out in the spring of 2000. 
17. BLUE MOUNTAIN LAKE, AR 
Location. (See Table 37-1: Arkansas River Basin, 
AR, OK, and KS: Lakes.) 
Existing project. Construction cost was approximately 
$5.1 million. For further information see pages 
906 and 907 of the 1962 Annual Report. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Operation 
and maintenance of project continued. Flood damages 
prevented during FY99 are estimated at $9323,000; 
cumulative benefits through September 30, 1999, are 
estimated at $27,661,000. The project's five developed 
parks experienced public visitation exceeding 1.4 million 
visitor-hours. 
Condition at end of fiscal year. Project is complete 
except for additional recreational sanitary facilities. 
Construction of the project began in May 1940 and it 
was placed in operation in March 1947. 
18. CLEARWATER LAKE, MO 
Location. (See Table 37-K: White River Basin, AR & 
MO: Lakes.) 
Existing project. Construction cost, including the 
cost of modifying the project, is estimated at $22.4 million. 
For further information see pages 897 and 898 of 
1962 Annual Report. 
Major rehabilitation. Construction began in November 
1987 on a seepage berm on the upstream face of 
37-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
the dam, a grout curtain on the right abutment, and a 
parapet wall along the dam. 
An additional 9 acres of land was acquired to widen 
the spillway from 190 feet to 370 feet. The widened 
spillway will pass about 90 percent of the probable 
maximum flood with water surface at the top of existing 
dam and parapet wall, preventing waves from overtopping 
the dam. The cost of the modification was 
$11,467,910. Construction was complete in September 
1989. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Operation 
and maintenance continued. Flood damages prevented 
during FY99 are estimated at $11,106,000; cumulative 
benefits through September 1999 are estimated 
at $181,288,000. Project currently has 6 developed 
parks, which in FY99 experienced public visitation exceeding 
5 million visitor-hours. 
Condition at end of fiscal year. Project is complete 
except for improvements to the sanitary facilities in the 
recreation areas. Construction of the project began in 
June 1940 and was ready for beneficial use in March 
1948. A new water control plan is being considered that 
better meets the needs of the interests in the basin. Objections 
by the Arkansas Game & Fish Commission 
during the review of the Draft Environmental Assessment 
has delayed progress on implementation of the 
proposed plan. We are in the process of validating data 
used in the claim by the Arkansas Game & fish Commission, 
before determining a future course of action. 
19. DEQUEEN LAKE, AR 
Location. On Rolling Fork River, RM 22.8, a 
tributary of the Little River, in Sevier County, about 4 
miles northwest of DeQueen, AR. 
Existing project. An earth-fill dam, 2,360 feet long, 
constructed to 160 feet above streambed. An uncontrolled 
spillway, 200 feet wide, is about 1,400 feet east 
of main embankment. Outlet works consist of a gated 
conduit, 12 feet in diameter. 
The lake controls 169 square miles of drainage area 
and provides a total storage of 136,100 acre-feet 
(101,200 acre-feet for flood control storage, 25,500 
acre-feet for conservation storage, and 9,400 acre-feet 
for sedimentation reserve). Federal cost of the project is 
estimated at $19,623,752. 
Local cooperation. Section 2, Flood Control Act of 
1938, and Section 301, Water Supply Act of 1958, as 
amended, apply. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. Flood damages 
prevented during FY99 are estimated at $764,000; cumulative 
benefits through September, 1999, are estimated 
at $8,746,000. In FY99, the project's six developed 
parks experienced public visitation exceeding 1.3 
million visitor-hours. 
Condition at end of fiscal year. Construction began 
April 1966. Project was placed in useful operation 
in August 1977. 
20. DIERKS LAKE, AR 
Location. On Saline River, RM 56.6, a tributary of 
the Little River, about 5 miles northwest of Dierks, 
Howard County, AR. 
Existing project. An earth-fill dam, 2,760 feet long, 
and about 153 feet above the streambed. An uncontrolled 
spillway 800 feet wide is in a saddle at the west 
end of the dam. Outlet works consisting of a gated 6- by 
9-foot oblong conduit, one 24 -inch low-flow pipe, and 
one 30-inch water supply pipe are provided. The lake 
controls a drainage area of 114 square miles and provides 
for storage of 67,100 acre-feet for flood control 
and 29,700 acre-feet for water supply, conservation, and 
sedimentation reserve, a total of 96,800 acre-feet. The 
Federal cost of the project was $16,002,903. 
Local cooperation. Section 2, Flood Control Act of 
1938, and Water Supply Act of 1958, as amended, apply.
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY99 are estimated at $219,000; cumulative 
benefits through September 1999, are estimated at 
$5,342,000. Currently have three developed parks, 
which in FY99 experienced 0.9 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in June 1968. In May 1975, the embankment closure 
was completed and the project was placed in useful 
operation. 
21. FOURCHE BAYOU BASIN, LITTLE 
ROCK, AR 
Location. On Fourche, Rock and Grassy Flat 
Creeks in the vicinity of Little Rock, Pulaski County, 
AR.
Existing project. The project, authorized by the 
Water Resources Development Act of 1986 (PL99-662), 
consists of widening, clearing and snagging with alteration 
of highway and railroad bridges. This work was 
physically completed February 1996. Authorization 
also included the acquisition of 1,750 acres of bottom- 
37-6

LITTLE ROCK, AR DISTRICT 
lands and nature appreciation facilities. The ASA(CW) 
declined to include the bottomland acquisition when the 
project was authorized. In 1996, that decision was reversed. 
A decision document will have to be prepared 
to authorize a modification to the Local Cooperation 
Agreement to include the bottomland acquisition. An 
environmental baseline study was completed in FY 98 to 
delineate between potential HTRW sites and clean areas 
within the bottomlands prior to any acquisitions. The 
estimated project cost is $33,300,000; Federal, $22.7 
million; non-Federal $10.6 million. 
Local cooperation. The city of Little Rock, the 
project sponsor, signed the local cooperation agreement 
in August 1987. 
Operations and results during the fiscal year.. A 
decision document was not initiated pending the city of 
Little Rock 's decision to proceed with the acquisition of 
the 1,750 acres of Fourche bottomlands and nature appreciation 
areas. 
22. GILLHAM LAKE, AR 
Location. Damsite is on the Cossatot River, RM 
49.0, in Howard County, about 5 miles northeast of 
Gillham in Sevier County, AR. 
Existing project. Federal cost of the project was 
$17,827,111. 
Local cooperation. Section 2, Flood Control Act of 
1938, and Section 301, Water Supply Act of 1958, as 
amended, apply. Tri-Lakes Water District furnished a 
resolution of intent to repay costs allocated to water 
supply storage. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY99 are estimated at $734,000; total 
cumulative flood damages prevented are estimated at 
$11,699,000. In FY99, the project's four developed 
parks experienced public visitation exceeding 1 million 
visitor-hours. 
Condition at end of fiscal year. Construction began 
in June 1968. The embankment closure was completed 
in May 1975, and the project was placed in useful 
operation. 
23. LITTLE RIVER BASIN, AR 
Location. Improvements are on the Little River and 
tributaries in Arkansas. More definite location of individual 
items is shown in Table 37-J. 
Existing project. A six-lake system for flood control 
and other purposes in the Little River Basin. The 
system consists of four lakes in Arkansas: Millwood on 
the main stem, Dierks on the Saline River, DeQueen on 
the Rolling Fork River, and Gillham on the Cossatot 
River; and two lakes in Oklahoma: Broken Bow on the 
Mountain Fork River and Pine Creek on the Little River. 
Under a District boundary change, effective in October 
1980, the four projects in this system in Arkansas were 
reassigned from the Tulsa District to the Little Rock 
District. 
Local cooperation. Section 2, Flood Control Act of 
1938, and Section 301, Water Supply Act of 1958, as 
amended, apply. Tri-Lakes Water District (DeQueen, 
Gillham, and Dierks) furnished a resolution of intent to 
repay costs allocated to water supply storage. The 
Southwest Arkansas Water District is currently repaying 
costs allocated to water supply storage at Millwood 
Lake. 
Operations and results during fiscal year. Operation 
and maintenance of projects continued. See individual 
projects for details. Flood damages prevented by the 
Little River Basin reservoirs during FY99 are estimated 
at $2,199,000; cumulative benefits through September, 
1999, are estimated at $38,391,000. 
Withdrawals for water supply purposes were: The; 
Tri-Lakes Water District, AR, 1,354 acre-feet from Gillham 
Lake; Tri-Lakes Water District, AR, 384 acre-feet 
from Dierks Lake, and Southwest Arkansas Water District, 
AR, 74,923 acre-feet from Millwood Lake. 
Condition at end of fiscal year. Millwood, De- 
Queen, Gillham, and Dierks Lakes are complete and in 
operation. 
24. MILL CREEK, FORT SMITH, AR 
Location. In southwest Fort Smith, Sebastian 
County, AR. 
Existing project. The project was constructed under 
Section 205 of the Continuing Authority Program. The 
project included improvements on 3.9 miles of the Mill 
Creek channel and modifications on three bridges. Project 
construction was completed in November 1992. The 
estimated project cost is $8,959,300: $4,843,000, Federal 
and $4,116,300, non-Federal. 
Local cooperation. The city of Fort Smith, the local 
sponsor, signed the local cooperation agreement in November 
1988.The city assumed project operation and 
maintenance on 17 June 1993. 
Conditions at end of fiscal year. Financial completion 
is pending, as it requires a correction in the financial 
management system. 
37-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
25. MILLWOOD LAKE, AR 
Location. On the Little River, RM 16.0, approximately 
7 miles east of Ashdown, Little River County, 
AR, and about 2 miles northeast of Millwood, Little 
River County, AR. 
Existing project. The Federal cost of the project 
was $46,087,382. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. Flood damages 
prevented during FY99 are estimated at $482,000; cumulative 
benefits through September, 1999, are estimated 
at $12,604,000. Millwood Lake has 12 developed 
parks which in FY99 experienced public visitation 
exceeding 3.9 million visitor-hours. 
Condition at end of fiscal year. Construction began 
in September 1961 and the project was placed in full 
flood control operation in August 1966. 
26. NIMROD LAKE, AR 
Location. 
Existing project. Estimated cost is $4,092,825. For 
further information see pages 908 and 909 of 1962 Annual 
Report. 
Local cooperation. Section 2 of the 1938 Flood 
Control Act applies. 
Operations and results during fiscal year. Operation 
and maintenance of project continued. Addition 
and improvement to existing recreation sanitary facilities 
continued. In FY99, seven parks experienced public 
visitation exceeding 2.6 million visitor-hours. During 
FY99, flood damages prevented are estimated at 
$898,000; cumulative benefits through September, 
1999, are estimated at $19,355,000. 
Condition at end of fiscal year. Project is complete. 
27. WHITE RIVER BASIN (LITTLE 
ROCK DISTRICT), AR & MO 
Location. Improvements are on the White River and 
tributaries, Arkansas and Missouri. More definite location 
of individual items is shown in Table 37-K: White 
River Basin. 
Existing project. A general comprehensive plan for 
flood control and other purposes in the White River Basin. 
The plan includes seven lakes; two are flood control 
only projects and five are multiple-purpose projects. 
Beaver, Table Rock, Bull Shoals, Norfork, Clearwater, 
Greers Ferry and Bell Foley lakes were selected and approved 
for construction by the Chief of Engineers, and 
individual reports on six of these seven lakes are presented 
on subsequent pages. The Bell Foley project, the 
remaining unbuilt authorized project, was reevaluated in 
FY 89; the project continues to have a favorable benefitto-
cost ratio since its formulation in 1968. The lakes in 
the plan are listed in Table 37-K: White River Basin. 
Local cooperation. Section 2, Flood Control Act of 
1938 applies, Water Supply Act of 1958, as amended, 
applies to Beaver, Greers Ferry, and Norfork projects. 
Operations and results during fiscal year. Operation 
and maintenance of projects continued. Flood damages 
prevented by the White River Basin lakes during 
FY99 are estimated at $17,953,000; cumulative benefits 
through September, 1999, are estimated at 
$540,046,000. Flood damages prevented by the White 
River Basin levees during FY99 are estimated at 
$1,398,000; cumulative benefits through September 
1999, are estimated at $85,627,000. 
Electric energy delivered to Southwestern Power 
Administration for marketing during FY99 totaled 2.5 
billion kilowatt-hours. 
Water releases for fish hatcheries were: 28,960 acrefeet 
from Norfork Lake for Fish and Wildlife Service 
trout hatchery; 14,480 acre-feet from Table Rock Lake 
for Missouri Conservation Commission trout hatchery; 
and, 14,480 acre-feet from Greers Ferry Lake for U.S. 
Fish and Wildlife Service trout hatchery. 
Withdrawals for water supply purposes were: Beaver 
Water District, AR, 43,966 acre-feet, and Carroll-Boone 
Water District, AR, 7,820 acre-feet, from Beaver Lake; 
Madison County Water District, AR, 2,561 acre-feet, 
and Benton-Washington Counties Water District, AR, 
2,149 ac-ft, from Beaver Lake; Kings River Country 
Club, 34 ac-ft, from Table Rock Lake; Marion County 
Regional Water District, AR, 887 acre-feet from Bull 
Shoals Lake; Water and Sewer Improvement District 
No.3 of Mountain Home, AR, 4,282 acre-feet from Norfork 
Lake; and the city of Clinton, AR, 2,410 acre-feet; 
Community Water System, Inc., AR, 4,284 acre-feet; 
Red Apple Inn, AR, 115 ac-ft; and, Thunderbird Country 
Club, AR, 57 ac-ft, from Greers Ferry Lake. 
Condition at end of fiscal year. Beaver, Table 
Rock, Bull Shoals, Norfork, Clearwater, and Greers 
Ferry lakes are complete and in operation. Progress on 
these lakes is shown in individual reports. Bell Foley 
lake project is in a deferred status. Water Valley and 
Lone Rock lakes have been deauthorized. A new water 
control plan was approved and implemented in December 
1998. This plan was developed in close coordination 
with the basins various interests and was recommended 
as their preferred plan of operation. 
37-8

LITTLE ROCK, AR DISTRICT 
28. WHITE RIVER, BATESVILLE, AR 
Location. On the White River, within the city of 
Batesville, Independence County, AR. 
Existing project. The Definite Project Report 
(DPR), recommending construction of a levee and 
floodwall to protect the industrial area, under Section 
205 of the 1948 Flood Control Act, was approved in 
June 1988. The project includes 4,855 feet of 
levee/floodwall, 9 stoplog structures, 6 drainage structures, 
a stoplog storage area, 3 sewerline control gates, 
and a two-gage automated warning system.. The 
levee/floodwall construction contract was awarded in 
July 1995 and completed in Dec 1996. The 
levee/floodwall was transferred to the city of Batesville 
for operation and maintenance March 14, 1997. However, 
in Aug. 1999, it was determined that erosion to the 
bank and at two drainage structure culverts required a 
design deficiency correction. The city also requested a 
betterment to extend a drainage structure culvert. Estimated 
total project cost is $3.7 million. The federal 
share is $2.775million 
Local cooperation. The city of Batesville signed a 
local cooperation agreement in January 1994 with the 
U.S. Army Corps of Engineers. The city's project share 
is estimated to be $925,000. 
Operations and results during the fiscal year. The 
sewerline control gates contract was completed May 28, 
1999. The levee contractor filed an appeal to the Engineer 
Board of Appeals for claims totaling $147,140.84. 
A settlement of $9, 288 was agreed to on June 16, 1999. 
29. WHITE RIVER, JACKSONPORT, AR 
Location. On the left bank, of the White River at 
RM 256 between Newport and Jacksonport, Jackson 
County, AR. 
Existing project. 300 feet of revetment was added 
to the existing revetment which protected the Massey- 
Alexander Levee (formerly known as Jackson County 
Levee District No. 2) under authority of Section 205 of 
the Flood Control Act of 1948, as amended. The project 
cost was estimated at $123.600 with a Federal share of 
$92.700. The construction started August 1996 and was 
completed December 1996. 
Local cooperation. The Massey-Alexander Levee 
District signed a Project Cooperation Agreement (PCA) 
in September 1995. An additional 535 feet of revetment 
was added, as a betterment, to protect a natural gas 
pipeline at the local sponsor's expense of $206,000. 
The sponsor assumed operation of the project in November 
1997. 
30. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Approved regulations for operation and maintenance 
of flood control works, Part 208 of Title 33, Code of 
Federal Regulations, provide for periodic inspection of 
completed projects transferred to local interests for operation 
and maintenance. Inspections of local flood 
protection projects were made to determine extent of 
compliance with approved regulations for maintenance 
and operation of these projects. Responsible officials of 
improvement districts concerned were advised of inadequacies 
in maintenance and operation of local flood 
protection works under their jurisdiction where appropriate. 
Costs for FY99 were $98,715.29. Total accumulative 
cost through September, 1999, was 
$2,117,412.54. 
31. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
Arkansas River, Tucker Creek, AR, FY99 costs, 
$265,469.91 Federal and $93,500.00 non-Federal. (See 
Table 37-E: Other Authorized Flood Control Projects.) 
32. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
(1) Emergency bank protection, Section 14, 1946 Flood 
Control Act. FY99 costs, $787,736.51, Federal 
$543,255.17, Non-Federal $244,481.34: Section 14, 
Coordination Account, $13,959.84; Batesville Water 
Tower, AR, $441,718.87, Federal $279,253.14, Non- 
Federal $162,465.73, project was completed 30 September 
1999 at a project cost of $508,000 a Federal share of 
$330,200; Beaver Creek at Slough Hollow, MO, Federal 
$22,056.85; Arkansas River at Riverfront Park, North 
Little Rock, AR, $9,147.92, Federal $-174.37, Non- 
Federal $9,322.29; Frog Bayou; Crawford County, AR 
Federal $7,235.31; and Highway 69 at Black River, AR, 
$293,617.72, Federal $220,924.40, Non-Federal 
$72,693.32. 
(2) Snagging and clearing, Section 208, 1954 Flood 
Control Act. Fiscal year costs: None. 
(3) Flood control activities, Section 205, 1948 Flood 
Control Act. FY99 costs, $273,227.66: Section 205 Coordination 
Account, $13,792.67; Black River, Poplar 
Bluff, Mo., $35,018.49; Cornstalk Branch, Judsonia, 
AR, $2,387.19; Grassy Flat Creek, Little Rock, AR, ,$ 
127.82; Hester, Heartsill, and Adamson Creeks, AR, 
$15.24; White River, Batesville, AR, $94,679.64; White 
River, Jacksonport, AR, $103.10, Federal $63.97, Non- 
Federal $39.13; Flat Creek, Cassville, MO, $17,872.21; 
Brodie Creek, Little Rock, AR, $19,917.98; Spadra 
Creek, Clarkville, AR, . $23,966.07; Dark Hollow, 
North Little Rock, AR, $15,931.12; Coleman Creek, 
37-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Little Rock, AR, $20,392.31; Crooked Creek, Bryant, 
AR, $9,016.10; Clear Creek, Pierce City, MO, 
$20,046.85. 
Emergency Response Activities 
(1) Public Law 84-99 (Flood Control and Coastal 
Emergency): None 
(2) Emergency Work for Others:_FEMA under the 
Federal Response Plan following a Presidential Declaration 
for Federal Assistance: Tornadoes on 21 January 
1999 resulted in 15 Arkansas Counties being declared 
Disaster Areas by President Clinton. The Little Rock 
District was assigned debris removal missions and channel 
clearing by the Federal Emergency Management 
Agency( FEMA) in Saline and White Counties. These 
missions were completed by the end of May 1999. The 
cost was approximately $3,600,000. In addition to the 
debris removal mission, Little Rock District personnel 
served as technical advisors for FEMA as problems were 
encountered in other counties receiving assistance. 
Multiple-Purpose Projects Including Power 
33. BEAVER LAKE, AR 
Location. (See Table 37-K: White River Basin.) 
Existing project. Estimated cost is $50,797,000. 
For further information see 788 and 789 of 1966 Annual 
Report. (For authorization see Table 37-B. ) 
Major rehabilitation. Since the dam was constructed 
there has been a seepage problem below Dike 
No. 1. Based on detailed investigation, it was determined 
that the limestone foundation under Dike 1 and 
200 feet of the north end of the main dam embankment 
is the main problem. The plan of improvement was a 
concrete seepage cutoff in Dike 1 and the north end of 
the main dam. A $16.9-million contract to construct a 
concrete cutoff wall was awarded in June 1989; the notice 
to proceed was issued in October 1989. The contract 
period was estimated to be 760 days. However, the 
contractor ceased productive work due to inability to excavate 
rock and was been placed in default. An $18.8 
reprocurement contract was awarded in April 1992. 
Work began in May 1992 and all work was completed in 
Nov 1995. Project cost is estimated at $26,588,000 million.
The Beaver Dam Safety Assurance study was completed 
with FY 97 expenditures of $1,359.61. 
Water Quality Enhancement. Congress directed 
the Corps to implement best management practices 
(BMP's) in the Beaver Lake watershed and monitor the 
effects of these practices on water quality. A study was 
completed and a project report was approved in July 
1989. The BMP's and water quality monitoring were 
concurrently implemented over a 5-year period which 
began in May 1991 with a project completion date of 
July 1997. 
The BMP's were implemented under the terms of a 
memorandum of agreement between the Corps and the 
Natural Resources Conservation Service (NRCS), formerly 
the Soil Conservation Service, with the assistance 
of the Agricultural Stabilization and Conservation 
Service. The water quality monitoring was implemented 
under terms of a local cost-sharing agreement with the 
Arkansas Soil and Water Conservation Commission. 
Water quality monitoring was performed in consultation 
with the Environmental Protection Agency by a Corps 
administered contract. The water quality-monitoring 
contract was awarded on January 29, 1992. Water quality 
sampling began in May 1992 and was completed on 
July 1, 1996. BMP implementation was completed 
August 31,1995. Cost in FY98 was $67,897.93 Federal, 
and $1,434.58 non-Federal. Total project cost was 
$6,878,775.15 
Environmental Infrastructure Assistance. The 
Water Resources Development Act of 1992 authorized 
the Corps of Engineers to provide design and construction 
assistance to appropriate non-Federal interests for a 
water transmission line from the northern part of Beaver 
Lake, Arkansas, into Benton and Washington Counties. 
This project is part of a $40 million project, which includes 
a water intake, treatment and storage facilities, 
and transmission lines. The project sponsor is the 
Benton/Washington County Water Association, and the 
primary source of funding is the Rural Economic and 
Community Development Service (formerly the Farmers 
Home Administration, U.S. Department of Agriculture). 
The Little Rock District and the project sponsor executed 
a Memorandum of Agreement in June 1997. The 
Little Rock District then transferred $3 million to the 
sponsor for construction of a segment of the water 
transmission line. 
Local cooperation. Section 2 of the 1938 Flood 
Control Act, and the 1958 Water Supply Act, as 
amended, apply. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY99 are estimated at $923,000; cumulative 
benefits are estimated at $38,066,000. During the 
year 156,347,000 kilowatt-hours of electrical energy 
were delivered to the Southwestern Power Administration 
for marketing. The project has eleven developed 
parks, which in FY99 experienced public visitation exceeding 
15.6 million visitor-hours. 
Condition at end of fiscal year. Project is complete. 
Alterations to existing parks to enhance fee collections, 
improve efficiency, and reduce the maintenance 
37-10

LITTLE ROCK, AR DISTRICT 
effort or rehabilitate the 26-year old park operation 
through operation and maintenance and SRUF funds, as 
appropriate. Construction of the project began in October 
1959 and was placed in operation for flood control 
in December 1963, hydroelectric power generation with 
both units in May 1965, and water supply in January 
1966. Work on a dam seepage problem is complete. 
34. BULL SHOALS LAKE, AR 
Location. (See table 37-K. White River Basin, AR & 
MO.) 
Existing project. Cost with eight generating units 
was $88,858,711. For further information see pages 725 
and 726 of 1965 Annual Report. (For authorization see 
table 37-B.) 
Local cooperation. Section 2, Flood Control Act of 
1938 applies. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY99 are estimated at $2,671,000; total 
cumulative flood damages prevented are estimated at 
$147,542,000. During the year, more than 701,335,000 
kilowatt-hours of electrical energy were delivered to 
Southwestern Power Administration for marketing. The 
project has eighteen developed parks, which in FY99 
experienced public visitation exceeding 26 million visitor-
hours. 
Condition at end of fiscal year. Project is complete. 
Alterations to existing parks are needed to enhance 
fee collections, to improve efficiency, to reduce 
maintenance effort or to rehabilitate the 37-year-old 
park facilities through operations and maintenance or 
SRUF funds, as appropriate. Low dissolved oxygen 
readings in the downstream area of Bull Shoals Dam in 
October 1990 have resulted in ongoing studies to be undertaken 
to minimize harmful effects on the trout fishing 
of the White River. 
Unguaranteed short-term solutions to the problem, 
consisting of limiting generation, will sustain the existing 
fishery, but long-term guaranteed changes will require 
congressional authorization. Construction of the 
project began in April 1946 and was ready for beneficial 
flood control use in June 1951 and generation of electrical 
energy in September 1952. Units 1 through 8 were 
placed in operation September 1952, December 1952, 
June 1953, January 1962, February 1962, August 1963, 
and September 1963, respectively. 
Major rehabilitation (Powerhouse). A major rehabilitation 
study was initiated in October 1995. The 
study was to investigate a solution to the environmentally 
induced reliability problem (low dissolved oxygen) 
of these units. Potential solutions include new autoventing 
turbines, a down stream weir, turbine venting, or 
forced-air. Following preliminary study results, the turbines 
were modified in 1997 to increase downstream 
aeration. The study has been suspended while the effects 
of these modifications are evaluated. 
35. DARDANELLE LOCK AND DAM 
(NO. 10), AR 
Location. (See Table 37-H.: Arkansas River Basin; 
AR, OK, and KS: Navigation.) 
Existing project. Project is a unit of MKARNS. 
Dam is 2,683 feet long and 68 feet high. It has a spillway 
with 20 tainter gates 50 feet long and 39 feet high. 
Navigation lock is 110 by 600 feet with a lift of 54 feet. 
Powerhouse originally contained four 31,000-kilowatt 
generators. Lake has a storage capacity of 486,200 acrefeet. 
Estimated cost was $84,270,124. 
Local cooperation. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. Pool fluctuated 
within 2-ft. power pondage, elevation 336.0 to 338.0. 
Power generation continued. During FY99, about 
501,273,000 kilowatt-hours of electrical energy were 
delivered to the Southwestern Power Administration for 
marketing. In FY99, the project's thirteen developed 
parks experienced public visitation exceeding 7 million 
visitor-hours. 
Condition at end of fiscal year. Project is complete. 
Construction began June 1957. Power units were 
placed on line in April, May, and September 1965, and 
January 1966. The lock became operable in December 
1969. The Visitors Center and resident office were 
completed in May 1985. The contract to install tow 
haulage equipment was awarded in December 1998. 
Major rehabilitation. Work is underway to replace 
the existing four units with new "state-of-the-art" 
equipment which will increase the plant output by approximately 
13 percent. Unit No. 1 was completed and 
returned to service in February 1998. Unit 3 was completed 
and returned to service in November 1998, unit 2 
was completed and returned to service in January 2000. 
The contract end date is July 2000. Estimated cost of 
the powerhouse major rehabilitation is $29,700,000. 
36. GREERS FERRY LAKE, AR 
Location. (See Table 37-K: White River, AR & 
MO.) 
Existing project. Estimated cost is $55,125,000. 
For further information see page 740 of 1964 Annual 
Report. 
37-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Local cooperation. Section 2, 1938 Flood Control 
Act and 1988 Water Supply Act, as amended, apply. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY99 are estimated at $325,000; total 
cumulative flood damages prevented are estimated at 
$28,604,000. In FY99, 135,025,000 kilowatt-hours of 
electrical energy were delivered to the Southwestern 
Power Administration for marketing. The project has 
seventeen developed parks, which in FY99 experienced 
public visitation exceeding 38.1 million visitor-hours. 
The project's operational management plan provides 
means by which the natural resources, including water 
quality, aesthetic value, forestry, fish and wildlife are 
managed and protected for future generations. An allvolunteer 
environmental program (annual cleanup) has 
been most successful and serves as a model for the Nation. 
During the past 27 years the program has won 
more than 26 national awards. 
Condition at end of fiscal year. Project is complete. 
Construction of the project began in June 1957 
and was ready for beneficial flood control use in January 
1962. Power units 1 and 2 were operable in March and 
May 1964, and water supply was operable in April 
1971. The Visitors Center was completed in June 1983 
at a cost of $813,000. 
37. NORFORK LAKE, AR 
Location. (See Table 37-K. White River Basin, AR 
& MO.) 
Existing project. The total estimated cost is 
$70,701,629, including highway bridge construction. 
This does not include an estimate for the addition of 
power units 3 and 4, which were authorized, but never 
built. For further information see page 896 of 1962 Annual 
Report. 
Local cooperation. Section 2, Flood Control Act of 
1938 and Water Supply Act of 1958, as amended, applies. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY99 are estimated at $670,000; total 
cumulative flood damages prevented through September 
1999, are estimated at $48,512,000. During the year, 
more than 169,384,000 kilowatt-hours of electrical energy 
was delivered to the Southwestern Power Administration 
for marketing. The project's 18 developed 
parks experienced public visitation exceeding 15.8 million 
visitor-hours during FY99. 
Condition at end of fiscal year. Project is complete 
except for addition of power units 3 and 4. Construction 
of project began in October 1940, ready for beneficial 
flood control use in June 1943, and for generation of 
electrical energy with one unit in June 1944. Second 
unit was added in February 1950. Water supply was 
added as a purpose in December 1969. Construction of 
two highway bridges over Norfork Lake to replace ferries 
was completed in November 1982. The bridges 
were transferred to the Arkansas Highway and Transportation 
Department for operation and maintenance in 
July 1984. 
38. OZARK-JETA TAYLOR LOCK AND 
DAM (NO. 12), AR 
Location. (See Table 37-H. Arkansas River Basin, 
AR, OK, and KS: Navigation.) 
Existing project. Project is a unit of MKARNS. 
The dam is 2,480 feet long and 58 feet above streambed; 
spillway has 15 tainter gates, each 50 feet long and 46 
feet high. Navigation lock is 110 by 600 feet with a lift 
of 34 feet. Powerhouse contains five 20,000 kilowatt 
generators. Lake has a storage capacity of 148,400 acrefeet. 
In addition, one foot of power pondage is provided 
in Pool 13 between elevations 391.0 and 392.0. Cost 
was $85,629,412. (For authorization see table 37-B.) 
Local cooperation. (See section 1.) 
Operations and results during fiscal year. Continued 
operation and maintenance. Delivered 
347,023,000 kilowatt-hours of electrical energy to 
Southwestern Power Administration for marketing. 
Ozark Lake has 10 developed parks which in FY99 experienced 
public visitation exceeding 1.3-million visitorhours. 
Condition at end of fiscal year. Construction began 
in December 1964. Project is complete. Lock and 
dam was placed in operation in November 1969. Power 
units were placed on line as follows: unit 1, November 
1972; unit 2, August 1973; unit 3, October 1973; unit 4, 
December 1973; and unit 5, May 1974. A major rehabilitation 
study was initiated in October 1996. The 
powerplant has experienced numerous mechanical 
problems and major repair requirements since its construction. 
The study describes the condition of the 
powerplant and reviews alternative solutions. The Rehabilitation 
Study Report was submitted in March 1999 
and approved for inclusion in 2001 budget.. The contract 
to install tow haulage equipment was awarded in 
December 1998. 
39. TABLE ROCK LAKE, MO 
Location. (See Table 37-K: White River Basin, AR 
& MO.) 
37-12

LITTLE ROCK, AR DISTRICT 
Existing project. Cost was $119,491.90. For further 
information see page 893 of 1962 Annual Report. 
(For authorization see table 37-B.) 
Dam Safety (Assurance). Table Rock Dam has a 
hydrologic deficiency. The Probable Maximum Flood 
(PMF) would overtop the dam more than 5 feet and 
would breach the earthen embankment portion of the 
dam, causing catastrophic flood conditions. An auxiliary 
gated spillway to safely pass the PMF is currently 
under construction. The project is being built in two 
major phases. The first phase contract was awarded in 
March 1999 and consists of the excavation of the approach 
channel, foundation grouting, and the construction 
of a portion of the earthen embankment. The second 
phase contract will be awarded in June 2000 and 
will consist of the major dam construction (including 
bridge, gates, concrete, etc...) and the excavation of the 
approach channel. The total estimated project cost is 
$60.2 million. 
Local cooperation. Section 2 of the 1938 Flood 
Control Act applies. 
Operations and results during fiscal year. Continued 
operation and maintenance. Flood damages prevented 
during FY 99 are estimated at $2,258,000; total 
cumulative flood damages prevented are estimated at 
$96,034,000. During the year, about 521,098,000 kilowatt-
hours of electrical energy were delivered to the 
Southwestern Power Administration for marketing. The 
District and the Waterways Experiment Station are investigating 
the possibilities of improving the quality of 
Table Rock releases with a hypolimnetic oxygenation 
system. Table Rock Lake has fifteen developed parks 
which in FY99 experienced public visitation exceeding 
16.5 million visitor-hours. This project's operational 
management plan provides means by which the natural 
resources, including forestry, fish and wildlife, are managed 
and protected for future generations. 
Condition at end of fiscal year. Project is complete 
except for addition and improvement to existing recreational 
sanitary facilities. Construction of project began 
in October 1954. The project was ready for beneficial 
flood control use in November 1958, and for generation 
of electrical energy with units 1 and 2 in May 1959. 
Units 3 and 4 were added in April and June 1961. 
General Investigations 
40. SURVEYS 
Expenditures for surveys in FY99 totaled $ 
459,212.86. 
(1) Flood damage prevention studies, FY99 expenditures, 
$335,770.54: Arkansas River, Fort Smith, AR, 
$83,795.16; May Branch, Ft. Smith, AR, FY99 Federal 
funds expenditures were $308,512.22, Federal 
$251,975.38, Non-Federal $56,536.84. The city of 
Forth Smith, AR, the sponsor, signed the Feasibility 
Cost Sharing Agreement 13 November 1998. The feasibility 
study cost is estimated to be $1.4 million, is cost 
shared 50-50,and takes 3 years to complete. 
(2) Miscellaneous activities. FY99 expenditures, $ 
71,022.52: Special investigations, $45,859.75; Review 
of FERC Licenses, $5,119.09; Interagency Water Resource 
Development, $19,082.56; North American Waterfowl 
Management Plan, $961.12. 
(3) Coordination with Other Agencies and Non-Fed., 
FY99 expenditures, $52,398.32: Cooperation w/other 
Water Agencies, $5,027.25. Planning Assistance to 
States (PAS): Negotiation Funds, $3,549.77; Black and 
Arkansas Rivers, AR $3,039.57; City of Paris, AR 
$19,836.26, Federal $10,000, Non-Federal $9,836.26; 
Monett, MO, Flood Hazard Study, $ 34,000.00, Federal 
$17,000, Non-Federal $17,000.00; and Willow Spring, 
MO, Flood Hazard Study, $26,840.34, Federal 
$13,781.73, Non-Federal $13,058.61. 
41. PRECONSTRUCTION 
ENGINEERING & DESIGN (PED). 
Total PED expenditures in FY99 were $35,136.59. 
(1) Local Protection: Arkansas River, Tucker Creek, 
$21,047.43. Plans and specifications were completed 
during FY98 and the Project Cooperation Agreement 
was executed on 10 August 1998. The City of Conway 
was the sponsor and provided real estate for the project. 
The construction contract was awarded on 2 September 
1998. The bid award was for $293,209. The project 
would raise low portions of the existing Faulkner 
County Levee No. 1 to provide 100-year Arkansas River 
flood protection for the city of Conway, Faulkner 
County, Arkansas, in the vicinity of Tucker Creek and 
Tupelo Bayou; Arkansas River Levees, AR, $7,148.56. 
Congress added funds in FY 1996 to continue preconstruction, 
engineering and design (PED). The plans and 
specifications for repairing the Plum Bayou system 
(Plum Bayou, Baucum and Old River Lake levees) were 
completed in FY97; the proposed repairs for this system 
include culvert replacements and slide repairs, and the 
estimated cost is $2.1 million. Additional funding was 
not received in FY99. 
(2) Reservoirs: Pine Mountain Lake, AR, $6,940.60. 
42. COLLECTION AND STUDY OF 
BASIC DATA. 
Total expenditures in FY99 were $603,683.56. 
(1) Flood Plain Management Services (FPMS): Expenditures 
for FPMS activities in FY99 totaled 
$603,683.56. National Flood Proofing Committee, 
37-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
$58,268.43; Flood Plain Management Services, 
$100,140.38; Technical Services, $89,958.07; Quick 
Responses, $10,000; SS - Elkins, AR FW, $10,346.67; 
SS - Hollister, MO, $84,665.01, SS - Forsyth, MO, 
$79,957.46; SS - Anderson, MO, $29,997.77, SS - 
Fayetteville, AR, $140,349.77. 
The authority for the Flood Plain Management 
Services program is Section 206 of the 1960 Flood 
Control Act, PL 86-645, as amended. Under the authority 
of Section 321 of the Water Resources Development 
Act of 1990, PL 101-640, technical services and planning 
assistance are (1) provided to states and local governments 
without charge and (2) offered to Federal 
agencies and private persons on a cost recovery basis. 
Through these technical services and planning guidance, 
the program encourages comprehensive flood plain 
management planning at all levels to reduce the potential 
for losses to life and property from floods. 
Federal and non-Federal agencies and the private 
sector are assisted with planning and development information 
for flood hazard areas. This assistance is in 
the form of local flood plain regulations, Federal Insurance 
Program requirements, and Executive Order 11988 
guidelines. Such assistance may include factual flood 
information (available or determined) and interpretation 
of flood frequencies, extent of flooding, flood-water 
velocity, duration of flooding and floodway limits. 
(2) Hydrologic Data Collection: During FY99, 115 
stations were operated; 79 cooperatively with USGS and 
36 by the Corps. The total cost for streamflow and some 
sediment data from all sources of funding was $802,290, 
of which $641,050 was transferred to USGS. 
The District also participated in a cooperative program 
with the National Weather Service for rainfall 
and/or river reporting stations for use in forecasting 
streamflow for flood warning and operation of lake 
projects. Records were also collected at certain hydroclimate 
rainfall stations under a cooperative program 
between the two agencies. For these services, $51,015 
was transferred to the National Weather Service. 
(3) Environmental Restoration (Section 1135): Total 
FY99 expenditures were $2,472,184.25, including the 
Coordination Account, $14,364.61; Initial Appraisals, 
$17,041.51; Morgan Point Bendway Closure, 
$2,417,537.91; the Nimrod Fisheries Restoration, 
$18,974.54, and the Beaver Lake Tailwater Habitat 
Restoration, $4,265.68. 
(4) Aquatic Ecosystem Restoration (Section 206): 
Total FY99 expenditures were $19,432.39, including the 
Coordination Account, $7,978.48; Preliminary Restoration 
Plans, $11,453.91. 
43. NIMROD FISHERIES RESTORATION 
Location. Nimrod Lake is located about 9 miles 
southeast of Plainview, Arkansas, in Yell County, on the 
Fourche LaFave River at river mile 62.6. 
Existing Project. The proposed modification consists 
of re-vegetating the shoreline, adding fish shelters, 
and manipulating the water level management plan. 
Local Cooperation. The Arkansas Game and Fish 
Commission is the local sponsor and strongly supports 
this project. 
Results during the fiscal year. The plans and 
specifications were prepared and the construction contract 
was awarded in August 1999.. 
Condition at end of fiscal year. The fish shelters 
portion of the contract was completed in September 
1999. 
44. MORGAN POINT BENDWAY 
CLOSURE STRUCTURE, DESHA 
COUNTY, AR 
Location. This project is located immediately 
downstream of the non-overflow embankment of the 
Wilbur D. Mills Dam of the MKARNS, in Desha 
County (Southeastern Arkansas). 
Existing project. The project modification report 
was approved in September 1995 under Section 1135(b) 
of the Water Resources Development Act of 1986, as 
amended: Environmental Restoration. The report recommended 
construction of a closure structure at the 
downstream end of the bendway, placement of a water 
intake structure, cypress tree plantings and placement of 
fish shelters. The project is intended to restore about 7 
miles of riverine and wetland habitat damaged by the 
construction and operation of the Wilbur D. Mills Dam. 
Local cooperation. The state of Arkansas is the 
sponsor with a cost share of 75 percent Federal and 25 
percent non-Federal. 
Operations and results during fiscal year. Construction 
on the project was initiated on 2 November 
1998. The construction contract was physically complete 
on 30 September 1999. Fish stocking and tree 
planting project components are scheduled for completion 
by 31 July 2000. 
45. COLEMAN CREEK LITTLE ROCK, 
AR 
The city of Little Rock asked the Corps of Engineers 
to investigate the flooding problems along Coleman 
Creek in west-central Little Rock residential area, under 
the authority of Section 205 of the 1948 Flood Control 
Act. Funds were received and a study initiated in FY99. 
37-14

LITTLE ROCK, AR DISTRICT 
Work in the amount of $25,000 was performed in FY99, 
and the study effort is ongoing. 
46. SPADRA CREEK, CLARKSVILLE, 
AR 
The mayor of Clarksville asked the Corps of Engineers 
to study flooding problems under authority of 
Section 205 of the 1948 Flood Control Act. A study 
was initiated in FY99 to consider alternative plans for 
extending and/or raising an existing levee. Work in the 
amount of $24,000 was performed in FY99 and the 
study is ongoing. 
47. HIGHWAY 69 BRIDGE AT BLACK 
RIVER, JACKSON COUNTY, AR 
The Arkansas Highway and Transportation Department 
requested the assistance of the Corps of Engineers 
during FY 99 to investigate riverbank erosion along the 
left bank of the Black River at the Highway 69 bridge 
under authority of Section 14 of the 1946 Flood Control 
Act. After an investigation, the district completed PED, 
executed the PCA, advertised and awarded a construction 
contract. Construction, including two modifications, 
was virtually completed by the end of August 
1999. A potential modification regarding repair of a 
county road damaged during construction remained 
pending. 
37-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Table 37-A 
Cost And Financial Statement 
See Total 
Section Cost to 
in Text Project Funding FY96 FY97 FY98 FY99 Sept. 30, 1999 
1.-15. McClellan-Kerr New Work 
Arkansas River Approp. 7,000,000 1,646,147 2,128,000 3,211,000 497,937,619 
Navigation Cost 6,083,171 3,207,682 2,059,266 2,677,586 507,338,124 
Locks & Dams, Maint. 
AR Approp. 20,238,375 18,863,000 18,562,277 21,639,832 462,138,484 2 
Cost 19,958,273 17,216,514 21,055,570 22,011,013 461,822,250 2 
New Work 
Contrib. - - - - 5,723,348 
Cost - - - - 6,312,969 
1. Montgomery New Work 
Point Lock & Dam Approp. - 3,338,000 44,483,000 33,314,000 81,135,000 
Cost - 3,314,818 30,704,610 39,110,226 73,129,654 
16. Black River New Work 
Poplar Bluff, MO Approp. 
Cost 
New work 
Contrib. 
Cost 
74,400 
37,029 
- 333,000 
36,196 305,248 
- 40,300 0 
- - 32,288 
17. Blue Mountain New Work 
Lake, AR Approp. - - - - 5,069,974 
Cost - - - - 5,069,974 
Maint. 
Approp. 939,859 1,025,000 884,662 950,644 21,410,064 2 
Cost 930,550 1,011,237 880,107 960,918 21,402,020 2 
18. Cato Springs New Work 
Branch, Approp. 159,000 -45,000 0 - 235,700 
Fayetteville, AR Cost 118,989 -5,000 201 - 235,700 
New Work 
Contrib. -2 1,002 0 0 36,900 
Cost 5,911 5,000 0 743 36,864 
19. Clearwater Lake, New Work 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Major Rehab. 
Approp. 
C , 
10,406,300 " 
10,406,300 " 
1,898,900 2,008,978 2,178,054 2,641,040 44,487,774 
1,828,237 1,996,594 2,193,323 2,628,874 44,478,493 
12,087,910 2 
1) fQ7 911 2 
osL - -iL,UO ,7 V 
20. DeQueen Lake New Work 
Little River Approp. - - - - 19,629,753 
Basin, AR Cost - - - - 19,623,752 
Maint. 
Approp. 979,624 996,000 884,906 890,321 16,773,552 2 
Cost 892,504 850,893 970,167 956,807 16,682,062 2 
37-16 
0 
35,018
0 
7,376 
498,600 
494,303 
63,400 
56,052 
MO

LITTLE ROCK, AR DISTRICT 
Table 37-A (Continued) 
Cost And Financial Statement 
See Total 
Section Cost to 
in Text Project Funding FY96 FY97 FY98 FY99 Sept. 30, 1999 
21. Dierks Lake, New Work 
Little River Approp. - - - - 16,002,903 
Basin, AR Cost - - - - 16,002,781 
Maint. 
Approp. 810,747 1,027,000 855,167 985,380 17,121,698 2 
Cost 799,002 872,216 994,846 1,015,742 17,067,649 2 
22. Dry Jordon New Work 
Creek, Approp. 134,200 -40,000 -36,700 - 157,500 
Harrison, AR Cost 65,404 30,944 10 - 157,500 
New Work 
Contrib. 
Cost - - - - 
23. Fourche Bayou New Work 
Basin, Approp. 260,000 232,000 0 0 20,572,000 3 
Little Rock, AR Cost 382,371 192,028 101,934 24,882 20,625,076 3 
New Work 
Contrib. - - - - 1,731,678 
Cost 20,000 13,000 - - 1,717,768 
24. Gillham Lake, New Work 
Little River Approp. - - - - 17,827,111 
Basin, AR Cost - - - - 17,827,111 
Maint. 
Approp. 833,693 960,000 662,228 749,468 15,554,132 2 
Cost 750,243 651,664 941,833 802,776 15,578,709 2 
26. Mill Creek, New Work 
Fort Smith, Approp. 15,000 300,000 -18,000 - 4,900,001 2 
AR Cost 13,410 548 287,836 - 4,764,419 2 
New Work 
Contrib. - - -281,391 - 299,261 
Cost - - -281,391 - 299,261 
27. Millwood Lake, New Work 
Little River Approp. - - - - 46,087,382 
Basin, AR Cost - - - - 46,087,382 
Maint. 
Approp. 1,860,934 1,781,000 1,488,369 1,557,982 40,964,504 2 
Cost 1,684,911 1,770,389 1,562,375 1,643,683 41,113,600 2 
28. Nimrod Lake, New Work 
AR Approp. - - - - 4,092,826 
Cost - - - - 4,092,826 
Maint. 
Approp. 1,087,468 1,276,000 1,317,095 1,296,213 26,771,842 
Cost 1,110,018 1,123,501 1,441,733 1,304,019 26,751,788 
29. White River New Work 
Basin, AR & MO Approp. - - - - 342,618,387 
(Little Rock Cost - - - - 342,439,802 
District) Maint. 
Approp. 23,169,649 24,184,548 - - 455,085,012 " 
Cost 23,363,092 23,790,468 - - 454,690,932 " 
37-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Table 37-A (Continued) 
Cost And Financial Statement 
See Total 
Section Cost to 
in Text Project Funding FY96 FY97 FY98 FY99 Sept. 30, 1999 
30. White River, New Work 
Batesville, Approp. 1,867,309 160,000 -48,000 60,600 2,748,009 
AR Cost 1,581,848 454,832 33,232 94,680 2,762,716 
New Work 
Contrib. - - 0 - 184,472 
Cost 140,948 7,006 990 - 182,468 
31. White River, New Work 
Jacksonport, Approp. 67,691 -5,000 -10,000 0 92,691 
AR Cost 18,696 56,647 1,318 64 92,692 
New Work 
Contrib. 282,500 - -84,473 0 233,027 
Cost 53,208 177,361 2,418 39 233,027 
35. Beaver Lake, New Work 
AR Approp. - - - - 46,183,033 
Cost - - - - 46,183,033 
Maint. 
Approp. 3,276,283 3,792,400 3,810,120 4,023,097 78,067,329 
Cost 3,433,577 3,632,443 4,108,798 4,105,375 78,288,327 
Major Rehab. 
Approp. - -32,147 - - 33,571,573 
Cost 37,149 1,360 - - 27,410,331 
35. Beaver Lake, New Work 
Water Quality Approp. -98,000 12,000 0 0 4,304,000 
Cost 112,305 67,876 0 3 4,282,001 
New Work 
Contrib. 22,400 1,390 0 - 557,406 
Cost 31,300 1,415 20 - 540,123 
35. Beaver Lake, New Work 
Infrastructure Approp. - 0 0 0 3,000,000 
Cost - 2,965,847 3,633 8,379 2,999,957 
New Work 
Contrib. - - - - 
Cost - - - - 
36. Bull Shoals New Work 
Lake, AR Approp. - - - - 88,857,611 
Cost - -- -- - 88,857,611 
Maint. 
Approp. 5,588,900 5,076,000 4,402,706 4,233,269 113,721,585 2 
Cost 5,528,529 5,044,334 4,553,436 4,299,353 113,906,733 2 
37. Dardanelle Lock New Work 
& Dam (No. 10) Approp. - - - - 84,270,124 
AR Cost - - - - 84,261,240 
Maint. 
Approp. 6,207,304 6,150,500 6,608,568 5,802,930 113,016,090 2 
Cost 5,174,177 6,397,614 7,413,260 5,955,972 113,237,109 2 
Major Rehab. 
Approp. 2,438,000 5,216,000 5,217,000 8,454,000 23,788,000 
Cost 2,773,356 5,261,790 5,183,761 8,236,885 23,521,356 
37-18

LITTLE ROCK, AR DISTRICT 
Table 37-A (Continued) 
Cost And Financial Statement 
See Total 
Section Cost to 
in Text Project Funding FY96 FY97 FY98 FY99 Sept. 30, 1999 
38. Greers Ferry New Work 
Lake, AR Approp. - - - - 48,865,512 
Cost - - - - 48,865,512 
Maint. 
Approp. 4,247,060 4,487,100 4,474,250 4,402,460 99,715,245 2 
Cost 4,485,247 4,391,651 4,631,513 4,526,182 99,900,781 2 
39. Norfork Lake, New Work 
AR Approp. - - - - 74,578,929 
Cost - - - 70,701,629 
Maint. 
Approp. 3,136,263 3,469,000 3,122,143 3,193,833 81,376,094 2 
Cost 3,188,343 3,347,796 3,144,674 3,303,333 81,386,921 2 
40. Ozark-Jeta New Work 
Taylor Lock & Approp. - - - - 85,629,412 
Dam (No. 12), Cost - - - - 85,629,412 
AR Maint. 
Approp. 3,753,347 3,991,000 3,381,029 3,921,348 83,925,641 
Cost 3,342,746 3,760,321 3,601,746 4,137,687 84,017,474 
41. Table Rock Lake, New Work 
MO Approp. - 1,015,000 951,000 3,064,000 72,107,875 
Cost - 944,116 972,326 2,588,013 71,582,331 
Maint. 
Approp. 5,022,243 5,351,070 5,180,801 4,782,742 113,413,126 2 
Cost 4,899,159 5,377,651 6,060,460 4,951,928 114,488,551 2 
45. Nimrod New Work 
Waterfowl Approp. 9,000 26,200 0 - 72,200 
Levee Cost 23,997 29,481 1,569 - 72,201 
New Work 
Contrib. - 24,100 0 0 24,100 
Cost - 20,000 3,152 891 24,043 
46. Morgan Point New Work 
Bendway Approp. 288,000 -100,000 0 2,707,000 2,910,000 
Closure Cost 130,641 52,861 9,194 2,417,538 2,620,234 
Structure, New Work 
Arkansas River Contrib. - 270,700 0 0 270,700 
Cost - - 0 270,700 270,700 
1. For more details on project funds, see text for individual projects. 
2. Beginning data shown in Table 37-A includes special recreation use fees. 
3. Includes funds for plans and specifications. 
4. Includes total project cost, including study cost. 
37-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Table 37-B Authorizing Legislation 
Date of 
Authorizing Act Project and Work Authorized Documents 
June 28, 1938 
August 18, 1941 
July 24, 1946 
July 24, 1946 
ARKANSAS RIVER BASIN, AR, OK, & KS 
(See Section 1 of text) 
Approved General comprehensive plan: 
Mannford Reservoir, OK 
Oologah Lake, OK 
Canton Lake, OK 
Tenkiller Ferry Lake, OK 
Wister Lake, OK 
Blue Mountain Lake, AR 
Nimrod Lake, AR 
Modified comprehensive plan to include reservoirs in 
Grand (Neosho) River Basin, OK, and Mo, and in 
Verdigris River Basin: 
Markham Ferry Reservoir, OK 
Fort Gibson Lake, OK 
Pensacola Reservoir Lake O' The Cherokees, OK 
Fall River Lake, KS 
Elk City Lake, KS 
Toronto Lake, KS 
Neodosha Lake, KS 
Authorized Chief of Engineers to provide in the Canton 
Lake 69,000 acre-feet of irrigation storage, subject to certain 
conditions. 
Approved multiple-purpose plan: 
Oologah Lake, OK 
Markham Ferry Reservoir, OK 
Fort Gibson Lake, OK 
Blackburn Reservoir, OK 
Mannford Reservoir, OK 
Taft Reservoir, OK 
Bank stabilization 
Dardanelle Lock and Dam, AR 
Eufaula Lake, OK 
Navigation locks and dams 
Ozark Lock and Dam, AR 
Short Mountain Lock and Dam, OK 
Webbers Falls Lock and Dam, OK 
Tenkiller Ferry Lake, OK 
June 30, 1948 Modified Arkansas River navigation comprehensive plan H. Doc 758, 79th Cong., 2d sess. 
to include bank protection works at Bradens Bend, OK. 
37-20 
Flood Control Com. Doc. 1, 75th 
Cong., 1st sess. 
H. Doc. 107 and 440, 76th Con., 1st 
sess. 
H. Doc 758, 79th Cong. 2d sess. 
H. Doc 758, 79th Cong. 2d sess.

LITTLE ROCK, AR DISTRICT 
Table 37-B (Continued) Authorizing Legislation 
Date of 
Authorizing Act Project and Work Authorized Documents 
May 17, 1950 
July 14, 1960 
November 17, 1986 
June 10, 1948 
July 24, 1946 
July 3, 1958 
July 24, 1946 
Modified comprehensive plan authorized in 1938 Flood 
Control Act and multiple-purpose plan authorized in River 
and Harbor Act of 1946 to provide for substituting Keystone 
Lake Mannford, Blackburn and Taft Reservoirs. 
Authorized incorporation of River and Harbor and Flood 
Control plans into a single plan of development and made 
all pervious authorizations applicable to combined plan of 
development. 
Fourche Bayou Basin, Little Rock, AR 
(See Section 26 of text.) 
Mill Creek, Fort Smith, AR 
(See Section 30 of text.) 
RED RIVER BELOW DENISON DAM INCLUDING 
LITTLE RIVER BASIN, OK AND AR 
(See Section 26 of text) 
Construct Boswell, Hugo, and Millwood Lakes, and Bank 
Stabilization 
Modified Millwood: Construct Pine Creek, Lukfata, Broken 
Bow, DeQueen, Gillham, Dierks Lakes 
Emergency streambank erosion protection, Red River, 
Little River Co., AR 
Water Resources Development Act 
of 1986, P.L. 99-662, Sec. 401. 
Section 205, P.L. 80-858. Authorized 
by Asst. Sec. of the Army 
(CW), 10/14/88. 
H. Doc. 602, 79th Cong., 2d sess. 
H. Doc. 170, 85t Cong., 1st sess. 
Section 14, PL 79-526 
WHITE RIVER BASIN 
(LITTLE ROCK DISTRICT) 
(See Section 34 of text) 
June 28, 1938 
August 18, 1941 
September 3, 1954 
October 23, 1962 
Approved comprehensive plan for White River Basin: 
Lone Rock Lake, AR, Norfork Lake, AR, 
Clearwater Lake, MO, Water Valley Lake, AR, 
Bell Foley Lake, AR, Greers Ferry Lake, AR, 
and White River emergency. 
Modified comprehensive plan to include Bull Shoals Lake, 
AR, and MO, Table Rock Lake, MO, and AR, and Norfork 
Lake, AR, and MO (power). 
Authorized power in Greers Ferry Reservoir and added 
Beaver Lake to the plan. 
Authorizing clearing and straightening of channel for Village 
Creek, Jackson and Lawrence Counties. 
Flood Control Com. Doc 1, 75th 
Cong., 1st sess. 
H. Doc. 917, 76th Cong., 3d sess. 
H. Doc. 290, 77th Cong., 1st sess. 
H. Doc. 499, 83d Cong., 2d sess. 
H. Doc 352, 87th Cong., 2d sess. 
37-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Table 37-B (Continued) Authorizing Legislation 
Date of 
Authorizing Act Project and Work Authorized Documents 
March 1, 1974 
May 11, 1962 
October 22, 1976 
June 30, 1948 
TABLE 37-C 
Authorizing highway bridge construction across Norfork 
Lake 
Environmental restoration of wetlands and fish and wildlife 
resources in the White River Basin. AR and MO. 
(See Section 33 of text.) 
White River Fish Hatchery, Arkansas provides for trout 
production facilities downstream from Beaver Dam. 
White River, Batesville, AR. 
(See Section 35 of text.) 
Other Authorized Navigation I 
Flood Control Com. Doc. 1, 75t 
Cong., 1st sess. 
Senate Report 102-344; Energy & 
Water Development Appropriations 
Act, 1993, PL 102-377 
Water Resources Development Act 
of 1976, P.L. 94-587, Sec. 105. 
Section 205, P.L. 80-858, construction 
be approved by ASA (CW). 
'roiects 
For Last Federal Cost thru Sept. 30, 1999 
Full Report 
See Annual Operation and 
Project Report For Construction Maintenance 
Arkansas River, Little Rock Slackwater Harbor, AR 1988 $736,869 
Black River, AR and MO 2 1950 80,000 $930,324 
Current River, AR and MO 2 1964 17,0003 132,178 
Upper White River, AR 45 1952 83,197 1,788,374 
White River, AR (above Peach Orchard Bluff)2,3 1950 - 785,666 
White River, Jacksonport, AR6 1984 43,110 
1. Completed. Authorized by Chief of Engineers under authority of Sec. 107, 1960 R 8 H Act, as amended, (P.L.86-645). 
2. Channel adequate for existing commerce; completion not contemplated . 
3. Includes $7,000 for previous project. 
4. Federal operation and maintenance terminated June 30, 1952, due to lack of commerce. Facilities at Locks and Dams Nos. 1,2, and 3 disposed of in accordance 
with authority in Public Law 996, 84th Congress. 
5. Completed. 
6. Responsibility for maintenance of project downstream from Newport, AR; transferred to Memphis District in FY 62. 
37-22

LITTLE ROCK, AR DISTRICT 
TABLE 37-E Other Authorized Flood Control Projects 
For Last Cost to Sept. 30, 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Bell Foley Lake, White River, ARI Inactive 
Black River, Butler County Road 607, MO Completed 
Black River, Poplar Bluff, MO, to Knobel, AR Completed 
Butler County Drainage District 3, MO Completed 
Carden's Bottom Drainage District No. 2, Completed 
Arkansas River, AR 
Cato Springs, Fayetteville, AR Completed. 
Clarksville, AR Completed 
Conway County Drainage and Levee District Completed 
District No. 1, Arkansas River, AR 
Conway County Levee Districts Nos. 1, Completed 
2, and 8, Arkansas River, AR 
Conway County Levee District No. 6, Completed 
Arkansas River, AR 
Crawford County Levee District, AR Completed 
Crawford County Levee District, Arkansas Completed 
River, AR 
Crooked Creek, Harrison, AR Completed 
Curia Creek Drainage District, Completed 
Independence County, AR 
East Poplar Bluff and Poplar Bluff, MO Completed 
Faulkner County Levee District No. 1, Completed 
Arkansas River, AR 
Fort Smith, Arkansas River, AR Completed 
From North Little Rock to Gillett, AR Completed 
(above Plum Bayou) 
Fourche Creek, Little Rock, AR2 Cancelled 
Jackson County Levee District 2 Completed 
White River, AR 
Little Massard Creek, Fort Smith, AR Completed 
Little Red River District 1, AR Completed 
Little Red River, White County Road Completed 
Bridge, Judsonia, AR 
Little Rock Levee, AR, East End Completed 
Fourche Bayou, AR 
McLean Bottom Levee District No. 3, Completed 
Arkansas River, AR 
Near Dardanelle, Arkansas River, AR Completed 
Newport, White River, AR Completed 
North Little Rock, Arkansas River, AR Completed 
Otter Creek and Tributaries Completed 
Shannon Hills, AR 
Petit Jean River, AR Completed 
Petit Jean River, AR Completed 
Pine Mountain Lake, AR3 Inactive 
Point Remove Levee and Drainage Completed 
District, Conway County, AR 
Red River, 1-30, Little River Co., AR Completed 
Red River, Hwy. 31, Little River Co., AR Completed 
Roland Drainage District, Arkansas River, AR Completed 
Rolling Fork River, Sevier County, AR Completed 
TABLE 37-E (Cont.) Other Authorized Flood 
1975 
1985 
1958 
1983 
1951 
1996 
1962 
1959 
1952 
1952 
1983 
1954 
1995 
1983 
1958 
1941 
1951 
1954 
1973 
1986 
1983 
1988 
1983 
1975 
1950 
1953 
1941 
1958 
1987 
1966 
1991 
1985 
1983 
$1,432,116 
44,500 
84,315 
42,172 
919,955 
426,000 
271,717 
187,440 
1,018,840 
390,952 
53,506 
2,001,820 
1,245,000 
117,898 
304,699 
99,511 
1,077,546 
845,300 
22,890 
131,699 
198,096 
28,968 
63,355 
1,901,899 
422,549 
198,069 
314,276 
512,001 
162,204 
84,350 
88,379 
1,432,331 
86,943 
1992 
1992 
1950 
1983 
Control 
119,897 - 
144,828 - 
269,907 - 
64,500 - 
Projects 
37-23 
v

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
For Last Cost to Sept. 30, 1999 
Full Report 
See Annual Operation and 
Project Status Report For Construction Maintenance 
Skaggs Ferry, Black River, AR Completed 1941 81,023 - 
South Bank, Arkansas River (Head Fourche Completed 1964 1,404,852 - 
Island to Pennington Bayou), AR 
South Bank, Arkansas River, Little Rock to Completed 1961 409,115 - 
Pine Bluff, AR, Tucker Lakes 
Swan Creek Bank Stab., Taney County, MO Completed 1986 76,800 - 
Van Buren, Arkansas River, AR Completed 1952 438,222 - 
Village Creek, White River, and Mayberry Completed 1972 1,567,156 - 
Levee Districts, AR4 
Village Creek, Jackson and Inactive 1977 510,217 - 
Lawrence Counties, AR5 
West of Morrilton, Arkansas River, AR Completed 1962 1,269,959 - 
White River, at Hwy 14, /4 mile east Completed 1981 214,308 - 
of Oil Trough, AR 
White River Bank Stab., Batesville, AR Completed 1986 101,100 - 
White River, Batesville Water TowerSec 14, AR Completed 1999 473,000 - 
White River, Jacksonport, AR6 Completed 1987 293,567 - 
White River, Newport, AR Completed 1989 93,929 - 
White River, St. Paul, AR Completed 1990 22,400 - 
1. Reclassified as inactive in Jun '77; reviewed & deferred in May '85; funded for reevaluation (draft report dated Sep '89). 
2. Construction of project cancelled because local interests failed to provide right-of-way for construction and maintenance. 
3. Reclassified as inactive in Jul '85. 
4. See H Doc 577.87th Cong for description. 
5. Reclassified in Jun '77: local interests unable to meet local cooperation requirements; funded for reevaluation in FY 89; recommended to be placed in 
the inactive status. 
6. Design deficiency correction to be completed 30 December 1996. 
TABLE 37-G Deauthorized Projects 
For Last Funds Expended 
Full Report 
See Annual Date Federal Contributed 
Project Report For Authority Deauthorized Funds Funds 
Crooked Creek Lake 1969 1990 
& Levee, AR 
Lone Rock, Buffalo 1959 1977 $130,653 
River, AR 
Prosperity Lake, MO 1989 864,000 
Water Valley, Eleven 1959 1977 414,011 
Point River, AR & MO 
37-24

TABLE 37-H ARKANSAS RIVER BASIN; AR, OK, AND KS: NAVIGATION 
(See Section 1 of Text) 
Miles Elevation Depth on Miter 
Up- Upper Year 
stream Lock Pool Type of Opened to Total 
from Miles to Dimension Lift (feet, Upper Lower Character of Kind of Construc- Naviga- Estimated 
Feature Mouth Nearest Town (feet) (feet) MSL) (feet) (feet) Foundation Dam tion tion Cost 
LITTLE ROCK DISTRICT 
Norrell Lock and Dam 
No.1 
Entrance Channel 
Lock No. 2 
Wilbur D. Mills Dam 
(No. 2) 
Joe Hardin Lock and 
Dam No. 3 
Emmett Sanders Lock 
and Dam (No. 4) 
Lock and Dam No. 5 
David D. Terry Lock 
and Dam (No. 6) 
Murray Lock and Dam 
(No. 7) 
Toad Suck Ferry 
Lock and Dam (No. 8) 
Arthur V. Ormond 
Lock and Dam (No. 9) 
Dardanelle Lock and 
Dam (No. 10) 
Lock and Dam No. 11 
8 east of AR 
Post, AR 
First 10.3 miles 
of system 
6 east of AR 
Post, AR 
3 southeast of 
AR Post, AR 
5 north of 
Grady, AR 
7 east of Pine 
Bluff, AR 
4 southeast of 
Redfield, AR 
12 southeast of 
Little Rock, AR 
6 northwest of 
Little Rock, AR 
6 west of 
Conway, AR 
3 southwest of 
Morrilton, AR 
2 northwest of 
Dardanelle, AR 
Deleted 
110by600 30max 
20 nom 
110 by 600 
28 max 
llO by 600 20 
ll0 by 600 14 
ll0 by 600 17 
110 by 600 18 
ll0 by 600 18 
ll0 by 600 16 
110 by 600 
110 by 600 
19 
54 
142 
162 
182 
196 
213 
231 
249 
265 
284 
338 
16 15 
18 14 
18 
18 
18 
18 
18 
18 
18 
18 
14 
14 
14 
14 
14 
14 
14 
14 
1967 $22,472,000 
$43,649,000 
1967 $70,266,000 
1968 
1968 $38,040,000 
1968 $45,246,000 
1968 $31,710,000 
1968 $69,086,000 
1969 $46,076,000 
1969 $57,831,000 
1969 $37,798,000 
1969 $84,270,124 
Ht-4 
0
C, 
H
Hl

TABLE 37-H Cont. ARKANSAS RIVER BASIN; AR, OK, AND KS: NAVIGATION 
(See Section 1 of Text) 
Miles Lock Elevation Depth on Miter Type of Total 
Up- Miles to Dimension Lift Upper Upper Lower Character of Kind of Construc- Year Estimated 
Feature stream Nearest Town (feet) (feet) Pool (feet) (feet) Foundation Dam tion Opened to Cost 
Ozark-Jeta Taylor 
Lock and Dam 
(No. 12) 
James W. Trimble 
Lock and Dam 
(No. 13) 
TULSA DISTRICT 
James W. Trimble 
Lock and Dam 
(No. 13) 
W. D. Mayo Lock 
and Dam (No. 14) 
Robert S. Kerr Lock 
and Dam (No. 15) 
Webbers Falls Lock 
and Dam (No.16) 
Chouteau Lock and 
Dam (No. 17) 
Newt Graham Lock 
and Dam (No.18) 
1 east of 
Ozark, AR 
110 by 600 34 372 
7 east of 
S110 by Fort Smith, AR 600 
4 east of 
Redland, OK 
20 392 
18 15 
18 14 
1969 $85,629,412 
1969 $58,816,000 
1970 $6,858,000 
1970 $32,655,000 
1970 $94,578,237 
1970 $83,738,277 
1970 $31,619,000 
1970 $44,355,000 
110 by 600 20 412 14 15 
1 north of 
Cowlington, 110 by 600 OK 
1 northwest of 
Gore, OK 
4 northwest of 
Okay, OK 
8 southwest of 
Inola, OK 
48 
110 by 600 30 
110 by 600 
110 by 600 
21 
460 18 14 
490 19 16 
511 
21 532 
15 14 
15 14 
w
J1 
No 
0
O
03 
O
O
r
0
0
P
o
\T1

TABLE 37-H Cont. ARKANSAS RIVER BASIN; AR, OK, AND KS: NAVIGATION 
(See Section 1 of Text) 
Additional features entering into cost of project 
Little Rock District: 
Bank stabilization and channel rectification, mile 33.7 to 362 and 
Arkansas-White Cutoff, 100 percent complete ............ $119,300,184 
Maintenance and repair fleet and marine terminals, 
complete............................................. 10,247,000 
Total, Little Rock District ............................ 814,362,720 
Navigation aids (U.S. Coast Guard) ............................ 2,268,000 
Tulsa District 
Bank stabilization and channel rectification, Short Mountain 
to Fort Smith, complete.. ........................ 12,700,038 
Maintenance and repair fleet and marine terminals, 
complete ...................................................... 2,750,000 
Subtotal ...................................... $309,253,552 
Upstream Lakes: 
Oologah, 90.2 miles upstream from mouth, Verdigris River 
complete .......................................... $ 46,722,329 
Keystone, 638.8 miles upstream from mouth, Arkansas River, 
complete ..................... ......... ............. 123,170,773 
Eufaula, 27 miles upstream from mouth, Canadian River, 
complete....... .............................. 124,130,747 
Subtotal ................................................... 294,023,849 
Total, Tulsa District ............................. 603,277,401 
Total Project Cost 96 percent complete........ $ 1,419,908,121 
1. Navigation mileage from mouth of White River, except Dam No. 2, is 40.5 miles above mouth of Arkansas River. 
2. Details in Tulsa District report. 
tJ 
;1 
HH 
�3 
c
CH-) 
.

TABLE 37-I ARKANSAS RIVER BASIN; AR, OK, AND KS: LAKES 
(See Section 1 of Text) 
Miles Drainage Height Reservoir Power Year or 
Above Area of Dam Capacity Development Percent Total Estim 
Lake and State River Mouth Nearest Town (sq mi) (feet) Type (acre-feet) (kilowatts) Complete Cost 
Blue Mountain, AR Petit Jean 74.4 Paris, AR 488 115 Earthfill 257,900 --- 1947 $ 5,069 
Canton, OK North Canadian 384.3 Canton, OK 12,483 68 Earthfill 383,300 --- 1948 11,209 
Elk City, KS Elk 8.7 Independence, KS 634 107 Earthfill 284,300 --- 1966 19,052 
(Table Mound) 
Eufaula, OK Canadian 27.0 Eufaula, OK 47,522 114 Earthfill 3,798,000 90,000 1964 123,795 
Fall River, KS Fall 54.2 Fall River, KS 585 94 Earthfill 256,400 --- 1949 10,550 
Fort Gibson, OK Grand (Neosho) 7.7 Fort Gibson, OK 12,492 110 Concrete- 1,284,400 45,000 1953 43,821 
Keystone, OK Arkansas 538.8 Sand Springs, OK 74,506 121 gravity 1,836,500 70,000 1964 123,171 
Markham Ferry, OK Grand (Neosho) 47.4 Pryor, OK 11,533 90 Earthfill 444,500 100,000 1968 6,908 
Neodesha, KS Verdigris 222.8 Neodesha, KS 1,152 74 Earthfill 90,000 --- 0 97 
Nimrod, AR Fourche La Fave 62.6 Plainview, AR 680 103 Earthfill 336,010 --- 1942 4,092 
Oologah, OK Verdigris 90.2 Claremore, OK 4,339 137 Concrete- 1,519,000 --- 1974 37,029 
0 Pensacola.OK Grand (Neosho) 77.0 Disney, OK 10,298 147 gravity 2,197,000 86,400 1940 52 
Tenkiller Ferry, OK Illinois 12.8 Gore, OK 1,610 197 Earthfill 1,230,800 34,000 1953 25,963 
Toronto, KS Verdigris 271.5 Toronto, KS 730 90 Concrete arch 199,700 --- 1960 13,896 
Wister, OK Poteau 60.9 Wister, OK 993 99 Earthfill 427,900 --- 1949 10,687 
Subtotal, exclusive of Eufaula, Keystone, and Oologah. 151,403 
Arkansas River Basin; AR, OK and KS; Navigation (Table 28-H). 1,419,908 
Total, Arkansas River Basin, 96 percent complete. 1,571,312 
1.Project includes facilities for production of hydroelectric power. 
2.Cost included in navigation project. 
3.Details in Tulsa District report. 
4.Constructed by State of Oklahoma under the name of Robert S. Kerr Dam (Lake Hudson). Estimate shown is for Federal participation. 
5.Inactive. Estimate is based on 1954 price levels. 
6.Constructed by State of Oklahoma under the name Grand River Dam (Lake O The Cherokees). Estimate shown is for Federal participation. 
sated 
0 
),974 0 
,834 - 
!,990 
,907 
,873 
,405 
,173 b' 
,756 O 
,910 
,826 
,928 > 
,126 
,540 O 
,324 Z 
,439 n
C 
,997 4
O 
,121 m 
,118 0
C) 
O 
\o 
\0r

1. Project is reported separately herein. 
1. For details see individual reports. 
2. Inactive - placed in a deferred status in May 1985. Estimate based on 1983 price levels. 
TABLE 37-J LITTLE RIVER BASIN, AR: LAKES 
(See Section 26 of Text) 
Project River Site Nearest Town 
DeQueen Lake Rolling Fork River 22.8 DeQueen, AR 
Gillham Lake Cossatot River 49 Gillham, AR 
Dierks Lake Saline River 56.6 Dierks, AR 
Millwood Lake Little River 16 Millwood, AR 
HH 
H
O
C
Hi H3 
TABLE 37-K WHITE RIVER BASIN; AR, AND MO: LAKES 
(See Section 34 of Text) 
Miles Drainage Height Reservoir Power 
Above Area of Dam Capacity Development Total Estimated 
Lake River Mouth Nearest Town (sq mi) (feet) Type (acre-feet) (kilowatts) Cost 
Beaver' White 609 Eureka Springs, AR 1,186 228 Concrete-gravity & earthfill 1,952,000 112,000 $ 52,631,472 
Bell Foley2 Strawberry 27.2 Poughkeepsie, AR 519 136 Concrete-gravity & earthfill 518,000 ---- 93,700,000 
Bull Shoals' White 418.6 Mountain Home, AR 6,036 258 Concrete-gravity 5,408,000 340,000 96,356,000 
Clearwater' Black 257.4 Piedmont, MO 898 154 Earthfill 413,000 ---- 22,462,553 
Greers Ferry' Little Red 79.0 Heber Springs, AR 1,146 243 Concrete-gravity 1,844,000 96,000 55,125,000 
Norfork' North Fork 4.8 Norfork, AR 1,806 216 Concrete-gravity 1,983,000 80,550 111,624,000 
Table Rock' White 523.8 Branson, MO 4,020 252 Concrete-gravity & earthfill 3,462,000 200,000 71,233,000 
Total 15,580,000 828,550 503,132,025

TULSA, OK, DISTRICT *
TULSA, OKLAHOMA, DISTRICT 
The civil works boundry of the Tulsa District includes 
an area of approximately 160,000 square miles covering 
Oklahoma and parts of Kansas and Texas within 
the Arkansas and Red River Basins. The District's 
responsibilities within the Arkansas River Basin cover 
southern Kansas, northern Oklahoma, and the Texas 
Panhandle. These areas are included in the drainage 
basin of the Arkansas River and its tributaries above 
the mouth of the Poteau River, extending to the Kansas- 
Colorado State line, exclusive of that portion of the 
South Canadian River Basin and its tributaries west of 
the Texas-New Mexico State line. The District's responsibilities 
within the Red River Basin cover the northern 
portion of Texas, and the southern portion of Oklahoma. 
These areas are embraced in the drainage basin of the 
Red River and its tributaries above Index, Arkansas. 
IMPROVEMENTS 
1. McClellan-Kerr Arkansas River 
Navigation System, OK 
2. Other Authorized Navigation Projects 
Flood Control 
3. Arcadia Lake, OK 
4. Arkansas City, KS 
5. Arkansas-Red River Basins Chloride 
Control Projects, KS, OK, and TX 
5a. Area V, Estelline Springs, TX 
5b. Area VIII, TX 
5c. Red River Basin Chloride 
Control, TX & OK 
6. Birch Lake, OK 
7. Bowie County Levee, TX 
8. Candy Lake, OK 
9. Canton Lake, OK 
10. Copan Lake, OK 
11. Council Grove Lake, KS 
12. El Dorado Lake, KS 
13. Elk City Lake, KS 
14. Fall River Lake, KS 
15. Fort Supply Lake, OK 
16. Fry Creeks, Bixby, OK 
17. Great Bend, KS 
18. Great Salt Plains Lake, OK 
19. Halstead, KS 
20. Heyburn Lake and Polecat Creek, OK 
38-2 
38-2 
38-2 
38-3 
38-3 
38-3 
38-3 
38-4 
38-4 
38-4 
38-4 
38-5 
38-5 
38-5 
38-5 
38-6 
38-6 
38-6 
38-6 
38-6 
38-6 
38-7 
38-7 
21. Hugo Lake, OK 
22. Hulah Lake, OK 
23. John Redmond Dam and Reservoir, KS 
24. Kaw Lake, OK 
25. Lake Kemp, TX 
26. Lake Wichita, Holliday Creek, TX 
27. Marion Reservoir, KS 
28. McGrath Creek, Wichita Falls, TX 
29. Mingo Creek, OK 
30. Oologah Lake, OK 
31. Optima Lake, OK 
32. Parker Lake, OK 
33. Pat Mayse Lake, TX 
34. Pearson-Skubitz Big Hill Lake, KS 
35. Pine Creek Lake, TX 
36. Sardis Lake, OK 
37. Skiatook Lake, OK 
38. Toronto Lake, KS 
39. Tulsa & West Tulsa Levees, OK 
40. Waurika Lake, OK 
41. Winfield, KS 
42. Wister Lake, OK 
43. Other Authorized Flood Control Projects 
44. Inspection of Completed Local 
Flood Protection Projects 
45. Scheduling Flood Control 
Reservoir Operations 
46. Emergency Flood Control Activities 
47. Flood Control Work Under 
Special Authorization 
38-1 
Navigation Page 
38-7 
38-7 
38-7 
38-8 
38-8 
38-8 
38-8 
38-8 
38-8 
38-9 
38-9 
38-9 
38-9 
38-10 
38-10 
38-10 
38-10 
38-10 
38-11 
38-11 
38-11 
38-11 
38-12 
38-12 
38-12 
38-12 
38-12

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Multiple-Purpose Projects Including Power Tables 
48. Broken Bow Lake, OK 
49. Eufaula Lake, OK 
50. Fort Gibson Lake, OK 
51. Keystone Lake, OK 
52. Lake Texoma (Denison Dam), OK & TX 
53. Robert S. Kerr Lock and Dam 
and Reservoir, OK 
54. Tenkiller Ferry Lake, OK 
55. Webbers Falls Lock and Dam, OK 
38-12 
38-12 
38-13 
38-13 
38-13 
38-13 
38-14 
38-14 
General Investigations 
56. Surveys 
57. Collection and Study of Basic Data 
38-14 
38-14 
38-A Cost and Financial Statement 
38-B Authorizing Legislation 
38-C Other Authorized Navigation Projects 
38-D Not Applicable 
38-E Other Authorized Flood Control 
Projects 
38-F Not Applicable 
38-G Deauthorized Projects 
38-H Arkansas River Basin 
Multiple-Purpose Plan 
38-I Inspection of Completed Local 
Flood Protection Projects 
38-J Flood Control Work Under 
Special Authorization 
38-K General Investigations 
Navigation 
1. McCLELLAN-KERR ARKANSAS 
RIVER NAVIGATION SYSTEM 
(Tulsa District Portion), OK. 
Location. The Tulsa District portion of the 
McClellan-Kerr Arkansas River Navigation System 
provides a navigation route up the Arkansas River 
from the Oklahoma-Arkansas State line to the head of 
navigation at Catoosa, OK, near Tulsa, OK. The total 
length of the Tulsa District portion of the system is 
137 navigation miles. Descriptions and costs for the 
entire navigation system can be found in Little Rock 
District's entry in this Annual Report. 
Existing projects. The McClellan-Kerr Arkansas 
River navigation project is a component of the multiple-
purpose plan for the Arkansas River Basin which 
provides for the improvement of the basin through the 
construction of coordinated developments for navigation, 
hydroelectric power, flood control, water supply, 
water quality control, sediment control, recreation, 
and fish and wildlife propagation. The McClellan- 
Kerr project also includes bank stabilization, channel 
straightening, and cutoffs as required. The navigation 
channel has a minimum depth of 9 feet and 
minimum widths of 250 feet on the Arkansas River 
and 150 feet on the Verdigris River. The Tulsa 
District portion of the navigation system consists of 
Arkansas River Bank Stabilization and Channel Rectification, 
Chouteau Lock and Dam, Newt Graham 
Lock and Dam, Robert S. Kerr Lock and Dam and 
Reservoir, Robert S. Kerr Marine Terminal, Sans Bois 
Navigation Channel, W.D. Mayo Lock and Dam, Webbers 
Falls Lock and Dam, and the pool in Oklahoma 
which was created by Lock and Dam 13 in Arkansas. 
The other parts of the multiple-purpose plan for the 
Arkansas River Basin are listed in Table 29-H. 
Local cooperation. Fully complied with. 
Terminal facilities. Public port facilities are in 
operation at Muskogee and Catoosa, OK, and at Fort 
Smith, AR. Other private commercial port facilities 
are complete and in operation at eight Oklahoma 
locations. 
Operations and results during fiscal year. A 
new electrical feeder line to Chouteau Lock and Dam 
was installed to provide a dependable power supply. A 
contract to construct a new dredge disposal area 
upstream of the Chouteau Lock was awarded in August 
1998, and will be completed in early FY 99. A 
contract to replace the tainter gate hoist cables at 
W.D. Mayo Lock and Dam was awarded in September 
1998 and will be completed in FY 99. Routine operation 
and maintenance continued. 
2. OTHER AUTHORIZED NAVIGATION 
PROJECTS. 
See Table 38-C. 
Flood Control 
3. ARCADIA LAKE, OK. 
Location. On the Deep Fork River, at river mile 
218.3, in the metropolitan area of Oklahoma City and 
Edmond, OK, about 1.5 miles west of Arcadia, in 
38-2 
38-15 
38-24 
38-27 
38-27 
38-28 
38-28 
38-29 
38-30 
38-30

TULSA, OK, DISTRICT 
Oklahoma County, OK. (See Arcadia, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. The plan of improvement provides 
for flood control, water supply, and recreation 
by construction of an earthfill dam approximately 102 
feet high and 5,250 feet long with a high-level uncontrolled 
spillway. Outlet works consist of a gated tower 
and conduit. The lake has a total capacity of 92,000 
acre-feet (27,380 for conservation, 64,430 for flood 
control, and 190 for sedimentation reserve), and controls 
a 105-square-mile drainage area. Construction 
began in October 1980, and the project became operational 
for flood control in November 1986. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
4. ARKANSAS CITY, KS. 
Location. Arkansas City is located approximately 
4 miles north of the Kansas-Oklahoma state line at 
the crossroads of U.S. Highway's 77 and 166, in 
Cowley County, KS, immediately northwest of the 
confluence of the Arkansas and Walnut Rivers. 
Existing project. The project consists of raising 
and extending approximately 6 miles of levee along 
the Arkansas and Walnut Rivers, and rechanneling 
approximately 2-1/2 miles of the Walnut River. Structural 
steel gates will be constructed at two railroad/ 
river crossings and stoplog structures will be constructed 
at two U.S. Highway/river crossings. 
Local cooperation. A Project Cooperation Agreement 
was signed on September 4, 1996. The city of 
Arkansas City, the local sponsor, are currently fulfilling 
their requirements. 
Operations and results during fiscal year. 
Phase I construction is complete. Phase II will begin 
in FY 00. 
5. ARKANSAS-RED RIVER BASINS 
CHLORIDE CONTROL PROJECTS, 
KS, OK, AND TX. 
Location. On certain tributary streams of the 
Arkansas and Red Rivers in the western half of the 
Tulsa District. 
Existing project. The project was initiated as a 
result of studies involving the control of water pollution 
caused by 15 natural salt sources identified in 
1957 by the U.S. Public Health Service. The Arkansas 
and Red Rivers are major national and regional water 
resources which are severely limited due to poor 
water quality primarily caused by the natural pollutant, 
sodium chloride. The Arkansas River is polluted 
by five naturally occurring salt sources located in 
northwestern Oklahoma and southwestern Kansas. 
The Red River Basin is polluted by 10 naturally 
occurring salt sources located in northwestern Texas, 
and southwestern Oklahoma. Preliminary Feasibility 
Studies included the construction and subsequent 
maintenance of an injection well and a ring dike used 
for data collection. Preauthorization studies completed 
in 1966 and 1970 recommended construction of 
project features at 13 of the 15 chloride emission 
areas. For a detailed discussion of the chloride control 
projects, see page 19-4 of the Annual Report for 1983. 
The Water Resources Development Act of 1986 (PL 
99-662) authorized the Red River Basin and the Arkansas 
River Basin as separate projects with separate 
authority under Section 203 of the Flood Control Act 
of 1966. The Arkansas River portion of the project was 
deferred in 1982 (not economically justified). 
5a. AREA V, ESTELLINE SPRINGS, TX. 
Location. Chloride Control Area V is located about 
0.5 mile east of Estelline, TX, on the Prairie Dog Town 
Fork of the Red River. 
Existing project. For a description of the completed 
improvement, see the Annual Report for 1987. 
Construction started in 1963, and the structure was 
completed in 1964. 
Local cooperation. Descriptive text concerning 
local cooperation requirements is given on page 19-5 
of the Annual Report for 1983. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
5b. AREA VIII, TX. 
Location. Chloride Control Area VIII is located at 
river mile 74.9, of the South Fork of the Wichita River, 
in King County, TX, about 5 miles east of Guthrie, TX. 
Existing project. The plan of improvement consists 
of a low-flow brine collection dam (the Bateman 
Low-Flow Dam) with attendant pumping station and 
pipeline facilities. The collected brine is pumped to 
the storage reservoir behind the Truscott Brine Dam. 
This brine dam, located at river mile 3.6 on Bluff 
Creek (a tributary of the North Fork of the Wichita 
River) about 3 miles northwest of Truscott, TX, contains 
collected brine from Area VIII and will contain 
brine collected in the future from Area X. Construction 
was initiated at Area VIII and Truscott Brine 
38-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Dam in 1976. The Bateman Low-Flow Dam was 
completed and put into full operation in May 1987. 
Local cooperation. Descriptive text concerning 
local cooperation requirements is given on page 19-5 
of the Annual Report for 1983. 
Operations and results during fiscal year. 
Microwave towers for the pipeline were installed. 
Routine operation and maintenance continued. 
5c. RED RIVER BASIN CHLORIDE 
CONTROL, TX & OK. 
Location. The project is located in Cottle, Hall, and 
King Counties, TX, and Harmon County, OK, along 
the Wichita and Red Rivers. Area VI is located on the 
Elm Fork of the Red River in Harmon County, OK; 
Area VII is on the North Fork of the Wichita River, 
Cottle County, TX; Crowell Brine Dam is on Canal 
Creek, a tributary of the Pease River; Area IX is on the 
Middle Pease River, Cottle County, TX; Area X is on 
the Middle Fork of the Wichita River, King County, 
TX; and Areas XIII-XIV are on the Jonah and Salt 
Creeks of Prairie Dog Town Fork of the Red River, 
Hall County, TX. 
Existing project. The plan of improvement consists 
of one deep-well injection system, three brine 
storage reservoirs, four low-flow brine collection dams, 
two well collection facilities, six pumping plants, and 
56.3 miles of pipeline. Construction was completed at 
the Area X, low-flow dam, pump station and access 
road in March 1994. A Limited Reevaluation Report 
containing a project economic reevaluation was approved 
in November 1993. 
Local Cooperation. Section 1107 of the Water 
Resources Development Act of 1986 authorized the 
project at full Federal expense. The Red River Authority 
of Texas has signed a 221 Agreement as the 
non-Federal sponsor. 
Operation and results during fiscal year. Estimated 
total cost of the project is $241,500,000 (October 
1997 price level base). A draft Supplement to the 
Final Environmental Impact Study (SFEIS) was submitted 
for public review in May 1995. Finalization of 
the SFEIS has been put on hold indefinitely and the 
Assistant Secretary of the Army for Civil Works directed 
that a reevaluation of the Wichita River Basin 
be performed with available funding. 
6. BIRCH LAKE, OK. 
Location. On Birch Creek at river mile 0.8, about 
1.5 miles south of Barnsdall, in Osage County, OK. 
(See Barnsdall, OK, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see the Annual Report for 1979. 
Construction began in November 1973, and the project 
was placed in useful operation in March 1977. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
7. BOWIE COUNTY LEVEE, TX. 
Location. Bowie County is located in northeastern 
Texas, along the Red River, near Texarkana, Texas. 
The Bowie County Levee is situated on the south side 
of the Red River and extends almost 9 miles from the 
Kansas City Southern Railroad embankment westward 
to an area near Wamba, Texas. (See Wamba, 
TX, Gelogical Survey map, scale 1:24,000.) 
Existing project. The project, as authorized under 
the Flood Control Act of 1946, provides for the rehabilitation 
of the existing Bowie County, Texas, Levee. 
The levee was constructed in 1913 by the Bowie 
County Levee District No. 1. The Bowie County Levee 
is part of a levee system which includes the Miller 
County Levee that extends downstream approximately 
35 miles. The existing Bowie County Levee does not 
meet current design standards and has not received 
proper maintenance. Studies completed in 1994 indicated 
that no economically feasible flood control alternative 
was identified and Federal interest in pursuing 
detailed design and project construction was not warranted. 
Local cooperation. Additional legislation is required 
to allow the Government to build the levee 
proposed by the local sponsor. The Government has 
determined that this project will be cost-shared in 
accordance with the Flood Control Act of 1936. 
Operations and results during fiscal year. 
8. CANDY LAKE, OK. 
Location. On Candy Creek, a tributary of Bird 
Creek in the Verdigris River Basin, at river mile 1.9. 
The damsite is about 1.5 miles northeast of Avant in 
Osage County, OK. (See Avant, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. The plan of improvement provides 
for an earthfill dam about 4,200 feet long, 
including an uncontrolled concrete spillway, with a 
maximum height of 103 feet above the streambed. 
38-4

TULSA, OK, DISTRICT 
Outlet works will consist of a gated intake structure, 
a 10x11.25-foot conduit, and a stilling basin. An 
18x24-inch low-flow pipe and an 18-inch water supply 
pipe will be provided. The lake will have a total 
capacity of 75,420 acre-feet (44,160 for conservation 
and sediment reserve and 31,260 for flood control). 
The drainage area above the damsite is 43 square 
miles. Candy Lake will be operated as a unit of a 
seven-lake system for flood control in the Verdigris 
River Basin in Oklahoma. Construction began in 
September 1976. 
Local cooperation. Section 2 of the Flood Control 
Act of 1938, the Water Supply Act of 1958, and Section 
221 of the Flood Control Act of 1970, apply. 
Operations and results during fiscal year. In 
accordance with PL 99-662, 33 U.S.C. 579a 1001 
(b)(2), the Assistant Secretary of the Army for Civil 
Works submitted a list of projects for deauthorization 
to Congress on January 8, 1993. Certain projects from 
this list, including Candy, were deauthorized on 
July 9, 1995. Senator Don Nickles and Congressman 
Coburn are seeking legislation to return the lands to 
the original owners. 
9. CANTON LAKE, OK. 
Location. On the North Canadian River at river 
mile 394, about 2 miles north of Canton in Blaine 
County, OK. (See Canton, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 590 of the Annual 
Report for 1969. Construction began in December 
1940, and the project was placed in useful operation in 
April 1948. 
Local cooperation. The Canton Lake Committee 
was established to improve coordination and communication 
between the multi-purpose users of Canton 
Lake. The committee coordinates Oklahoma City's 
water supply release schedule with interested parties 
to minimize impacts.. 
Operations and results during fiscal year. 
Routine operation and maintenance continued. 
10. COPAN LAKE, OK. 
Location. On the Little Caney River, a tributary of 
the Caney River, in the Verdigris River Basin, at river 
mile 7.4, about 2 miles west of Copan in Washington 
County, OK. (See Copan, KS, Geological Survey map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-7 of the Annual 
Report for 1983. Copan Lake is operated as a unit of 
a seven-lake system for flood control in the Verdigris 
River Basin in Oklahoma. Construction began in 
November 1972, and the project was placed in useful 
operation in April 1983. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
11. COUNCIL GROVE LAKE, KS. 
Location. On the Grand (Neosho) River at river 
mile 450, about 1.5 miles northwest of Council Grove, 
in Morris County, KS. (See Council Grove Lake, KS, 
Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 519 of the Annual 
Report for 1969. Construction began in June 1959, 
and the project was placed in useful operation in July 
1964. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
12. EL DORADO LAKE, KS. 
Location. On the Walnut River, a tributary of the 
Arkansas River, at river mile 100.2, about 4 miles 
northeast of El Dorado in Butler County, KS. (See El 
Dorado, KS, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-7 of the Annual 
Report for 1983. El Dorado Lake was authorized as a 
unit of a three-lake system for flood control in the 
Walnut River Basin. Construction began in October 
1973, and impoundment began in June 1981. Project 
is complete. 
Local cooperation. By payment of $8.17 million 
on May 18, 1997, the Kansas Department of Wildlife 
and Parks has fully complied with the Local Cooperation 
Agreement. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
38-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
13. ELK CITY LAKE, KS. 
Location. On the Elk River at river mile 8.7, about 
7 miles northwest of Independence, in Montgomery 
County, KS. (See Table Mound, KS, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 593 of the Annual 
Report for 1969. Construction began in February 
1962, and the project was placed in useful operation in 
March 1966. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
14. FALL RIVER LAKE, KS. 
Location. On the Fall River at river mile 54.2, 
about 4 miles northwest of Fall River, in Greenwood 
County, KS. (See Severy, KS, Geological Survey map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 953 of the Annual 
Report for 1969. Construction began in May 1946, and 
the project was placed in full operation in April 1949. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
15. FORT SUPPLY LAKE, OK. 
Location. On Wolf Creek, a tributary of the North 
Canadian River, at river mile 5.5, about 12 miles 
northwest of Woodward, in Woodward County, OK. 
(See Fort Supply, OK, Geological Survey Map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 594 of the Annual 
Report for 1969. Construction began in October 1938, 
and the project was placed in full flood control operation 
in May 1942. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
16. FRY CREEKS, BIXBY, OK. 
Location. In the northern part of the city of Bixby, 
in Tulsa County, OK. 
Existing project. The project consists of enlarging 
both Fry Creeks, diverting Fry Creek 1 into Fry Creek 
2 and then diverting the combined creeks into the 
Arkansas River. The total length of the modified 
channels would total 4.3 miles, with bottom widths of 
30 to 225 feet and depths of 6 to 12 feet. Three bridges 
will be constructed and 20 acres of land has been 
acquired for mitigation of fish and wildlife losses. 
Local Cooperation. The Project Cooperation 
Agreement was signed with the city of Bixby, OK, in 
January 1995. 
Operations and results during fiscal year. Estimated 
total cost of the project is $13,540,000. In 
September 1996, construction efforts were initiated 
on this project and will be completed in FY 00. 
17. GREAT BEND, KS. 
Location. In Barton County, KS, on the north bank 
of the Arkansas River about 4.5 miles above its confluence 
with Walnut Creek. (See Great Bend, KS, Geological 
Survey map, scale 1:24,000.) 
Existing project. The plan, authorized by the 
Flood Control Act of 1965, provides for 6.2 miles of 
leveed channel to divert Walnut Creek flood flow 
around Great Bend into the Arkansas River upstream 
from the city; a 1.5-mile leveed channel to divert Little 
Walnut Creek flood flow into the Walnut Creek diversion 
levees along the Arkansas River; a tie-back levee 
4.3 miles long on the Arkansas River left bank upstream 
from the junction of the Walnut diversion 
channel; and appurtenant facilities. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. 
Financial closeout on this project was completed during 
FY 97. This project has been fully operational 
since June 1994. Estimated total cost of the project is 
$36,350,000 (October 1994 price level base). 
18. GREAT SALT PLAINS LAKE, OK. 
Location. On the Salt Fork of the Arkansas River 
at river mile 103.3, about 12 miles east of Cherokee, in 
Alfalfa County, OK. (See Jet, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 594 of the Annual 
Report for 1969. Construction of the project began in 
September 1938, and was completed in July 1941. The 
project was placed in full flood control operation in 
May 1941. 
38-6

TULSA, OK, DISTRICT 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
19. HALSTEAD, KS. 
Location. In the city of Halstead, in Harvey County, 
KS, along the Arkansas River. (See Halstead, KS, 
Geological Survey Map, scale 1:24,000.) 
Existing project. Provides for channel modification 
and construction of about 4 miles of levee in 
combination with straightening and widening approximately 
3.6 miles of the Little Arkansas River 
channel to a 50-foot-bottom width in the vicinity of 
Halstead. Channel modification will be restricted to 
one side of the channel except in transition areas. 
Tree planting and revegetation will be done and ten 
pool riffle areas will be established to minimize environmental 
impacts. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. The 
project is fully operational, however, the Corps is 
evaluating a construction contract claim on this project. 
This effort is expected to continue through the end of 
FY 00. 
20. HEYBURN LAKE AND POLECAT 
CREEK, OK. 
Location. On Polecat Creek, a minor tributary of 
the Arkansas River, at river mile 48.6, about 11 miles 
west of Sapulpa, in Creek County, OK. (See Lake 
Heyburn, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 599 of the Annual 
Report for 1969. Construction started in March 1948, 
and the project was placed in useful operation in 
October 1950. Channel improvements below the lake 
were completed in September 1952. 
Local cooperation. The channel improvement 
project below the lake was never maintained by the 
sponsor, Joint Drainage District No. 1, Tulsa and 
Creek Counties, OK. For this reason, the channel 
returned to its pre-project condition and does not 
provide flood protection for the affected area. The 
Corps of Engineers discontinued maintenance inspections 
of the channel project in 1982, due to the condition 
of the project and lack of cooperation on the part 
of the sponsor. 
Operations and results during fiscal year. 
Routine operation and maintenance continued. 
21. HUGO LAKE, OK. 
Location. On the Kiamichi River at river mile 17.6, 
about 7 miles east of Hugo, in Choctaw County, OK. 
(See Hugo Dam, OK, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-12 of the Annual 
Report for 1977. Construction began in October 1967, 
and the project was placed in useful operation in 
January 1974. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. 
Routine operation and maintenance continued. 
22. HULAH LAKE, OK. 
Location. On the Caney River at river mile 96.2, 
about 15 miles northwest of Bartlesville, near Hulah, 
in Osage County, OK. (See Bowring, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 595 of the Annual 
Report for 1969. Construction began in May 1946, and 
was completed in June 1950. The project was placed 
in full flood control operation in September 1951. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. A 
contract was awarded in July 1998 to repair an area 
on the downstream side of the embankment where 
slides were occurring. Routine operation and maintenance 
continued. 
23. JOHN REDMOND DAM AND 
RESERVOIR, KS. 
Location. The dam is located on the Grand (Neosho) 
River at river mile 343.7, about 2 miles northwest of 
Burlington, in Coffey County, KS. (See John Redmond 
Dam, KS, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 581 of the Annual 
Report for 1970. Construction was initiated in July 
1959, and was completed in December 1965. The 
project was placed in flood control operation in July 
1964. 
Local cooperation. Fully complied with. 
38-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Operations and results during fiscal year. 
Routine operation and maintenance continued. 
24. KAW LAKE, OK. 
Location. On the Arkansas River at river mile 
653.7, about 8 miles east of Ponca City, in Kay County, 
OK. (See Charley Creek West, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-13 of the Annual 
Report for 1977. Construction began in June 1966, 
and the project was placed in operation in May 1976. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
25. LAKE KEMP, TX. 
Location. On the Wichita River at river mile 126.7, 
about 40 miles southwest of Wichita Falls, TX. (See 
Northeast Lake Kemp, TX, Geological Survey Map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-14 of the Annual 
Report for 1977. Construction began in May 1970, and 
the project was placed in useful operation in October 
1972. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
26. LAKE WICHITA, HOLLIDAY 
CREEK, TX. 
Location. The project is located in Wichita and 
Archer Counties, TX. The Lake Wichita dam and the 
Holliday Creek channel are located in the city of 
Wichita Falls, TX. (See Wichita Falls, TX, Geological 
Survey Map, scale 1:24,000.) 
Existing project. The existing Lake Wichita dam 
was replaced with an earthen dam approximately 
16,000 feet long with a concrete spillway, an auxiliary 
spillway, and low-flow outlet works. Channel improvements 
along Holliday Creek from the new spillway 
to the Wichita River, a distance of 9.3 miles, were 
also constructed. 
Local cooperation. Fully compiled with. 
Operations and results during fiscal year. The 
project was completed October 1, 1996, and is fully 
operational. Estimated total project cost is $48,789,000 
(October 1995 price level base). 
27. MARION RESERVOIR, KS. 
Location. On the Cottonwood River at river mile 
126.7, about 3 miles northwest of Marion, in Marion 
County, KS. (See Pilson, KS, Geological Survey map, 
scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 597 of the Annual 
Report for 1969. Construction began in June 1964, 
and the project was placed in flood control operation 
in February 1968. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. A 
contract was awarded in December 1997 to replace the 
riprap on the upstream side of the embankment. The 
work began in July 1998 after the lake level was 
lowered, and the work was completed in FY 98. Routine 
operation and maintenance continued. 
28. MCGRATH CREEK, WICHITA 
FALLS, TX. 
Location. The project is located in the northern 
central portion of Texas, in the city of Wichita Falls. 
Existing project. McGrath Creek is approximately 
3,900 feet long and connects Sikes Lake and the 
recently constructed Holliday Creek project. The 
project involves realigning and concrete lining the 
McGrath Creek Channel, and constructing a new 
spillway to pass flows through Sikes Lake. 
Local cooperation. The city of Wichita Falls, TX, 
is the non-Federal sponsor. The Project Cooperation 
Agreement was executed in November 1994. 
Operations and results during fiscal year. 
Project construction is completed. Estimated total 
project cost is $13,520,000 (October 1996 price level 
base). 
29. MINGO CREEK, OK. 
Location. On the right-bank tributary of Bird 
Creek in the city of Tulsa, in Tulsa County, OK. (See 
Tulsa, OK, Geological Survey Map, scale 1:24,000.) 
Existing project. The recommended plan will 
consist of 23 detention sites, which would capture 
38-8

TULSA, OK, DISTRICT 
peak flows and hold them temporarily until downstream 
flows subside. There will be about 9.4 miles of 
channelization in selected locations on the tributaries 
and main stem of Mingo Creek. 
Local cooperation. In accordance with the cost 
sharing and financing concepts reflected in the Water 
Resources Development Act of 1986, the non-Federal 
sponsor must provide lands, easements, rights-ofway, 
and dredged material disposal areas; modify or 
relocate buildings, utilities, roads, bridges (except 
railroad bridges), and other facilities where necessary 
in the construction of the project; pay five percent of 
the costs allocated to flood control; and bear all costs 
of operation, maintenance, and replacement of flood 
control facilities. The non-Federal sponsor has also 
agreed to make all required payments concurrently 
with project construction. The local sponsor is the city 
of Tulsa, OK. The city has constructed 4.75 miles of 
channel and placed two excavated detention facilities 
into flood control operation prior to initiation of Federal 
construction in September 1988. The project is 
currently 95% complete. 
Operations and results during fiscal year. Reimbursement 
to date for work completed by the City of 
Tulsa is $19,000,000. Estimated total project cost is 
$119,200,000 (October 1997 price level base). Project 
completion is expected in FY 00. 
30. OOLOGAH LAKE, OK. 
Location. On the Verdigris River at river mile 
90.2, about 2 miles southeast of Oologah, in Rogers 
County, OK. (See Oologah, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-15 of the Annual 
Report for 1972. Construction began in July 1950, but 
the project was placed in standby status in October 
1951. Construction resumed in December 1955, and 
was completed in May 1963 for initial development. 
Construction for ultimate (second stage) development 
was initiated in July 1967, and was completed in 1974. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. 
Routine operation and maintenance continued. 
31. OPTIMA LAKE, OK. 
Location. On the North Canadian River at river 
mile 623.2, about 4.5 miles northeast of Hardesty, in 
Texas County, OK. (See Optima Dam, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the existing 
improvement, see page 19-16 of the Annual Report for 
1979. Construction began in March 1966, and impoundment 
began in October 1978. Construction was 
completed in 1981. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
32. PARKER LAKE, OK. 
Location. On Mtfddy Boggy Creek, a tributary of 
the Red River, about 23 miles east of Ada, in Coal 
County, OK. (See Parker, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. Parker Lake, if constructed, 
would be a multipurpose element in a plan of improvement 
for the Upper Muddy Boggy Creek Basin, OK. 
The project would consist of an earthfill dam about 
2,200 feet long, a gated outlet works for flood control 
and water supply, and a 100-foot-wide spillway. The 
lake created would have a total storage capacity of 
220,240 acre-feet and would yield 42 million gallons 
per day for municipal and industrial water supply. 
The project was authorized by the Water Resources 
Development Act of 1986. The project has not been 
funded for construction, however, a Limited Project 
Review of the project is scheduled to be completed in 
March 1998. Federal accomplishment of single purpose 
municipal and industrial water supply projects is 
not in accord with current Administration priorities. 
Local cooperation. The Oklahoma Water Resources 
Board, the sponsor, has agreed to cost share in 
the flood control portion of the project and the water 
supply provided enough interested users for the water 
supply can be identified. 
Operation and results during fiscal year. Estimated 
total project cost is $71,400,000 (October 1992 
price level base). 
33. PAT MAYSE LAKE, TX. 
Location. On Sanders Creek, a tributary of the Red 
River, at river mile 4.6, about 12 miles north of Paris, 
in Lamar County, TX. (See Grant, TX, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 584 of the Annual 
Report for 1970. Construction began in March 1965, 
38-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
and the project was placed in full flood control operation 
in September 1967. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
34. PEARSON-SKUBITZ BIG HILL 
LAKE, KS. 
Location. On Big Hill Creek at river mile 33.3, 
about 4.5 miles east of Cherryvale, KS. (See Dennis, 
KS, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-11 of the Annual 
Report for 1983. Construction began in April 1974, 
and impoundment began in March 1981. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
35. PINE CREEK LAKE, OK. 
Location. On the Little River at river mile 145.3, 
about 5 miles northwest of Wright City, in McCurtain 
County, OK. (See Wright City, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 584 of the Annual 
Report for 1970. Construction began in February 
1963, and the project was placed in useful operation in 
June 1969. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
36. SARDIS LAKE, OK. 
Location. On Jackfork Creek, a tributary of the 
Kiamichi River, at river mile 2.8, about 2.5 miles 
north of Clayton, in Pushmataha County, OK. (See 
Yanush, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-11 of the Annual 
Report for 1983. Sardis Lake is operated as a unit of 
a two-lake system for flood control in the Kiamichi 
River Basin. (The other lake in the system is Hugo 
Lake). Construction began in August 1975, and the 
project became operational in January 1983. 
Local cooperation. The Oklahoma Water Resources 
Board (OWRB) failed to make satisfactory 
arrangements to pay for the Sardis Lake water supply 
storage as agreed to in a letter exchange of September 
1997. On July 2, 1998, the state of Oklahoma was 
declared in default under the contract. On July 14, 
1998, the Department of Justice (DOJ) filed suit in the 
Northern District Court of Oklahoma. The litigation 
has not moved forward because of a taxpayer "qui 
tam" suit filed in January 1998 in the Western District 
Court of Oklahoma against the OWRB and the 
United States. The suit between OWRB and the 
United States was postponed until a decision was 
reached on the taxpayer "qui tam" suit. On March 4, 
1999, the Western District Court dismissed OWRB 
and the United States from the suit. The taxpayer 
group has 30 days to appeal. The DOJ will continue 
legal proceedings when the appeal process has lapsed 
in the "qui tam" suit. 
Operations and results during fiscal year. A 
new roof was constructed on the project office building. 
Routine operation and maintenance continued. 
37. SKIATOOK LAKE, OK. 
Location. On Hominy Creek, a tributary of Bird 
Creek in the Verdigris River Basin, at river mile 14.3, 
about 5 miles west of Skiatook, in Osage County, OK. 
(See Avant S.E., OK, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see Pagel19-8 of the Annual Report 
for 1987. Construction began in January 1974, 
impoundment began in October 1984, and the project 
became operational in November 1984. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. A 
dam safety project to rehabilitate the existing spillway 
was authorized with the approval of the Dam 
Safety Report in FY 97. Construction is scheduled to 
begin in FY 01. The total project cost is estimated to 
be $9,500,000 (October 1997 price levels). A waterborne 
shower/toilet is under construction in Twin Points 
Recreation Area. A wastewater treatment system for 
the facility was completed. Rural water will be installed 
for the area in FY 99. Routine operation and 
maintenance continued. 
38. TORONTO LAKE, KS. 
Location. On the Verdigris River at river mile 
271.5, about 4 miles southeast of Toronto, in Woodson 
County, KS. (See Fredonia, KS, Geological Survey 
map, scale 1:24,000.) 
38-10

TULSA, OK, DISTRICT 
Existing project. For a description of the completed 
improvement, see page 600 of the Annual Report 
for 1969. Construction began in November 1954, and 
the project was placed in full operation in March 1960. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. 
39. TULSA AND WEST TULSA 
LEVEES, OK. 
Location. On the banks of the Arkansas River near 
Tulsa, OK. On the left bank, the levee extends from 
river mile 531.0 near Sand Springs, OK, downstream 
to river mile 521.4 at Tulsa. On the right bank, the 
levee extends from near river mile 526.7 downstream 
to river mile 521.3 and is adjacent to the major portion 
of the business and residential districts in West Tulsa, 
Tulsa County, OK. 
Existing project. The Tulsa and West Tulsa Levees 
were completed by the Tulsa District in 1945. The 
project was turned over to the Tulsa County Drainage 
District No. 12 for operations and maintenance. The 
project consists of 3 levees with a total length of about 
20 miles and an average height of 10 feet. The levees 
provide protection from flooding to property valued at 
approximately $1 billion dollars. Many of the drainage 
pipes that pass under the levee have deteriorated 
and levee material has eroded into the pipes leaving 
small cavities in the embankment. The Tulsa District 
completed an evaluation of the levees in September 
1989, which determined that rehabilitation would be 
required for the levees to operate as designed. Funds 
to repair the levee were provided in FY 91 and FY 94 
by the U.S. Congress. 
Local cooperation. The Local Cooperation Agreement 
(LCA) was executed in March 1992, with Tulsa 
County and Levee District No. 12, the non-Federal 
sponsors. Approximately one-half of the project repairs 
have been completed to date. In FY 99, a 
supplement to the LCA and additional funding was 
provided by the local sponsor to allow construction of 
Phase II. 
Operations and results during fiscal year. 
Phase I contract for repair of 23 of the 48 deficient 
pipes was awarded July 30, 1992, and completed in 
July 1993. Phase II construction was initiated in the 
summer of 1999 and is expected to be completed in 
FY 00. 
40. WAURIKA LAKE, OK. 
Location. On Beaver Creek, a tributary of the Red 
River, at river mile 27.0, about 6 miles northwest of 
Waurika, in Jefferson County, OK. (See Hastings, 
OK-TX, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-12 of the Annual 
Report for 1983. Waurika Lake is operated as a unit 
of a coordinated lake system for flood control in the 
Red River Basin. Construction began in July 1971, 
and impoundment began in August 1977. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operations and maintenance continued. 
41. WINFIELD, KS. 
Location. Winfield is located approximately 15 
miles north of the Kansas-Oklahoma state line on 
U.S. Highway 77 in Cowley County, KS. The city is 
located immediately southeast of the confluence of the 
Walnut River and Timber Creek. 
Existing project. The project consists of raising 
and extending approximately 4 miles of levee along 
Timber Creek and the Walnut River. Road ramps will 
be constructed at two locations where city streets 
cross the Walnut River. 
Local cooperation. A Project Cooperation Agreement 
(PCA) was signed on September 4, 1996. The 
city of Winfield, the local sponsor, is currently fulfilling 
its requirements. 
Operations and results during fiscal year. A 
construction contract was awarded in FY 98. Construction 
was completed in FY 00. Estimated total 
project cost is $8,777,000 (October 1996 price level 
base). 
42. WISTER LAKE, OK. 
Location. On the Poteau River at river mile 60.9, 
about 2 miles south of Wister, in LeFlore County, OK. 
(See Wister, OK, Geological Survey map, scale 
1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 601 of the Annual 
Report for 1969. Construction began in April 1946, 
and was completed in May 1949. The project was 
placed in full flood control operation in October 1949. 
Local cooperation. Fully complied with. 
38-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Operations and results during fiscal year. 
Routine operation and maintenance continued. 
43. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS. 
See Table 38-E. 
44. INSPECTION OF COMPLETED 
LOCAL FLOOD PROTECTION 
PROJECTS. 
Inspections of completed, Federally constructed local 
flood protection projects which are owned, operated, 
and maintained by local interests are made to 
determine the extent of compliance with approved 
regulations for operations and maintenance. The 
inspections assist the Corps of Engineers in determining 
if the project provides the flood protection for 
which it was constructed. See Table 38-I for a list of 
projects inspected in FY 99. Fiscal year cost was 
$137,295. 
45. SCHEDULING FLOOD CONTROL 
RESERVOIR OPERATIONS. 
The Tulsa District Corps of Engineers is responsible 
for flood control operations at 12 non-Corps projects. 
These include nine Bureau of Reclamation lakes, two 
Grand River Dam Authority lakes, and one citycounty 
owned lake. All of these projects were constructed 
wholly or in part with Federal funds. Routine 
flood control releases were required at several of 
the projects. Fiscal year costs for scheduling flood 
control reservoir operations totaled $795,800. 
46. EMERGENCY FLOOD CONTROL 
ACTIVITIES. 
Fiscal year cost for catastrophic disaster preparedness 
was $48,434; advance preparation was $121,942. 
47. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION. 
See Table 38-J for FY 99 expenditures for Small 
Flood Control Projects Not Specifically Authorized by 
Congress (Section 205); Emergency Streambank and 
Shoreline Projects (Section 14). 
Multiple-Purpose Projects Including Power 
48. BROKEN BOW LAKE, OK. 
Location. On the Mountain Fork River at river 
mile 20.3, about 9 miles northeast of Broken Bow, in 
McCurtain County, OK. (See Broken Bow, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvements, see page 29-17 of the Annual 
Report for 1971. Construction began in November 
1961, and the project was placed in useful operation in 
October 1969. Power units 1 and 2 were placed in 
operation in January and June 1970, respectively. 
Local cooperation. The development of a trout 
fishery in the Mountain Fork River below Broken Bow 
Lake was implemented in 1989, in cooperation with 
the Corps of Engineers (Corps), Southwestern Power 
Administration, Oklahoma Department of Wildlife 
Conservation, and the Oklahoma Water Resources 
Board. The operation of the trout stream has been 
cooperatively managed by a Memorandum of Understanding. 
The Water Resources Development Act of 
1996 (WRDA 96), Sec. 338, modified the project to 
provide for the reallocation of sufficient quantity of 
water supply storage space to support the Mountain 
Fork trout fishery at no expense to the State of 
Oklahoma. The District is waiting implementing 
guidance on WRDA 96. 
Operations and results during fiscal year. A 
new roof was constructed on the powerhouse and 
asbestos was removed from the powerhouse. Routine 
operation and maintenance continued. 
49. EUFAULA LAKE, OK. 
Location. On the Canadian River at river mile 
27.0, about 12 miles east of Eufaula, in McIntosh 
County, OK. (See Porum, OK, Geological Survey 
map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 588 of the Annual 
Report for 1970. Construction began in December 
1956, and the project was placed in full flood control 
operation in February 1964. There are numerous 
areas along the shoreline where private property is 
subject to flooding and erosion as a result of the 
construction and operation. Erosion problems in 
numerous subdivisions bordering the lake were studied 
in 1989 and 1993. At this time, it is estimated that 
there are approximately 22 miles of shoreline in need 
of attention. Estimated costs for repair is approximately 
$15 million. 
38-12

TULSA, OK, DISTRICT 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. An 
erosion repair contract has been completed at Hideaway 
Cove. A contract has been awarded to rehabilitate 
the floating tainter gate bulkhead. Routine 
operation and maintenance continued. 
50. FORT GIBSON LAKE, OK. 
Location. On the Grand (Neosho) River at river 
mile 7.7, about 5 miles north of Fort Gibson, in 
Muskogee County, OK. (See Fort Gibson Dam, OK, 
Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 604 of the Annual 
Report for 1969. Construction began in March 1942, 
but was held in abeyance during World War II. Construction 
resumed in May 1946, and was completed in 
June 1950. The fourth generator was installed and 
the project placed in full operation in September 1953. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. 
Routine operation and maintenance continued. 
51. KEYSTONE LAKE, OK. 
Location. On the Arkansas River at river mile 
538.8, near Sand Springs, OK, and about 15 miles 
west of Tulsa, OK. (See Keystone Dam, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 589 of the Annual 
Report for 1970. Construction began in January 1957, 
and the project was placed in flood control operation 
in September 1964. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. 
Structural repairs were made on the spillway. Routine 
operation and maintenance continued. 
52. LAKE TEXOMA (DENISON DAM), 
OK AND TX. 
Location. On the Red River at river mile 725.9, 
about 5 miles northwest of Denison, TX. (See Denison 
Dam, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 603 of the Annual 
Report for 1969. Lake Texoma is operated as a unit of 
a coordinated lake system for flood control in the Red 
River Basin. Construction started in August 1939, 
and was completed in February 1944. Commercial 
power generation was started in March 1945. Authorized 
work is complete except for installation of the 
third, fourth, and fifth power units. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. The 
powerhouse was converted from local control to remote 
control from the Robert S. Kerr Powerhouse. 
New equipment purchased and installed included: 
new SCADA equipment, microwave communication 
equipment, new control room switchboards, generator 
and transformer protection, auxiliary relays, DC 
breaker panels, essential AC panels, creep detectors 
for governors, shutdown and speed solinoids, and 
programmable logic controller to load setters. Also, 
the powerhouse received a new roof. Routine operation 
and maintenance continued. 
53. ROBERT S. KERR LOCK AND DAM 
AND RESERVOIR, OK. 
Location. On the Arkansas River at navigation 
mile 336.2, about 8 miles south of Sallisaw, in LeFlore 
County, OK. (See Robert S. Kerr, OK, Geological 
Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-21 of the Annual 
Report for 1972. The Robert S. Kerr Lock and Dam 
and Reservoir is a unit of the McClellan-Kerr Arkansas 
River Navigation System. Construction began in 
April 1964, and closure was completed in October 
1970. The lock and dam became operational for 
navigation in December 1970. Generating units 1, 2, 
3, and 4 were placed in operation in October, July, 
September, and November 1971, respectively. 
Local cooperation. See section 1 of this report. 
Terminal facilities. Five sites have been developed 
for handling coal, grain, construction aggregates, 
and miscellaneous cargo. The facilities are 
considered adequate for present traffic. 
Operations and results during fiscal year. A 
new roof was constructed on the powerhouse and lock 
control building to accommodate the remoting of 
Denison powerhouse, a new DEMS (annunciation 
system) was added along with new SCADA equipment 
38-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
and a new operators control box. Routine operation 
and maintenance continued. 
54. TENKILLER FERRY LAKE, OK. 
Location. On the Illinois River at river mile 12.8, 
7 miles northeast of Gore, in Sequoyah County, OK. 
(See Gore, OK, Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 606 of the Annual 
Report for 1969. Construction began in June 1947, 
and was completed in July 1953. 
Local cooperation. Fully complied with. 
Operations and results during fiscal year. Routine 
operation and maintenance continued. A project 
to build an auxiliary spillway and to modify the 
existing spillway was authorized February 22, 1994, 
by the Acting Assistant Secretary of the Army, under 
the Dam Safety Assurance Program. Phase I was 
awarded in FY 00. Phase II will be awarded in FY 02. 
55. WEBBERS FALLS LOCK AND DAM, OK. 
Location. On the Arkansas River at navigation 
mile 366.6, about 5 miles northwest of Webbers Falls, 
in Muskogee County, OK. (See Webbers Falls, OK, 
Geological Survey map, scale 1:24,000.) 
Existing project. For a description of the completed 
improvement, see page 19-23 of the Annual 
Report for 1977. The Webbers Falls Lock and Dam is 
a unit of the McClellan-Kerr Arkansas River Navigation 
System. Construction began in January 1965, 
and the project was placed in useful operation in 
November 1970. The lock and dam became operational 
for navigation in December 1970. Generating 
units 1, 2, and 3 were placed in operation in August, 
September, and November 1973, respectively. 
Local cooperation. See section 1 of this report. 
Terminal facilities. Facilities at the Port of Muskogee 
include: a cargo pier, mooring dolphins, warehouse, 
terminal building, and fuel facility built by the 
Muskogee City-County Port Authority; a liquid cargo 
loading facility and a steel unloading facility built by 
Frontier Steel Company; grain holding facilities built 
by Conagra, Inc.; and a general-purpose private dock 
built by the Fort Howard Paper Company. The facilities 
are considered adequate for present traffic. 
Operations and results during fiscal year. A 
cracked bull gear was removed from one of the generators 
and a contract for fabrication of a new gear was 
awarded in FY 97. A new bullgear is being fabricated 
by the contractor and it will be delivered in the first 
quarter of FY 99. A contract was awarded to purchase 
new slip rings. A contract for construction of a new 
dredge disposal area was awarded in FY 98. The work 
should be completed in the first quarter of FY 99. A 
new roof was constructed on the powerhouse. Routine 
operation and maintenance continued. 
General Investigations 
56. SURVEYS. 
Fiscal year cost was $326,016, which included one 
special study; miscellaneous activities-special investigations, 
review of FERC licenses, and intragency 
water resources development; North American Waterfowl 
Management Plan; coordination with other 
Federal agencies, States, and non-Federal interests, 
and seven Planning Assistance to States Studies. 
Table 38-K provides a specific list and respective fiscal 
year expenditures. 
57. COLLECTION AND STUDY OF 
BASIC DATA. 
Fiscal year cost was $548,041, which includes floodplain 
management services. Table 38-K provides a 
specific list and respective fiscal year expenditures. 
38-14

TULSA, OK, DISTRICT 
Table 38-A COST AND FINANCIAL STATEMENT 
See 
Section Total to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 19991 
1. McClellan-Kerr Arkansas New Work 
River Navigation System, Approp 
OK, (Tulsa District Portion) Cost 
Maint 
Approp 
Cost 
- 130,936,6382 
- 130,936,6382 
4,351,000 3,919,000 3,771,000 3,871,300 169,593,262 
4,430,125 4,080,296 3,054,371 4,638,166 169,789,907 
3. Arcadia Lake, OK 
1,270 
- 82,965,900 
4,508 82,958,217 
Maint 
Approp 
Cost 
4. Arkansas City, KS 
(Contributed Funds) 
5. Arkansas-Red River 
Basins Chloride Control, 
KS, OK, and TX 
New Work 
Approp 
Cost 
305,100 459,700 354,000 
322,128 351,059 479,049 
651,000 -95,000 1,878,000 
189,780 274,651 1,903,566 
Contrib. 265,000 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
5a. Area V, 
Estelline Springs, TX 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
-1,000 
1,041 
900 
900 
1,200 
1,275 
5b. Area VIII, TX New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
5c. Red River Basin Chloride 
Control, TX & OK 
New Work 
Approp 
Cost 
- 46,682,242 
-10,250 46,671,992 
1,218,700 1,556,100 1,198,000 1,071,300 12,023,348 
1,181,429 1,518,053 1,297,175 1,080,350 12,017,326 
-4,805,200 2,137,000 720,000 1,849,000 29,368,800 
4,686,819 4,063,142 1,547,581 1,405,550 28,257.501 
38-15 
New Work 
Approp 
Cost 500 
331,000 
342,408 
276,000 
295,583 
4,247,582 
3,437,512 
5,084,000 
4,927,157 
265,000 
25,705,208 
25,705,208 
2,316,354 
2,316,354 
300,028 
300,028 
157,457 
157,376 
2,400 
2,320

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 19991 
6. Birch Lake, OK New Work 
Approp 
Cost 
13,549,170 
13,549,170 
545,700 553,200 496,000 
565,467 541,678 498,447 
498,400 13,056,266 
526,092 13,056,266 
7. Bowie County Levee, TX 
8. Candy Lake, OK 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
9. Canton Lake, OK 
500,000 100,000 
537,251 487,934 
13,400 
19,118 
15,100 
8,116 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
10. Copan Lake, OK New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
1,976,600 1,737,000 1,456,500 
1,914,609 1,682,862 1,562,995 
-200 -30,293 
870,550 678,900 733,500 
905,816 640,770 760,094 
1,560,400 33,476,268 
1,601,356 33,469,660 
- 83,800,814 
-1,625 83,799,189 
611,800 11,687,779 
629,790 11,682,139 
11. Council Grove Lake, KS New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
12. El Dorado Lake, KS New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
- - - 11,810,509 
- - - 11,810,509 
1,017,600 1,134,800 1,070,000 1,391,950 19,963,260 
1,034,025 1,112,760 1,067,444 1,453,622 19,959,015 
5,781 29,369 26 
429,700 430,500 337,470 
460,637 419,541 347,380 
317,400 
330,713 
92,413,349 
92,413,343 
6,979,050 
6,979,555 
38-16 
Maint 
Approp 
Cost 
45,000 
79,025 
3,500 
10,244 
10,898 
4,300 
4,478 
1,820,000 
1,793,592 
4,927,922 
4,927,922 
217,570 
217,497 
11,209,834 
11,209,834

TULSA, OK, DISTRICT 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 19991 
13. Elk City Lake, KS New Work 
Approp 
Cost 
19,052,990 
19,052,990 
584,500 622,800 425,000 
612,379 597,575 434,131 
519,500 15,522,750 
538,892 15,515,631 
14. Fall River Lake, KS 
(Federal) 
(Contrib. Funds) 
15. Fort Supply Lake, OK 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
Contrib. 
Cost 
New Work 
Approp 
Cost 
- - - 10,550,873 
- - - 10,550,873 
765,300 845,500 891,000 1,161,500 18,074,942 
758,359 850,016 897,288 1,179,778 18,068,279 
612 
6108 
6120 
6120 
7,723,134 
7,723,134 
806,400 734,300 922,000 
757,720 771,363 798,618 
764,700 18,488,798 
931,152 18,487,140 
16. Fry Creeks, Bixby, OK 
(Contrib. Funds) 
17. Great Bend, KS 
(Federal) 
(Contrib. Funds) 
18. Great Salt Plains Lake, OK 
New Work 
Approp 
Cost 
Contrib. 
Cost 
New Work 
Approp 
Cost 
Contrib. 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
19. Halstead, KS 
(Federal) 
New Work 
Approp 
Cost 
-441,000 2,837,000 2,413,000 1,845,000 
166,296 2,385,420 2,917,165 1,849,834 
275,000 365,000 
140,854 141,209 
-732,000 -373,000 
58,816 -335,263 
357,937 
50 
178,254 
371,147 
280,800 298,000 146,500 
290,215 302,592 154,372 
- 200,000 
35,348 113,882 
-100,000 
7,214 
145,500 
148,745 
-37,000 
13,203 
38-17 
Maint 
Approp 
Cost 
Maint 
Approp 
Cost 
9,864,568 
9,736,246 
640,000 
640,000 
19,968,400 
19,968,073 
4,259,254 
4,259,254 
4,626,270 
4,626,270 
8,061,347 
8,060,802 
8,346,000 
8,322,226

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 19991 
Halstead, KS (Cont'd) 
(Contributed Funds) 
20. Heyburn Lake and 
Polecat Creek, OK 
Contrib. 
Cost 
940,000 
94,944 924,537 
New Work 
Approp 
Cost 
2,560,572 
2,560,572 
682,400 730,300 568,000 
711,519 643,679 649,285 
598,050 13,677,536 
621,158 13,672,108 
21. Hugo Lake, OK 
1,552,800 1,444,600 1,359,618 
1,633,828 1,452,729 1,338,389 
1,543,500 30,847,180 
1,604,919 30,825,422 
22. Hulah Lake, OK 
Maint 
Approp 
Cost 
287,200 351,700 682,000 
299,951 350,942 366,808 
527,170 11,956,782 
862,271 11,956,782 
Minor 
Rehabilitation 
Approp 
Cost 
23. John Redmond Dam 
and Reservoir, KS 
135,718 
135,718 
28,151,470 
28,151,470 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
23. Kaw Lake, OK 
(Federal) 
1,387,500 2,513,000 654,000 3,031,700 31,081,167 
1,387,313 2,328,060 1,000,729 3,063,025 31,081,148 
New Work 
Approp 
Cost 
109,430,750 
109,430,750 
(Contributed Funds) 
Maint 
Approp 
Cost 
Contrib. 
Cost 
1,829,900 1,778,100 1,705,000 1,643,420 35,824,195 
1,823,545 1,812,806 1,730,601 1,635,264 35,778,283 
-5,394 43,934 
43,934 
38-18 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
-4,800 
Maint 
Approp 
Cost 
-80
- 
41,211,562 
41,211,562 
New Work 
Approp 
Cost 
11,388,150 
11,388,150

TULSA, OK, DISTRICT 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 19991 
25. Lake Kemp, TX New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
176,800 140,100 140,000 
192,262 161,347 139,004 
26. Lake Wichita, 
Holliday Creek, TX 
(Federal) 
(Contributed Funds) 
27. Marion Reservoir, KS 
New Work 
Approp 
Cost 
Contrib. 
Cost 
New Work 
Approp 
Cost 
850,000 
1,086,914 
575,000 
575,000 
227,260 16,510 
- 33,844,000 
60,061 33,844,000 
7,835,000 
7,835,000 
13,420,818 
13,420,818 
Maint 
Approp 
Cost 
Minor 
Rehabilitation 
Approp 
Cost 
2,720,400 2,372,000 1,953,000 1,456,800 24,439,355 
2,641,500 2,438,030 1,903,431 1,563,173 24,439,265 
68,924 
44,000 68,924 
28. McGrath Creek, 
Wichita Falls, TX 
(Federal) 
(Contributed Funds) 
29. Mingo Creek, OK 
(Federal) 
(Contributed Funds) 
30. Oologah Lake, OK 
New Work 
Approp 
Cost 
157,840 3,393,000 3,391,000 
677,449 3,945,215 3,548,168 
93,000 
40,422 
Contrib. 250,000 2,315,000 451,100 
Cost 250,000 2,376,586 576,922 
New Work 
Approp 
Cost 
8,551,840 
8,391,770 
- 3,203,600 
18 3,203,526 
1,135,000 4,785,000 9,036,726 4,034,000 74,114,726 
10,275,863 4,534,340 9,271,284 2,068,230 71,959,750 
Contrib. 3,515,000 
Cost 3,389,184 
1,785,000 2,490,000 
3,184,924 1,734,535 745,211 
New Work 
Approp 
Cost 
16,253,400 
15,616,125 
37,029,9283 
37,029,9283 
1,560,400 1,543,000 1,485,000 1,545,600 30,549,960 
1,496,720 1,596,187 1,519,158 1,556,000 30,549,869 
38-19 
7,637,702 
7,637,702 
3,430,501 
3,429,369 
196,400 
201,101 
Maint 
Approp 
Cost

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 19991 
31. Optima Lake, OK 
32. Parker Lake, OK 
33. Pat Mayse Lake, TX 
Maint 
Approp 
Cost 
34. Pearson-Skubitz 
Big Hill Lake, KS 
912,000 878,000 841,000 1,049,060 18,592,266 
913,131 857,128 871,487 1,070,088 18,622,257 
New Work 
Approp 
Cost 
16,879,166 
16,879,166 
860,600 929,800 869,000 
874,573 911,511 856,954 
749,300 14,341,528 
779,690 14,333,676 
35. Pine Creek Lake, OK 
1,904,200 1,074,900 857,000 
1,159,860 1,024,551 913,376 
986,350 20,426,137 
1,002,949 20,425,545 
36. Sardis Lake, OK 
-100 
-281,041 
- -105,740 
Maint 
Approp 
Cost 
37. Skiatook Lake, OK New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
1,054,000 1,000,100 800,000 
1,067,305 1,023,550 856,598 
-300 -1,244 
2,096,800 1,230,900 947,000 
1,968,658 1,270,191 1,056,800 
759,400 13,232,621 
786,443 13,231,854 
465,000 106,733,738 
269,564 106,538,302 
818,500 15,065,438 
841,665 15,062,525 
38-20 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
123,600 
139,603 
50,000 
52,567 
55,334 
91,000 
97,887 
75,000 
15,326 
New Work 
Approp 
Cost 
New Work 
Approp 
Cost 
23,544 
25,930 
4,313 
47,173,438 
47,173,438 
7,458,193 
7,458,155 
585,326 
584,973 
9,310,661 
9,310,661 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
20,628,049 
20,628,049 
New Work 
Approp 
Cost 
68,518,439 
68,518,429

TULSA, OK, DISTRICT 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 19991 
38. Toronto Lake, KS New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
39. Tulsa & West Tulsa, 
(Federal) 
(Contributed Funds) 
40. Waurika Lake, OK 
OK New Work 
Approp 
Cost 
Contrib. 
Cost 
Minor 
Rehabilitation 
Approp 
Cost 
New Work 
Approp 
Cost 
318,200 347,700 398,000 
315,903 344,096 402,765 
111,072 17,749 
679 
39,000 
36,764 
-8,700 
10,644 
75,000 
31,937 
-69 
1,848,700 1,364,500 1,152,000 1,355,000 21,895,862 
1,840,342 1,327,246 1,201,941 1,377,034 21,895,508 
41. Winfield, KS 
(Contributed Funds) 
42. Wister Lake, OK 
New Work 
Approp 
Cost 
658,000 -86,000 2,378,000 3,375,000 
355,547 248,869 2,330,421 2,802,721 
Contrib. 
Cost 
New Work 
Approp 
Cost 
65,000 
-6,745 
Maint 
Approp 
Cost 
773,400 1,011,400 501,500 
890,328 919,324 604,693 
489,500 15,083,524 
530,175 15,083,138 
Major 
Rehabilitation 
Approp 
Cost 
48. Broken Bow Lake, OK 
11,131,529 
11,131,529 
41,222,692 
41,222,692 
New Work 
Approp 
Cost 
38-21 
519,716 
526,993 
2,856 
75,000 
49,191 
13,896,324 
13,896,324 
8,590,832 
8,579,885 
1,425,000 
960,099 
475,000 
181,807 
1,118,111 
1,110,444 
69,729,461 
69,729,281 
Maint 
Approp 
Cost 
7,654,617 
6,968,554 
65,000 
10,690,751 
10,687,439

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 19991 
Broken Bow Lake, OK 
(Cont'd) 
49. Eufaula Lake, OK 
(Contributed Funds) 
50. Fort Gibson Lake, OK 
(Contributed Funds) 
51. Keystone Lake, OK 
Maint 
Approp 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
Contrib. 
Cost 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
Contrib. 
Cost 
New Work 
Approp 
Cost 
1,257,100 1,318,000 1,321,669 1,091,900 32,420,866 
1,562,791 1,251,537 1,294,720 1,215,477 32,416,580 
-224,840 
-29,117 
- 123,795,9074 
- 123,795,9074 
4,276,700 3,884,800 4,697,000 4,028,000 82,523,583 
4,139,697 4,006,071 4,480,746 4,367,219 82,494,759 
-76,449 
41,223 
254,780 
254,180 
43,821,4055 
43,821,4055 
4,084,300 3,436,000 3,273,000 3,464,000 69,136,612 
4,007,568 3,486,300 3,203,442 3,647,826 69,095,905 
501,000 
487,164 
- 123,171,1736 
- 123,171,1736 
3,590,500 3,588,800 3,295,000 3,899,600 65,209,005 
3,564,897 3,660,176 3,304,610 3,945,300 65,182,739 
52. Lake Texoma 
(Denison Dam), 
OK and TX 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
6,184,500 5,680,000 5,480,000 
5,595,256 6,241,324 5,666,505 
- 68,168,9607 
-11,570 68,157,3907 
5,370,740 119,337,408 
5,437,475 119,257,953 
Minor 
Rehabilitation 
Approp 
Cost 
53. Robert S. Kerr Lock and 
Dam and Reservoir, OK 
New Work 
Approp 
Cost 
Maint 
Approp 
Cost 
46,237 
46,237 
94,578,237 
94,578,237 
38-22

TULSA, OK, DISTRICT 
Table 38-A COST AND FINANCIAL STATEMENT 
(Continued) 
See 
Section Total to 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep 30, 19991 
Robert S. Kerr Lock and 
Dam and Reservoir, OK 
(Cont'd) 
Maint 
Approp 
Cost 
3,896,000 4,176,000 4,416,000 3,609,200 72,091,045 
3,518,357 4,561,323 4,445,457 3,695,194 72,065,256 
54. Tenkiller Ferry Lake, OK New Work 
Approp 
Cost 
486,000 411,000 195,000 
508,091 595,704 239,836 
1,684,000 27,663,7208 
809,938 26,773,4788 
Maint 
Approp 
Cost 
55. Webbers Falls 
Lock & Dam, OK 
3,284,800 3,078,700 2,748,000 2,903,100 61,805,820 
3,268,051 3,076,723 2,848,279 2,947,711 61,805,730 
New Work 
Approp 
Cost 
86,107,967 
86,107,967 
Maint 
Approp 
Cost 
3,180,000 3,484,900 3,590,400 4,376,000 66,541,824 
2,831,359 3,192,062 3,695,492 4,972,118 66,498,161 
1. Includes $2,077,900 expended by the Jobs Act (P.L. 98-8 dated, March 24, 1983) for projects listed in Tables 29-M of the FY 85 
Annual Report. 
2. Includes $12,700,038 for Bank Stabilization and Channel Rectification. 
3. Excludes $81,460 contributed funds and $1,348,816 special funds. 
4. Excludes $299,803 contributed funds and $13,211,728 special funds. 
5. Excludes $134,919 contributed funds. Includes $49,581 Public Works acceleration funds; and $1,058,500 Hydropower. 
6. Excludes $5,366,231 special funds. 
7. Includes $433,549 Emergency Relief funds. Exchange $1,256,068 from special contributed funds. 
8. Excludes $946 contributed funds. Includes $39,999 Public Works acceleration funds. 
9. The cost for Grand Lake 0' the Cherokees has been added to the amount reported in paragraph 45, Scheduling Flood Control 
Reservoir Operations. 
38-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 38-B AUTHORIZING LEGISLATION 
See Date of Project 
Section Authorizing and Work 
In Text Act Authorized Documents 
July 24, 1946 
October 22, 1976 
November 17, 1986 
December 31, 1970 
October 22, 1976 
November 17, 1986 
October 23, 1962 
November 7, 1966 
December 31, 1970 
November 17, 1986 
October 23, 1962 
August 26, 1994 
October 23, 1962 
June 28, 1938 
July 24, 1946 
June 30, 1948 
October 23, 1962 
May 17, 1950 
October 27, 1965 
August 18, 1941 
August 18, 1941 
June 22, 1936 
November 17, 1986 
November 17, 1986 
McCLELLAN-KERR ARKANSAS 
RIVER NAVIGATION SYSTEM 
Big and Little Sallisaw Creeks 
Navigation Project 
W.D. Mayo Hydropwer 
ARCADIA LAKE 
Changed water quality to 
water supply 
ARKANSAS CITY 
ARKANSAS-RED RIVER BASINS 
CHLORIDE CONTROL 
Authorized Area V 
(Estelline Springs) 
Authorized Areas VII, VIII, and X 
Authorized Areas I, II-III, VI, 
IX, XIII, XIV, and XV 
Authorized the Red River Basin 
and the Arkansas River Basin as 
separate projects with separate 
authority. 
BIRCH LAKE 
BOWIE COUNTY LEVEE 
CANDY LAKE 
CANTON LAKE 
Approved Irrigation Storage 
Approved Water Supply Storage 
COPAN LAKE 
COUNCIL GROVE LAKE 
EL DORADO LAKE 
ELK CITY LAKE 
FALL RIVER LAKE 
FORT SUPPLY LAKE 
FRY CREEKS 
GREAT BEND 
38-24 
4. 
5. 
5a. 
5b.&5c. 
6. 
7. 
8. 
9. 
10. 
11. 
12. 
13. 
14. 
15. 
16. 
17. 
HD 79-758 
PL 79-525 
PL 94-587 
PL 99-662 
HD 91-299 
PL 94-587 
PL 99-662 
SD 87-107 
PL 89-789 
SD 110 
PL 91-611 
PL 99-662 
HD 87-563 
PL 103-316 
HD 87-564 
HD 75-569 
HD 87-563 
HD 80-442 
HD 89-232 
HD 76-440 
HD 76-440 
HD 74-308 
PL 99-662 
PL 99-662

TULSA, OK, DISTRICT 
TABLE 38-B AUTHORIZING LEGISLATION 
(Continued) 
See Date of Project 
Section Authorizing and Work 
In Text Act Authorized Documents 
18. 
19. 
20. 
21. 
22. 
23. 
24. 
25. 
26. 
27. 
28. 
29. 
30. 
31. 
32. 
33. 
34. 
35. 
36. 
37. 
38. 
39. 
GREAT SALT PLAINS LAKE 
HALSTEAD 
HEYBURN LAKE AND POLECAT CREEK 
HUGO LAKE 
HD 74-308 
PL 99-662 
HD 80-290 
HD 79-602 
June 22, 1936 
November 17, 1986 
July 24, 1946 
July 24, 1946 
June 22, 1936 
May 17, 1950 
February 15, 1958 
October 23, 1962 
October 23, 1962 
November 17, 1986 
May 17, 1950 
March 14, 1990 
November 17, 1988 
November 17, 1986 
June 28, 1938 
June 22, 1936 
November 17, 1986 
October 23, 1962 
October 23, 1962 
November 10, 1978 
July 3, 1958 
October 23, 1962 
December 4, 1981 
October 23, 1962 
August 18, 1941 
August 18, 1941 
38-25 
HULAH LAKE HD 74-308 
JOHN REDMOND DAM AND RESERVOIR HD 80-442 
Authorized name change PL 85-327 
KAW LAKE HD 87-143 
LAKE KEMP HD 87-144 
LAKE WICHITA, HOLLIDAY CREEK PL 99-662 
MARION RESERVOIR HD 80-442 
Authorized name change PL 101-253 
MCGRATH CREEK WICHITA FALLS, TX PL 100-676 
MINGO CREEK PL 99-662 
OOLOGAH LAKE Committee Doc. 
No. 1, 75th 
Cong., 1st Session 
OPTIMA LAKE HD 74-308 
PARKER LAKE PL 99-662 
PAT MAYSE LAKE HD 88-71 
PEARSON-SKUBITZ BIG HILL LAKE HD 87-472 
Authorized name change PL 95-265 
PINE CREEK LAKE HD 85-170 
SARDIS LAKE SD 87-145 
Authorized name change PL 97-88 
SKIATOOK LAKE HD 87-563 
TORONTO LAKE HD 76-440 
PL 77-228 
TULSA & WEST TULSA, OK PL 77-228

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 38-B AUTHORIZING LEGISLATION 
(Continued) 
See Date of Project 
Section Authorizing and Work 
In Text Act Authorized Documents 
December 30, 1963 
October 27, 1965 
June 28, 1938 
July 30, 1983 
WAURIKA LAKE 
WINFIELD 
WISTER LAKE 
Changed conservation pool 
elevation 
SD 88-33 
PL 88-253 
PL 89-298 
Committee Doc. 
No. 1, 75th 
Cong., 1st Session 
PL 98-63 
July 3, 1958 
October 23, 1962 
July 24, 1946 
July 16,1984 
November 17, 1986 
August 18, 1941 
July 24, 1946 
November 17, 1986 
May 17, 1950 
June 28, 1938 
October 17, 1940 
Sepember 30, 1944 
August 14, 1953 
November 17, 1986 
July 24, 1946 
July 8, 1963 
BROKEN BOW LAKE 
EUFAULA LAKE 
Authorized Piney Creek and 
Muddy Creek bridge replacement 
Authorized cost sharing 
FORT GIBSON LAKE 
Incorporated into the multiple-purpose 
plan for the Arkansas River Basin 
Added hydropower units 5 & 6 
KEYSTONE LAKE 
LAKE TEXOMA (Denison Dam) 
Flood control and power 
Navigation and regulating flows 
Authorized name 
Water supply 
Recreation 
ROBERT S. KERR LOCK AND 
DAM AND RESERVOIR 
Authorized name change 
June 28, 1938 
June 24, 1946 
July 24, 1946 
TENKILLER FERRY LAKE 
Power 
WEBBERS FALLS LOCK AND DAM 
Committee Doc. 
No. 1, 75th 
Cong., 1st Sess. 
HD 79-758 
HD 79-758 
38-26 
40. 
41. 
42. 
48. 
49. 
50. 
51. 
52. 
HD 85-170 
SD 87-137 
HD 79-758 
PL 98-360 
PL99-662 
HD 76-107 
PL 76-228 
PL 99-662 
SD 81-07 
HD 75-541 
PL 76-868 
PL 78-454 
PL 83-273 
PL 99-662 
HD 79-758 
PL 88-62 
53. 
54. 
55.

TULSA, OK, DISTRICT 
TABLE 38-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last 
Full Report Cost to September 30, 1999 
See Annual Operation and 
Project Status Report for Construction Maintnenace 
Big and Little Sallisaw Inactive - - 3,163 
Navigation Project 
Poteau River Navigation Project, Complete 1983 536,952 
OK and AR 
Red River from Fulton, AR, Complete 1924 378,574 182,157 
to Mouth of Washita River 
TABLE 38-E OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
For Last 
Full Report Cost to September 30, 1999 
See Annual Operation and 
Project Report For Construction Maintenance 
Augusta LPP, KS 1.2 1938 84,217 
Boswell Lake, OK3 1952 - 
Cherry and Red Fork Creeks LPP, OK2 1970 261,448 
Crutcho Creek LPP, OK3 1972 213,016 
Dodge City LPP, KS 2 
Enid LPP, OK2 1963 743,612 14,599 
Flat Rock and Valley View Creeks LPP, Tulsa, OK2, 4 1975 1,741,000 
Florence LPP, KS2 1965 369,782 
Hutchinson LPP, KS2 1956 3,497,718 
Iola LPP, KS2 1939 22,290 
Jenks LPP, OK2 1950 344,797 
Joe Creek LPP, OK 2 - 308,041 
Lamed LPP, KS2 
Lukfata Lake, OK3 1983 1,424,685 
Marion, KS 1988 5,488,618 
Oklahoma City LPP, OK 2 1960 8,047,512 
Red River Bank Stabilization Below Denison, OK and TX2 1953 222,105 
Red River Emergency Bank Protection - 400,000 
Sand Creek LPP, KS2 1968 545,996 
Sand Lake, OK3 1963 - 
Shidler Lake, OK 3 1983 568,191 
Tulsa and West Tulsa LPP, OK2 1954 3,592,432 
Turtle Creek LPP, Yukon, OK3 1975 144,853 
West Branch Chisholm Creek LPP, KS2 1965 364,200 
Wichita and Valley Center LPP, KS2 1960 12,247,379 
LPP - Local Protection Project. 
1. Completed by Kansas Works Progress Administration. 
2. Complete. 
3. Deferred. 
4. Federal cost limited to $1,000,000. 
5. Active with no current year expenditures. 
38-27

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 38-G DEAUTHORIZED PROJECTS 
For Last 
Full Report Day Federal Contributed 
See Annual and Funds Funds 
Project Report for Authority Expended Expended 
Big Pine Lake, TX 1984 November 1, 1997 1,701,670 0 
Public Law 99-662 
Candy Lake, OK 1996 July 9, 1995 4,950,000 0 
Public Law 99-662 
Cedar Point Lake, KS 1980 November 17,1986 0 0 
Public Law 99-662 
Cow Creek, Hutchinson, KS 1971 November 17, 1986 363,720 0 
Public Law 99-662 
El Dorado, West Branch, 1977 November 17, 1986 92,319 0 
Walnut River, KS Public Law 99-662 
Neodesha Lake, KS 1952 November 17, 1986 97,910 0 
Public Law 99-662 
Towanda Lake, KS 1981 November 17, 1986 393,361 0 
Public Law 99-662 
Tuskahoma Lake, OK 1963 July 19, 1992 
Public Law 99-662 
TABLE 38-H ARKANSAS RIVER BASIN MULTIPLE-PUPOSE PLAN 
(See Section 1 of Text) 
Feature River River Mile1 Nearest Town 
LAKES 
Canton North Canadian 394.3 Canton, OK 
Elk City Elk River 8.7 Elk City, KS 
Eufaula Canadian 27.0 Eufaula, OK 
Fall River Fall River 54.2 Fall River, KS 
Fort Gibson Grand (Neosho) 7.7 Fort Gibson, OK 
Grand Lake 0' the Cherokees Grand (Neosho) 77.0 Disney, OK 
Keystone Arkansas 538.8 Sand Springs, OK 
Lake Hudson (Markham Ferry) Grand (Neosho) 47.4 Locust Grove, OK 
Neodesha Verdigris 222.8 Neodesha, KS 
Oologah Verdigris 90.2 Oologah, OK 
Tenkiller Ferry Illinois 12.8 Gore, OK 
Toronto Verdigris 271.5 Toronto, KS 
Wister Poteau 60.9 Wister, OK 
McCLELLAN-KERR ARKANSAS RIVER NAVIGATION SYSTEM, OK 
(Tulsa District Portion) 
Bank Stabilization and Verdigris and N/A2 Fort Smith, AR, 
Channel Rectification Arkansas to Catoosa, OK 
Chouteau Lock and Dam (17), OK Verdigris 401.5 Okay, OK 
Newt Graham Lock and Dam (18), OK Verdigris 421.6 Inola, OK 
Robert S. Kerr Lock and Dam (15), OK Arkansas 339.0 Sallisaw, OK 
Robert S. Kerr Marine Terminal, OK Arkansas 336.2 Cowlington, OK 
Sans Bois Navigation Channel, OK Sans Bois Creek 341.0 Keota, OK 
W.D. Mayo Lock and Dam (14), OK Arkansas 319.6 Redland, OK 
Webbers Falls Lock and Dam (16), OK Arkansas 366.6 Gore, OK 
1. On the McClellan-Kerr Arkansas River Navigation System, these are navigation miles. 
2. As required for a channel 9 feet deep. 
38-28

TULSA, OK, DISTRICT 
TABLE 38-I INSPECTION OF COMPLETED LOCAL FLOOD 
PROTECTION PROJECTS 
(See Section 44 of Text) 
Projects Inspected in Fiscal Year Inspection Date 
Cherry/Red Fork Creeks, OK November 1997 
Deep Fork Channel Clearing September 1999 
Dodge City, KS October 1997 
Enid Diviersion Channel, OK November 1998 
Flat Rock/Valley View Creeks, OK November 1997 
Florence, KS October 1997 
Great Bend, KS October 1997 
Haikey Creek, OK October 1997 
Halstead, KS December 1998 
Hutchinson, KS April 1999 
Iola, KS December 1997 
Holliday Creek, Wichita Falls, TX June 1999 
Jenks, OK May 1998 
Joe Creek, OK October 1997 
Larned, KS November 1997 
Marion, KS November 1997 
Mingo Creek, Audubon Creek, OK October 1998 
North Canadian Waste Water Treatment Plant, OK June 1999 
Oklahoma City Floodway, OK June 1999 
Park City, KS May 1999 
Sand Creek, City of Newton, KS November 1997 
South Deer Creek, OK October 1997 
Tulsa and West Tulsa Levees, OK October 1998 
West Branch Chisholm Creek, KS May 1999 
Wichita/Valley Center, KS May 1999 
38-29

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 38-J FLOOD CONTROL WORK 
UNDER SPECIAL AUTHORIZATION 
(See Section 47 of Text) 
Fiscal Year 
Study Identification/Name Cost 
SMALL FLOOD CONTROL PROJECTS NOT SPECIFICALLY 
AUTHORIZED BY CONGRESS - Section 205 Coordination 
Section 205 Coordination 
Bixby Creek, Bixby, OK 
Lake Carl Blackwell, Stillwater, OK 
Little Snake Creek, Bixby, OK 
Sycamore Creek, Coffeyville, KS 
Whitewater River, Augusta, KS 
Wichita Falls, TX, Plum Creek 
Wolf Creek, Lawton, OK 
TOTAL SMALL FLOOD CONTROL PROJECTS 
EMERGENCY STREAMBANK AND SHORELINE PROTECTION (Section 14) 
Section 14 Coordination 
County Bridge, Washita River, Garvin County, OK 
Mainstreet Bridge, Halstead, KS 
Neosho River Bridge, Neosho County, KS 
Slover Street, Shawnee, OK 
TOTAL EMERGENCY STREAMBANK AND SHORELINE PROTECTION 
PROJECT MODIFICATION TO IMPROVE ENVIRONMENT 
Section 1135 Coordination 
Initial General Appraisals 
Arcadia, OK, Fish Habitat Restoration 
Eastern Avenue Bottomland Hardwoods Restoration, OK 
El Dorado, KS, Fish Habitat Restoration 
Riverine Habitat Restoration, OK 
Sally Jones Lake, Vian, OK 
Tenkiller Lake, OK, Tailwater Restoration 
TOTALMODIFICATION TO IMMPROVE ENVIRONMENT 
AQUATIC ECOSYSTEM RESTORATION (SECTION 206) 
Section 206 Coordination 
Preliminary Restoration Plans 
Byron Walker Wetlands, Kingman, KS 
Aquatic Ecosystem Restoration, North Canadian River, OK 
TOTAL AQUATIC ECOSYSTEM RESTORATION 
(Section 1135) 
11,785 
136,601 
14,664 
-396 
119,464 
14,518 
1,829,056 
45,228 
2,170,920 
25,516 
222,493 
49,530 
32,420 
46,590 
376,549 
11,842 
25,203 
40 
55,823 
1,311 
76,029 
31,626 
8,744 
210,618 
7,950 
11,777 
5,228 
89,798 
114,753 
38-30

TULSA, OK, DISTRICT 
TABLE 38-K GENERAL INVESTIGATIONS 
(See Sections 56 and 57 of Text) 
Fiscal Year 
Study Identification/Name Cost 
SURVEYS 
Special Studies 
Watershed/Ecosystem Reconnaissance Study 
Grand (Neosho) River, KS 896 
Miscellaneous Activities 
Special Investigations 35,005 
Review of FERC Licenses 3,964 
Intragency Water Resources Development 12,606 
North American Waterfowl Management Plan 1,914 
Coordination with Other Federal Agencies, States, and Non-Federal Interests 
Department of Agriculture, Soil Conservation Service (PL 83-566) 
Coop with Other Water Resource Development Agencies 11,409 
Planning Assistance to States 
Planning Assistance to States, Negotiation 13,425 
Oklahoma, McClellan Kerr Arkansas River 157,302 
Oklahoma, Grand Lake Sewer Study 28,225 
Oklahoma, Lake Texoma Regional Sewer 300 
Oklahoma, Mangum Lake 43,427 
Oklahma, Poteau River Phase 3,773 
Oklahoma, Tenkiller Water Treatment 10,287 
Oklahoma, Lake Wister Revegetation 3,483 
TOTAL SURVEYS 326,016 
COLLECTION AND STUDY OF BASIC DATA 
Flood Plain Management Services 86,658 
Guides, Pamphlets and Supporting Studies 272 
Indian Workshops 22 
NFPC 5,624 
Project Impact 13,760 
Quick Responses 14,912 
SS-Avant, OK 31,187 
SS-Bixby, OK FPP 30 
SS-Blanchard, OK 23,156 
SS-Cache Creek 51 
SS-Del City, OK 2,392 
SS-Eastgate, Ottawa County, OK 40,062 
SS-Florence, KS 5,019 
SS-Haysville, KS 15 
SS-Midwest City, OK 81 
SS-Ponca Tribe, OK 19,992 
SS-Riverine Flood Model 36,798 
SS-Skiatook, OK 14,960 
SS-Tuttle, OK 5,000 
SS-Waurika, OK 49,971 
SS-Webbers Falls, OK 41,828 
SS-Wichita, KS 909 
Technical Services General 155,342 
.TOTAL COLLECTION AND STUDY OF BASIC DATA 548,041 
38-31

FORT WORTH, TX, DISTRICT *
District includes that portion of Texas south of 
Red River drainage basin exclusive of drainage 
basin of Rio Grande and its tributaries above and 
including Pecos River; exclusive of drainage basins 
to all short streams arising in coastal plain of Texas 
and flowing into the Gulf of Mexico, including 
entire basins of Buffalo Bayou, San Jacinto, San 
Bernard, Lavaca, Navidad, Mission, and Arkansas 
Rivers; exclusive of lower basins of major streams 
flowing into the gulf as follows: Sabine River, Texas 
and Louisiana, downstream from U.S. Highway 
190 crossing at Bon Wier, Texas; Neches River 
downstream from Town Bluff gaging station; Trinity 
River downstream from Texas State Highway 45 
crossing at Riverside, Texas; Brazos River downstream 
from confluence with Navasota River; Colorado 
River downstream from gaging station at Austin; 
Guadalupe River downstream from confluence 
with San Marcos River; San Antonio River 
downstream from confluence with Escondido Creek; 
Nueces River downstream from confluence with Frio 
and Atascosa Rivers; and exclusive of Agua Dulce, 
San Fernando, and Olmos Creek basins draining into 
Baffin Bay; coastal area south thereof to Rio Grande 
and south to the northern boundaries of Newton, 
Jasper, Tyler, Polk, Trinity, Walker, Waller, Austin, 
Fayette, Gonzales, Karnes, Live Oak, Jim Hogg, 
Zapata; the northern and western boundaries of 
McMullan; and the western boundaries of 
Montgomery and Duval Counties, Texas. District also 
includes those portions of the Sulphur River and 
Cypress Creek Watershed located in the State of Texas; 
that portion of western Louisiana in Sabine River 
drainage basin upstream from U.S. Highway 190 
crossing at Bon Wier, Texas. 
39-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
IMPROVEMENTS 
Navigation Page 
1. Trinity River Project, TX ............. 39-2 
Flood Control 
2. Aquilla Lake, TX ................... 39-3 
3. Bardwell Lake, TX ................... 39-3 
4. Beals Creek, Big Spring, TX ........... 39-3 
5. Belton Lake, TX .................... 39-4 
6. Benbrook Lake, TX ................. 39-4 
7. Canyon Lake, TX.................... 39-4 
8. Ferrells Bridge Dam- 
Lake O' The Pines, TX ............... 39-5 
9. Grapevine Lake, TX ............... 39-5 
10. Hords Creek Lake, TX ............... 39-6 
11. Jim Chapman Lake, TX ............. 39-6 
12. Joe Pool Lake, TX ................... 39-6 
13. Lavon Lake, TX ..................... 39-7 
14. Lavon Lake Modification and East Fork 
Channel Improvement, TX. ........... 39-7 
15. Lewisville Dam, TX ....................... 39-7 
16. Navarro Mills Lake, TX............... 39-8 
17. O.C. Fisher Dam and Lake, TX ........ 39-8 
18. Proctor Lake, TX .................. 39-8 
19. Ray Roberts Lake, TX................ 39-8 
20. San Antonio 
Channel Improvement, TX ............ 39-9 
21. San Gabriel River, TX ................ 39-9 
22. Somerville Lake, TX ................ 39-10 
23. Stillhouse Hollow Dam, TX .......... 39-10 
24. Waco Lake, TX ................... 39-11 
25. Waco Lake, TX (Dam Safety) ......... 39-11 
26. Wright Patman Dam and Lake, TX .... 39-11 
27. Inspection of Completed 
Flood Control Projects .............. 39-12 
Navigation 
1. TRINITY RIVER PROJECT, TX 
The project authorized by the River and 
Harbor Act of 1965 (H. Doc 276, 89th Cong., 1st Sess.) 
consists of five major components: Multiple-Purpose 
Channel, Tennessee Colony Lake, Dallas Floodway 
Extension, West Fork Floodway, and Water Conveyance 
Facilities. For the last full report on the project as 
authorized, see Annual Report of 1978. The project 
information present herein is based on the tentatively 
selected project plan presented in the Draft General 
Design Memorandum. The plan consists of three 
structural components: Dallas Floodway Extension, 
Tennessee Colony Lake, and Channel to Liberty in 
the lower basin. 
Operations during fiscal year. Channel to 
Liberty and Tennessee Colony Lake have been 
Flood Control (Cont) Page 
28. Scheduling Flood Control Reservoir 
Operations ....................... 39-12 
29. Other Authorized 
Flood Control Projects .............. 39-12 
30. Work Under Special Authorization .... 39-12 
Multiple-Purpose Projects Including Power 
31. Robert Douglas Willis 
Hydropower, TX.................... 39-12 
32. Sam Rayburn Dam and 
Reservoir, TX ...................... 39-13 
33. Sam Rayburn Dam and Reservoir, 
TX (Dam Safety) ................... 39-13 
34. Town Bluff Dam- 
B.A. Steinhagen Lake, TX............ 39-13 
35. Whitney Lake, TX .................. 39-13 
General Investigations 
36. Surveys .............................. 39-14 
37. Preconstruction Engineering 
and Design ........................ 39-14 
38. Collection and Study of Basic Data .... 39-14 
Tables 
Table 30-A Cost and Financial 
Statement ................. 39-15 
Table 30-B Authorizing Legislation ...... 39-19 
Table 30-C Other Authorized 
Flood Control Projects ....... 39-23 
Table 30-D Inspection of Completed 
Flood Control Projects ....... 39-24 
Table 30-E Work Under Special 
Authorization ............. 39-25 
dormant for several years due to lack of local support. 
The Dallas Floodway Extension has advanced to the 
Preconstruction Engineering and Design stage and 
is described in Preconstruction Engineering and 
Design section. 
CHANNEL TO LIBERTY: 
Location. The Channel to Liberty begins at the 
Houston Ship Channel, crosses the bay area in an 
easterly direction to intersect the existing Double Bayou 
Channel turns northward along the coastline to 
Wallisville Lake and then continues northward 
through the lake area along the course of the Trinity 
River to River Mile 45 above Liberty, Texas. 
Existing project. See Galveston,Texas District 
Annual Report writeup for existing project. 
39-2

FORT WORTH, TX, DISTRICT 
Proposed project. The navigation portion of 
the channel will have a width of 200 feet with a depth 
of 12 feet and will extend from the Houston Ship 
Channel in Galveston Bay to the port of Liberty, Texas. 
The flood control portion of the channel will have a 
bottom width of 200 feet with a depth of 30 feet, and 
will extend from Wallisville Lake to River Mile 45 above 
Liberty, Texas. 
Local cooperation. Local interests are 
required to: (a) provide, without cost to the Federal 
Government, all lands, easements and rights-ofway 
required for construction, operation and 
maintenance of the project, (b) accomplish, without 
cost to the Federal Government, all relocations and 
alterations to existing improvements, other than 
highway bridges over new land cuts and railroad 
bridges required for the construction of the project, 
(c) maintain and operate the flood control portion 
of the channel upstream of Liberty, Texas, and (d) 
reimburse the Federal Government for one-half of 
the separable costs allocated to recreation and fish 
and wildlife enhancement. 
TENNESSEE COLONY LAKE: 
Location. The Tennessee Colony dam site is 
located at River Mile 341.7 on the Trinity River about 
22 miles west of Palestine, Texas. The lake would 
extend into Freestone, Anderson, Henderson, and 
Navarro Counties, and would control a drainage area 
of 12,302 square miles. 
Existing project. The plan of improvement 
provides for the construction of an earthfilled dam 
with a maximum height of 123 feet above the 
streambed and a total embankment length of 42,350 
feet with a gated concrete spillway. The lake will have 
a total controlled storage of 3,455,000 acre-feet and 
a water surface area of 114,400 acres at the top of 
the flood control pool and 68,100 acres at the top of 
the conservation pool. The total storage includes 
2,269,500 acre-feet for flood control, 1,040,000 acrefeet 
for conservation, and 145,500 acre-feet for 
sediment reserve. 
Local cooperation. Local interests are 
required to reimburse the Federal Government for 
costs allocated to water supply storage and onehalf 
of the separable cost allocated to recreation and 
fish and wildlife enhancement. 
Flood Control 
2. AQUILLA LAKE, TX 
Location. On Aquilla Creek in Hill County, 
Texas, with the dam at River Mile 23.3, about 6.8 miles 
southwest of Hillsboro, Texas, and about 24.0 miles 
north of Waco, Texas. 
Existing project. For description of completed 
improvements and authorizing Acts see Annual 
Report for 1984. Construction was started March 1977, 
and project was ready for beneficial use April 29, 1983. 
Estimated cost is $46,100,000. 
Local cooperation. The Water Supply Act of 
1958, as amended, and the Federal Water Project 
Recreation Act of 1965 and Section 221, Flood 
Control Act of 1970 apply. A contract with the 
Brazos River Authority for water supply storage was 
approved by the Secretary of the Army, June 29,1976. 
To date, the Authority has paid $1,011,184 toward 
principal and $106,536 to operation and maintenance. 
Operations during fiscal year. Routine 
operation and maintenance continue. 
Benefits accrued to Aquilla Lake project: 
Accumulated flood damages prevented through 
FY 1999 were $19,417,800. 
3. BARDWELL LAKE, TX 
Location. Dam is on Waxahachie Creek, 5-river 
miles upstream from its confluence with Chambers 
Creek, a tributary of the Trinity River, and about 5 
miles south of Ennis, Ellis County, Texas. 
Existing project. For a description of completed 
improvement and authorizing act see Annual Report 
of 1969. Construction of project was started August 
1963 and completed for beneficial use in November 
1965. Estimated cost of project is $12,941,000. 
Local cooperation. Local interests must 
reimburse the Federal Government for costs allocated 
to increased water supply storage under the terms 
of the Water Supply Act of 1958. A contract was 
approved by the Secretary of the Army on June 
24, 1963, and the Trinity River Authority, a State 
agency, agreed to fulfill all requirements of local 
cooperation. To date the authority has paid $1,615,951 
toward principal and $2,109,260 toward annual 
cost of operation and maintenance of project, 
including cost of operating 10-foot conduit. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Bardwell Lake project: 
Accumulated flood damages prevented through 
FY 1999 were $12,591,400. 
4. BEALS CREEK, BIG SPRING, TX 
Location. Beals Creek, Big Spring, Texas is 
located in the city of Big Spring, Howard County, Texas 
on Beals Creek, a tributary of the Colorado River. 
Existing project. The Beals Creek Flood 
Control Project consists of construction of a channel 
to the north of and within a portion of the existing 
39-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Beals Creek channel. The channel extends 
approximately 7,200 feet from a point south of 
Channing Street at Onemile Lake and ends at the 
Benton Street Bridge. The channel is a trapezoidal 
grass-lined channel with an average depth of 11 feet, 
a bottom width of 20 feet, and side slopes of 1 
vertical to 3 horizontal. A grade control structure will 
be constructed at the upper limit of the project at 
Onemile Lake to allow the proper drainage gradient 
while preserving the existing wetland environment 
in the Onemile Lake area. Final Federal cost (Oct. 
1, 1997, base price) is $8,240,254; non-Federal cost 
for real estate, relocation of utilities and disposal is 
$3,618,152. 
Local cooperation. The Project Cooperation 
Agreement with the city of Big Spring was signed 
by the Assistant Secretary of the Army (CW) on 
March 10, 1994. 
Operations during the fiscal year. The 
project was physically completed in December 1998. 
Financial closeout has been initiated. 
5. BELTON LAKE, TX 
Location. Dam is on Leon River about 16.7 miles 
above confluence of Leon and Lampasas Rivers and 
about 3 miles north of Belton, Texas. 
Existing project. For a description of completed 
improvement and authorizing acts see Annual 
Report of 1962. Construction started June 1949 
and project was ready for beneficial use in March 1954. 
Raising water supply pool: Construction started in 
July 1970 and the pool raise is complete. Estimated 
cost of project is $18,410,000. 
Local cooperation. Section 2, Flood Control 
Act of 1938, applies. A contract with Brazos River 
Authority, a State agency, for remaining water 
supply storage in reservoir was approved by Secretary 
of the Army on January 15, 1958, at an estimated 
cost of $5,125,003. To date $1,945,216 has been 
paid. Under the contract Brazos River Authority must 
also pay annually 11.2 percent of actual annual 
cost of operation and maintenance. To date $3,186,505 
has been paid. An interim contract with Brazos 
River Authority for emergency use of water supply 
storage in project was approved by Secretary of the 
Army on January 2,1957. Amount of $433,083 paid 
by authority on March 21, 1957 for use of these facilities 
was credited to interest and principal payable under 
formal water supply contract. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Belton Lake project: 
Accumulated flood damages prevented through 
FY 1999 were $140,403,200. 
6. BENBROOK LAKE, TX 
Location. Dam is in Tarrant County, Texas, 
on Clear Fork of Trinity River 15 river miles 
upstream from its confluence with West Fork of 
Trinity River about 10 miles southwest of downtown 
Fort Worth, Texas. 
Existing project. For description of completed 
improvement and authorizing acts see Annual 
Report for 1962. Construction of project was started 
May 1947 and ready for beneficial use in September 
1952. Estimated cost of project is $14,544,000. 
Local cooperation. Section 2, Flood Control 
Act of 1938, applies. No water supply storage is 
included in project. In 1956, Congress passed 
legislation enabling the city of Fort Worth to purchase 
conservation storage space in Benbrook Lake. 
Contracts have been negotiated with the city of 
Fort Worth and the Benbrook Water and Sewer 
Authority for the use of portions of the navigation 
storage for water supply purposes until such storage 
is required for Trinity River Navigation. To date, 
$2,346,916 has been paid by the city of Fort Worth 
and $183,468 by Benbrook Water and Sewer Authority. 
A cost sharing contract with the city of Benbrook for 
Recreation Development was approved by the 
Secretary of the Army May 20, 1977. To date, 
$25,296 has been paid. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to system consisting of 
Benbrook Lake, Clear Fork and West Fork Floodways: 
Accumulated flood damages prevented through 
FY 1999 are estimated at $3,022,045,700. 
7. CANYON LAKE, TX 
Location. Dam is on Guadalupe River, 303 miles 
above its mouth, and about 12 miles northwest of New 
Braunfels, Comal County, Texas. 
Existing project. For a description of completed 
improvement and authorizing act see Annual Report 
of 1969. Construction started April 1958 and project 
completed for beneficial use June 1964. Estimated 
cost of project is $21,732,000, including $1,400,000 
contributed by local interests. 
Hydropower: The Guadalupe-Blanco River 
Authority (GBRA) was licensed by the Federal 
Energy Regulatory Commission to construct a 6,070 
kilowatt plant which is located adjacent to the 
existing outlet channel. The project operates utilizing 
conservation releases, i.e., no change from the 
present operating regiment is anticipated. GBRA has 
an agreement with the Pedernales Electric Cooperative 
for sale of power. Construction of the hydropower was 
completed in 1989 with non-Federal funds. 
39-4

FORT WORTH, TX, DISTRICT 
Local cooperation. Local interests (Guadalupe- 
Blanco River Authority) will utilize water impounded 
for water supply and streamflow regulation for 
development of electric power. In a formal contract 
approved by Chief of Engineers on October 24, 
1957, Guadalupe-Blanco River Authority agreed to 
fulfill all requirements of local cooperation. Required 
contribution of $1,400,000 was made in full by 
Guadalupe-Blanco River Authority. The estimated 
cost of the water storage contract is about $9,000,000. 
To date, $3,189,420 has been paid. In addition, 
$22,848 was contributed for installation and operation 
of reservoir leakage gages. Under the contract the 
authority must pay 34.8 percent of actual annual cost 
of operation and maintenance. To date, $2,446,967 
has been paid. 
Operations during fiscal year. Routine 
operation and maintenance continued. Additional work 
included replacing roof on project office and outlet 
works, adding parking lot and paving road to the project 
office. Total cost to complete repairs using operations 
funds was $226,000. 
Benefits accrued to Canyon Lake project: 
Accumulated flood damages prevented through 
FY 1999 were $177,939,800. 
8. FERRELLS BRIDGE DAMLAKE 
O' THE PINES, TX 
Location. Dam is on Cypress Creek in Marion, 
Harrison, Upshur, Morris, Camp, and Titus Counties, 
Texas, 8 miles west of Jefferson, Texas. 
Existing project. An earthfill dam 10,600 
feet long and 77 feet high includes a 200-foot spillway 
with a capacity of 68,200 cubic feet per second. 
Reservoir controls runoff from 850 square miles of 
drainage area, and has a gross storage capacity of 
842,100 acre-feet including 587,200 acre-feet flood 
control storage, 3,800 acre-feet conservation storage, 
and 251,000 acre-feet for municipal and industrial 
water supply. Reservoir extends 28 miles upstream. 
Project affords substantial flood protection of Cypress 
Creek Valley from damsite to confluence with Red 
River and, together with operation of other reservoirs 
proposed in Red River Basin, will provide flood 
protection along main stem of Red River below 
Denison Dam. Construction commenced in January 
1955 and was completed June 1960. Estimated 
Federal cost of project is $17,231,700, including 
$4,349,200 for Code 711 and $399,739 accelerated 
Public Works fund. This project transferred to the 
Fort Worth District as of the end of FY 1979. 
Local cooperation. None required. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Ferrells Bridge Dam-Lake O' The 
Pines project: Accumulated flood damages prevented 
through FY 1999 were $13,431,600. 
9. GRAPEVINE LAKE, TX 
Location. Dam is in Tarrant County, Texas, 
on Denton Creek, 11.7 river miles upstream from its 
confluence with Elm Fork of Trinity River and 
about 20 miles northwest of city of Dallas, Texas. 
Existing project. For description of completed 
improvement and authorizing act, see Annual 
Report for 1962. Construction of project was started 
December 1947 and ready for beneficial use in July 
1952. Estimated cost of project is $18,896,000, 
including $2,040,000 contributed by local interests. 
A contract for modification of Embankment and 
Spillway was awarded September 30, 1983 and 
completed Fiscal Year 1990. The improvements 
provided for spillway modification by construction 
of spillway chute and stilling basin and a berm on 
the downstream side of the main embankment. 
Local cooperation. A contract with Dallas 
County Park Cities Water Control and Improvement 
District No. 2 for 50,000 acre-feet of water supply 
storage was approved by Secretary of the Army on 
March 21, 1955. Park Cities paid the required 
$607,000. A contract with city of Dallas for 85,000 
acre-feet of water supply storage was approved by 
Secretary of the Army on March 17, 1954. Dallas paid 
the required $1,433,026. A contract with city of 
Grapevine, Texas, for 1,250 acre-feet of water supply 
storage was approved by Secretary of the Army on 
September 14, 1953, at an estimated cost of $22,654. 
A contract for Interim Use of Navigation Storage with 
city of Grapevine was approved by Secretary of the 
Army on February 27, 1981, at an estimated cost of 
$684,000, has been paid in full. Above contracts 
include payment of operation and maintenance 
costs as follows: Dallas County Park Cities Water 
Control and Improvement District No. 2, a pro rata 
part of the actual annual cost, which part is to be not 
less than $2,000 nor more than $3,000; Dallas, 9.2 
percent of actual annual cost; and Grapevine, its pro 
rata part of actual annual cost (estimated at $79.55 
annually and included in total annual payment). 
Following operation and maintenance payments 
have been made: Park Cities, $139,231; Dallas, 
$778,547; and Grapevine, $350,367. 
Operations during fiscal year. Routine 
operation and maintenance continue. 
Benefits accrued to system comprised of 
Grapevine Lake and Dallas Floodway: Accumulated 
flood damages prevented through FY 1999 were 
$4,367,962,600. 
39-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
10. HORDS CREEK LAKE, TX 
Location. On Hords Creek, a tributary of 
Pecan Bayou, about 13.5 miles west of Coleman, Texas, 
and about 27.8 miles upstream from mouth of 
Hords Creek. 
Existing project. For description of completed 
improvement and authorizing acts see Annual 
Report for 1962. Construction of project was started 
January 1947 and completed for beneficial use in April 
1948. Estimated cost of project is $4,337,000 including 
$105,000 contributed by local interests. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Hords Creek project: 
Accumulated flood damages prevented through 
FY 1999 were $937,000. 
11. JIM CHAPMAN LAKE, TX 
Location. Jim Chapman Lake is located in 
northeast Texas about 4 miles southeast of Cooper, 
13.0 miles north of Sulphur Springs, and is at river 
mile 23.3 on the South Sulphur River. The South 
Sulphur River rises in Fannin County, Texas, and flows 
generally east for about 80 miles to its confluence with 
the North Sulphur River to form the Sulphur River. 
Existing project. For description of completed 
improvement and authorizing acts, see Annual Report 
for 1997. Construction of project was started in July 
1958 and completed for beneficial use in May 1994. 
Estimated cost of project is $143,000,000, including 
$227,000 non-Federal cost for land for the levees. 
Local cooperation. Local interests (North 
Texas Municipal Water District, Sulphur River 
Municipal Water District, city of Irving) will utilize 
water impounded for present and future water 
supply. The total cost allocated to water supply to be 
reimbursed is $54,600,000. North Texas Municipal 
Water District, NTMWD, has contracted for 36.859 
percent of the water supply storage for future use 
with deferred payments for ten years. Under the 
contract NTMWD must pay 13.803 percent of actual 
annual cost of operation and maintenance. Sulphur 
River Municipal Water District, SRMWD, has 
contracted for 6.5 percent of the water supply 
storage for initial use and 19.78 percent for future 
use for a total of 26.282 percent of the water supply 
storage. To date, $214,663 has been paid. Under the 
contract, SRMWD must pay 2.435 percent of actual 
annual operation and maintenance. To date, $58,799 
has been paid. The city of Irving has contracted for 
16.923 percent of the water supply storage for initial 
use and 19.936 for future use for a total of 36.859 of 
the water supply storage. To date, $607,388 has 
been paid. Under the contract Irving must pay 
6.337 percent of actual annual operation and 
maintenance. To date $201,408 has been paid. 
The Texas Parks and Wildlife Department 
and the Corps of Engineers have entered into or have 
agreed to formal Operation and Maintenance 
contracts for recreation facilities and wildlife 
conservation and management. Under the contracts 
for recreation facilities dated 7 November 1988 
and 11 September 1990, Texas Parks and Wildlife 
will be responsible for 100 percent of the operations 
and maintenance of two state parks that are being 
constructed with Federal funds. Under the contracts 
for wildlife conservation and management the state 
will be responsible for 24.14 percent of the operations, 
maintenance and replacement annual costs for 
areas totaling approximately 35,500 acres. The 
remaining balance will be the responsibility of the 
Project Sponsors and the Government. 
Operations during fiscal year. Routine 
operation and maintenance continued. In addition, 
riprap was added to the upstream embankment 
and repairs to the outlet works wing walls at Jim 
Chapman Lake. Total repair cost using maintenance 
funds was $1,872,358. 
Benefits accrued to Jim Chapman Lake project: 
Accumulated flood damages prevented through 
FY 1999 are estimated at $5,022,700. 
12. JOE POOL LAKE, TX 
Location. Dam is located at River Mile 11.2 on 
Mountain Creek, a right bank tributary of the West 
Fork of the Trinity River, and is adjacent to the city 
limits of Grand Prairie, Dallas County, Texas, which 
is one of the rapid growing cities in the Dallas-Fort 
Worth Metropolitan area. 
Existing project. For description of completed 
improvement and authorizing acts see Annual 
Report for 1996. Construction of project was started 
in 1975 and completed for beneficial use in September 
1994. Estimated cost of project is $215,540,000 
including $11,350,000 contributed by local interests. 
Local cooperation. The Water Supply Act of 
1958 as amended, and the Federal Water Project 
Recreation Act of 1965 apply. Contracts for water 
supply storage and recreation with the Trinity 
River Authority were approved by the Acting 
Secretary of the Army, June 15, 1977. The recreation 
contract with Trinity Valley Authority was modified 
March 28, 1979, to allow the Corps to participate with 
the State of Texas and approved by the Assistant 
Secretary of the Army March 21, 1980. Recreation 
development contract with the State of Texas was 
approved by the Assistant Secretary of the Army March 
21, 1980. Reimbursement is currently estimated 
at $57,240,000 for water supply and $19,840,000 for 
39-6

FORT WORTH, TX, DISTRICT 
recreation (excluding future recreation facilities) for 
a total of $76,790,000 exclusive of interest. To date 
$1,571,210 has been paid. Of the actual annual cost 
of operation and maintenance, $66,145 has been paid. 
Operations during fiscal year. Routine 
operation and maintenance continued. Public Law 
97-400, H.R. 7377, 97th Congress, effective December 
31, 1982, changed the name of Lakeview Lake to Joe 
Pool Lake. 
Benefits accrued to Joe Pool Lake project: 
Accumulated flood damages prevented through 
FY 1999 were $822,156,000. 
13. LAVON LAKE, TX 
Location. Dam is in Collin County, Texas, 
on East Fork of Trinity River 55.9 miles above its 
confluence with Trinity River and about 22 miles 
northeast of Dallas, Texas. 
Existing project. For description of completed 
improvement and authorizing acts see Annual 
Report for 1962. Construction of project was started 
January 1948 and ready for beneficial use in 
September 1953. Project is complete. See following 
section for Lavon Lake Modification and East Fork 
Channel Improvement authorized by Flood Control 
Act of 1962. Estimated cost of project is $15,470,000. 
Local cooperation. Section 2, Flood Control 
Act of 1938, applies. A contract with North Texas 
Municipal Water District for water supply storage, 
including cost of intake structure, was approved by 
Secretary of the Army July 8, 1954, at an estimated 
cost of $1,405,753. Contract was revised in 1973 and 
final revised contract amount is $1,445,262. To 
date North Texas Municipal Water District has 
paid $5,732,622. Under the contract North Texas 
Municipal Water District must pay annually 13.6 
percent of actual annual cost of operation and 
maintenance, and to date has paid $1,098,416. 
Operations during fiscal year. Routine 
operation and maintenance continued. In addition, 
the tainter gates were painted and repaired at 
Lavon Lake. Total for tainter gates using maintenance 
funds was $1,290,288. 
Benefits accrued to Lavon Lake project: 
Accumulated flood damages prevented through 
FY 1999 were $204,914,700. 
14. LAVON LAKE MODIFICATION 
AND EAST FORK CHANNEL 
IMPROVEMENT, TX 
Location. Existing dam is in Collin County Texas, 
on East Fork of Trinity River, 55.9 miles above its 
confluence with Trinity River and about 22.0 miles 
northeast of Dallas, Texas. Channel improvement of 
East Fork extends from its mouth to River Miles 
31.8. 
Existing project. For description of completed 
improvement and authorizing acts see Annual 
Report for 1988. Construction of project was initiated 
in May 1970 and ready for beneficial use in December 
1975. Estimated Federal cost of the modification and 
improvement is $69,750,000 and $220,000 local 
interests, a total of $69,970,000. Project is complete. 
Local cooperation. Local interests must 
reimburse the Federal Government for costs allocated 
to increased water supply storage under the terms 
of the Water Supply Act of 1958. The North Texas 
Municipal Water District has contracted for 43 
percent of the water supply (approved September 22, 
1967, by the Secretary of the Army) and to date 
$985,433 has been paid. North Texas Municipal 
Water Supply District has submitted assurance to 
contract for 57 percent of future water supply. 
Reimbursement is currently estimated at $37,825,004. 
Levee Districts 4 and 5, which comprise the lower 
10 miles of the East Fork Channel, entered into 
agreements as required by Section 221 of the Flood 
Control Act of 1970 on January 28, 1972 and have 
furnished all necessary construction easements. 
Levee Districts 6, 8, 10, 13, and 15, which 
comprise the upper 15 miles of the East Fork 
Channel, have declined to provide the necessary 
assurances. On December 8, 1972, this portion of the 
project was reclassified from "active" to "inactive" 
category. 
Operations during fiscal year. Improvement 
of the lower ten miles of the East Fork Channel and 
Levees and total project are 100 percent complete. 
15. LEWISVILLE DAM, TX 
Location. Dam is in Denton County, Texas, on 
Elm Fork of Trinity River 30 river miles above its 
confluence with Trinity River and about 22 miles 
northwest of city of Dallas, Texas at a site downstream 
from old Garza Dam. 
Existing project. For description of completed 
improvement and authorizing acts see Annual 
Report for 1962. Construction of project was started 
November 1948 and ready for beneficial use in 
November 1954. Estimated cost of project is 
$25,902,000, including $3,677,000 contributed by local 
interests. 
Hydropower: The city of Denton, Texas 
(COD) was licensed by the Federal Energy Regulatory 
Commission to construct a 2,000 kilowatt plant 
which is located adjacent to the existing outlet 
channel. The project operates utilizing conservation 
releases, i.e., no change from the present operating 
regiment is anticipated. COD Utilities Department 
39-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
utilizes this power for its local customers. Construction 
of the hydropower was completed in 1991 with non- 
Federal funds. 
Local cooperation. A contract with city of 
Dallas for 415,000 acre-feet of water supply storage 
land rights and interests to Garza Dam and Reservoir 
was approved by the Secretary of the Army on July 
16, 1953. Local contributions have been made in full. 
A contract with city of Denton, Texas, for remaining 
21,000 acre-feet of water supply storage was approved 
by the Secretary of the Army on May 20, 1954, 
with an estimated cost of $250,064. Local contributions 
have been paid in full. Under above contracts, cities 
of Dallas and Denison must pay annually 21.9 and 
1 percent, respectively, of actual annual cost of 
operation and maintenance. To date Dallas has 
paid $4,637,566 and Denton $200,438. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to system comprised of 
Lewisville Lake; this includes Ray Roberts Lake 
and Dallas Floodway Systems. Accumulated flood 
damages prevented through FY 1999 were 
$17,282,635,400. 
16. NAVARRO MILLS LAKE, TX 
Location. Dam is in Navarro County, Texas, 
at River Mile 63.9 on Richland Creek, a tributary of 
Trinity River, about 16.0 miles southwest of Corsicana, 
Texas. 
Existing project. For description of completed 
improvement and authorization acts see Annual 
Report for 1965. Construction started December 1959 
and project completed for beneficial use March 
1963. Estimated cost of project $13,154,000 including 
$300,000 contributed by local interests. 
Local cooperation. The Water Supply Act of 
1958, as amended applies. A formal contract with the 
Trinity River Authority was approved March 3, 
1966, by the Secretary of the Army at an estimated 
cost of $2,260,800. To date the Authority has paid 
$1,410,712 for water supply and $1,589,605 for 
operation and maintenance. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Navarro Mills Lake project: 
Accumulated flood damages prevented through 
FY 1999 were $45,996,200. 
17. O.C. FISHER DAM AND 
LAKE, TX 
Location. Dam is on North Concho River, a 
tributary of Concho River, about 6.6 miles above mouth 
of North Concho River near city of San Angelo, 
Texas. 
39-8 
Existing project. For description of completed 
improvement and authorizing acts see Annual 
Report for 1962. Name was changed from San 
Angelo Dam and Reservoir to O.C. Fisher Dam 
and Lake January 3, 1975 by Public Law 93-634. 
Construction of project was started May 1947 and 
ready for beneficial use February 1952. Estimated 
cost of project is $17,111,000. 
Local cooperation. Section 2, Flood Control 
Act of 1938, applies. A water supply contract with 
Upper Colorado River Authority for water supply 
storage in reservoir was approved by Secretary of the 
Army on October 11, 1948. The Authority has 
contributed $860,444 toward cost of project and 
$64,336 toward operation and maintenance for a 50- 
year period. The Authority must pay additional 
contributions of $1 a year for useful life of project, 
beginning January 1, 1965. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to O.C. Fisher Dam and Lake 
project: Accumulated flood damages prevented 
through FY 1999 were $2,376,000. 
18. PROCTOR LAKE, TX 
Location. Dam is at River Mile 238.9 on Leon 
River, a tributary of Brazos River, about 8.0 miles 
northeast of Comanche in Comanche County, Texas. 
Existing project. For description of completed 
improvement and authorization act see Annual 
Report of 1969. Construction of project was started 
July 1960 and completed for beneficial use 1963. 
Estimated cost of project is $16,249,000. 
Local cooperation. The Water Supply Act of 
1958 applies. A formal contract with the Brazos 
River Authority, a State agency, was approved by 
Secretary of the Army, July 1, 1960, and was modified 
and approved May 9, 1966, at an estimated cost of 
$1,707,900. To date the Authority has paid $609,077 
for water supply and $686,550 for operation and 
maintenance. 
Operations during fiscal year. Routine 
operation and maintenance were continued. 
Benefits accrued to Proctor Lake project: 
Accumulated flood damages prevented through 
FY 1999 were $38,810,700. 
19. RAY ROBERTS LAKE, TX 
Location. Damsite is located at River Mile 60.0 
on the Elm Fork of the Trinity River, Denton County, 
between Sanger and Aubrey, Texas and 30 miles 
upstream from Lewisville Dam. 
Existing project. The plan of improvement 
provides for construction of an earthfilled dam with --

FORT WORTH, TX, DISTRICT 
a maximum height of 141 feet above the streambed, 
a length of 15,250 feet including an uncontrolled 
broadcrested spillway 100 feet long, controlling 682 
square miles of drainage area. The lake will have a 
total controlled storage of 1,064,600 acre-feet, with 
a water surface area of 36,900 acres. The total 
storage includes 260,800 acre-feet for flood control, 
749,200 acre-feet for water supply, and 54,600 acrefeet 
for sediment reserve. The Water Resources 
Development Act of 1990 authorized the Greenbelt 
Corridor between Lewisville and Ray Roberts Lakes. 
Estimated Federal cost of the project is $317,300,000 
(Oct. 1; 1995 base price). Public Law 96-384, 96th 
Congress, H.R. 8094, effective January 4, 1981, 
changed the name of Aubrey Lake to Ray Roberts 
Lake.
Hydropower: At the request of the city of 
Denton and the approval of the Secretary of the Army, 
the penstock was added to the embankment as a 
minimum facility for future hydropower. The city of 
Denton, Texas (COD) was licensed by the Federal 
Energy Regulatory Commission to construct a 1,000 
kilowatt plant which is located adjacent to the 
existing outlet channel. The project operates utilizing 
conservation releases, i.e., no change from the 
present operating regiment is anticipated. COD 
Utilities Department utilizes this power for its local 
customers. Construction of the hydropower was 
completed in 1991 with non-Federal funds. 
Local cooperation. The Water Supply Act of 
1958 as amended and the Federal Water Project 
Recreation Act of 1965 and Section 221, Flood 
Control Act of 1970 apply. Contracts with the cities 
of Dallas and Denton, Texas, for water supply 
storage and recreation were approved by the Secretary 
of the Army September 16, 1980. To date the city of 
Dallas has paid $223,471,352. The city of Denton has 
paid in full their share of the water supply storage. 
Dallas has paid $511,375 and Denton has paid 
$179,667 toward annual cost of operation and 
maintenance of project. 
Operations during fiscal year. The project 
was physically completed in April 1999. Financial 
closeout of the project has been initiated. Routine 
operation and maintenance continued. 
Benefits accrued to Ray Roberts Lake project: 
Accumulated flood damage prevented is shown in with 
Lewisville Dam, TX. 
20. SAN ANTONIO CHANNEL 
IMPROVEMENT, TX 
Location. Floodway is in city of San Antonio, 
Bexar County, Texas, on San Antonio River and 
San Pedro, Apache, Alazan, Martinez, and Six Mile 
Creeks. 
Existing project. The project consists of 30.7 
miles of channel and associated improvements on six 
separate streams. Completion of detailed engineering 
and design studies revealed that the least costly 
alternative for the remaining channel improvements 
would consist of two tunnels 120 feet below the 
surface each having an inside diameter of 24 feet and 
vertical intake, outlet and access shafts. The San Pedro 
Creek tunnel is 6,040 feet in length and the San 
Antonio River tunnel is 16,360 feet in length. 
Estimated Federal cost of these modifications is 
$153,100,000 (Oct. 1, 1998, base price), and estimated 
cost to local interests is $65,900,000 which includes 
$4,050,000 cash contributions and $61,850,000 for 
lands, damages, and construction, a total of 
$218,500,000. The existing project was authorized 
by 1954 Flood Control Act. The Water Resources Act 
of 1976 added authorization to the existing project 
for construction of flood control measures needed to 
preserve and protect the Espada Aqueduct located 
in the vicinity of Six Mile Creek. Construction was 
started in October 1957. 
Local cooperation. Local interests must 
furnish lands and rights-of-way for construction, 
including purchase and removal of buildings, 
relocation or reconstruction of bridges (exclusive of 
railway bridges), channel dams where applicable, and 
utility lines; hold the United States free from 
damages; maintain and operate all works after 
completion; and provide a cash contribution for 
enhancement benefits of 2.65 percent of actual 
Federal construction cost. San Antonio River 
Authority furnished assurances that it will comply 
with all requirements of local cooperation. These 
assurances were accepted by the District Engineer 
on April 15, 1957. To date $3,958,731 has been 
contributed by San Antonio River Authority. In 
addition, $30,000 has been contributed and accepted, 
under the authority of Civil Functions Appropriations 
Act of 1958, for vehicular crossings over the San 
Antonio Channel. 
Operations during fiscal year. During 
FY 1999, funds were used to initiate hydraulic 
performance investigations and flood damage repair. 
The project is about 99 percent complete overall and 
is scheduled to be completed in September 2002. 
Benefits accrued to San Antonio project: 
Accumulated damages prevented through FY 1999 
were $439,000,000. 
21. SAN GABRIEL RIVER, TX 
Location. Project is a system of three reservoirs 
in Williamson County in the central portion of 
Brazos River Basin, which consists of Granger Dam 
at River Mile 31.9 on San Gabriel River, about 7.0 
miles east of Granger, Texas; North San Gabriel Dam 
39-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
at River Mile 4.3 on North Fork of San Gabriel 
River, about 3.5 miles northwest of Georgetown, Texas; 
and South Fork Dam at River Mile 4.7 on South Fork 
of San Gabriel River, about 3.0 miles southwest of 
Georgetown, Texas. 
Existing project. Granger Lake was authorized 
by 1954 Flood Control Act, and North (North San 
Gabriel Dam and Lake Georgetown) and South 
Fork Lakes were authorized by 1962 Flood Control 
Act. Estimated total Federal cost of project is 
$181,400,000 (Oct. 1, 1986, base price) and estimated 
non-Federal cost of $90,600,000 for a project total of 
$272,000,000. Plan of improvement provides for 
the following: Granger: An earthfilled dam 16,320 
feet long, including spillway with maximum height 
of 115 feet above streambed, which controls 709 square 
miles of drainage area. Reservoir provides a total 
storage capacity of 244,200 acre-feet, of which 
162,200 acre-feet are for flood control, 37,900 acrefeet 
for water supply storage, and 44,100 acre-feet 
for sediment reserve. Estimated cost of project is 
$62,062,000. North San Gabriel Dam: A rockfill 
dam 6,700 feet long, including spillway with maximum 
height of 164 feet above streambed, which controls 
246 square miles of drainage area. Reservoir provides 
a total storage capacity of 130,800 acre-feet of which 
87,600 acre-feet are for flood control, 29,200 acre-feet 
for water supply storage, and 14,000 acre-feet for 
sediment reserve. Estimated cost of project is 
$38,765,000. South Fork: A rockfill dam 5,620 feet 
long, including spillway with maximum height of 152 
feet above streambed, which controls 123 square miles 
of drainage area. Reservoir provides a total storage 
capacity of 82,600 acre-feet (45,700 for flood control, 
28,900 for water supply storage, and 8,000 for 
sediment reserve). Estimated cost of project is 
$171,173,000. Public Law 96-575, 96th Congress, H.R. 
4941 effective January 4, 1981, changed the name 
of North Fork Lake to North San Gabriel Dam and 
Lake Georgetown. 
Local cooperation. Construction is subject 
to condition that local interests reimburse the 
Federal Government for costs allocated to water supply 
at Granger, Lake Georgetown, and South Fork 
Lakes. Reimbursement currently estimated at 
$13,315,000 for Granger, $6,295,000 for Lake 
Georgetown, and $50,563,000 for South Fork, for a 
total of$70,172,000 exclusive ofinterest. Brazos River 
Authority, a State agency, is the local interests' 
sponsor of project, and by letter dated April 18, 
1966, indicated its acceptance of the proposed plan 
of development and its willingness to pay for the costs 
allocated to water supply in each reservoir in the 
ultimate plan. Such water supply assurances for 
Granger and Lake Georgetown Lakes were approved 
May 24, 1968 as satisfactory in accordance with 
requirements of the Water Supply Act of 1958, as 
amended. Contract negotiations for South Fork 
Lake will be deferred until the need for water supply 
develops and the reservoir is scheduled for construction. 
Operations during fiscal year. Through 
1983 all work has been completed. Deliberate 
impoundment of water commenced at Granger and 
Lake Georgetown Lakes on January 21, 1980 and 
March 3, 1980, respectively. In FY 1982, studies 
on South Fork Lake were resumed in preparation of 
General Design Memorandum to provide reaffirmation 
prior to construction. A Draft Reevaluation Report 
on South Fork Lake was submitted to headquarters 
in October 1986. The report recommended no 
Federal action and defer further studies indefinitely. 
Future water supply needs of the area would be 
addressed by reallocating storage at Granger Lake. 
The South Fork Lake project would be eligible for 
deauthorization in FY 2000 if no funds are obligated 
by then. 
Benefits accrued to project consisting of Granger 
and Lake Georgetown: Accumulated flood damages 
prevented through FY 1999 were $36,982,100. 
22. SOMERVILLE LAKE, TX 
Location. Dam is on Yegua Creek 20 miles 
upstream from its confluence with Brazos River 
and about 2 miles south of Somerville, Texas. 
Existing project. For description of completed 
improvements and authorizing act see Annual 
Report of 1969. Construction started in June 1962 
and the project was ready for beneficial use in 
January 1967. Estimated cost of project is $30,227,000. 
Local cooperation. The Water Supply Act of 
1958, as amended, applies. A contract with the 
Brazos River Authority, a State agency for water supply 
storage approved May 10, 1962, by the Secretary of 
the Army, has paid $2,457,383 to date. Also under 
the contract, the Authority must pay annually 
28.655 percent of the actual annual cost of operation 
and maintenance. 
Operations during fiscal year. Routine 
operation and maintenance continued. In addition, 
repair and maintenance was completed on the north 
access road drainage ditch. Total cost for repairs using 
maintenance funds was $453,632. 
Benefits accrued to Somerville Lake project: 
Accumulated flood damages prevented through 
FY 1999 were $65,799,900. 
23. STILLHOUSE HOLLOW 
DAM, TX 
Location. Dam is on Lampasas River 16 miles 
upstream from its confluence with Little River, a 
tributary of the Brazos River, and about 5 miles 
southwest of Belton, Texas. 
39-10

FORT WORTH, TX, DISTRICT 
Existing project. For description of completed 
improvements and authorizing act see Annual 
Report of 1969. Construction was initiated in July 
1962 and the project was ready for beneficial use in 
February 1968. Estimated cost of project is $23,670,000. 
Local cooperation. The Water Supply Act of 
1958 applies. A contract with the Brazos River 
Authority, a State agency, for water supply storage 
was approved April 13, 1962, by the Secretary of the 
Army, at an estimated cost of $6,912,430. To date the 
Authority has paid $3,131,843. Also under the 
contract the Authority must pay annually 27.748 
percent of the actual annual cost of operation and 
maintenance. To date the Authority has paid 
$1,666,051. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Stillhouse Hollow Dam 
Project: Accumulated estimate of flood damages 
prevented through FY 1999 is $35,641,000. 
24. WACO LAKE, TX 
Location. Dam is on Bosque River, 4.6 river 
miles above its confluence with Brazos River, at 
city of Waco, McLennan County, Texas. 
Existing project. For description of completed 
improvements and authorizing act see Annual 
Report of 1969. Estimated cost of project is $50,853,000 
including $250,000 contributed by local interests and 
$2,500,000 other non-Federal cost. Construction 
was started in July 1958, and project was ready 
for beneficial use in February 1965. 
Local cooperation. Section G of the Flood 
Control Act of December 1944 applies. A contract with 
the Brazos River Authority, a State agency, for 
water supply storage and the contract with the city 
of Waco transferring the existing Lake Waco to the 
Government for their water storage, was approved 
by the Secretary of the Army on April 15, 1958. To 
date, the Authority for their portion of the water supply 
storage has paid $3,015,056. Also under the contract 
the Authority and the city must pay 14.706 and 2.087 
percent respectively of the actual cost of operation 
and maintenance. To date the Authority has paid 
$1,432,587 and the city has paid $216,930. A contract 
with the Brazos River Authority, for additional 
storage for municipal and industrial water supply, 
was approved by the Acting Assistant Secretary of 
the Army, September 28, 1984. 
Operations during fiscal year. Routine 
operations and maintenance continued. 
Benefits accrued to Waco Lake project: 
Accumulated flood damages prevented through 
FY 1999 were $117,580,400. 
25. WACO LAKE, TX (DAM SAFETY) 
Location. For location of completed dam see 
Waco Lake, Texas in this chapter. 
Existing project. The existing rolled earthfill 
embankment's top elevation of 510 feet National 
Geodetic Vertical Datum (NGVD), is hydrologically 
deficient. The original hydrologic design criteria 
used for Waco Dam design has been revised. Current 
hydrologic design criteria indicates the spillway 
and outlet works cannot pass the Probable Maximum 
Flood (PMF) without overtopping the dam by 1.0 foot, 
which could lead to failure of the embankment and 
catastrophic release of the reservoir. Adding required 
freeboard, Waco Dam crest height is hydrologically 
deficient by 4.6 feet. The proposed modification 
consists of raising the dam crest approximately by 
4.6 feet to 514.6 feet NGVD utilizing a combination 
of compacted earthfill and reinforced cast-in-place 
concrete parapet wall for the full length of the dam. 
No major modification to the spillway, spillway 
service bridge, outlet works tower, or outlet works 
tower service bridge will be required. However, the 
spillway hoist mechanisms for the tainter gates 
will be waterproofed. The outlet works service 
bridge will be provided with a removeable bulkhead 
to be installed only during large flood events but would 
otherwise remain unchanged. Estimated Federal 
cost for raising the dam modification is $6,260,000 
(Oct. 1, 1998, base price) and $220,000 is to be 
reimbursed by local sponsors. 
Operations during fiscal year. During 
FY 1999 funds were used to continue construction. 
Project construction is scheduled to be completed 
March 2000. 
26. WRIGHT PATMAN DAM AND 
LAKE, TX 
Location. Dam is on Sulphur River in Cass and 
Bowie Counties, Texas. Dam is 45 miles above 
mouth of Sulphur River, and about 8 miles southwest 
of Texarkana, Texas. 
Existing project. For description of completed 
improvements and authorizing act see Annual 
Report of 1984. Estimated cost of project is $51,945,000 
which includes $5,449,100 Code 711, $399,939 
accelerated public works funds, and $13,138,004 
to be reimbursed by local interests, over a period not 
to exceed 50 years, for water supply storage, and 
including $2,092,040 for pro rata share of original 
reservoir cost. Construction was initiated in August 
1948 and completed in March 1962, except real 
estate activities, construction under Code 711, and 
conversion of 120,000 acre-feet to water supply 
storage after completion of Cooper Reservoir (Jim 
39-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Chapman Lake). This project transferred to the 
Fort Worth District as of the end of FY 1979. 
Local cooperation. A contract with the city 
of Texarkana, Texas, for reserving water supply 
storage space was approved by the Secretary of the 
Army December 17, 1968. To date, the city has paid 
$822,503. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
Benefits accrued to Wright Patman Dam and 
Lake project: Accumulated flood damages prevented 
through FY 1999 were $13,859,000. 
27. INSPECTION OF COMPLETED 
FLOOD CONTROL PROJECTS 
Inspection of completed local flood protection 
projects is made periodically in compliance with 
Section 208.10, of Title 33, Code of Federal Regulations, 
which contains regulations for operation and 
maintenance of local flood-protection works approved 
by the Secretary of the Army in accordance with 
authority in Section 3, Flood Control Act of June 22, 
1936. See Table 30-D for inspections made this 
fiscal year. 
Inspection costs for FY 1999 from regular 
funds for maintenance were $292,656. Total costs to 
September 30, 1999 were $1,240,540. 
28. SCHEDULING FLOOD 
CONTROL RESERVOIR 
OPERATIONS 
In accordance with Flood Control Act of 1944, 
expenditures were made for scheduling flood control 
reservoir operations and preparation of reservoir 
regulation manual for Marshall Ford Dam, on the 
Colorado River, near city of Austin, Texas, and for 
preparation of reservoir regulation manual for Twin 
Buttes Dam, on Middle and South Concho Rivers near 
city of San Angelo, Texas. Marshall Ford Dam was 
authorized by 1937 River and Harbor Act. Project 
was constructed jointly by Bureau of Reclamation 
and Lower Colorado River Authority and was 
completed during FY 1942. Twin Buttes Reservoir 
was authorized for construction by Department of 
Interior by Public Law 152, 85th Congress. 
Construction was initiated in June 1960; closure of 
dam started in June 1962; deliberate impoundment 
was started January 23, 1963. 
Accumulated damages prevented by Marshall 
Ford Reservoir through FY 1999 were $277,892,300 
and by Twin Buttes through FY 1999 were $1,118,000. 
Twin Buttes Reservoir consists of two separate 
pools, one on South Concho River and the other on 
Middle Concho River and Spring Creek. Equalizing 
channel between these two pools is at elevation 
1925.0. Costs for FY 1999 from regular funds for 
operation of both reservoirs were $48,030. 
29. OTHER AUTHORIZED FLOOD 
CONTROL PROJECTS 
(See Table 30-C.) 
30. WORK UNDER SPECIAL 
AUTHORIZATION 
(See Table 30-E.) 
Flood control activities pursuant to Section 
205, Public Law 585, 80th Congress, as amended 
(preauthorization); emergency streambank protection 
under Section 14, Public Law 526, 79th Congress, 
as amended; Snagging and Clearing of navigable 
streams and tributaries in interest of flood control 
Section 208, Public Law 780, 83rd Congress, as 
amended. Emergency flood control, hurricane-flood, 
and shore protection activities (Public Law 99, 84th 
Congress, and antecedent legislation). Environmental 
restoration under Section 1135, Public Law 99- 
662, 99th Congress, as amended. 
Fiscal year costs were $454,585 for disaster 
preparedness; no levee repair. 
Multi-Purpose Projects Including 
Power 
31. ROBERT DOUGLAS WILLIS 
HYDROPOWER, TX 
Location. For location of completed dam see 
Town Bluff Dam-B.A. Steinhagen Lake, Texas in this 
chapter. 
Existing project. Installation of hydroelectric 
power generating facilities at Town Bluff Dam was 
authorized by the River and Harbor Act of 1945 (Public 
Law 79-14), March 2, 1945, but deferred in the 
original construction. Town Bluff Dam was completed 
and placed in operation in 1951. A Design Analysis 
Report completed in April 1982 and a Feasibility Report 
was approved September 9, 1983 indicated that 
installing hydropower at this project was economically 
feasible. The hydropower facilities include a 7,400 
kilowatt power plant (two units at 3,700 kilowatts 
each), intake and outlet facilities, and necessary 
switchgear equipment is located in the main 
embankment at the old diversion channel. The 
plant is operated remotely from the Sam Rayburn 
project. The project produces an estimated 35,900 
megawatt hours of energy per year. There is no 
Federal cost on this project. It is completely funded 
by non-Federal funds. The estimated non-Federal cost 
is $18,643,000. 101st Congress House Report 923, 
effective February 7, 1989, changed the name of Town 
39-12

FORT WORTH, TX, DISTRICT 
Bluff Hydropower to Robert Douglas Willis 
Hydropower. 
Local cooperation. A contract with the Sam 
Rayburn Municipal Power Authority was approved 
by Secretary of the Army, June 28, 1985, relative to 
financing, escrow agreement, and power sales 
agreement. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
32. SAM RAYBURN DAM AND 
RESERVOIR, TX 
Location. Dam is on Angelina River 25.2 
miles upstream from its confluence with Neches River 
and about 10.0 miles northwest of Jasper, Texas. 
Existing project. For description of completed 
improvements and authorizing act see Annual 
Report 1969. Construction was started August 1956 
and project was ready for beneficial use in March 1965. 
Estimated cost of project is $68,683,000 including 
$3,000,000 contributed by local interests. 
Local cooperation. A contract with the 
Lower Neches Valley Authority, a State agency, to 
contribute $3,000,000 toward the first cost and an 
additional $200,000 annually for 50 years after 
completion of the project was approved by the 
Secretary of the Army on January 22, 1957. 
Contribution of $3,000,000 was made in full and annual 
payments to date of $5,600,000 have been made by 
the Authority. 
A contract with the city of Lufkin for water supply 
storage was approved May 27, 1969 by the Secretary 
of the Army at an estimated cost of $525,600. To date 
the city has paid $443,723. Also under the contract 
the city of Lufkin must pay annually 0.692 percent 
of the annual cost of operation and maintenance. To 
date the city has paid $214,364. 
Operations during fiscal year. Routine 
operation and maintenance continued. In addition, 
repair of the cavitation on wicket gates was completed 
at Sam Rayburn Dam. The total repair cost using 
maintenance funds was $469,274. 
Benefits accrued to Sam Rayburn project: 
Accumulated flood damages prevented through 
FY 1999 were $665,018,100. 
33. SAM RAYBURN DAM AND 
RESERVOIR, TX 
(DAM SAFETY) 
Location. For location of completed dam see 
Sam Rayburn Dam and Reservoir, Texas in this 
chapter. 
Existing project. The original 2200-foot wide 
uncontrolled spillway was constructed through 
erodible loose sand, shaley clay, and sandstone. 
Based on experience of significant erosion at other 
uncontrolled and unlined spillways constructed 
through less erodible material, the spillway at Sam 
Rayburn Dam would have experienced severe erosion 
damage and probably breach during passage of 
floods in excess of the 150-year flood frequency (25 
percent of Probable Maximum Flood). The original 
spillway was removed in part and replaced with a new 
reinforced concrete weir, stilling basin and outfall 
channel near the existing spillway structure. The new 
weir was completed December 1996 and has a width 
of 640 feet, an overall length of 433 feet, an outfall 
channel approximately 5,000 feet long and a crest 
elevation of 176.0 feet National Geodetic Vertical 
Datum (NGVD). Estimated Federal cost for the 
spillway modification is $40,000,000 (Oct 1, 1997, base 
price) and $1,000,200 is to be reimbursed by 
hydropower sponsors, $101,000 from the city of 
Lufkin and $330,000 from the Lower Neches Valley 
Authority. 
Operations during fiscal year. During 
FY 1999, funds were used to continue financial 
closeout of the project. The project was physically 
completed in December 1996. 
34. TOWN BLUFF DAMB.
A. STEINHAGEN LAKE, TX 
Location. Dam is on Neches River about 12.4 
miles below mouth of Angelina River, one-half mile 
north of Town Bluff, Texas, and 93.0 river miles north 
of Beaumont, Texas. 
Existing project. For description of completed 
improvement and authorizing acts see Annual 
Report for 1962. Construction started March 1947 
and project was ready for beneficial use in April 1951. 
Estimated cost of project is $9,888,000, including 
$2,000,000 contribution by local interests. 
Local cooperation. Completed as required. 
Operations during fiscal year. Routine 
operation and maintenance continued. 
35. WHITNEY LAKE, TX 
Location. Dam is on Brazos River, about 442 
miles above mouth of river, 5.5 miles southwest of 
Whitney, Texas, and about 38 miles upstream from 
city of Waco, Texas. 
Existing project. For description of completed 
improvement and authorizing acts see Annual 
Report for 1962. Construction of project was started 
May 1947 and ready for flood control use in December 
1951. First power was placed on-the-line in June 1953. 
Raise power pool is complete. Estimated cost of 
project is $46,306,000. 
39-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Local cooperation. Section 2, Flood Control 
Act of 1938, applies. A contract with the Brazos River 
Authority, a State agency, for water supply storage 
was approved by the Secretary of the Army November 
3, 1982. To date, the Authority has paid $263,800. 
Operations during fiscal year. Continued 
routine operation and maintenance. 
Benefits accrued to Whitney Lake project: 
Accumulated flood damages prevented through 
FY 1999 were $232,942,400. 
General Investigations 
36. SURVEYS 
Fiscal year costs were $562,456 for flood damage 
prevention studies; $99,798 for coordination with other 
agencies; $0 for review of deferred projects; $145,205 
for special studies; $0 for review of completed 
projects; $0 for environmental services partnerships; 
$85,485 for miscellaneous activities; for a total 
of $892,944. 
37. PRECONSTRUCTION 
ENGINEERING AND DESIGN 
DALLAS FLOODWAY EXTENSION, TX 
Dallas Floodway Extension is located on the 
Trinity River in the city of Dallas, Dallas County, Texas. 
The plan of improvement provides for extending the 
existing Floodway downstream about 9 miles to 
the confluence of the Trinity River and Five Mile Creek 
The plan consists of a levied floodway and flood 
conveyance improvement (channel) along the main 
stem, Five Mile Creek and White Rock Creek. 
Maintained free of encroachments, the levees and 
channels would provide Standard Project Flood 
protection for approximately 6,450 acres of urban lands 
currently subject to flooding. The estimated planning 
and engineering estimate is $8,560,000. Planning and 
engineering studies were initiated in FY 1991. Fiscal 
year costs were $1,986,313. 
GRAHAM, TX (BRAZOS RIVER BASIN) 
Graham is located in Graham, Young County, 
Texas. The plan of improvement provides a buy-out 
of 127 structures within the 10-year flood plain in 
the city of Graham, TX; install a flood warning 
system to protect residents above the buy-out zone; 
create recreational areas consisting of a trail, picnic 
sites, and park road; and ecosystem restoration of 
the project lands with native vegetation. The 
ecosystem restoration includes replanting of native 
trees, shrubs, and herbaceous vegetation. This 
feature will restore a portion of the bottomland 
hardwood forest that has been adversely impacted 
by past floodplain development. Planning, engineering 
and design estimate is $250,000, and was initiated 
in FY 1998. Fiscal year costs were $148,368. 
JOHNSON CREEK, ARLINGTON, TX 
Johnson Creek lies principally in Tarrant 
County with a small portion lying in Dallas County. 
The plan of improvement includes a buy-out of 140 
structures for flood damage reduction. 155 acres of 
ecosystem restoration, and 2.25 miles of linear 
recreation features. The buy-out would prevent 
damages during a 25-year flood event. Planning 
engineering and design was initiated in FY 1999, and 
planning engineering and design estimate is $210,000. 
Fiscal year costs were $0. 
38. COLLECTION AND STUDY OF 
BASIC DATA 
Work was continued under the Flood Plain 
Management Services on the compilation of 
information on floods and potential flood damages, 
including identification of those areas subject to 
inundation. Fiscal year expenditures for these 
activities totaled $352,110. Fiscal year costs were 
$4,137 for hydrologic studies. 
39-14

FORT WORTH, TX, DISTRICT 
TABLE 30-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 199917 
1. Trinity River Project, 
TX Includes Channel to 
Liberty, Tennessee 
Colony Lake, and Dallas 
Floodway Extension 
2. Aquilla Lake, TX 
3. Bardwell Lake, TX 
4. Beals Creek, 
Big Spring, TX 
5. Belton Lake, TX 
6. Benbrook Lake, TX 
7. Canyon Lake, TX 
8. Ferrells Bridge Dam- 
Lake O' The Pines, TX 
9. Grapevine Lake, TX 
New Work: 
Approp. 
Cost: 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
- 22,574,865 
- 22,574,865 
546,960 560,000 534,560 
610,311 577,909 552,535 
- 45,506,300 
- 45,506,300 
531,206 8,430,333 
540,153 8,430,316 
- - - - 10,934,505 
- - - - 10,934,505 
1,167,730 1,329,000 1,248,626 1,437,881 28,751,85918 
1,158,409 1,271,354 1,355,681 1,463,439 27,596,71018 
1,217,008 3,811,000 1,600,000 (-) 90,000 7,438,000 
269,195 4,136,348 1,862,152 288,379 7,352,894 
- - - - 16,960,549 
- - - - 16,960,5491 
2,166,950 2,636,000 2,472,745 2,556,481 45,051,08518 
2,210,757 2,615,172 2,419,364 2,672,650 44,978,42318 
- - - - 13,130,463 
- - - - 13,069,9912 
1,615,650 1,656,000 1,637,734 2,091,600 37,504,51918 
1,733,258 1,643,236 1,539,518 2,211,506 36,112,58918 
- - - - 19,088,5243 
- - - - 19,088,524 
2,192,200 2,591,000 2,819,591 2,819,182 34,883,47218 
2,231,476 2,546,045 2,837,762 2,908,958 34,662,86418 
- - - - 14,175,197 
- - - - 14,175,19756 
2,039,800 2,477,208 2,176,269 2,894,350 49,202,15218 
2,161,065 2,1.80,427 2,206,332 3,162,258 49,177,38118 
- - - - 21,317,790 
- - - - 21,317,790 
18 
1,857,675 2,078,500 1,887,862 2,296,282 43,372,65818 
1,930,147 1,988,540 1,859,271 2,464,720 43,365,877 
39-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 30-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 199917 
10. Hords Creek Lake, TX 
11. Jim Chapman Lake, TX 
(Contributed Funds) 
12. Joe Pool Lake, TX 
13. Lavon Lake, TX 
14. Lavon Lake Modification 
and East Fork Channel 
Improvement, TX 
15. Lewisville Dam, TX 
16. Navarro Mills Lake, TX 
17. O.C. Fisher Dam and 
Lake, TX 
18. Proctor Lake, TX 
New Work: 
Approp. 
Cost 
Maint.- 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
- - - 2,731,089 8 
- - - 2,731,089 
960,203 991,000 1,087,776 1,251,004 21,040,20018 
959,881 1,017,136 1,060,055 1,307,156 20,975,482 18 
502,000 400,000 1,500,000 - 138,694,887 
32,376,166 418,497 357,103 115,547 138,625,306 
-- - - 227,000 
-- - - 227,000 
822,400 2,592,000 1,184,429 2,710,500 11,140,329 
924,711 979,828 1,235,029 2,742,629 9,555,913 
8,650 
686,325 
735,482 
(-)8,995 
701,000 
684,504 
742,311 
769,060 
- 188,960,000 
- 188,873,609 
710,632 8,562,676 
729,149 8,560,475 
-- - - 12,864,796 
- - - 12,864,796 
2,217,557 2,681,000 2,414,617 3,558,700 50,952,11218 
2,193,757 2,392,643 2,710,436 3,648,220 50,962,32218 
- 69,796,862 
- 69,796,862 
- - - 25,333,988 
- - - 25,333,988 9 
3,926,250 2,533,328 2,354,593 3,010,000 62,781,35618 
3,775,204 2,348,636 2,550,593 3,290,275 60,218,72318 
-- - - 9,846,759 
- - - 9,846,75911 
1,296,700 1,394,000 1,269,418 1,385,839 27,565,77018 
1,360,083 1,367,519 1,300,276 1,412,125 27,563,894 18 
1,215,050 731,000 1,077,238 
1,319,881 696,444 1,124,866 
- 16,027,467 
- 16,027,467 
858,821 24,353,00918 
879,065 24,351,79618 
-- - - 14,469,585 
- - - 14,469,585 
1,421,550 2,073,000 2,150,233 1,776,500 34,214,02218 
1,404,574 2,125,556 2,180,765 1,797,287 34,014,59918 
39-16

FORT WORTH, TX, DISTRICT 
TABLE 30-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 199917 
19. Ray Roberts Lake, TX 
31. Robert Douglas Willis 
Hydropower, TX 
(Contributed Funds) 
32. Sam Rayburn Dam and 
Reservoir, TX 
33. Sam Rayburn Dam and 
Reservoir, TX (Dam 
Safety) 
(Federal Funds) 
(Contributed Funds) 
20. San Antonio Channel 
Improvement, TX 
(Federal Funds) 
(Contributed Funds) 
21. San Gabriel River, TX 
Granger 
Lake Georgetown 
22. Somerville Lake, TX 
23. Stillhouse Hollow Dam, 
TX 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
Maint 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint. 
Approp. 
Cost 
4,279,000 
4,093,294 
651,900 
660,181 
1,893,000 
2,130,533 
731,000 
696,961 
3,000,000 
2,810,234 
931,265 
814,104 
350,000 
1,024,438 
747,070 
945,197 
319,778,700 
319,441,993 
8,410,837 
8,399,565 
- - - 18,628,463 
- - - 18,628,463 
-- - - 60,670,957 
- - - 60,670,95712 
3,497,250 4,314,000 4,018,935 4,016,033 77,871,25118 
3,809,294 3,740,446 4,096,596 4,682,773 77,555,396 18 
8,688,000 
13,031,871 
112,489 
5,982,000 
5,309,631 
177,600 
2,200,000 2,600,000 
2,126,180 2,628,705 
55,933 
3,564,000 
3,832,116 
268,900 
177,600 
117,187 
1,503,000 
1,816,452 
43,568 
1,524,905 
- 40,514,000 
41,563 40,371,602 
- 293,615 
- 229,355 
1,034,000 151,886,048 
977,248 151,732,211 
- 4,001,268 
105,858 5,319,763 
- 101,796,100 
- 101,796,100 
1,255,400 
1,273,893 
1,397,550 
1,422,543 
1,411,000 
1,436,996 
1,484,000 
1,434,107 
1,411,484 
1,412,614 
1,510,134 
1,538,068 
1,505,205 
1,522,681 
1,635,000 
1,670,674 
22,658,89018 
21,364,37118 
21,786,30718 
21,785,08218 
- - - 27,790,438 
-- - - 27,790,438 
2,127,900 2,309,000 2,387,292 2,777,824 45,563,504 18 
2,114,655 2,308,393 2,417,204 2,798,427 37,477,31418 
- - - 20,522,084 13 
-- - - 20,522,084 
1,364,000 1,688,000 1,431,623 1,769,350 28,975,47018 
1,373,463 1,689,654 1,419,740 1,855,012 28,949,999 18 
39-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 30-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 96 FY 96 FY 97 FY 99 Sep. 30, 1999"1 
34. Town Bluff Dam- New Work: 
B.A. Steinhagen Lake, Approp. - - - - 6,602,737 
TX Cost - - - - 6,602,737 14 
Maint. 
Approp. 1,491,200 1,418,500 1,427,421 1,586,532 27,880,610 18 
Cost 1,483,018 1,412,917 1,381,961 1,726,525 27,816,86318 
24. Waco Lake, TX New Work: 
Approp. - - - - 49,521,121 1 
Cost - - - - 49,521,121 
Maint 
Approp. 1,930,125 1,845,672 2,026,823 2,284,498 43,631,38618 
Cost 1,968,762 1,925,185 2,032,899 2,320,599 43,554,23318 
25. Waco Lake, TX New Work: 
(Dam Safety) Approp. 245,000 284,000 997,000 3,008,000 4,734,000 
Cost 387,924 225,002 300,366 2,442,170 3,389,096 
35. Whitney Lake, TX New Work: 
Approp. - - - - 42,952,938 
Cost - - - - 42,952,938 16 
Maint. 
Approp. 3,437,925 3,262,000 3,569,406 3,922,883 73,510,178 18 
Cost 3,905,527 3,540,370 3,622,987 3,940,521 73,231,65118 
26. Wright Patman Dam New Work: 
and Lake, TX Approp. - - - - 35,731,626 
Cost - - - - 35,731,626 
Maint. 
Approp. 2,237,750 2,386,292 2,500,213 2,801,450 48,422,47518 
Cost 2,291,675 2,204,934 2,632,788 2,950,825 48,410,10718 
1 Excludes $47,309 receipts from reconveyance of 
land deposited to miscellaneous receipts. 
2 Excludes $322,346 receipts from reconveyance of 
land deposited to miscellaneous receipts. 
3 Excludes $1,422,848 expended for new work from 
contributed funds, including $22,848 "Contributed 
Funds Other" for installation and operation of gages for 
leakage study. 
4 Includes $1,378,486 for Code 711, $52,808 for 
Code 713, and $399,739 accelerated Public Works Act 
funds. Excludes $1,711,200 contributed funds. 
S Includes $1,376,322 for Code 711, $52,808 for 
Code 713, and $399,739 accelerated Public Works Act 
funds. Excludes $4,137 reimbursed in Fiscal Year 1973. 
6 Claim Northeast Texas Municipal Water District 
$16,546. Three payments of $12,410 less real estate charges 
of $1,325, making a total of $2,811 reimbursed in Fiscal 
Year 1972, Fiscal Year 1973, and Fiscal Year 1974. 
7 Excludes $146,795 receipts from reconveyance of 
land deposited to miscellaneous receipts, and $2,040,026 
for new work expended from contributed funds. 
8 Excludes $105,079 expended from contributed funds. 
9 Excludes receipts from reconveyance of land of 
$426,606 which were deposited to miscellaneous receipts, 
and $3,676,661 for new work expended from contributed 
funds. 
10 Includes $130,000 under appropriation 96X5125. 
1 Excludes $300,000 expended from contributed 
funds. 
12 Excludes $3,000,000 expended from contributed 
funds. 
'3 Includes receipts from disposals and revocation 
of funds related thereto. 
14 Excludes $2,000,000 contributed funds expended. 
1E"x cludes $2,750,000 expended for contributed funds. 
16 Excludes $188,282 receipts from reconveyance of 
lands deposited to miscellaneous receipts. 
17 Includes funds provided by the Jobs Act (PL 98- 
8, dated March 24, 1983). 
18 Beginning Fiscal Year 1985 data shown on Table 
A includes Special Recreation Use Fees. Data for 
previous fiscal years have been changed to conform to 
the new procedure. 
39-18

FORT WORTH, TX, DISTRICT 
TABLE 30-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
2. Aug. 13, 1968 
3. Mar. 31, 1960 
4. Oct. 12, 1972 
5. Jul. 24, 1946 
Sep. 3, 1954 
6. Mar. 2, 1945 
7. Mar. 2, 1945 
Sep. 3, 1954 
8. Jul. 24, 1946 
9. Mar. 2, 1945 
10. Aug. 18, 1941 
11. Aug. 3, 1955 
12. Oct. 27, 1965 
13. Mar. 2, 1945 
AQUILLA LAKE, TX 
Construction of a dam on Aquilla Creek, about 6.8 
miles southwest of Hillsboro, Texas and about 
24 miles north of Waco, Texas. 
BARDWELL LAKE, TX 
Construction of a dam on Waxahachie Creek 
about 5 miles south of Ennis, Texas. 
BEALS CREEK, BIG SPRING, TX 
Construction of a channel. 
BELTON LAKE, TX 
Construction of a dam on the Leon River about 3 
miles north of Belton, Texas. 
Modification of the dam to provide for 
generation of hydroelectric power. 
BENBROOK LAKE, TX 
Construction of a dam on the Clear Fork of the 
Trinity River about 10 miles southwest of Fort 
Worth, Texas. 
CANYON LAKE, TX 
Construction of a dam on the Guadalupe River about 
12 miles northwest of New Braunfels, Texas. 
FERRELLS BRIDGE DAMLAKE 
O' THE PINES, TX 
Provides for construction of an earthfill dam 
and reservoir area. 
GRAPEVINE LAKE, TX 
Construction of a dam on Denton Creek, a tributary 
of the Trinity River, about 20 miles northwest 
of Dallas, Texas. 
HORDS CREEK LAKE, TX 
Construction of a dam on Hords Creek, a tributary 
of Pecan Bayou, near the city of Coleman, 
Texas. 
JIM CHAPMAN LAKE, TX 
Construction of an earthfill dam and reservoir 
area. 
JOE POOL LAKE, TX 
Construction of a dam on Mountain Creek, 
adjacent to the city limits of Grand Prairie, 
Texas, about 3 miles above the existing Mountain 
Creek Dam. 
LAVON LAKE, TX 
Construction of a dam on the East Fork of the Trinity 
River, about 22 miles northeast of Dallas, Texas. 
39-19 
S. Doc. 52, 90th Cong., 
1st Sess. 
H. Doc 424, 82nd Cong., 
2nd Sess. 
H. Doc. 115, 92nd 
Cong., 2nd Sess. 
H. Doc. 88, 81st Cong., 
1st Sess. 
H. Doc. 535, 81st Cong., 
2nd Sess. 
H. Doc. 403, 77th Cong., 
1st Sess. 
H. Doc, 247, 76th Cong., 
1st Sess. 
H. Doc. 602, 79th Cong., 
2nd Sess. 
H. Doc. 403, 77th Cong., 
1st Sess. 
H. Doc. 370, 76th Cong., 
1st Sess. 
H. Doc 488, 83rd Cong., 
2nd Sess. 
H. Doc 276, 89th Cong., 
1st Sess. 
H. Doc. 533, 78th Cong., 
2nd Sess.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 30-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
14. Oct. 23, 1962 
Mar. 7, 1974 
15. Mar. 2, 1945 
16. Sep. 3, 1954 
Dec. 31, 1970 
17. Aug. 18, 1941 
18. Sep. 3, 1954 
19. Oct. 27, 1965 
32. Mar. 2, 1945 
33. Mar. 2, 1945 
20. Sep. 3, 1954 
LAVON LAKE MODIFICATION AND EAST 
FORK CHANNEL IMPROVEMENT, TX 
Enlarge Lavon Dam and enlargement and 
realignment of the lower 25 miles of the East 
Fork of the Trinity River, including rehabilitation 
of existing levees. 
Improvement of Collin County Road 115. 
LEWISVILLE DAM, TX 
Construction of a dam on the Elm Fork of the Trinity 
River near the city of Lewisville, Texas. 
NAVARRO MILLS LAKE, TX 
Construction of a dam on Richland Creek, a 
tributary of the Trinity River, about 16 miles 
southwest of Corsicana, Texas. 
Alteration of FM Highway 3164 in Wolf Creek Park. 
O.C. FISHER DAM AND LAKE, TX 
Construction of a dam on the North Concho River 
just above San Angelo, Texas. 
PROCTOR LAKE, TX 
Construction of a dam on the Leon River about 8 
miles northeast of Comanche, Texas. 
RAY ROBERTS LAKE, TX 
Construction of a dam on the Elm Fork of the Trinity 
River between Sanger and Aubrey, Texas, about 
30 miles upstream from the existing Lewisville 
Dam. 
SAM RAYBURN DAM AND RESERVOIR, 
TX 
Construction of a dam on the Angelina River 
about 10 miles northwest of Jasper, Texas. 
SAM RAYBURN SPILLWAY (DAM 
SAFETY ASSURANCE), TX 
Modification of the spillway and embankment. 
SAN ANTONIO CHANNEL IMPROVEMEN 
TX 
Channel improvement of the San Antonio River 
and tributaries in and near the city of San 
Antonio, Texas. 
H. Doc. 554, 87th Cong., 
2nd Sess. 
H. Doc. 403, 77th Cong., 
1st Sess. 
H. Doc. 498, 83rd Cong., 
2nd Sess. 
H. Doc. 315, 76th Cong., 
1st Sess. 
H. Doc. 535, 81st Cong., 
2nd Sess. 
H. Doc. 276, 89th Cong., 
1st Sess. 
S. Doc. 98, 76th Cong., 
1st Sess. 
S. Doc. 98, 76th Cong., 
1st Sess. 
H. Doc. 344, 83rd Cong., 
2nd Sess. 
39-20

FORT WORTH, TX, DISTRICT 
TABLE 30-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
21. Sep. 3, 1954 
Jan. 3, 1975 
22. Sep. 3, 1954 
23. Sep. 3, 1954 
34. Mar. 2, 1945 
31. Mar. 2, 1945 
1. Oct. 27, 1965 
24. Sep. 3, 1954 
SAN GABRIEL RIVER PROJECT, TX 
Construction of: (1) a dam (Granger Dam and Lake) 
on the San Gabriel River about 7 miles east of 
Granger, Texas, (2) a dam (North Fork Lake) on 
the north Fork of the San Gabriel River about 
3.5 miles northwest of Georgetown, Texas and 
(3) a dam (South Fork Lake) on the South Fork 
of the San Gabriel River about 3 miles southwest 
of Georgetown, Texas. 
SOMERVILLE LAKE, TX 
Construction of a dam on Yegua Creek about 
2 miles south of Somerville, Texas. 
STILLHOUSE HOLLOW DAM, TX 
Construction of a dam on the Lampasas River 
about 5 miles southwest of Belton, Texas. 
TOWN BLUFF DAM-B.A. STEINHAGEN 
LAKE, TX 
Construction of a dam on the Neches River near 
Jasper, Texas. 
ROBERT DOUGLAS WILLIS 
HYDROPOWER, TX 
Construction of two units at 3,000 kilowatts each 
of hydroelectric power generating facilities 
connected with Town Bluff-B.A. Steinhagen 
Lake, Texas. 
TRINITY RIVER PROJECT, TX 
Construction of Tennessee Colony Dam located at 
river mile 339.2 on the Trinity River about 16 
miles west of Palestine, Texas; a multiple 
purpose channel from the Houston, Texas ship 
channel to Fort Worth, Texas; a distance of 
approximately 363 miles, an extension of the 
existing Dallas, Texas, Floodway downstream 
approximately 9.0 miles; a realignment and 
enlargement of the West Fork of the Trinity 
River from the mouth of the West Fork to the 
existing Fort Worth, Texas, Floodway, a distance 
of approximately 31 miles; and water conveyance 
facilities involving construction of about 98 miles 
of pipeline from Tennessee Colony Lake to the 
existing Benbrook Lake. 
WACO LAKE, TX 
Construction of a dam on the northwest edge of 
Waco, Texas, below the confluence of the North, 
South, and Middle Bosque Rivers. 
H. Doc. 535, 81st Cong., 
2nd Sess. and 
H Doc. 591, 87th Cong., 
2nd Sess. 
H. Doc. 535, 81st Cong., 
2nd Sess. 
H. Doc. 535, 81st Cong., 
2nd Sess. 
S. Doc. 98, 76th Cong., 
1st Sess. 
S. Doc. 98, 76th Cong., 
1st Sess. 
H. Doc. 276, 89th Cong., 
1st Sess., and 
H. Doc. 364, 90th Cong., 
2nd Sess. 
H. Doc. 535, 81st Cong., 
2nd Sess. 
39-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 30-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
WACO LAKE, TX (Dam Safety) 
25. Sep. 3, 1954 Modification of raising the dam crest. H. Doc. 535, 81st Cong., 
2nd Sess. 
WHITNEY LAKE, TX 
35. Aug. 18, 1941 Construction of a dam on the Brazos River, about H. Doc, 390, 76th Cong., 
19 miles southwest of Hillsboro, Texas. Raise 1st Sess. 
the power pool 13.0 feet. 
WRIGHT PATMAN DAM AND LAKE, TX 
26. Jul. 24, 1946 Construction of an earth-fill dam and reservoir. H. Doc, 602, 79th Cong., 
2nd Sess. 
39-22

FORT WORTH, TX, DISTRICT 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS 
TABLE 30-C (See Section 29 of Text) 
For Last Full Cost to September 30, 1999 
Report See 
Annual Report Operation and 
Project For Construction Maintenance 
Belton Lake Hydropower Study, TX' - - - 
Belton Lake Modification, TX3 1988 - - 
Big Fossil Creek, TX' 1969 - - 
Big Sandy Lake, TX5 1986 - - 
Big Spring, TX2 1979 - - 
Boggy Creek, Austin, TX' 1992 - - 
Brownwood Channel Improvement, TX5 - - - 
Calloway Branch, Hurst, TX' 1986 - - 
Carl L. Estes Dam and Lake, TX5 1979 - - 
Dam "A" Lake, TX5 1987 - - 
Duck Creek Channel Improvement, TX5 1983 - - 
Elm Fork Floodway, TX5 1987 - - 
Fort Worth Floodway (Clear Fork), TX' 1971 - - 
Fort Worth Floodway (West Fork), TX' 1971 - - 
Grand Prairie, TX (Landfill)' 1987 - - 
Grand Prairie, TX (Meyers Road)' 1989 - - 
Greenville, TX' 1983 - - 
Lake Brownwood Modification, TX5 1983 - - 
Lake Fork Lake, Sabine River, TX5 - - - 
Lake Worth, Tarrant County, TX4 - - - 
Millican, TX4 1988 - - 
Navasota Lake, Navasota River, TX5 - - - 
Roanoak Lake, TX5 1979 - - 
Rockland Lake, TX5 1988 - - 
Rutledge Hollow Creek Channel Improvement, 1969 - - 
Poteet, TX' 
San Gabriel River, South, TX4 - - - 
Tarrant County, Tony's Marine Creek, TX4 
Zacate Creek Channel, TX' 1983 - - 
'Recommended for Deauthorization 5Deauthorized 
39-23 
'Completed 'Inactive 3Deferred

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
INSPECTION OF COMPLETED FLOOD CONTROL PROJECTS 
TABLE 30-D (See Section 26 of Text) 
Location Dates of Inspection 
Beals Creek, Big Spring ............... ...................... ............. Jul. 7, 1999 
Bear Creek, Collin County ................................................ Mar. 9, 1999 
Beltline Road Bridge, Richardson ................. ........................... Feb. 11, 1999 
Big Fossil Creek Floodway, Richland Hills ................ ......................... Mar. 3, 1999 
Boggy Creek Floodway, Austin ............ ................................ Aug. 19, 1999 
Calloway Branch Channel, Hurst. .................................................. Feb. 16, 1999 
Calloway Branch, Airline Dr. Pk., Richland Hills ................ ................... Jul. 30, 1999 
Cat Claw Creek Channel, Abilene .............................. .................. Jul. 13, 1999 
Dallas Floodway, Dallas ............... ....... ......................... .... Oct. 7, 1998 
Delaware Branch, Irving ........................ ................................. Sept. 30, 1999 
Dry Branch, Grand Prairie .............................................. Jul. 9, 1999 
Duck Creek, Garland ............................... . ...................... Jul. 29, 1999 
East Fork Floodway, Kaufman County ..................................... Nov. 30, 1994 
Fort Worth Floodway, Tarrant County ...................................... Oct. 15, 1998 
Grand Prairie Landfill, Grand Prairie .................. ..................... Feb. 17, 1999 
Hutton Branch, Carrollton ............... .......... ........ ............ Feb. 11, 1999 
Johnson Creek Channel, Grand Prairie ................... .................. Jun. 16, 1999 
Long Branch Channel, Greenville ............... ........................... Feb. 1, 1999 
Lorean Branch Channel, Hurst ............ .................. ............. Feb. 16, 1999 
McCoy Road Bridge, Carrollton ......................... ....... .............. Feb. 11, 1999 
Meyers Road, Grand Prairie ................. ........ .................... Feb. 17, 1999 
Munday Floodway, Munday .................................... ............ Dec. 1, 1998 
Park Row Bridge, Arlington ................... ............................ Mar. 2, 1999 
Pleasanton Floodway, Pleasanton ................... ..... ........................ Sept. 23, 1999 
Poteet Floodway, Poteet ............................. ..................... Sept. 23, 1999 
Ridglea Country Club Drive Bridge, Fort Worth .................. .................. Feb. 2, 1999 
Roaring Springs Road Bridge, Westover Hills ....................................... Feb. 3, 1999 
Rush Creek Channel, Arlington ........................ ................... Mar. 2, 1999 
San Antonio Floodway, San Antonio ...................................... Sept. 22, 1999 
Singing Hills Creek Channel, Watauga ........................................... Feb. 25, 1999 
Sulphur Branch Channel, Euless ............. ....... ....................... Dec. 2, 1998 
Ten Mile Creek Channel, Desoto ........................................... Jun. 23, 1999 
Walnut Creek, Seguin ........................................................ Sept. 21, 1999 
Wheeler Creek Channel, Gainesville ................. ............................ Jun. 17, 1999 
Zacate Creek Floodway, Laredo ............... ...... ....................... Sept. 29, 1999 
39-24

FORT WORTH, TX, DISTRICT 
TABLE 30-E 
Project 
WORK UNDER SPECIAL AUTHORIZATION 
(See Section 29 of Text) 
Flood Control Activities - Section 205 Cost 
Cienegas Creek, Del Rio, TX .................. ............ ............. ...... $ 
Duck Creek, Garland, TX ........................................................... 
Farmers Branch, White Settlement, TX .................. ...................... 
Hickory Creek, Balch Springs, TX ................................................... 
Little Fossil Creek, Haltom City, TX ...................... .... ............. 
San Felipe, Del Rio, TX ................................... ...... ........ 
Section 205 Coordination ........................................................... 
Sulphur Branch, Euless, TX .................................. ................ 
Ten Mile Creek, De Soto, TX ............................................ 
38,292 
784,970 
13,961 
4,295 
56,804 
39,229 
13,992 
269,864 
9,446 
Project Emergency Bank Protection - Section 14 Cost 
Bear Creek, Collin County, TX ..................................................... 32,690 
Colorado River, Caldwell Lane, Travis County, TX .................................... $ 27,611 
Colorado River, Smithville Water Supply, TX ........................................ 77,111 
Cottonwood Creek, Spring Valley Road, TX ................. ......................... 19,474 
Mary's Creek .............................................................. 37,716 
Section 14 Coordination ....... ........................................... 14,041 
Waco Sewerage System, TX .................. ................................ 37,960 
Washington on Brazos State Park, TX .............. ............................. 19,048 
West Fork Trinity River Landfill, Arlington, TX ..................................... 348,288 
West Fork Trinity River Water Plant, TX ......................................... 59,835 
39-25

GALVESTON, TEXAS DISTRICT *
Galveston District comprises drainage basins of all 
short streams arising in coastal plain of Texas and flowing 
into the Gulf of Mexico, including the entire basin of 
Buffalo Bayou, San Jacinto, San Bernard, Lavaca, Navidad, 
Mission, and Aransas Rivers. It embraces Agua Dulce, 
San Fernando, and Olmos Creek Basins draining into 
Baffin Bay, and coastal area south thereof to the Rio 
Grande and east of western Boundary of Starr County, 
Texas. It includes lower basins of major streams flowing 
into the Gulf of Mexico: Sabine River, Texas and Louisiana, 
downstream from U.S. Highway 190 crossing at Bon Wier, 
Texas; Neches River downstream from Town Bluff gaging 
station; Trinity River downstream from Texas State 
Highway 19 crossing at Riverside, Texas; Brazos River 
downstream from confluence with Navasota River; 
Colorado River downstream from northern boundary of 
Fayette County; Guadalupe River downstream from 
confluence with San Marcos River; San Antonio River 
downstream from confluence with Escondido Creek; 
Nueces River downstream from confluence with Frio and 
Atascosa River. 
IMPROVEMENTS 
Navigation 
1. Aquatic Plant Control (Southwestern 
Division) 
2. Brazos Island Harbor, TX 
3. Cedar Bayou, TX 
4. Channel to Bolivar, TX 
5. Clear Creek and Clear Lake, TX 
6. Corpus Christi Ship Channel, TX 
7. Double Bayou, TX 
8. Freeport Harbor, TX 
9. Galveston Harbor and Channel, TX 
10. Gulf Intracoastal Waterway between 
Apalachee Bay, FL, and the Mexican 
Border 
11. Houston-Galveston Navigation 
Channels, TX 
12. Houston Ship Channel, TX 
13. Matagorda Ship Channel, TX 
14. Neches River and Tributaries, 
Salt Water Barrier , TX 
15. Sabine-Neches Waterway, TX 
16. Texas City Channel, TX 
17. Trinity River and Tributaries, TX 
17A. Anahuac Channel, TX 
17B. Channel to Liberty, TX 
17C. Wallisville Lake, TX 
18. Reconnaissance and Condition Surveys 
19. Navigation Work Under Special 
Authorization 
Shore Protection 
20. Corpus Christi Beach, TX 
Flood Control 
21. Buffalo Bayou and Tributaries, TX 
21A. Addicks and Barker Reservoirs, TX 
21B. Brays Bayou, TX 
21C. Greens Bayou, TX 
21D. Halls Bayou, TX 
21E. Hunting Bayou, TX 
21F. Little White Oak Bayou, TX 
Page Flood Control (cont.) 
21G. Carpenters Bayou, TX 
40-2 22. Buffalo Bayou at Lynchburg, TX 
40-2 23. Clear Creek, TX 
40-2 24. Cypress Creek, TX 
40-3 25. Lower Rio Grande Basin, TX 
40-3 25A. Arroyo Colorado, TX 
40-3 25B. South Main Channel, TX 
40-4 25C. Raymondville Drain, TX 
40-4 26. Sims Bayou, TX 
40-5 27. Inspection of Completed Flood Control 
Works 
28. Flood Control Work Under Special 
40-6 Authorization 
29. Emergency Stream Bank and Shoreline 
40-8 Erosion Work and Snagging and Clearing 
40-9 Under Special Authorization 
40-9 
40-10 
40-10 
40-11 
40-11 
40-12 
40-12 
40-12 
40-13 
40-13 
Environmental Restoration 
30. Project Modifications for Improvement of 
Environment 
General Investigations 
31. Surveys 
32. Coordination With Other Agencies 
33. Collection and Study of Basic Data 
34. Pre-construction Engineering and Design 
Tables 
40-A Cost and Financial Statement 
40-B Authorizing Legislation 
40-13 40-C Other Authorized Navigation Projects 
40-D Other Authorized Flood Control Projects 
40-E Other Authorized Environmental 
40-14 Restoration Projects 
40-14 40-F Deauthorized Projects 
40-14 40-G Total Cost of Existing Projects 
40-15 40-H Channel Dimensions 
40-15 40-I Channel Dimensions, GIWW 
40-15 Tributary Channels 
40-15 40-J Dredging Operations 
40-1 
Page 
40-16 
40-16 
40-16 
40-17 
40-17 
40-17 
40-17 
40-18 
40-18 
40-18 
40-19 
40-19 
40-19 
40-19 
40-20 
40-20 
40-20 
40-21 
40-26 
40-42 
40-43 
40-44 
40-45 
40-46 
40-48 
40-52 
40-54

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Navigation 
1. AQUATIC PLANT CONTROL 
(SOUTHWESTERN DIVISION) 1965 
ACT 
Location. Navigable waters, tributary streams, 
connecting channels, and other allied waters in Texas. 
Previous project. For details see page 699 of Annual 
Report for 1963. 
Existing project. A comprehensive project to provide 
for control and progressive eradication of water-hyacinth, 
alligatorweed, Eurasian watermilfoil, hydrilla, and other 
obnoxious aquatic plant growths, from navigable waters, 
tributary streams, connecting channels, and other allied 
waters in Texas in the combined interest of navigation, 
flood control, drainage, agriculture, fish and wildlife 
conservation, public health, and related purposes, 
including continued research for development of the most 
effective and economic control measures. Control of 
hydrilla, water-hyacinth and alligatorweed has been 
approved for the Nueces River Basin, North Coastal 
Area, Guadalupe River Basin, Sabine River Basin, Trinity 
River Basin, Cypress Creek Basin, Neches River Basin, 
South Coastal Area, San Jacinto River Basin, Rio Grande 
Basin, Colorado River Basin and Brazos River Basin. 
Local cooperation. Sec. 302, 1965 River and Harbor 
Act, amended by Water Resources Development Act of 
1986, applies. 
Operations during fiscal year. The cost-sharing 
program had been funded for $31,000 for FY 98, but 
chemical control work by the State of Texas was curtailed 
for the year to await interpretation of herbicide labelling 
instructions by the Environmental Protection Agency. 
Mechanical control of waterhyacinth and hydrilla was 
accomplished by the State along segments of the Rio 
Grande without Corps participation. In FY 99 the costsharing, 
cost-reimbursable contract with the State of 
Texas was amended to include the cost of mechanical 
control of waterhyacinth. It was extended this FY for 
the final option year. A new one year cost-sharing, costreimbursable 
contract, with the options for an additional 
four years, will be negotiated with the State of Texas to 
maintain Program capabilities. 
2. BRAZOS ISLAND HARBOR, TX 
Location. At extreme south end of coast of Texas, 
about 7 miles north of mouth of Rio Grande and about 5 
miles east of Brownsville, Texas. (See National Ocean 
Survey Chart 11301.) 
Previous project. For details see page 1017 of Annual 
Report for 1932. 
Existing project. Provides for channel dimensions 
in various sections of the waterway as shown in Table 
40-H.
Project also provides for dual jetties at the gulf 
entrance, a north jetty 6,330 feet long, a south jetty 5,092 
feet long, and 1,000-foot extension to existing north jetty 
and for maintenance of 3rd fishing harbor constructed 
by local interests. Under ordinary conditions, mean tidal 
range is about 1.5 feet, and extreme range is about 2 feet. 
All depths refer to mean low tide. To some extent, height 
of tides is dependent on the wind, and during strong 
"northers" in winter season, water surface in southern 
end of Laguna Madre may be raised 4 feet or more above 
mean low tide in the gulf. 
Widening Brownsville Channel from Goose Island 
to Brownsville turning basin and deepening southeast 
corner of Brownsville turning basin to 36 feet was 
completed in April 1980. The 1,000-foot extension to 
existing north jetty was deauthorized under Section 1001 
of the Water Resources Development Act of 1986. The 
entrance channel was enlarged from 38 feet by 300 feet 
to 44 feet by 300 feet in FY 1992. Construction of an 
environmental mitigation site consisting of the creation 
of a 16 acre tidal wetland which included shoal grass 
and black mangroves, was completed in 1997. (See Table 
40-G for total cost of existing project to September 30, 
1999.) 
Local cooperation. Fully complied with. 
Terminal facilities. Numerous terminal facilities for 
bulk and liquid cargo are available. (See Port Series No. 
26, revised 1991.) Facilities are adequate for existing 
commerce. 
Operations during fiscal year. Maintenance: 
Routine maintenance. (See Table 40-J for dredging 
operations.) 
3. CEDAR BAYOU, TX 
Location. The bayou is about 30 miles long. It flows 
to the south and empties into northwest corner of upper 
Galveston Bay, about 1.5 miles below mouth of San 
Jacinto River and about 28.5 miles north of Galveston, 
Texas. (See National Ocean Survey Chart 11326.) 
Previous project. For details see Annual Report 
for 1938. 
Existing project. Project provides for a channel 10 
feet by 100 feet from Houston Ship Channel to Bayou 
Mile 11.0 Channel was completed from Houston Ship 
Channel to first bend in Cedar Bayou above the mouth 
in 1931. Channel from Mile -0.1 to Mile 3.0 was completed 
in March 1975. Channel from 3.0 to Mile 11.0 was 
deauthorized under Sec. 12 of Public Law 93-251. Project 
also includes jetties at mouth of bayou provided for under 
previous project. 
Under ordinary conditions, mean tidal range is about 
0.6 feet and extreme range 1.2 feet. Height of tides is 
dependent largely on the wind, and during strong 
"northers" in the winter season water surface may be 
depressed 2 feet below mean low tide. (See Table 40-G 
for total cost of existing project to September 30, 1999.) 
Local cooperation. Fully complied with. 
Terminal facilities. U.S. Steel Company has a barge 
dock at bayou mile 2.8, and there are a few small wharves, 
privately owned, for local use at various places along 
40-2

GALVESTON, TEXAS, DISTRICT 
Cedar Bayou. Facilities are considered adequate for 
existing commerce. 
Operations during fiscal year. Maintenance: 
Routine maintenance. (See Table 40-J for dredging 
operations.) 
4. CHANNEL TO PORT BOLIVAR, TX 
Location. Port Bolivar is at end of Bolivar Peninsula 
and 4 miles north of city of Galveston. Channel connects 
the port with channel in Galveston Harbor. (See National 
Ocean Survey Chart 11324.) 
Previous project. For details see page 1856 of 
Appendix to Annual Report for 1915. 
Existing project. Existing project dimensions for 
channel are shown in Table 40-H. (Also see Table 40-B 
for authorizing legislation.) 
Under ordinary conditions, mean tidal range is about 
1.3 feet and extreme range 2 feet. Height of tides is 
dependent largely on the wind, and during strong 
"northers" in the winter season water surface may be 
depressed 2 feet below mean low tide. Enlargement of 
turning basin from 1,000 to 1,600 feet is inactive. A 
channel 14 feet deep, 200 feet wide, and approximately 
950 feet long is maintained across the east end of the 
turning basin to accommodate the Galveston-Port Bolivar 
ferry. Project is complete except for inactive portion. 
Project dimensions have not been maintained in the 
completed part since lesser dimensions are adequate for 
existing commerce. (See Table 40-G for total cost of 
existing project to September 30, 1999.) 
Local cooperation. None required. 
Terminal facilities. Terminals are privately owned 
and consist of 2 slips and 2 piers. The piers, 400 feet 
wide by 1,200 feet long and 210 feet wide by 1,200 feet 
long, are badly deteriorated and not in use. The slips 
are used as anchorage by shallow-draft vessels. A 
highway ferry landing owned by the State of Texas is 
located at south end of turning basin. Facilities are 
considered adequate for existing commerce. 
Operations during fiscal year. Maintenance: No 
maintenance required for fiscal year. 
5. CLEAR CREEK AND CLEAR 
LAKE, TX 
Location. Clear Creek has its source about 18 miles 
south of Houston, Texas, and flows southeast for about 
25 miles, emptying into west side of upper Galveston 
Bay at a point 24 miles north west of Galveston, Texas. 
(See National Ocean Survey Chart 11326.) 
Existing project. Project provides for 1.5 miles of 
channel 7 feet by 75 feet from Galveston Bay to mouth 
of Clear Creek; 0.7 miles of channel 7 feet by 60 feet, 
known as North Fork Channel; and 7.7 miles of channel 
7 feet by 60 feet through Clear Creek and Clear Lake. 
The project was completed in June 1950. 
Under ordinary conditions, mean tidal range is about 
0.8 foot and extreme range 1.4 feet. Height of tides is 
dependent largely on the wind, and during strong 
"northers" in the winter season water surface may be 
depressed 2 feet below mean low tide. 
Local cooperation. Fully complied with. 
Terminal facilities. Consist of small privately 
owned wharves, several ship repair yards and marinas 
which accommodate light commercial vessels and 
pleasure yachts. These are along lake shore and at towns 
of Seabrook and Kemah at mouth of creek. A commercial 
shell loading dock is located near League City at the 
head of NASA-Manned Spacecraft Center has a barge 
dock along lake shore near their property. 
Operations during fiscal year. Maintenance: No 
maintenance required for fiscal year. 
6. CORPUS CHRISTI SHIP 
CHANNEL, TX 
Location. This project, formerly known as the Port 
Aransas-Corpus Christi Waterway, Texas, was changed 
to Corpus Christi Ship Channel, Texas, by 1968 River 
and Harbor Act. This is a consolidation of old 
improvements of Port Aransas, Texas, and channel from 
Aransas Pass to Corpus Christi, Texas. Aransas Pass is 
on southern portion of Texas Coast, 180 miles southwest 
of Galveston and 132 miles north of mouth of Rio Grande. 
Aransas Pass connects Corpus Christi Bay with the gulf. 
Waterway extends from deep water in the gulf through 
Aransas Pass jettied entrance, thence westerly 20.75 miles 
to and including a turning basin at Corpus Christi, thence 
westerly 1.75 miles through Industrial Canal to and 
including turning basin at Avery Point, thence westerly 
4.25 miles to and including a turning basin near Tule 
Lake, thence northwesterly 1.8 miles to and including a 
turning basin at Viola, Texas. (See National Ocean Survey 
Charts 11308, 11309, 11311, and 11314.) 
Previous project. For details see page 1861 of Annual 
Report for 1915. 
Existing project. (See Table 40-H for existing project 
dimensions provided for in various channels and basins 
comprising this waterway.) 
Project also provides for two rubblestone jetties at 
Aransas Pass entrance, extending into the gulf from St. 
Joseph and Mustang Islands, project lengths of which 
are 11,190 and 8,610 feet, respectively. Project further 
provides for a stone dike on St. Joseph Island about 
20,991 feet long, connecting with north jetty and 
extending up this island to prevent a channel being cut 
around jetty. Project also provides for a breakwater at 
the entrance to the harbor area at Port Aransas, and for 
the realignment of the existing 12-foot by 100-foot project 
channel to Port Aransas. The breakwater consists of two 
overlapping sections. The one on the east side of the 
realigned entrance channel has a length of 830 feet and 
40-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
the second, located on the west side of the entrance 
channel, has a length of 1,290 feet. The channel to Port 
Aransas was relocated in the 300-foot clear distance 
between the overlapping sections. The portion of the 
channel remaining inside the breakwaters was widened 
to 150 feet. Under ordinary conditions, mean tidal range 
at Aransas Pass is about 1.1 feet and extreme range about 
2 feet, and at Corpus Christi mean range about 1 foot 
and extreme about 1.5 feet. Heights of tides are dependent 
largely on strength and directions of winds, and during 
strong "northers" in the winter season water surface may 
be depressed as much as 3 feet below mean low tide. 
Estimated cost for new work is: Federal (Corps) 
$74,938,515, including $456,515 for Port Aransas 
Breakwaters and exclusive of amount expended on 
previous projects: and non-Federal $18,977,431 (includes 
$768 for Port Aransas Breakwaters) including $7,644,435 
contributed funds and value of useful work performed, 
$3,320,228 lands, $6,027,000 relocations and $1,985,000 
other cost. (October 1, 1992 base price.) 
The Port Aransas-Corpus Christi 40-foot project was 
completed in 1966. The Jewel Fulton Canal was completed 
in 1963. The Port Aransas Breakwaters were completed 
in July 1973. Deepening deep-draft channels to 45 feet 
from Tule Lake Turning Basin through Viola Turning 
Basin was completed in 1989, and constructing a mooring 
area at Port Ingleside with dolphins has been deferred. 
Entrance and jetty channels have been dredged to project 
depth and width, and dredging of channel from Harbor 
Island to and through the Chemical Turning Basin at 45- 
foot depth has been completed. Initial mooring dolphins 
were completed in May 1979. Disposal area levees, Area 
1 and Rincon were completed in August 1984. First stage 
disposal area levees, South Shore, were completed in 
September 1984. Construction contract for mitigation 
terracing was completed in 1997. (See Table 40-G for 
total cost of existing project to September 30, 1999.) 
Local cooperation. Fully complied with. 
Terminal facilities. Terminal facilities on Harbor 
Island at head of Aransas Pass, Ingleside, Corpus Christi, 
La Quinta, Avery Point, and Viola, are considered 
adequate for existing commerce. (See Port Series, No. 25, 
revised 1993, Corps of Engineers.) 
Operations during fiscal year. Maintenance: A 
contract was award in September 1998 to remove 
damaged mooring dolphins and work was completed in 
November 1998 at a cost of $77,250. (See Table 40-J for 
dredging operations.) 
7. DOUBLE BAYOU, TX 
Location. Enters Trinity Bay on the east side about 
30 miles north of Galveston and about 8.25 miles south of 
Anahuac, Texas. 
Existing Project. Project provides for a channel 7 
feet by 125 feet from the mouth of Double Bayou to the 
7-foot contour in Trinity Bay, a length of 3.9 miles; and a 
channel, know as West Fork, 7 feet by 100 feet for a 
length of 2.0 miles. The project was completed in 1971. 
Under ordinary conditions mean tidal range is about 
0.5 feet and extreme range is about 1.2 feet. Height of 
tides is dependent largely on winds, and during strong 
north winds in the winter season, water surfaces may be 
depressed 1.5 feet below mean low tide. (See National 
Ocean Survey Chart 11326.) 
Local cooperation. Fully Complied with. 
Terminal facilities. Facilities are privately owned. 
At the mouth of the bayou is a timber wharf for loading 
oil barges. Between miles 1 and 1.5 above the mouth are 
a timber wharf, a boat slip, and a marine railway owned 
by the Brown and Root Corporation. At mile 3 above the 
mouth is a small depot for handling oyster shell. The 
facility consists of a timber bulkhead and hoppers for 
loading trucks. One-half mile above the mouth are several 
fishing vessel docks. 
Operations during fiscal year. Maintenance: No 
maintenance required for Fiscal Year 1999. 
8. FREEPORT HARBOR, TX 
Location. Formed by improvement of Brazos River, 
Texas, from mouth to about 6 miles upstream to Freeport, 
Texas. (See National Ocean Survey Charts 11321 and 
11322.) 
Previous projects. For details see page 1860 of 
Annual Report for 1915, and page 872 of Annual Report 
for 1938. 
Existing project. Existing project dimensions for 
various channels and basins are shown in Table 40-H on 
channel dimensions at end of chapter. 
Existing project also provides for: Dual jetties and a 
diversion canal for the Brazos River, including a dam, a 
lock in the dam and necessary auxiliary equipment. Also 
provides for rehabilitation of southwest jetty and the 
relocation of the northeast jetty (about 640 feet to the 
northeast); realignment of the channel between the Jetty 
Channel and Brazosport Turning Basin; realignment of 
the channel between Brazosport Turning Basin and Upper 
Turning Basin; relocation of Upper Turning Basin; and 
public use facilities adjacent to the Freeport Jetties. The 
30-foot channel from Upper Turning Basin to Stauffer 
Chemical Plant, including the turning basin, was 
deauthorized by Sec. 12 of PL 93-251. Construction of 
lock in diversion dam at local expense is considered 
inactive. 
The 38-36 foot project was completed in 1962. New 
work consists of realigning, deepening and widening the 
Outer Bar and Jetty Channels; relocating the northeast 
jetty; rehabilitating the southwest jetty; realigning and 
deepening the harbor channel between the jetty channel 
and the Upper Turning Basin; relocating and enlarging 
the Upper Turning Basin; constructing a turning point 
near the northwesterly end of the jetty channel; enlarging 
Brazosport Turning Basin; deepening Brazos Harbor 
Channel; and enlarging and deepening Brazos Harbor 
Turning Basin, as authorized by the R&H Act of 1970. 
40-4

GALVESTON, TEXAS, DISTRICT 
The initial contract for the 45 foot project, construction 
of 3,700 feet of the North Jetty, was awarded in May 
1987. Navigation problems were identified by the Local 
Sponsor and pilots, and a contract to make channel 
adjustments to a bend near the project main turning basin 
was completed in 1998 to provide full utilization of the 
45-foot channel. Project is essentially complete. 
Construction of Surfside Recreation by the Local Sponsor 
is the last remaining item. (See Table 40-G for total cost 
of existing project to September 30, 1999.) 
Under ordinary conditions mean tidal range is about 
1.5 feet and extreme range is about 2.5 feet. Except under 
extreme conditions, rises on river and in diversion channel 
do not cause greater variations in water surface than 
those caused by tidal action. Estimated cost of new work 
is: $63,707,000 Federal (Corps) and $470,000 Federal 
(USCG); and $32,313,000 non-Federal, including 
$21,302,000 contributed funds, $300,000 contributed work, 
$6,967,000 lands, $3,174,000 levees and spillways, and 
$570,000 relocations. (October 1, 1997 base price.) 
Local cooperation. Fully complied with except for 
Section 101 of River and Harbor Act of 1970, under costsharing 
tenets of the Water Resources Development Act 
of 1986 and the Water Resources Development Act of 
1996. Local Cooperation Agreement, executed June 26, 
1986, along with Amendments 1, 2, 3, and 4 executed 
March 19, 1987; July 19, 1991; July 19, 1991; and July 
15, 1997; respectively, require that local interest provide 
lands, easements, rights-of-way, including land for 
recreation, and dredged material disposal areas, presently 
estimated at $10,141,000, modify or relocate utilities, 
roads, and other facilities, except railroad bridges, where 
necessary for construction of the project, presently 
estimated at $570,000, contribute in cash one-half of the 
separable and joint costs allocated to recreation, 
presently estimated at $530,000; and, during construction, 
pay 25 percent of the construction costs allocated to 
deep-draft navigation, including disposal facility 
construction, presently estimated at $21,302,000. 
Terminal facilities. Small privately owned wharves, 
two oil docks, one acid dock, two shell unloading docks 
and one caustic dock. Brazos River Navigation District 
has one large dock with four transit sheds over rail 
facilities permitting all-weather work. Facilities considered 
adequate for existing commerce. (See Port Series No. 26, 
revised 1991, for additional facilities.) 
Operations during fiscal year. New Work: No 
new work for FY 99. 
Maintenance: Repairs were made to the Jetty 
Walkway in April 1999 for a cost of $99,984. (See Table 
40-J for dredging operations.) 
9. GALVESTON HARBOR AND 
CHANNEL, TX 
Location. A consolidation of authorized 
improvements at Galveston, Texas, which includes 
projects formerly identified as Galveston Harbor, Texas; 
Galveston Channel, Texas; and Galveston seawall 
extension. Entrance to Galveston Harbor is on Gulf of 
Mexico on the northern portion of the Texas Coast. 
Galveston Channel extends from a point in Galveston 
Harbor between Bolivar Peninsula and Fort Point to and 
along wharf front Galveston, Texas, and is about 5 miles 
long and 1,200 feet wide. (See National Ocean Survey 
Chart 11324/5.) 
Previous projects. For details see page 1854 of 
Annual Report for 1915. 
Existing project. Provides for channel dimensions 
in sections of the waterway shown in Table 40-H. 
Also provided are: two rubble-mound jetties, the 
south one extending from Galveston Island and the north 
one extending from Bolivar Peninsula, for distances of 
35,900 feet and 25,907 feet, respectively, into the Gulf of 
Mexico; a concrete seawall from the angle at Sixth Street 
and Broadway, in the city of Galveston, to the south 
jetty, and a 16,300-foot extension of the concrete seawall 
in a southwesterly direction from 61st Street; for 11 groins 
along the gulf shore between 12th Street and 61st Street; 
and for maintenance of seawall from the angle at 6th 
Street and Broadway to the south jetty. Under ordinary 
conditions, mean tidal range in Galveston Harbor is 1.6 
feet on outer bar and 1.4 feet on inner bar with extreme 
ranges of 2.3 and 2.1 feet, respectively. Mean range in 
Galveston channel is about 1.3 feet and extreme range 
about 2 feet under ordinary conditions. Height of tides 
in both Galveston harbor and channel is dependent 
largely on the wind, and during strong "northers" water 
surface may be depressed 2 feet below mean low tide. 
Existing project is complete. Dredging of Galveston, 
channel to 36 foot depth was completed in November 
1966. Dredging of the realigned entrance and Outer Bar 
Channel was completed in October 1967. Rehabilitation 
of the Beach Front Groins was completed June 1970. 
Dredging of Galveston channel to 40 feet was completed 
in March 1976. See Section 16. TEXAS CITY CHANNEL, 
TX regarding work authorized by Water Resources 
Development Act of 1986, Section 11, HOUSTONGALVESTON 
NAVIGATION CHANNELS, TX , and 
Section 34, PRE-CONSTRUCTION ENGINEERING AND 
DESIGN under Houston-Galveston Navigation Channels, 
TX, for work also authorized by the Water Resources 
Development Act of 1996. (See Table 40-G for total cost 
of existing project to September 30, 1999.) 
Local cooperation. Complied with. 
Terminal facilities. None on Galveston Harbor, 
which is entrance channel leading to terminal facilities 
on Galveston, Texas City, and Houston Ship Channels. 
Galveston Channel terminal facilities are mostly on south 
side of channel. Principal wharves, owned by the city of 
Galveston, extend from 10th to 41st Street (see Port Series 
No. 23, revised 1996). A container ship terminal equipped 
with a crane capable of stacking containers three units 
high on the deck of any normal container ship has been 
completed and placed into operation by the city of 
Galveston at Piers 10 and 11, on the south side of 
40-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Galveston Channel. The city of Galveston has also 
placed into operation a barge terminal equipped with 
two 35-ton and one 5-ton cranes for loading and 
unloading barges on Lash and Seabee ships at Pier 35 
and a docking and holding area for Lash and Seabee 
barges on Pelican Island, directly across the channel 
from Piers 35 and 36. Present facilities are considered 
adequate for existing commerce. 
Operations during fiscal year. New Work: See 
Section 11, HOUSTON-GALVESTON NAVIGATION 
CHANNELS, TX. 
Maintenance: Routine Maintenance. Also see 
Section 11, HOUSTON-GALVESTON NAVIGATION 
CHANNELS, TX. (See Table 40-J for dredging 
operations.) 
7. GULF INTRACOASTAL 
WATERWAY BETWEEN 
APALACHEE BAY, FL, AND 
MEXICAN BORDER 
Location. Extends from a point on Sabine River 
about 3 miles below Orange, Texas, to Brownsville, 
Texas, about 421 miles; a navigation channel, about 7 
miles long, in Colorado River, extending from 
Matagorda, Texas, to Gulf of Mexico; a tributary 
channel in San Bernard River, extending from 
Intracoastal Waterway crossing to State highway 
bridge some 30 miles above crossing; a tributary 
channel in Colorado River extending from Intracoastal 
Waterway upstream 15.5 miles; a tributary channel 
extending about 14 miles from Intracoastal Waterway 
to Palacios, Texas; a tributary channel extending about 
2 miles from Intracoastal Waterway to Rockport, Texas; 
a tributary channel extending about 6 miles from 
Intracoastal Waterway near Port Aransas, Texas, to 
town of Aransas Pass, Texas; a tributary channel about 
one-fourth mile long extending from Intracoastal 
Waterway near Port O'Connor, Texas, into Barroom 
Bay; a tributary channel extending about 38.8 miles 
from Intracoastal Waterway via Seadrift to a point in 
Guadalupe River 5.5 miles below Victoria, Texas; a 
harbor of refuge for small craft at Seadrift; a channel 
extending from gulf to Port Mansfield, Texas, about 
11 miles; and a tributary channel in Arroyo, Colorado 
extending from Intracoastal Waterway to a point near 
Harlingen, Texas, about 31 miles; side channels in 
vicinity of Port Isabel, Texas, and a small boat basin 
at Port Isabel, Texas, and a tributary channel extending 
from Intracoastal Waterway main channel at a point 
in West Galveston Bay into Offatts Bayou about 2.2 
miles with a west turnout (wye connection) 12 feet 
deep and 125 feet wide between Offatts Bayou Channel 
and the Gulf Intracoastal Waterway. (See National 
Ocean Survey Charts 11302, 11303, 11305, 11306, 11308, 
11309, 11314, 11315, 11317, 11319, 11322, 11326, and 
11331.) 
Previous project. For details see page 1859 of Annual 
Report for 1915. (West Galveston Bay and Brazos River 
Canal, Texas.) 
Existing project. Existing project dimensions 
provided for in main channel of waterway: A channel 12 
feet deep (below mean low tide) and 125 feet wide from 
the Sabine River to Brownsville, Texas. Relocation of 
channel 12 feet deep by 125 feet wide in Matagorda Bay, 
miles 454.3 to 471.3, relocation of channel 12 feet deep 
by 125 feet wide in Corpus Christi Bay, miles 539.4 to 
549.7 (mileage is west of Harvey Lock, Louisiana); and 
alternate channel, 12 feet deep (below mean low tide) 
and 125 feet wide via Galveston Channel and Galveston 
Bay to the Galveston causeway; maintenance of existing 
channel 12 feet deep by 125 feet wide through Lydia 
Ann Channel, between Aransas Bay and Aransas Pass; 
provisions of such passing places, widening of bends, 
locks and guard locks, railway bridges over artificial cuts 
as are necessary, and the tributary channels shown in 
tabulation. The authorized channel 16 feet deep and 125 
feet wide from Sabine River to Houston Ship Channel is 
inactive. (See Table 40-I on existing project dimensions 
provided for in tributary channels.) 
Removal of the railroad bridge across the canal at 
Mud Bayou was completed and operation and care of 
the facility was discontinued on April 14, 1969. 
Deepening the existing 6 foot by 60 foot side channels 
at Port Isabel to 12 feet was completed February 22, 1972, 
Offatts Bayou channel was completed January 1974. 
Relocation of main channel across Corpus Christi Bay 
was completed in September 1976. The 14 foot by 175 
foot Channel to Aransas Pass was completed in April 
1979. Dredging Chocolate Bayou Channel was completed 
in January 1981. Construction of a saltwater barrier in 
Chocolate Bayou was completed in February 1981. The 
12 foot by 125 foot channel relocation route in Matagorda 
Bay has been deauthorized. The Harbor of Refuge at 
Seadrift, Texas, has been placed in the inactive category. 
Mouth of Colorado River: Construction of jetties at 
mouth of Colorado River was completed in 1986. 
Construction of a navigation channel from the Gulf to 
the GIWW and an impoundment basin were fiscally 
completed in 1991. Construction of Tiger Island Dam and 
recreation facilities were also completed in 1991. 
Construction of the recreation facilities at Jetty Park was 
completed in 1992. Construction of the diversion dam 
and connecting channel was completed in 1993. 
Construction of the oyster cultch was completed in 1995. 
Brazos River Floodgates- Major Rehabilitation: Major 
rehabilitation of the East Floodgate Guidewalls was 
completed in 1997. The cost of rehabilitation was 
$2,750,000 Federal (Corps) and $2,750,000 Federal (Inland 
Waterways Trust Fund). Sargent Beach: Work 
authorized by the Water Resources Development Act of 
1992 for construction of a concrete-pile and concrete 
block revetment structure which extends 8 - miles to 
protect the Gulf Intracoastal Waterway was completed 
in 1998. Construction cost was $29,460,000 Federal 
40-6

GALVESTON, TEXAS, DISTRICT 
(Corps) and $29,460,000 Federal (Inland Waterways Trust 
Fund). 
Active authorized work remaining consists of the 
following: (1) Work authorized by the Water Resources 
Development Act of 1988 for enlarging the existing 
Channel to Victoria from a depth of 9 feet and width of 
100 feet to a depth of 12 feet and width of 125 feet. (2) 
Aransas National Wildlife Refuge, work authorized by 
the Water Resources Development Act of 1996 for 
construction of bank protection and a spill containment 
system through the critical habitat for the endangered 
whooping crane. (See Table 40-G for total cost of 
existing project to September 30, 1999.) 
Mean tidal variation is 0.5 foot at Orange, 1 foot at 
Port Arthur, 1.3 feet in Galveston Bay, 1.5 feet at Freeport, 
1 foot in Matagorda Bay, 1 foot in San Antonio Bay, 1 
foot at Corpus Christi, 1.5 feet at Port Isabel, and 1.5 feet 
at Brownsville. Extreme ranges of tide under ordinary 
conditions are 1 foot at Orange, 1.5 feet at Port Arthur, 2 
feet in Galveston Bay, 2 feet at Freeport, 1.5 feet in 
Matagorda and San Antonio Bays, 1.5 feet at Corpus 
Christi, 2 feet at Port Isabel, and 1.5 feet at Brownsville. 
Height of tides is dependent largely on wind. Strong 
north winds have depressed water surface as much as 2 
feet below mean low tide. 
Estimated cost for new work is: 
Channel to Victoria - $27,143,000 Federal 
(Corps), $422,000 Federal (Department of Transportation), 
$60,000 Federal (U.S. Coast Guard), and $6,457,000 non- 
Federal consisting of $3,016,000 cash, $1,643,000 lands, 
$181,000 fender system, and $1,617,000 levees and other 
associated costs. (October 1, 1999 base prices.) 
Aransas National Wildlife Refuge - $20,800,000 
Federal (Corps). (October 1, 1999 base prices.) 
Local cooperation. Fully complied with except for 
provisions of Section 101, 1968 River and Harbor Act 
and Water Resources Development Act of 1988. The 
Project Cooperation Agreement for Channel to Victoria 
was executed November 17, 1994. 
Terminal facilities. There are terminal facilities at 
Aransas Pass, Port Arthur, Galveston, Port Isabel, and 
Brownsville. See Port Series No. 22 (revised 1988), Port 
Series No. 23 (revised 1996), Port Series No. 25 (revised 
1983) and Port Series No. 26 (revised 1991), Corps of 
Engineers. Local interests constructed terminal facilities 
at Port Mansfield and Port Harlingen. There are numerous 
privately owned piers and wharves along the waterway. 
A 330-foot navigation district owned general cargo dock, 
a 770-foot private dock and a 760-foot private timber 
trestle have recently been completed at the upper end of 
the Channel to Victoria. Facilities are adequate for existing 
commerce. 
Operations during fiscal year. New Work: - 
Channel to Victoria - The contract for dredging 
Stations 600+00 to 835+00 and constructing levees, 
awarded February 6, 1998, continued through FY 1999 at 
a cost of $2,500,476 (Federal) and $277,831 (contributed 
funds). The construction contract for dredging Stations 
835+00 to 1300+00 was awarded May 28, 1999. 
Construction continued through FY 99 at a cost of 
$1,107,540 (Federal) and $123,060 (contributed funds). 
Aransas National Wildlife Refuge - A 
construction contract for placing concrete mats along 
Welder Flats, Reaches 1 through 19 of the Refuge area, 
awarded April 2, 1998, physically completed in September 
1998, was financially completed in FY 99 for a fiscal year 
cost of $144,562. A contract for erosion protection at 
Welder Flats was awarded March 25, 1999 and physically 
completed in September 1999 at a cost of $3,502,312 for 
FY 99. The contract consisted of construction of 
geotextile tubes, cellular concrete mattresses, scour pad 
and anchorage area. A contract to purchase 665 feet of 
spill containment booms was issued August 10, 1999 
and incurred a total cost of $27,429 in FY 99. 
Maintenance: - 
Main Channel and Tributaries - A contract 
was issued September 25, 1998 to clear top of levees and 
inside of placement areas number 28, 30, 33, and 34 along 
the GIWW from High Island to Port Bolivar at a cost of 
$49,500. In addition the levee tops and insides of 
placement areas number 36, 37, 39, 40 and 42 were cleared 
by a construction contract awarded February 19, 1999. 
Repairs to mooring dolphins along the GIWW at a cost 
of $364,963 were made in FY 99. The cost incurred for 
1999 for Dredged Material Management Plans was as 
follows - GIWW, Corpus Christi Bay to Port Isabel 
$382,288; GIWW, Brazos River to Port O'Connor $3,902; 
and GIWW, Port O'Connor to Corpus Christi $4,256. (See 
Table 40-J for dredging operations.) 
Aransas National Wildlife Refuge - No 
maintenance cost incurred for FY 1999. 
Brazos River Floodgates - The Brazos River 
Floodgates were operated and maintained at a cost of 
$965,327.
Channel to Victoria - A contract to repair 
levees from Stations 1242+00 to 1532+00 was awarded 
June 17, 1999, and completed in FY 99 at a cost of 
$284,000. Construction contract, awarded in September 
1997 for replacement of gate guides and operability of 
flap gates was financially completed in FY 99 for a cost 
of $48,000. The contract for constructing bank 
stabilization and drainage structure at Stations 490+72 
to 493+77, awarded September 26, 1997, was financially 
completed at a cost of $18,000. 
An archaeological service contract was awarded in 
FY 97 for Channel to Victoria Barge Canal, Calhoun 
County, Texas. The project consists of conducting fullscale 
data recovery (field excavations and extensive postartifact 
processing, analysis, and project report 
preparation) investigations at prehistoric archaeological 
site 41CL59. Site 41CL59 is an extensive prehistoric shell 
and earth midden with an occupation dating beginning 
about 400 B.C. and continuing up until A.D. 1000. The 
site measures 700 meters long by 100 meters wide, and is 
10 to 25 feet thick, sandwiched stratigraphically within 
40-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
the adjoining terrace bluff overlooking the Barge Canal 
and the former Guadalupe River floodplain. Vast amount 
of lithics (stone dart and arrow points, knives, scrapers, 
awls, etc.), special perforated shell tools, ceramics, along 
with an extensive collection of faunal and floral material 
have been recovered from the site. In addition, rich 
features associated with the later historic Indian period 
and early Texan ranching settlers have also been 
recovered from this site. The project is being conducted 
by the Corps in compliance with Section 106 of the 
National Historic Preservation Act and 36 CFR Part 800 
regulations. Work continued with the issuance of three 
contracts. The contract work consists of ongoing artifact 
processing and analysis of the tremendous amount of 
material recovered during the data recovery excavations 
conducted in FY 97-98. Required artifact curation and 
project report preparation is scheduled for FY 00 through 
FY 02. To date, the total cost (FY 97-99) expended on 
archaeological mitigation of site 41CL59 is $1,124,126 of 
which FY 99 expenditures consist of $49,890 for data 
recovery and $150,944 for report and report of finding. 
Channel to Victoria archaeological site 41 CL76 was 
also tested and determined eligible for the National 
Register in FY 99, for a cost of $61,233. Data recovery 
mitigation for 41CL76 is anticipated to commence in FY 
01. 
In addition, final National Register eligibility testing 
is scheduled to be conducted at archaeological site 
41VT98 in summer FY 00. Subsequent data recovery 
mitigation at 41VT98 (includes field excavations, artifact 
analysis, curation, and report preparation) is planned for 
FY 01 and continuing into FY 02/03. 
Colorado River Locks - The Colorado River 
Locks were operated and maintained at a cost of 
$1,123,255. A contract to rehabilitate the east and west 
locks and boat basin, awarded September 26, 1997, was 
physically completed March 1, 1999, at a FY 99 cost of 
$347,016.
Channel to Port Mansfield - (See Table 40-J 
for dredging operations.) 
Chocolate Bayou - (See Table 40-J for dredging 
operations.) 
Mouth of Colorado River - A contract to repair 
the ramp and walkway to the jetty was issued January 
21, 1999 an completed at a cost of $99,999. (See Table 
40-J for dredging operations.) 
11. HOUSTON-GALVESTON 
NAVIGATION CHANNELS, TX 
Location. Houston Ship Channel connects 
Galveston Harbor, at a point opposite Port Bolivar, with 
city of Houston, Texas, extending 50 miles northwesterly 
across Galveston Bay through San Jacinto River and 
Buffalo Bayou to a turning basin at head of Long Reach 
with light-draft channel 5 miles long from turning basin 
to Jensen Drive, Houston. The entrance to Galveston 
Harbor and Channel is on Gulf of Mexico on the northern 
portion of the Texas Coast. Galveston Channel extends 
from a point in Galveston Harbor between Bolivar 
Peninsula and Fort Point to and along wharf from 
Galveston, Texas and is about 5 miles long and 1,200 
feet wide. (See National Ocean Survey Charts 11324/5, 
11327, 11328, and 11329.) 
Existing project. See Section 9, GALVESTON 
HARBOR AND CHANNEL, TX and Section 12, 
HOUSTON SHIP CHANNEL, TX for project prior to 
October 1998. New authorized project provides for 
enlarging the Houston Ship Channel to a depth of 45 
feet over a width which varies between 650 and 1,112 
feet, and deepening the Galveston Harbor Channel to 47 
feet over its original 800-foot width and 10.5 mile length; 
and extending the channel an additional 3.9 miles to the 
47-foot bottom contour in the Gulf of Mexico along 
existing alignment. A dredged-material disposal plan, 
which would utilize confined or beneficial uses of dredged 
material in the bay and/or offshore disposal and 118 acres 
of Oyster mitigation is also provided in the project. 
Estimated cost for new work is: $289,826,000 Federal 
(Corps) which includes $84,036,000 for deferred 
environmental construction; $3,290,000 Federal (U.S. 
Coast Guard); and $105,693,000 non-Federal consisting 
of $47,176,000 cash, $712,000 lands, and $52,000 
relocations for general navigation features; $8,375,000 
for berthing areas; and $49,377,000 cash for 
environmental restoration which includes $28,012,000 for 
deferred environmental construction. (October 1, 1999 
base price.) 
The plan for construction consist of nine reaches as 
follows: (1) Offshore Entrance Channel Extension, (1A) 
Offshore Jetty and Entrance Channel, (2) Galveston 
Channel, (3) Lower Bay, (4) Upper Bay, (5) Mid Bay, (6) 
Goat Island, (7) Upper Bayou, (8) Lower Bayou, and (9) 
Oyster Reef Mitigation. The first construction contract 
to dredge the Entrance Channel Extension, awarded 
August 7, 1998, was completed in FY 99. Construction 
was initiated in FY 99 on contracts (1A) Offshore Jetty 
and Entrance Channel, (3) Lower Bay, (7) Upper Bayou 
and (9) Oyster Reef Mitigation. 
Local cooperation. Complied with for the completed 
work. For the Houston-Galveston Navigation Channels 
project, authorized by the Water Resources Development 
Act of 1996, the cost-sharing and financing concepts 
reflected in the Water Resources Development Act of 
1986, as amended, apply. Local interests are required to 
provide lands, easements, rights-of-way, roads and other 
facilities, except railroad bridges; pay one-half of the 
separable and joint costs allocated to recreation; and 
pay 25 percent of the costs allocated to deep-draft 
navigation, during construction including in-kind work 
in connection with construction; and pay an additional 
10 percent of the costs allocated to navigation within a 
period of 30 years following completion if not offset by 
credit allowed for lands, easements, rights-of-way, and 
relocations. 
40-8

GALVESTON, TEXAS, DISTRICT 
The Port of Houston Authority and the City of 
Galveston are the sponsors for the project. A Project 
Cooperation Agreement with the Port of Houston 
Authority was executed on June 10, 1998. The Project 
Cooperation Agreement with the City of Galveston is 
pending. 
Terminal facilities. See Section 9, GALVESTON 
HARBOR AND CHANNEL, TX and Section 12, HOUSTON 
SHIP CHANNEL, TX. 
Operations during fiscal year. New Work: 
Construction contract for dredging the Entrance Channel 
Extension, awarded August 7, 1998, was completed in 
FY 99 at a fiscal year cost of $9,635,171. A construction 
contract for dredging the remaining entrance channel and 
jetty area was awarded March 19, 1999 and incurred a 
cost of $2,675,400 for FY 99. Construction contract for 
dredging Lower Bay, awarded September 4, 1998, 
continued through FY 99 at a cost of $19,847,798. A 
construction contract for dredging Upper Bayou was 
awarded October 26, 1998 and continued through FY 99 
at a cost of $5,442,775. The contract to construct an 
oyster reef was awarded March 12, 1999 and continued 
through the year at a cost of $1,723,930. Also see Section 
34, PRE-CONSTRUCTION ENGINEERING AND DESIGN. 
Maintenance: See Section 9, GALVESTON HARBOR 
AND CHANNEL, TX and Section 12, HOUSTON SHIP 
CHANNEL, TX for maintenance of existing channels. 
(See Table 40-J for dredging operations.) 
12. HOUSTON SHIP CHANNEL, TX 
Location. Connects Galveston Harbor, at a point 
opposite Port Bolivar, with city of Houston, Texas, 
extending 50 miles northwesterly across Galveston Bay 
through San Jacinto River and Buffalo Bayou to a turning 
basin at head of Long Reach with light-draft channel 5 
miles long from turning basin to Jensen Drive, Houston. 
(See National Ocean Survey Charts 11324/5, 11327, 11328, 
and 11329.) 
Previous project. For details see page 1856 of Annual 
Report for 1915. 
Existing project. Provides for channel dimensions 
in sections of the waterway shown in Table 40-H. 
Also provides for certain cut-offs, for easing sharp 
bends, an earthen dam across the upper end of Turkey 
Bend, and for off-channel silting basins as deemed 
necessary by the Chief of Engineers. Construction of 
26,000 linear feet of pile dike to protect the channel in 
upper Galveston Bay was deauthorized by Sec. 12 of PL 
93-251. The 40-foot project was completed in March 1966. 
Dredging a channel in Greens Bayou to Mile 1.57 was 
completed in 1970. Dredging Greens Bayou, Mile 1.57 to 
Mile 2.73, has been deauthorized. See Section 11, 
HOUSTON-GALVESTON NAVIGATION CHANNELS, 
TX an Section 34, PRE-CONSTRUCTION ENGINEERING 
AND DESIGN under Houston-Galveston Navigation 
Channels, TX, for work authorized by the Water 
Resources Development Act of 1996. (See Table 40-G 
for total cost of existing project to September 30, 1999.) 
Mean tidal range under ordinary conditions is 0.6 
foot to 1.3 feet in lower part of Galveston Bay; 0.6 foot 
to 1.3 feet in upper bay; and 0.5 to 1 foot in San Jacinto 
River and Buffalo Bayou. Extreme ranges under ordinary 
conditions are about 2 feet, 1.2 feet and 1 foot, 
respectively. Freshets caused rises of over 12 feet in 
Buffalo Bayou; however, this condition has not occurred 
since completion of Addicks and Barker Dams for flood 
control on upper watershed of Buffalo Bayou. Height of 
tides is dependent largely on the wind, and during strong 
"northers" in winter season the water surface may be 
depressed 2 feet below mean low tide. 
Local cooperation. Fully complied with for Houston 
Ship Channel. Local Cooperation Agreement for 
assumption of maintenance on Bayport Ship Channel 
was executed April 6, 1993. Local Cooperation 
Agreements for assumption of maintenance on Barbour 
Terminal Channel and Greens Bayou Channel were both 
executed on February 8, 1994. 
Terminal facilities. City of Houston and Port of 
Houston Authority operate modern terminals which 
supplement privately owned wharves, piers, and docks, 
as described in Port Series No. 24 (revised 1989), Corps 
of Engineers. Facilities are considered adequate for 
existing commerce. 
Operations during fiscal year. New Work: See 
Section 11, HOUSTON-GALVESTON NAVIGATION 
CHANNELS, TX. 
Maintenance: Routine maintenance. (See Table 
40-J for dredging operations.) See Section 11, HOUSTONGALVESTON 
NAVIGATION CHANNELS, TX and 
Section 34, PRE-CONSTRUCTION ENGINEERING AND 
DESIGN. 
13. MATAGORDA SHIP CHANNEL, TX 
Location. This is a consolidation of shallow draft 
channel improvements of "Channel from Pass Cavallo to 
Port Lavaca, Texas," and deep draft channel 
improvements authorized under "Matagorda Ship 
Channel, Texas." Bar at Pass Cavallo is 125 miles 
southwest of Galveston entrance and 54 miles north of 
Aransas Pass. It connects Matagorda Bay with the gulf. 
Project extends across Matagorda Bay and Lavaca Bay 
to towns of Port Lavaca and Point Comfort. These two 
towns are on opposite sides of Lavaca Bay and both are 
about 26 miles northwest from Pass Cavallo. (See National 
Ocean Survey Chart 11316.) 
Existing project. Existing project dimensions 
provided for in various channels and basins are listed in 
Table 40-H on channel dimensions. 
Project also provides for dual jetties at entrance, 
south jetty extending 6,000 feet to 24-foot depth in the 
gulf and north jetty extending 5,900 feet to 24-foot depth. 
Under ordinary conditions mean tidal range is about 1 
40-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
foot and extreme range about 2 feet. Height of tide is 
dependent largely on the wind, and during strong 
"northers" in winter season the water surface may be 
depressed 2 feet below mean low tide. (See Table 40-G 
for total cost of existing project to September 30, 1999.) 
Local cooperation. Fully complied with. 
Terminal facilities. Privately owned facilities at Port 
Lavaca, municipally owned facilities at mouth of Lynn 
bayou, privately owned and publicly owned facilities at 
Point Comfort, Texas. These facilities are considered 
adequate for present commerce. Facilities at Point Comfort 
consist of a channel, turning basin with wharfs, oil dock 
and loading equipment, all owned by Aluminum Company 
of America; and a wharf built by local interest at Point 
Comfort turning basin. 
Operations during fiscal year. Maintenance: Routine 
maintenance. (See Table 40-J for dredging operations.) 
14. NECHES RIVER AND TRIBUTARIES, 
SALT WATER BARRIER AT 
BEAUMONT, TX 
Location. The project is located just below the Big 
Thicket National Preserve and the confluence of Pine 
Island Bayou and the Neches River at Beaumont, Texas, 
in Jefferson and Orange Counties on the upper coast of 
Texas. (See National Ocean Survey Chart 11343.) 
Existing project. The project will provide for an 
overflow dam in the Neches River, a gated salt water 
barrier consisting of five 56 feet by 24.5 feet tainter gates; 
a gated navigation bypass channel with a clear opening 
of 56 feet and a depth of 16 feet; an access road and 
levee; and an auxiliary dam across a canal which drains 
an adjacent bayou. Estimated cost for new work is 
$39,668,000 Federal (Corps) and $13,222,000 non-Federal 
consisting of $7,654,000 contributed funds, $222,000 for 
lands, $5,346,000 for relocations. (October 1, 1999 base 
price.) 
The project was authorized for construction in the 
Water Resources Development Act of 1976 (Sec. 102, PL 
94-587). 
Local cooperation. Local Sponsor for the project is 
the Lower Neches Valley Authority. Report of the Chief 
of Engineers for the Water Resources Development Act 
of 1976 authorization cited a 1974 Waterways Experiment 
Station report, which concluded that 75 percent of the 
salinity in the Neches River at Beaumont was due to the 
Federal deep draft navigation project to Beaumont and 
25 percent was due to withdrawals by water users. From 
1994 to 1996, the Corps reevaluated the project which 
resulted in a May 1997 decision by the Assistant 
Secretary of the Army (Civil Works), to direct that the 
project go forward with 75 percent Federal / 25 percent 
non-Federal cost-sharing as a navigation mitigation 
project. In October 1999, the Assistant Secretary of the 
Army (Civil Works) issued a decision stating that 
operations and maintenance will also be cost-shared as 
75 percent Federal and 25 percent non-Federal. 
Terminal facilities. None. 
Operations during fiscal year. New Work: See 
Section 34, PRE-CONSTRUCTION ENGINEERING AND 
DESIGN. 
15. SABINE-NECHES WATERWAY, TX 
Location. This is a consolidation of old improvements 
of "Harbor at Sabine Pass and Port Arthur Canal" and 
"Sabine-Neches Canal, including Sabine River to Orange 
and Neches River to Beaumont, Texas." Sabine Pass is 
on Gulf of Mexico about 58 miles east of Galveston and 
280 miles west of Southwest Pass, Mississippi River. It 
connects Sabine Lake with gulf. Port Arthur canal 
extends 7 miles from near upper end of Sabine Pass to 
Port Arthur docks at mouth of Taylors Bayou. Near its 
upper end, Sabine-Neches canal joins and extends to 
mouths of Neches and Sabine Rivers. Waterway next 
extends up Neches River to Beaumont and up Sabine 
River to Orange. (See National Ocean Survey Charts 
11341, 11342, and 11343.) 
Previous projects. For details see page 1863 of 
Annual Report for 1915, page 985 of Annual Report for 
1916, and page 873 of Annual Report for 1926. 
Existing project. Existing project dimensions 
provided for in various channels and basins are set forth 
in Table 40-H on channel dimensions. Project also 
provides for two stone jetties at Sabine Pass entrance 
from the gulf, western jetty to be 21,905 feet long and 
eastern jetty 25,310 feet long. Project further provides 
for removal of guard lock in Sabine-Neches Canal, 
construction of suitable permanent protective works 
along Sabine Lake frontage owned by city of Port Arthur 
to prevent dredged material from entering Sabine Lake 
and to prevent erosion of material deposited, 
reconstruction of Port Arthur Bridge, and relocation of 
Port Arthur field office. Mean tidal variation at entrance 
is about 1.5 feet, at Port Arthur about 1 foot, and at 
Orange and Beaumont about 0.5 foot. Prolonged north 
winds during winter season have depressed water surface 
as much as 3.4 feet below mean low tide while tropical 
disturbances have caused heights as much as 8 feet 
above mean low tide. 
Existing project is complete. Removal of obstructive 
bridge at Port Arthur was completed May 1969. The high 
level fixed bridge across Sabine-Neches Canal was 
completed October 1970. Deepening project to 40 feet 
was completed April 1972. (See Table 40-G for total cost 
of existing project to September 30, 1999.) 
Local cooperation. Complied with. 
Terminal facilities. See volume 2, Port Series No. 
22 (revised 1988), Corps of Engineers. Facilities are 
considered adequate for present commerce. 
Operations during fiscal year. Maintenance: 
Routine Maintenance. The contract to rehabilitate 
Placement Area No. 11, awarded June 17, 1996, was 
40-10

GALVESTON, TEXAS, DISTRICT 
financially completed in FY 99 at a fiscal year cost of 
$404,467. A construction contract to repair the road on 
Placement Areas No. 8 and No. 11 was awarded August 
31, 1999 and incurred a cost of $10,000 for FY 99. A 
contract for archeology investigations of Channel to Red 
Bluff incurred a fiscal year cost of $51,990 for FY 99. 
Mosquito control spraying was performed in FY 99 for 
$102,147. (See Table 40-J for dredging operations.) 
16. TEXAS CITY CHANNEL, TX 
Location. Texas City is on the mainland of Texas 
on west side of Galveston Bay, about 10 miles northwest 
of city of Galveston. (See National Ocean Survey Charts 
11324/5.) 
Previous projects. For details see page 1856 of 
Annual Report for 1915. 
Existing project. Provides for channel 40 feet deep, 
400 feet wide and about 6.75 miles long, from Bolivar 
Roads to a turning basin at Texas City, 40 feet deep, 
1,000 feet to 1,200 feet wide and 4,253 feet long; and an 
Industrial Canal, 40 feet deep and 300-400 feet wide 
extending a distance of 1.7 miles southwestward from 
the south end of Texas City Turning Basin, and a turning 
basin, 40 feet deep, 1,000 feet wide and 1,150 feet long. 
Project also provides for easing the approach to the 
turning basin; a pile dike 28,200 feet long, parallel to and 
north of the channel; and a rubble-mound dike, 27,600 
feet long, along the southerly side of the pile dike. 
The 40-foot channel was completed in June 1967. 
Widening the Texas City Turning Basin; realigning the 
Texas City Turning Basin to a location 85 feet easterly 
from its present position; and enlargement through 
widening and deepening of the Industrial Canal and 
basins was initiated in July 1980 and completed in June 
1982. The only work remaining is deferred construction 
consisting of widening the Industrial Canal from 250 feet 
to 300 feet at 40 foot depth. 
Work authorized by Water Resources Development 
Act of 1986 would modify the project by providing for 
deepening the Texas City Turning Basin to 50 feet, 
enlarging the 6.7-mile long Texas City Channel to 50 feet 
by 600 feet, deepening the existing 800-foot wide Bolivar 
Roads Channel and Inner Bar Channel to 50 feet, 
deepening the existing 800-foot wide Outer Bar and 
Galveston Entrance Channel to a 52-foot depth for 4.1 
miles at a width of 800 feet and an additional reach at a 
width of 600 feet to the 52 foot contour in the Gulf of 
Mexico. Establishment of 600 acres of wetland and 
development of water-oriented recreational facilities on 
a 90-acre enlargement of the Texas City Dike are also 
proposed. The project is currently in the "deferred" 
category. (See Table 40-G for total cost of existing project 
to September 30, 1999.) 
Under ordinary conditions mean tidal range is about 
1.3 feet and extreme range is about 2 feet. Height of tide 
is dependent largely on the wind and during strong 
"northers" water surface may be depressed 2 feet below 
mean low tide. Estimated cost for new work is $123,300,000 
Federal (Corps), excluding expenditures on previous 
projects, and $74,393,700 non-Federal, including 
$62,027,741 contributed funds, $248,000 work 
contribution, $427,959 lands, $10,737,000 levees and 
spillways, $6,000 for removal of barge mooring facilities 
from Shoal Point (formerly known as Snake Island), 
$561,000 for berthing areas, and $386,000 relocations. 
(October 1, 1988 base price.) 
Local cooperation. Fully complied with for completed 
work. For work authorized by the Water Resources 
Development Act of 1986, as amended, local interests 
are required to provide lands, easements, rights-of-way, 
and disposal areas; relocate utilities, roads, and other 
facilities, except railroad bridges; provide berthing areas; 
pay one-half of the separable and joint costs allocated 
to recreation; and bear all costs of operation, 
maintenance and replacement of recreation facilities, and, 
during construction, pay 25 percent of the costs allocated 
to deep-draft navigation to a depth of 45 feet plus 50 
percent of the costs allocated to deep-draft navigation 
deeper than 45 feet; pay an additional 10 percent of the 
costs allocated to deep-draft navigation within a period 
of 30 years following completion if not offset by credit 
allowed for lands, easements, rights-of-way, relocations 
and disposal areas; and pay 50 percent of the costs 
incurred for operation and maintenance below the 45- 
foot depth. 
Terminal facilities. Privately owned terminal 
facilities are on the mainland at inner end of this channel 
and are considered adequate for existing commerce. A 
deep-draft channel and turning basin extend about 1.9 
miles southwestward from south end of Texas City 
Turning Basin have been constructed by local interests. 
See Port Series No. 23 (revised 1996), Corps of Engineers. 
Operations during fiscal year. Maintenance: 
Routine Maintenance. (See Table 40-J for dredging 
operations.) 
17. TRINITY RIVER AND 
TRIBUTARIES, TX 
Location. The main stem of the Trinity River is 
formed at Dallas by the confluence of the West Fork 
and the Elm Fork at river mile 505.5. The mouth of the 
Trinity is about one-half mile west of Anahuac, Texas. 
(See Geological Survey base map, Texas, scale 1:500,000.) 
Previous project. For details of abandoned locks 
and dam construction see page 986 of Annual Report for 
1933.
Existing project. See individual detailed reports on 
Anahuac Channel, Channel to Liberty and Wallisville 
Lake. Project includes the existing Federal project 
designated as "Mouth of Trinity River, Texas," which 
was completed in 1907 at a cost of $80,000 (no cost to 
local interest). Project is not being maintained. (See Table 
40-G for total cost of existing project to September 30, 
1999.) 
40-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Local cooperation. See individual detailed reports 
on Channel to Liberty and Wallisville Lake. There is no 
local cooperation required for Anahuac Channel. 
Terminal facilities. Privately owned wharves and 
piers at Anahuac, Moss Bluff, Wallisville, and Liberty, 
Texas, are adequate for existing commerce. 
17A. ANAHUAC CHANNEL, TX 
Location: Extends from 6-foot depth in Galveston 
Bay to Anahuac, Texas, opposite mouth of Trinity River 
38 miles north of Galveston, Texas. (See National Ocean 
Survey Chart 11323.) 
Existing project. No project dimensions authorized 
by 1905 River and Harbor Act. A 6- by 80-foot channel, 
16,000 feet long was dredged in 1905. At present a 6- by 
100-foot channel is maintained. Under ordinary 
conditions tidal range is 0.6 to 1.2 feet. Height of tide is 
dependent largely on wind. Strong north winds depress 
water surface 1.5 feet below mean sea level. Latest 
published map is in House Document 440, 56th Congress, 
1st Session. Project was completed in 1911. 
Local cooperation. None required. 
Terminal facilities. Privately owned wharves and 
piers are the only terminal facilities at Anahuac. 
Operations during fiscal year. Maintenance: No 
work was incurred during the fiscal year. 
17B. CHANNEL TO LIBERTY, TX 
Location. Improvement is located in Galveston Bay 
and tidal reach of lower Trinity River. (See Geological 
Survey Maps for Anahuac, Cove, Moss Bluff, and 
Liberty, Texas.) 
Previous projects. For details see page 986 of Annual 
Report for 1932. 
Existing project. Provides for a 6-foot channel from 
Anahuac to Liberty which was completed in 1925. A 
navigable channel from the Houston Ship Channel near 
Red Fish Bar in Galveston Bay to Liberty, Texas, with 
depth of 9 feet and width of 150 feet, extending along 
the east shore of Trinity Bay to the mouth of the Trinity 
River at Anahuac, thence in the river channel to a turning 
basin at Liberty, Texas, and a protective embankment 
along the west side of the channel in Trinity Bay. 
The 6-foot Channel to Liberty was completed in 1925. 
The 9-foot Channel to Liberty has been dredged from 
junction with Houston Ship Channel to a point one mile 
below Anahuac, Texas. Work remaining consists of 
dredging a 9- by 150-foot channel from one mile below 
Anahuac, Texas to Liberty, Texas. 
Local cooperation. Fully complied with for portion 
of "Channel to Liberty" between Houston Ship Channel 
and 1 mile below Anahuac, Texas, as required by 1946 
River and Harbor Act (H. Doc. 634, 79th Cong., 2nd 
Sess.), but not complied with for remaining portion of 
"Channel to Liberty" as required by River and Harbor 
Act of 1945 (H. Doc. 403, 77th Cong., 1st Sess.). 
Terminal facilities. Privately owned wharves and 
docks at Anahuac, Wallisville, Texas Gulf Sulphur Co.'s 
slip, Moss Bluff and Liberty, Texas, are adequate for 
existing commerce. 
Operations during fiscal year. Maintenance: 
Routine maintenance. (See Table 40-J for dredging 
operations.) 
17C. WALLISVILLE LAKE, TX 
Location. Dam is at river mile 3.9, about 4 miles 
northwest of Anahuac, Texas. (See National Ocean 
Survey Chart 11323.) 
Existing project. Provides for construction of a dam 
and overflow spillway approximately 8 miles long to 
prevent salinity intrusion and create a 3,800 acre reservoir. 
The maximum pool elevation will be 2 feet above National 
Geodetic Vertical Datum. (The reservoir was reduced from 
5600 acres with a maximum pool elevation of 4 feet 
N.G.V.D. by agreement to protect the endangered bald 
eagle.) Project provides for an 84 foot by 600-foot 
navigation lock to facilitate navigation on Channel to 
Liberty. The sill has a depth of minus 16 feet below 
National Geodetic Vertical Datum. Project also provides 
for two recreational areas; and three water control 
structures to control salinity intrusion and regulate 
freshwater flows to the saltwater marsh west of the river. 
Dam controls a drainage area of 1,262 square miles below 
Livingston Dam (non-Federal project at channel mile 99.2) 
and has a storage capacity of 14,000 acre-feet. Under 
ordinary conditions mean tidal range in bay is from 0.6 
foot to 1.2 feet. Height of tide is dependent largely on 
wind. Strong northerly winds depress water surface 1.5 
feet below mean sea level. Total estimated cost of 
authorized project is $78,000,000 Federal (Corps). (October 
1, 1997 base price.) 
A contract for construction of access road, Big Hog 
intake structure, intake canal and access bridge was 
completed in October 1968. Work started in July 1970 on 
construction of the lock and dam, roads, diversion 
channel, and navigation channel. Work was suspended 
in February 1973 because of an injunction halting 
construction. Protective work on the lock and dam was 
permitted and was completed in April 1973. An exception 
to the injunction was granted for plugging oil wells which 
was completed in August 1973. Notice of appeal to the 
Court of Appeals for the Fifth Circuit was filed in April 
1973. In August 1974, the Court of Appeals reversed the 
judgment and remanded the case with directions that a 
revised or supplemental statement be prepared and 
judged anew. Final supplement to the Environmental 
Impact Statement for the modified project authorized in 
the Supplemental Appropriations Act, 1983 (PL 98-63) 
was submitted to the Environmental Protection Agency 
on September 21, 1983. 
In March 1986, the Court rendered its Memorandum 
of order continuing the injunction and directing the Corps 
40-12

GALVESTON, TEXAS, DISTRICT 
to recommence the administrative process at the time 
when the first departure from standard NEPA procedures 
occurred prior to the 1983 legislative action. The Corps 
and Local Sponsors perfected an appeal to the U.S. Court 
of Appeals and on May 11, 1987, the Court of Appeals 
ruled in favor of the Corps and dismissed the suit in its 
entirety. 
The Energy and Water Development Appropriation 
Act of 1991 provided $9,200,000 for the project and 
directive language for continuation of construction. 
In the fall of 1989, a pair of bald eagles were 
discovered nesting at the project site which led to 
additional consultation under the Endangered Species 
Act. Solicitation of the contract for the non-overflow 
dam was postponed to allow for environmental 
coordination. An Environmental Assessment was 
prepared with a Finding of No Significant Impact (FONSI) 
which was signed in September 1991. Environmental 
documents were approved and construction was 
resumed. 
A contract to rehabilitate and complete the 
navigation lock, complete the North and South 
navigation channels, construct a new administrative/ 
resident office building, and electrical and mechanical 
equipment controls for the controlled spillway structure 
was awarded in December 1995 and completed in FY 99. 
Work remaining consist of completion of Control 
Structure A and design and construction of Cedar Hill 
Park.
Local cooperation. Local interest must contribute an 
amount equal to cost allocated to water supply, one-half 
of cost allocated to salinity control and cost allocated to 
recreation less cost of basic facilities and less 15 percent 
of total project cost. Local interest reimbursement is 
estimated at $10,500,000. 
Operations during fiscal year. New Work: The 
architect/engineering contract, awarded April 4, 1994 to 
prepare plans and specifications and cost estimates for 
lock rehabilitation and construction of new facilities, 
completed the design in 1996 and continued through FY 
1998 providing construction phase services at a cost of 
$57,566. Architect/engineering contract awarded 
September 20, 1995, to design Structure A, provide 
construction phase services and reestablish property 
boundary lines, continued through Fiscal Year 1998 at a 
cost of $35,643. The construction contract for lock 
rehabilitation and construction of new facilities was 
awarded December 22, 1995 and continued through FY 
1998 at a cost of $7,800,000. The contract includes 
rehabilitation and completion of the navigation lock, 
completion of the North and South navigation channels, 
construction of a new administration/resident office 
building, and electrical and mechanical equipment 
controls for the controlled spillway structure. 
Maintenance: Ranger surveillance, administration of 
project, and administration of duck blind permit program 
were conducted. 
18. RECONNAISSANCE AND 
CONDITION SURVEYS 
Reconnaissance and condition surveys were 
conducted in FY 1999 at a total cost of $34,534. The 
surveys were on the following projects: 
Greens Bayou 
Channel to Red Bluff 
Double Bayou 
Clear Creek 
Dec 99 
Apr 99 
May 99 
Aug 99 
19. NAVIGATION WORK UNDER 
SPECIAL AUTHORIZATION 
Navigation activities pursuant to Section 107, Public 
Law 86-645 (preauthorization): 
Initial coordination for Section 107 navigation 
activities was performed in FY 99 at a cost of $6,951. 
Mitigation of shore damages attributable to 
navigation projects pursuant to Section 111, Public Law 
90-483: 
No mitigation of shore damages studies were 
performed in FY 99. 
Shore Protection 
20. CORPUS CHRISTI BEACH, TX 
(RESTORATION PROJECT) 
Location. Corpus Christi Beach, a shore area having 
a length of about 2 miles, is located on the west side of 
Corpus Christi Bay in Nueces County at Corpus Christi, 
Texas. (See National Ocean Survey Charts 11309 and 
11311.) 
Existing project. The plan of improvement provided 
for initial restoration of eroded areas of Corpus Christi 
Beach, over a shore length of 1.4 miles, located on the 
easterly side of Rincon Peninsula, with periodic 
nourishment as required. Construction was completed in 
March 1978. Periodic nourishment and construction of 
sand retention groin was completed in November 1985. 
Local cooperation. Fully complied with. 
Operations during fiscal year. Section 934 of Water 
Resources Development Act of 1986 provides for 
extension of nourishment period to 50 years for beach 
nourishment projects. A study to determine the 
appropriateness of such an extended nourishment period 
for the Federal beach nourishment project was completed. 
The study indicated that there was no economic 
justification for continued Federal participation in the 
program. The responsibility for beach monitoring and 
maintenance was transferred to the City of Corpus Christi 
in July 1990. The project was financially closed out in 
FY99. 
40-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Flood Control 
21. BUFFALO BAYOU AND 
TRIBUTARIES, TX 
Location. Improvements are on Buffalo Bayou 
watershed, a part of San Jacinto River watershed, in Harris 
County, west and northwest of city of Houston, Texas. 
(See Geological Survey quadrangle sheets for Harris 
County.) 
Existing project. Provides for improvements of 
Buffalo Bayou and its tributaries above turning basin of 
Houston Ship Channel to control floods for protection 
of city of Houston, and prevent deposition of silt in 
turning basin of ship channel by construction of 
detention reservoirs, enlargement and rectification of 
channels and construction of control works. 
Channel rectification on Brays Bayou with an 
improved channel length 25.4 miles was completed in 
March 1971. Channel rectification on White Oak Bayou 
was completed in 1976. Work remaining consists of 
rectification of approximately 22 miles of main stem of 
Buffalo Bayou. 
See individual detailed reports on Addicks and 
Barker Reservoirs; and Brays, Greens, Halls, Hunting, 
Little White Oak, and Carpenters Bayous. 
Local cooperation. Section 203, 1954 Flood Control 
Act applies. Local interests have accomplished all 
required local cooperation on Brays Bayou and White 
Oak Bayou. On Buffalo Bayou, local interests purchased 
interests that the United States had in 7 miles of rectified 
channel below Barker and Addicks Dams for $256,651. 
Of the remaining required rights-of-way on Buffalo 
Bayou, local interests have acquired about 40 percent. 
About 53 percent of required bridge relocations and 3 
percent of the required bridge relocations have been 
accomplished. Advance of $4,400,000 by the Harris 
County Flood Control District was refunded in September 
1956. Public Law 86-53 authorized reimbursement of 
$38,726 to Galveston, Houston and Henderson Railroad 
Company for bridge alterations at Brays Bayou. Non- 
Federal contributions totaled $63,661 for project 
betterment. Recreation development is subject to 
conditions of non-Federal cost-sharing under Federal 
Water Project Recreation Act of 1965. 
See individual detailed reports on Addicks and 
Barker Reservoirs; and Brays, Greens, Halls, Hunting, 
Little White Oak, and Carpenters Bayous. 
21A. ADDICKS AND BARKER 
RESERVOIRS, TX 
Location. Reservoirs are located in and west of the 
City of Houston in Harris and Fort Bend Counties, Texas. 
Existing project. Construction of Barker Dam was 
complete in February 1945. Construction of Addicks Dam 
and 7.4 miles of channel rectification downstream from 
Addicks and Barker Dams was completed in October 1948. 
Modification of Barker and Addicks Dams consisting of 
gating of two uncontrolled conduits in each dam, was 
complete in 1969. Major rehabilitation of Addicks and 
Barker Dams to prevent seepage through the embankment 
was completed in 1982. 
Work under the Dam Safety Assurance program was 
initiated in Fiscal Year 1986. Work accomplished included 
raising approximately 32,400 feet of Addicks Dam 1 to 3 
feet and raising approximately 57,600 feet of Barker Dam 3 
to 5 feet and armor-plating low ends of both dams. A 
contract with the city of Houston for cost-sharing in the 
construction of recreation facilities was entered into in 
November 1981. The lease for approximately 10,534 acres 
of land and water areas was approved in February 1983. 
Local cooperation. None required. 
Operations during fiscal year. Recreation: 
Community Park West (Phase IB) and the velodrome were 
completed in 1986 and remain in use. Community Park 
West (Phase 4) and the development of Community Park 
2 (soccer fields, ball fields, and parking lots) were 
completed by the City of Houston in 1992. Harris County 
Precinct 3 is building additional soccer fields in 
Community Park 2 in Cullen-Barker Park. The Fort Bend 
County YMCA pavilion, archery range, and nature trails 
in Barker Reservoir are being heavily used. Maintenance 
and improvements of these recreation areas continue by 
all agencies. 
Maintenance: Construction contract for repairs and 
rehabilitation to Barker ditch and dam outfall awarded 
April 9, 1997, completed in FY 99 at a cost of $337,071. 
The contract for rehabilitation and repairs to the outlet 
works at Addicks and Barker Dams, awarded September 
15, 1997, was completed in FY 99 at a cost of $128,655. 
21B. BRAYS BAYOU, TX 
Location. The project is located in the south-central 
portion of Buffalo Bayou, Harris County, TX. 
Existing project. The authorized plan of improvement 
consists of 3 miles of stream improvements, 3 flood 
detention basins, and 7 miles of stream diversion 
channels. Aesthetic vegetation is included. Recreation 
facilities include trails, picnic facilities, sports fields, 
comfort stations and parking areas. The estimated cost 
for new work is $258,707,000 Federal (Corps) and 
$155,476,000 non-Federal consisting of $22,916,000 cash 
contributions, and $132,560,000 for lands and relocations 
(October 1999 base price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101-640). 
In 1995, the project was divided into two separable 
elements, a Detention Element (stream improvements and 
detention basins) and a Diversion Element. The Local 
Sponsor was authorized to develop the project and 
design and construct an alternative to the diversion 
component and be reimbursed for the Federal share by 
the Water Resources Development Act of 1996 (PL 104- 
40-14

GALVESTON, TEXAS, DISTRICT 
303). Construction funds were received in 1998. 
Location cooperation. Local Sponsor for the project 
is Harris County Flood Control District. Local Sponsor 
is required to provide lands, easements, and rights-ofway; 
modify or relocate buildings, pipelines, utilities, 
roads and other facilities, except for railroad bridges; 
pay five percent of the total costs allocated to flood 
control presently estimated at $22,916,000 and bear all 
costs of operation, maintenance, and replacement of flood 
control and recreation facilities. 
Operations during fiscal year. New Work: 
Construction by the Local Sponsor of the Detention 
Element is currently underway. The Local Sponsor is 
also compiling a General Reevaluation Report to find an 
alternative to the Diversion Element. The Project 
Cooperation Team continued work on the Project 
Cooperation Agreement. 
21C. GREENS BAYOU, TX 
Location. The project is located in the north-central 
portion of Buffalo Bayou, Harris County, TX, and does 
not include the Halls Bayou tributary. 
Existing project. The authorized plan of improvement 
consists of 25 miles of stream enlargements, 14 miles of 
stream clearing and 4 flood detention basins. Aesthetic 
vegetation and mitigation is included. Recreation facilities 
include trails, picnic facilities, sports fields, launches, 
ramps, comfort stations and parking areas. The estimated 
cost for new work is $155,010,000 Federal (Corps) and 
$95,537,000 non-Federal consisting of $14,784,000 cash 
contributions, and $80,753,000 for lands and relocations 
(October 1999 base price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101-640). 
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. Local Sponsor is 
required to provide lands, easements, and rights-of-way; 
modify or relocate buildings, pipelines, utilities, roads 
and other facilities, except for railroad bridges; provide a 
cash contribution presently estimated at $14,784,000 and 
bear all costs of operation, maintenance, and replacement 
of flood control and recreation facilities. 
Operations during fiscal year. New Work: See 
Section 34, PRE-CONSTRUCTION ENGINEERING AND 
DESIGN. 
21D. HALLS BAYOU, TX 
Location. Halls Bayou is a major tributary of Greens 
Bayou, located in the north-central portion of Buffalo 
Bayou, Harris County, TX. 
Existing project. The authorized plan of improvement 
consists of 18 miles of stream improvements. Recreation 
facilities include trails, picnic facilities, boat ramps, a 
comfort station and parking areas. The estimated cost 
for new work is $68,493,000 Federal (Corps) and 
$51,581,000 non-Federal consisting of $7,676,000 cash 
contributions, and $43,905,000 for lands and relocations 
(October 1999 base price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101-640). 
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. Local Sponsor is 
required to provide lands, easements, and rights-of-way; 
modify or relocate buildings, pipelines, utilities, roads 
and other facilities, except for railroad bridges; provide a 
cash contribution presently estimated at $7,676,000 and 
bear all costs of operation, maintenance, and replacement 
of flood control and recreation facilities. 
Operations during fiscal year. New Work: Project 
is awaiting Pre-construction Engineering and Design 
funds. 
21E. HUNTING BAYOU, TX 
Location. Hunting Bayou is located in Houston, 
approximately 4 to 5 miles from the central business 
district. 
Existing project. The authorized plan of improvement 
consists of 14.3 miles of stream improvements. Recreation 
facilities include trails, picnic facilities, a comfort station 
and parking areas. The estimated cost for new work is 
$67,625,000 Federal (Corps) and $61,139,000 non-Federal 
consisting of $6,885,000 cash contributions, and 
$54,254,000 for lands and relocations (October 1999 base 
price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101-640). 
The Local Sponsor was authorized to design and 
construct an alternative to the project and be reimbursed 
for the Federal share by the Water Resources 
Development Act of 1996 (PL 104-303). 
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. Local Sponsor is 
required to provide lands, easements, and rights-of-way; 
modify or relocate buildings, pipelines, utilities, roads 
and other facilities, except for railroad bridges; provide a 
cash contribution presently estimated at $6,885,000 and 
bear all costs of operation, maintenance, and replacement 
of flood control and recreation facilities. 
Operations during fiscal year. New Work: See 
Section 31, PRE-CONSTRUCTION ENGINEERING AND 
DESIGN. 
21F. LITTLE WHITE OAK BAYOU, TX 
Location. Little White Oak Bayou is a tributary of 
White Oak Bayou in north-central Houston. 
Existing project. The authorized plan of improvement 
consists of 6.0 miles of stream enlargements. Recreation 
facilities include trails and picnic facilities. The estimated 
40-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
cost for new work is $17,958,000 Federal (Corps) and 
$17,957,000 non-Federal consisting of $1,996,000 cash 
contributions, and $15,961,000 for lands and relocations 
(October 1990 base price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101-640). 
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. Local Sponsor is 
required to provide lands, easements, and rights-of-way; 
modify or relocate buildings, pipelines, utilities, roads 
and other facilities, except for railroad bridges; provide a 
cash contribution presently estimated at $1,996,000 and 
bear all costs of operation, maintenance, and replacement 
of flood control and recreation facilities. 
Operations during fiscal year. New Work: Project 
is awaiting Pre-construction Engineering and Design 
funds. 
21G. CARPENTERS BAYOU, TX 
Location. Carpenters Bayou is a tributary of Buffalo 
Bayou in northeastern Houston. 
Existing project. The authorized plan of improvement 
consists of 9.7 miles of stream enlargements. Recreation 
facilities include trails and picnic facilities. The estimated 
cost for new work is $3,900,000 Federal (Corps) and 
$1,950,000 non-Federal consisting of $370,000 cash 
contributions, and $2,320,000 for lands and relocations 
(October 1990 base price). 
The project was authorized for construction in the 
Water Resources Development Act of 1990 (PL 101-640). 
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. Local Sponsor is 
required to provide lands, easements, and rights-of-way; 
modify or relocate buildings, pipelines, utilities, roads 
and other facilities, except for railroad bridges; provide a 
cash contribution presently estimated at $370,000 and 
bear all costs of operation, maintenance, and replacement 
of flood control and recreation facilities. 
Operations during fiscal year. New Work: Project 
is awaiting Pre-construction Engineering and Design 
funds. 
22. BUFFALO BAYOU, TX 
(LYNCHBURG PUMP STATION) 
Location. The project is located 10 miles east of 
Houston, Texas near the entrance to the Houston Ship 
Channel. 
Existing project. The Lynchburg Pump Station is 
to be protected by a flood barrier encircling the facility. 
A plan consisting of a combination sheet pile wall and 
earth levee is recommended. Total barrier length is 
approximately 2000 feet. The Crosby-Lynchburg Road 
will be rerouted to the top of the levee. 
Local cooperation. The Coastal Water Authority, 
owned by the City of Houston, is the Local Sponsor of 
the project. 
Operation during the fiscal year. The Detailed 
Project Study was completed in September 1996. An 
implementation plan in the amount of $5,985,000 has been 
tentatively agreed upon by the Local Sponsor, subject 
to approval by higher authority of the Corps of Engineers. 
Pending resolution of Project Cooperation Agreement 
issues, construction could be initiated in FY 2001 if funds 
are available. 
23. CLEAR CREEK, TX 
Location. The project is located about midway 
between the two metropolitan centers of Houston, Texas, 
on the north and Galveston-Texas City on the south in 
Harris and Galveston Counties above and below existing 
Clear Lake. 
Existing project. The authorized plan of improvement 
consists of an improved channel from Mile 3.8 to Mile 
34.8 to contain within its banks all flood flows up to and 
including that of a 100-year flood. The selected plan 
provides channel enlargement and easing of bends within 
the existing stream from Mile 3.8 to Mile 26.05 to contain 
at least the 10-year frequency storm, and additional outlet 
with gated structure from Clear Lake to Galveston Bay, 
restriction of development in the residual 100-year flood 
plain and measures to mitigate environmental effects. In 
1986, at the request of Brazoria County Drainage District 
No. 4, that portion of the project upstream of the Brazoria/ 
Galveston County line, approximate improved Mile 19.1, 
was placed in the "inactive" category. Estimated cost 
for new work, excluding "inactive" portion, is $78,426,000 
Federal (Corps) and $54,798,000 non-Federal consisting 
of $6,661,000 cash contributions, $22,600,000 for lands, 
and $25,537,000 for relocations (October 1, 1999 base 
price). 
Environmental interest groups and agencies, private 
citizens, and some local communities located near or 
adjacent to Clear Lake expressed opposition to the Clear 
Creek Flood Control Project as currently authorized and 
planned for upstream reaches. In general, the opposition 
to the project has been focused on environmental 
concerns in the upstream reaches and on induced 
flooding concerns downstream in Clear Lake. 
Construction has been delayed at the request of the 
Local Sponsor so that an alternative to the authorized 
project can be developed that will reduce above concerns 
and still provide flood protection to those that are 
critically affected by flood waters in the watershed. 
Local cooperation. Local Sponsors for the project 
are Galveston and Harris counties. The Local Cooperation 
Agreement, executed June 30, 1986, requires local 
interests to provide lands, easements, rights-of-way, and 
material disposal areas; modify or relocate building, 
pipelines, utilities, roads and other facilities, except 
railroad bridges, where necessary in the construction of 
40-16

GALVESTON, TEXAS, DISTRICT 
the project; make a cash contribution for mitigation 
measures consistent with the non-Federal share of total 
project costs without mitigation measures; pay five 
percent of the total costs allocated to flood control; and 
bear all costs of operation and maintenance of flood 
control facilities. 
Operations during fiscal year. New Work: The 
Local Sponsors, Harris and Galveston Counties, 
approved the Corps' recommendation to prepare a General 
Reevaluation Report (GRR) for the Clear Creek project. 
Brazoria County requested and was accepted as an active 
sponsor for the GRR and any resultant project. The 
GRR was initiated in June 1999. The schedule was 
developed and the Project Study Plan was initiated. 
Initial work was undertaken to update the databases for 
the watershed with focus on state-of-the-art technologies 
such as aerial photogrammetry and digital terrain 
modeling. 
24. CYPRESS CREEK, TX 
Location. The project is located north of Houston, 
Texas in Harris County. 
Existing project. The authorized plan of improvement 
consists of enlargement of the lower 29.4 miles of the 
Cypress Creek Channel, incorporating grassed side 
slopes and channel bottom and appropriate erosion 
control measures; application of floodplain management 
techniques in the residual floodplain; construction of 
project-oriented recreation features, including 11.5 miles 
of hike-and-bike trails and related facilities for health, 
safety, and public access; and habitat management 
measures on 844 acres of Harris County Parkway land, 
creation of wooded and brush habitat along 100 acres of 
the project right-of-way, acquisition of 329 acres of 
wildlife habitat along the creek, and creation of 35 acres 
of ponds and marshes. The authorized plan is no longer 
under consideration. The current plan is to buy out or 
raise houses where inhabitants are at or below the five 
year flood level. Estimated cost for the new plan is 
$4,463,000 Federal (Corps) and $1,487,000 non-Federal 
contribution. (October 1, 1999 base price.) 
Local cooperation. Local Sponsor for the project is 
Harris County. The non-Federal share of the cost of 
non-structural flood control measures shall be 25 percent 
of the cost of such measures. The non-Federal interests 
for any such measures shall be required to provide all 
lands, easements, rights-of-way, and relocations 
necessary for the project, but shall not be required to 
contribute any amount in cash during construction of 
the project. 
Operations during fiscal year. See Section 34, PRECONSTRUCTION 
ENGINEERING AND DESIGN. 
25. LOWER RIO GRANDE BASIN, TX 
Location. The project is located in Willacy, Hidalgo, 
and Cameron Counties. The basin is bounded on the 
east by the Gulf of Mexico, on the south by the Rio 
Grande which forms the international boundary between 
the United States and Mexico, on the west by Starr 
County, and on the north by Brooks and Kenedy 
Counties. 
Existing project. See individual detailed reports on 
Arroyo Colorado, South Main Channel, and 
Raymondville Drain. 
Local cooperation. See individual detailed reports 
on Arroyo Colorado, South Main Channel, and 
Raymondville Drain. 
25A. ARROYO COLORADO, TX 
Location. The project is located in Hidalgo and 
Cameron Counties, Texas. 
Existing project. The authorized project will provide 
flood protection along Highway 83 and erosion protection 
for the banks of the Arroyo Colorado in the city of 
Harlingen. The project consists of a gated water control 
structure, 1.4 miles of channel improvements, and stone 
armoring of selected reaches in Harlingen. The estimated 
cost for new work is $5,851,000 Federal (Corps) and 
$1,951,000 non-Federal consisting of $1,848,000 cash and 
$103,000 for lands and relocations (October 1, 1993 base 
prices). 
The project has reached a stalemate as the Local 
Sponsor, the Hidalgo County Drainage District #1, can 
not provide required guarantee to hold and save the 
Government free from all damages arising from the 
construction, operation, maintenance, repair and 
replacement for the project, nor are they able to operate 
and maintain the project when completed. The 
International Boundary and Water Commission has 
complete jurisdiction over the project as it is one of the 
elements of the Rio Grande Floodway System. The 
Commission is interested in the project but only if 
additional funds to do operations and maintenance are 
provided. Legislative approval will be required to alter 
the current status. 
Local cooperation. Local Sponsor, the Hidalgo 
County Drainage District #1, is required to provide lands, 
easements, and rights-of-way; modify or relocate 
buildings, pipelines, utilities, roads and other facilities, 
except for railroad bridges; provide a cash contribution 
presently estimated at $1,848,000 and bear all costs of 
operation, maintenance, and replacement of flood control 
facilities. 
Operations during fiscal year. None. 
25B. SOUTH MAIN CHANNEL, TX 
Location. The project is located in Hidalgo and 
Willacy Counties, Texas. 
Existing project. The authorized project consists of 
channel improvements which will provide flood 
40-17

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
protection to the cities of McAllen, Edinburg, Edcouch, 
La Villa and Lyford, as well as the rural areas of Hidalgo 
and Willacy Counties north of U.S. Highway 83. The 
estimated cost for new work is $128,637,000 Federal 
(Corps) and $71,057,000 non-Federal consisting of 
$9,985,000 cash and $28,107,000 lands and $32,965,000 
relocations (October 1, 1999 base prices). 
Local cooperation. Local Sponsors for the project 
are Hidalgo County Drainage District #1 and Willacy 
County Drainage District #1. Local Sponsor is required 
to provide lands, easements, and rights-of-way; modify 
or relocate buildings, pipelines, utilities, roads and other 
facilities, except for railroad bridges; provide a cash 
contribution presently estimated at $9,985,000 and bear 
all costs of operation, maintenance, and replacement of 
flood control facilities. 
Operations during fiscal year. New Work: See 
Section 34, PRE-CONSTRUCTION ENGINEERING AND 
DESIGN. 
25C. RAYMONDVILLE DRAIN, TX 
Location. The project is located in northern Hidalgo 
and Willacy Counties, Texas. 
Existing project. The authorized project will provide 
a drainage outlet to the Laguna Madre for northern 
Hidalgo and Willacy Counties. The project consists of 
43.8 miles of channel work, including enlargement of 
existing channels and construction of new channels, a 
3.88-mile long levee, and diversion ditches along the west 
side of Raymondville. The estimated cost for new work 
is $58,980,000 Federal (Corps) and $19,660,000 non-Federal 
consisting of $6,001,000 cash and $6,142,000 lands and 
$7,517,000 relocations (October 1, 1998 base prices). 
Local cooperation. Local Sponsor for the project is 
Hidalgo County Drainage District #1 and Willacy County 
Drainage District #1. Local Sponsor is required to provide 
lands, easements, and rights-of-way; modify or relocate 
buildings, pipelines, utilities, roads and other facilities, 
except for railroad bridges; provide a cash contribution 
presently estimated at $6,001,000 and bear all costs of 
operation, maintenance, and replacement of flood control 
facilities. 
Operations during fiscal year. New Work: See 
Section 34, PRE-CONSTRUCTION ENGINEERING AND 
DESIGN. 
26. SIMS BAYOU, TX 
Location. The project is located in Harris County, in 
the southern portion of Houston, Texas. 
Existing project. The authorized plan of improvement 
provides for enlargement and rectification, with 
appropriate erosion control measures, of 19.3 miles of 
Sims Bayou to provide 25-year flood protection; 
environmental measures and riparian habitat improvement 
along the entire alignment; and recreational development 
to include 27 miles of hike-and-bike trails connecting to 
existing public parks, together with picnic, playground, 
and other leisure facilities. Estimated cost for new work 
is $213,574,000 Federal (Corps) and $106,594,000 non- 
Federal consisting of $18,812,000 cash contributions, 
$39,988,000 for lands, $47,498,000 for relocations and 
$297,000 for channels (October 1, 1999 base price). 
Local cooperation. Local Sponsor for the project is 
Harris County Flood Control District. In accordance with 
the cost-sharing and financing concepts reflected in the 
Water Resources Development Act of 1986, local 
interests are required to provide lands, easements, and 
rights-of-way; modify or relocate buildings, pipelines, 
utilities, roads, and other facilities, except railroad bridges, 
where necessary for the construction of the project; pay 
one-half of the separable and joint costs allocated to 
recreation; and bear all costs of operation, maintenance 
and replacement of recreation facilities; and pay 5 percent 
of the costs allocated to flood control; and bear all costs 
of operation, maintenance and replacement of flood 
control facilities. The Local Cooperation Agreement for 
flood control was executed on October 19, 1990. The 
recreation Local Cooperation Agreement is pending. 
Operations during fiscal year. New Work: 
Construction contract for channel rectification from 
Hemingway Drive to Reveille Park, awarded December 
22, 1994, continued through FY 1999 at a cost of $774,576. 
The construction contract for channel rectification from 
Swallow to Hemingway was awarded July 19, 1996, and 
continued in FY 1999 with a cost of $793,819. Surveys 
were performed by contract in connection with plans 
and specifications for the Cullen to State Highway 288 
reach and the State Highway 288 to Union Pacific 
Railroad reach at a cost of $208,785 and $91,274 
respectively for FY 1999. Construction contract for 
channel rectification from Swallow to Mykawa, awarded 
November 20, 1997, continued through FY 99 at a cost 
of $4,414,394. Construction contract for channel 
rectification from Mykawa to Cullen was awarded April 
1, 1999, and continued through FY 99 at a cost of 
$813,595. A contract to repair damages from Reveille 
Park to Hemingway was award April 19,1999 and 
continued through FY 99 at a cost of $841,785. 
Reimbursement was made to the Local Sponsor, 
Harris County Flood Control District, for their work on 
the reach from Port Terminal Railroad to Interstate 
Highway 45, in the amount of $300,000. 
27. INSPECTION OF COMPLETED 
FLOOD CONTROL WORKS 
Inspections of completed projects operated and 
maintained by local interests were made on the following 
projects. Fiscal year cost was $151,374. 
Project 
Freeport and Vicinity, TX 
Hurricane Flood Protection 
Galveston Harbor & Channel, TX 
Seawall 
Date of 
Inspection 
January 1999 
January 1999 
40-18

GALVESTON, TEXAS, DISTRICT 
Project 
Little Vince Bayou, TX - 
Channel Rectification 
Vince Bayou, TX - Channel 
Rectification 
GIWW, Chocolate Bayou, TX 
Saltwater Barrier 
Big Hog Bayou, TX - 
Intake Structure 
White Oak Bayou, TX - Channel 
Rectification 
Date of 
Inspection 
June 1999 
June 1999 
July 1999 
July 1999 
Project 
Galveston Harbor & Channel, 
Galveston Seawall 
Cypress Creek 
Greens Bayou/Dry Gully 
Brays Bayou 
Texas City Hurricane Flood 
Protection Levee 
Victoria Levee 
Total Costs 
Amount 
$10,703 
5,492 
1,402 
13,388 
17,984 
6,423 
$55,392 
September 1999 
28. FLOOD CONTROL WORK UNDER 
SPECIAL AUTHORIZATION 
Flood control activities pursuant to section 205 of 
1970 Flood Control Act, Public Law 858, 80th Congress, 
as amended: 
Initial coordination for Section 205 Flood Control 
activities was performed in FY 99 at a cost of $12,559. 
Construction of the flood protection project for 
Buffalo Bayou, Texas (Lynchburg Pump Station) is 
discussed in Section 22. 
An initial appraisal for flood protection at Pin Oak 
Creek at Kirbyville, Texas, initiated in FY 98, completed 
in FY 99 at a fiscal year cost of $4,648. A feasibility 
report is underway and is expected to be completed in 
FY00. 
Emergency flood control - repair, flood fighting, and 
rescue work (Public Law 99, 84th Congress and 
antecedent legislation): 
Disaster Preparedness cost for Fiscal Year 1999 was 
$261,367. Catastrophic Disaster Preparedness Program 
fiscal year cost was $112,032. 
Emergency Operations FY 99 cost was $78,563 for 
the District's response to Tropical Storm Frances, a 
system that dumped heavy rain on parts of Texas from 
September 11-13th, 1998. The tropical storm also brought 
surge levels to over five feet along the Texas coast and 
inland bays. Five counties were declared under a Federal 
Disaster Declaration: Galveston, Brazoria, Matagorda, 
Jefferson and Harris. Funds in the amount of $54,526 
were for the District's response to Hurricane Brett, which 
was a category 3 hurricane that made landfall on August 
22, 1999. 
Rehabilitation of Flood Control Works was initiated 
and completed in FY 99 for the Texas City Hurricane 
Flood Protection Levee. Total cost was $327,328 which 
included a construction contract, awarded March 19, 
1999, and completed April 25, 1999, at a cost of $281,148. 
Field Investigations were performed to prepare a 
Project Information Report for the following proposed 
rehabilitation projects: 
28. EMERGENCY STREAM BANK AND 
SHORELINE EROSION WORK AND 
SNAGGING AND CLEARING 
ACTIVITIES UNDER SPECIAL 
AUTHORIZATION 
Stream bank and shoreline erosion activities pursuant 
to Section 14 of the 1946 Flood Control Act, Public Law 
525, as amended: 
Initial coordination for stream bank and shoreline 
erosion activities were performed in FY 99 at a cost of 
$11,137. 
Snagging and clearing activities for flood control 
pursuant to Section 208 of the Flood Control Act of 
1954, Public Law 780, as amended: 
No new feasibility studies of snagging and clearing 
activities for flood control improvements were performed 
in Fiscal Year 1999. 
Environmental Restoration 
30. PROJECT MODIFICATIONS FOR 
IMPROVEMENT OF 
ENVIRONMENT 
Project modifications for improvement of environment 
activities pursuant to Section 1135 of the Water 
Resources Development Act of 1986, Public Law 99-662, 
as amended: 
Fiscal year costs for coordination were $153. No 
initial appraisals were performed in FY 99. 
Plans and specifications and environmental 
documentation for a waterfowl habitat were completed 
in FY 1996 for restoration of the Addicks and Barker 
Waterfowl Habitat Restoration, Texas, project. The 
project has been withdrawn by the Local Sponsor. Fiscal 
year costs for FY 99 were $2,197. 
General Investigations 
31. SURVEYS 
Fiscal year costs for reconnaissance studies were 
$346,514 for navigation and $33,746 for flood damage 
prevention. Reconnaissance and feasibility studies on 
)-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
watershed and ecosystems projects incurred costs of 
$259,011. Reconnaissance and feasibility studies on 
review of authorized projects incurred costs of $3,135,849 
for FY 1999. Miscellaneous Activities for FY 99 include 
the following: Special Investigations at a cost of $30,994; 
Interagency Water Resources Development at $13,077; 
National Estuary Program at $6,965; and North American 
Waterfowl Management Plan at a cost of $1,793. 
32. COORDINATION WITH OTHER 
AGENCIES 
Cost for Coordination With Other Agencies was 
$4,333 for FY 1999. 
33. COLLECTION AND STUDY OF 
BASIC DATA 
Floodplain management, technical services and quick 
responses were performed at a cost of $35,028, $74,993, 
and $4,009, respectively. 
Hydrologic studies cost $20,135. 
Floodplain management services were completed for 
the Corpus Christi Seawall, Texas for a fiscal year cost 
of $10,000. 
34. PRE-CONSTRUCTION 
ENGINEERING AND DESIGN 
Houston-Galveston Navigation Channels, Texas - 
The project was authorized for construction by the Water 
Resources Development Act of 1996. The total project 
provides for enlarging the Houston Ship Channel to a 
depth of 45 feet and a width of 530 feet, and the 
Galveston Channel to a depth of 45 feet over a width 
which varies between 650 and 1112 feet, and deepening 
the Galveston Harbor Channel to 47 feet over its original 
800-foot width and 10.5 mile length, and extending the 
channel an additional 3.9 miles to the 47-foot bottom 
contour in the Gulf of Mexico along the existing 
alignment. Dredged material will be used for construction 
of environmental restoration sites to include 
approximately 118 acres of oyster cultch, 4,250 acres of 
marsh, and 12 acres of bird island. Total planning and 
engineering costs were $19,042,800 Federal and $1,020,000 
non-Federal. Planning and engineering studies were 
initiated in FY 1990. Fiscal year costs were $4,299 
(Federal) and $10,085 was expended from Sponsor 
contributed funds. The project was authorized by the 
Water Resources and Development Act of 1996 and 
construction began in 1998. See Section 11, HOUSTON 
GALVESTON NAVIGATION CHANNELS. 
Greens Bayou, Texas - The project will provide for 
25 miles of stream enlargements, 14 miles of stream 
clearing and 4 flood detention basins. Aesthetic 
vegetation and mitigation is included. Recreation facilities 
include trails, picnic facilities, sports fields, launches, 
ramps, comfort stations and parking areas. Estimated 
planning and engineering cost is $6,410,000. Planning 
and engineering studies were initiated in FY 1990. Fiscal 
year costs were $805,297. 
Cypress Creek, Texas - The project will provide 
for enlargement of the lower 29.4 miles of the channel. 
Project-oriented recreation features include 11.5 miles of 
hike-and-bike trails and related recreation facilities, habitat 
management measures on 844 acres of Harris County 
Parkway project land, creation of wooded and brush 
habitat along 100 acres of project right-of-way, 
acquisition of 329 acres of wildlife habitat, and creation 
of 35 acres of ponds and marshes. The authorized plan 
is no longer under consideration. The current plan is to 
buy out or raise houses where inhabitants are at or below 
the five year flood level. Estimated planning and 
engineering estimate is $3,455,000. Planning and 
engineering studies were initiated in FY 1990. Fiscal year 
costs were $86,676. 
South Main Channel, Texas - The project consists 
of channel improvements which will provide flood 
protection to the cities of McAllen, Edinburg, Edcouch, 
La Villa and Lyford, as well as the rural areas of Hidalgo 
and Willacy Counties north of U.S. Highway 83. 
Estimated planning and engineering estimate is 
$6,720,000. Planning and engineering studies were 
initiated in FY 1990. Fiscal year costs were $720,508. 
Neches River and Tributaries, Salt Water Barrier, 
Texas - The project consists of a tainter gated salt water 
barrier structure, a gated navigation bypass channel, an 
access road and levee, and an auxiliary dam across an 
associated canal. Estimated planning and engineering 
estimate is $5,780,000. A review of the project economics 
was completed in FY 1994. Fiscal year costs were 
$2,322,312. 
Raymondville Drain, Texas - The project consist of 
43.8 miles of channel work, including enlargement of 
existing channels, and construction of new channels, a 
3.88-mile long levee, and diversion ditches along the west 
side of Raymondville, Texas. Estimated planning and 
engineering estimate is $2,238,000. Planning and 
engineering studies were initiated in FY 1997. Fiscal 
year costs were $23,409. 
Hunting Bayou, Texas - The project was authorized 
for construction in the Water Resources Development 
Act of 1990 ( PL 101-640). The authorized project 
provides for 14.3 miles of stream improvements, recreation 
trails, picnic facilities, a comfort station, access and 
parking areas. The Local Sponsor was authorized to 
design and construct an alternative to the project and 
be reimbursed for the Federal share by the Water 
Resources Development Act of 1996 (PL 104-303). The 
project is currently being reformulated and will be 
identified by the General Reevaluation Study. Estimated 
planning and engineering estimate is $1,770,000. Planning 
and engineering studies were initiated in FY 1998. Fiscal 
year costs were $46,072. 
40-20

GALVESTON, TEXAS, DISTRICT 
TABLE 40-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 199929 
1. Aquatic Plant Control 
(Southwestern Division) 
1965 Act 
2. Brazos Island 
Harbor, TX 
3. Cedar Bayou, TX 
4. Channel to Port 
Bolivar, TX 
5. Clear Creek and 
Clear Lake, TX 
6. Corpus Christi Ship 
Channel, TX 
(Regular Funds) 
(Contributed Funds) 
7. Double Bayou, TX 
(Regular Funds) 
(Contributed Funds) 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Major Rehab: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 250,000 
Cost 115,789 
Maint: 
Approp. 2,510,000 
Cost 2,876,195 
Major Rehab: 
Approp. - 
Cost - 
New Work: 
Contrib. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Maint: 
Contrib. 
Cost 
30,000 
166,490 
635,000 
603,742 
664,500 
673,911 
627,000 
626,822 
6,319 
27,305 
31,000 
4,784 
0 4,533,600' 
2,259 4,509,377' 
0 (107,300) 27,871,2022 
21,221 (71,340) 27,871,2022 
2,691,260 2,192,000 3,086,299 60,547,5353 
2,664,921 2,153,377 3,153,019 60,546,8233 
- - - 2,170,080 
- - - 2,170,080 
- 681,2634 
- 681,2634 
(270)
8 
- 603,430 4,064,9765 
- 603,358 4,064,8965 
- - 133,9256 
- - 133,9256 
- 12,200 1,243,2617 
- 12,120 1,243,1817 
- - 66,934 
- - 66,934 
- 12,400 
- 12,360 
89,280 
340,542 
(3,957) 
75,970 
- 149,887 
- 433,050 
- 431,188 
- 154,569 
- 131,000 
12,089 
549,639 
549,639 
- 77,474,6398 
- 77,472,4638 
4,988,000 5,765,099 124,964,6909 
3,836,430 6,918,654 124,962,7489 
- 3,576,684 
- 3,576,684 
- 6,279,088 
- 6,143,152 
- - 226,558 
- - 226,558 
- 15,774 1,860,902 
134 17,502 1,860,902 
- - 256,894 
- - 233,325 
40-21

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 199929 
8. Freeport Harbor, TX 
Minor Rehab: 
9. Galveston Harbor and 
Channel, TX 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Major Rehab: 
Approp. 
Cost 
45,000 
442,008 
5,948,000 
5,947,444 
2,564,804 4,052,000 
2,503,579 4,263,253 
4,620,841 3,630,000 
4,587,072 2,342,847 
40,000 
55,290 
4,647,783 
5,970,636 
64,761,95610 
64,735,89510 
79,777,039" 
79,776,18211 
8,935 
8,935 
315,000 
321,195 
4,263,430 4,333,000 
4,246,903 4,319,309 
- 29,096,39212 
- 29,096,39212 
166,376 112,051,29413 
194,590 112,047,92613 
- 7,969,329 
- 7,969,329 
10. Gulf Intracoastal 
Waterway between 
Apalachee Bay, FL and 
the Mexican Border 
(Galveston District) 
(Regular Funds) 
(Inland Waterways 
Trust Fund) 
(Regular Funds) 
(Inland Waterways 
Trust Fund) 
(Regular Funds) 
11. Houston-Galveston 
New Work: 
Approp. 
Cost 
New Work: 
Approp 
Cost 
14,196,800 12,270,830 9,978,000 7,204,100 134,047,22714 
15,544,808 12,332,656 8,097,000 8,907,151 133,644,19714 
10,971,000 
11,108,145 
Maint: 
Appr 15,516,954 
Cost 15,409,003 
Major Rehab: 
Approp. (200,0000) 
Cost 1,077,391 
Major Rehab: 
Approp. (200,000) 
Cost 1,116,142 
Minor Rehab: 
Approp. - 
Cost 
New Work: 
Navigation Channels, TX Approp. 
(Regular Funds) Cost 
(Contributed Funds) 
12. Houston Ship 
Channel, TX 
(Regular Funds) 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
965,000 
1,226,177 
1,020,000 
220,436 
6,671,600 
6,669,239 
8,558,000 2,941,000 
8,649,381 3,122,015 
- 28,765,000 
26,540 28,634,106 
24,577,401 27,841,900 28,308,062 461,010,80915 
24,582,562 26,035,524 30,264,184 460,946,83316 
250,000 
415,369 
250,000 
467,140 
- (40,300) 
8,781 (8,162) 
- (40,300) 
9,338 (2,525) 
3,390,338 
3,390,338 
2,955,700 
2,955,700 
- 835,873 
- 835,873 
1,725,000 20,000,000 44,201,800 83,244,600 
1,654,890 2,753,710 32,002,467 53,712,654 
- - 19,960,000 20,980,000 
540,853 234,666 9,651,362 10,647,317 
- - - 35,760,38217 
- - - 35,760,38217 
6,742,478 13,273,600 6,237,105 190,420,5118 
6,739,949 12,579,485 6,943,371 190,417,90018 
40-22

GALVESTON, TEXAS, DISTRICT 
TABLE 40-A COST AND FINANCIAL STATEMENT 
See 
Section 
in Text Project Funding FY 96 FY 97 FY 98 
Total Cost To 
FY 99 Sep. 30, 199929 
13. Matagorda, Ship 
Channel, TX 
(Regular Funds) 
14. Sabine-Neches 
Waterway, TX 
(Regular Funds) 
(Contributed Funds) 
15. Sabine-Neches 
Waterway, TX 
(Regular Funds) 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
16. Texas City Channel, TX New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Major Rehab: 
Approp. 
Cost 
3,855,000 
3,996,501 
148,000 
202,440 
- - - 18,058,77719 
- - - 18,058,77719 
1,406,029 2,757,000 2,563,618 65,303,62520 
1,400,113 2,030,483 3,298,461 65,301,34820 
502,000 1,450,000 2,307,000 
481,833 1,455,003 2,322,312 
6,106,843 
6,106,541 
- - - 56,136,81521 
- - - 56,136,81521 
17,125,646 11,594,320 8,356,000 7,840,364 235,020,87022 
17,118,474 11,587,144 7,940,843 8,272,907 235,016,35622 
1,636,700 
1,640,884 
25,000 
24,922 
(50,596) 
(52,144) 
78 
420,000 
244,100 
- 15,156,97223 
- 15,156,97223 
3,274,501 32,819,61624 
3,452,538 32,819,61624 
- 726,158 
- 726,158 
13. Trinity River and 
Tributaries, TX 
(Includes Wallisville) 
20. Corpus Christi Beach, 
TX (Restoration Project) 
(Contributed Funds) 
21. Buffalo Bayou and 
Tributaries, TX 
New Work: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
New Work: 
Approp. 
Cost 
Recreation: 
Approp. 
Cost 
Maint: 
Approp. 
Cost 
Major Rehab: 
Approp. 
Cost 
Dam Safety: 
Approp. 
Cost 
5,000,000 12,000,000 
8,853,079 11,989,713 
1,178,100 739,714 
1,196,514 665,091 
9,200,000 
8,902,679 
880,000 
772,311 
5,500,000 
4,730,564 
928,558 
1,135,125 
76,623,67625 
75,252,81525 
23,032,88626 
23,029,85226 
- - 2,120,641 
- - 2,120,641 
- (28,635) 2,009,710 
- - 2,009,710 
820,837 
835,514 
3,134,500 
3,169,504 
1,493,500 3,420,310 5,796,200 74,067,27127 
1,481,133 1,129,781 1,011,074 66,977,86227 
- - - 377,804 
174 - - 377,797 
2,835,440 5,115,500 2,007,741 43,271,296 
2,825,098 4,604,711 2,589,876 43,249,943 
- - - 12,475,000 
- - - 12,475,000 
- - - 12,693,700 
- - - 12,693,700 
40-23

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 199929 
22. Buffalo Bayou at New Work: 
Lynchburg, TX Approp. 43,500 165,000 262,800 32,000 758,600 
(Regular Funds) Cost 64,056 96,969 279,578 81,139 756,480 
(Contributed Funds) New Work: 
Approp. - - - - 273,346 
Cost 118,879 161 - - 253,286 
23. Clear Creek, TX New Work: 
(Regular Funds) Approp. 231,000 5,463,502 1,004,000 290,873 22,187,736 
Cost 758,944 5,526,988 928,246 369,459 22,170,442 
(Contributed Funds) New Work: 
Approp. 400,000 275,000 - - 1,315,000 
Cost 10,000 523,381 (-530) 82,935 1,234,382 
24. Cypress Creek, TX New Work: 
(Regular Funds) Approp. 335,000 155,000 220,000 85,000 2,295,100 
Cost 324,518 162,349 221,524 86,676 2,295,076 
(Contributed Funds) New Work: 
Approp. 320,800 170,000 - - 835,000 
Cost 305,072 189,180 - - 834,935 
25. Lower Rio Grande New Work: 
Basin, TX Approp. 711,663 962,000 850,600 740,800 7,014,463 
Cost 723,293 973,452 865,066 743,917 7,013,965 
26. Sims Bayou, TX New Work: 
(Regular Funds) Approp. 15,032,000 13,026,290 11,409,000 8,846,127 70,792,417 
Cost 15,144,932 12,855,241 9,552,099 9,504,001 69,371,873 
(Contributed Funds) New Work: 
Approp. 1,900,000 885,500 755,860 200,000 4,741,36028 
Cost 1,615,661 1,146,701 398,575 484,385 4,362,13728 
1 Excludes $1,637,270 credit for contributed 
work. 
2 Includes $675,855 for previous projects. In addition, 
$10,571,509 expended from contributed funds, of 
which $123,361 was for previous projects. Excludes 
$874,258 expended from contributed funds for dock removal 
for the local sponsor. 
3 In addition, $1,352,092 expended from contributed 
funds and $34,000 expended from contributed 
funds for Port Isabel. In addition $621,723 expended 
from contributed funds from the City of South Padre 
Island for beneficial placement of dredged material on 
the South Padre Island Beach. 
4 Includes $39,087 for previous projects. In addition 
$25,000 expended from contributed funds. 
5 Includes $69,784 for previous projects. 
6 Includes $48,711 for previous projects. 
7 Includes $46,101 for previous projects. 
8 Includes $1,372,534 for previous projects. Includes 
$456,515 for Sec. 107 project for Port Aransas 
Breakwaters. In addition $768 expended from contributed 
funds for Port Aransas Breakwaters. 
9 Includes $62,452 for previous projects. In addition, 
$1,071,952 expended from contributed funds. 
10 Includes $147,098 for previous projects. In 
addition, $20,811,568 expended from contributed funds. 
($581,615 on 45-foot project.) 
" In addition, $229,311 expended from contributed 
funds. 
12 Includes $8,421,996 for previous projects. In 
addition, $3,648,932 expended from contributed funds. 
13 Includes $86,126 for previous projects. In addition, 
$2,963,102 expended from contributed funds. 
14 Includes $706,709 for previous projects. Includes 
Sec. 107 projects for Port Isabel Small Boat Basin 
($46,559); Port Isabel Side Channel ($8,414); Offatts Bayou 
($356,466); and Channel to Aransas Pass ($658,573). In 
addition contributed funds expended for Port Isabel Small 
Boat Basin ($46,559); Offatts Bayou ($49,665); Channel 
to Aransas Pass ($347,950); Chocolate Bayou ($658,310); 
Mouth of Colorado River ($3,379,080); ($847,207) Channel 
to Victoria; and ($862,716) expended for the local 
sponsor's levee requirement on Channel to Victoria. 
15 Includes $1,526,564 for previous projects. In 
addition $22,672 contributed funds for main channel and 
$246,450 contributed funds for Rollover Pass (beginning 
1997). Includes following amounts for tributary channels 
separately funded starting in fiscal year 1987: Channel 
to Victoria $16,527,640. Channel to Aransas Pass $2,600. 
40-24

GALVESTON, TEXAS, DISTRICT 
TABLE 40-A COST AND FINANCIAL STATEMENT 
See 
Section Total Cost To 
in Text Project Funding FY 96 FY 97 FY 98 FY99 Sep. 30, 199929 
Chocolate Bayou Channel $3,107,120. Includes following 
amounts for tributary channels separately funded starting 
in fiscal year 1989: Channel to Harlingen $6,665,315. 
Channel to Port Mansfield $8,464,680. Also includes 
$11,054,465 for Mouth of Colorado River, separately 
funded beginning in fiscal year 1992 and $31,200 contributed 
funds for Channel to Harlingen beginning in 
fiscal year 1998. 
16 Includes $1,526,564 for previous projects. In 
addition $22,672 expended from contributed funds for 
main channel and $189,978 contributed funds for Rollover 
Pass (beginning 1997) for the beneficial placement of 
dredge material at Rollover Pass. Includes following 
amounts for tributary channels separately funded starting 
in fiscal year 1987: Channel to Victoria $16,526,962, 
Channel to Aransas Pass $2,600, Chocolate Bayou Channel 
$3,107,120. In addition $1,362,374 was expended from 
contributed funds for Chocolate Bayou Channel. Also 
includes amounts for tributary channels separately funded 
starting in fiscal year 1989: Channel to Harlingen 
$6,665,048. Channel to Port Mansfield $8,464,228. Also 
includes an expended amount of $11,054,452 for Mouth 
of Colorado River, separately funded in fiscal year 1992. 
In addition, includes $28,140 contributed funds expended 
beginning in fiscal year 1998. 
'7 Includes $4,105,157 for previous projects. In 
addition, $2,591,939 expended from contributed funds, 
of which $1,209,179 was for previous projects. 
18 Includes $1,213,142 for previous projects. In 
addition, $534,641 expended from contributed funds for 
Houston Ship Channel, of which $200,000 was for previous 
projects and $125,000 expended from contributed 
funds for Greens Bayou Channel. Includes appropriated 
funds for tributary channels separately funded starting 
in fiscal year 1992: Greens Bayou Channel $560,968. Barbour 
Terminal Channel $2,106,860. Bayport Ship Channel 
$9,667,085. Also, includes $91,942 contributed funds for 
Bayport Ship Channel beginning in FY 1998. Expenditures 
for tributary channels separately funded starting 
in fiscal year 1992: Greens Bayou Channel $560,731. Barbour 
Terminal Channel $2,106,860. Bayport Ship Channel 
$9,667,085. In addition $91,942 expended from contributed 
funds for Bayport Ship Channel beginning in FY 
1998. 
19 In addition, $12,259,619 expended from contributed 
funds and $182,800 for contributed lands. 
20 Starting in fiscal year 1990 includes an appropriation 
of $2,335,085 and expenditures of $2,334,990 for 
Channel to Red Bluff. 
2' Includes $5,180,832 for previous projects. In 
addition, $2,680,942 expended from contributed funds, 
of which $577,507 was for previous projects. 
22 Includes $2,379,677 for previous projects. In 
addition, $5,635,435 expended from contributed funds 
and $7,944 expended from contributed funds for real estate 
acquisition for the local sponsor. 
23 Includes $366,823 for previous projects. In addition, 
$1,023,819 expended from contributed funds, of 
which $99,000 was for mitigation measures. 
24 Includes $195,083 for previous projects. 
25 Includes $1,966,306 for previous projects. In 
addition, $66,000 expended from contributed funds. 
26 Includes $543,662 for previous projects. 
27 Includes $4,400,000 of advanced funds repaid 
to Harris County Flood Control District. In addition, 
$63,661 contributed funds expended for Brays Bayou and 
$12,900 Federal funds and $19,104 contributed funds expended 
for enlargement of Clodine Ditch. 
28 Excludes $1,995,869 expended from contributed 
funds for real estate acquisition for the local sponsor. 
29 Includes funds ($12,544,400) provided by the 
Jobs Act (P.L. 98-8, dated March 24, 1983) for projects 
listed in Table 15-I of Annual Report for 1985. 
40-25

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
1. Oct. 27, 1965 
Nov. 17, 1986 
2. Jun. 3, 1930 
May 24, 1934 
(PWA) 
Aug. 30, 1935 
Aug. 26, 1937 
Mar. 2, 1945 
Mar. 2, 1945 
Jul. 24, 1946 
May 17, 1950 
Jul. 14, 1960 
Nov. 17, 1986 
3. Jul. 3, 1930 
AQUATIC PLANT CONTROL 
Provides for control of progressive eradication of aquatic plant 
growth from the navigable waters and streams in the U.S. 
Amended cost sharing requirements to provide for 50 percent Federal 
and 50 percent non-Federal participation in control operations. 
BRAZOS ISLAND HARBOR, TX 
Jetties and jetty channel, inside channels and basins. 
Local cooperation requirement modified to provide contribution of 
funds to cover cost of original dredging of all inside channels 
and basins. 
Deepen jetty channel to 31 feet and inner channels and Brownsville 
and Port Isabel turning basins to 28 feet. 
Enlarge Port Isabel turning basin. 
Deepen entrance channel to 35 feet; deepen to 33 feet channel 
across Laguna Madre; deepen to 32 feet channels from Laguna 
Madre to turning basins at Brownsville and Port Isabel; widen 
turning basins; and dredging present shallow-draft channel south 
of Port Isabel from railroad bridge to Laguna Madre and connecting 
channel to Port Isabel turning basin. 
Additional connecting channel between Port Isabel and Brownsville 
channels; and transfer shallow-draft channels at Port Isabel 
to GIWW. 
Deepen to 38 feet in outer bar channels and 36 feet in all other 
authorized channels and basins; extend existing turning basins 
at Brownsville and Port Isabel; and construct small-boat basin 
with a connecting channel next to Brownsville ship channel. 
Widen Brownsville Channel to 300 feet at a depth of 36 feet from 
former Goose Island passing basin to turning basin extension, 
thence at a width of 500 feet and same depth to turning basin 
proper, deepen to 36 feet in area in southeast corner of turning 
basin, maintain two existing basins of fishing harbor, and a 
connecting channel, and construct a third basin, with necessary 
connecting channel and extend Brazos Island Harbor north jetty 
seaward 1,000 feet.27 
Enlargement of the entrance channel from deep water in the Gulf 
of Mexico to the Laguna Madre to a depth of 44 feet and a 
width of 400 feet; enlargement of the Turning Basin Extension 
to a point 800 feet beyond the grain elevator to a depth of 42 
feet at widths varying from 325 to 400 feet; removal of Brownsville 
Navigation District Wharves 5, 6, and 9 to permit widening 
of the adjacent portion of the Turning Basin to 1,200 feet 
at a depth of 36 feet; construction of asphalt walkways with 
handrails on the crown of the North and South Jetties, and 
construction of park-type public use facilities at the inner end 
of the North Jetty. 
CEDAR BAYOU, TX 
Channel 10 feet deep and 100 feet wide from Houston Ship Channel 
to a point on bayou 11 miles above mouth.29 
H. Doc. 251, 89th 
Cong., 1st Sess. 
Sec. 103(c), PL 99-662 
Rivers and Harbors 
Committee Doc. 16, 
71st Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 10, 
71st Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 32, 
75th Cong., 1st Sess. 
H. Doc. 335, 76th 
Cong., 1st Sess. 
H. Doc. 347, 77th 
Cong., 1st Sess. 
H. Doc. 627, 79th 
Cong., 2nd Sess. 
H. Doc. 192, 81st 
Cong., 1st Sess. 
H. Doc. 428, 86th 
Cong., 2nd Sess.' 
Sec. 201, PL 99-662 
S. Doc 107, 71st 
Cong., 2nd Sess.' 
40-26

GALVESTON. TEXAS. DISTRICT 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
CHANNEL TO PORT BOLIVAR, TX 
4. Jun. 25, 1910 A channel 30 feet deep and 200 feet wide from deep water in 
Galveston Harbor extending to a turning basin 1,000 feet square 
and 30 feet deep.3o 
Mar. 4, 1919 Enlargement, extension and protection of turning basin.3o 
CLEAR CREEK AND CLEAR LAKE, TX 
5. Jun. 13, 1902 A channel 4 feet deep and 50 feet wide. 
Aug. 30, 1935 Enlargement of channel to 6 feet deep and 60 feet wide. 
Mar. 2, 1945 Realignment, enlargement, and extension of channel to highway 
bridge near League City. 
CORPUS CHRISTI SHIP CHANNEL, TX 
6. Mar. 3, 1899 Acquisition of old curved portion of north jetty previously constructed 
by private parties. 
Jun. 13, 1902 Complete north jetty in accordance with builder's plans. 
Mar. 3, 1905 Complete north jetty in accordance with builder's plans. 
Mar. 2, 1907 Connect old curve to St. Joseph Island, and construct south jetty. 
Feb. 27, 1911 Dredge roadstead in Harbor Island Basin to 20 feet deep and construct 
10,000 linear feet of stone dike on St. Joseph Island. 
Mar. 4, 19132 Channel between jetties and Harbor Island Basin to 25 feet deep, 
extend jetties seaward, extend dike on St. Joseph Island 9,100 
feet, and dredge approach channel 12 feet deep to town of Port 
Aransas. 
Sep. 23, 1922 Dredging channel from Aransas Pass to Corpus Christi, 25 feet 
deep, 200 feet bottom width. 
Jul. 3, 19303 Deepen entrance channel from gulf to Harbor Island and provide 
an inner basin at Harbor Island of reduced area but greater 
depth. 
Jul. 3, 1930 Channel from Aransas Pass to Corpus Christi Channel with depth 
30 feet. 
Aug. 30, 19354 Enlarge all channels from gulf to western end of basin dredge by 
Humble Oil and Refining Co., at its docks on Harbor Island. 
Aug. 30, 1935 Maintain channel and maneuvering basin between breakwater and 
western shoreline of Corpus Christi Bay. 
Aug. 30, 1935 Maintain 30-foot depth of approach channel, turning basin at Corpus 
Christi, Industrial Canal and turning basin at Avery Point. 
H. Doc. 328, 61st 
Cong., 2nd Sess. 
H. Doc. 1122, 65th 
Cong., 2nd Sess.' 
H. Doc. 449, 56th 
Cong., 1st Sess. 
H. Doc. 264, 73rd 
Cong., 2nd Sess. 
H. Doc. 319, 77th 
Cong., 1st Sess.' 
Specified in Act. 
Specified in Act. 
Specified in Act. 
Rivers and Harbors 
Committee Doc. 5, 
59th Cong., 2nd 
Sess. 
H. Doc. 1094, 61st 
Cong., 3rd Sess. 
H. Doc. 1125, 62nd 
Cong., 3rd Sess. 
H. Doc. 321, 67th 
Cong., 2nd Sess. 
H. Doc. 214, 70th 
Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 9, 
71st Cong., 1st 
Sess. 
Committee Docs. 35, 
72nd Cong., 1st 
Sess., and 40, 73rd 
Cong., 2nd Sess. 
H. Doc. 130, 72nd 
Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 13, 
74th Cong., 1st 
Sess. 
40-27 
TABLE 40-B

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
6. Aug 30, 1935 
Jun. 20, 1938 
Mar. 2, 1945 
Jun. 30, 1948 
Sep. 3, 1954 
Sep. 3, 19545 
Sep. 3, 1954 
Jul. 3, 1958 
Jul. 3, 1958 
Jul. 3, 1958 
Jul. 3, 1958 
Jul. 14, 1960 
(As amended by 
Dec. 31, 1970) 
CORPUS CHRISTI SHIP CHANNEL, TX (Continued) 
Maintain and deepen to 32 feet channel from deep water at Port 
Aransas to and including turning basin at Corpus Christi. 
Extend main turning basin at Corpus Christi westward 2,500 feet 
at its present width and depth, deepen existing Industrial Canal 
and turning basin to 32 feet and extend this canal at a depth of 
32 feet and general width of 150 feet, westward along Nueces 
Bay shore to a turning basin 32 feet by 900 feet, and 1,000 feet 
long near Tule Lake. 
Provide depth of 34 feet in all project channels and basins from 
Port Aransas to and including Tule Lake turning basin, for a 
width of 250 feet from Port Aransas to breakwater at Corpus 
Christi, for a width of 200 feet in Industrial Canal and in channel 
between Avery Point and Tule Lake turning basins, and 
widen Avery Point turning basin to 1,000 feet. 
Deepen entrance channel to 38 feet from gulf to outer end of jetty; 
38 feet decreasing to 36 feet thence to station 90 north jetty; 
and 36 feet in all other deep water channels and basins except 
2,000-foot undredged part of inner basin at Harbor Island, and 
a width of 400 feet in channel from Port Aransas to Maneuvering 
basin at Corpus Christi. 
An anchorage basin 12 feet deep, from 300 to 400 feet wide, and 900 
feet long in Turtle Cove at Port Aransas, Texas. 
Branch channel 32 feet by 150 feet, extending northerly from main 
channel in vicinity of Port Ingleside, along north shore of Corpus 
Christi Bay to Reynolds Metals Co. plant and turning basin 32 
feet deep and 800 feet square near plant in general vicinity of 
LaQuinta, Texas. 
An entrance channel 36 by 400 feet on a tangent alignment from 
400-foot channel in Corpus Christi Bay, near Corpus Christi 
breakwater to flared approach channel to Corpus Christi turning 
basin. 
Deepen and widen LaQuinta Channel to 36 by 200 feet; enlarge 
LaQuinta turning basin to 36 by 800 by 1,000 feet; a flared 
entrance to channel; and widening at curves. 
Deepen entrance channel to 42 feet from gulf to outer end of jetty; 
40 feet in all other deep-water channels and basins except 
undredged northward extension to inner basin at Harbor Island 
and branch channel to LaQuinta; and widen Industrial Channel 
to 400 feet with flared entrances to Corpus Christi and Avery 
Point turning basins. 
Channel 40 by 200 feet extending 2.2 miles from Tule Lake turning 
basin to a turning basin 40 feet deep, 700 to 900 feet wide, 
1,000 feet long at Viola, Texas. 
Depth of 12 feet and a width of 100 feet in locally dredged Jewel 
Fulton Canal from LaQuinta Channel to a turning basin 12 by 
200 by 400 feet, and assumption of maintenance by United 
States. 
Construction of a breakwater at entrance to harbor area at Port 
Aransas, and realignment of existing 12-foot by 100-foot project 
channel. 
Rivers and Harbors 
Committee Doc. 63, 
74th Cong., 1st Sess. 
H. Doc. 574, 75th 
Cong., 3rd Sess. 
H. Doc. 544, 78th 
Cong., 2nd Sess. 
H. Doc. 560, 80th 
Cong., 2nd Sess. 
H. Doc. 654, 81st 
Cong., 1st Sess. 
H. Doc. 89, 83rd 
Cong., 1st Sess. 
H. Doc. 487, 83rd 
Cong., 2nd Sess. 
S. Doc. 33, 85th Cong., 
1st Sess. 
H. Doc. 361, 85th 
Cong., 2nd Sess. 
H. Doc. 361, 85th 
Cong., 2nd Sess. 
H. Doc. 361, 85th 
Cong., 2nd Sess. 
Sec. 107, PL 86-645 
40-28

GALVESTON, TEXAS. DISTRICT 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
6. Aug. 13, 1968 
CORPUS CHRISTI SHIP CHANNEL, TX (Continued) 
Provides for a project depth of 45 feet in the existing deep-draft 
channels and basins, for construction of a new deep-draft turning 
point, for construction of a deep draft mooring area and 
mooring facilities and for widening of the channels and basins 
at certain locations. The Act also deauthorized the undredged 
northward extension of Inner Basin at Harbor Island and the 
undredged west turnout (Wye connection) between the LaQuinta 
Channel and the main channel of the waterway. 
S. Doc. 99, 90th Cong., 
2nd Sess.' 
Oct. 22, 1976 Modified local cooperation requirements for 1968 Act. Shifted 
responsibility for cost of disposal areas and confinement works 
from sponsor to joint 75 percent Federal and 25 percent non- 
Federal responsibility. 
Sep. 15, 1994 Assume maintenance of 17 foot by 100 foot Jewel Fulton Canal, 
after construction by local interest. 
DOUBLE BAYOU, TX 
7. Mar. 3, 1899 A channel 6-feet deep and 100-feet wide through the bar at mouth 
of Double Bayou. 
Jul. 14, 1960 
(As amended 
Oct. 25, 1965) 
7-foot by 125-foot channel from the 7-foot depth in Trinity Bay 
to the intersection of Double Bayou Channel with the channel 
to Liberty; and thence a 7- by 100-foot channel upstream for 
2.0 miles. 
FREEPORT HARBOR, TX 
8. Mar. 3, 1899 Dredging and other work necessary in judgment of Secretary of 
War for improving harbor; for taking over jetties and privately 
built works at mouth of river. 
Mar. 2, 1907 Examination authorized. Work later confined to maintenance of 
jetties. 
Feb. 27, 1911 
Mar. 4, 1913 
Repairs to jetties and dredging. 
Construct seagoing hopper dredge. 
Aug. 8, 1917 Purchase of one 15-inch pipeline dredge and equipment, its operation 
of 3 years, operation of seagoing dredge one-half time for 3 
years, and repairs to jetties. 
Mar. 3, 19256 Diversion dam, diversion channel, and necessary auxiliary works. 
Jul. 3, 1930 Maintenance of diversion channel at expense of local interest. 
Aug. 30, 19357 Deepening channels and basins. 
Aug. 30, 1935 Maintenance of present project dimensions of channels and basins 
at Federal expense. 
May 17, 1950 Deepen outer bar channel to 38 feet from gulf to a point within 
jetties, thence 36 feet in authorized channels to and including 
upper turning basin. 
Sec. 124, PL 94-587 
Sec. 204, PL 99-662 as 
amended 
H. Doc. 387, 55th 
Cong., 2nd Sess. 
Sec. 107, PL 86-645 
Specified in Act. 
H. Doc. 1087, 60th 
Cong., 2nd Sess. 
Specified in Act. 
Specified in Act. 
Specified in Act. 
Rivers and Harbors 
Committee Doc. 10, 
68th Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 18, 
70th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 15, 
72nd Cong., 1st Sess. 
Rivers and Harbors 
Committee Docs. 15, 
72nd Cong., 1st 
Sess., and 29, 73rd 
Cong., 2nd Sess. 
H. Doc. 195, 81st 
Cong., 1st Sess. 
40-29 
TABLE 40-B

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
8. Jul. 3, 1958 
Oct. 5, 1961 
Dec. 31, 1970 
Nov. 17, 1986 
9. Aug. 5, 1886 
Jun. 13, 1902 
Mar. 3, 1905 
Mar. 2, 1907 
Mar. 2, 19079 
Jun. 25, 19109 
Jul. 27, 1916 
Jul. 18, 1918 
Sep. 22, 1922 
Jan. 21, 1927" 
Aug. 30, 1935 
FREEPORT HARBOR, TX (Continued) 
Relocate outer bar channel on straight alignment with jetty channel 
and maintain Brazos Harbor entrance channel and turning basin 
(constructed by local interests). 
Modification of HD 1469. Revoking certain provisions of local 
cooperation. 
Relocation of entrance channel and deepen to 47 feet; enlargement 
to a depth of 45 feet and relocation of jetty channel and inside 
main channel; deepening to 45 feet of channel to Brazosport; 
enlargement of the widened area of Quintana Point to provide a 
depth of 45 feet with a 750-foot diameter turning area; Brazosport 
turning basin to 45 feet deep with a 1,000 foot turning 
area; a new turning basin with a 1,200 foot diameter turning 
area and 45 feet deep; deepening Brazosport channel to 36 by 
750 feet diameter; flared approaches from Brazos Harbor Channel; 
relocation of north jetty and rehabilitation of south jetty. 
Modified local cooperation requirements for the 1970 Act. 
GALVESTON HARBOR AND CHANNEL, TX 
Construct 2 rubblestone jetties at entrance to Galveston Harbor. 
A channel 1,200 by 30 feet from Bolivar Roads (outer end of old 
inner bar near Fort Point) at 51st Street.8 
Purchase or construct hydraulic pipeline dredge. 
Extension of jetties to present project length and construction and 
operation of a dredge. 
Extension of Galveston Channel from 51st to 57th Sts., with depth 
of 30 feet and width of 700 feet. 
Conditional extension of Galveston Channel between 51st and 57th 
Sts., 30 feet deep and 1,000 feet wide. 
Extend seawall at Galveston from angle at 6th St., and Broadway 
to vicinity of Fort San Jacinto. 
Deepen harbor channel to 35 feet and widen to 800 feet. 
Further extension of seawall at Galveston to a junction with south 
jetty; and repairing seawall in front of Fort Crockett reservation. 
Deepen Galveston Channel to 32 feet; and maintain Galveston 
Harbor channels to dimensions of 800 feet wide, 35 feet deep 
on outer bar and 34 feet deep in inner bar.' 
Maintain State Highway Ferry Landing Channels to dimensions of 
12 by 100 feet. 
H. Doc. 433, 84th 
Cong., 2nd Sess. 
PL 394, 87th Cong. 
H. Doc. 289, 93rd 
Cong., 2nd Sess. 2 
Sec. 101, PL 99-662 
H. Doc. 85, 49th 
Cong., 1st Sess., and 
Annual Report, 1886, 
p. 1311. 
H. Doc. 264, 56th 
Cong., 2nd Sess. 
Specified in Act. 
H. Doc. 340, 59th 
Cong., 2nd Sess., and 
Rivers and Harbors 
Committee Doc. 11, 
59th Cong., 2nd Sess. 
H. Doc. 768, 59th 
Cong., 2nd Sess. 
H. Doc. 328, 61st 
Cong., 2nd Sess. 
H. Doc. 1390, 62nd 
Cong., 3rd Sess. 
H. Doc 758, 65th 
Cong., 2nd Sess. 
H. Doc. 693, 66th 
Cong., 2nd Sess. 
H. Doc. 307, 69th 
Cong., 1st Sess. 
River and Harbors 
Committee Doc. 31, 
72nd Cong., 1st Sess. 
40-30

GALVESTON, TEXAS, DISTRICT 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
GALVESTON HARBOR AND CHANNEL, TX (Continued) 
9. Aug. 30, 1935 Construct 13 groins along gulf shore from 12th to 61st Sts. in city 
of Galveston at a limited cost of $234,000 (10 groins constructed). 
Aug. 30, 1935 
Aug. 30, 1935 
Apr. 4, 1938 
Deepen Galveston Channel to 34 feet (Bolivar Roads to 43rd St.). 
H. Doc. 400, 73rd 
Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 61, 
74th Cong., 1st Sess. 
Deepen Galveston entrance channel to 36 feet. Rivers and Harbors 
Committee Doc. 57, 
74th Cong., 1st Sess. 
Completion of project for construction of 13 groins. 
Jun. 30, 1948 Deepen Galveston Harbor to 38 feet from gulf to a point 2 miles 
west of seaward end of north jetty; thence 36 feet to Bolivar 
Roads; revoking authority for maintenance of ferry channels; 
and Galveston channel to 36 feet deep from Bolivar Roads to 
43rd Street. 
May 17, 1950 Deepen outer bar channel to 38 feet from gulf to a point within 
jetties, thence 36 feet in authorized channels to and including 
upper turning basin. 
Jul. 3, 1958 Dredge to a depth of 42 feet over the authorized width of 800 feet 
from the Gulf of Mexico to a point 2 miles west of the seawall 
and of the North jetty thence at a depth of 40 feet to the 
junction of the Houston Ship Channel, with widths of 800 feet 
to Bolivar Roads, thence decreasing to 400 feet at the junction 
with the Houston Ship Channel. 
Jun. 23, 1971 
(House Res.) 
Nov. 18, 1971 
(Senate Res. 
Deepen Galveston Channel to 40 feet from Bolivar to 43rd Street. 
Oct. 12, 1996 Provides for navigation and environmental restoration improvements. 
The navigation improvements consist of deepening and 
widening the Entrance Channel to 47 feet deep and 800 feet 
wide; the Houston Ship Channel to 45 feet deep and 530 feet 
wide; and the Galveston Channel to 45 feet deep. The environmental 
restoration portion consist of initial construction of marsh 
habitat and a colonial water bird nesting island through the 
beneficial use of new work dredged material, and incremental 
development (deferred construction) of additional marsh over 
the life of the navigation project through the beneficial use of 
maintenance materials dredged from Galveston Bay. The project 
is referred to as Houston-Galveston Navigation Channels. 
GULF INTRACOASTAL WATERWAY BETWEEN 
APALACHEE BAY, FL AND MEXICAN BORDER 2 
10. Mar. 2, 1907 Channel 4 by 100 feet from West Galveston Bay across Chocolate 
Bay to 4 feet of water in Chocolate Bay. 
Mar. 3, 1925 Channel 9 by 100 feet, Sabine River to Galveston Bay, and a 20- 
inch pipeline dredge. Such passing places, widening at bends, 
locks or guard locks and railway bridges over artificial cuts as 
are necessary. 
Jan. 21, 1927 Channel 9 by 100 feet, Galveston Bay to Corpus Christi. 
PL 463, 75th Cong. 
H. Doc. 561, 80th 
Cong., 2nd Sess. 
H. Doc. 195, 81st 
Cong., 1st Sess. 
H. Doc. 350, 85th 
Cong., 2nd Sess. 
H. Doc. 121, 92nd 
Cong. 
Sec. 101 (30), 
PL 104-303 
H. Doc 445, 56th 
Cong., 1st Sess. 
H. Doc. 238, 68th 
Cong., 1st Sess. 
H. Doc. 238, 68th 
Cong., 1st Sess. 
40-31 
TABLE 40-B

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act 
10. Aug. 26, 1937 
Jun. 20, 193813 
Jun. 20, 1938 
Jun. 20, 1938 
Jun. 20, 1938 
Jun. 20, 1938 
Mar. 23, 1939 
Jul. 23, 1942 
Mar. 2, 1945 
Mar. 2, 19459 
Mar. 2, 1945 
Mar. 2, 1945 
Mar. 2, 194514 
Jul. 24, 1946 
Jul. 24, 1946 
May 17, 1950 
May 17, 1950 
May 17, 1950 
Jul. 12, 1952 
Project and Work Authorized 
GULF INTRACOASTAL WATERWAY (Continued) 
Maintenance of a flood-discharge channel in Colorado River. 
Channel 9 by 100 feet in San Bernard River, Texas. 
Channel in Colorado River, 9 by 100 feet, with basin. 
Channel 9 by 100 feet from Palacios through Trepalacios and 
Matagorda Bays. 
Channel 9 by 200 feet from main channel to harbor at Rockport 
and improve harbor to 9-foot depth. 
Channel 6 by 100 feet from main channel to Aransas Pass, Texas. 
Enlarge waterway to depth of 12 feet and a width of 125 feet from 
Sabine River to Corpus Christi. 
Construct waterway from Corpus Christi to vicinity of Mexican 
border to provide a depth of 12 feet and width of 125 feet throughout. 
Channel 6 by 60 feet from GIWW to a point in Chocolate Bayou 
near Liverpool. 
Channel 6 feet deep and 60 feet wide from main channel near Port 
O'Connor, Texas, in Barroom Bay. 
Enlarge channel from main channel to Aransas Pass, Texas, providing 
a depth of 9 feet and width of 100 feet. 
Channel 12 by 125 feet from main channel to Red Fish Landing, 
Texas, with basin. 
Channel 12 feet deep and 125 feet wide from main channel to 
vicinity of Harlingen, Texas, via Arroyo Colorado with basin. 
Fill a portion of shallow-draft channel adjacent to Port Isabel 
Turning Basin, construct a channel to connect shallow-draft 
channel with main channel near shoreline of Laguna Madre, and 
enlarge shallow-draft channel west of this connection, all to 12- 
foot depth and bottom width of 125 feet. 
Reroute main channel to north shore of Red Fish Bay between 
Aransas Bay and Corpus Christi Bay; deepen tributary channel 
from Port Aransas to Aransas Pass, Texas, 12 feet and 
extended basin at same depth. 
Deauthorized 6 by 60 foot channel in Chocolate Bayou and reauthorized 
the 4 by 100-foot channel. 
Alternate channel across South Galveston Bay between Port Bolivar 
and Galveston causeway. 
"Red Fish Landing" changed to "Port Mansfield, Texas." 
Incorporate as part of Intracoastal Waterway a channel 9 by 100 
feet from main channel via Seadrift to point on Guadalupe 
River 3 miles above Victoria, Texas, authorized by River and 
Harbor Act of 1945. 
40-32 
Documents 
S. Committee print, 
75th Cong., 1st Sess. 
H. Doc. 640, 75th 
Cong., 3rd Sess. 
H. Doc. 642, 75th 
Cong., 3rd Sess. 
H. Doc. 564, 75th 
Cong., 3rd Sess. 
H. Doc. 641, 75th 
Cong., 3rd Sess. 
H. Doc. 643, 75th 
Cong., 3rd Sess. 
H. Doc. 230, 76th 
Cong., 1st Sess. 
PL 675, 77th Cong. 
H. Doc. 337, 76th 
Cong., 1st Sess. 
H. Doc. 428, 76th 
Cong., 1st Sess. 
H. Doc. 383, 77th 
Cong., 1st Sess. 
S. Doc 248, 78th 
Cong., 2nd Sess. 
H. Doc. 402, 77th 
Cong., 1st Sess. (See 
PL 14, 79th Cong.) 
H. Doc. 627, 79th 
Cong., 2nd Sess. 
H. Doc. 700, 79th 
Cong., 2nd Sess. 
H. Doc. 768, 80th 
Cong., 2nd Sess. 
H. Doe. 196, 81st 
Cong., Ist Sess. 
PL 516, 81st Cong. 
PL 527, 82nd Cong., 
2nd Sess.

GALVESTON, TEXAS, DISTRICT 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
10. Sep. 3, 195415 
GULF INTRACOASTAL WATERWAY (Continued) 
Small craft harbor 9 by 200 by 1,000 feet at Seadrift with an 
entrance channel 9 by 100 feet. 
Sep. 3, 1954 Widen tributary channel between Port Aransas and Aransas Pass, 
Texas, to 125 feet; straighten and widen to 125 feet connecting 
channel to Conn Brown Harbor, and maintain Conn Brown 
Harbor at Federal expense, all to 12 feet deep. 
Sep. 9, 1959 Improve channels and basins comprising channel to Port Mansfield 
constructed in part by Federal Government and in part by 
local interest; constructing turnout curves at Gulf Intracoastal 
Waterway intersection and bend easing at entrance to turning 
basin; construct parallel jetties at gulf entrance; maintenance of 
locally dredged jetty channel 16 by 250 feet; and maintenance 
of small craft basin. 
Jul. 14, 1960 Entrance channel 7 feet deep by 75 feet wide from main channel to 
Gulf of Mexico to inside shoreline at Port Isabel, Texas, an 
inner channel 6 feet deep by 50 feet wide from entrance channel 
to East Harbor Basin, and an irregular-shaped harbor basin 
6 feet deep having a surface area of about 7 acres. 
Jul. 14, 1960 
(As amended 
Dec. 31, 1970) 
Jul. 14, 1960 
(As amended 
Dec. 31, 1970) 
Jul. 14, 1960 
(As amended 
Dec. 31, 1970) 
Oct. 23, 196216 
Deepen the existing 6-foot channel at Port Isabel to 12 feet and 
removing the submerged bars at each end of the island to a 
depth of -12 feet MLT. 
Deepening the existing channel to 12 by 125 feet, and extend 
southeasterly from the Gulf Intracoastal Waterway main channel 
in West Galveston Bay, into Offatts Bayou, a distance of 2.2 
miles, and a west turnout 12 by 125 feet between the proposed 
Offatts Bayou Channel and the Gulf Intracoastal Waterway. 
Deepening Aransas Pass tributary channel to 14 feet from mile 0 
at Harbor Island to mile 6.1 at the city of Aransas Pass; widening 
to 175 feet between miles 3.5 and 4.6; and deepening Conn 
Brown Harbor, turning basin and connecting channel between 
Conn Brown Harbor and turning basin. 
Improve main channel 16 feet deep and 150 feet wide from Sabine 
River to Houston Ship Channel; with two relocations; relocate 
main channel in Matagorda Bay and Corpus Christi Bay; and 
maintaining existing Lydia Ann Channel. 
Oct. 23, 1962 Deepen and widen channel to Palacios; construct two protective 
breakwaters; maintain and deepen existing basins; and deepen, 
enlarge and maintain existing approach channel to basin No. 2. 
Oct. 23, 1962 Eliminates requirement of local interest to construct bridge at mile 
29.2 turning basin at Victoria, and maintain turning basins at 
Victoria and Seadrift; provide: Federal construction of verticallift 
railroad bridge at Missouri-Pacific Railroad mainline crossing, 
mile 29.2; construction and future maintenance of basin near 
Victoria, Texas, and maintenance of basin constructed by local 
interests at Seadrift, Texas. 
H. Doc. 478, 81st 
Cong., 2nd Sess. 
H. Doc. 376, 83rd 
Cong., 2nd Sess. 
S. Doc. 11, 86th Cong., 
1st Sess. 
Sec. 107, PL 645, 86th 
Cong. 
Sec. 107, PL 86-645 
Sec. 107, PL 86-645 
Sec. 107, PL 86-645 
H. Doc. 556, 87th 
Cong., 2nd Sess. 
H. Doc. 504, 87th 
Cong., 2nd Sess. 
H. Doc. 288, 87th 
Cong., 2nd Sess. 
Modify existing Federal navigation project to provide a channel 
extending from Gulf Intracoastal Waterway through Chocolate 
Bay and Chocolate Bayou to project channel mile 8.2, thence 
to a turning basin near channel mile 13.2 and for salt water 
barrier in Chocolate Bayou about 3.7 miles upstream from basin 
(channel mile 16.9). 
H. Doc. 217, 89th 
Cong., 1st Sess. 
40-33 
Oct. 27, 1965'7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
10. Aug. 13, 1968 
Nov. 17, 1986 
Nov. 17, 1988 
Oct. 31, 1992 
Oct. 12, 1996 
11. Oct. 12, 1996 
12. Mar. 5, 1905 
Mar. 2, 1919 
Mar. 3, 1925 
Jul. 3, 1930 
Aug. 30, 193511 
Aug. 30, 1935 
GULF INTRACOASTAL WATERWAY (Continued) 
Entrance channel 15 feet deep and 200 feet wide at the mouth of 
Colorado River Channel protected by an east jetty 3,500 feet 
long extending to 12-foot depth and a west jetty 2,900 feet 
long extending to 5-foot contour; make channel 12 feet by 100 
feet from gulf shore to Matagorda, including recreation facility, 
a turning basin 12 feet by 300 feet wide and 1,450 feet long, 
and a new diversion channel 250 feet wide and varying in depth 
from 20 to 23 feet including a closure dam across the present 
river channel. 
Modified 1968 authorization to provide that diversion features be 
constructed at Federal expense and operation and maintenance 
be shared 75 percent Federal and 25 percent non-Federal. 
Enlarge existing Channel to Victoria from a depth of 9 feet and 
width of 100 feet to a depth of 12 feet and width of 125 feet. 
Provide 8 miles of erosion protection for the existing waterway in 
the vicinity of Sargent, Texas. 
Provides for erosion protection along a 31-mile reach of the Gulf 
Intracoastal Waterway which crosses the critical wintering habitat 
of the endangered whooping crane, including a 13.25 mile 
reach within the boundary of the Aransas National Wildlife 
Refuge. Also, provides for limited oil spill containment features 
and equipment to protect those areas from accidental 
hazardous spills. 
HOUSTON-GALVESTON NAVIGATION CHANNELS, TX 
Provides for navigation and environmental restoration improvements. 
The navigation improvements consist of deepening and 
widening the Entrance Channel to 47 feet deep and 800 feet 
wide; the Houston Ship Channel to 45 feet deep and 530 feet 
wide; and the Galveston Channel to 45 feet deep. The environmental 
restoration portion consist of initial construction of marsh 
habitat and a colonial water bird nesting island through the 
beneficial use of new work dredged material, and incremental 
development (deferred construction) of additional marsh over 
the life of the navigation project through the beneficial use of 
maintenance materials dredged from Galveston Bay. 
HOUSTON SHIP CHANNEL, TX 
Easing or cutting off sharp bends and construction of a pile dike.'8 
A channel 30 feet deep, widen bend at Manchester and enlarge 
turning basin. 
A light-draft extension of channel to mouth of White Oak Bayou. 19 
Widen channel through Morgan Point and to a point 4,000 feet 
above Baytown and widen certain bends. 
Deepen to 32 feet in main channel and turning basin, and a 400- 
foot width through Galveston Bay. 
Deepen to 34 feet in main channel and widen from Morgan Point 
to turning basin 
S. Doc. 102, 90th 
Cong., 2nd Sess. 
Sec. 812, PL 99-662 
Sec. 3, PL 100-676 
Sec. 101 (20), 
PL 102-580 
Sec. 101 (29), 
PL 104-303 
Sec. 101 (30), 
PL 104-303 
Rivers and Harbors 
Committee Doc. 35, 
61st Cong., 2nd Sess. 
H. Doc. 1632, 65th 
Cong., 3rd Sess. 
H. Doc. 93, 67th 
Cong., 1st Sess. 
H. Doc. 13, 71st Cong., 
1st Sess. 
Rivers and Harbors 
Committee Doc. 28, 
72nd Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 
58, 74th Cong., 1st 
Sess. 
40-34

GALVESTON. TEXAS. DISTRICT 
AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
HOUSTON SHIP CHANNEL, TX (Continued) 
12. Mar. 2,1945 Branch channel 10 by 60 feet behind Brady Island. 
Mar 2, 1945 Widen channel from Morgan Point to lower end of Fidelity Island 
with turning points at mouth of Hunting Bayou and lower end 
of Brady Island. 
Mar. 2, 1945 Widen channel from lower end of Fidelity Island to Houston turning 
basin and dredge off-channel silting basins. 
Jun. 30, 1948 Deepen to 36 feet from Bolivar Roads to and including main turning 
basin at Houston, Texas, including turning points at Hunting 
Bayou and Brady Island. 
Jul. 3, 195820 Deepen to 40 feet from Bolivar Roads to Brady Island, construct 
Clinton Island turning basin, a channel 8 by 125 feet at Five 
Mile Cut, and improve shallow-draft channel at Turkey Bend. 
Jul. 14, 1960 Barbour Terminal at Morgan Point. 
Oct. 27, 1965 Restoring existing locally dredged channel from mile 0 to 0.34 to 
36 feet deep and dredging a 15-12 ft. channel from mile 0.34 to 
2.81, in Greens Bayou.21 
Nov. 17, 1986 Maintenance of Greens Bayou, Barbour Terminal Channel, and 
Bayport Ship Channel to forty-foot depths at Federal expense. 
Oct. 12, 1996 Provides for navigation and environmental restoration improvements. 
The navigation improvements consist of deepening and 
widening the Entrance Channel to 47 feet deep and 800 feet 
wide; the Houston Ship Channel to 45 feet deep and 530 feet 
wide; and the Galveston Channel to 45 feet deep. The environmental 
restoration portion consist of initial construction of marsh 
habitat and a colonial water bird nesting island through the 
beneficial use of new work dredged material, and incremental 
development (deferred construction) of additional marsh over 
the life of the navigation project through the beneficial use of 
maintenance materials dredged from Galveston Bay. The project 
is referred to as Houston-Galveston Navigation Channels. 
MATAGORDA SHIP CHANNEL, TX 
13. Jun. 25, 1910 Channel to Port Lavaca, Texas 7 feet deep and 89 feet bottom 
width. 
Aug. 30, 1935 Extend 7-foot channel to shoreline of Lavaca Bay at mouth of 
Lynns Bayou. 
Aug. 26, 1937 Deepen and widen channel to present project dimensions. 
Mar. 2, 1945 Extend channel 6 by 100 feet from Port Lavaca via Lavaca Bay, 
Lavaca and Navidad Rivers to Red Bluff, a distance of 20 
miles. 
Mar. 2, 1945 A harbor of refuge 9 feet deep near Port Lavaca and an approach 
channel 100 feet wide and equal depth. 
H. Doc. 226, 76th 
Cong., 1st Sess. 
H. Doc. 226, 76th 
Cong., 1st Sess. 
H. Doc. 737, 79th 
Cong., 2nd Sess. 
H. Doc. 561, 80th 
Cong., 2nd Sess. 
H. Doc. 350, 85th 
Cong., 2nd Sess.' 
Sec. 107, PL 86-645 
H. Doc. 257, 89th 
Cong., 1st Sess. 
Sec. 819, PL 99-662 
Sec. 101 (30), 
PL 104-303 
H. Doc. 1082, 60th 
Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 28, 
74th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 37, 
75th Cong., 1st Sess. 
H. Doc. 314, 76th 
Cong., 1st Sess. 
H. Doc. 731, 79th 
Cong., 2nd Sess. 
40-35 
TABLE 40-B

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
13. Jul. 3, 1958 
Jul. 3, 1958 
14. Oct. 22, 1976 
15. Jul. 25, 1912 
Sep. 22, 1922 
Sep. 22, 1922 
Mar. 3, 1925 
Jan. 21, 1927 
Aug. 30, 1935" 
Aug. 30, 193511 
Aug. 30, 1935 
Aug. 26, 1937 
Aug. 26, 1937 
MATAGORDA SHIP CHANNEL, TX (Continued) 
Deepen to 12 feet and widen to 125 feet Port Lavaca Channel and 
approach channel to harbor of refuge; deepen to 12 feet Port 
Lavaca turning basin and basins at harbor of refuge. 
An entrance channel 38 by 300 feet, a channel 36 by 200 feet, 22 
miles long across Matagorda and Lavaca Bays to Point Comfort, 
Texas, a turning basin 36 feet deep and 1,000 feet square 
at Point Comfort, and dual jetties at entrance from gulf. 
NECHES RIVER AND TRIBUTARIES, SALT WATER 
BARRIER AT BEAUMONT, TX 
Construct gated salt water barrier in Neches River consisting of 
seven 40 x 24.5 foot tainter gates; gated navigation by-pass 
channel with clear opening of 56 feet and depth of 16 feet; 
access road and levee; and auxiliary dam across canal which 
drains adjacent bayou. 
SABINE-NECHES WATERWAY, TX 
Existing project dimensions of jetties, a 26-foot channel through 
Sabine Pass, Port Arthur Canal and Port Arthur turning basin; 
and a 26-foot turning basin at Port Arthur. A depth of 25-feet 
in Sabine-Neches Canal, Neches River to Beaumont and Sabine 
River to Orange, including cutoffs and widening channels. 
Deepen channels to 30 feet from gulf to Beaumont, with increased 
widths and an anchorage basin in Sabine Pass. 
Deepen Port Arthur east and west turning basins and approach 
channel to 30 feet. Take over and deepen to 30 feet channel 
connecting west turning basin with Taylors Bayou turning basin. 
For a 30-foot depth in channel from mouth of Neches 
River to cutoff in Sabine River near Orange. 
Removal of guard lock in Sabine-Neches Canal. 
Widen Sabine Pass and jetty channel, Port Arthur Canal, and Sabine-
Neches Canal. For dredging 2 passing places in Sabine- 
Neches Canal, easing of bends, removal and reconstructing Port 
Arthur field office, extending Beaumont turning basin upstream 
200 feet above new city wharves, and an anchorage basin in 
Sabine Pass. 
A depth of 32 feet in channels from gulf to Beaumont turning 
basin, including all turning basins at Port Arthur. 
Deepen channels to 34 feet with increased widths from gulf to 
Beaumont turning basin. 
Construct suitable permanent protective works along Sabine Lake. 
Maintain Taylors Bayou turning basin. 
Maintain channel from Sabine River to Orange Municipal wharf. 
Dredging 500 feet from eastern end of Harbor Island and abandonment 
of channel south and west of Harbor Island. 
H. Doc. 131, 84th 
Cong., 1st Sess. 
H. Doc. 388, 84th 
Cong., 2nd Sess. 
Sec. 102, PL 94-587 
H. Doc. 773, 61 st 
Cong., 
2nd Sess. 
H. Doc. 975, 66th 
Cong., 3rd Sess. 
S. Doc. 152, 67th 
Cong., 2nd Sess. 
H. Doc. 234, 68th 
Cong., 1st Sess. 
H. Doc 287, 69th 
Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 27, 
72nd Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 12, 
74th Cong., 1st Sess. 
Specified in Act. 
Rivers and Harbors 
Committee Doc. 3, 
75th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 20, 
75th Cong., 1st Sess. 
40-36

GALVESTON, TEXAS, DISTRICT 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
15. Jun. 20, 193822 
Oct. 17, 1940 
Mar. 2, 1945 
Mar. 2, 1945 
SABINE-NECHES WATERWAY, TX (Continued) 
Increased widths of channels from gulf to Beaumont turning basin 
and channel connecting Port Arthur west turning basin and 
Taylors Bayou turning basin, deepen Beaumont turning basin 
and Beaumont turning extension to 34 feet; and dredge a new 
cutoff from Smith's Bluff cutoff to McFadden Bend. 
Abandon Orange turning basin; dredge a channel 25 by 150 feet, 
suitably widened on bends to highway bridge, and dredge a 
cutoff channel opposite Orange. 
Extend Beaumont turning basin upstream 300 feet. 
Widen Port Arthur west turning basin to 600 feet. 
Mar. 2, 1945 Dredge a channel from Beaumont turning basin to vicinity of Pennsylvania 
Shipyard. 
Jul. 24, 194623 
Jul. 24, 194624 
Deepen Sabine Pass outer bar channel to 37 feet, Sabine Pass jetty 
channel to 36 feet at inner end, deepen to 36 feet Sabine Pass 
Channel, Port Arthur Canal, Port Arthur east and west turning 
basins, Taylors Bayou turning basin and channel from Port 
Arthur west turning basin to Taylors Bayou turning basin, 
deepen to 36 feet and widen to 400 feet Sabine-Neches Canal 
from Port Arthur Canal to mouth of Neches River except 
through Port Arthur Bridge; deepen Neches River channel from 
mouth to Beaumont turning basin to 36 feet widening to 350 
feet from Smith's Bluff to Beaumont turning basin; deepen 
junction area on Neches River at Beaumont turning basin to 36 
feet; and widen Sabine-Neches Canal between Neches and Sabine 
Rivers to 150 feet. 
Improve Cow Bayou, Texas, by construction of a channel 100 feet 
wide and 13 feet deep extending from navigation channel in 
Sabine River to a point 0.5 mile above county bridge at 
Orangefield, Texas, with a turning basin. 
Jul. 24, 1946 Improve Adams Bayou, Texas, to provide a channel 12 feet deep 
and 100 feet wide extending from 12-foot depth in Sabine River 
to first county highway bridge across bayou. 
May 17, 1950 
Sep. 3, 195425 
Oct. 23, 196226 
Deepen to 36 feet and widen to 400 feet the Sabine-Neches Canal 
near Port Arthur bridge; reconstruct Port Arthur Bridge and 
relocate Port Arthur field office. 
Rectification of certain reaches of existing Sabine Pass Channel, 
Sabine-Neches Canal, and Neches River and Sabine River 
Channel; widen to 350 feet entrance channel to Port Arthur 
turning basins; widen curve at junction of Port Arthur and 
Sabine-Neches Canals; relocate and enlarge Sabine Pass anchorage 
basin to 34 by 1,500 by 3,000 feet; widen to 200 feet Sabine- 
Neches Canal from mouth of Neches River to mouth of Sabine 
River and Sabine River Channel to upper end of existing project 
at Orange, except for channel around Harbor Island at Orange; 
deepen to 30 feet Sabine River Channel from cutoff near Orange 
municipal slip to upper end of project, except around Harbor 
Island; and enlarge area at entrance to Orange municipal slip to 
provide a maneuvering basin. 
Improve outer bar channel to 42 and 40 feet for all inland channels to 
Port Arthur and Beaumont; width of 500 feet in Port Arthur 
Canal and 400 feet in Neches River Channel to Beaumont with 
three turning points in Neches River; a channel, 12 by 125 feet, 
H. Doc. 581, 75th 
Cong., 3rd Sess. 
S. Doc 14, 77th Cong., 
1st Sess. 
H. Doc. 685, 76th 
Cong., 3rd Sess. 
S. Doc 60, 77th Cong., 
1st Sess. 
S. Doc 158, 77th Cong. 
2nd Sess. 
H. Doc. 571, 79th 
Cong., 2nd Sess. 
H. Doc. 702, 79th 
Cong., 2nd Sess. 
H. Doc. 626, 79th 
Cong., 2nd Sess. 
H. Doc. 174, 81st 
Cong., 1st Sess. 
S. Doc. 80, 83rd Cong., 
2nd Sess. 
H. Doc. 553, 87th 
Cong., 2nd Sess.' 
40-37

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
SABINE-NECHES WATERWAY, TX (Continued) 
extending in Sabine River to Echo; and replace an obstructive 
bridge at Port Arthur, Texas. Deauthorization of uncompleted 
portion of channel between Port Arthur west turning basin and 
Taylors Bayou turning basin and enlargement of entrance channel 
to Port Arthur turning basins. 
16. Mar. 4, 1913 
Jul. 3, 1930 
Aug. 30, 193511 
Aug. 30, 1935 
Aug. 30, 1935 
Aug. 26, 1937 
Jun. 30, 1948 
Jul. 14, 1960 
Oct. 12, 1972 
(Senate Res.) 
Oct. 12, 1972 
(House Res.) 
Nov. 17, 1986 
TEXAS CITY CHANNEL, TX 
A channel 300 by 30 feet and construct a pile dike 28,200 feet 
long north to channel. 
A harbor 800 by 30 feet at Texas City, and construct a rubblemound 
dike. 
Extension of rubblemound dike to shoreline. 
Deepen channel and harbor to 32 feet. 
Deepen channel and harbor to 34 feet. 
Extend harbor 1,000 feet southward, 800 by 34 feet. 
Deepen channel and harbor to 36 feet, widen channel to 400 feet 
and harbor to 1,000 feet and changing name of project to 
"TEXAS CITY CHANNEL, TEXAS." 
Deepen channel and turning basin to 40 feet and construct 16-foot 
Industrial Barge Canal. 
Widen the existing main turning basin to 1,200 feet including 
relocation of the basin 85 feet to the east; providing a 40-foot 
deep channel in the Industrial Canal at widths of 300-400 feet, 
with a turning basin at the head of the canal 40 feet deep, 1,150 
feet long, and 1,000 feet wide, and easing of the bend at the 
entrance to the canal, and deauthorization of shallow-draft 
Industrial Barge Canal not incorporated in the plan of 
improvement above. 
Deepening the Texas City Turning Basin to 50 feet, enlarging the 
6.7 mile long Texas City Channel to 50 feet by 600 feet; deepening 
the existing 800-foot wide Bolivar Roads Channel and 
Inner Bar Channel to 50 feet; deepening the existing 800-foot 
wide Outer Bar and Galveston Entrance Channels to 52 feet; 
extending the Galveston Entrance Channel to a 52 foot depth 
for 4.1 miles at a width of 800 feet and an additional reach at a 
width of 600 feet to the 52 foot contour in the Gulf of Mexico; 
and establishment of 600 acres of wetland and development of 
water-oriented recreational facilities on a 90-acre enlargement 
of the Texas City Dike. 
H. Doc. 1390, 62nd 
Cong., 3rd Sess. 
H. Doc. 107, 71st 
Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 4, 
73rd Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 46, 
73rd Cong., 2nd Sess. 
Rivers and Harbors 
Committee Doc. 62, 
74th Cong., 1st Sess. 
Rivers and Harbors 
Committee Doc. 47, 
75th Cong., 1st Sess. 
H. Doc. 561, 80th 
Cong., 2nd Sess.' 
H. Doc. 427, 86th 
Cong., 2nd Sess. 
H. Doc. 199, 
92nd Cong., 
2nd Sess. 
(Sec. 201, 
PL 89-298) 
Sec. 201, PL 99-662 
40-38

GALVESTON, TEXAS, DISTRICT 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
17. Jun. 18, 1878 
1889 
Jun. 13, 1902 
(As amended 
Mar. 3. 1905, 
Mar. 2. 1907, 
Jun. 25. 1910, 
Jul. 25. 1912, 
Mar. 4. 1913, 
and Jul. 27. 1916) 
Mar. 3. 1905 
Sep. 22, 1922 
Mar. 2. 1945 
Jul. 24. 1946 
Oct. 23. 1962 
Oct. 27. 1965 
Jul. 30. 1983 
20. Dec. 15, 1970 
(House Res.) 
Dec. 17, 1970 
(Senate Res.) 
TRINITY RIVER AND TRIBUTARIES, TX 
Dredging of a channel through the bar at the mouth of the Trinity 
River. 
Modified to include two parallel jetties 275 feet apart, the westerly 
one of length 7,359 feet and the other of length 300 feet. 
Improvement of the Trinity River in the interest of providing 
navigation from the mouth of the Trinity River to Dallas. 
The plan provided for the construction of 37 locks and dams, 
with auxiliary dredging and other open-channel work necessary 
to obtain a 6-foot depth for continuous navigation (excepting 
periods of excessive drought). Each Act also authorized 
the construction of certain-named locks and dams. 
Authorized the Anahuac Channel. No project dimensions were 
specified by the Act, so a 7- by 8-foot channel, 12,238 feet 
long was dredged in 1905. 
Abandon improvements above Liberty and terminate all improvements 
by lock and dam, leaving a 6-foot channel from Liberty 
to mouth. 
Provides for a navigable channel from the Houston Ship Channel 
near Red Fish Bar in Galveston and Trinity Bays to the 
mouth of Trinity River and 9 feet deep and 150 feet wide in 
the river section, with a turning basin at Liberty. 
Modification of the project to provide for a channel 9 feet deep 
and 150 feet wide from the Houston Ship Channel near Red 
Fish Bar in Galveston Bay extending along the east shore of 
Trinity Bay to the mouth of the Trinity River at Anahuac, 
including protective spoil embankment on the bay side of the 
channel in lieu of the 9 by 200-foot channel in Galveston and 
Trinity Bays. 
Provides for the multiple-purpose Wallisville Reservoir, including 
a navigation lock in the Wallisville Dam at Channel Mile 
28.30 and advancement of the Channel to Liberty from one 
mile below Anahuac (Mile 23.2) to the Texas Gulf Sulphur 
Company's slip at Channel Mile 35.8, and incorporation into 
existing project Anahuac Channel and mouth of Trinity River 
projects. 
Reevaluation of navigation benefits. 
Modified Wallisville Reservoir by reducing the size to 5,600 
acres and confining the reservoir to east side of Trinity River. 
CORPUS CHRISTI BEACH, TX (RESTORATION 
PROJECT) 
Restoration and periodic nourishment of 1.4 miles of beach. 
H. Doc. 409, 56th 
Cong., 1st Sess. 
Specified in Act. 
H. Doc. 989, 66th 
Cong., 3rd Sess. 
H. Doc. 403, 77th 
Cong., 1st Sess. 
H. Doc. 634, 79th 
Cong., 2nd Sess. 
H. Doc. 215, 87th 
Cong., 1st Sess. 
H. Doc. 276, 89th 
Cong., 1st Sess. 
PL 98-63 
H. Doc. 415, 91st 
Cong., 2nd Sess. 
(Sec. 201, 
PL 89-298) 
40-39

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
BUFFALO BAYOU AND TRIBUTARIES, TX 
Barker and Addicks Reservoirs, Texas. 
Sep. 3, 1954 
Oct. 27, 1965 
Nov. 28, 1990 
Oct. 12, 1996 
Oct. 12, 1996 
Oct. 12, 1996 
21. Jun. 20, 1938 
23. Aug. 13, 1968 
Nov. 17, 1986 
CLEAR CREEK, TX 
Channel enlargement and rectification from upper end of Clear H. Doc. 351, 90th Cong., 
Lake at Mile 3.8 to improved channel Mile 34.8.28 2nd Sess. 
Modified local cooperation requirements of the 1968 Sec. 1001, PL 99-662 
authorization. 
40-40 
H. Doc. 456, 75th Cong., 
2nd Sess. 
H. Doc. 250, 83rd Cong., 
2nd Sess.' 
H. Doc. 169, 89th Cong., 
1st Sess. 
Sec. 101, PL 101-640 
Sec. 211, PL 104-303 
Sec 350, PL 104-303 
Sec. 575, PL 104-303 
Clearing, straightening, enlarging and lining of Buffalo, Brays, 
and White Oak Bayous. 
Extend upper limits of White Oak Bayou upstream about 2.1 
miles from BRI RR bridge to mouth of Cole Creek. 
Flood damage reduction improvements and recreational 
development for the Houston, Texas urban area, divided into 
six separable elements - Brays, Greens, Hunting, Halls, 
Carpenters and Little White Oak Bayous. Flood control 
improvements consist of 75.3 miles of stream enlargement, 
14 miles of stream clearing, 7 flood detention basins, 7 miles 
of diversion channels and environmental revegetation. 
Recreation features consist of 14.7 miles of trails, 502 picnic 
facilities, 12 group pavilions, 2 boat launching ramps, 10 
restrooms, playgrounds, exercise stations and parking facilities. 
Authorizes non-Federal interests to undertake flood control 
projects in the United States, subject to obtaining any permits 
required pursuant to Federal and State laws in advance 
of actual construction. For the purpose of demonstrating the 
potential advantages and effectiveness of non-Federal implementation 
of flood control projects, the Secretary shall enter 
into agreements pursuant to this section with non-Federal 
interests for development of the following Buffalo Bayou 
projects: Brays Bayou, Hunting Bayou, and White Oak 
Bayou. 
The non-Federal interest for the Buffalo Bayou and tributaries 
authorized flood control projects, may be reimbursed by up 
to $5,000,000 or may receive a credit of up to $5,000,000 
toward required non-Federal project cost-sharing contributions 
for work performed by the non-Federal interest at each 
of the following locations if such work is compatible with 1 
or more of the following authorized projects: White Oak 
Bayou, Brays Bayou, Hunting Bayou, Garners Bayou (not 
authorized), and the Upper Reach of Greens Bayou. 
During any evaluation of economic benefits and costs that occurs 
after October 12, 1996, the Secretary shall not consider 
flood control works constructed by non-Federal interests 
within the drainage area of such projects prior to the date of 
such evaluation in the determination of conditions existing 
prior to construction of the following authorized projects: 
Buffalo Bayou Basin, Buffalo Bayou and Tributaries (Brays, 
Greens, Hunting, Halls, Little White Oak, and Carpenters 
Bayous), and Cypress Creek.

GALVESTON, TEXAS, DISTRICT 
TABLE 40-B AUTHORIZING LEGISLATION 
See Date 
Section Authorizing 
in Text Act Project and Work Authorized Documents 
CYPRESS CREEK, TX 
24. Nov. 17, 1988 Enlargement and rectification of lower 29.4 miles of Cypress Sec. 3, PL 100-676 
Creek channel and recreational development. 
LOWER RIO GRANDE BASIN, TX 
25. Nov. 17, 1986 Channel improvements to provide drainage protection for the Sec. 401, PL 99-662 
area in Hidalgo and Willacy Counties north of U.S. Highway 
83, and for the area between U.S. Highway 83 and the 
Rio Grande in Hidalgo County; and to provide flood protection 
for the cities of McAllen, Edinburg, Raymondville, 
Edcouch, La Villa, and Lyford. 
SIMS BAYOU, TX 
26. Nov. 17, 1986 Enlargement and rectification, with appropriate erosion control Sec. 401, PL 99-662 
measures of 19.31 miles of Sims Bayou; environmental measures 
and riparian habitat along entire alignment, and recreational 
development. 
Sep. 29, 1989 Amended the Water Resources and Development Act (WRDA) Sec. 103, PL 101-101 
of 1986 authorization as project cost estimate had exceeded 
limit established in Section 902 of WRDA 1986. 
1 Contains latest published maps. 
2 Extension of north jetty 1,950 feet and south jetty 
1,265 feet considered inactive. (1975 Deauthorization list) 
3 Dredging 2,000 by 650-foot northerly extension of 
inner basin deauthorized. 
4 Included in Public Works Administration program 
September 6, 1933 and February 16, 1935. 
s West leg of Wye junction with main channel 
deauthorized. 
6 Construction of lock in diversion dam at local 
expense considered inactive. 
7 Dredging upper 1.3 mile of channel to vicinity of 
Stauffer Chemical plant was deauthorized under Sec. 12 of PL 
93-251. Included in Public Works Administration program 
September 6, 1933. (1975 Deauthorization list) 
8 Dredging 43rd to 51st Streets was deauthorized 
under Sec. 12 of PL 93-251. (1975 Deauthorization list) 
9 Deauthorized under Sec. 12 of PL 93-251. (1975 
Deauthorization list) 
10 Deepening 43rd to 57th Streets was deauthorized 
under Sec. 12 of PL 93-251. (1975 Deauthorization list) 
11 Previously authorized September 6, 1933 by Public 
Works Administration. 
12 H. Doc. 230, 76th Cong., 1st Sess. and project 
documents contain latest published maps. 
13 Dredging upper 3.4 miles was deauthorized under 
Sec. 12 of PL 93-251. (1975 Deauthorization list) 
14 Dredging upper 5 miles was deauthorized under 
Sec. 1001 of PL 99-662. 
15 Inactive. 
16 Portion of 16-foot by 150-foot channel from Sabine 
River to Houston Ship Channel is inactive. Relocation of channel 
in Matagorda Bay deauthorized under Sec. 12 of PL 93-251. 
(1986 Deauthorization list) 
17 The 9 feet by 100 feet channel from Mile 8.2 to 
Mile 13.2 in Chocolate Bayou was deauthorized under Sec. 
1001 of PL 99-662. 
18 Construction of pile dike was deauthorized under 
Sec. 12 of PL 93-251. (1975 Deauthorization list) 
19 Hill Street Bridge to mouth of White Oak Bayou 
was deauthorized under Sec. 12 of PL 93-251. (1975 
Deauthorization list) 
20 Deepening channel to 40 feet from Southern Pacific 
Slip (mile 47) to Brady Island was deauthorized under Sec. 12 
of PL 93-251. (1975 Deauthorization list) 
21 The 12-foot channel from mile 1.65 to mile 2.81 
deauthorized under Sec. 12 of PL 93-251. (1985 
Deauthorization list) 
22 Complete widening of channel between Port Arthur 
west turning basin and Taylors Bayou turning basin deauthorized 
by 1962 R&H Act. 
23 Complete deepening of channel between Port 
Arthur west turning basin and Taylors Bayou turning basin 
deauthorized by 1962 R&H Act. 
24 Channel extension above Cow Bayou turning basin 
near Orangefield was deauthorized under Sec. 12 of PL 93-251. 
(1975 Deauthorization list) 
25 Widening to 350 feet entrance channel to Port 
Arthur turning basin deauthorized by 1962 R&H Act. 
26 The 12-foot channel in Sabine River from Orange 
to Echo, Texas deauthorized under Sec. 12 of PL 93-251. (1985 
Deauthorization list) 
27 Jetty extension was deauthorized under Sec. 1001 
of PL 99-662. 
28 Portion of project upstream of Brazoria/Galveston 
County line, approximately mile 18.5, in inactive category. 
29 Cedar Bayou, miles 3 to 11 were deauthorized under 
Sec. 12 of PL 93-251. 
30 Channel to Port Bolivar turning basin was 
deauthorized under Sec. 1001 of PL 99-662. 
40-41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-C OTHER AUTHORIZED NAVIGATION PROJECTS 
For Last Full Cost to September 30, 1999 
Report See 
Annual Report Operation and 
Project For Construction Maintenance 
Aquatic Plant Control (1958 and 1962 River and Harbor Acts) 1967 38,2-2 
Bastrop Bayou, TX2 1931 9,920 27,129 
Corpus Christi, TX, Channel to Navy Seaplane Base Encinal 
Peninsula 1968 1,194,344 26,467 
Dickinson Bayou, TX 1954 33,942 57,553 
East Bay (Hanna Reef), TX3 1922 2,476 847 
Greens Bayou Bridges, TX 1993 450,000 
Johnson Bayou, LA4 1933 2,261 54,042 
Little Bay, TX5 1979 - 252,728 
Oyster Creek, TX 1922 6,942 7,556 
1 Excludes $1,672 work contribution. 
2 Widening from 60 feet to 100 feet at 4-foot depth 
was deauthorized under Sec. 12 of PL 93-25 1. 
3 Inactive category for maintenance. 
4 Channel adequate for existing commerce. 
5 Aransas County Navigation District, Rockport, TX, 
constructed project as authorized by 1950 River and Harbor 
Act (H. Doc. 114, 81st Cong., Ist Sess.) in 1955 under 
Department of Army permit. 
40-42

A 
Project 
Arroyo Colorado, Rio Hondo, TX' 
Buffalo Bayou at Piney Point, TX 2 
Colorado River, Matagorda, TX2 
Falfurrias, TX' 
Freeport and Vicinity, Texas, Hurricane-Flood Protection 2 
Guadalupe River at Victoria, TX2 
Guadalupe River (Remove Log Jams), TX2 
Highland Bayou, TX2 
Kirbyville, TX2 
Lavaca-Navidad River, TX: 
Hallettsville Project 
Port Arthur and Vicinity Hurricane-Flood Protection, TX2 
San Diego Creek, Alice, TX2 
State Highway 111 Bridge, Lake Texana, TX2 
Taylors Bayou, TX2 
Texas City and Vicinity, Texas, Hurricane-Flood Protection 2 
Tranquitas Creek, Kingsville, TX2 
Three Rivers, TX 5 
Upper White Oak Bayou, TX2 
U.S. 190 Bridge, Sabine River, Merryville, LA2 
Vince and Little Vince Bayous, TX2 
For Last Full 
Report See 
,nnual Report 
For 
1986 
1996 
1963 
1995 
1984 
1996 
1978 
1984 
1993 
1961 
1997 
1963 
1995 
1997 
1993 
1956 
6 
1989 
1993 
1993 
Cost to September 30, 1999 
Operation and 
Construction Maintenance 
201,300 
473,8009 
273,757 
103,454 
29,285,0423 
532,18710 
505,749 
12,254,390 
1,484,6134 
256,043 
61,400,292" 
135,175 
214,1555 
37,413,20912 
38,882,400' 
130,239 
5,835,9275 
972,300 
500,0008 
19,307,100 
Inactive. 
2 Completed. 
3 In addition, $8,695,438 expended from contributed 
funds, $1,126,905 estimated value of contributed lands, and 
$2,726,446 for relocations by local interests. 
4 In addition, $1,484,613 expended from contributed 
funds, estimated value of $200,096 for contributed lands, and 
$202,456 for relocations by local interests. 
5 In addition, $71,370 expended from contributed 
funds. 
6 See Annual Report for 1983, Fort Worth District, 
page 16-12.
7 In addition, $14,396,307 expended from contributed 
funds, estimated value of $1,224,219 for contributed lands, and 
contributed work in the amount of $1,070,806 by local interests. 
Work performed at 100% Local Sponsor expense was in the 
amount of $320,347. 
8 In addition, $237,792 expended from contributed 
funds. 
9 In addition, $92,920 expended from contributed 
funds. 
10 In addition, $480,888 expended from contributed 
funds. 
" In addition, $16,976,675 expended from contributed 
funds. 
12 In addition, $12,340,997 expended from contributed 
funds. 
40-43 
TABLE 40-D 
GALVESTON. TEXAS. DISTRICT 
OTHER AUTHORIZED FLOOD CONTROL PROJECTS

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-E OTHER AUTHORIZED ENVIRONMENTAL 
RESTORATION PROJECTS 
For Last Full Cost to September 30, 1999 
Report See 
Annual Report Operation and 
Project For Construction Maintenance 
Laguna Madre Seagrass Restoration, TX ' 1998 225,440 - 
Salt Bayou, McFadden Ranch, TX' 1997 1,754,0003 
1 Completed 
2 In addition $75,146 expended from contributed funds. 
a In addition, $576,877 expended from contributed 
funds and an estimated value of contributed lands in the amount 
of $8,000. 
40-44

TABLE 40-F 
Project 
Baytown 
Brazos River, TX, Velasco to 
Old Washington 
Corpus Christi Ship Ch - 1913 Act Jetty 
GIWW, Harbor Refuge at Seadrift 
Liberty Local Protection Project, TX 
Mill Creek Brazos River, Austin Co. 
1946 Act 
Navidad & Lavaca Rivers, Jackson 
and Lavaca Counties- General 
Channel Project 
Peyton Creek, TX 
Sabine River and Tributaries, TX 
(Echo to Morgan Bluff) 
GALVESTON, TEXAS, DISTRICT 
DEAUTHORIZED PROJECTS 
For Last Full 
Report See Date 
Annual Report and 
For Authority 
1980 Sec. 1001 of PL 99-662 
1924 Sec. 1001 of PL 99-662 
17 Nov 1986 
Sec. 1001 of PL 99-662 
19 Jul 1992 
1978 Sec. 1001 of PL 99-662 
19 Jul 1992 
1971 Sec. 1001 of PL 99-662 
17 Nov 1986 
1952 Sec. 1001 of PL 99-662 
1 Jan 1990 
1952 Sec. 1001 of PL 99-662 
1 Jan 1990 
1975 Sec. 1001 of PL 99-662 
17 Nov 1986 
1971 Sec. 1001 of PL 99-662 
17 Nov 1986 
Includes $123,676 for previous projects. 
40-45 
Federal 
Funds 
Expended 
245,000 
216,989' 
Contributed 
Funds 
Expended 
223,010 
79,041 
98,517 
24,753 
21,086 
66,377

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-G TOTAL COST OF EXISTING PROJECTS 
See Total Cost 
Section to 
in Text Project Funds New Work Maintenance Rehabilitation Sep. 30, 1999 
2. Brazos Island Harbor, TX 
3. Cedar Bayou, TX 
4. Channel to Port 
Bolivar, TX 
6. Corpus Christi Ship 
Channel, TX 
8. Freeport Harbor, TX 
9. Galveston Harbor and 
Channel, TX 
10. Gulf Intracoastal Waterway 
between Apalachee Bay, FL 
and the Mexican Border 
11. Houston Ship Channel, TX 
Regular 
Public Works 
Contributed 
Total cost of project 
Regular 
Contributed 
Total cost of project 
Regular 
Contributed 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Contributed land 
Total cost of project 
Regular 
Public Works 
Contributed 
Total 
Value of useful work 
performed 
Total cost of project 
Regular 
Channel 
Seawall 
Public Works 
Contributed 
Total cost of project 
Regular 
Public Works 
Inland WW. Trust Fund 
Contributed 
Total 
Value of useful work 
performed 
Contributed land 
Total cost of project 
Regular 
Public Works 
Contributed 
Total cost of project 
24,346,787 
2,848,560 
10,500,076 
37,695,423 
642,176
0 
642,176 
85,214
0 
85,214 
75,775,642 
324,287 
6,143,152 
82,243,849 
1,716,695 
276,720 
84,237,264 
64,472,222 
116,575 
20,811,568 
85,395,796 
360,249 
85,756,045 
11,920,187 
8,754,209
0 
3,648,932 
24,323,328 
132,471,011 
466,477 
28,634,106 
4,920,904 
166,492,498 
395,000 
139,776 
167,027,274 
29,042,293 
2,612,932 
1,382,760 
33,037,985 
2,170,080
0
0 
2,170,080 
60,546,823
0 
1,352,092 
61,898,915 
3,995,112
0 
3,995,112 
1,197,080
0 
1,197,080 
124,900,296
0 
1,057,677 
125,957,973
0
0 
125,957,973 
79,776,181
0 
229,311 
80,005,492
0 
80,005,492 
111,436,516 
512,163 
13,121 
2,963,102 
114,924,902 
459,420,269
0
0 
1,120,477 
460,540,746
0
0 
460,540,746 
189,204,758
0 
426,583 
189,631,341 
3,576,684
0
0 
3,576,684
0
0 
3,576,684 
8,935
0
0 
8,935
0 
8,935 
7,373,356 
595,973
0
0 
7,969,329 
3,390,338
0 
2,955,700
0 
6,346,038
0
0 
6,346,038 
87,063,690 
2,848,560 
11,852,168 
101,764,418 
4,637,288
0 
4,637,288 
1,282,294
0 
1,282,294 
204,252,622 
324,287 
7,200,829 
211,778,506 
1,716,695 
276,720 
213,771,921 
144,257,338 
116,575 
21,040,879 
165,410,223 
360,249 
165,770,472 
130,730,059 
9,862,345 
13,121 
6,612,034 
147,217,559 
595,281,618 
466,477 
31,589,806 
6,041,381 
633,379,282 
395,000 
139,776 
633,914,058 
218,247,051 
2,612,932 
1,809,343 
222,669,326 
40-46

GALVESTON, TEXAS, DISTRICT 
TABLE 40-G TOTAL COST OF EXISTING PROJECTS 
See Total Cost 
Section to 
in Text Project Funds New Work Maintenance Rehabilitation Sep. 30, 1999 
15. Sabine-Neches Waterway, TX Regular 49,592,331 232,636,679 0 282,229,010 
Public Works 1,363,652 0 0 1,363,652 
Contributed 2,103,435 5,169,188 0 7,272,623 
Total 53,059,418 237,805,867 0 290,865,285 
Value of useful work 
performed 32,000 0 0 32,000 
Contributed land 116,760 0 0 116,760 
Total cost of project 53,208,178 237,805,867 0 291,014,045 
16. Texas City Channel, TX Regular 14,653,853 32,624,533 726,158 48,004,544 
Public Works 136,296 0 0 136,296 
Contributed 1,023,819 0 0 1,023,819 
Total cost of project 15,813,968 32,624,533 726,158 49,164,659 
17. Trinity River and Regular 73,286,509 22,486,190 0 95,772,699 
Tributaries, TX Contributed 66,000 0 0 66,000 
Total cost of project 73,352,509 22,486,190 0 95,838,699 
40-47

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-H CHANNEL DIMENSIONS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet Feet 
See (Below (Below Bottom 
Section Mean Low Bottom Mean Low Width Length 
in Text Project Section of Waterway Tide) Width (Feet) Tide) (Feet) Feet Miles 
2. Brazos Island 
Harbor, TX 
Outer Bar and Jetty Channel 
Padre Island to Long Island 
Long Island to Goose Island 
Goose Island to Turning 
Basin Extension 
Turning Basin Extension 
Brownsville Turning Basin 
Port Isabel Channel via East 
Turnout 
West Wye, from Brownsville 
Channel 
Port Isabel Turning Basin 
Fishing Boat Harbor: 
West Basin 
Middle Basin 
East Basin 
Connecting Channel 
Entrance Channel 
3. Cedar Bayou, Houston Ship Channel to Bayou 
TX Mile 3.0 
Bayou Mile 3.0 to Mile 11.07 
4. Channel to Port Bolivar Channel 
Port Bolivar, TX Turning Basin 
5. Clear Creek and 
Clear Lake, 
TX 
6. Corpus Christi 
Ship Channel, 
TX 
Galveston Bay to Clear Creek 
North Fork Channel 
Channel through Clear Creek and 
Clear Lake 
Aransas Pass Outer Bar 
Channel 
Aransas Pass Jetty Channel 
Inner Basin at Harbor Island 
Channel to Port Aransas 
Port Aransas Turning Basin 
Anchorage Basin at Port 
Aransas 
Inner Basin to Mile 8.5 
Mile 8.5 to LaQuinta 
Junction 
LaQuinta Junction to Corpus 
Christi Turning Basin 
Corpus Christi Turning Basin 
Industrial Canal 
Avery Point Turning Basin 
Channel to Chemical 
Turning Basin 
Chemical Turning Basin 
Tule Lake Channel 
Tule Lake Turning Basin 
Viola Channel 
Viola Turning Basin 
Channel to LaQuinta 
LaQuinta Turning Basin 
Turning Point at LaQuinta 
Channel Junction 
Jewel Fulton Canal 
Jewel Fulton Turning Basin 
Mooring Area at Ingleside: 
Mooring Area (a) 
Mooring Area (b) 
44 
42 
42 
42 
42 
36 
36 
36 
36 
15 
15 
15 
15 
15 
10 
10 
30 
30 
44 
42 
42 
42 
42 
36 
36 
400 
250 
250 
300 
325 
1,200 
200 
200 
200-1,000 
370-305 
370-305 
370 
270 
100 
100 
100 
200 
7501 
75 
60 
60 
47 700 
45 600-730 
45 730-1,720 
12 100-150 
12 200-4002 
12 300-400 
45 600-500 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
45 
12 
12 
45 
45 
40-48 
500 
400 
800 
400 
975 
400 
1,2005 
300 
1,200 
300-350 
1,200 
300-400 
1,200 
1,2503 
100 
200 
150 
150 
400 
250 
250 
300 
375 
660-1,200 
200 
36 200 
36 200-1,000 
15 370-305 
15 370-305 
15 370 
15 265 
15 100 
10 
30 
14 
77 
7 
47 
45 
45 
12 
12 
12 
45 
45 
40-45 
45 
45 
45 
45 
45 
40 
40 
40 
40 
45 
45 
45 
12 
12 
45 
100 
200 
200 
75 
60 
60 
700 
600 
Irregular 
100 
2002 
300-400 
600-500 
500 
400 
1,000 
400 
1,000 
350 
1,0505 
200 
900 
200-250 
700-900 
300-400 
1,200 
1,2503 
100 
200 
150 
2.5 
2.1 
9.6 
3.2 
1.3 
2,670 0.5 
1.4 
0.8 
1,300 0.2 
1,470 0.3 
1,200 0.2 
1,470 0.3 
1,230 0.2 
770 0.1 
5.7 
900 0.2 
1.5 
0.7 
7.7 
1.8 
1.0 
1,550 
0.1 
200 
900 
5,423 
1,150 
0.2 
8.5 
3.6 
8.6 
1.0 
1.1 
0.2 
0.6 
1,690 0.3 
3.1 
1,000 0.2 
1.8 
1,000 0.2 
5.6 
800 0.1 
1,250 0.2 
- 0.8 
400 0.1 
- 0.8

TABLE 40-H 
GALVESTON, TEXAS, DISTRICT 
CHANNEL DIMENSIONS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet Feet 
See (Below (Below Bottom 
Section Mean Low Bottom Mean Low Width Length 
in TextProject Section of Waterway Tide) Width (Feet) Tide) (Feet) Feet Miles 
7. Double Double Bayou Channel: 
Bayou, TX Mouth to 7-foot contour in 
Trinity Bay 
West Fork 
8. Freeport Outer Bar Channel 
Harbor, TX Jetty Channel 
Quintana Turning Basin 
Channel to Brazosport 
Turning Basin 
Brazosport Turning Basin 
Channel to Upper Turning 
Basin 
Upper Turning Basin 
47 
45 
45 
125 
100 
400 
400 
7504 
45 400 
45 1,0004 
45 285-375 
45 1,2004 
125 - 3.9 
100 - 2.0 
47 
45 
300 - 
200 - 
45 390 
45 1000 
3.0 
0.8 
- 1.2 
667 0.1 
45 285-375 - 1.4 
45 12004 800 0.1 
9. Galveston 
Harbor and 
Channel, TX 
12. Houston Ship 
Channel, TX 
Channel to Stauffer Chemical 
Plant 
Stauffer Turning Basin 
Brazos Harbor Channel 
Brazos Harbor Turning 
Basin 
Entrance Channel 
Outer Bar Channel 
Inner Bar Channel 
Anchorage Basin 
Bolivar Roads Channel 
Bolivar Roads Channel to 
43rd St. 
Bolivar Roads to Morgan 
Point 
Morgan Point to Boggy 
Bayou 
Boggy Bayou to Greens 
Bayou 
Greens Bayou to Sims Bayou 
Hunting Bayou Turning 
Point 
Clinton Island Turning 
Basin 
Sims Bayou to Southern 
Pacific Slip 
Southern Pacific Slip to 
Houston Turning Basin 
Houston Turning Basin 
Upper Turning Basin 
Brady Island Channel 
Barbour Terminal Channel 
Turning Basin 
Bayport Ship Channel 
Turning Basin 
Anchorage Area 
Five-Mile Cut Channel 
Light-Draft Channel: 
Upper Turning Basin to 
Jensen Drive 
Turkey Bend Channel 
Greens Bayou Channel: 
Mile 0 to Mile 0.36 
Mile 0.36 to Mile 1.57 
500 
1.1 
0.1 
0.5 
200 
500 
200 
7504 
800 
800 
800 
2,875' 
800 
1,125 
30 
25 
30 
30 
42 
42 
40 
36 
40 
40 
40 
40 
40 
40 
40 
40 
40 
36 
36 
36 
10 
40 
40 
40 
40 
40
8 
30 
30 
36 
36 
52 
52 
50 
36 
50 
40 
40 
40 
40 
40 
40 
40 
40 
36 
36 
36 
10 
40 
40 
40 
40 
40 
8 
10 
10 
40 
15 
200 
500 
200 
7504 
800 
800 
800 
2,875 
800 
1,125 
400 
400 
300 
300 
948-1,0009 
965-1,0709 
300 
300 
400-1,000 
150 
60 
300 
2,000 
300 
1,600 
150 
125 
60 
60 
175 
100 
400 
400 
300 
300 
900-1,0009 
8009 
300 
300 
400-1,000 
150 
60 
300 
2,000 
300 
1,600 
150 
125 
675 0.1 
- 4.7 
- 1.7 
- 3.2 
- 1.8' 
- 1.0 
- 3.9 
- 26.2 
- 12.8 
- 2.4 
- 5.3 
1,375 
1,592
- 0.6 
- 2.9 
3,100 0.6 
1,000 0.2 
- 0.9 
- 3.1 
2,000 0.4 
- 3.8 
1,000 0.3 
- 1.9 
- 4.1 
- 0.8 
- 0.3 
- 1.3 
60 
60 
175 
100 
10 
10 
40 
15 
40-49

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-H CHANNEL DIMENSIONS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet Feet 
See (Below (Below Bottom 
Section Mean Low Bottom Mean Low Width Length 
in TextProject Section of Waterway Tide) Width (Feet) Tide) (Feet) Feet Miles 
13. Matagorda Ship 
Channel, TX 
15. Sabine-Neches 
Waterway, TX 
Outer Bar and Jetty Channel 
Channel to Point Comfort 
Approach Channel to 
Turning Basin 
Turning Basin 
Channel to Port Lavaca 
Lynn Bayou Turning Basin 
Channel to Harbor of Refuge 
North-South Basin 
East-West Basin 
Channel to Red Bluff 
Sabine Bank Channel 
Sabine Pass Outer Bar 
Channel 
Sabine Pass Jetty Channel 
Sabine Pass Anchorage 
Basin 
Sabine Pass Channel 
Port Arthur Canal 
Entrance to Port Arthur 
Turning Basins 
Port Arthur East Turning 
Basin 
Port Arthur West Turning 
Basin 
Channel connecting Port 
Arthur West and Taylors 
Bayou Turning Basins 
Taylors Bayou Turning Basin 
Sabine-Neches Canal, Port 
Arthur Canal to Neches 
River 
Turning Point at Mile 19.5 
Neches River, Mouth to 
Maneuvering Area Beaumont 
Turning Basin 
Turning Point, Mile 31.1 
Turning Point, Mile 36.6 
Turning Point, Mile 40.3 
Channel Extension, Mile 40.3 
Maneuvering Area at 
Beaumont Turning Basin 
Beaumont Turning Basin 
Beaumont Turning Basin 
Extension 
Beaumont Turning Basin 
Extension to End of Project 
Channel Vicinity 
Bethlehem Steel Company 
Sabine-Neches Canal, Neches 
River to Sabine River 
Sabine River Channel, Mouth 
to Foot of Green Ave. 
Orange Turning Basin 
Orange Municipal Slip 
Old Channel Around Harbor 
Island 
Channel to Echo7 
Adams Bayou 
Cow Bayou 
Orangefield Turning Basin 
38 
36 
36 
36 
12 
12 
12 
12 
12 
6 
42 
42 
40 
40 
40 
40 
40 
40 
40 
300 
300-2006 
200-300 
1,000 
125 
27-340 
125 
300 
250 
100 
800 
800 
800-500 
1,500 
500 
500 
275-678 
420 
600 
38 
36 
36 
36 
12 
12 
12 
12 
12 
6 
42 
42 
40 
40 
40 
40 
40 
40 
40 
40 200-250 
40 150-1,000 
40 
40 
40 
40 
40 
40 
36 
40 
34 
34 
30 
30 
30 
30 
30 
25 
12 
12 
13 
13 
400 
9004 
400 
1,0004 
1,0004 
1,0004 
350 
Irregular 
500 
350 
200 
200 
200 
Irregular 
200 
150-200 
125 
100 
100 
300 
300 
300-2006 
200-300 
1,000 
125 
27-340 
125 
300 
250 
100 
800 
800 
800-500 
1,500 
500 
500 
275-678 
370-547 
350-550 
40 200-250 
40 90-1,233 
40 400 
40 9004 
40 
40 
40 
40 
36 
40 
34 
34 
400 
1,000 
1,000 
1,300 
350 
Irregular 
160-535 
300 
30 200 
30 
30 
30 
30 
25 
12 
13 
13 
200 
200 
Irregular 
150-200 
150-200 
100 
100 
300 
40-50 
- 3.2 
- 20.9 
- 1.1 
1,000 0.2 
- 4.1 
532 0.1 
- 1.9 
1,682 0.3 
1,750 0.3 
- 20.2 
- 14.7 
- 3.4 
- 4.1 
3,000
-
- 
5.6 
6.2 
- 0.3 
1,765 0.3 
1,610 0.3 
- 0.6 
3,470 0.7 
- 11.2 
8 
- 18.3 
700 8 
930 8 
1,530 8 
1,265 0.2 
1,300 0.2 
1,500 0.3 
- 0.4 
- 0.7 
- 4.4 
- 9.5 
1,550 0.3 
2,435 0.5 
2.4 
1.7 
7.0 
500 0.1

GALVESTON, TEXAS, DISTRICT 
TABLE 40-H CHANNEL DIMENSIONS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet Feet 
See (Below (Below Bottom 
Section Mean Low Bottom Mean Low Width Length 
in TextProject Section of Waterway Tide) Width (Feet) Tide) (Feet) Feet Miles 
16. Texas City Texas City Channel 50 600 40 400 - 6.8 
Channel, TX Turning Basin 50 1,000-1,200 40 1,000 4,253 .8 
Industrial Barge Canal:' � 
Channel from Texas City 
Turning Basin to Mile 1.7 40 300-400 - - - - 
Turning Basin 40 1,000 - - - - 
17.. Trinity River Multiple Purpose Channel 
Channel, TX to Fort Worth" 12 200 - - - - 
Channel to Liberty' 2 9 150 6 100 - 41.4 
Anahuac Channel 6 100 6 100 - 5.8 
Average. 
Includes 100-foot channel width. 
Includes 450-foot channel to Corpus Christi. 
Diameter. 
Includes 350-foot channel width. 
300-foot width through Matagorda Peninsula. 
Deauthorized. 
Included in channel length. 
Includes 300-foot channel width. 
10 Channel dredged 34 feet deep by 250-200 feet wide 
by 9,908 feet long and basin 34 feet deep by 1,000 feet wide by 
1,150 feet long by local interests. 
1" Not constructed. 
12 9-foot by 150-foot channel completed from Houston 
Ship Channel to a point one mile below Anahuac, a distance of 23 
miles. Upper end not connected to river channel to prevent salt 
intrusion into river. River channel maintained at 6 by 100-foot 
from mouth to Liberty, Texas. 
40-51

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
GULF INTRACOASTAL WATERWAY 
APALACHEE BAY, FLORIDA TO MEXICAN BORDER 
EXISTING PROJECT DIMENSIONS, PROVIDED 
TABLE 40-I FOR IN TRIBUTARY CHANNELS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet (Below Bottom Feet (Below 
Mean Low Width Mean Low Bottom Length 
Tributary Channel 
Offats Bayou 
Main Channel 
West Wye 
Chocolate Bayou Channel 
12-Foot Channel via 
East Turnout 2 
West Turnout 
9-Foot Channel 4 
Turning Basin 
San Bernard River Channel 5 
Colorado River Channel 6 
Turning Basin 
Silting Basin 
Mouth of Colorado River 
Navigation Channel, GIWW to Gulf 
Turning Basin at Matagorda 
Channel to Palacios 8 
Turning Basin No. 1 
Turning Basin No. 2 
Connecting Channel 
Channel to Barroom Bay 9 
Channel to Victoria Main Channel via 
East Turnout 
Turning Basin 
West Turnout Channel 
Channel to Seadrift via South Turnout 
Turning Basin 
North Turnout Channel 
Harbor of Refuge at Seadrift Channel 
Basin 
Channel to Rockport 
Turning Basin 
Channel to Aransas Pass 
Turning Basin 
Channel to Conn Brown Harbor 
Conn Brown Harbor 
Channel to Port Mansfield 10 
Entrance Channel 
Approach Channel to Hopper Dredge 
Turning Basin 
Hopper Dredge Turning Basin 
Channel Across Padre Island and 
Laguna Madre 
Turnout Channels, East Side of Main 
Channel, GIWW 
North Turnout 
South Turnout 
Channel West Side of Main Channel, 
GIWW, to P.T. of Turnout Channels 
Turnout Channels, West Side of Main 
Channel, GIWW 
North Turnout 
South Turnout 
Channel from P.T. of Turnout Channels to 
Approach 
Channel to Main Turning Basin 
Approach Channel to Main Turning Basin 
Main Turning Basin 
Turning Basin Extension 
Small Craft Basin 
Shrimp Basin 
Tide) (Feet) Tide) Width (Feet eet Miles 
12 
12 
12 
12
999999 
15-12 
12 
12 
12 
12 
12 
12 
12 
12 
12
99999
99 
14 
14 
14 
14 
16 
16 
16 
14 
12 
12 
14 
12 
12 
14 
14 
14 
14
8 
12 
12 125 
12 125 
12 125 
12 125 
125 
125 
125 
125 
100 
600 
100 
100 
400 
150 
100-200-300 
350 
125 
200 
300 
150-480 
60 
125 
6 0 0 
(AVG) 
125 
100 
250 
100 
100 
200 
200 
475 
175 
300 
125 
300 
250 
100 
300 
100 
100 
100 
100 
200 
200 
125 
200 
400 
1,000 
160 
350 
100 
100 
400 
150 
100-200-300 
125 
200 
300 
130-400 
125 
500(AVG) 
125 
100 
200 
100 
200 
342(AVG) 
125-175 
300 
0.2 
300 
16 250 
16 100 
16 300 
14 100 
12 100 
12 100 
14 100 
12 200 
12 200 
14 
14 
14 
14
8 
12 
125 
200 
400 
1,000 
160 
350 
2,200 
500 
635 
1,130 
2.3 
0.4 
8.2 
0.8 
26.0 
15.5 
0.1 
1.0 
16.1 
0.1 
0.2 
0.1 
- 34.8 
800(AVG) 0.1 
- 0.8 
- 2.0 
230
- 0.5 
- 2.1 
1,225 0.2 
- 6.1 
2,212 0.4 
125 
1,800 0.3 
0.8 
0.4 
300 0.1 
7.7 
- 0.6 
- 0.6 
- 0.6 
- 0.6 
- 0.6 
1,250 
580 
860 
1,450 
0.6 
0.3 
0.2 
0.1 
0.2 
0.3 
9999 
15-20 
12 
12 
12 
12 
12
9 
12
999 9
9 
14 
14 
14 
14 
40-52

GALVESTON, TEXAS, DISTRICT 
GULF INTRACOASTAL WATERWAY 
APALACHEE BAY, FLORIDA TO MEXICAN BORDER 
EXISTING PROJECT DIMENSIONS, PROVIDED 
TABLE 40-I FOR IN TRIBUTARY CHANNELS 
Adopted Project 
Dimensions Improved Project Dimensions 
Depth in Depth in 
Feet (Below Bottom Feet (Below 
Mean Low Width Mean Low Bottom Length 
Tributary Channel Tide) (Feet) Tide) Width (Feet) Feet Miles 
Channel to Harlingen via South Turnout 
from Main Channel, GIWW 12 125 12 12511 - 25.812 
Turning Basin near Rio Hondo 12 400 12 400 500 0.1 
North Turnout from Main Channel 12 200 12 200 - 0.7 
Port Isabel Side Channels 
Main Channel 12 125 12 125-90 - 0.6 
Main Channel 12 233-60 12 233-60 - 0.4 
South Leg 12 125 12 125 - 0.2 
Port Isabel Small Boat Harbor 
Entrance Channel 7 75 7 75 - 1.4 
Harbor Channel 6 50 6 50 - 0.3 
Boat Basin 6 Variable 6 72-501 1,308 0.2 
1 Includes the construction of a salt water barrier at 
Mile 16.9. 
2 Constructed 10 feet deep by 100 feet wide by local 
interests. East turnout channel constructed 150 feet wide. 
3 Constructed by local interests. 
4 Authorized to mile 13.2. Mile 8.2 to Mile 13.2 was 
deauthorized. 
s Authorized to Mile 31 above mouth (channel mile 
29.41). Upper 3.4 miles was deauthorized under Section 12 of PL 
93-251. 
6 Includes a discharge channel from Matagorda, Texas, 
to the gulf which was dredged by local interests in 1939. 
(Maintenance will be discontinued upon completion of 
improvements authorized by R&H Act of 1968.) 
7 Authorized by R&H Act of 1968. Also provides for 
a dam across the present discharge channel, a new 250-foot wide 
by 20 to 23-feet deep discharge channel into Matagorda Bay, and 
a 15-foot by 200-foot wide entrance channel with parallel jetties 
from the gulf shoreline into the Gulf of Mexico. East jetty to be 
3,500 feet long and west jetty 2,900 feet long. 
' Includes two protective breakwaters at entrance to 
turning basins. 
9 In the inactive category for maintenance. 
10 Also provides for two stone jetties at the gulf entrance 
about 1,000 feet apart. (North jetty constructed 2,300 feet long 
and south jetty constructed 2,270 feet long.) 
" South turnout is 200 feet wide. 
12 Authorized to mile 31. Mile 25.8 to Mile 31 was 
deauthorized. 
40-53

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-J DREDGING OPERATIONS 
See Cubic 
Section Yards of 
in Text Project Description Period Materials FY 99 Cost 
2. Brazos Island Harbor, TX 
(Maintenance) 

Dredging Brownsville 
Ship Channel 

January 31, 1999 to
March 2, 1999 

691.337 

$2.990.594

3. Cedar Bayou, TX 
(Maintenance)

Dredging Cedar Bayou 
Channel 

June 25, 1999 to 
September 30, 1999 

337,100 

$500,000
 
6. Corpus Christi Ship Channel, TX 
(Maintenance) 

Dredging Beacon 82 thru 
Viola Turning Basin 

October 1, 1998 to 
October 31, 1998 

489,817

$837,662  

Dredging Inner Basin to 
Beacon 82 

December 23, 1998 to 
August 3, 1999

3,511,074 

$2,758,441

Dredging Entrance Channel 

June 2, 1999 to 
July 11, 1999

1,417,492

$2,397,113

Dredging Corpus Christi 
Channel 

October 1, 1998 to 
November 30, 1998

9000 

$207,450 

5. Freeport Harbor, TX 
(Maintenance) 

Dredging Inside Channels, 
Freeport Harbor 

October 1, 1998 to 
March 11, 1999

1,972,627

$2,653,963

Dredging Entrance and 
Jetty Channels

October 1, 1998 to 
February 14, 1999 

1,623,436

$2,572,780 
 
Dredging Freeport 
Entrance Channel 

September 10, 1999 to 
September 30, 1999

0 

$148,969

Dredging Entrance and 
Jetty Channels 

September 23, 1998 to 
September 30, 1998

711,000 

$300,000


10. Gulf Intracoastal Waterway, TX 
Channel to Victoria 
(New Work)
 
Dredging Channel to Victoria 
Stations 600+00 to 835+00 


 
October 1, 1998 to 
September 30, 1999 

306,977 

$2,500,476

Dredging Channel to Victoria 
Stations 835+00 to 1300+00
 
May 28, 1999 to September 30, 1999 

0 

$1,107,540

GIWW- Main Channel 
(Maintenance) 

Dredging Port Isabel to 
Arroyo Colorado
 
October 1, 1998 to 
November 16, 1998 

523,000 

$1,492,465 

Dredging GIWW Main Channel 
across Aransas Bay 

October 1, 1998 to 
January 19, 1999 

1,071,026

$725,306 

Dredging Brazos River 
Crossing to Boggy Bayou 

July 21, 1997 to 
June 29, 1998 

1,551,473

$395,777 

Dredging GIWW Main 
Channel in Matagorda Bay, 
Corpus Christi Bay to 
Mud Flats and Port 
Mansfield Channel 

February 5, 1999 to 
May 28, 1999 

904,156 

$1,581,919 

Dredging GIWW, Turnstake 
Island to Rattlesnake Island
 
May 14, 1999 to 
September 30, 1999 

1,217,979 

$867,140 


40-54
TABLE 40-J 
 
 
GIWW- Main Channel 
(Maintenance)

Dredging Freeport Harbor to 
Brazos River Crossing 


December 28, 1998 to July 21, 1999

1,884,838

$2,861,115


Dredging Boggy Bayou to 
Colorado River

October 16, 1998 to September 30, 1999

2,008,938

$5,522,000

Dredging Channel to 
Palacios 

Novermber 30, 1998 to January 28, 1999

2,397,471

$1,210,824


Dredging GIWW and 
Barge Mooring Facility 


December 23, 1998 to August 3, 1999

129,572

$364,963


Dredging Colorado River 
to Matagorda Bay 

September 23, 1999 to September30, 1999

0

$10,000


Dredging High Island to 
Bolivar


September 23, 1999 to September 30, 1999

0

$10,000


Dredging GIWW, Port 
O'Connor to San Antonio 
Bay 


September 29, 1999 to September 30, 1999

0

$20,000

 
Channel to Port Mansfield 
(Maintenance) 


Dredging Port Mansfield


February 5, 1999 to May 28, 1999


84,278

$135,794


Dredging Port Mansfield 
Entrance Channel 


April 5, 1999 to June 14, 1999

230,962

$1,391,714



Mouth of Colorado River 
(Maintenance)


Dredging Mouth of Colorado 
River with Boggy Bayou 

October 16, 1998 to September 30, 1999

749,023

$1,542,987
 
Chocolate Bayou 
(Maintenance)

Dredging Chocolate 
Bayou 


May 18, 1999 to September 30, 1999

72,000

$500,000
 
Houston-Galveston 
Navigation Channels, TX 
(New Work) 

Dredging Entrance Channel 


October 1, 1998 to September 30, 1999

3,271,463

$8,256,265


Dredging Lower Bay

October 1, 1999 to September 30, 1999

3,636,553

$5,497,840


Dredging Upper Bayou 

October 26, 1999 to September 30, 1999

689,154

$3,935,534


Dredging Jetty and Entrance 
Channel 

April 29, 1999 to September 30, 1999

272,597

$1,934,900

Houston Ship Channel, TX 
(Maintenance) 

Dredging Lower Bay, 
(O&M portion) 

October 1, 1998 to September 30, 1999

141,176

$600,000


Dredging Jetty and Entrance 
Channel (O&M portion)

April 29, 1999 to September 30, 1999

86,043

$232,315 



 




40-55

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 40-J DREDGING OPERATIONS 
See Cubic 
Section Yards of in Text Project Description Period Materials FY 99 Cost 


Houston Ship Channel, TX 
(Maintenance) 

Dredging Sims Bayou to 
Greens Bayou with 
Extension to Boggy Bayou Basin  

February 23, 1999 to September 30, 1999

203,635

$1,050,000

Barbour Terminal Channel 
(Maintenance)


Dredging Barbour .Terminal 
Channel Cut

February 12, 1999 to March 16, 1999

78,000

$623,887

 
Bayport Ship Channel 
(Maintenance) 


Dredging Bayport . Ship 
Channel 

February 22,1999 to June 21, 1999

2,411,910

$3,106,625


 
Matagorda Ship Channel, TX 
(Maintenance) 


Dredging Matagorda Peninsula to Point Comfort

October 1,1998 to June 12, 1999

3,856,997

$1,875,918


 
Dredging Matagorda 
Entrance Channel

July 16, 1999 to August 4, 1999

590,740

$1,053,153
 
Sabine-Neches Waterway, TX 
(Maintenance) 

Dredging Sabine Pass, Jetty 
Channel and Outer Bar 
Channel 

October 1, 1998 to October 7, 1998

1,501,000

$928,030


Dredging Neches River 
Lower Reach in 
Orange and Jefferson 
Counties

July 16, 1999 to September 30, 1999

0

$250,000


Dredging Sabine Pass 
Channel 

January 4, 1999 to July 31, 1999

2,102,577

$2,056,620


Dredging Port Arthur Canal, 
Junction Area, and Turning 
Basin 

February 1, 1999 to September 30, 1999

2,743,554

$3,131,947


 Texas City Channel, TX 
(Maintenance)



Dredging Texas-City 
Channel Turning Basin 
Industrial Canal


October 1, 1998 to April 30, 1999

2,077,276

$3,339,695
 
Trinity River and 
Tributaries, TX 
(Maintenance) 
 


 
Emergency Dredging Channel 
to Liberty, Smith Point

October 1, 1998 to March 6, 1999 

0

$107,450













1 In addition $48,498 expended from contributed funds. 
2 Partial cost incurred in FY 99 for mobilization.. 
3 In addition $277,831 expended from contributed 
4 In addition $123,060 expended from contributed 
5 In addition $75,887 expended from contributed funds. 
6 An estimated expense for mobilization was entered 
7 In addition $406,800 expended from contributed 
funds. 
funds. 
UIndiin . $..1 ,0,21 xpndd ro. cntibte 
1t In addition $1,507,241 expended from contributed 
i i In addition $740,499 expended from contributed 
12 An estimated expense for mobilization, levees, spills 
and ditches was entered. In addition $164,780 expended from 
contributed funds. 
'3 In addition $301,467 expended from contributed 
funds. 
14 An estimate of 70,000 cubic yards was reported in 
FY 98, the actual cubic yards were 56,335. 
8 In addition $1,378,906 expended from contributed 
9 In addition $5,497,840 expended from contributed 
40-56 
funds. 
funds. 
in FY 99. 
funds. 
funds. 
funds.

MISSISSIPPI RIVER COMMISSION* 
The Mississippi River Commission (MRC) was 
created by an act of Congress on Jun. 28, 1879. The 
Flood Control Act of May 15, 1928, authorized the 
Flood Control, Mississippi River and Tributaries 
(MR&T) Project. The Commission consists of three 
officers of the Corps of Engineers, one from the former 
Coast and Geodetic Survey (presently the National 
Oceanic and Atmospheric Administration), and three 
civilians, two of whom must be civil engineers. All 
members are appointed by the President with the advice 
and consent of the Senate. 
During the fiscal year the Commissioners were: 
MG Phillip R Anderson, President Designee, Jul. 1997; 
Mr. Sam E. Angel, member designee; Mr. R. D. James, 
civil engineer, appointed Dec. 1, 1981; Mr. William 
Clifford Smith, appointed Oct. 22, 1998; BG Carl 
Strock, Commander Northwestern Division, member 
designee; RADM John C. Albright, member, NOAA, 
retired May 99; BG Robert H. Griffin, Commander, 
Great Lakes and Ohio River Division, member designee; 
RADM Nicholas Prahl, NOAA, member designee; and 
COL William David Brown served as Secretary of the 
Commission. 
The MRC is charged, under direction of the 
Secretary of the Army and supervision of the Chief of 
Engineers, with prosecution of improvements for flood 
control of the Mississippi River and of its tributaries and 
outlets in its alluvial valley, so far as they are affected by 
Mississippi River backwater, between Head of Passes, 
LA (mile 0), and Cape Girardeau, MO (1,006 miles 
AHP-Lower Mississippi mileage terminates at mile 954 
AHP), and with prosecution of improvements in the 
interest of navigation between Cairo, IL (954 miles 
AHP), and Baton Rouge, LA (234 miles AHP); and for 
stabilization of the lower 7 miles of the right bank of the 
Ohio River, to former mouth of Cache River. It also is 
charged with prosecution of certain flood control works 
on the Mississippi River and tributaries, as far as they 
are affected by backwater, between Cape Girardeau, MO, 
and Rock Island, IL (1,437 miles AHP), and with 
prosecution of improvements on designated tributaries 
and outlets below Cape Girardeau for flood control, 
navigation, major drainage, and related water uses. 
Authorized operations of the Commission below 
Cape Girardeau are conducted by District Engineers of 
New Orleans, Vicksburg, and Memphis Districts within 
the areas described below, in accordance with approved 
directives and programs and congressional 
appropriations therefore. 
New Orleans District: Mississippi River project 
levees and river channel stabilization as required from 
Head of Passes, mile 0 to 320 AHP, construction of three 
salinity-control structures for fish and wildlife 
enhancement, two in lower Mississippi River Delta 
region, and one in the Mississippi- Louisiana Estuarine 
Area; Bonnet Carre and Morganza Floodways; 
maintenance and improvements of Mississippi River 
navigation channel from Baton Rouge, LA (mile 
234 AHP), to mile 320; Baton Rouge Harbor (Devils 
Swamp); navigation improvement of Atchafalaya and 
Old Rivers from Mississippi River to Morgan City; 
control of Old and Atchafalaya Rivers; Atchafalaya 
Basin Floodways; flood control and drainage 
improvements in Bayou Cocodrie and tributaries, in 
Bayou des Glaises, and in Upper Pointe Coupee Loop 
area; and freshwater distribution from Atchafalaya River 
to Teche-Vermilion Basins. 
Vicksburg District: Mississippi River project levees 
and river channel stabilization as required from upper 
limits of New Orleans District (mile 320 AHP) in 
vicinity of Black Hawk, LA, to Coahoma-Bolivar County 
line, MS (mile 620 AHP) on left bank, and to vicinity of 
mouth of White River, AR (mile 599 AHP), on right 
bank including south bank Arkansas River levee to 
vicinity of Pine Bluff, AR, and north bank levee to 
vicinity of Tucker on left bank of Plum Bayou, AR; bank 
stabilization in lower 36.1 miles of Arkansas River; 
maintenance and improvement of Mississippi River 
navigation channel between miles 320 and 599 AHP; 
Vicksburg and Greenville Harbors; specific fish and 
wildlife facilities in Tensas, Yazoo, and Big Sunflower 
* Authorizing legislation (Tables 41-D and 41-E is listed at the end of this chapter. All other tables are referenced in text and 
also appear at the end of the chapter. 
41-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Basins; a demonstration erosion control project in the 
Yazoo Basin; flood control and drainage improvements 
in Red River backwater area including leveed portions 
east and west of Black River and south of Red River; 
Jonesville, LA, Boeuf and Tensas Rivers, Bayou Macon 
Basins and tributaries, AR and LA, and Bayou 
Lafourche, LA; Yazoo River Basin, MS, including 
backwater area; Big and Little Sunflower Rivers, Deer 
Creek, and Steele Bayou, MS; and Grand Prairie Region 
and Bayou Meto Basin, AR, including provision for 
agricultural water supply. 
Memphis District: Mississippi River project levees 
and river channel stabilization as required, from upper 
limits of Vicksburg District to north bank of Little River 
diversion channel, MO (1,003 miles AHP), a few miles 
below Cape Girardeau, MO, on right bank, and to Cache 
River diversion channel (967 miles AHP) above Cairo, 
IL, on left bank, including levees and revetment on right 
bank of Ohio River, in Mounds-Mound City area, IL; 
except operations above Cairo, IL, do not include 
channel stabilization on the Mississippi River. 
Maintenance and improvement of Mississippi River 
navigation channel between mile 599 and 954 AHP and 
of Memphis Harbor, TN; specific fish and wildlife 
facilities in St. Francis Basin; levees in White River 
backwater area up to vicinity of Augusta, AR, and a 
pumping plant near mouth of White River; levees and 
pumping plants at De Valls Bluff and Des Arc, AR; 
channel improvements in Cache River Basin, AR; 
channel improvements in Big Creek and tributaries, AR; 
improvement works in St. Francis River Basin, MO and 
AR, including backwater area improvements in Belle 
Fountain Ditch and Drainage District No. 17, AR; Little 
River diversion channel, MO, and L-Anguille River, 
AR; Wolf River Basin, TN; Obion and Forked Deer 
River Basins, TN; Reelfoot Lake area, including channel 
improvement for Bayou du Chien and Lake No. 9, TN 
and KY; West Kentucky tributaries, KY; Mud Lake 
pumping station, TN; and pumping plants and outlet 
structures in the Cairo-Mounds-Mounds City area, IL. 
Channel improvements to Eight Mile Creek, Arkansas; 
Whiteman's Creek Ten Mile and Fifteen Mile Bayous in 
West Memphis, and vicinity Arkansas; Horn Lake Creek 
and Tributaries, Mississippi; and Nonconnah Creek, 
Tennessee and Mississippi. Navigation channel and 
harbor improvements to Helena Harbor and vicinity, 
Arkansas at Mississippi River, mile 652 AHP. Channel 
improvements and pumping station for Helena, Phillips 
County,and vicinity, Arkansas and St. Johns Bayou and 
New Madrid Floodway, Missouri. 
Field operations of the commission restricted to 
levee construction under Sec. 6, 1928 Flood Control Act 
(local interests contributing one-third of costs and 
furnishing rights-of-way) are conducted within the 
following limits by two districts reporting directly to the 
Commission on matters within their jurisdiction- 
St. Louis District: Mississippi River (Sec. 6) levees from 
upper limits of Memphis District to Clemens Station, 
MO (1,254 miles AHP), on right bank, and Hamburg 
Bay, IL (1,215 miles AHP), on left bank, and Illinois 
River from its mouth to mile 120 at Havana, IL. Rock 
Island District: Mississippi River (Sec. 6) levees from 
upper limits of St. Louis District to Rock Island, IL 
(1,437 miles AHP). For work accomplished see 
Table 42-N, page 42-50, Annual Report for 1975. 
MISSISSIPPI RIVER AND ALLUVIAL 
VALLEY BELOW CAPE GIRARDEAU, 
MO
Location and description. The Mississippi River 
rises in Lake Itasca, MN, and flows generally southerly 
for 2,340 miles through the central portion of United 
States to empty into the Gulf of Mexico 115 miles 
below New Orleans. It is improved for barge 
navigation for 1,832 miles to Minneapolis, MN. The 
Mississippi River and its major tributaries, the 
Missouri, Ohio, St. Francis, White, Arkansas, Yazoo, 
and Red-Old Rivers, drain 1,245,000 square miles in all 
or part of 31 states between the Rocky and Appalachian 
Mountains and part of two Canadian provinces. Below 
Cape Girardeau, MO, 53 miles above Ohio River, river 
bottomlands widen abruptly into an alluvial valley of 
35,460 square miles which was originally subjected to 
flood overflow. A major part of the alluvial valley has 
been protected from floods by levees which confine 
floodflows within a floodplain having an average width 
of 5 miles. (See map of alluvial valley of Mississippi 
River, scale 1:500,000.) Observations made by 
Mississippi River Commission to Sep. 30, 1982, show 
approximate all-time maximum and minimum discharges 
between levees as follows: Cairo to White River, 
2,000,000 and 70,000 cubic feet per second; thence to 
Red River, 2,150,000 and 90,000 cubic feet per second; 
thence to the Gulf of Mexico, 1,500,000 and 50,000 
cubic feet per second in Mississippi River and 660,000 
and 11,000 cubic feet per second in Atchafalaya River. 
As the 1927 floodflow was not confined between levees, 
maximum discharges recorded do not include entire 
flow of the 1927 flood, maximum of record below 
White River. High water and flood stages usually occur 
in late winter or early spring, but great floods such as 
that of 1937 occurred as early as January. Low water 
stages generally prevail from August to December. 
Extreme all-time high in stages recorded at 
representative gages (rounded to nearest foot) are 
41-2

MISSISSIPPI RIVER COMMISSION 
60 feet at Cairo, 49 feet at Memphis, 61 feet at Red 
River Landing, and 21 feet at New Orleans (Carrollton). 
The river is nontidal above Red River Landing where 
tidal amplitude rarely exceeds 0.1 foot during extreme 
low water. 
Previous projects. For details see page 1944, 
Annual Report for 1932. 
Existing project. The Mississippi River and 
Tributaries Project in the alluvial valley between Head 
of Passes, LA, and Cape Girardeau, MO, provides 
protection from floods by means of levees, floodwalls, 
floodways, reservoirs (in Yazoo and St. Francis Basins), 
bank stabilization, and channel improvements in and 
along the river and its tributaries and outlets insofar as 
affected by backwater of Mississippi River, including 
levee work on the main stem between Cape Girardeau 
and Rock Island. When completed, 23,621 square miles 
will be protected from the Mississippi River project 
flood. The project also provides for a 12- by 300-foot 
navigation channel between Baton Rouge, LA, and 
Cairo, IL; for salinity-control structures; and for 
channel realignment and improvement including bank 
stabilization and dikes to reduce flood heights, control 
natural tendency of river to lengthen by meandering, 
and protect levees from being destroyed by caving 
banks. Locations of major main stem Mississippi River 
improvements are shown in Table 41-A and those for 
off-main stem tributaries are shown in Table 41-B. 
Pertinent data on dams and lakes are shown in 
Table 41-C. Authorizing and incorporating legislation 
are shown in Tables 41-D and 41-E. Summary of 
presently estimated Federal cost of authorized 
improvements is shown in Table 41-F. Construction of 
the existing project began in 1928 and has continued 
throughout ensuing years. Through Sep. 30, 1999, 
physical completion of the entire project is 86.8 percent. 
Recommended modifications. None. 
Local cooperation. The Flood Control Act of 
1928, as amended, applies. Such requirements have, in 
general, been complied with by local interests. 
Terminal facilities. See Port Series No. 21, 1990, 
for Ports of Baton Rouge and Lake Charles, LA; Port 
Series No. 20, 1990, for Port of New Orleans, LA; also 
folio of Flood Control and Navigation Maps of 
Mississippi River from Cairo, IL, to the Gulf of Mexico 
(59th edition), 1992. 
Project cost. Total allotted for flood control, 
excluding maintenance charges through Aug. 18, 1941, 
chargeable under authorizations to Sep. 30, 1999, was 
$6,728,148,157 (See Table 41-V.) (See also 
Tables 41-U, 41-W, and 41-X for additional financial 
statements. 
The 35 4 Session was held on Apr. 12 - 16, 1999 
on board the Motor Vessel MISSISSIPPI enroute on the 
Mississippi River from Cairo, IL, to New Orleans, LA. 
Bank protection works, levees, and channel conditions 
were observed enroute. Public meetings were held at 
Cairo, IL; Memphis, TN; Vicksburg, MS; and 
New Orleans, LA, with approximately 300 people in 
attendance. This session was adjourned in 
New Orleans, LA, Apr. 16, 1999. 
The 355U' Session was held on Aug. 22 - Sep. 3, 
1999, on board the Motor Vessel MISSISSIPPI. Public 
meetings were held at Winona, MN; Dubuque, IA; 
Alton, IL; New Madrid, MO; Memphis, TN; 
Greenville, MS; and Houma, LA. This session 
adjourned Sep. 3, 1999, in Houma, LA. 
Records of Proceedings of all sessions of the 
Mississippi River Commission are on file in the office 
of the President. 
Alluvial Valley Mapping 
General. Contoured quadrangles and general maps 
of the alluvial valley are available for departmental use 
and public distribution under prescribed regulations. 
Preparation, revision, and publication of quadrangle 
maps (scale 1:62,500) continued. Roadmap-type 
information brochures of principal portions of the 
overall project were published along with pamphlets on 
the subject of flood control and navigation. Maps and 
supplemental data sheets for active works were updated 
and published as required. 
The 1999, 4th edition of the folio of navigation 
maps (Scale 1:24,000) covering the Atchafalaya River 
system and outlets to the Gulf of Mexico was revised 
and printed in FY 99. 
Approximately 2,100 flight-line miles of blackand-
white aerial photography (various scales); 
11,028 flight-line miles of color true photography; and 
about 23.5 hours of oblique photography were flown 
along the Mississippi River and tributaries in the 
New Orleans, Vicksburg, and Memphis Districts. 
Work accomplished in the Districts: New Orleans 
District: The revision of 1:62,500 scale quadrangle 
maps Bayou Dularge, LA; Lake Felicity, LA; Timbalier 
41-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Bay, LA; Terrebonne Bay, LA; and Caillou Bay, LA 
were completed in FY 99. 
Memphis District-Series conversion of 
U.S. Geological Survey 1:24,000-scale to 
1:62,500-scale quads of New Madrid, MO; 
Portageville, MO were published in FY 1999. 
Vicksburg District-Series The revision of 
1:62,500 scale quadrangle maps Lake Providence, LAMS 
and Alsatia, LA-MS was completed in FY 99. 
Publishing is in progress. 
Floods 
Streamflow observations during the fiscal year 
follow: 
Memphis District-Mississippi River crest stage of 
49.4 feet at Cairo gage on Feb. 3-4, 1999, and maximum 
discharge of 1,153,000 cubic feet per second 
occurred at Hickman, KY on Feb. 4, 1999, a crest stage 
of 34.2 feet at Memphis on Feb. 7-8, 1999, and a 
maximum discharge of 1,086,000 cubic feet per second 
at Memphis on Feb. 7-8, 1999. 
Vicksburg District-The Mississippi River in the 
Vicksburg District - Peak stages and discharges on the 
Vicksburg District's reach of the Mississippi River were 
as follows: Arkansas City, 34.8 feet on Feb. 11, 1999, 
and maximum discharge of 1,229,000 cubic feet per 
second; Vicksburg, 41.7 feet on Feb. 13, 1999, and a 
maximum discharge of 1,279,000 cubic feet per second; 
and Natchez, 49.4 feet on Feb. 14, 1999, and maximum 
discharge of 1,280,000 cubic feet per second. 
New Orleans District-On the Mississippi River, 
the Red River Landing gage recorded a maximum stage 
of 53.5 feet NGVD on Feb. 15, 1999, and the 
New Orleans gage recorded a maximum stage of 15 feet 
NGVD on Feb. 18, 1999. On the Atchafalaya River, 
the Simmesport gage recorded a maximum stage of 
36.6 feet NGVD on Feb. 18, 1999. 
Studies and Investigations 
General investigations. Surveys and reports, 
authorized by laws and by Senate and House committee 
resolutions, were made as required. Collection and 
study of basic data continued. 
A July 1997 resolution of the Committee on 
Transportation and Infrastructure of the U.S. House of 
Representatives authorized a study of flooding and other 
problems in the area west of the Atchafalaya Basin 
Floodway between Alexandria, Louisiana, and the Gulf 
of Mexico. A reconnaissance study was initiated in 
FY 1998 and completed in FY 1999. 
A May 1998 resolution of the Committee on 
Transportation and Infrastructure of the U.S. House of 
Representatives authorized a study of flooding and other 
problems in the area between Bayou Lafourche and the 
Mississippi River from Donaldsonville, Louisiana, to 
the Gulf of Mexico. A reconnaissance study was 
initiated in FY 1999. 
An April 1992 resolution of the Public Works and 
Transportation of the U.S. House of Representatives 
Committee authorized a study of flooding and other 
problems east of the Atchafalaya Basin Floodway 
between Morganza, Louisiana, and the Gulf of Mexico. 
A feasibility study was continued in FY 1999. The 
Energy and Water Development Appropriation Act of 
1995 and the Water Resources Development Act of 
1996 directed an expedited study of a lock the Houma 
Navigation Canal under the authority of the Morganza, 
Louisiana, and the Gulf of Mexico study. An interim 
feasibility study on the lock was completed in FY 1997 
and was approved for preconstruction engineering and 
design in FY 1999. A May 1998 resolution of the 
committee on Transportation and Infrastructure of the 
U.S. House of Representatives authorized a study of 
flooding and other problems in the area between Bayou 
Lafourche and the Mississippi River, from 
Donaldsonville to the Gulf of Mexico. A 
reconnaissance study was initiated in FY 99. 
Mississippi River and Tributaries Levees 
Operations and results during fiscal year. This 
feature consists of construction of new, and enlargement 
of existing, levees to approved grade and section; 
construction and restoration of levee berms; and 
construction, repair, and maintenance of roads on 
levees. Work accomplished is summarized in 
Table 41-N and further broken down as follows: 
New Orleans District--Continued construction of 
levees in the Main Stem System. 
Vicksburg District-Continued constructed of levees 
in the Main Stem System. See Table 41-L. 
Memphis District--Continued construction of levees 
in the Main Stem System. See Table 41-M. 
41-4

MISSISSIPPI RIVER COMMISSION 
Condition as of Sep. 30. (See Tables 41-K, 41-L, 
41-M, and 41-N.) There are 1,609.8 miles of levees 
authorized for the Mississippi River below Cape 
Girardeau, of which 1,603.0 are in place with 1,321.4 
built to approved grade and section. The Main Stem 
Levee System consists of 2,203.6 miles, of which 
2,196.8 are in place with 1,847.3 miles completed to 
approved grade and section. Included in this system are 
85.4 miles of levees and structures along the south bank 
of Arkansas River miles (all completed); 59.2 along the 
south bank of Red River (all completed); and 
449.2 miles in the Atchafalaya River Basin, with 
449.2 miles in place and 375.0 miles completed to grade 
and section (see Table 41-N). Of the authorized 
677.8 miles of berms and seepage control measures, 
558.3 are complete. Graveled or hard-surfaced roads 
have been constructed on 2,094.8 miles of these levees. 
There are an additional 1,511.0 miles of authorized 
tributary levees in the MR&T Project, of which 
1,225.2 miles, are in place with 1,031.8 to approved 
grade and section. Berms have been completed on 
15.3 miles and 916.2 miles of graveled or hard-surfaced 
roads have been constructed on the levees. 
For summary of levee work Table 41-N. 
Mississippi River and Tributaries--Channel 
Improvements 
Operations and results during fiscal year. 
Dredging: Mississippi River Main Stem-(See 
Table 41-G.) Work included dredging 
21,360,800 cubic yards for maintenance of channel and 
harbor improvements. Minimum channel depth of 
9 feet was maintained. Dredging was done with the 
following plant: Vicksburg District, channel maintenance 
was performed by government-owned dredge 
Jadwin. Memphis District charmel maintenance 
dredging was performed by the Government-owned 
dustpan dredge Hurley. New Orleans district channel 
maintenance dredging was performed by governmentowned 
dustpan dredge Jadwin. 
The MR&T Harbor maintained in Memphis District 
was Memphis Harbor (McKellar Lake), by leased 
cutterhead dredge Natchez. MR&T Harbors maintained 
in Vicksburg District were Greenville Harbor and 
Vicksburg by cutterhead dredge Marion. 
Bank revetment and dikes: (See Table 41-H, 41-I, 
and 41-J.) Construction of 4.61 miles of new bank 
revetment and 119,171 squares of concrete mattress, for 
maintenance, along the Mississippi River was completed 
by Government plant and hired labor. Also, 3.17 miles 
of new dikes were constructed and required maintenance 
was performed. 
Approximately 1.02 miles of new bank revetment 
was constructed on the Atchafalaya River. 
Other work performed in the interest of navigation, 
supplementing maintenance dredging on Mississippi 
River between Cairo, IL, and Baton Rouge, LA, 
included removal of snags, wrecks, and obstructions; 
issuance of bulletins by the Vicksburg District providing 
information on available high-water velocities at 
selected locations; maintenance of bulletin boards 
showing daily gage readings at regular MRC gages; and 
contact pilot service furnishing navigation interests with 
latest information and advice on channel conditions and 
navigation interests. Cost of this work is given in 
Table 41-U. 
Condition as of Sep. 30. In carrying out 
authorized channel improvement program between 
Baton Rouge and Cairo, 16 cutoffs were developed 
between 1933 and 1942. These, combined with chute 
channel development and alignment improvements, 
decreased channel length between these cities by about 
170 miles. However, current velocities increased the 
attack on the banks and the river began to regain its 
length. As a result, the net shortening between 1933 
and 1962 was 114 miles of the theoretical 170-mile 
cutoff. 
There are now in place 1,031.6 miles of operative 
bank revetment and 301.4 miles of dikes on the lower 
Mississippi River. This amount of channel stabilization 
should prevent the river from regaining much more of 
its length due to meandering. A navigation channel 9 
by 300 feet is being accomplished by revetment and 
dikes and maintained by dredging as required during the 
low-water season. Due to growing effectiveness of 
channel improvement program, average maintenance 
dredging requirements are steadily being reduced, and 
an increase in navigable depth is being obtained. 
Approximately 141.1 miles of foreshore protection have 
been constructed along the lower Mississippi River. 
There are 83.8 miles of revetment and 5.9 miles of 
dikes on tributary channels as listed in Tables 41-H, 
41-I, and 41-J. 
41-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
New Orleans District 
ATCHAFALAYA BASIN, LA 
Operations and results during fiscal year. New 
work by hired labor: Real estate activities and planning 
for construction were continued. 
Construction of levee enlargements and floodwalls 
continued on the east and west protection levees, and 
levees west of Berwick. 
In FY 99, six levee slides on the west Atchafalaya 
Basin Protection Levee were prepared by hired labor at 
a cost of $250,439, and with assistance from the 
Atchafalaya Basin Levee District. 
In FY 99, four contracts were awarded; three for 
levee enlargement (Wax Lake, E84 Reach B, and Teche 
Ridge Franklin) and one for floodproofing at Morgan 
City/Berwick, LA. Another levee enlargement contract 
was completed (Teche Ridge Centerville). 
Maintenance by hired labor: Operation and 
maintenance of Bayou Boeuf, Berwick, and Bayou 
Sorrel Locks, Morganza Control Structure, condition 
and operation studies, and water control management 
activities were continued. 
New Orleans District hired labor personnel also 
repaired and replaced two 4200 pound pumps at the 
Pointe Coupee Pumping Station. A contract for SE 
guidewall replacement at Bayou Sorrell was completed 
in FY 99. 
Maintenance dredging was performed, resulting in 
the removal of 1,540,169 cubic yards by two leased 
cutterhead dredges from Berwick Bay Harbor at a total 
cost of $1,839,134. 
Condition as of Sep. 30. Construction was 
initiated Aug. 7, 1929, with commencement of the west 
protection levee from Bordelonville to Hamburg, LA. 
The project is 93 percent complete. The current 
estimated Federal cost is $1,870,000,000 and 
non-Federal cost is $8,000,000. Of the 449.2 miles of 
levees and floodwalls authorized for the Atchafalaya 
system, 375.0 miles are built to grade. See Table 41-K 
for status of levees. 
Construction of the first 2.5 miles of the proposed 
5 miles of channel was initiated in January 1958 and 
completed in July 1959, with 7,458,086 cubic yards 
excavated. 
The remaining 2.5 miles were to be constructed 
when development of the initially constructed portion 
warrants expansion. Project expansion has not been 
necessary. Therfore this feature was deauthorized on 
Nov. 2, 1979, under the provisions of Section 12, 
Public Law 93-251 (WRDA 74), as amended. 
Major items remaining to be completed include 
completion of levees to grade and section, channel 
training works below Morgan City, modification of 
existing structures and construction of two freshwater 
distribution structures. Approximately 51.2 miles of 
bank stabilization have been placed as shown in 
Table 41-H. 
Flood Control 
ATCHAFALAYA BASIN FLOODWAY 
SYSTEM, LA 
Location. The project lies in the lower part of the 
Atchafalaya Basin which is situated in south-central 
Louisiana. It lies in parts of Iberville, Iberia, Point 
Coupee, St. Martin, St. Mary and St. Landry Parishes. 
Further, it is limited to the part of the Atchafalaya River 
Basin that has been confined between protection or 
guide levees that are about 15 miles apart. The northern 
boundary, west of the Atchafalaya River, lies along the 
south right-of-way line for the Union Pacific Railroad 
near the south side of U.S. Highway 190 between the 
West Atchafalaya Basin Protection Levee (WABPL) and 
the west limits of the Town of Krotz Springs, thence 
southerly along the west limits of the town and easterly 
along the south limits of the town to the Atchafalaya 
River; east of the Atchafalaya River it lies along the 
southern right-of-way line for the Union Pacific 
Railroad. The eastern and western boundaries lie at the 
floodside toes of the East Atchafalaya Basin Protection 
Levee (EABPL) and WABPL, respectively. The area 
within these limits has been calculated at about 
595,000 acres. 
Existing Project. This project consists of the 
acquisition of 50,000 acres of fee title, excluding 
minerals, from willing sellers and 338,000 acres of 
easements including: (1) flowage easements; 
(2) flowage, developmental control and environmental 
protection easements; and (3) developmental control and 
environmental protection easements. All acquisition is 
over privately owned land. The state will provide its 
150,000 acres of existing lands and also about 
30,000 acres of land donated by the Dow Chemical 
Company to accomplish the project features. Other state 
41-6

MISSISSIPPI RIVER COMMISSION 
and Federal lands in the project area include 
15,000 acres acquired by the Department of Interior for 
the Atchafalaya National Wildlife Refuge and 
12,000 acres acquired by the State for the Sherburne 
Wildlife Management Area. Additionally, the project 
includes features to protect and improve the environmental 
resources of the area and to provide for 
improved recreational use. 
To date approximately 36,300 acres of fee and 
121,000 acres of easements have been negotiated. 
Local Cooperation: A Project Cooperation 
Agreement (PCA) is not required for the acquisition of 
flowage, developmental control and environmental 
protection easements nor for acquisition of the public 
access lands (fee). A PCA will be required for the 
unscheduled work, such as the Operations and 
Maintenance and Recreation features. One recreational 
feature, the Simmesport boat launch and appurtenant 
facilities, has been approved for construction. 
Operations and Results During Fiscal Year 99: 
During FY 99, more restrictive easements were acquired 
over 26,500 acres. Approximately 2,025 acres of 
additional fee were negotiated in FY 99. 
Project Master Plan is under development; 
Operational Management Plan is approved and 
implemented. During FY 99, the project operations 
staff expanded providing increased on site 
Environmental Protection and Recreational Assistance, 
Reforestation and Trail Improvement Activities were 
implemented by contract during FY 99. 
Conditions as of Sep 30. In FY 99, approximately 
40,000 acres of easements from 100 ownerships will be 
negotiated and approximately 12,800 acres will be 
purchased in fee from willing sellers. 
BAYOU COCODRIE AND TRIBUTARIES, LA 
Operations and results during fiscal year. 
Maintenance by hired labor consisted of water control 
management. 
Condition as of Sep. 30. Construction was 
initiated in June 1946 and is 57 percent complete, based 
on the current estimated Federal cost of $20,400,000 
and non-Federal cost of $323,000. See page 2031, 
Annual Report for 1961, for description of completed 
work. 
Work required to complete the project consists of 
enlargement of 13.5 miles of upper Bayou Boeuf, 
channel improvement of 25.3 miles of Bayou Cocodrie, 
enlargement of Bayou Courtableau from Washington, 
LA, to the west protection levee, and additional culverts 
through the west protection levee at 100 percent Federal 
cost in lieu of the previously authorized diversion 
channel from Washington to the Bayou Courtableau 
drainage structure. 
With the termination of the Eastern Rapides and 
South Central Avoyelles project, it has become 
necessary to provide an adequate outlet structure solely 
for the Bayou Cocodrie and Tributaries project. The 
economic effects of this change along with current 
benefits estimates have caused the benefit-cost ratio for 
the project to be less than unity. As a result, the project 
has now been classified as inactive. If economic 
conditions change, the project could be reactivated. 
BONNET CARRE' SPILLWAY, LA 
Operations and results during fiscal year. 
Maintenance by hired labor: Condition and operation 
studies, water control management, and ordinary 
maintenance of the control structure and spillway 
continued. 
Condition as of Sep. 30. Construction of the 
spillway was initiated in FY 1929. The control 
structure was completed in 1931, levees were completed 
in 1932, and utility crossings were completed in 1936. 
The cost of the completed work is $14,212,200. 
It was necessary to operate the structure to reduce 
flood stages in 1937, 1945, 1950, 1973, 1975, 1979, 
1983 and 1997. The structure was operated in 1994 to 
transfer fresh water from the Mississippi River to 
Lake Pontchartrain. The structure was operated for one 
month from March 17-April 17, 1997, to reduce flood 
stages. 
Needle replacement began in FY 96 with the 
purchase of about 625 needles for $80,000. The total 
replacement quantity required is approximately 7,000. 
An additional cable security system has been installed 
through needle eyes to prevent needles from dislodging 
during severe storms. 
Natural Resources and Recreation Project Master 
Plan was approved and implemented. Operational 
Management Plan is under development. 
41-7

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
OLD RIVER, LA 
Operations and results during fiscal year. 
Maintenance by hired labor consisted of operation and 
maintenance of the lock and control structures as 
required, condition and operation studies, water control 
management, maintenance of cleared areas, levee 
shaping, and engineering studies. A picket boat was 
previously used at the inflow channels to the low sill 
and auxiliary control structures. It was removed from 
operation in FY 1988. 
Natural Resources and Recreation Master Plan is 
under development. Operations and Maintenance 
Activity includes development of Old River Cooperative 
Visitor Center. 
Condition as of Sep. 30. Construction began 
September 1955 and is complete at a Federal cost of 
$292,273,000. Principal items completed are as 
follows: Low-sill structure, June 1959; overbank 
structure, October 1959; auxiliary structure, September 
1986; levees and levee enlargements, October 1963; 
inflow and outflow channels for the low-sill structure, 
February 1961; inflow and outflow channels for the 
auxiliary structure, August 1987; navigation lock 
completed December 1962 and opened to navigation 
March 1963, at which time Old River was closed to 
navigation with a rock and earthfill dam; highway 
approaches and bridge over the lock completed March 
1965. Approximately 9.4 miles of bank protection have 
been constructed at the inflow and outflow channels. 
(See Table 41-H for details of bank protection.) 
LOUISIANA STATE PENITENTIARY LEVEE, 
LOUISIANA 
Location. The project is located near Angola, LA, 
in West Feliciana Parish, approximately 40 miles 
northwest of Baton Rouge, LA, and borders the 
Louisiana State Penitentiary along the Mississippi River 
and State of Mississippi state line. 
Existing Project. The project provides for 
improving about 12 miles of existing levees along the 
Mississippi River which currently afford flood 
protection to the penitentiary on the left descending 
bank below Old River. The existing levees are owned 
and maintained by the State of Louisiana and are 
substandard with regard to Federal specifications. By 
improving the existing levees to Federal standards, the 
project will reduce the risk of flooding with its attendant 
property damage and threat to the lives of up to 
5,100 inmates and about 1,750 employees and residents 
(527 reside on the penitentiary grounds). Funds to 
initiate preconstruction, engineering and design were 
appropriated in FY 91 and funds to initiate construction 
were appropriated in FY 98. 
Local Cooperation. The limited Reevaluation 
Report was approved on July 2, 1999 and formed the 
basis for execution of the Project Cooperation 
Agreement which was approved on July 30, 1999. The 
local Sponsor, the Louisiana Department of Public 
Safety and Corrections has provided cash in the amount 
of $1,150,000 in addition to furnishing the lands and 
damages necessary to support their share of the project 
cost.
Conditions as of Sep. 30. Construction was 
initiated in FY 99 with the award of three contracts in 
September 1999. Two contracts are for the levee 
upstream of Camp C and the other is for replacement of 
the existing drainage structure. 
Salinity Control Structures 
MISSISSIPPI DELTA REGION, LA 
CAERNARVON FRESHWATER DIVERSION 
STRUCTURE, BRAITHWATE, LA 
Location. The Caernarvon structure is constructed 
in the Mississippi River Levee on the left descending 
bank at mile 81 AHP, just below the St. Bernard- 
Plaquemines Parish line. 
Existing Project. The Caernarvon Freshwater 
Diversion Feature of the Miss. Delta Region Project is 
capable of diverting up to 8,000 cfs of River water into 
the Breton Sound Estuary for fish and wildlife habitat 
enhancement. River stages and the fresh water needs of 
the estuary, determined by monitoring data, establish 
the actual quantities to be diverted. 
Local Cooperation. The Local Cooperation 
Agreement with the State of Louisiana was signed in 
June 1987. Cost sharing for initial construction and 
ongoing operations and maintenance is 75 % Federal and 
25% non-Federal. The project is operated and maintained 
by Plaquemines Parish, under the direction of the 
LA Department of Natural Resources. 
Condition as of Sep. 30. Construction began in 
1988 and was completed in 1991, at a Federal cost of 
$19,700,000 and a non-Federal cost of $6,500,000. 
Diversions have been ongoing, as needed, since August 
1991. The goal of fish and wildlife habitat 
41-8

MISSISSIPPI RIVER COMMISSION 
improvement has been met or exceeded, most notably in 
the areas of seed oyster availability on the public oyster 
grounds, a large variety and volume of recreational 
fishing and duck hunting. 
DAVIS POND FRESHWATER DIVERSION 
STRUCTURE, LA 
Location. The Davis Pond structure is under 
construction in the Mississippi River Levee on the right 
descending bank at mile 118 AHP, in St. Charles 
Parish, two miles Luling, LA. 
Existing Project. The Davis Pond Freshwater 
Diversion Feature of the Miss. Delta Region Project 
will be capable of diverting up to 10,650 cfs of River 
water into the Barataria Bay Estuary for fish and 
wildlife habitat enhancement. Fresh water needs of the 
estuary, determined by monitoring data, will establish 
the actual quantities diverted. 
Local Cooperation. The Project Cooperation 
Agreement was signed in April 1993 with the State of 
Louisiana. Cost sharing for initial construction and 
ongoing operations and maintenance is 75 % Federal and 
25% non-Federal. The project will be operated and 
maintained by St. Charles Parish, under the direction of 
the LA Department of Natural Resources. 
Condition as of Sep. 30. Of the eight construction 
contracts to be completed before diversions will 
commence, three are complete. Three contracts are 
underway, and should be completed in CY 2000. Two 
minor contracts are scheduled to be advertised, awarded 
and completed in CY 2000. The Davis Pond feature is 
scheduled to be capable of diverting River water in 
CY 2001, if the need exists. Final construction and 
ongoing monitoring under the construction phase of this 
feature will continue into 2004. Estimated total first 
cost is $106,400,000. The estimated Federal share is 
$79,800,000 and the estimated non-Federal share is 
$26,600,000. 
New Orleans District 
MISSISSIPPI - LOUISIANA ESTUARINE AREAS, 
LA/MS 
BONNET CARRE' FRESHWATER DIVERSION 
STRUCTURE, LA 
Location. The Bonnet Carre' structure will be 
constructed in the upstream end of the Bonnet Carre 
Spillway structure, on the left descending bank of the 
Mississippi River at Mile 129 AHP, in St. Charles 
Parish, LA. 
Existing Project. The Bonnet Carre Project will be 
capable of diverting up to 30,000 cfs of River water into 
the Lake Pontchartrain, Lake Borgne/Biloxi Marsh 
Estuarine Area for fish and wildlife habitat 
enhancement. Fresh water needs of the area, 
determined by monitoring data, will establish actual 
diversion quantities. 
Condition as of Sep. 30. Before construction can 
proceed, a Project Cooperation Agreement must be 
signed with the States of Louisiana and Mississippi. 
Louisiana has withdrawn their support of the project 
until agreement between Louisiana and Mississippi can 
be reached on how the project will be operated. Federal 
cost of the Project is estimated to be $74,600,000. The 
construction, operation and maintenance of the Project 
will be shared as follows: Federal, 75%; La, 20%; 
MS, 5%. 
Vicksburg District 
LOWER ARKANSAS BASIN, AR 
Condition as of Sep. 30. Arkansas River levees. 
A total of 56.2 miles of the 61.5 miles of north bank 
levees and all of the 85.4 miles of south bank levees 
have been completed to approved grade and section. 
These levees above mile 36.1 are protected by 
bank-protection works constructed as a feature of project 
for Arkansas River and tributaries, AR and OK. For 
present status of this work, see report of Little Rock 
District. Below mile 36.1, needed bank protection is 
constructed with project maintenance funds. Little 
Bayou Meto gates and lifting mechanism were replaced 
during FY 88. Big Bayou Meto Gate operating 
mechanisms replaced FY 94, 95, 96. 
LOWER RED RIVER SOUTH BANK RED 
RIVER LEVEES, LA 
Operations and results during fiscal year. New 
work by hired labor consisted of engineering studies. A 
Project Management Plan to address replacement of the 
drainage structure and pumping plant was approved in 
Aug 94. A major maintenance report was prepared and 
approved Sep. 95 recommending replacement of the 
drainage structure. Design of the replacement structure 
is continuing. Construction is scheduled for initiation 
in late 1999. 
Maintenance by hired labor consisted of water 
control management and economic studies. 
41-9

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Condition as of Sep. 30. Construction was 
initiated in FY 92 and is complete. All of the 
59.2 miles of levees authorized are completed to 
approved grade and section. 
TENSAS BASIN, AR AND LA 
(a) Boeuf and Tensas Rivers, and Bayou Macon, 
AR and LA. 
Operations and results during fiscal year. Planning 
and design on project features are complete. The Lake 
Chicot Pumping Plant and related features are complete 
and in operation. No further work on the Tensas River 
Project (Separable Element) will be initiated due to lack 
of commitment from a local sponsor to cost share 
remaining E&D and construction. This project has been 
placed in the "inactive" category. 
Condition as of Sep. 30. Channel improvement 
has been accomplished on 741.7 miles of project 
streams, providing major drainage outlets for the 
tributary areas. Additionally, 61.0 miles of the Tensas 
River has been cleared and snagged. The GDM for the 
Tensas River Project, above mile 61, including Mill 
Bayou-Bayou Vidal is complete. However, no further 
work will be initiated due to lack of a local sponsor. 
(b) Red River backwater area. 
Operations and results during fiscal year. 
Planning and design continued on project features. All 
channel work required to get flows to the Tensas 
Cocodrie Pumping Plant and gravity structure is 
complete. The gravity structure and the pumping plant 
are complete and are being operated and maintained by 
contract. One mitigation item, the construction of two 
water control weirs, was completed in May 1988. 
Contracts for three additional mitigation features are 
complete. Construction of the Durham Prong 
mitigation feature is complete. Tensas-Cocodrie, 
Item 4-A, levee enlargement, 6.3 miles in length, was 
completed in September 1988, and Item 4-B, 2.4 miles 
of levee enlargement, was completed in October 1990. 
A contract for Item 2 was awarded in January 1991 and 
is physically complete. These contracts will complete 
the levee enlargement for all of the levee system, except 
0.8 miles. 
Work on the Below Red River Phase II GDM has 
been reclassified as inactive. Design and construction 
of the Sicily Island Area Levee project is underway. 
Condition as of Sep. 30. Levees in Tensas- 
Cocodrie area are complete except for levee raising of 
0.8 miles. The work comprised 93.1 miles of new 
levee, excluding 2.1 miles of high ground where no 
levees are required, and 86.9 miles of gravel road on 
levees. Construction of 63.4 miles of levee, Larto Lake 
to Jonesville levee system, has been completed. A levee 
grade reevaluation study for all levee systems in the Red 
River Backwater area was completed in Mar. 1985. 
Levee work on Sicily Island area consists of 56 miles of 
new levee, 2 pumping plants, 11 miles of channel work, 
and structural mitigation features. Levee items 1A, 1B, 
3A, 4A, 4B, 5A-R, 5B, Bayou Louis weir and 
connecting channel, and the Fool River Pump Plant are 
complete. Construction of Levee Items 1E, 2A, 2B and 
3B, and the Haha Bayou Pump Plant are underway. 
YAZOO BASIN, MS 
Operations and results during fiscal year. 
(a) Big Sunflower River, etc. The Project is 
authorized by the Flood Control Acts of 1944, 1946, 
1950, 1962, and 1965. Construction of channel 
improvements on Steele Bayou, Black Bayou are 
underway. Construction on Steele Bayou Channel in the 
Swan Lake Area is being done in phases. Phase IV was 
awarded 27 Apr 99 and is scheduled for completion in 
FY 00. Phase V is scheduled for award in Sep 00. 
Main Canal is complete. Black Bayou, Item 2, was 
completed Jul. 5, 1999 in FY 99. A contract to 
complete Black Bayou Item 3 is scheduled for award in 
April 2000. 
Mitigation for Upper Steele Projects 
Mitigation for the environmental losses is now 
underway. Approximately 2,740 acres of cleared lands 
have been obtained in the Yazoo Basin to mitigate the 
wildlife losses resulting from construction of the Upper 
Steele Bayou Projects. This land has been reforested 
and will be managed for aquatic, wetlands, and 
waterfowl. A total of 5,250 acres of mitigation will be 
required for this project. 
(b) Flood Control Reservoirs 
(1) Arkabutla Lake. (See Table 41-C.) The dam 
and appurtenant structures were maintained and 
operated. Clearing of tributary streams in the lake area 
was continued. Maximum pool elevation in the lake 
was 230.2 feet NGVD on May 10, 1999, and storage in 
41-10

MISSISSIPPI RIVER COMMISSION 
flood control pool was 299,600 acre-feet. Peak 24-hour 
inflow was 23,900 cubic feet per second on Mar. 14, 
1999. On Sep. 30, 1998, the pool elevation was 
218.1 feet NGVD, and storage in the flood control pool 
was 100,000 acre-feet. 
(2) Enid Lake. (See Table 41-C.) The dam and 
appurtenant structures were maintained and operated. 
Rehabilitation of boat channels and snagging and 
clearing of tributary streams in the lake area continued. 
Maximum pool elevation in the lake was 254.0 feet 
NGVD on May 11, 1999, when storage in the flood 
control pool was 339,500 acre-feet. Peak 24-hour 
inflow was 16,500 cubic feet per second on Mar. 14, 
1999. On Sep. 30, 1999, pool elevation was 243.1 feet 
NGVD and storage in the flood control pool was 
173,700 acre-feet. 4,500 ac. ft. of storage in 
conservation pool was reallocated to municipal and 
industrial water supply in June 1998. 
(3) Grenada Lake. (See Table 41-C.) 
Construction of remaining public-use facilities has been 
deferred pending development of cost-sharing 
agreements with local interests for construction and 
non-Federal operation and maintenance, consistent with 
projects for which recreation facilities are being 
constructed under the provisions of the Federal Water 
Project Recreational Act of 1965 (Public Law 89-72), as 
amended. Maximum pool elevation in the lake was 
217.7 feet NGVD on Jul. 5, 1999, when storage in the 
flood control pool was 651,600 acre-feet. Peak 24-hour 
inflow was 46,200 cubic feet per second on Jan. 24, 
1999. On Sep. 30, 1999, the pool elevation was 
208.1 feet NGVD and storage in the flood control pool 
was 337,800 acre-feet. 
(4) Sardis Lake (See Table 41-C.) The dam and 
appurtenant structures were maintained and operated. 
Clearing of tributary streams in the lake area continued. 
Maximum pool elevation in the lake was 263.9 feet 
NGVD on Jul. 5, 1999, when storage in the flood 
control pool was 746,600 acre-feet. Peak 24-hour 
inflow was 29,000 cubic feet per second on Mar. 15, 
1999. On Sep. 30, 1999, the pool elevation was 
250.4 feet NGVD and storage in the flood control pool 
was 345,500 acre-feet. A construction contract was 
awarded for the seismic remediation of Sardis Dam 
utilizing driven pre-stressed concrete piling as a result 
of an extensive study and evaluation of the expected 
performance of the dam during a major earthquake in 
the New Madrid earthquake zone of the central United 
States. 
(c) Greenwood, Yazoo City and Belzoni 
protection works. Contract forces continued operation 
and maintenance of levees, drainage facilities, and 
pumping plant. 
(d) Main stem. Contract forces continued 
operation and maintenance of channels, levees, and 
drainage facilities. 
(e) Mississippi Delta, MS. Feasibility studies 
limited solely to flood control problems in the Big 
Sunflower River Basin, are complete. No economically 
feasible projects were identified. A negative feasibility 
report was forwarded to the Mississippi River 
Commission in September 1997. 
(f) Reformulation Study. The uncompleted portions 
of the Yazoo Basin construction program are being 
reformulated. This reformulation study includes 
investigations of the engineering, economic, and 
environmental aspects of the basin and is being 
accomplished in 4 phases. These studies will evaluate 
reasonable arrays of alternatives to the project features 
that remained after construction of items that were 
budgeted and scheduled for award in FY 90. The Upper 
Steele Bayou and Upper Yazoo Project reports were 
approved on May 25, 1993 and Jun. 21, 1994, 
respectively. Concerning the final 2 phases, the Yazoo 
Backwater Reformulation Study began in FY 93 and the 
Tributaries Reformulation study began in FY 95. The 
Backwater Study includes nonstructural, structural, and 
combination plans. Nonstructural features include 
conservation and water management easements and 
reforesting of cleared agricultural lands. Structural 
features include an array of various capacity pumping 
stations and a levee alternative. Current completion 
date is FY 00. The Yazoo Tributaries Reformulation 
Study is evaluating flood control requirements on nine 
project features. Study efforts were suspended in 1996 
due to lack of funds. Therefore, completion date was 
delayed one year to FY 01. 
(g) Demonstration Erosion Control. 
The Demonstration Erosion Control Project (DEC), 
a joint project with the USDA NRCS was initiated by 
FY 85 appropriations as a continuation on streambank 
erosion control efforts. The purpose of the project is to 
demonstrate the applicability of a systems approach to 
the design of erosion, sedimentation, and flood control 
works by applying this approach to 16 demonstration 
watersheds in the Yazoo Basin hill area. During FY 98, 
work continued in the DEC toward development of the 
systems plans and implementation of a monitoring 
program. Cumulative through FY 99, the District has 
completed the construction of 135 low drop grade 
41-11

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
control structures, 575,000 linear feet of bank 
stabilization, 120,000 linear feet of channel 
improvement, 22 box culverts, 6 high drop grade 
control structures, 757 riser pipe grade control 
structures, 2 floodwater retarding structures, and 
51,000 feet of levees. 
(h) Tributaries. Construction: 
(1) Bank Stabilization. Three bank stabilization 
items located on the Tallahatchie and Yalobusha Rivers 
were awarded in FY 94. The work was completed in 
FY 95. 
(2) Channels. Construction of the Alligator- 
Catfish, Round Lake Water Control Structure was 
completed Nov. 28, 1989. Construction on the 
remaining channel work on the Ascalmore-Tippo Project 
is complete. Contract forces continued operation and 
maintenance of channels, levees, and drainage facilities. 
(3) Levees. Levee work associated with the last 
item of work on Ascalmore-Tippo Project is complete. 
Levee work associated with Item 1 and Item 1-A Pelucia 
Creek is complete. Three Pelucia Creek pumping 
stations are complete. Construction of Pelucia Creek, 
Item 2, Item 3, and Item 4 were completed in FY 94. 
Pelucia Creek relocations were completed in FY 99. 
(i) Upper Yazoo Projects. The first 11 items of 
channel improvement, approximately 72.6 miles, and 
nine drainage structures have been completed. This 
work extends from Yazoo City, Mississippi, to about 
15 miles downstream of Greenwood, Mississippi. 
The Fort Pemberton Flood Control Structure was 
completed on Apr. 29, 1991. 
Roebuck Lake and Fort Loring water control 
structures and Tchula Lake weirs were completed in 
FY 95. 
Item 3A-2 levee was completed in FY 94. Channel 
Item 3A-1 was completed in FY 96. Item 3A-2 channel 
work was completed in FY 97. This item contains the 
first thin layer disposal site. Channel Item 3B-1 was 
awarded in September 1997 and was completed in 
FY 99. Channel Item 3B-2 was awarded April 1998 
and is scheduled for completion in FY 00. 
Design efforts for Channel Item 5 is underway. 
Design efforts for Channel Item 4 are complete, and the 
first work on Item 4 is scheduled for Jan 00. 
The Alligator-Catfish water control structure was 
awarded in FY 95 and was completed in FY 98. This 
structure has been renamed the J. Tol Thomas Water 
Control Structure. 
Mitigation for Upper Yazoo Projects. Mitigation 
for the terrestrial impacts is now underway. 
Approximately 7,400 acres of cleared, frequently 
flooded lands have been obtained in the Yazoo Basin 
area of Mississippi to mitigate the wildlife losses 
resulting from construction of the Upper Yazoo 
Projects. This land has been reforested and will be 
managed for aquatic, wetlands, and water fowl. A total 
of 17,000 acres of mitigation will be required for this 
project. 
(j) Yazoo Basin backwater. The Yazoo area 
backwater levees are complete, including the backwater 
levee from the Mississippi River levee to the west levee 
of the lower Auxiliary Channel, the Little Sunflower 
River drainage structure, and the connecting channel 
from the Steele Bayou drainage structure to the Big 
Sunflower River. 
The Satartia area backwater levee is complete. 
Rocky Bayou area levee Items 1A and 1B have been 
completed. Completed backwater levees will require 
raising to provide the degree of protection intended 
based on the project design flow line developed for the 
Mississippi River following the 1973 flood. 
Four Greentree Reservoirs and pumping stations 
have been constructed to mitigate for the waterfowl 
impacts of the project. 
Mitigation of the terrestrial impacts is now 
underway. Approximately 8,800 acres of cleared, 
frequently flooded, agricultural lands have been 
obtained in the Yazoo Backwater area of Mississippi to 
mitigate the wildlife losses resulting from construction 
and operation of the Yazoo Area and Satartia Area 
levees projects. This land has been reforested and will 
be managed for terrestrial wildlife. 
41-12

MISSISSIPPI RIVER COMMISSION 
Condition as of Sep. 30. The first feature of 
Yazoo Basin project was started in 1936, and the total 
project is about 65 percent complete. 
Memphis District 
CACHE BASIN, AR 
Operations and results during fiscal year. No 
contracts were awarded or completed during the fiscal 
year.
Condition as of Sep. 30. Project was initiated 
during 1972 and is 4 percent complete. Construction of 
the authorized project was stopped in 1978 due to 
environmental opposition. Reevaluation studies of the 
authorized plan were initiated in June 1987 to provide 
a more environmentally balanced plan. The reevaluation 
effort was terminated on Dec. 15, 1994, due to a 
lack of local sponsorship. The Memphis District has 
initiated action to turn the acquired mitigation lands 
(7,959 acres) over to the U.S. Department of Interior. 
CONSTRUCTION GENERAL 
FRANCIS BLAND FLOODWAY DITCH (EIGHT 
MILE CREEK), ARKANSAS 
Location. The project is located in the City of 
Paragould, AR. 
Existing Project. The existing project consist of 
12.5 miles of channel improvements. Eight miles of 
channel enlargement will occur in the rural downstream 
area of Paragould. Three and a half miles of 
enlargement will occur in the City of Paragould along 
with one mile of channel riprap/stabilization. The 
project will provide 100 year flood protection within the 
City of Paragould. 
Local Cooperation. A project Cooperation 
Agreement (PCA) was assigned in June 1996. 
Conditions as of Sep. 30. The contract work on 
the rural eight miles of channel has been completed. 
The City of Paragould continues to work to provide 
PCA requirements (lands, relocation, etc.) for the work 
within the city. 
HELENA AND VICINITY, AR 
Location. The project is located in the City of 
Helena, AR. 
Existing Project. The existing project consists of 
1.41 miles of earthen and concrete channel enlargement 
within the city limits of Helena, AR. The concrete 
channel will be constructed primarily under streets while 
the earthen channel is in an undeveloped section of the 
city. 
Local Cooperation. The Project Cooperation 
Agreement (PCA) was signed in August 1997. 
Conditions as of Sep. 30. A contract will be 
awarded in Feb. 2000 for the earthen channel 
improvements. The City of Helena is working to meet 
PCA (lands, relocations, etc.) requirement for 
advertisement of the second construction contract, the 
concrete channel. 
HELENA HARBOR, PHILLIPS COUNTY, AR 
Operations and results during fiscal year. 
Condition as of Sep. 30. Project construction was 
initiated during 1989 and completed in December 1994. 
HORN LAKE CREEK AND TRIBUTARIES 
INCLUDING COW PEN CREEK, TENNESSEE 
AND MISSISSIPPI 
Location. Horn Lake Creek is located in northwest 
Desoto County, MS and southwest Shelby County, TN. 
Existing project. The project was approved for 
construction on Nov. 17, 1986, under authority of 
Title IV, Section 401 of the 1986 Water Resources 
Development Act. The project consists of 3.5 miles of 
drift removal and 2.75 miles of channel clearing on 
Horn Lake Creek; 2.1 miles of channel clearing on 
Rocky Creek and 0.62 miles of channel clearing and 
1.85 miles of channel enlargement on Cow Pen Creek. 
The project will provide 1.1-year flood frequency 
protection on Horn Lake and Rocky Creeks and 25-year 
flood frequency protection on Cow Pen Creek. The 
estimated construction cost for the project is 
$5,600,000. The initial contract for project 
construction was awarded in Apr. 1993. Project 
completion occurred in 1998. 
Local Cooperation. A Local Cooperation 
Agreement was executed with the Horn Lake Creek 
Watershed Drainage District on Feb. 26, 1992. The 
sponsor is required to provide the lands, easements, 
rights-of-way and relocations required for project 
construction and a cash contribution. Total non-Federal 
41-13

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
cost share will be between 25 and 50 percent of total 
project cost. 
Condition as of Sep. 30. The final contract for 
work on Cow Pen Creek was awarded in September 
1997 and was completed in Sept. 1998. 
LOWER WHITE RIVER 
Operations and results during fiscal year. 
(a) Augusta to Clarendon Levee. There were no 
contracts awarded or completed during the fiscal year. 
(b) Clarendon Levee. There were no contracts 
awarded or completed during the fiscal year. 
(c) White River Backwater Levee-Hudson's 
Landing to MRL. Gravel surface awarded on Sep. 21, 
1999.
(d) White River Navigation. Cutterhead 
hydraulic pipeline awarded on Jun. 16, 1999. 
Condition as of Sep. 30. 
(a) Augusta to Clarendon Levee. Project was 
initiated during 1946 and is 39 percent complete. There 
were no contracts awarded or completed this fiscal year. 
(b) Clarendon Levee. There were no contracts 
awarded this year. 
(c) White River Backwater Levee. Levee 
stabilization is complete. 
(d) Des Arc Arkansas. Bank stabilization, 
completed. 
(e) White River Navigation. Cutterhead 
hydraulic pipeline, completed on Oct. 15, 1998. 
NONCONNAH CREEK, MS AND TN 
Operations and results during fiscal year. No 
contracts awarded or completed during this fiscal year. 
Condition as of Sep. 30. Project construction was 
initiated during 1990 and is 50 percent complete. 
MISSISSIPPI RIVER LEVEES 
Operations and results during fiscal year. 
Minor maintenance on levees is performed by the 
local interests and major maintenance is performed as 
required for slide repairs, road rehabilitation, and other 
similar work by the U.S. Army Corps of Engineers. 
MISSISSIPPI RIVER LEVEES 
Seepage Stoval, Coahoma completed. 
Commerce-Birds Pt. Levee raise awarded May 25, 
1999, 80% complete. Below Commerce, MO relief 
wells, parcel 2, awarded Jul. 30, 1999, 40% complete. 
Stone Dike Construction Mississippi River awarded 
Jun. 30, 1998, and was 62.7 percent complete. 
Montezuma Bar, stone dike construction on Mississippi 
River awarded Jul. 20, 1998, completed Aug. 1999. 
Stewart Towhead, MO dikes awarded Jun. 30, 1999, 
completed Oct. 1999. Below Island 9, TN Dike 
construction awarded Jul. 22, 1999 60% completed. 
Above Loosahatchie, TN Dike construction, awarded 
Jun. 29, 1999 0% complete. 
REELFOOT LAKE - LAKE NO. 9, TN AND KY 
Operations and results during fiscal year. No 
contracts awarded or completed during this fiscal year. 
Condition as of Sep. 30. Project was initiated 
during 1974 and is 95 percent complete. 
ST. FRANCIS BASIN, AR AND MO 
(a) Little River Drainage. 
Operations and results during fiscal year. Real 
estate activities are continuing. 
Condition as of Sep. 30. Project was initiated 
during 1938 and is 95 percent complete. 
(b) Lower St. Francis River. 
Operations and Results During Fiscal Year. 
Rivervale Levee Slope Restoration awarded Jun. 30, 
1997, was completed Aug. 18, 1999. Big Lake scour 
41-14

MISSISSIPPI RIVER COMMISSION 
repair and trash rack awarded on Jul. 31, 1998 was 
complete Jul. 2, 1999. WG Huxtable Pumping Plant, 
impeller replacement awarded on Jan. 30, 1998. Tulot 
Ditch County Bridges awarded on Jan. 29, 1998, and 
completed Dec. 2, 1998. Tulot Ditch County Bridges 
awarded on Feb. 11, 1999, and completed Sep. 24, 
1999. Channel Enlargement, Ditch 1 Item 4 awarded 
on May 29, 1998 was completed Aug. 4, 1999. 
Ditch 56 Culvert Replacement awarded on Aug. 25, 
1998, and was 10 percent complete. Awarded Ditch 9 
Lake City cleanout on Sep. 14, 1999, 0 percent 
complete. Rivervale to Ditch 56 Levee Restoration 
awarded on Jun. 30, 1997, completed Aug. 18, 1999. 
Drainage District 17 Pumping Station painting and 
insulation awarded on Oct. 6, 1998, completed Jun. 24, 
19999. 
(c) Upper St. Francis River. 
Operations and Results During Fiscal Year. 
State Bridge, Main and Ditch 2, Item 2, bridge, 
Mile 17.70, awarded Mar. 21, 1996, completed Jan. 4, 
1999. Main and Ditch 2, Item 2, bridge, Mile 20.89, 
awarded Jun. 27, 1997, complete. Main and Ditch 2, 
Item 2, bridges, Miles 17.12 and 19.85 awarded 
Nov. 21, 1996, complete. Main and Ditch 2, Item 1, 
channel enlargement, awarded Oct. 21, 1996, complete. 
Highway 90, Emergency stone placement awarded 
Sep. 15, 1998, completed Dec. 8, 1998. Ditch 1 and 6, 
bridges, Miles 1.21 and 2.95 awarded Sep. 7, 1999, 
0 percent complete. 
Condition as of Sep. 30. Project initiated 1937. 
project is 90 percent complete. 
ST. JOHNS BAYOU AND NEW MADRID 
FLOODWAY 
Operations and results during fiscal year. 
Construction of the first item of work (4.3 miles of 
vegetative clearing) was completed in Oct. 97. NEPA 
coordination activities continue for remaining items for 
work. 
Condition as of Sep. 30. Construction on 
remaining items can not be initiated until NEPA 
processing is completed. Remaining construction work 
on the First Phase include approximately 23.3 miles of 
channel improvements and two pumping stations. Work 
scheduled this summer after compliance with NEPA and 
receipt of rights-of-way from locals includes initiating 
a channel enlargement item and work on the 
New Madrid Pumping Station. 
WEST KENTUCKY TRIBUTARIES, KY 
Operations and results during fiscal year. No 
contract awarded or completed during fiscal year. 
Condition as of Sep. 30. Project was initiated 
during 1978 and is 4 percent complete. Project is 
currently inactive due to lack of local support; however, 
locals have formally requested assistance in developing 
an environmentally sensitive plan of improvement. A 
preliminary time and cost estimate for a general 
reevaluation have been prepared. 
WEST TENNESSEE TRIBUTARIES, TN 
Operations and results during fiscal year. 
(a) Forked Deer River and principal tributaries, 
TN. Forked Deer River channel improvement is 
14 percent complete. 
(b) Obion River and principal tributaries, TN. 
Obion Rivers channel improvement is 68 percent 
complete. 
(c) Riprap Protection at four sites Dyer, 
Crockett, Haywood, and Lauderdale awarded 
Aug. 29, 1996, is complete. 
Riprap protection at 3 sites Dyer, Crockett, and 
Lauderdale counties awarded on Aug. 10, 1998, and 
was completed Aug. 18, 1999. Shutdown plan control 
structures at 3 sites, Dyer and Lauderdale counties 
awarded on Aug. 3, 1998, was completed Sep. 1999. 
Condition as of Sep. 30. West Tennessee 
Tributaries Project is 60 percent complete. 
WHITEMAN'S CREEK, ARKANSAS 
Location. The project is located in the city of 
Jonesboro, AR. 
Existing project. The project was authorized for 
construction by the Water Resources Development Act 
of 1992, on Oct. 31, 1992. The project consists of 
6.1 miles of channel improvements on Whiteman's, 
Turtle, Moore's and Higginbottom Creeks. The 
proposed improvements will provide 10-year level of 
flood protection along Whiteman's, Turtle and Moores 
and 25-year protection on Higginbottom. 
41-15

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Local cooperation. A Project Cooperation 
Agreement (PCA) was executed May 31, 1996. 
Conditions as of Sep. 30. The contract to initiate 
work on Item 1, Higginbottom Creek and Moore's 
Ditch was awarded in August 1996 and completed in 
June 1997. The second and final contract for work on 
Whiteman's and Turtle Creek's was advertised in 
November, 1999 and scheduled for completion in 
September, 1999. 
41-16

MISSISSIPPI RIVER COMMISSION 
TABLE 41-A MISSISSIPPI RIVER IMPROVEMENTS 
Mileage 
Above Head 
of Passes Locality Improvement Remarks 
0-957' 
10-81 
11-25 
118 
81 
44-91 
81-96 
91-104 
96-279 
104-234 
127-129 
129 
129-234 
235 
279-287 
287-303 
303-314 
314-572 
Head of Passes, LA-Cairo, IL 
The Jump-New Orleans, LA 
Baptiste Collette-Bayou 
Ostrica, LA 
Davis Pond, LA (formerly 
Myrtle Grove, LA) 
Caernarvon, LA 
Bohemia, LA-New Orleans, 
LA 
New Orleans, LA 
New Orleans, LA 
New Orleans-Morganza, LA 
New Orleans-Baton Rouge, 
LA 
Bonnet Carre' Floodway, LA 
Mississippi-Louisiana 
Estuarine Areas, LA/MS 
(Bonnet Carre') 
Bonnet Carre'-Baton Rouge, 
LA 
Baton Rouge Harbor 
Morganza Floodway, LA 
Morganza-Old River, LA 
Old River, LA control 
Old River-Cypress Creek, AR 
Dredging, revetment, and contract 
work 
Main line levee, right bank 
Local levees, left bank 
Salinity control structure, right 
bank 
Salinity control structure, left 
bank 
Main line levee and floodwall, 
left bank 
Main line levee, right bank 
Main line levee and floodwall, 
left bank 
Main line levee, right bank 
Main line levee, left bank 
Regulating spillway, left bank 
Salinity control structure, 
left bank 
Main line levee, left bank 
Devils Swamp barge channel 
Regulating spillway, right bank 
Main line levee, right bank 
Levee closure and enlargement, 
low and high water spillway 
structures, navigation lock, and 
approach channels, right bank 
Main line levee, right bank 
Modified by Public 
Law 87-874. 
-- 
Extends up south 
bank of Old River to 
Barbre Landing. 
Authorized by Public 
Law 83-780. 
Joins Arkansas 
River, south bank 
levee. 
41-17 
Authorized by Public 
Law 89-298 
(HD 308/74/1). 
Included in MS Delta 
Region, LA feature. 
Postauthorization 
change report, 
approved June 1987. 
Authorized by Public 
Law 89-298 
(HD 308/74/1). 
Included in MS Delta 
Region, LA feature. 
-- 
Authorized by Public 
Law 81-516. 
Authorized by Public 
Law 81-516. 
--
-- 
Authorized by Public 
Public Law 100-676

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-A MISSISSIPPI RIVER IMPROVEMENTS 
(Continued) 
Mileage 
Above Head 
of Passes Locality Improvement Remarks 
437 
437-721 
490 
537 
646 
605-666 
672-993 
722-725 
721-734 
803-873 
857 
890 
890 
890-954 
902-922 
922 
946 
9571 
Vicksburg Harbor, MS 
Vicksburg-Lake View, MS 
Wilson Point, LA 
Greenville Harbor, MS 
Long Lake, Helena, AR 
Henrico-Helena, AR 
St. Francis River-Commerce, 
MO3 
Industrial levee (Ensley 
Bottoms) 
Memphis Harbor, TN 
Tiptonville-Obion River 
Near Mud Lake, TN 
St. Johns Bayou, MO 
New Madrid Floodway, MO 
New Madrid-Birds Point, 
MO 
Slough Bend, Hickman, KY 
Hickman, KY 
Peafield, MO 
Cairo, Cairo drainage 
district 
Harbor extension and industrial 
fill 
Main line levee, left bank 
Pumping Plant and drainage 
structure, right bank 
Harbor improvements and port 
area 
Culvert and floodgate, right 
bank 
Main line levee and floodwall, 
right bank 
Main line levee, right bank 
Levee and pumping station 
Closure of Tennessee Chute, 
industrial fill, levee, harbor 
channels, etc. 
Main line levee, left bank, levee 
extension, and diversion Obion 
River 
Pumping station and adjacent 
channel improvements 
Drainage floodgate and levee 
closure 
Drainage floodgate and levee 
closure 
Floodway, right bank 
Main line levee, left bank 
Floodwall, left bank 
Drainage floodgate 
Floodwalls and levees 
41-18 
Authorized by Public 
Law 70-391. Modified 
by Public 
Laws 79-526 and 83- 
780. 
-- 
Unpublished 
Vicksburg District's 
MRC report approved 
Apr. 14, 1966.2 
Authorized by Public 
Law 85-500. 
Authorized by Public 
Law 79-526.2 
Authorized by Public 
Law 79-526. 
Modified by Acts of 
Jul. 24, 1946 and 
Dec. 23, 1971. 
Authorized Dec. 15 
and 17, 1970 under 
Sec. 201 of Oct. 27, 
1965 FC Act. 
Modified by Jul. 24, 
1946 Act. 
Modified by Sep. 3, 
1954 Act. 
-- 
--
-- 
Authorized by 
Sep. 3, 1954 Act. 
--

MISSISSIPPI RIVER COMMISSION 
TABLE 41-A MISSISSIPPI RIVER IMPROVEMENTS 
(Continued) 
Mileage 
Above Head 
of Passes Locality Improvement Remarks 
9571 Cairo, Cairo drainage Floodwalls, levees, and pumping -- 
district, Mounds, Mound plant 
City, and vicinity 
Thebes-Rock Island, IL Levees, both banks Intermittent (Sec. 6). 
Cape Girardeau, MO, to Rock Levees Intermittent (Sec. 6). 
Island, IL 
1. Cairo, IL, is on Ohio River about 3 miles above its mouth (Mississippi River mile 954 AHP). 
2. Also see Table 41-D, "Authorizing Legislation." 
3. Commerce, MO, is on Upper Mississippi River, 39 miles above mouth of Ohio River. 
41-19

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
OUTLET IMPROVEMENTS 
Mileage 
Below Head of 
Atchafalaya 
River Locality Improvement Remarks 
ATCHAFALAYA BASIN, LA' 
Atchafalaya Basin, Morganza 
and West Atchafalaya 
Floodways 
West Atchafalaya Floodway 
between Red River and 
Alabama Bayou 
Morganza Floodway between 
Mississippi River and 
Alabama Bayou 
Atchafalaya Basin Floodway 
between Alabama Bayou and 
Morgan City 
East protection levee 
(Morganza and Atchafalaya 
Floodways) 
Lacour-Red Cross 
Morganza-Morgan City 
Bayou Latenache 
Upper Pointe Coupee Loop 
area 
Bayou Fordoche-Ramah 
Bayou Sorrel' 
Bayou Sorrel Lock-Morgan 
City 
Morgan City 
Below Morgan City 
Below Morgan City 
Atchafalaya Basin Floodway 
lower protection levee 
Calumet 
Below Morgan City 
Berwick' 
Floodway 
Floodway 
Floodway 
0-54 
27-54 
54-117 
20-27 
25-117 
27 
0-27 
31-57 
80 
53-117 
117 
117-129 
117-129 
105 
105-120 
115 
Including lower Morganza 
Floodway guide levee. 
Through upper Morganza guide 
levee and enlargement of outlet 
channel. 
Enlargement of Bayou 
Latenache. Approved Jun. 4, 
1970. See Table 41-D. 
Levee landside borrow pit. 
Alternate route, Gulf Intracoastal 
Waterway, Port Allen to 
Morgan City. 
Gulf Intracoastal Waterway 
utilizes levee west side borrow 
pit channel. 
Gulf Intracoastal Waterway. 
Bypass route for Gulf 
Intracoastal Waterway. 
East of lower river. 
Bayou Teche-Wax Lake Outlet. 
Inclosed area between Wax Lake 
Lake Outlet and Berwick. 
Lower Atchafalaya River. 
41-20 
Levee, upper Morganza guide 
Levee and Morgan City 
floodwall 
Drainage structure, Pointe 
Coupee, and channel 
enlargement 
Additional drainage facilities 
Drainage channel 
Lock 
Alternate navigation channel. 
Gulf Intracoastal Waterway 
Lock in Bayou Boeuf' 
Channel relocation 
Levee, floodwall 
Floodgate, east 
Levees, floodwall, drainage 
structures, and pumping plants 
Lock

MISSISSIPPI RIVER COMMISSION 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
Below Head of 
Atchafalaya 
River Locality Improvement Remarks 
116 
5 
5-105 
29 
29 
40 
40 
40 
41 
41 
41 
94 
Water system 
Levee fuse plug 
Protection levee 
Levee enlargement and floodgate 
extension 
Railway 
Railway 
Gated drainage structures 
Highway 
Highway 
Gated drainage control 
structures and channels 
Railway 
Railway 
Floodgate and approach 
channels 
Outlet, Charenton drainage 
canal and protection levee 
Floodgate, west 
Drainage canal-railway and 
highway bridges 
Adjustment to provide fresh 
water. 
West Atchafalaya Floodway. 
-- 
-- 
--
-- 
Through West Atchafalaya 
protection levee. 
-- 
-- 
-- 
-- 
Borrow pit channel to Grand 
Lake through West Atchafalaya 
protection levee. 
Restoration of drainage west of 
West Atchafalaya Basin 
protection levee. 
Bayou Teche and Wax Lake 
Outlet. 
To lower flood heights. 
Patterson 
West protection levee 
(Atchafalaya Basin and West 
Atchafalaya Floodways) 
Simmesport-Hamburg 
Mansura to Wax Lake Outlet 
Coulee des Grues 
West Atchafalaya Floodway 
Morganza Floodway 
Bayou Darbonne 
West Atchafalaya Floodway 
Morganza Floodway 
Bayou Courtableau 
West Atchafalaya Floodway 
Morganza Floodway 
Charenton 
Jaws-Lake Fausse Pointe 
Calumet 
Wax Lake Outlet 
Atchafalaya River 
Barbre Landing-Alabama 
Bayou 
Simmesport 
Simmesport-Bayou Garofier 
Melville 
Krotz Springs 
Below Alabama Bayou 
Mississippi River-Morgan City 
TECHE-VERMILION 
BASINS, LA 
Atchafalaya River to Teche- 
Vermilion Basins 
Courtableau Basin, LA, and 
outlets 
Levee, ring, and drainage 
structure 
West bank, levee 
Levee, ring 
Levee, ring 
Channel enlargement 
12- by 125-foot navigation 
channel 
Pumping station above Krotz 
Springs, conveyance channels, 
and appurtenant works 
Increase channel capacities to 
decrease flood heights. 
Through Grand and Six Mile 
Lakes. 
Freshwater distribution from 
Atchafalaya River to Teche- 
Vermilion Basins. 
41-21 
East bank, levee 
94 
105 
105 
0-54 
5-6 
5-66 
28-30 
40-41 
54-117 
94-106 
Mileage 
Above 
Mouth

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
above 
mouth Locality Improvement Remarks 
0-8 
50-133 
96 
133 
Drainage channel 
Drainage channel 
Outlet to gulf 
Intercepting drainage channel. 
Drainage control structure 
Diversion channel 
Charenton Canal 
West Atchafalaya protection 
levee borrow pit channel 
Bayou Courtableau spillway 
Bayou des Glaises 
BAYOU COCODRIE AND 
TRIBUTARIES 
Bayou Courtableau 
Bayou Cocodrie 
Bayous Cocodrie-Boeuf 
diversion 
Bayou Boeuf 
Bayous Boeuf-Rapides 
diversion 
Upper Cocodrie 
Bayou Boeuf 
Bayou Lamourie to Kincaid 
Structures 
Lecompte Control Structure 
Bayou Rapides Control 
Structure 
Bayou Lamourie Control 
Structure 
Various 
LAKE PONTCHARTRAIN, LA 
Lake Pontchartrain, Jefferson 
Parish, LA 
AMITE RIVER, LA 
Amite River, LA 
LOWER RED RIVER, SOUTH 
BANK, RED RIVER 
LEVEES, LA 
Moncla-Hotwells 
Bayou Rapides Pumping 
plant and gravity 
structure 
Red River-Moncla to Lake 
Long 
Washington to west protection 
levee. 
Flood protection 
23) 
Bank protection 
Levee, south bank 
Levee, south bank 
Levees 
Authorized by Public Law 
81-516. 
Eliminated by Public Law 
89-298. 
-- 
Senate Doc. (Public Law 84-99) 
Added to project by 
Public Law 101-514. 
Intermittent (Sec. 6). 
41-22 
Enlargement and additional 
culverts 
Enlargement and realinement 
New channel 
New channel 
New channel 
Enlargement, clearing, and 
snagging 
Enlargement, realinement, 
clearing, and snagging 
Fixed elevation weir 
Gated drainage structure 
Gated drainage structure 
Railway, highway, and local road 
bridges, and pipeline crossing 
0-17 
17-40 
40-51 
51-60 
17-42 
87-107 
40 
60 
87 
82-145

MISSISSIPPI RIVER COMMISSION 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
above 
mouth Locality Improvement Remarks 
EASTERN RAPIDES AND 
SOUTH-CENTRAL 
AVOYELLES PARISHES, LA 
Eastern Rapides and southcentral 
Avoyelles Parishes, 
LA 
TENSAS BASIN, AR AND LA 
Red River backwater area 
Tensas-Cocodrie area 
Larto Lake-Jonesville 
Sicily Island area 
Below Red River area 
Black River, LA 
Six Mile Bayou area 
Jonesville, LA 
Ouachita River 
Boeuf and Tensas Rivers and 
Bayou Macon, AR and LA 
Boeuf River, AR and LA 
Below Bayou La Fourche 
Bayou La Fourche 
Boeuf River, AR and LA 
above Bayou La Fourche 
Canal 19 
Canal 19 extension 
Big and Colewa Creeks 
Tributaries of Boeuf River-- 
Canal 19 
Fleschmans Bayou 
Caney Bayou 
Big Bayou 
Canal 18 
Kirsch Lake Canal 
Black Pond Slough 
Bayou Macon, AR and LA 
Bayou Macon 
Canal 43 
Canal 81 
Flood protection and drainage 
improvement 
Levees, drainage channels, 
structures, and pumping plant 
Levees, drainage channels, and 
structures 
Levees, drainage channels, 
structures, and pumping plants 
Levees, drainage channels, 
structures, and pumping plants 
Drainage structure and 
appurtenant channel works 
Levees, floodwall, pumping 
plant, and interior drainage 
Levees, drainage channels, and 
structures 
Clearing 
Channel improvement and 
realinement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Authorized by Public Law 
91-611. 
(4) 
(4) 
(4) 
(4) 
Unpublished VXD-MRC Letter 
Report dated May 31, 1977, 
MR&T authority. 2 
Portion of levee built under 
Sec. 6. Incorporated in MR&T 
by Public Law 81-516.2 
Monroe to Sandy Bayou and 
Bawcomville (Sec. 6). 
() 
() 
Authorized by Public Laws 
78-534 and 79-526. 2,3 
(s) 
() 
Authorized by Public Law 
78-534. 3 
(6) 
(6) 
(s) 
(6) 
(6) 
(6) 
See Table 41-E
(s) 
(s) 
41-23 
3-56 
3-56 
56 
0-32 
0-56 
151-235 
210-286 
286-296 
0-75 
0-8 
0-7 
0-33 
0-10 
0-9 
0-14 
0-170 
0-34 
0-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
above 
mouth Locality Improvement Remarks 
Lake Chicot 
0-6 
0-165 
0-22 
0-0.2 
To divert flows from 
Lake Chicot 
Authorized by Public Law 
90-483. 
Clearing (6) 
Channel improvement 
Channel improvement 
Filling canal 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
89-298. 
Authorized by Public Law 
81-516. 
Levee, south bank 
Revetment 
Pumping plant and drainage 
structure 
Tributary of Bayou Macon 
Rush Bayou 
Tensas River, AR and LA 
Tensas River 
Tributary of Tensas River 
Mill and Vidal Bayous 
Grant's Canal, LA 
Grant's Canal at Lake 
Providence 
LOWER ARKANSAS RIVER, 
AR 
Yancopin-Pine Bluff 
Fletcher Bend, AR, to 
Pine Bluff 
North Little Rock to Gillett 
(below Plum Bayou) 
GRAND PRAIRIE-BAYOU 
METO, AR 
Grand Prairie Region and 
Bayou Meto Basin, AR 
YAZOO BASIN, MS 
Yazoo Backwater area 
Yazoo River System below 
Arkabutla Lake 
Yazoo River between Yazoo 
City and Prichard 
Yazoo River between Yazoo 
City and Askew 
Will M. Whittington Auxiliary 
Channel 
Yazoo City protection 
Rocky Bayou area 
Belzoni protection 
Greenwood protection 
Arkabutla Lake 
Yalobusha River below 
Grenada Lake 
Grenada Lake 
Tallahatchie River-Little 
Tallahatchie River 
(5) 
Authorized by Public Law 
81-516. 
-- 
Including Tallahatchie and 
Coldwater Rivers. 
Intermittent. 
Intermittent. 
Floodway channel 
Levee, drainage structure, and 
pumping plant 
Channel clearing and 
enlargement 
Levee and floodwall 
Levees, channel improvement, 
drainage structures, and 
pumping plants 
Flood detention and conservation 
Channel improvement 
Improvement of 7.8 miles was 
approved Apr. 29, 1970. 
See Table 41-C. 
-- 
See Table 41-C. 
23-98 
35-98 
48-102 
0-75 
0-381 
75-366 
75-345 
45-109 
75 
127 
185 
381 
0-64 
64 
0-24 
41-24 
Levee, north bank 
Aquifer protection. 
water supply and environmental 
improvements 
Levees and pumping plants 
Channel improvement 
Levees, right bank 
Levees, left bank 
Flood detention and conservation See Table 41-C. 
Levees, Panola-Quitman Floodway --

MISSISSIPPI RIVER COMMISSION 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
above 
mouth Locality Improvement Remarks 
0-26 
26 
0-13 
13 
0-88 
137-260 
75-381 
0-8.3 
0-23 
0-42 
275-290 
0-204 
0-8 
0-28 
0-81 
0-43 
0-4 
0-27 
153-160 
0-68 
Little Tallahatchie River 
below Sardis Lake 
Sardis Lake 
Yocono River below Enid Lake 
Enid Lake 
Cassidy Bayou below Old 
Coldwater River 
Upper Yazoo Projects 
Area between main stem and 
hills including Bobo Bayou 
McKinney Bayou 
enlargement of pumping plant. 
Alligator-Catfish Bayous 
Bear Creek 
Whiteoak Bayou 
Tallahatchie River, MS 
Big Sunflower River, etc. 
Big Sunflower River 
Hull Brake-Mill Creek Canal 
Hushpuckena River 
Quiver River 
Gin and Muddy Bayous, MS 
Bogue Phalia 
Ditchlow Bayou 
Little Sunflower River 
Deer Creek 
Steele Bayou 
Muddy Bayou 
Channel improvement 
Flood detention and conservation 
Channel improvement 
Flood detention and conservation 
Channel improvement 
Floodway channel 
Levees and channel improvement 
Channel improvement and 
Channel improvement 
Channel improvement 
Channel improvement 
Two road crossings of Panola- 
Quitman Floodway, MS, and for 
protection of Sheley Bridge 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Water-control structure 
41-25 
See Table 41-C. 
-- 
See Table 41-C. 
Including Moores Bayou, Cutoff 
Bayou, Whiting Lake and 
outlet. 
-- 
Authorized by Public Law 
79-526. 
Authorized by Public Law 
79-526. 
Authorized by Public Law 
89-298. 
As modified in GDM in 1967. 
Authorized by Public Law 
89-298. 
Authorized by Public Law 
89-298. 
Authorized by Public Law 
90-147. 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
87-874. 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
78-534. 3 
Authorized by Public Law 
78-534. 3 
Modified in December 1970. 
See Table 41-D. 
Approved Mar. 3, 1970. See 
Table 41-D.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
above 
mouth Locality Improvement Remarks 
13-55 
LOWER WHITE RIVER AND 
BASIN, AR 
Laconia Circle-Old Town Lake 
Big Creek and tributaries 
structures 
Clarendon levee 
Augusta to Clarendon 
De Valls Bluff 
Des Arc, AR 
CACHE BASIN, AR 
Cache River, AR 
Bayou DeView, AR 
ST. FRANCIS RIVER AND 
BASIN, AR AND MO 
Inter-River Drainage District 
in Missouri 
Mouth of St. Francis River- 
Wappapello Dam 
Wappapello Lake 
Little River Basin 
Marked Tree, AR 
Tyronza River 
Big Slough Ditch 
Mayo Ditch 
Cross County Ditch 
Belle Fountain Ditch 
Drainage District No. 17 
L'ANGUILLE RIVER, AR 
L' Anguille River and 
tributaries, Brushy and First 
Creeks 
WEST TENNESSEE 
TRIBUTARIES 
Wolf River and tributaries, TN 
Obion River and tributaries, 
North, South, Middle, and 
0-68 
41-26 
Levee, backwater including 
outlet 
Pumping plant 
Channel improvement and 
Levee and outlet structures 
Levees, outlet structures 
Levee, outlet structure, and 
pumping station 
Levee, outlet structure, and 
pumping station 
Channel improvement and 
structures 
Channel improvement and 
structures 
Channel improvement and two 
outlet structures 
Floodway, levees, drainage 
channels, and structures 
Flood detention and conservation 
Floodway, levees, drainage 
channels, and structures 
Marked Tree Siphon 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement 
Channel improvement and 
pumping station 
Channel improvement 
Channel improvement 
Channel improvement 
Mile 605-645 Mississippi River. 
(6) 
Authorized by Public Law 
89-298. 
Authorized by Public Law 
89-298. 
(s) 
(5) 
Authorized by Public Law 
81-516. 
Authorized by Public Law 
81-516. 
Authorized by Public Law 
81-516. 
Authorized Dec. 16, 1975. See 
Table 41-D. 
-- 
See Table 41-C. 
Authorized by Public Law 
90-483. 
-- 
--
_-- 
-- 
Authorized by Public Law 
90-483. 
Authorized by Public Law 
80-858. 
(6) 
Authorized by 1948 Flood 
Control Act. 
99 
108-192 
122 
143 
0-196 
0-90 
260 
0-225 
225 
0-105 
86 
0-36 
0-29 
0-17 
0-12 
0-108 
0-25

MISSISSIPPI RIVER COMMISSION 
TABLE 41-B MISSISSIPPI RIVER TRIBUTARY AND 
(Continued) OUTLET IMPROVEMENTS 
Mileage 
above 
mouth Locality Improvement Remarks 
Rutherford Forks 
Forked Deer River and 
tributaries, North, Middle, 
and South Forks 
Mud Lake Pumping Station, 
TN 
Harris Fork Creek, TN 
and KY 
Porter Gap, TN 
REELFOOT LAKE-LAKE 
NO. 9, TN AND KY 
Running Reelfoot Bayou, TN 
Bayou du Chien and Lake 
No. 9, KY and TN 
WEST KENTUCKY 
TRIBUTARIES, KY 
0-47 Obion Creek, KY 
Channel improvement 
Pumping plant 
Flood control improvements 
Construction to main-stem 
standards, levee and 
appurtenant structures for 
flood control 
Channel improvement 
Channel improvements and 
pumping station 
Channel improvement 
Authorized by 1948 Flood 
Control Act. 
Authorized by Resolutions 
Dec. 15 and 17, 1970.2 
Authorized by Water Resources 
Act of Oct. 22, 1976.2 Section 
102, 1976.2 
Section 183, 1976.2 
Authorized by Public Law 
83-780. 
Authorized in December 1970. 
See Table 41-D. 
Authorized by Public Law 
89-298. 
LITTLE RIVER DIVERSION 
CHANNEL, MO 
Delta to Ancell, MO 
MISSOURI RIVER, MO 
Mouth to St. Charles, MO 
ILLINOIS RIVER, IL 
Mouth to Havana, IL 
OHIO RIVER, IL AND KY 
Cairo to Mound City and 
Mounds, IL 
Levees 
Levees 
Levees 
Mile 49 above Cairo. 
Intermittent (Sec. 6). 
Intermittent (Sec. 6). 
Floodwall, levee, revetment, and 
pumping plant 
1. General data concerning Bayou Boeuf, Bayou Sorrel, and Berwick locks where Atchafalaya Basin protection levees cross 
Gulf Intracoastal Waterway, alternate route to Plaquemine, LA, and lower Atchafalaya River (extension of Bayou Tech 
Waterway), respectively, are in report of New Orleans District. 
2. Also see Table 41-D, "Authorizing Legislation." 
3. Public Law 81-516 modified requirements of local cooperation. 
4. Authorized by Public Law 77-228. Modified by Public Law 89-298. 
5. Authorized or incorporated in MR&T by Public Law 79-526.3 See Table 41-D. 
6. Authorized by Public Law 85-500. 
41-27 
0-20 
0-15 
0-28 
0-120

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-C MISSISSIPPI RIVER TRIBUTARY 
DAMS AND LAKES 
Grenada Enid Sardis Arkabutla Wappapello 
Name' Lake Lake Lake Lake Lake 
River 
Nearest town to damsite 
Drainage area, square miles 
Conservation pool: 
Area, thousand acres 
Volume, thousand acre-feet 
Elevation, feet, NGVD 
Flood control pool: 
Area, thousand acres 
Volume, thousand acre-feet 
Runoff, inches 
Outlet gates: 
Number 
Size, feet 
Capacity, thousand cubic 
feet per second 
Spillway: 
Type, uncontrolled 
Length, feet 
Elevation, crest, feet, NGVD 
Discharge capacity, thousand 
cubic feet per second 
Surcharge pool: 
Area, thousand acres 
Volume, thousand acre-feet 
Runoff, inches 
Elevation, feet, NGVD 
Dam: 
Type, earthfill 
Length, thousand feet 
Elevation, crest, feet, NGVD 
Yalobusha 
Grenada 
1,320 
10 
86 
193.0 
65 
1.252 
17.8 
3
7.5 by 14 
10.7 
Chute 
200 
231.0 
52 
Yocona 
Enid 
560 
6
58 
230.0 
28 
602 
20.2 
Little Tallahatchie 
Sardis 
1,545 
11 
108 
236.0 
58.5 
1,462 
17.7 
2 4 
8 by 16 6 by 12 
9.4 10.0 
Chute 
200 
268.0 
50 
106 
1,385 
19.7 
247.5 
Rolled 
13.9 
256.0 
41 
554 
18.5 
284.0 
Rolled 
8.4 
293.0 
Chute 
400 
281.4 
132 
90 
1,447 
17.6 
301.0 
Hydraulic 
15.3 
311.4 
41-28 
Coldwater 
Arkabutla 
1,000 
5
31 
209.3 
33 
494 
9.3 
3
8.5 by 19 
10.0 
Chute 
300 
238.3 
St. Francis 
Wappapello 
1,310 
4
31 
354.7 
23 
582 
8.4 
3
10 by 20 
18.0 
Gravity 
740 
394.7 
229 
32 
521 
7.5 
413.7 
Rolled 
2.7 
419.7 
89 
63 
858 
16.1 
256.3 
Rolled 
11.5 
264.3 
1. Grenada, Enid, Sardis, and Arkabutla Lakes are in Yazoo River Basin, MS; Wappapello Lake is in St. Francis River 
Basin, MO.

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
Act or 
Authorization Work Authorized Document 
May 15, 1928 
Jun. 19, 1930 
Feb. 15, 1933 
Apr. 23, 1934 
Aug. 30, 1935 
Jun. 15, 1936 
Jun. 28, 1938 Construction of Mounds to Mound City levee and control works 
along Cache River, IL. 
Modification of previous act pertaining to floodways and outlets 
and lands therein; including program for the improvement and 
regularization of the Mississippi River, between Cairo and 
Arkansas River, extension of levee road system; strengthening 
of levees. 
Enlarge main line levees to offset abandonment of floodways 
between Arkansas and Red Rivers, flood-control works in 
backwater areas of Yazoo and Red Rivers, and in Bayous 
Rapides, Beouf, and Cocodrie, LA. 
Flood protection in alluvial valley of Mississippi River, revetment 
and contraction works and dredging to provide least channel 
depth of 9 feet and width of 300 feet below Cairo. 
Provided for allotment of the balance of emergency rescue funds 
to reimburse levee districts and others for expenditures in floodcontrol 
works during the 1927 and subsequent floods. 
Provided for ownership of lands in Bonnet Carre' Spillway and 
Floodway with proviso for granting rights-of-way, easements, 
and permits, in said lands. 
Authorized payment for purchase of, or to reimburse states and 
local levee districts for the cost of, levee rights-of-way for floodcontrol 
work in the Mississippi Valley, and for other purposes. 
Improvement of Wolf and Nonconnah Rivers, TN (Nonconnah 
Creek is correct title). 
Improvement of Wolf River (Memphis Harbor), TN. 
Modification of the 1928 Act to provide for: 
Construction of a backwater levee at mouth of White River, AR. 
Construction of Eudora floodway in lieu of Boeuf floodway; flood 
control, Yazoo River: construction of Morganza floodway; and an 
outlet to the Gulf of Mexico west of Berwick, LA, including a 
6-year program for the improvement and regularization of the 
Mississippi River between Arkansas and Red Rivers, and 
Atchafalaya River; and construction of roads on levees and 
drainage adjustments incident to floodway levees. 
Provided for construction of floodwalls, levees, and revetments 
along Wolf River and Nonconnah Creek for protection of 
Memphis, TN. 
Modify the Yazoo River project to substitute a combined 
reservoir floodway and levee plan. 
Unpublished report on 
record in OCE. 
H. Comm. on Flood 
Control, 
Doc. 1, 75th Cong., 
1st sess. 
H. Comm. on Flood Control, 
Doc. 1, 75th Cong., 
1st sess. 
H. Doc. 359, 77th Cong., 
1st sess. 
41-29 
H. Doc. 90, 70th Cong., 
1st sess. 
Public Law 395, 71st Cong., 
2d sess. 
Public Law 351, 72d Cong. 
Public Law 171, 73d Cong. 
R&H Comm. Doc. 26, 
72d Cong., 1st sess. 
R&H Comm. Doc. 45, 
74th Cong., 1st sess. 
Unpublished report dated 
Apr. 2, 1925. 
H. Comm. on Flood 
Control, 
Doc. 1, 74th Cong., 
1st sess. 
Aug. 28, 1937 
Aug. 18, 1941

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Dec. 22, 1944 Navigation channel 12 feet deep and 300 feet wide between 
Baton Rouge and Cairo; flood protection of Yazoo River 
Backwater Area in vicinity of Satartia, MS. 
Continue prosecution of channel improvement and stabilization 
program, $200 million. 
Jul. 24, 1946 Flood control on the Big Sunflower, Little Sunflower, 
Hushpuckena, and Quiver Rivers and their tributaries, and on 
Hull Brake-Mill Creek Canal, Bogue Phalia, Ditchlow Bayou, 
Deer Creek, and Steele Bayou, MS.' 
Improve Boeuf and Tensas Rivers and Bayou Macon, AR. 1 
Improve Bayou Lafourche, LA. 
Improve Yazoo River tributaries. 
North bank, Arkansas River levees(below Plum Bayou). 
Levees on White River (Augusta to Clarendon). 1 
Bayou des Glaises diversion channel, LA.' 
Modify local cooperation requirements in St. Francis and Yazoo 
Basins. 
Tiptonville-Obion levee and drainage improvements. 
Improvement of St. Johns Bayou, MO. 
Big Sunflower River, etc.1 
Tennessee Chute (Memphis Harbor), TN. 
Continue prosecution of project for flood control and channel 
improvement, $100 million. 
Jun. 30, 1948 Improve Mississippi River below Cape Girardeau, MO, with 
respect to West Tennessee tributaries. 
Improve L' Anguille River, AR. 
Baton Rouge Harbor (Devils Swamp), LA.' 
May 17, 1950 Flood protection at Des Arc, AR. 
Improve St. Francis River and Basin, AR and MO. 
Improve Cache River and Bayou DeView, AR and MO. 
Improve Grand Prairie Region and Bayou Meto Basin, AR. 
H. Doc. 509, 78th Cong., 
2d sess. 
Public Law 534, 
78th Cong., 2d sess. 
H. Doc. 516, 78th Cong., 
2d sess. 
S. Doc. 151, 78th Cong., 
2d sess. 
S. Doc. 191, 79th Cong., 
2d sess. 
H. Doc. 516, 78th Cong., 
2d sess. 
H. Doc. 308, 74th Cong., 
1st sess. 
H. Doc. 98, 76th Cong., 
1st sess. 
H. Doc. 602, 79th Cong., 
2d sess. 
Public Law 526, 
79th Cong., 2d sess. 
H. Doc. 757, 79th Cong., 
2d sess. 
H. Doc. 138, 80th Cong., 
1st sess. 
H. Doc. 516,78th Cong., 
2d sess. 
S. Doc. 51, 80th Cong., 
1st sess. 
Public Law 526, 
79th Cong., 2d sess. 
H. Doc. 627, 
80th Cong., 2d sess. 
H. Doc. 651, 
80th Cong., 2d sess. 
H. Doc. 321, 80th Cong., 
1st sess. 
H. Doc. 485, 81st Cong., 
2d sess. 
H. Doc., 132, 81st Cong., 
1st sess. 
S. Doc. 88, 81st Cong., 
1st sess. 
H. Doc. 255, 81st Cong., 
1st sess. 
41-30

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Flood protection, Lake Pontchartrain, Jefferson Parish, LA. 1 
Filling Grant's Canal, Lake Providence, LA. 
Additional protection to Red River Backwater Area. 
Extend Federal jurisdiction to cover levees in Orleans Parish, LA. 
Bank protection, Amite River, LA. 
Continue prosecution of project for flood control and channel 
improvement, $200 million. 
Jonesville, LA, levee, retaining wall, and drainage structure. 1 
Oct. 30, 1951 Modify requirements for local cooperation in White River 
Backwater Area, AR. 
Sep. 3, 1954 Navigation improvement of Atchafalaya from Mississippi River 
to Morgan City, LA. 
Modify project for Vicksburg-Yazoo Area (Harbor), MS. 
Improve New Madrid Floodway, MO, including Peafield drainage 
floodgate. 
Control of Old and Atchafalaya Rivers and a lock for navigation. 
Improve Reelfoot Lake area, KY and TN. 
Jul. 3, 1958 Improve Greenville Harbor, MS. 
Extensions to project for Boeuf and Tensas Rivers and Bayou 
Macon in Arkansas. 
White River backwater area pumping plant. 
Wolf River and tributaries for flood protection in Tennessee. 
Jul. 14, 1960 Continue prosecution of project for channel improvement-- 
$50 million. 
Oct. 23, 1962 Modification--Baton Rouge Harbor (Devils Swamp), LA. 
Construct improvements in Gin and Muddy Bayous, Yazoo River 
Basin, MS. 
Replace 2 bridges with adequate floodway over Boeuf River and 
Big Bayou in Boeuf Basin, AR. 
Jun. 18, 1965 Continue prosecution of project for flood control and channel 
improvement, $53 million. 
S. Doc. 139, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
Public Law 516, 81st Cong., 
2d sess. 
S. Doc. 117, 81st Cong., 
1st sess. 
Public Law 237, 82d Cong., 
1st sess. 
S. Doc. 53, 82d Cong., 
1st sess. 
H. Doc. 85, 83d Cong., 
1st sess. 
H. Doc. 183, 83d Cong., 
1st sess. 
H. Doc. 478, 83d Cong., 
2d sess. 
S. Doc. 160, 83d Cong., 
2d sess. 
S. Doc. 15, 86th Cong., 
1st sess. 
H. Doc. 108, 85th Cong., 
1st sess. 
S. Doc. 26, 85th Cong., 
1st sess. 
H. Doc. 76, 85th Cong., 
1st sess. 
Public Law 86-645. 
Public Law 87-874. 
Public Law 87-874 
Public Law 87-874. 
Public Law 89-42. 
41-31

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Modify and expand levees and channel improvement features of 
main stem project. 
Modify flood control improvements in following tributary areas 
and basins: Cairo-Mounds-Mounds City, St. Francis, Lower 
White, Boeuf-Tensas-Macon, Red River backwater, Yazoo 
headwater, Grand Prairie, and Bayou Meto. 
Acquire any modified easements required in New Madrid 
Floodway as provided by Sec. 4 of May 15, 1928 act. 
Operate and maintain pumping plant in Red River backwater 
area (Tensas-Cocodrie Pumping Plant). 
Provide improvements in West Kentucky tributaries. 
Provide fish and wildlife facilities in St. Francis and Big 
Sunflower Basins; Yazoo Headwater and Backwater Areas; and 
Mississippi Delta region. 
Deauthorize Amite River, LA, project. 
Modify St. Francis River, MO and AR, project within District 
No. 7, Poinsett County, AR. 
Provide pumping plant and drainage structure at Wilson 
Point, LA. 
Nov. 7, 1966 Construction of improvements to supplement freshwater supply 
in Teche-Vermilion Basins in Louisiana. 
Bank revetment for protection of existing industrial facilities 
along Mississippi River below Baton Rouge, LA. 
Modification of West Tennessee tributaries feature to provide 
relocation of gas transmission lines at Federal expense. 
Nov. 20, 1967 
Aug. 13, 1968 
Sep. 10, 19683 
Mar. 3, 19703 
Continue emergency work, $87,135,000, which includes $100,000 
for road crossing of Panola-Quitman Floodway, MS, and $80,000 
for protection of Sheley Bridge, Tallahatchie River, MS. 
Improvements in Boeuf and Tensas Rivers and Bayou Macon 
Basin to divert flows that would otherwise enter Lake Chicot, 
AR. 
Improvements in the Belle Fountain ditch and tributaries, MO, 
and Drainage District No. 17, AR. 
Provide pumping plants and other drainage facilities in Cairo, 
IL, and vicinity. 
Modification of Yazoo Headwater Project to include cleanout 
along David Bayou, MS. 
Modify Yazoo Backwater feature to include a control structure in 
Muddy Bayou, MS. 
Oct. 27, 1965 
41-32 
H. Doc. 308, 88th Cong., 
2d sess. 
H. Doc. 308, 88th Cong., 
2d sess. 
H. Doc. 308, 88th Cong., 
2d sess. 
H. Doc. 308, 88th Cong., 
2d sess. 
H. Doc., 308, 88th Cong., 
2d sess. 
H. Doc. 308, 88th Cong., 
2d sess. 
H. Doc. 308, 88th Cong., 
2d sess. 
S. Doc. 57, 89th Cong., 
1st sess. 
Unpublished Vicksburg 
District's MRC report. 
Approved Apr. 14, 1966. 
H. Doc. 524, 89th Cong., 
2d sess. 
Public Law 89-789. 
Public Law 89-789. 
Public Law 90-147. 
H. Doc. 168, 90th Cong., 
1st sess. 
H. Doc. 339, 90th Cong., 
2d sess. 
Public Law 90-483. 
Unpublished MRC report 
dated May 8, 1968. 
Unpublished MRC report 
dated Feb. 2, 1970. 
Apr. 14, 19662

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Modification of Yazoo Headwater Project to include drainage 
structure and channel improvement on Rocky Bayou, MS. 
Jun. 4, 19703 Provide for enlargement of Bayou Latenache from Pointe Coupee 
drainage structure to Alabama Bayou, LA. 
Dec. 31, 1970 
Senate and 
House Public 
Works 
Resolutions 
adopted Dec. 17 
and 15, 1970, 
respectively. 4 
River Basin 
Monetary Act 
of Dec. 23, 1971 
Jan. 19, 19732 
TITLE I Water 
Resources 
Development 
Act of 1974. 
Modify and expand project to include flood protection within the 
area of eastern Rapides and south-central Avoyelles Parishes, 
LA, that are drained by Bayou des Glaises diversion channel 
and Lake Long, and their tributaries. 
Modify the project for West Kentucky tributaries (Obion Creek), 
KY, to provide for all relocations, at Federal expense, of all 
transmission lines required by the project. 
Report on Western Tennessee Tributaries, TN and KY, 
authorized: 
a. Modification of Reelfoot Lake feature to provide channel 
improvements on Bayou du Chien and Lake No. 9 in KY and 
TN. 
b. Modification of Mississippi levee feature to include a 
pumping station near Mud Lake floodgate and adjacent 
channel improvements. 
Modification of Big Sunflower Basin feature to provide 
additional improvements in Steele Bayou Basin, MS. 
Continue prosecution of project for the comprehensive 
development of the basin, $97 million. 
Modification of Tiptonville-Obion River levee feature to relieve 
local interests of all responsibility except that of providing 
maintenance. 
Modification of the Mississippi levee feature to provide additional 
drainage facilities in Long Lake area, vicinity of Helena, AR. 
Projects recommended by four completed reports were 
authorized for accomplishment of Phase I design memorandum 
of advance engineering and design on: 
a. Greenville Harbor, Greenville, MS. 
b. East bank of Mississippi River, Warren to Wilkinson 
Counties, MS (Natchez area). 
c. East bank of Mississippi River, Warren to Wilkinson 
Counties, MS (Vicksburg-Yazoo area). 
d. Bushley Bayou Area of Red River Backwater Area, LA. 
Modification of West Tennessee tributaries feature (Obion and 
Forked Deer Rivers), TN, to acquire lands for fish and wildlife, 
recreation, and environmental purposes. 
Apr. 29, 19703 
41-33 
Unpublished MRC report 
dated Mar. 6, 1970. 
Unpublished MRC report 
dated Sep. 22, 1969. 
S. Doc. 91-113, 2d sess. 
Public Law 91-611. 
H. Doc. 91-414, 2d sess. 
S. Doc. 91-74, 2d sess. 
Sec. 1, Public Law 92-222. 
Sec. 7, Public Law 92-222. 
Unpublished Memphis 
District's MRC report 
dated Oct. 4, 1972. 
Sec. 1, Public Law 93-251, 
Mar. 7, 1974. 
S. Doc. 93-38, 1st sess. 
H. Doc. 93-148, 1st sess. 
H. Doc. 93-148, 1st sess. 
H. Doc. 93-157, 1st sess. 
Sec. 3, Public Law 93-251.

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
TITLE II River 
Basin 
Monetary 
Authorization 
Act of 1974 
River Basin 
Monetary Act 
of Oct. 2, 1975 
Dec. 16, 19752 
TITLE II Public 
Works for 
Water and 
Power 
Development 
and Energy 
Research 
Appropriation 
Act, 1976. 
Modification of the Yazoo Basin, MS, feature to provide for a 
streambank erosion control demonstration project for the delta 
and hill areas of basin. 
Modification of project to provide that the Secretary of the Army, 
acting through the Chief of Engineers, can substitute authorized 
mitigation lands, not yet acquired and no longer suitable, for 
like acreage in the same or adjacent subbasins of the project 
area. This section provides the authority to substitute authorized 
mitigation lands in: 
a. Tensas Basin, LA and AR, feature (Red River backwater). 
b. St. Francis Basin, AR and MO, feature. 
Modification of Bayou Cocodrie and tributaries, LA, feature, to 
provide for: enlargement of Bayou Courtableau from 
93-251. 
Washington to west protection levee; right-of-way and spoil 
disposal areas at Federal expense; and necessary additional 
culverts through west protection levee. 
Modification of Cache River Basin, AR, feature to provide for: 
acquisition by fee easements of lands for fish and wildlife 
management, recreation, and environmental purposes. 
Continue prosecution of project for the comprehensive 
development of the basin, $211 million. 
Continue prosecution of project for the comprehensive 
development of the basin, $158,000,000. 
Modification of St. Francis Basin, AR and MO, feature to provide 
relief from ponding of interior runoff in the Inter-River 
Drainage District of Missouri. 
Continue prosecution of project for comprehensive development 
during period Jul. 1-Sep. 30, 1976, $60,300,000. 
Sec. 32, Public Law 93-251. 
Sec. 42, Public Law 93-251. 
Sec. 87, Public Law 
Sec. 99, Public Law 
93-251. 
Sec. 201, Public 
Law 93-251. 
Mar. 7, 1974. 
Sec. 1, Public Law 
94-101. 
Unpublished Memphis 
District's MRC report 
dated Nov. 11, 1975. 
Public Law 94-180, 
Dec. 26, 1975. 
41-34

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
TITLE II Public 
Works for 
Water and 
Power 
Development 
and Energy 
Research 
Appropriation 
Act, 1977. 
Water Resources 
Development 
Act of 1976. 
TITLE II Public 
Works for 
Water and 
Power 
Development 
and Energy 
Research 
Appropriation 
Act, 1978. 
Dec. 9, 1977, 5th 
Ind. on VXD 
May 31, 1977, 
Letter Report.2 
Jun. 28, 1980 
Continue prosecution of project for flood control, rescue work, 
repair, restoration, and control of bank erosion, $231,497,000. 
Sec. 101(a) authorized accomplishment of Phase I - Advanced 
Engineering and Design Memoranda-On: 
a. St. Johns Bayou and New Madrid Floodway, MO, project: 
Report of OCE - Sep. 26,1975. 
b. Nonconnah Creek, TN and MS, project: Report of OCE - 
Jun. 23, 1976, and as an independent part of the project: 
Improvements for flood control and allied purposes on Horn 
Lake Creek and tributaries, including Cowpen Creek, TN 
and MS. 
Modification of West Tennessee Tributaries feature (Obion and 
Forked Deer Rivers), TN, to: 
a. (Sec. 102) - Provide project for flood control for Harris Fork 
Creek, TN and KY: (H.D. 94-221) except that highway bridge 
relocations and alterations shall be at Federal expense. 
b. (Sec. 183) - Provide for construction of a levee and 
appurtenant works from mouth of Obion diversion channel to 
vicinity Highway 88 and thence to vicinity of Porter Gap, TN. 
Continue prosecution of project for flood control, rescue work, 
repair, restoration, and control of bank erosion, $253,081,000. 
Modification of the Tensas Basin Project, Red River Backwater 
Area, to include a drainage structure and appurtenant channel 
works in the Six Mile Bayou area of Concordia Parish, LA. 
The establishment of the Tensas River National Wildlife Refuge 
for the preservation and development of environmental 
resources and in lieu of mitigation acquisitions which 
otherwise would be required for certain water resources 
projects, within designated limits, in the basins of the Tensas, 
Boeuf, and Red Rivers in the State of Louisiana. 
Public Law 94-355, 
Jul. 12, 1976. 
Public Law 94-587, 
Oct. 22, 1976. 
Public Law 95-96 
Aug. 7, 1977. 
Unpublished Vicksburg 
District report dated 
May 31, 1977, on Cynthia 
and Six Mile Bayous, LA. 
Public Law 96-285, 
Jun. 28, 1980. 
41-35

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Energy and 
Water 
Development 
Appropriation 
Act. 1981 
Supplemental 
Appropriations 
Bill for FY 
Ending 
Sep. 30, 1985 
(PL 99-88), and 
the Water 
Resources 
Development 
Act of 1986 
(PL 99-662) 
Water 
Resources 
Development 
Act, 1986 
For expenses necessary for prosecuting work of flood control 
projects, rescue work, repair, restoration or maintenance of 
flood control projects threatened or destroyed by flood, 
$232,519,000: Provided, That not less than $250,000 be 
available for control of bank erosion of streams in the Yazoo 
Basin, including the foothill area. Provided further, That funds 
for the Tensas Basin Red River Backwater Area, be used for 
flood control, etc., for Sicily Island and Below Red River 
including pumping stations. 
Authorizes and directs the Secretary of the Army acting 
through the Chief of Engineers to proceed with planning, 
design, engineering, and construction of 41 water resources 
projects, including Atchafalaya Basin Floodway System. For 
the Atchafalaya Basin Floodway Systems project, cost-sharing 
is only required for the recreation feature of the project. The 
flood control and environmental features are Federal costs. 
Sec. 104(a), Authorization of Projects - Authorization of 
Construction: 
Incorporation of the project for flood control, Louisiana State 
Penitentiary levee, Mississippi River, LA: Report of the Chief 
of Engineers, dated Dec. 10, 1982, at a total cost of $23,400,000, 
with an estimated first Federal cost of $17,600,000 and an 
estimated first non-Federal cost of $5,800,000. No acquisition 
of land for or actual construction of the project may commence 
until appropriate non-Federal interests shall agree to 
undertake measures to minimize the loss of fish and wildlife 
habitat lands in the project area. The work is unscheduled. 
a. Bushley Bayou, LA. Water Resources Development Act of 
1986 authorized the project for flood control, Bushley 
Bayou, LA. 
b. Eight Mile Creek, Paragould, AR. Project entails channel 
improvement along the creek with miniparks and hiking/ 
biking trails. 
c. Helena and Vicinity, AR. The Helena Basin is an urban 
basin containing approximately 3,500 acres which 
frequently and severely floods the city of Helena. A 
pumping station and sump with channel enlargement and a 
gated culvert was recommended. 
d. West Memphis and Vicinity, AR. Channel improvements 
along Ten Mile Bayou and Fifteen Mile Bayou for a total of 
23.86 miles, with limited revegetation of right-of-way to 
maintain environmental stability. 
e. St. Johns Bayou and New Madrid Floodway, MO. Flood 
control for urban and rural land. 
Public Law 96-367, 
Oct. 1, 1980. 
FY 1985 Supplemental 
Appropriations Bill 
(PL 99-88), and Water 
Resources Development 
Act of 1986 (PL 99-662). 
Public Law 99-662, 
Nov. 17, 1986. 
41-36

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
f. Nonconnah Creek and Johns Creek, TN and MS. Channel 
enlargement, recreation features with channel construction 
and environmental enhancement. 
g. Horn Lake Creek and Tributaries, TN and MS. This is an 
urban flood control project located in extreme northwest 
Mississippi and southwest Tennessee. The plan of 
improvement consists of 3.5 miles of selective drift removal 
on lower Horn Lake Creek and 2.6 miles of vegetative 
clearing on Horn Lake Creek, 2.1 miles on Rocky Creek and 
0.6 miles of vegetative clearing and 1.8 miles of channel 
enlargement on Cow Pen Creek. Hike/bike trails are 
included along Rocky Creek and Cow Pen Creek. 
h. Atchafalaya Basin Floodway System, La. Not mentioned, 
but this Act authorized basic cost sharing principles 
for the project. In particular establishes that the 
fish and wildlife enhancement feature of the project is of 
national significance, and therefore, a 100 percent Federal cost. 
i. Lower Atchafalaya Basin Reevaluation Study. Authority 
to, within available funds, investiage conditions at Wax 
Lake Outlet, Bayou Black, and other features, and 
recommend any modification desirable for flood protection 
navigation, and environmental program. 
Sec. 601(a) Authorization of Projects. Authorization of 
Construction: 
a. Yazoo Backwater Area, MS. Authorized the project for 
mitigation of fish and wildlife losses at the Yazoo 
Backwater Project, MS. The project shall include 
acquisition of 40,000 acres for mitigation of project-induced 
fish and wildlife losses. 
b. Greenville Harbor, MS. Authorized the project for 
navigation, Greenville Harbor, MS, as contained in the 
reports of Chief of Engineers, Nov. 15, 1977 and 
Feb. 2, 1982, at a total cost of $43,700,000 with an estimated 
first Federal cost of $28,000,000 and an estimated non- 
Federal first cost of $15,700,000. 
c. Vicksburg Harbor, MS. Authorized the project for 
navigation, Vicksburg Harbor, as contained in the report of 
the Chief of Engineers, Aug. 13, 1979, at a total estimated 
first Federal cost of $55,900,000 and an estimated non- 
Federal first cost of $23,300,000. 
d. Helena Harbor, Phillips County, AR. The recommended 
plan consists of dredging a navigation channel to provide 
access to 685 acres of landfill; construction of an overlook 
park; implementing landscaping and erosion control 
measures; and mitigation fish and wildlife losses. The 
project is scheduled to be constructed in two phases. 
41-37 
Energy 
and water 
Development 
Appropriation 
Act, 1994

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
e. White River Navigation to Batesville, AR. The plan of 
improvement recommended in the Feasibility Report 
provides for construction and maintenance to provide a 
200-foot wide, 9-foot deep channel available 95 percent of the 
time from mile 10 (Arkansas Post Canal) to mile 254, two 
scenic overlooks, a primitive camping area, and acquisition 
of about 1,865 acres of woodlands for mitigation. However, 
section 52 of the Water Resources Development Act of 
1988 deauthorized this project. 
f. Obion Creek, KY. To prevent headwater flooding along 
tributary streams and backwater flooding of alluvial lands. 
g. Memphis Harbor, Memphis, TN. This is a navigation 
project in the vicinity of Memphis, TN, which would consist 
of dredging and maintaining a 4.9 mile long, 500-foot 
minimum width, 9-foot deep general navigation channel 
with additional dredging as required and strategic 
placement of dredged material to create and provide 
navigation access to 1,000 acres to be developed as a 
waterfront industrial complex. 
Sec. 806. Reelfoot Lake, KY. This project is modified to 
provide that the Federal share of the cost of operating the 
pumping plant feature of such project shall be 50 percent. 
Sec. 836. Mud Lake, Western Tennessee Tributaries. This 
project is modified to provide that the requirements of local 
cooperation shall be (1) 50 percent of the value of the lands, 
easements, and rights-of-way, (2) to hold and save the United 
States free from damages due to the construction works, and 
(3) to maintain and operate all the works after completion. 
Jun. 4, 1987 Modification of Mississippi Delta Region project to construct 
salinity control structure at Davis Pond (mile 118) rather than 
at Myrtle Grove (mile 59). 
Water 
Resources 
Development 
Act, 1988 
Water 
Resources 
Development 
Act, 1988 
Sec. 3(a), Project Authorizations - Authorization of 
Construction: 
a. Mississippi-Louisiana Estuarine Area, MS and LA. 
Authorized the project for environmental enhancement, 
as contained in the report of Chief of Engineers, dated 
May 19, 1986, at a total cost of $59,300,000. 
Section 4(b) 
West Memphis and Vicinity, AR. Modified the project 
by allowing that non-Federal cooperation may be 
provided by levee districts, drainage districts, or 
any unit of a state, county, or local government. 
Unpublished New Orleans 
District report, 
Nov. 1, 1984. 
Public Law 100-676 
Nov. 17, 1988 
Public Law 100-676, 
Nov. 17, 1988 
41-38

MISSISSIPPI RIVER COMMISSION 
TABLE 41-D AUTHORIZING LEGISLATION 
(Continued) 
Act or 
Authorization Work Authorized Document 
Energy and 
Water 
Development 
Appropriation 
Bill, 1990 
Energy and 
Water 
Development 
Appropriation 
Bill, 1990 
West Memphis and Vicinity, AR. 
Directed the Corps to develop the most cost-effective 
flood control plan for the City of West Memphis without 
regard to frequency of flooding, drainage area, and the 
amount of runoff. 
Bayou Rapides Drainage Structure and Pumping Plant 
Directed the Secretary of the Army to incorporate 
existing flood control features for the Bayou Rapides 
Drainage Structure and Pumping Plant into the Lower Red 
River, South Bank Levees portion of the MR&T Project. 
Public Law 101-83, 
Jul. 25, 1989 
Public Law 101-514, 
Nov. 5, 1990 
Supplemental Atchafalaya Basin Floodway System, LA. 
Appropriations 
Bill for FY 
Ending 
Sep. 30, 1985 
(PL 99-83), and 
the Water 
Resources 
Development 
Act of 1986 
(PL 99-662) 
Water Resources 
Development 
Act, 1992 
Water Resources 
Development 
Acts, 1986, 
1990 and 1999 
Authorizes and directs the Secretary of the Army acting 
through the Chief of Engineers to proceed with planning, 
design, engineering, and construction of 41 water resources 
projects, including Atchafalaya Basin Floodway System. For 
the Atchafalaya Basin Floodway Systems project, cost-sharing 
is only required for the recreation feature of the project. The 
flood control and environmental features are Federal costs. 
This act authorized basic cost sharing principles for the project. 
In particular, establishes that the fish and wildlife enhancement 
feature of this project is of national significance and therefore 
a 100% federal cost. 
Whiteman's Creek, Arkansas. 
Directed the Secretary of the Army to implement flood control 
improvement, which essentially consist of 6.1 miles of channel 
enlargement along streams within the city limits of Jonesboro, 
Arkansas. 
Louisiana State Penitentiary Levee, Mississippi River, Louisiana 
FY 1985 Supplemental 
Appropriations Bill 
(PL 99-88), and Water 
Resoureces Development 
Act of 1986 (PL 99-662). 
Public Law 102-580 
Oct. 31, 1992 
Public Law 99-662 
Nov. 17, 1986 
Authorizes and directs the Secretary of the Army, acting through 
the Chief of Engineers to proceed with planning, design, 
engineering, and construction of improvements of 12 miles of 
existing levee along the Mississippi River which provides flood 
protection to the Louisiana State Penitentiary at Angola, LA. 
This act authorizes basic cost sharing principles, and 
establishes that the cost sharing will be shared on a 75 %/25 % 
basis with the state of Louisiana for this project. 
Authorizes the Secretary of the Army to consider credit for work 
performed by an non-Federal sponsor since project authorization. 
Public Law 101-646 
Nov. 28, 1990 
Public Law 106-53 
Aug. 17, 1999 
1. Incorporated into Mississippi River and tributaries project as shown in Table 41-E. 
2. Date minor modification for blocked drainage was approved under delegated authority of the President, Mississippi River 
Commission, and in accordance with Sec. 10(p) of the 1946 Flood Control Act (Public Law 79-526). 
3. Date minor modification was approved under discretionary authority of Chief of Engineers contained in May 15, 1928, 
Flood Control Act, as amended. 
4. Projects approved under the provisions of Sec. 201 of Flood Control Act of Oct. 27, 1965. 
41-39

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-E INCORPORATING AND AUTHORIZING 
LEGISLATION 
For Last 
Public Full Report 
Act of Law Authorizing See Annual 
Incorporation No. Act Description Report for 
Jul. 24, 1946 79-526 Jun. 22, 1936 Tiptonville-Obion levee and drainage 1941, p. 943 
improvements, TN 
Jul. 24, 1946 79-526 Jun. 22, 1936 Bayou des Glaises diversion ditch, LA 1946, p. 1029 
Jul. 24, 1946 79-526 Jun. 22, 1936 From North Little Rock, AR, to Gillett, 1946, p. 1053 
AR, on north bank of Arkansas River 
(portion below Plum Bayou) 
Jul. 24, 1946 79-526 Aug. 18, 1941 White River levees, Augusta to 1946, p. 1083 
Clarendon and De Valls Bluff, AR 
Jul. 24, 1946 79-526 Dec. 22, 1944 Boeuf and Tensas Rivers and Bayou 1945, p. 982 
Macon, LA 
Jul. 24, 1946 79-526 Dec. 22, 1944 Big Sunflower River, etc. 1946, p. 1061 
Jun. 30, 1948 80-858 Jul. 24, 1946 Devils Swamp barge channel at Baton 1948, p. 1059 
Rouge, LA (Baton Rouge Harbor) 
May 17, 1950 81-516 Jun. 22, 1936 Jonesville, LA 1953, p. 773 
May 17, 1950 81-516 Jul. 24, 1946 Lake Pontchartrain-Jefferson Parish, LA 1953, p. 737 
41-40

MISSISSIPPI RIVER COMMISSION 
TABLE 41-F SUMMARY OF PRESENTLY ESTIMATED 
FEDERAL FIRST COST OF AUTHORIZED IMPROVEMENTS 
Estimated Cost' 
Project Title Fiscal Year 1999 
Completed features 2 
Mississippi River levees 
Mud Lake Pumping Station, TN 
Sec. 6 levees, 1928 Flood Control Act 
Channel improvement 
Atchafalaya Basin, LA 
Atchafalaya Basin Floodway System, LA 
Bayou Cocodrie and tributaries, LA 
Old River, LA 
Lower Red River--South Bank Red River levees, LA 
Eastern Rapides and South-Central Avoyelles Parishes, LA 
Mississippi Delta Region, LA 
Tensas Basin, AR and LA 
Lower Arkansas River, AR 
Grand Prairie-Bayou Meto, AR (Flood Control & Water Supply) 
Yazoo Basin, MS 
Lower White River, AR (All except Big Creek & Tribs.) 
Lower White River (Big Creek & Tribs.) 
Cache Basin, AR 
St. Francis Basin, AR and MO 
Francis Bland Floodway Ditch (Eight Mile Creek), AR 
L'Anguille River, AR 
West Tennessee Tributaries, TN 
Harris Fork Creek, TN and KY 
Reelfoot Lake-Lake No. 9, TN and KY 
Reelfoot Lake, TN and KY (Completed) 
Reelfoot Lake-Lake No. 9, TN and KY 
West Kentucky Tributaries, KY 
Sardis Dam (Dam Safety Assurance), MS 
St. Johns Bayou and New Madrid Floodway, MO 
Nonconnah Creek, TN and MS 
Horn Lake Creek and Tributaries, TN and MS 
Greenville Harbor, MS 
Memphis Harbor (Ensley Berm), TN 
Helena Harbor, Phillips County, AR 
Helena, AR, and Vicinity 
West Memphis, AR, and Vicinity 
Vicksburg Harbor, MS 
Louisiana State Penitentiary Levee, LA 
Hickman Bluff, KY 
Whiteman's Creek, AR 
Reelfoot Lake, KY and TN (Ecosystem Restoration) 
$ 339,236,000 
2,117,000,000 
5,270,0003 
4,000,0003 
3,697,000,000 
1,870,000,000 
184,000,000 
20,400,0003 
292,273,000 
23,200,0003 
50,000,0003 
99,500,000 
476,746,000 
29,676,000' 
208,000,0003 
1,799,987,000 
16,802,000' 
55,400,0003 
155,000,000 
389,000,000 
9,100,0003 
15,100,0003 
147,000,000 
14,300,0003 
(19,440,000) 3 
440,000 
19,000,0003 
24,800,0003 
29,200,000 
59,609,0004 
18,400,0004 
3,120,0004 
32,400,0003'4 
23,100,0004 
32,156,0004 
8,380,0003'4 
11,600,0004'6 
63,500,0004 
19,500,0004,7 
17,760,0003 
3,300,000 
17,173,0003,8 
41-41

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-F SUMMARY OF PRESENTLY ESTIMATED 
(Continued) FEDERAL FIRST COST OF 
AUTHORIZED IMPROVEMENTS 
Estimated Cost' 
Project Title Fiscal Year 1999 
Mississippi - Louisiana Estuarine Areas, MS and LA 74,600,0005 
Eastern Arkansas, AR 114,0003 
Jackson and Trenton, AR 9,650,0003 
Mississippi Delta, MS 61,600,0003 
Bushley Bayou, LA 37,000,000 
Bayou Meto, AR 125,000,000 
Miss R Alexander County, IL, Scott City, MO 3,250,000 
Clarendon Levee, AR 1,576,000 
Augusta to Carendon, AR 4,601,000 
Memphis Metro, TN 26,000,000 
Wolf River, TN 7,106,000 
Morganza, LA, to Gulf of Mexico 88,400,000 
Reelfoot Lake, TN and KY 20,152,000 
TOTAL $12,843,304,000 
1. 
2. 
3. 
4. 
5. 
6. 
7. 
8. 
Inflation projected through the construction period. Harbors; Lake Pontchartrain; Wolf River; completed roads. 
Includes Bonnet Carre', Morganza, and New Madrid Floodways; Memphis, Greenville, and Vicksburg on main stem levees; 
channel construction works; Atchafalaya River and Basin; Wax Lake Outlet; Charenton Canal; Bayou des Glaises diversion 
channel, Boeuf Basin levees; Grant's Canal; De Valls Bluff, Jonesville, and Des Arc protection works; Baton Rouge Harbor; 
and miscellaneous features; Teche-Vermilion Basins, LA. 
Incremental (not projected through the construction period). 
Authorized by Water Resources Development Act of 1986, Public Law 99-662, Nov. 17, 1986. 
Authorized by Water Resources Development Act of 1988, Public Law 100-676, Nov. 18, 1988. 
Locals built their own project. 
Authorized by Water Resources Development Act of 1999, Public Law 106-53, Aug. 17, 1999. 
Authorized by Water Resource Development Act of 1999, Public Law 106-53, Aug. 17, 1999 and Report of the Chief of 
Engineers, Dec. 23, 1999. 
41-42

MISSISSIPPI RIVER COMMISSION 
TABLE 41-G MISSISSIPPI RIVER MAIN STEM 
CHANNEL IMPROVEMENTS 
Location Operations in 1,000 Cubic Yards 
Mileage Fiscal Year 1999 
Above Head Channel 
District of Passes Construction Maintenance Total 
New Orleans 
Baton Rouge Harbor 
(Devils Swamp) 235 -- 0 0 
Main stem channel 234-320 -- 1,153.2 1,153.2 
(Smithland and 
Wilkinson Pt Crossings) 
Atchafalaya Basin 1540.2 1540.2 
Berwick Bay Harbor 0 0 
Three Rivers 
Old River Lock Forebay 304 0 0 
and Tailbay 
Vicksburg 
Main stem channel 322-600 -- 646.1 646.1 
Vicksburg Harbor 437 -- 130.5 130.5 
Greenville Harbor 537 -- 221.8 221.8 
Memphis 
Main stem channel 600-954 -- 17,669 17,669 
Memphis Harbor, 
McKellar Lake 725 -- 0 0 
TOTAL -- 21,360.8 21,360.8 
41-43

TABLE 41-H BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 1999) 
Operations This FY 
Construction 
New Work 
Extension 
(Linear 
Feet) 
Lap 
(Linear 
Feet) 
Reinforcement 
(Linear Maintenance 
(Squares)' Feet) (Squares)' (Squares)' 
Nonop- Operaerative 
tive 
Since Thru 
Prior This 
FY FY 
(Linear (Linear 
Feet) Feet) 
MISSISSIPPI RIVER 
Standard Revetment: 
Venice, LA ................. 
Olga, LA ................... 
Lower Childress- 
Fort Jackson, LA ............. 
Neptune, LA ................ 
Buras, LA .................. 
Tropical Bend, LA ............ 
Bayou Lamoque, LA .......... 
P Port Sulphur, LA ............. 
Nestor, LA ................. 
Point Michel, LA ............. 
Bohemia, LA................. 
Diamond, LA ............... 
Gravolet, LA ................ 
Junior, LA .................. 
Harlem, LA ................. 
Myrtle Grove, LA ............ 
Monsecour, LA .............. 
Alliance, LA ................ 
Belair, LA .................. 
Jesuit Bend, LA .............. 
Linwood, LA ................ 
Oak Point, LA ............... 
Scarsdale, LA ............... 
English Turn, LA ............ 
Poydras, LA ................ 
Twelve Mile Point, LA ........ 
Cutoff, LA ................. 
Location 
Above 
Head Bank 
of R 
Passes or 
(Miles) L 
5,168 395 24,836 
12 
19 
22 
23 
25 
30 
33 
39 
41 
44 
46 
49 
51 
54 
56 
59 
61 
62 
65 
68 
71 
72 
75 
78 
82 
84 
88 
R
L
R
L
R
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
R 
49,552 
19,053 
15,430 
14,399 
17,283 
25,012 
21,505 
36,995 
12,420 
22,932 
15,441 
11,600 
23,874 
23,599 
15,148 
17,435 
13,340 
17,265 
26,111 
24,978 
14,643 
16,426 
17,825 
21,845 
45,864 
9,979 
23,234 
-
-- 
-- 
2,550 
756 
-- 
-- 
11,039 
3,450 
-4,300 
-
-
-
-
-
-
-
-,30 
tTl 0
Ooil 
t7 07d 
O
Oz
0
0
C
til 
cn 
O
7d

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares) Feet) Feet) 
Standard Revetment: 
Third district reach, LA . .. 
Algiers Point, LA ....... 
Gouldsboro Bend, LA .... 
Gretna Bend, LA ....... 
Greenville Bend, LA ..... 
Carrollton Bend, LA ..... 
Avondale Bend, LA ...... 
Kenner, LA ............ 
Luling, LA ........... 
Destrehan, LA ......... 
Good Hope, LA ........ 
Waterford, LA ......... 
Montz, LA ............ 
Lucy, LA ............ 
Reserve, LA ............ 
Willow Bend, LA ....... 
Angelina, LA .......... 
Vacherie, LA .......... 
Belmont, LA .......... 
Rich Bend, LA ......... 
Romeville, LA ......... 
St. Alice, LA .......... 
Burnside, LA .......... 
Aben, LA ............ 
St. Elmo, LA .......... 
Smoke Bend, LA ....... 
Marchand, LA ......... 
Philadelphia Point, LA .... 
New River Bend, LA ..... 
.... 93 
95 
.... 96 
97 
100 
... 104 
.. . 109 
S. . 114 
. .. 119 
... 102 
126 
128 
S.... 132 
.. . 136 
. .. 138 
... 141 
. . . 145 
.. . 148 
.. . 152 
... 157 
... 161 
. .. 165 
S.. 170 
*... 172 
... 174 
... 177 
... 180 
. . . 183 
. . . 185 
L
R
R
R
R
L
R
L
R
L
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L 
1,994 
-- 
11,488 
-- 
-- 
13,760 
10,731 
4,154 
9,810 
--
_-- 
-- 
-
-- 
-
--
_-- 
-- 
-- 
-- 
--
---- 
MM 
(nn 
OO 
ad 
r" 
27,167 
12,238 
4,960 
9,662 
22,045 
16,262 
28,409 
45,492 
44,893 
5,409 
24,531 
21,264 
17,502 
19,450 
23,234 
13,227 
32,762 
26,025 
25,575 
38,498 
33,986 
31,130 
29,304 
11,700 
12,014 
18,792 
19,603 
5,379 
45,672 
,P 
7" 4

TABLE 41-H BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
(Continued) NEW ORLEANS DISTRICT (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear( Linear (Linear (Linear nan (Linear 
Location (Miles) L Feet) Feet) (Squares)'1 Feet) (Squares)'1 (Squares) Feet) Feet) 
Standard Revetment: 
White Castle, LA .......... 193 R -- -- -- -- -- -- -- 45,968 
St. Gabriel, LA ............ 201 L -- -- -- -- -- -- -- 33,292 
Plaquemine Bend, LA ....... 209 R -- -- -- -- -- 2,951 -- 45,012 
Manchac, LA ............. 215 L -- -- -- -- -- -- -- 38,976 
Missouri Bend, LA ......... 222 R -- -- -- -- -- 6,755 -- 30,437 
Arlington, LA ............ 227 L -- -- -- -- -- -- -- 18,050 
Port Allen, LA ............ 231 R -- -- -- -- -- -- -- 17,627 
Scotlandville, LA .......... 234 L -- -- -- -- -- -- -- 1,623 
S Allendale, LA ............ 238 R -- -- -- -- -- -- -- 28,698 
Springfield Bend, LA ........ 244 L -- -- -- -- -- -- -- 25,690 
Arboth, LA .............. 250 R -- -- -- -- -- -- -- 20,190 
Faulkner Lake, LA ......... 253 L -- -- -- -- -- 4,327 -- 18,807 
Grand Bay, LA ............ 258 R -- -- -- -- -- -- -- 24,909 
Bayou Sara, LA ........... 265 L -- -- -- -- -- -- -- 29,722 
Red Store, LA ............ 269 R -- -- -- -- -- -- -- 18,464 
Arrow Bend, LA ........... 272 L -- -- -- -- -- -- -- 13,600 
Boies Point, LA ........... 275 R -- -- -- -- -- -- -- 16,094 
Morganza, LA ............ 279 R -- -- -- -- -- -- -- 20,513 
Iowa Point, LA ............ 282 L -- -- -- -- -- -- -- 15,477 
Brunette Point, LA ......... 285 R -- -- -- -- -- -- -- 14,335 
Greenwood Bend, LA ....... 289 L -- -- -- -- -- -- -- 26,032 
Hog Point, LA ............ 296 R 3,977 60 16,040 -- -- -- -- 37,516 
Carr Point, LA ............ 304 R -- -- -- -- -- -- -- 20,725 
Above Old River, LA ....... 305 R -- -- -- -- -- -- -- 9,958 
Fort Adams, MS ........... 308 L -- -- -- -- -- -- - 24,206 
Point Breeze, LA .......... 313 R -- -- -- -- -- -- -- 13,565 
Coochie, LA ............. 317 R -- -- -- -- -- -- -- 17,150
r
i
I
r
i
I
r
I
I
i
r
i
i
i
i
i
I 
O
0
0
0
to 
0
0
.< 
'IL 
CZ 
4d 
7d 
O

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)1 Feet) Feet) 
Palmetto, MS .............. 
Total Revetment 
New Orleans District, 
Mississippi River ....... 
Dikes: 
Profit Island Chute 
Closure, LA .............. 
Hog Point, LA ............. 
Hog Point Chute Closure ...... 
Total Dikes 
New Orleans District, 
Mississippi River ....... 
OLD RIVER CONTROL 
Standard Revetment: 
Inflow channel ............ 
Inflow channel ............ 
Outflow channel ........... 
Auxiliary inflow channel ..... 
Auxiliary outflow channel ..... 
Total Standard Revetment, 
Old River ............. 
322 L 
252 L 
299 L 
300 R 
315 
315 
315 
312 
312 
L
R 
L&R 
L&R 
L&R 
-- -- -- -- -- -- -- 34,650 
9,145 455 40,876 5,300 25,977 56,788 -- 1,899,147 
(1.73 Miles) (359.69 Miles) 
-- -- -- -- -- -- -- 4,315 
-- -- -- -- -- -- -- 6,850 
-- -- -- -- -- -- -- 900 
(2.29 Miles) 
-- -- -- -- -- -- -- 2,415 
-- -- -- -- -- -- -- 4,365 
-- -- -- -- -- -- -- 19,891 
-- -- -- -- -- -- -- 17,200 
-- -- -- -- -- -- -- 5,790 
-- 49,661 
(9.41 Miles) 
il 
rr 
Ov 
0ll 
z 
r--

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Below Construction erative tive 
Confluence New Work Since Thru 
of Red and Bank Exten- Prior This 
Atchafalaya R sion Lap Reinforcement FY FY 
Rivers or (Linear (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares) ' (Squares)' Feet) Feet) 
ATCHAFALAYA RIVER 
Standard Revetment: 
Mile One, LA............. 
Coville Bayou, LA ......... 
Legonier, LA ............. 
Simmesport, LA ........... 
Kuhlman Bayou, LA ........ 
Odenburg, LA ............ 
Jacoby, LA............... 
Cason, LA ............... 
McCrea, LA ............. 
Woodside, LA ............ 
Provosty, LA ............. 
Crooked Bayou, LA ........ 
Mercier, LA ............. 
Barberton, LA ............ 
Evans Point, LA ........... 
Goudeau, LA ............. 
Morris Bayou, LA ......... 
Goodwood, LA ............ 
Red Cross, LA ............ 
Melville LA .............. 
Cross Bayou, LA .......... 
Melville South, LA ......... 
Toles, LA ............... 
Petite Prairie, LA .......... 
Three Mile Bayou, LA ....... 
1
3
4
6
7
9 
10 
12 
13 
14 
17 
18 
22 
23 
24 
26 
27 
28 
29 
30 
31 
33 
35 
36 
37 
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
L
R
R 
4,209
- 
-- 4,150 
-- 6,550 
-- 8,940 
-- 12,491 
-- 5,565 
-- 5,375 
-- 7,390 
-- 10,798 
-- 6,572 
-- 13,002 
-- 9,111 
-- 16,246 
-- 10,478 
-- 3,592 
-- 6,6682 
-- 3,938 
-- 5,440 
-- 8,505 
-- 8,065 
-- 5,660 
-- 6,0652 
-- 13,340 
-- 6,355 
-- 8,381 
-- 6,330 
> 
O
tTj 
bmJ 
O
r' 
4C

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Below Construction erative tive 
Confluence New Work Since Thru 
of Red and Bank Exten- Prior This 
Atchafalaya R sion Lap Reinforcement FY FY 
Rivers or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Standard Revetment: 
Holloway Lake, LA ......... 
Bayou Sherman, LA ........ 
Krotz Springs, LA .......... 
Sherburne, LA ............. 
Bayou Big Graw, LA ........ 
Courtableau, LAA. ......... 
Coswell Bayou, LA ......... 
Alabama Bayou, LA ........ 
Happy Town, LA .......... 
Otis Landing, LA .......... 
Morgan City, LA .......... 
Total Standard Revetment 
Atchafalaya River 
Dikes: 
Ten Mile Dikes 
LOWER RED RIVER 
Standard Revetment: 
Long Lake, LA ............ 
Naples, LA .............. 
Turnbull Island, LA ........ 
37 
38 
40 
43 
46 
49 
48 
50 
53 
54 
115 
L
L
R
R
R
R
L
L
L
R
L 
5,374
.-- 
-- 
-__ 
5,374 
(1.02 Miles) 
23,858
-- 
-- 
-- 7,085 
-- 5,200 
-- 7,925 
-- 10,960 
-- 8,394 
-- 5,374 
-- 6,490 
-- 9,410 
7,285 
-- 5,251 
-- 3,410 
-- 23,858 4,209 
10 R 
Below Confluence 
of Old River 
Outflow Channel 
and Red River 
(Miles) 
10
7
9 
R
R
L 
Total Standard Revetment 
-- 275,791 
(52.23 Miles) 
-- 2,500 
(.47 Miles) 
-- -- -- -- - -- -- 6,652 
-- -- -- -- -- -- -- 6,190 
S-- -- -- -- -- 11,038 
S-- -- -- -- 23,880 
(4.52 Miles) 
4
po 
MCI 
wo
O 
h 
M 1 
Cl 
0

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Tons of (Linear (Tons of Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) Stone) Feet) Stone) (Tons of Stone) Feet) Feet) 
Dikes: 
None 
MISSISSIPPI RIVER 
Foreshore Protection: 
Port Allen ............... 
Cottage Plantation .......... 
Upper Plaquemine Point ...... 
Lower Plaquemine Point ...... 
Point Pleasant ............. 
Upper Point Clair .......... 
Point Clair ............... 
Belle Grove .............. 
Donaldsonville ............ 
Point Houmas............. 
Sunshine ................ 
Union .................. 
Convent ................ 
Oak Alley ............... 
Lutcher ................. 
W allace ................. 
Garyville ................ 
Edgard ................. 
Reserve ................. 
W aterford ............... 
26 Mile Point ............. 
Destrehan ............... 
St. Rose ................ 
Lower St. Rose ............ 
Ama ................... 
228.3 
222.6 
210.5 
207.0 
201.7 
196.0 
191.0 
189.9 
174.2 
168.9 
167.4 
166.3 
158.3 
153.4 
148.6 
145.5 
140.4 
138.2 
136.0 
129.0 
122.8 
121.0 
120.8 
116.6 
115.0 
R
L
L
L
R
L
L
R
R
R
L
L
L
R
L
R
L
R
L
R
L
L
L
L
R 
-- 7,500 
-- 2,000 
-- 4,350 
-- 0 
-- 5,221 
-- 0 
-- 10,251 
-- 0 
-- 0 
-- 5,400 
900 
-- 6,500 
-- 11,900 
-- 7,800 
-- 8,910 
-- 10,390 
-- 0 
-- 7,700 
-- 2,200 
-- 500 
-- 1,320 
-- 0 
-- 9,830 
-- 7,050 
-- 0 
0V 
ra 
,4i 
0
0
z
rd 
.. t 
M

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Tons of (Linear (Tons of Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) Stone) Feet) Stone) (Tons of Stone) Feet) Feet) 
Foreshore Protection: 
American Cyanamid ........ 
Willswood ............... 
Avondale ................ 
Twelve Mile Point .......... 
Avondale ................ 
Nine Mile Point ........... 
Greenville ............... 
Snowdrift ............... 
Gretna-Gouldsboro ......... 
Algiers ................. 
Holy Cross .............. 
Arabi .......... ....... 
Quarantine ............... 
Huntlee ................. 
Chalmette ............... 
Norman ................ 
Brou ................... 
Auora .......... ....... 
Blythe Blvd .............. 
Upper Stanton ............ 
Saxonholm-Docville ........ 
Pecan Grove-Story ......... 
Story-Allo ............... 
Delacroix ............... 
Twelve Mile Point .......... 
Merrit .................. 
Saxonholm-Docville ........ 
Naval Depot.............. 
Caernarvon .............. 
114.8 
113.2 
109.4 
108.9 
105.5 
105.0 
100.0 
97.6 
96.7 
95.4 
92.2 
91.9 
91.5 
90.4 
90.2 
90.0 
89.5 
89.3 
88.6 
86.5 
86.0 
85.8 
84.5 
84.2 
83.5 
83.0 
82.5 
82.5 
81.2 
R
R
R
L
R
R
R
R
R
R
L
L
R
R
L
R
L
R
R
R
L
L
L
R
R
L
L
R
L 
cM 
o
z 
4,788 
2,430 
6,500 
4,580 
2,070 
1,760 
6,900 
8,450 
1,683 
1,548 
1,915 
6,130 
3,805 
3,139 
1,260 
2,968 
3,030 
3,700 
4,345 
12,890 
1,060 
1,910 
5,400 
8,220 
1,300 
7,800 
7,700 
3,096 
13,200 
f-. 
C!
F

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Tons of (Linear (Tons of Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) Stone) Feet) Stone) (Tons of Stone) Feet) Feet) 
Foreshore Protection: 
English Turn ............. 
Little Rock ............... 
St. Claire................ 
Fort St. Leon ............. 
Scarsdale ................ 
Belle Chase .............. 
Stella-Delcour ............ 
Oak Point ............... 
Promised Land-Woodlawn .... 
Augusta-Live Oak .......... 
Jesuit Bend .............. 
Fanny-Belair ............. 
Sara-Star ................ 
Star .......... ........ 
Bayhi .................. 
Burbridge ............... 
Beau-Carlisle ............. 
Alliance ................ 
St. Rosalie ............... 
Monsecour-Poverty Point ..... 
Irontown ................ 
Myrtle Grove-Woodpark ..... 
Harlem ................. 
Wood Park-Deer Range ...... 
Nero........... ....... 
Deer Range .............. 
Upper Point-A-La-Hache ..... 
Junior ........... ...... 
Point Celeste ............. 
79.3 
78.8 
78.8 
78.2 
75.5 
75.5 
73.6 
73.3 
70.5 
70.5 
69.2 
66.8 
66.3 
65.8 
64.0 
63.2 
62.3 
62.0 
61.4 
60.3 
60.0 
58.8 
57.0 
56.0 
54.7 
54.1 
53.5 
53.5 
52.2 
L
R
L
R
L
R
L
R
L
R
R
L
R
R
R
L
L
R
R
L
R
R
L
R
L
R
L
R
R 
-- 7,500 
-- 9,268 
-- 1,025 
-- 10,700 
-- 16,611 
-- 11,500 
-- 6,405 
-- 13,766 
-- 15,495 
-- 13,135 
-- 16,454 
-- 12,400 
-- 2,100 
-- 5,470 
-- 11,190 
-- 12,335 
-- 6,258 
-- 4,300 
-- 6,976 
-- 7,380 
-- 2,298 
-- 8,450 
-- 15,550 
-- 17,650 
-- 4,450 
-- 4,220 
-- 9,101 
-- 7,811 
-- 3,300 
-P 
0
0
0 
~3 
t 
r
z
rn 
7d 
0
0
rn 
er: 
IT 
O 
-

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Tons of (Linear (Tons of Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) Stone) Feet) Stone) (Tons of Stone) Feet) Feet) 
Foreshore Protection: 
Davant ................. 
St. Thomas .............. 
Woodland ............... 
Point-A-La-Hache .......... 
Nolan .................. 
Socola .................. 
Point Michel ............. 
Happy Jack .............. 
Port Sulphur ............ 
Little Texas .............. 
Home Place .............. 
Nairn .................. 
Sixty Mile Point ........... 
Tropical Bend ............. 
Bowers ......... ....... 
Empire ................. 
Anderson ................ 
Fredrick ................ 
Buras .................. 
Lower Buras ............. 
Triumph ................ 
Fort Jackson ............. 
Grand Prairie ............. 
Upper Commander ......... 
Commander .............. 
51.5 
50.0 
50.0 
48.1 
47.2 
46.5 
44.2 
43.0 
39.7 
39.0 
37.6 
34.5 
32.1 
31.2 
30.8 
29.7 
29.2 
27.5 
26.0 
24.0 
22.5 
21.9 
19.2 
18.2 
18.0 
L
L
R
L
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
L
R
R 
-- 10,795 
-- 6,430 
-- 14,800 
-- 23,030 
-- 13,400 
-- 8,255 
-- 7,350 
-- 18,785 
-- 6,430 
-- 300 
-- 13,250 
-- 5,915 
-- 0 
-- 5,775 
-- 3,836 
-- 2,865 
-- 6,100 
-- 3,820 
-- 13,495 
-- 8,900 
-- 5,220 
-- 16,690 
-- 1,350 
-- 3,180 
-- 22,232

TABLE 41-H 
(Continued) 
BANK REVETMENTS, DIKES, AND FORESHORE PROTECTION: 
NEW ORLEANS DISTRICT (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Tons of (Linear (Tons of Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) Stone) Feet) Stone) (Tons of Stone) Feet) Feet) 
Foreshore Protection: 
Boothville-Commander ...... 16.0 R -- -- -- -- -- -- -- 1,824 
Upper Venice ............. 12.0 R -- -- -- -- -- -- -- 14,800 
Total Foreshore Protection 
New Orleans District 
Mississippi River -- -- -- -- -- -- -- 745,224 
(141.14 Miles) 
1. Gross squares articulated concrete mattress (100 square feet). 
t04--h+ 
Al 
0
C"1 
0
O
hd 
cry 
hd 
tT 
0l 
0C z
0
0d

TABLE 41-I BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)1 (Squares) Feet) Feet) 
MISSISSIPPI RIVER 
Standard Revetment: 
Bougere Bend, LA ......... 
Dead Mans Bend, MS ....... 
Glasscock Cutoff, MS-LA .... 
Railroad Landing, MS ....... 
St. Catherine Bend, LA ...... 
Morville, LA ............. 
Natchez Island, MS ......... 
Carthage, MS ............. 
Vidalia Casting Field ........ 
Natchez Front, MS ......... 
Giles Cutoff, LA-MS ........ 
Gibson, LA ................ 
Ashland, LA-MS .......... 
Kempe Bend, LA .......... 
Browns Field, LA .......... 
Goldbottom, MS ........... 
Hardscrabble, LA .......... 
Grand Gulf, MS ........... 
Point Pleasant, MS-LA ....... 
Togo Island, LA ........... 
Lake Karnac, LA-MS ....... 
Diamond Point, LA-MS ...... 
Oakbend, MS ............. 
Reid-Bedford, LA .......... 
Racetrack, MS ............ 
Barge Line Terminal, MS ..... 
Vicksburg Harbor, MS ...... 
Delta Point, LA ........... 
329 
335 
342 
346 
350 
356 
357 
361 
363 
364 
366 
371 
374 
383 
389 
392 
398 
403 
413 
415 
419 
423 
425 
429 
433 
437 
437 
437 
R
L
R
L
R
R
R
L
L
L
R
R
L
R
R
L
R
L
R
R
L
R
L
R
L
L
L
R 
1,551 
.-- 
_-- 
5,650 7 
1,995 
1,052 
-- 
-- 
-- 
-- _ 
-- 
-- 
-- 
-- 
_-- 
-- 
-- 
-- 
--_ 
--_ 
50 
5-- 
-5-0 
-- 
50 
-- 
--
-- 
-- 
-- 
-- 
-- 
-- 
9,569 
7,041 
3,941 
-- _ 
-- _ 
-- _ 
-- 
-- _ 
-- 
-- 
-- 
--
.-- 
.-- 
-- 
-- 
-- 
--
_-- 
-- 
-- 
-- 
627 
357
-- _ 
-- _ 
-- _ 
-- _ 
--. 
-_ 
2,422 
1,570 
_-- 
_-- 
-- 
-- 
--- 
24,593 
7,114 
10,409 
-- 
-- _ 
-- _ 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
-- _ 
-- 
-- 
-- 
--
_-- 
_-- 
-- 26,055 
-- 33,220 
-- 26,083 
-- 16,291 
-- 29,108 
-- 16,917 
-- 2,180 
-- 20,350 
-- 2,670 
-- 6,510 
-- 12,020 
-- 26,000 
-- 33,427 
-- 28,285 
-- 9,280 
-- 30,250 
-- 22,530 
-- 56,118 
-- 32,345 
-- 7,080 
-- 19,260 
-- 19,310 
-- 5,342 
-- 18,392 
-- 13,935 
-- 3,040 
-- 7,350 
-- 7,650 
ov 
IV 
nn 
4
7"

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)1 (Squares)1 Feet) Feet) 
Standard Revetment: 
King's Point-Opposite 
Delta Point, LA-MS ........ 
False Point, LA ........... 
Marshall-Brown's Point, 
LA-MS ................ 
Milliken Bend, LA ......... 
Belle Island, LA-MS ........ 
Goodrich, LA ............. 
Cottonwood Bar, MS ........ 
Filter-Cottonwood, MS ...... 
Hagaman, LA ............ 
Ben Lomond, MS .......... 
Baleshed Towhead-Stack 
Island, LA-MS ........... 
Lake Providence, LA ....... 
Mayersville, MS ........... 
Sarah Island-Opossum 
Point, LA-MS ............ 
Carolina, MS ............. 
Cracraft, AR ............. 
Worthington, MS-AR ....... 
Walnut Point Kentucky 
Bend, MS .............. 
American Cutoff, MS-AR ..... 
Sunnyside-Lakeport, AR ..... 
Vancluse, AR ............. 
Island 84, AR-MS .......... 
Warfield Point, MS ......... 
Leland-LaGrange, AR-MS .... 
439 L 
443 R 
446 
453 
460 
467 
470 
474 
481 
486 
488 
489 
497 
501 
507 
511 
514 
519 
526 
530 
534 
535 
537 
538 
19,330 
12,860 
L
R
L
R
R
L
R
L
R
R
L
R
L
R
R
L
L
R
R
L
L
L 
5,870 
380 50 1,190 
7,402 
-- 19,580 
-- 46,140 
-- 24,160 
-- 40,765 
-- 18,580 
-- 42,112 
-- 37,756 
-- 10,235 
-- 53,214 
-- 11,600 
-- 34,992 
-- 26,815 
-- 11,080 
-- 22,210 
-- 8,350 
-- 45,653 
-- 2,980 
-- 33,685 
-- 13,016 
-- 13,475 
-- 4,320 
-- 14,150 
4J 
t 
yC J 
7d 
0
0
0z
00 
CC 
bNO 
m~ 
01

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares) 1 Feet) Feet) 
Standard Revetment: 
Spanish Moss, AR ......... 
Tarpley Island, MS ......... 
Miller Bend, MS ........... 
Island 82, AR ............. 
Ashbrook Island, MS ........ 
Arkansas City-Yellow 
Bend, AR .............. 
Huntington Point, MS ....... 
Pair O'Dice, AR ........... 
Eutaw-Mounds, MS ......... 
Cypress Bend, AR ......... 
Catfish Point, MS .......... 
Ozark, AR-MS ............. 
Prentiss, AR-MS ........... 
Rosedale Bend, AR ......... 
Riverton, MS .............. 
Klondike, AR ............. 
Victoria Bend-Terrene, MS .... 
Lake Concordia, MS ........ 
Big Island, AR ............. 
Smith Point, MS ........... 
Dennis, MS ............... 
Cessions, MS .............. 
Total Revetment, 
Vicksburg District, 
Mississippi River ........ 
539 
542 
544 
546 
549 
553 
556 
561 
563 
568 
573 
578 
582 
585 
586 
588 
593 
596 
598 
601 
611 
615 
R
R
L
R
R
R
L
R
L
R
L
R
L
L
L
R
L
L
R
L
L
L 
10,628 
(2.01 Miles) 
200 21,741 
6,995 
_-- 
--
_-- 
-- 
-- _ 
-- 
-- 
-- 
-- 
-- 
-- 
-- 
--
_-- 
2,133 
-- 
4,580 
2,000 
29,360 
3,080 
3,455 
44,335 
21,205 
9,095 
40,188 
34,405 
20,075 
22,015 
20,315 
4,820 
12,500 
23,400 
29,245 
6,980 
16,515 
18,185 
25,195 
10,910 
9,327 
-- 
3,117 13,319 62,383 -- 1,499,914 
(284.07 Miles) 
J2 
0
0

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Dikes : 
Jackson Point, MS ......... 
Buck Island, MS ........... 
Opposite Warnicott Ldg., 
MS ................... 
Natchez Island, LA-MS ...... 
Opposite Rifle Point, MS ..... 
Rifle Point, LA ............ 
Waterproof Bar, LA ........ 
Spithead Towhead, MS ...... 
Browns Field, LA .......... 
Cottage Bend, LA-MS ....... 
Bondurant Towhead, LA ..... 
Coffee Point, LA .......... 
Yucatan, MS ............. 
Togo Island, LA ........... 
Newtown Bend, LA ......... 
Diamond Cutoff, MS ........ 
Below Racetrack, MS ....... 
Racetrack Towhead, MS ..... 
False Point, LA ........... 
Marshall Cutoff, LA ........ 
Below Grand Gulf, MS ...... 
Fritz Island, LA ........... 
Forest Home Towhead, LA . .. 
Willow Cutoff, LA .......... 
Tennessee Bar, MS ......... 
Arcadia Point, MS ......... 
Cottonwood Bar, MS ........ 
Point Lookout, LA ......... 
(2) 
330 
339 
352 
358 
369 
369 
379 
386 
388 
389 
394 
405 
410 
416 
420 
423 
430 
431 
441 
448 
399 
338 
449 
462 
465 
470 
471 
478 
L
L
L
R
L
R
R
L
R
L
R
R
R
L
R
L
L
R
R
R
L
R
L
R
L
L
R
R 
(3) 
4,306 
6,334 
-- 10,791 
-- 14,608 
-- 3,214 
-- 4,197 
-- 14,580 
-- 9,681 
-- 11,557 
-- 14,049 
-- 6,029 
-- 11,925 
-- 9,010 
-- 8,256 
-- 6,739 
-- 6,711 
-- 19,378 
-- 15,270 
-- 5,675 
-- 5,166 
-- 3,575 
-- 4,160 
-- 15,873 
-- 5,197 
-- 8,166 
-- 9,463 
-- 2,406 
-- 2,751 
922 
3,586 
--
-- _ 
-- 
0
0I-j 
0
0
00 
O
rIo 
o3 
.<
cn 
r

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares) 1 Feet) (Squares)1 (Squares) 1 Feet) Feet) 
Dikes : 
Ajax Bar, MS ............. 
Ben Lomond, MS .......... 
Baleshed Ldg., MS ......... 
Wilson Point, LA .......... 
Corregidor, MS ........... 
Carolina, AR ............. 
Cracraft Lower, AR ........ 
Cracraft, AR ............. 
Leota, MS................ 
Island 86, AR ............. 
Seven Oaks, AR ........... 
Walnut Point, MS .......... 
Anconia Chute, AR ......... 
Refuge, MS ............. 
Island 84, AR ............. 
Warfield Point, AR ......... 
Leland Bar, AR-MS ........ 
Leland Neck, AR-MS ....... 
Tarpley Cutoff, MS-AR ...... 
Island 82-Miller Bend, 
AR-MS ........ ....... 
Ashbrook-Miller Bend, 
AR-MS ................ 
Ashbrook Cutoff, MS ....... 
Chicot Ldg., AR ........... 
Catfish Point, MS .......... 
Below Prentiss, MS ......... 
Above Ozark, AR-MS ....... 
Malone Field, AR .......... 
() 
482 
488 
493 
500 
505 
509 
510 
513 
514 
520 
523 
525 
527 
528 
532 
535 
538 
540 
540 
L
L
L
R
L
L
R
R
L
R
R
L
R
L
L
L
R
L
R 
544 R&L 
547 
549 
564 
571 
580 
580 
585 
(3) 
-- 28,152 
-- 24,667 
-- 15,721 
-- 8,423 
-- 6,730 
-- 2,897 
-- 10,329 
-- 3,809 
-- 7,571 
-- 18,477 
-- 5,829 
-- 4,725 
-- 7,159 
-- 19,695 
-- 12,475 
-- 2,020 
-- 15,086 
-- 4,315 
-- 10,478 
-- 13,646 
L&R 
L
R
L
L
R
R 
13,015 
8,728 
22,381 
5,290 
12,413 
5,545 
7,549 
47." 
3
C/1 
C
0
G,� 
C/

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Dikes 
Terrene, MS ............. 
White River Landing, AR ..... 
Montgomery Towhead, AR .. . 
Victoria Bend, AR ......... 
Smith Point, MS............ 
Island 70, MS ............. 
Total Dikes, 
Vicksburg District, 
Mississippi River ........ 
590 
591 
592 
596 
600 
608 
(3) 
L
R
R
R
L
L 
-- 7,921 
-- 2,201 
-- 6,071 
-- 6,736 
-- 7,617 
-- 26,355 
4,508 
(0.85 Miles) 
-- 605,205 
(114.62 Miles) 
Miles 
Above 
Mouth 
ARKANSAS RIVER4 
Standard revetment: 
Menard Bend, AR .......... 
Como, AR ............... 
Morgan Bend, AR .......... 
Yancopin, AR ............ 
Total Standard Revetment, 
Arkansas River .......... 
Dikes: 
Hopedale Cutoff, AR ........ 
Morgan Bend, AR .......... 
31 L 
34 R 
36 
24 
-- -- -- -- -- - 11,770 
S-- -- -- -- -- 11,720 
-- -- -- -- -- -- -- 5,250 
-- -- -- -- -- -- -- 2,800 
L
R 
(2) 
30 R 
36 L 
-- 31,540 
(5.97 Miles) 
-- 1,848 
-- 3,658 
(3) 
O
,.] 
c3 
O 
.< 
7d 
-3 
7d 
0C 
Z
n
P3

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Above Construction erative tive 
Confluence New Work Since Thru 
with Bank Exten- Prior This 
Miss. R sion Lap Reinforcement FY FY 
River or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)1 Feet) Feet) 
Dikes: 
Fletcher Bend, AR ......... 
Total Dikes, Arkansas 
River ................ 
RED RIVERS 
Standard Revetment: 
Dupre, LA ............... 
Bringol, LA .............. 
Egg Bend, LA ............ 
Colonel Bend, LA .......... 
Roxana, LA .............. 
Ryland, LA .............. 
Whittington, LA ........... 
Smith, LA ............... 
Latanier, LA ............. 
Hudson, LA .............. 
Robert, LA .............. 
Alexandria Front, LA ....... 
Callahan, LA ............. 
Cotton, LA .............. 
Rapides, LA .............. 
Boyce, LA ............... 
Total Standard Revetment, 
Red River ............. 
(2) 
39 R 
(3) 
-- -- -- -- -- -- -- 2,187 
7,693 
(1.46 Miles) 
69 
73 
75 
77 
83 
88 
89 
91 
93 
99 
102 
105 
110 
116 
119 
125 
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R 
S-- -- -- -- -- -- 2,690 
S-- -- -- -- -- -- 4,000 
-- -- -- -- -- -- -- 2,400 
-- -- -- -- -- -- -- 650 
-- -- -- -- -- -- -- 3,325 
-- -- -- -- -- -- -- 3,925 
-- -- -- -- -- -- -- 2,900 
-- -- -- -- -- -- -- 2,700 
S-- -- -- -- -- -- 2,460 
-- -- -- -- -- -- -- 1,458 
-- -- -- -- -- -- -- 5,500 
-- -- -- -- -- -- -- 5,280 
-- -- -- -- -- -- -- 4,000 
S-- -- -- -- -- 14,700 
S-- -- -- -- -- -- 1,030 
-- -- -- -- -- -- -- 4,548 
61,566 
(11.66 Miles)

TABLE 41-I 
(Continued) 
BANK REVETMENTS AND DIKES: VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Above Construction erative tive 
Confluence New Work Since Thru 
with Bank Exten- Prior This 
Miss. R sion Lap Reinforcement FY FY 
River or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)1 Feet) (Squares) 1 (Squares)1 Feet) Feet) 
Dikes6 : (2) () 
Choctaw Bayou Bend, LA ... 71 R -- -- -- -- -- -- -- 2,000 
Bringol (Egg Bend), LA ...... 73 R -- -- -- -- -- -- -- 2,477 
Egg Bend, LA .............. 75 R -- -- -- -- -- 900 
Cologne Bend, LA .... ..... 77 R -- -- -- -- -- -- 1,850 
Echo, LA ............... 78 R -- -- -- -- -- -- 1,900 
Richardson, LA ........... 79 R -- -- - -- -- -- 2,700 
Alexandria, LA ........... 105 R -- -- -- -- -- - 
Bertrand, LA ............. 122 R -- -- -- -- -- -- -- 7,630 
Dismal Swamp, LA......... 24 L 1,411 -- -- -- -- -- -- 1,411 
Total Dikes, Red River ..... 1,411 -- -- -- -- -- -- 20,868 
(0.27 Miles) (3.95 Miles) 
1. Gross squares articulated concrete mattress (100 square feet). 
2. Linear feet of dike which were raised. 
3. Linear feet of dike on which repairs were made. 
4. See report on Arkansas River and tributaries, AR and OK, under Little Rock District. 
5. Mileages based on 1967 hydrographic survey. 
6. Includes all types of dikes and retards. 
7. Stone paving only. 
O
N 
m
O
0
7d 
0
hd 
0 ztrm 
0
0
O
Omn 
o 
o

TABLE 41-J BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linea 
Location (Miles) L Feet) Feet) (Squares)1 Feet) (Squares)1 (Squares)1 Feet) Feet) 
MISSISSIPPI RIVER 
Standard Revetment: 
Big Island, AR ............ 598 R -- -- -- -- -- -- 3,90 
Scrubgrass Bend, AR ........ 600 R -- -- -- -- -- -- -- 7,31 
Henrico, AR ............. 606 R -- -- -- -- -- -- -- 33,31 
Cessions Towhead, AR ...... 615 L -- -- -- -- -- -- -- 11,46 
Island 67, MS ............. 621 L -- -- -- -- -- -- -- 9,63 
Island 68 Bar-- 
Knowlton, AR ........... 622 R -- -- -- -- -- -- 26,71 
Ludlow, AR................. 626 R -- -- -- -- -- -- -- 10,39 
Rescue Land, AR-MS ....... 629 L -- -- -- -- -- -- -- 27,02 
Fair Landing, AR .......... 632 R -- -- -- -- -- -- -- 27,51 
Burke Landing, MS ......... 637 L -- -- -- -- -- -- -- 19,07 
Island 62, AR ............. 638 R -- -- -- -- -- -- -- 9,03 
Island 63, MS ............. 639 L -- -- -- -- -- -- -- 11,51 
Island 63 Bar, MS .......... 639 L -- -- - -- -- -- -- 3,79 
Oldtown Bend, AR ......... 644 R -- -- -- 920 4,671 -- -- 26,86 
Horseshoe, MS ............ 647 L -- -- -- -- -- -- -- 16,38 
Westover, AR ............ 650 R -- -- -- 1,641 6,811 -- -- 15,64 
Delta-Friars Point, MS ....... . 665 L -- -- -- -- -- -- -- 30,09 
Helena, AR .............. 660 R -- -- -- 1,425 5,453 -- -- 36,46 
Helena Towhead, AR ....... 664 R -- -- -- -- -- -- -- 3,69 
Trotters Landing, MS ..... 665 L -- -- -- -- -- -- -- 38,68 
Flower Lake, MS .......... 667 L -- -- -- -- -- -- -- 16,38 
St. Francis, AR ........... 672 R -- -- -- -- -- -- -- 24,66 
Harbert Point, MS .......... 675 L -- -- -- -- -- -- -- 9,06 
Walnut Bend, AR .......... 680 R -- -- -- -- -- -- -- 31,07 
Mhoon Bend, MS .......... 685 L -- -- -- 789 3,153 -- -- 35,82 
Peters, AR ............... 692 R -- -- -- -- -- -- -- 33,76 
Commerce, MS ........... .... 695 L -- -- -- -- -- -- -- 29,08 
r
5
5
0
5
0
0
0 0
on 
552 
00 
4
5
0
5
00 
0
0
52 
5
3
5
0
8
0
5

TABLE 41-J BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(Continued) (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares) 1 Feet) (Squares)'1 (Squares)1 Feet) Feet) 
Standard Revetment: 
Porter Lake, AR ........... 700 R -- -- -- 918 3,792 -- -- 34,155 
Pickett, MS-AR ........... 703 R -- -- -- -- -- -- 12,575 
Seyppel, AR ............. 709 R -- -- -- -- -- 4,830 
Norfolk-Star, MS .......... 711 L 3,923 -- 10,783 -- -- -- -- 39,505 
Cow Island Bend, AR ....... 714 R -- -- -- -- -- -- -- 22,274 
Cow Island Bend 
(Upper), TN ............. 716 R -- -- -- -- -- -- -- 8,623 
Coahoma, TN ................ 717 L -- -- -- -- -- -- -- 9,270 
Ensley, TN .............. 723 L -- -- -- -- -- -- -- 46,256 
Dismal Point, AR .......... 724 R -- -- -- -- -- -- -- 7,200 
Bauxippi-Wyanoke, AR ...... 730 R -- -- -- -- -- -- -- 24,530 
Presidents Island, TN ....... 733 L -- -- -- -- -- -- -- 12,755 
Hopefield Point, AR-TN ...... 736 R -- -- -- -- -- -- -- 10,360 
Loosahatchie-Memphis, 
TN ................... ....... 737 L -- -- -- -- -- -- -- 31,293 
Loosahatchie Bar, TN .......... 740 R -- -- -- -- -- -- -- 2,070 
St. Clair, AR ............... 742 R -- -- -- -- -- -- -- 2,930 
Island 40, TN-AR .......... ...... 744 R -- -- -- -- -- -- -- 30,750 
Brandywine, AR-TN .......... . 750 R -- -- -- -- -- -- -- 18,010 
Shelby Forest, TN ............. 753 L -- -- -- -- -- -- -- 9,545 
Dean Island, AR ............ .. 756 R -- -- -- -- -- -- -- 7,555 
Cedar Point-Densford, 
TN ....................... 759 L -- -- -- -- -- -- -- 20,190 
Chute of Island 35, TN ...... 764 R -- -- -- -- -- -- -- 30,930 
Richardson Ldg, TN ........ .... 769 L 690 30 3,427 -- -- -- -- 1,415 
Lookout Bar, TN .......... .... 772 R -- -- -- -- -- -- -- 2,990 
Lookout, TN ............. .... 774 R -- -- -- -- -- -- -- 5,005 
Sunrise Towhead, TN ....... .... 776 R -- -- -- -- -- -- -- 18,440 
Driver Bar, TN ............ .... 780 L -- -- -- -- -- -- -- 4,850 
t l 
0
0
7d 
70 
z
0
0O

TABLE 41-J 
(Continued) 
BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)1 Feet) (Squares)' (Squares)' Feet) Feet) 
Standard Revetment: 
Lower Bullerton, AR ........ 
Kate Aubrey Towhead- 
Island 30, TN ............ 
Osceola, AR ............. 
Osceola, AR ............. 
Ashport-Keyes Point, TN ..... 
Kate Aubrey, TN .......... 
Island 26, TN ............. 
Bend of Island 25, TN ....... 
Barfield, AR ............. 
Obion-Tamm, TN .......... 
Huffman-Hickman, 
AR-TN ................ 
Heloise, TN............... 
Island 18, MO ............ 
Linwood Bend, TN ......... 
Blaker Towhead, TN ........ 
Bells Point, MO ........... 
Gayoso-Caruthersville, 
MO ........... ...... 
Island 15, TN ............. 
Hathaway Landing, TN ...... 
Robinson Bayou, MO ....... 
Fritz Landing, TN .......... 
Lee Towhead, MO ......... 
Bend of Island 14, TN ....... 
Above Lee Towhead, TN ..... 
Little Cypress, MO ......... 
782 R 
786 
786 
786 
791 
793 
798 
803 
808 
819 
826 
831 
836 
841 
845 
845 
848 
851 
852 
852 
857 
859 
859 
861 
864 
-- 28,350 
R
R
R
L
R
R
L
R
L
R
L
R
L
L
R
R
L
L
R
L
L
L
L
R 
10,426 
1,645 
-- _ 
--_ 
--_ 
--_ 
34,163 
6,963 
-- 
-- 
--
_-- 
30,808 
1,350 
5,823 
44,232 
2,500 
15,690 
32,385 
52,335 
53,831 
29,764 
15,770 
30,490 
14,850 
18,562 
5,420 
25,600 
3,630 
1,000 
22,630 
15,670 
9,640 
15,830 
4,943 
40,140 
r. CT 
r 
C/) 
1 
0
C/] 
cna

TABLE 414-J BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(Continued) (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)1 Feet) (Squares)1 (Squares)1 Feet) Feet) 
Standard Revetment: 
Merriwether-Cherokee, 
TN ....................... 869 L - - - -- - -- -- 41,05 
Linda,MO .................. 876 R - - - - - - -- 20,00( 
Below Toney's Towhead, 
TN ....................... 879 L - - - - - - - 20,895 
Toney's Towhead, 
KY-TN ............ ....... . 882 L - - - - - - - 13,64( 
Kentucky Point, KY .......... 887 L - - - - -- - - 7,96( 
o NewMadridBar,KY ......... 888 R - -- - - - - - 16,825 
New Madrid Bend, MO ........ 889 R -- - - - - - - 43,26 
LaForge,MO ................ 892 R - - - - - -- - 24,93( 
Slough Landing Neck, 
TN-KY .......... ........... 899 L - -- - - -- -- 37,52( 
Winchester Towhead, 
MO .............. ........ 900 R - - - - - -- - 5,54( 
Island 9, KY-TN ............. 905 L - - -- - - - -- 33,585 
MiltonBell,MO ............. 908 R - - - - - - -- 16,60( 
Chute of Island 8, KY ......... . 913 L - -- - -- -- -- -- 12,62C 
Bend of Island 8, MO ......... . 914 R - - -- -- - - -- 39,945 
Island 8,KY ................. 914 R - - - -- - - -- 18,515 
Hickmnan-Reelfoot, KY ........ 919 L -- - -- 1,974 7,426 - - 46,399 
Beckwith Bend, MO .......... 924 R -- - - - - - -- 18,203 
Williams, KY ............... . 927 L - -- - -- - - -- 10,015 
Wolf Island, KY ............. . 934 R - - - - -- - -- 22,495 
Columbus,KY ............... 937 L -- - - - - -- - 7,395 
Belmont,MO ................ 938 R - -- - - - - - 5,785 
Island3and4,KY ............ 940 R -- - - - - - - 19,97C 
Campbell, KY ............... 943 L -- - -- -- - -- - 6,865 
Pritchard, MO ............... . 948 R -- - - -- - - -- 15,045
r
3
)
5
)
)
5
Z
)
)
)
i
)
3
i
i
i 
r0j 
7d 
O
c
mug3 
O
o

TABLE 414-J 
(Continued) 
BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Standard Revetment: 
Mayfield Creek, KY .......... 
Wickliffe, KY ............... 
Cache-Cairo, IL 
(Ohio River) ............... 
Total Revetment, 
Memphis District, 
Mississippi River .......... 
Dikes: 
Henrico, AR ................ 
Below Knowlton, AR ......... 
Island 67, MS ............... 
Below Ludlow, AR ........... 
Sunflower, AR .............. 
Island 64, AR ............... 
Rescue Landing, MS .......... 
Island 62, AR ............... 
Island 63 Bar, MS ............ 
Island 63, MS ............... 
Kangaroo Point, AR .......... 
Friars Point, MS ............. 
Montezuma Bar, MS .......... 
Montezuma Towhead, AR ...... 
Prairie Point, AR .............. 
Flower Lake, MS ............ 
Walnut Bend, AR ............ 
St. Francis Towhead, MS ...... 
949 L 
953 L 
958 R 
-- 8,935 
-- 16,150 
- -- -- - - -- -- 29,927 
4,613 
(0.87 Miles) 
603 
616 
621 
624 
627 
630 
631 
638 
639 
640 
649 
652 
657 
656 
668 
668 
681 
671 
RR 
L
R
L
R
L
R
L
L
R
L
L
R
R
L
R
L 
30 14,210 19,738 72,432 
(8) 
--2,950 
-- 
-- 
-
- 
850 
2,730 
3,250 
- 
-- 
- 2,047,963 
(387.87 Miles) 
(6) 
800 
650 
3--900 
- 
-- 
-- 
3,900 
- 
9,080 
20,670 
4,320 
5,040 
5,520 
7,330 
2,530 
23,180 
2,600 
5,640 
6,580 
6,870 
17,970 
6,700 
10,391 
11,060 
6,390 
3,380 
pe 
CJ1 
O
00l

TABLE 414-J 
(Continued) 
BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)' Feet) Feet) 
Dikes: 
Below Walnut Bend, AR ....... 
Bordeaux Point, MS .......... 
Peters, AR ................. 
Commerce, MS.............. 
Basket Bar, AR .............. 
Buck Island, MS ............. 
Porter Lake, AR ............. 
Pickett, MS ................. 
Seyppel, AR ................ 
Cat Island, AR ............... 
Coahoma, TN ............... 
Armstrong, AR-TN ........... 
Dismal Point, AR ............ 
Engineers Bar, AR ........... 
Hopefield Point, AR .......... 
Memphis Front, TN ........... 
Robinson Crusoe, TN ......... 
Loosahatchie Bar, TN ........ 
Sycamore Chute, AR-TN ....... 
Above Loosahatchie, TN ....... 
Redman Point, AR ........... 
Randolph Point, TN .......... 
Poker Point, AR ............. 
Shelby Forest, TN ............ 
Corona Bar, TN-AR .......... 
Densford, TN ............... 
Cedar Point, TN ............. 
Below Richardson 
Landing, TN .............. 
(8) 
676 
681 
693 
694 
696 
700 
701 
704 
706 
710 
718 
720 
724 
734 
736 
736 
738 
739 
741 
742 
743 
747 
748 
751 
755 
757 
759 
R
L
R
L
R
L
R
L
R
R
L
RR 
R
R
L
R
R
R
L
R
L
R
L
R
L
L 
767 L 
(6) 
1,700 
750 
2,350 
1,000 
.- 
150 
300 
200 
250 
200 
300 
500 
200 
-- 8,840 
- 10,730 
- 7,830 
-- 10,745 
-- 5,810 
-- 4,705 
-- 23,115 
-- 10,080 
- 16,230 
- 15,590 
-- 4,640 
- 18,690 
- 28,960 
- 4,155 
- 5,350 
- 6,300 
- 21,939 
-- 3,950 
-- 6,725 
- 10,645 
-- 7,750 
-- 16,940 
- 8,060 
-- 5,540 
- 9,400 
-- 7,780 
- 2,890 
-- 5,950 
00 
0
Oz 
r
4
tmm 
-4d 
CC .<

TABLE 41-J BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(Continued) (FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)' Feet) (Squares)' (Squares)1 Feet) Feet) 
Dikes: (8) (6) 
Lookout, TN-AR ............. 771 R - -- -- - - -- 12,865 
Plum Point, TN .............. 784 L -- -- -- -- - - -- 10,195 
Lake Neark, AR ............. 786 R - - -- -- - - 2,545 
Island 30 ................... 787 R -- - - -- - 50 -- 5,485 
Kate Aubrey, TN ............. 791 R -- - - -- - 300 -- 11,270 
Keyes Point, TN ............. 791 L 5,140 - -- - - 600 - 29,830 
Ashport-Goldust, TN-AR ....... 795 R -- -- - -- - - - 17,330 
Forked Deer, TN ............ 798 L -- - - - -- -- 8,550 
Island 25, AR ............... 804 R -- -- -- - -- -- 5,450 
Nebraska Point, TN ........... 808 L -- -- - -- -- -- -- 12,149 
Below Tamm Bend, TN ........ 813 L -- - - -- -- -- -- 8,300 
Wrights Point, AR ............ 820 R -- -- - - 875 -- 34,775 
Island 21, Chute, TN .......... 824 L - - - -- - 1,750 -- 3,170 
Head of Island 21, TN ......... 828 L -- -- - -- -- 15,540 
Island 20, MO-TN ............ 831 R -- -- -- - - -- - 21,969 
Island 18, TN ............... 837 L - -- - -- -- - -- 8,670 
Tennemo, TN ............... 842 L - -- - -- - -- -- 8,240 
Blaker Towhead, TN .......... 843 L - -- - -- - 1,500 -- 4,080 
Caruthersville-Linwood 
Bend, MO ................. 844 R - - -- - - 3,000 -- 30,590 
Opposite Carthersville, TN ..... 846 L -- -- -- -- -- 3,300 
Sandy Hook, TN ............. 850 R - - - - -- - -- 2,350 
Island I5, TN............... 851 L -- - -- - - - - 8,830 
Robinson Bayou, MO ......... 853 R - -- -- - - 500 -- 10,768 
Hathaway, TN ............... 854 L - - -- - - 750 - 27,355 
Island 15 Neck, TN ........... 854 L - - -- -- -- - -- 21,100 
Above Lee Towhead, TN ....... 859 L -- -- - - -- 150 -- 1,300 
Below Cherokee, TN .......... 866 L -- -- -- -- 100 -- 6,230 
Stewart Towhead, MO ........ 871 R 1,150 - - - -- 560 -- 19,440 
r
y
7
7
N
7
I

TABLE 41-J 
(Continued) 
BANK REVETMENTS AND DIKES: MEMPHIS DISTRICT 
(FISCAL YEAR 1999) 
Operations This FY Nonop- Opera- 
Construction erative tive 
Above New Work Since Thru 
Head Bank Exten- Prior This 
of R sion Lap Reinforcement FY FY 
Passes or (Linear (Linear (Linear Maintenance (Linear (Linear 
Location (Miles) L Feet) Feet) (Squares)1 Feet) (Squares)1 (Squares)1 Feet) Feet) 
Dikes: (8) (6) 
Ruddles Point, MO ........... 874 R -- - - - -- - - 8,130 
Island11, MO ............... 882 R -- - -- -- - - - 14,330 
New Madrid Bend, MO ........ 887 R - - -- -- -- 100 -- 1,715 
Kentucky Point, KY .......... 887 L -- - -- -- -- -- 15,610 
Morrison Towhead, MO ....... 890 R -- - -- -- - - -- 1,070 
Hotchkiss Bend, MO .......... 895 R - - - - - 1,500 -- 14,208 
Slough Landing, KY .......... 896 L - - -- - - - -- 5,065 
Below Island 9, TN ........... 901 L -- -- - - - 500 -- 18,859 
Donaldson Point, MO ......... 905 R -- -- - - - 1,350 -- 22,975 
Island 9, KY .................. 906 L -- -- - - -- - -- 7,010 
Island 7 - Island 8, MO-KY ..... 917 R -- - - -- -- -- - 14,795 
Below Williams, KY .......... 925 L -- -- - -- -- -- 3,640 
Moore Island, KY-MO ........ 929 R - - -- -- - -- 7,925 
Above Williams, KY .......... 930 L -- -- -- -- -- 1,150 
Wolf Island Bar, KY .......... 933 L -- -- -- -- 12,260 
Campbell, KY ............... 942 L -- -- -- -- -- - 2,610 
Pritchard, MO ............... 944 R -- - - - - -- 9,390 
Island 1, KY................ 948 L -- -- -- - - - - 17,345 
Total Dikes 
Memphis District, 
Mississippi River .......... 12,270 2,950 - - 26,835 - 973,853 
(2.32 Miles) (184.44 Miles) 
1. 
2. 
3. 
4. 
5. 
6. 
7. 
8. 
Gross squares articulated concrete mattress (100 square feet). 
Changed to correct previous errors. 
Lumber mattress revetment. 
Rock Groins. 
Linear feet of triangular frame retards and pile dikes. 
Linear feet of dike on which repairs were made. 
Stone paving only. 
Linear feet of dike which were raised. 
0
Oi 
0
cj 
rn 
m
c, 
0
C J 
O
oi 
z
0
0

TABLE 41-K PROJECT LEVEES: NEW ORLEANS DISTRICT 
(FISCAL YEAR 1999) 
Levees and Floodwalls Berm' Surfaced Roads on Levees 
(Miles) (Miles) (Miles) 
Built to 
Approved 
Grade and Total 
Total Section Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
Main Stem Levees 
Mississippi River Levees 
Fifth Louisiana Levee District... 
Levees ................. 
Old River structures and 
levees .................. 
Atchafalaya Basin Levee 
District ................. 
Levees. ................ 
Morganza structure and 
levee ................. 
Morganza forebay levee ...... 
Port Allen lock ............ 
Lafourche Basin Levee District 
Levees ................ 
Plaquemines West Levee 
District Levees ........... 
Buras Levee District ......... 
Levees .................. 
Empire lock .............. 
Baton Rouge front levees ...... 
Pontchartrain Levee 
District .................. 
Levees .................. 
Bonnet Carre' guide levees ... 
Bonnet Carre' forebay levee .. 
Bonnet Carre' structure ..... 
East Jefferson Levee District 
Levees ................. 
West Jefferson Levee District .. 
Levees .............. .. 
Floodwalls.............. 
Harvey Canal Lock ......... 
(16.8) (16.8) (--) (13.3) (--) 
15.5 15.5 -- 12.0 -- 
1.3 1.3 -- 
(126.3) (126.3) - (126.3) (--) 
118.7 118.7 -- 118.7 -- 
0.8 
6.7 
0.1 
0.8 -- 
6.7 - 
0.1 -- 
(--) (15.5) 
- 15.5 
(--) (15.5) 
- 15.5 
1.3 -- -- -- -- - -- - -- -- 
(1.0) (--) (1.0) 
1.0 - 1.0 
(--) (118.7) (--) (118.7) 
- 118.7 - 118.7 
0.8 
6.7 
0.1 
61.7 61.7 -- 61.7 -- 0.1 -- 0.1 
37.9 37.9 - 30.7 7.2 - -- -- 
(34.1) (34.1) -- (34.1) (--) (--) (-) (--) 
34.0 34.0 - 34.0 - - - - 
0.1 0.1 -- 0.1 -- -- -- -- 
2.1 2.1 -- 1.9 -- -- -- -- 
(124.9) (124.9) (--) (117.5) - (0.1) (--) (--) 
110.8 110.8 - 103.4 -- 0.1 -- - 
11.3 11.3 - 11.3 -- - - - 
1.3 1.3 -- 1.3 -- -- -- -- 
1.5 1.5 - 1.5 - - - - 
11.6 11.6 - 10.8 -- -- - -- 
(20.0) (20.0) - (20.0) (-) (-) (-) (-) 
19.8 19.8 - 19.8 -- -- -- - 
0.1 0.1 - 0.1 - -- -- -- 
0.1 0.1 -- 0.1 -- - - - 
-- 61.7 
-- 37.9 
(-) (34.0) 
-- 34.0 
- 2.1 
-- 61.7 
-- 37.9 
(--) (34.0) 
- 34.0 
- 2.1 
(--) (110.8) (--) (110.8) 
- 110.8 - 110.8 
- 11.6 
(--) (19.9) 
-- 19.8 
- 0.1 
-- 11.6 
(--) (19.9) 
-- 19.8 
-- 0.1 
((---)) 
(--) 
- 
(-)
-. 
(-) 
(--) (- 
- 
(--) (--) (--) 
4
-=,.

TABLE 41-K 
(Continued) 
PROJECT LEVEES: NEW ORLEANS DISTRICT 
(FISCAL YEAR 1999) 
Levees and Floodwalls Berms Surfaced Roads on Levees 
(Miles) ,Miles) (Miles) 
Built to 
Approved 
Grade and 
Total Section Cur- In Com- Cur- In Cam- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Cam- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
Orleans Levee District ............ 
Left descending, east bank ........ 
Levees .................... 
Floodwalls .................. 
IHNC lock .................. 
Right descending, west bank ....... 
Levees .................... 
Algiers Canal lock ............ 
Lake Borgne Basin Levee 
4& District Levees ............... 
Grand Prairie Levee District 
Levees .................... 
Total Mississippi River ........ 
Other Levees Included in 
Mainstem Atchafalaya Basin 
Atchafalaya River and 
Bayou des Glaises ............. 
East Bank Atchafalaya River ...... 
Bayou des Glaises ............. 
West bank Atchafalaya River ..... 
Simmesport Ring ............. 
Melville Ring ................ 
Krotz Springs Ring ............ 
Mansura Hills to Hamburg ....... 
West protection levee, Hamburg 
to Berwick drainage canal via 
Calumet .................... 
Levees west of Berwick, Berwick 
drainage canal to Charenton 
drainage canal ............... 
Morganza upper guide levee ...... 
(27.2) (27.2) (-) (24.9) (--) 
(13.3) (13.3) (--) (11.0) (-) 
4.6 4.6 -- 2.3 -- 
8.6 8.6 -- 8.6 -- 
0.1 0.1 -- 0.1 
(13.9) (13.9) (--) (13.9) (--) 
13.8 13.8 -- 13.8 -- 
0.1 0.1 -- 0.1 -- 
11.6 11.6 -- 
(-) (-) (-) (--) (--) 
(--) (--) (--) 
11.6 -- -- -- -- 
37.4 37.4 -- 37.4 -- 
511.6 511.6 -- 490.2 7.2 
(148.4) (148.4) (--) (143.9) (--) 
52.5 52.5 -- 52.5 -- 
7.9 7.9 -- 7.9 -- 
60.1 60.1 -- 55.6 -- 
1.6 1.6 -- 1.6 -- 
4.1 4.1 -- 4.1 -- 
1.7 1.7 -- 1.7 -- 
20.5 20.5 -- 20.5 -- 
128.7 128.7 -- 106.5 3.5 
56.5 56.5 3.7 20.8 8.2 
8.9 8.9 -- 8.9 -- 
1.2 -- 1.1 
(-) (--) (--) 
--.--.-- 
(-) (18.4) (--) (18.4) 
(-) (4.6) (-) (4.6) 
-- 4.6 -- 4.6 
(--) (13.8) (--) (13.8) 
-- 13.8 -- 13.8 
-- 11.6 -- 11.6 
-- 37.4 -- 37.4 
-- 479.6 -- 479.6 
(-) (148.4) (-) (148.4) 
-- 52.5 -- 52.5 
-- 7.9 -- 7.9 
-- 60.1 -- 60.1 
-- 1.6 -- 1.6 
-- 4.1 -- 4.1 
-- 1.7 -- 1.7 
-- 20.5 -- 20.5 
-- -- -- -- 128.7 -- 128.4 
-- -- -- -- 56.5 -- 56.5 
S -- -- -- 8.9 -- 8.9 
0 
,q h"3 
0 
o
0
;I 
0 
'
z~ 
(-) 
(-) 
(--) 
-- 
(--)

TABLE 41-K 
(Continued) 
PROJECT LEVEES: NEW ORLEANS DISTRICT 
(FISCAL YEAR 1999) 
Levees and Floodwalls Berm' Surfaced Roads on Levees 
(Miles) (Miles) (Miles) 
Built to 
Approved 
Grade and Total 
Total Section Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted FY FY struction pleted FY FY struction 
East Protection levee, Morganza 
to Cutoff Bayou, including 
19.5 miles of Morganza lower 
guide levee .................. 106.7 1.7 - 94.9 0.8 
Total Atchafalaya Basin ............ .. 449.2 3.7 375.0 12.5 
Total-Main Stem Leaves ......... 960.8 449.2 3.7 865.2 19.7 
-1- .-- ---- 1--.-1 
1.2 -- 1.1 
S 105.0 -- 86.0 
447.5 - 428.2 
-- 927.1 -- 907.8 
TRIBUTARY LEVEES IN 
MR&T PROJECT 
Lake Pontchartrain, LA ......... 
Item A levees ................ 
Item B levees ................ 
Item C levees ................. 
Total Tributary Levees in MR&T 
Project .................... 
GRAND TOTAL. .............. 
960.8 
(17.4) (-) (17.4) (--) 
5.0 -- 5.0 -- 
10.1 (17.4) -- 10.1 -- 
2.3 5.0 -- 2.3 
10.1 
17.4 2.3 -- 17.4 -- 
978.2 17.4 3.7 882.6 -- 
(-) 
-- 
(-) (--) (-) (-) (17.4) (-) (17.4) 
-- -- -- -- 5.0 -- 5.0 
-- -- -- -- 10.1 -- 10.1 
- - - -- 2.3 - 2.3 
1.2 -- 1.1 
-- 17.4 
-- 944.5 
-- 17.4 
-- 925.2 
978.2 
1. Landside seepage berms only. 
2. Changed to correct previous error.

TABLE 41-L PROJECT LEVEES: VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Levees and Floodwalls Berm Surfaced Roads on Levees 
(Miles) (Miles) (Miles) 
Built to 
Approved 
Grade and In Total 
Total Section Cur- In Coam- Cur- System Com- Curin 
Total rently System plete rently When plete rently 
Authorized Place Thru Under When Built Thru Under Com- Built Thru Under 
for This This This Con- Coan- This This Con- pleted This This Con- 
Location System FY FY FY struction pleted FY FY struction FY FY sruction 
MAIN STEM LEVEES 
Mississippi River Levees 
East bank in Mississippi ......... 178.3� 178.3 -- 109.1 18.1 156.9 -- 135.0 -- 174.2 
Greenville Harbor dikes ......... 7.8 7.8 -- 7.8 -- -- -- -- -- 2.7 
West bank in Arkansas .......... 75.6 75.6 -- 55.0 -- 61.3 -- 54.3 -- 75.4 
West bank in Louisiana 
(above Red River) ............. 198.7 198.7 -- 68.E 18.3 91.0 -- 70. 4.3 197.8 
Total Mississippi River 
Levees .................. 460.4 460.4 -- 240.0 36.4 309.2 -- 259.9 4.3 450.1 
-- 174.2 
-- 2.7 
-- 75.4 
-- 197.8 
-- 450.1 
Other Levees Included in Main 
Stem 
Lower Red River-South Bank 
Red River levees ............. (59.2) (59.2) (--) (59.2) (--) 
Hotwells to Moncla, LA, 
levees ................... . . 59.2 59.2 -- 59.2 -- 
Arkansas River, South Bank ..... 85.4 85.4 -- 85.4 
Total Other Levees Included in 
Main Stem ................ 144.6 144,6 -- 144-- 
Total--Main Stem Levees ....... 605.0 605.0 -- 384.6 36.4 
(--) (59.2) 
24.7 -- 24.7 
33. -- 24.7 
333.9 -- 284.6 
-- 59.2 -- 59.2 
-- 84.1 -- 81.1 
-- 143.3 -- 140.3 
4.3 593.4 -- 590.4 
TRIBUTARY LEVEES IN 
MR&T PROJECT 
Arkansas River, North bank ...... 61.55 56.2 -- 56.2 
Red River Backwater Levees ..... 263.6 196.9 -- 193.0 
(--) 
-- 8.3 
19.1 -- 
-- 8.3 
-..-- 
-- 47.4 
-- 249.0 
0z
0 
0
ONO 
'7 
121 
-- 47.4 
-- 193.0 19.1 
-- -- ) t-- -) (59.2)

TABLE 41-L 
(Continued) 
PROJECT LEVEES: VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Levees and Floodwalls Berm1 Surfaced Roads on Levees 
(Miles) (Miles) (Miles) 
Built to 
Approved 
Grade and Total 
Total Section Cur- In Coin- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authoriz Place Thru Under When Built Thru Under When Built Thru Under 
ed This This This Con- Com- This This Con- Com- This This Con- 
Location for FY FY FY2 struction pleted FY FY struction pleted FY FY struction 
System 
Yazoo River Basin ............. (624.1) (425.3) (--) (237.6) (--) (--) (--) (--) (--) (624.1) (--) (338.9) 
527.5 373.7 -- 186.0 -- -- -- -- -- 527.5 -- 299.9 
Headwater .................. 96.6 51.6 -- 51.6 -- -- -- -6- .639.0 -- 
Backwater ................. 949.2 678.4 - 486.8 19.1 8.3 -- 8.3 ---- 5793 19.1 
920.5 
Total Tributary Levees in 1,554.2 1,283.4 -- 871.4 55.5 342.2 -- 292.9 4.3 -- 1,169.7 19.1 
MR&T Project ............. 1,513.9 
GRAND TOTAL .............. 
1. Landside seepage berms only. 
2. Levee that has adequate freeboard based on the refined 1973 MR&T project flood flow line for the Mississippi River. Levees with more than 2 feet of freeboard are considered 
adequate. 
3. Subject to change as planning progresses. Does not include existing berms which need restudy. 
4. Includes 1.4 miles of concrete floodwall and 0.3 mile of levee on Vicksburg city front. 
5. Includes 5.3 miles for Gillett new levee. 
6. Relief wells used in place of berms. 
-I

TABLE 41-M PROJECT LEVEES: MEMPHIS DISTRICT 
(FISCAL YEAR 1999) 
Levees and Floodwalls Berms Surfaced Roads on Levees 
(Miles) Miles) Miles) 
Built to 
Approved 
Grade and 
Total Section Cur- In Com- Cur- In Co- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pletedt' FY FY struction pleted FY FY struction 
MAIN STEM LEVEES 
Mississippi River 
Mounds, IL ................. 
Mound City, IL .............. 
Cairo Drainage District, IL ...... 
City of Cairo, IL .............. 
Little River Drainage District, MO .. 
Levee District No. 2, Scott 
County, MO ................. 
Levee District No. 3, Mississippi 
County, MO ................. 
St. Johns Levee and Drainage 
District, MO ................ 
St. Francis Levee District 
of MO ..................... 
City of Hickman, KY ........... 
Board of Levee Commissioners 
Fulton, County, KY ........... 
Reelfoot Levee District of Lake 
and Obion Counties, TN ........ 
Madrid Bend Levee District, 
Lake Co., TN ............... 
Lake County Levee and Drainage 
District, TN ................ 
Dyer County Levee and Drainage 
District No. 1, TN ........... 
Tipton-Obion levee extension ..... 
St. Francis Levee District 
of AR .................... 
Helena Improvement District 
No. 1, AR................. 
Cotton Belt Levee District 
No. 1, AR................ 
3.9 3.9 
2.7 2.7 
13.82 13.8 
6.2 6.2 
19.3 19.3 
-- 3.9 
-- 2.7 
-- 7.8 
-- 2.24 
-- 19.3 
13.8 13.8 -- 3.84 10.0 
26.0 26.0 -- 26.0 -- 
59.0' 58.7 
55.7 55.7 
1.4 1.4 
16.7 16.7 
4.5 4.5 
5.2 5.2 
-- 58.2 
0.5 
2.5 
1.6 
4.4 
9.7 
4.8 
-- 0.5 
-- 2.5 
-- 2.0 
-- 4.9 
-- 4.8 
12.9 -- 4.9 
3.6 
1.1 
8.5 
4.0 
19.3 
-- 13.8 
-- 26.0 
-- 9.2 -- -- -- 46.9 
-- 48.74 -- 23.0 -- 12.0 -- 55.1 
-- 1.4 -- -- -- -- -- 0.5 
-- 16.7 
-- 4.5 
-- 5.2 
17.0 17.0 -- 17.0 
21.3 21.3 -- 21.3 
6.5 -- -- -- 
156.7 156.7 -- 153.2 
5.3 5.3 
-- 15.1 
-- 0.6 
-- 11.4 
-- 0.3 
-- 16.3 
-- 4.5 
3.6 
1.1 
8.5 
3.5 
19.3 
-- 13.8 
-- 26.0 
-- 46.1 
-- 55.1 -- 
-- 16.3 
-- 4.3 
-- -- -- -- -- 5.2 -- 5.2 
-- 9.6 -- 9.4 
-- 1.3 -- 0.4 
-- 17.0 
-- 21.3 
-- 6.5 
-- 89.2 -- 88.4 -- 156.7 
-- 5.3 -- 2.4 -- 2.4 
23.9 23.9 -- 23.9 -- 19.4 -- 19.4 
-- 4.7 
-- 23.9 
-- 17.0 
-- 21.3 
-- 156.7 
-- 4.2 
-- 23.9 
4N 
-.d 
r
C
C 
d 
C

TABLE 41-M 
(Continued) 
PROJECT LEVEES: MEMPHIS DISTRICT 
(FISCAL YEAR 1999) 
Levees and Floodwalls Berms Surfaced Roads on Levees 
(Miles) (Miles) (Miles) 
Built to 
Approved 
Grade and Total 
Total Section Cur- In Cornm- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Camn- This This Con- Com- This This Coa- 
Location System FY FY FY struction pletedt' FY FY struction pleted FY FY struction 
Laconia Drainage and Levee 
District Phillips County, AR ..... 20.5 
Laconia Levee District No. I of 
Deshna County, AR ........... 18.1 
Laconia Circle Special Drainage 
District of Deshna 
County, AR................. 6.6 
Yazoo-Mississippi Delta Levee 
District, MS ................ 93.6 
Madrid Bend L.D., Fulton Co., 
KY ................. .... 4.8 
Birds Point-New Madrid setback 
levee, MO ................. 35.3 
Total Mississippi River ........ 637.8 
TOTAL MAIN STEM LEVEES ..... 637.8 
TRIBUTARY LEVEES IN 
MR&T PROJECT 
St. Francis River .............. (308.2) 
East bank .................. 159.5 
West bank ................. 148.7 
Little River ................. (130.1) 
East bank (left) ................ 40.7 
West bank .................. 35.1 
Elk Chute .................. 39.9 
West Basin and middle valley ..... 14.4 
Lower White River ............. (95.6) 
White River backwater levee ...... 40.2 
Augusta to Clarendon ........... 49.2 
Clarendon levee .............. 6.2 
20.5 -- 20.5 
18.1 -- 18.1 
-- 11.5 -- 11.5 -- 20.5 
-- 12.6 -- 9.2 -- 16.5 
-- 20.5 
-- 16.5 
6.6 -- 6.6 -- -- -- 
93.6 -- 93.6 
4.8 -- 4.8 
353 -- 35.3 
631.0 -- 597.5 
631.0 -- 597.5 
(302.9) -- (302.9) 
156.2 -- 156.2 
146.7 -- 146.7 
(130.1) -- (130.1) 
40.7 -- 40.7 
35.1 -- 35.1 
39.9 -- 39.9 
14.4 -- 14.4 
(85.9) -- (84.1) 
40.2 -- 40.2 
39.5 -- 39.5 
6.2 -- 4.4 
-- 88.6 -- 
23.8 
10.0 342.7 -- 
10.0 342.7 -- 
88.6 93.6 -- 93.6 
-- 4-.-8 4.8 4.8 -- 
272.6 -- 
272.6 -- 
35.3 
605.6 
605.6 
-- 35.3 
-- 596.6 
-- 596.6 
-- -- -- -- (301.0) -- (133.5) 
-- -- -- -- 156.7 -- 94.7 
-- -- -- -- 144.3 -- 38.8 
-- -- -- -- (128.9) -- (94.5) 
-- -- -- -- 40.7 -- 40.1 
-- -- -- -- 35.1 -- 23.7 
-- -- -- -- 39.7 -- 17.3 
-- -- -- -- 13.4 -- 13.4 
-- -- -- -- (94.0) (-) (81.0) 
-- -- -- -- 38.8 -- 38.8 
-- -- -- -- 49.2 -- 36.2 
-- -- -- -- 6.0 -- 6.0 
-4 
J--+ 
J~ 
r
Ono 
m C/1 
w 
C 
r 
Mr1 
z

TABLE 41-M 
(Continued) 
PROJECT LEVEES: MEMPHIS DISTRICT 
(FISCAL YEAR 1999) 
Levees and Floodwalls Berms Surfaced Roads on Levees 
Miles) (Miles) (Miles) 
Built to 
Approved 
Grade and Total 
Total Section Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Com- This This Con- Com- This This Con- 
Location System FY FY FY struction pleted'/ FY FY struction 
Memphis Harbor .............. 10.5 10.5 -- 10.5 -- 7.0 -- . -- 1 -- 10,5 -- 
Total Tributary Levees in 
MR&T Project ............... 544.4 529.4 -- 527.6 -- 7.0 -- 7.0 -- 534.4 -- 319.5 -- 
GRAND TOTAL. .............. 1,182.2 1,160.4 -- 1,125.1 10.0 349.7 -- 279.6 -- 1,140.0 -- 916.1 -- 
1. Subject to change as planning progresses. 
2. Includes 5.1 miles of Cache River levee. This levee was enlarged to 1928 grades with Federal funds, but since that time has been classified as a secondary levee. 
3. Includes 12.1 miles of Farrenburg levee. This levee was enlarged to 1928 grades with Federal funds, but since that time has been classified as a secondary levee. 
4. Deficient in freeboard as a result of 1996 Revised Project Design Flood flowline. 
5. Landside seepage berms only. 
-, 6. Changed to correct previous error. 
0
0
,.] 
7d 
0
r7 
0
O
0
0
IN 
'N
Cn 
C3 
r
.< 
J 
C.C

TABLE 41-N RECAPITULATION 
PROJECT LEVEE TABLES 42-K, -L, AND -M 
(FISCAL YEAR 1999) 
Levees and Floodwalls Berms Surfaced Roads on Levees 
(1Miles) @Miles) (Miles) 
Built to 
Approved 
Grade and Total 
Total Section Cur- In Cam- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thru Under 
for This This This Con- Cam- This This Con- Cam- This This Con- 
Location System FY FY FY struction pleted' FY FY struction pleted FY FY struction 
MAIN STEM LEVEES 
Mississippi River 
New Orleans District, 
Table 41-K ................. 511.6 511.6 -- 490.2 7.2 1.2 -- 1.1 -- 479.6 -- 479.6 -- 
Vicksburg District, Table 41-L .... 460.4 460.4 -- 240.0 36.4 309.2 -- 259.9 4.3 450.1 -- 450.1 -- 
Memphis District, Table 41-M ..... 637.8 631.0 -- 57.5 10.0 342.7 -- 22. - 605.6 -- 596.6 -- 
Total Mississippi River ........ 1,609.8 1,603.0 -- 1,327.7 53.6 653.1 -- 533.6 4.3 1,535.3 -- 1,526. -- 
Other Levees Included in Main 3 
Stem 
Atchafalaya Basin Floodway-- 
NOD ..................... . 449.2 449.2 3.7 375.0 12.5 -- -- -- -- 447.5 -- -- 
428.2 
Lower Red River-South Bank-- 59.2 59.2 -- 59.2 -- -- -- -- -- 59.2 -- -- 
VXD .................... 59.2 
Arkansas River-South Bank-- 85.4 85..4 -- 85.4 -- 24 . 24.7 -- 4 .1- 
VXD ............... J........ 
Total Other Levees Included 593.8 593.8 3.7 512.6 24.7 -- 4. -- 590.8 -- 
in Main Stem ............. 2,203.6 2,196.8 3.7 1,847.3 66.1 677.8 -- 558.3 4.3 2,126.1 . 
Total Main Stem Levees ...... 568.5 
2,094. 
TRIBUTARY LEVEES IN 8 
MR&T PROJECT 17.4 17.4 -- 17.4 -- -- -- -- -- 17.4 -- 
Lake Pontchartrain, LA,--NOD ..... 624.1 425.3 -- 237.6 -- -- -- -- -- 624.1 . 
Yazoo River Basin--VXD ......... 61.5 56.2 -- 56.2 -- 8.3 -- 8.3 -- 47.4 -- 17.4 -- 
Arkansas River-North Bank-- 263.6 196.9 -- 193.0 19.1 -- -- -- -- 249.0 -- 338.9 19.1 
VXD ..................... 308.2 302.9 -- 302.9 -- -- -- -- -- 301.0 -- 
47.4 
Red River Backwater--VXD.......193.0 
St. Francis River-MD .......... 133.5 
1. Landside seepage berms only. 
2. Subject to change as planning progresses. 
3. 1996 Revised Project Design Flood flowline identified freeboard deficiencies. 
4. Changed to correct previous error. 
5. Relief wells have been used in lieu of seepage berms in some reaches of the Miss. River Levees. 
0
zMq 
J C!1 
-.4

TABLE 41-N 
(Continued) 
RECAPITULATION 
PROJECT LEVEE TABLES 42-K, -L, AND -M 
(FISCAL YEAR 1999) 
Levees and Floodwalls Berms Surfaced Roads on Levees 
Miles) (Miles) (Miles) 
Built to 
Approved 
Grade and Total 
Total Section Cur- In Com- Cur- In Com- Curin 
Total rently System plete rently System plete rently 
Authorized Place Thru Under When Built Thru Under When Built Thrn Under 
for This This This Con- Com- This This Con- Cam- This This Con- 
Location System FY FY FY struction plete' FY FY struction plete 
Little River--MD .............. 130.1 130.1 -- 130.1 -- -- -- -- -- 128.9 -- 94.5 - 
Lower White River--MD ......... 95.6 85.9 -- 84.1 -- -- -- -- -- 94.0 -- 81.0 -- 
Memphis Harbor-MD ........... 10.5 10.5 -- 10.5 -- 7.0 -- 7.0 -- 10.5 -- 10.5 -- 
Total Tributary Levees in 
MR&T Project ............. 1.511.0 1.225.2 1.0318 19.1 15.3 - 15.3 . 1.472.3 916.2 1.1 
Grand Total in Project ......... 3,714.6 3,422.0 3.7 2,879.1 85.2 691.2 -- 573.6 4.3 3,598.4 -- 3,011.0 19.1 
0 1. Landside seepage berms only. 
2. Subject to change as planning progresses. 
3. 1996 Revised Project Design Flood flowline identified freeboard deficiences. 
4. Changed to correct previous error. 
5. Relief wells have been used in lieu of seepage berms in some reaches of the Miss. River Levees. 
I 
O
O
oil 0
0
7d 
0z
O
cj 
Ono 
y
0
0

MISSISSIPPI RIVER COMMISSION 
TABLE 41-0 CHANNEL IMPROVEMENTS: 
NEW ORLEANS DISTRICT 
(FISCAL YEAR 1999) 
Total 
In Complete 
System Built Thru Currently 
Year When This This Percent Under 
Location Initiated Completed FY FY Complete Construction 
(Miles) 
Bayou des Glaises diversion channel 1938 6.0 -- 6.0 100 -- 
Bayous Rapides, Boeuf, and Cocodrie 1946 92.6 -- 63.4 75 -- 
Charenton drainage and navigation canal 1939 6.3 -- 6.3 100 -- 
Wax Lake Outlet 1938 15.7 -- 15.7 100 -- 
Atchafalaya Basin Floodway 1933 244.2 -- 186.4 76 -- 
Morganza Floodway 1941 3.3 -- 3.3 100 -- 
Old River outflow channel 1956 8.3 -- 8.3 100 -- 
Old River inflow channel 1960 2.3 -- 2.3 100 -- 
Old River lock approach channels 1961 2.2 -- 2.2 100 -- 
Baton Rouge Harbor (Devils Swamp) 1958 2.5 -- 2.5 100 -- 
Teche-Vermilion Water Supply 1977 6.3 -- 6.3 100 -- 
Old River Auxiliary Control Structure inflow channel 1986 1.9 -- 1.9 100 -- 
Old River Auxiliary Control Structure outflow channel 1988 0.9 -- 0.9 100 -- 
Caernarvon Freshwater Diversion channel 1988 1.7 -- 1.7 100 -- 
41-81

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
CHANNEL IMPROVEMENTS: 
VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Total 
In Complete 
System Built Thru Currently 
Year When This This Percent Under 
Location Initiated Completed FY FY Complete Construction 
(Miles) 
BIG SUNFLOWER RIVER, 
ETC., MS 
Big Sunflower River ..................... 
Quiver River .......................... 
Deer Creek ........................... 
Steele Bayou .......................... 
Steele Bayou' .......................... 
Main Canal ........................... 
M ain Canal2 . . . . . . . . . . . . . . . . . . . . . . . . . . . 
Black Bayou................. ......... 
Big Sunflower River tributaries .............. 
Quiver River tributaries ................... 
YAZOO BACKWATER 
Yazoo Backwater ....................... 
YAZOO BASIN HEADWATER, MS 
Upper Yazoo Project ..................... 
Coldwater River ........................ 
Arkabutla Canal ........................ 
Tallahatchie Canal ....................... 
Little Tallahatchie River and 
Panola-Quitman Floodway ................ 
Greenwood protection works ................ 
Yacona River .......................... 
Bobo Bayou ........................... 
Cassidy Bayou ......................... 
Cassidy Bayou3 . . . . . . . . . . . . . . . . . . . . . . . . . 
Bear Creek Diversion .................... 
Lake Cormorant ........................ 
Hurricane Bayou ........................ 
Opossum Bayou ........................ 
Abaica Creek .......................... 
Chicopa Creek .......... 
Bear Creek ............ 
Rocky Bayou ........... 
Whiteoak Bayou ......... 
Miscellaneous ditches ..... 
Yalobusha River ......... 
Yazoo River ............ 
Whittington Auxiliary Channel 
Tchula Lake ............ 
David-Burrell Bayou ..................... 
McKinney Bayou ....................... 
1947 
1947 
1947 
1947 
1965 
1959 
1993 
1992 
1957 
1960 
199.1 
69.6 
7.0 
54.9 
71.2 
21.1 
26.7 
36.5 
227.2 
35.4 
1960 39.9 
1976 
1941 
1948 
1940 
1939 
1971 
1952 
1944 
1934 
1939 
1940 
1956 
1964 
1957 
1960 
--
_-- 
_-- 
_-- 
_-- 
_-- 
1960 
179.0 
54.6 
0.4 
74.8 
48.0 
2.9 
1.8 
16.1 
69.0 
26.0 
4.8 
20.9 
2.5 
20.8 
7.7 
7.0 
23.3 
7.8 
55.9 
12.3 
46.0 
160.2 
30.8 
26.4 
40.4 
3.5 
41-82 
199.1 
69.6 
7.0 
54.9 
71.2 
21.1 
26.7 
20.1 
227.2 
35.4 
12.8 
13.8 
-- 39.9 
-- 
-- 
-- 
-- 
--8 
-- 
-- 
5.7 3.6 
100 
100 
100 
100 
100 
100 
100 
55 
100 
100 
100 
40 
100 
100 
98 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
--
-- 
-- 
--
-- 
-- 
_-- 
-- 
_-- 
-- 
72.6 
54.6 
0.4 
73.5 
48.0 
2.9 
1.8 
16.1 
69.0 
46.0 
160.2 
30.8 
26.4 
40.4 
3.5 
-- 
--
_-- 
_-- 
3.5 
. . . . . . . . . . . . . . . 
. . . . . . . . . . . . . . . 
. . . . . . . . . . . . . . . 
. . . . . . . . . . . . . . . 
. . . . . . . . . . . . . . . 
. . . . . . . . . . . . . . . 
. . . . . . . . . . . . . . . 
. . . . . . . . . . . . . . 
TABLE 41-P

MISSISSIPPI RIVER COMMISSION 
TABLE 41-P CHANNEL IMPROVEMENTS: 
(Continued) VICKSBURG DISTRICT 
(FISCAL YEAR 1999) 
Total 
In Complete 
System Built Thru Currently 
Year When This This Percent Under 
Location Initiated Completed FY FY Complete Construction 
(Miles) 
YAZOO BASIN HEADWATER, MS 
(Continued) 
Hillside Floodway ....................... 1964 11.0 -- 11.0 100 -- 
Yazoo City protection works ................ 1953 1.6 -- 1.6 100 -- 
Ascalmore-Tippo Bayous .................. 1975 30.2 -- 15.1 50 -- 
Alligator-Catfish Bayou ................... 1973 8.3 -- 8.2 99 -- 
Pelucia Creek ........................... 1975 11.7 .2 11.7 100 -- 
BOEUF & TENSAS RIVERS, 
ETC., LA AND AR 
Bayou Lafourche ........................ 1949 45.3 -- 45.3 100 -- 
Bayou Lafourche4'7 . . . . . . . . . . . . . . . . . . .. .. 1972 43.0 -- 4.4 10 -- 
Big & Colewa Creeks .................... . 1947 81.4 -- 81.4 100 -- 
Big & Colewa Creeks s'7 . . . . . . . . . . . . . . . . . . . 1965 86.8 -- 51.5 60 -- 
Tensas River .......................... 1947 96.5 -- 96.5 100 -- 
Tensas River 6 . . . . . . . . . . . . . . . . . . . . . . . . . . 1968 165.0 -- 61.0 37 -- 
Boeuf River, AR and LA .................... 1953 103.9 -- 103.9 100 -- 
Fleschmans Bayou, AR ................... 1963 6.6 -- 6.6 100 -- 
Caney Bayou, AR ....................... 1964 7.4 -- 7.4 100 -- 
Canal 18, AR .......................... 1963 10.3 -- 10.3 100 -- 
Big Bayou, AR ......................... 1952 33.3 -- 33.3 100 -- 
Black Pond Slough, AR ................... 1962 14.3 -- 14.3 100 -- 
Bayou Macon, AR and LA .................. 1959 150.8 -- 150.8 100 -- 
Rush Bayou, AR ........................ 1964 6.7 -- 6.7 100 -- 
Canal 19, AR .......................... 1957 50.2 -- 50.2 100 -- 
Canal 43, AR .......................... 1956 34.5 -- 34.5 100 -- 
Canal 81, AR ....................... .... 1957 32.7 -- 32.7 100 -- 
Mill Bayou-Bayou Vidal-Bayou 
Vidal Cutoff ............ .............. -- 17.1 -- -- -- -- 
Kirsch Lake Canal ....................... -- 9.3 -- -- -- 
Canal 19 Extension . .... ............ ... 1964 9.4 -- 9.4 100 -- 
Lake Chicot Pumping Plant ................. -- 2.5 -- 2.5 100 -- 
Mill Bayou ............................. 1955 4.8 -- 4.8 100 -- 
RED RIVER BACKWATER, LA 
Tensas-Cocodrie Pumping Plant .............. 1976 6.9 -- 6.9 100 -- 
Six Mile Bayou, LA ..................... -- 1.5 -- 1.5 100 -- 
1. Includes further work on 54.9 miles and adds 16.3 miles of channel to the project. 
2. Includes further work on 21.1 miles and adds 1.1 miles of channel to the project. 
3. Includes further work on 26.0 miles. 
4. Includes further work on 38.6 miles and adds 4.4 miles of channel to the project. 
5. Includes further work on 75.3 miles and adds 11.5 miles of channel to the project. 
6. Includes further work on 96.5 miles and adds 68.5 additional miles of channel to the project. 
7. Further work on these items has been deferred due to local oppositions and withdrawal of sponsorship by 
the levee district. 
41-83

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-Q CHANNEL IMPROVEMENTS: 
MEMPHIS DISTRICT 
(FISCAL YEAR 1999) 
Total 
In Complete 
System Built Thru Currently 
Year When This This Percent Under 
Location Initiated Completed FY FY Complete Construction 
(Miles) 
BIRDS POINT-NEW MADRID 
FLOODWAY 
Birds Point-New Madrid Intercepting 
Ditch Enlargement, Samos and 
Vicinity, M O ......................... 
ST. FRANCIS BASIN 
Little River Drainage, MO ................. 
St. Francis River, MO and AR .............. 
West Memphis Drainage, AR ............... 
Big Slough and Mayo Ditch, AR ............. 
Tyronza River, AR ...................... 
L'Anguille River, AR .................... 
LOWER WHITE RIVER 
BASIN, AR 
Cache River Basin, AR ................... 
Big Creek and tributaries, AR ............... 
WEST KENTUCKY TRIBUTARIES 
Obion Creek, KY ...................... 
WEST TENNESSEE TRIBUTARIES 
MS River, Western TN tributaries 
(Backwater Areas) (1946 Act) .............. 
Obion River Diversion Channel, 
TN (1946 Act) ........................ 
Reelfoot Lake-Lake No. 9, KY and TN ......... 
Running Reelfoot Bayou, TN ............... 
MS River Below Cape Girardeau: West 
TN tributaries (1948 Act) ................. 
Wolf River and tributaries, TN .............. 
NONCONNAH CREEK, MS AND TN 
Nonconnah Creek, MS and TN .............. 
HELENA HARBOR, PHILLIPS 
COUNTY, AR 
Helena Harbor, AR(2 . . . . . . . . . . . . . . . . . . . . . 
1952 
1963 
1953 
1951 
1960 
1939 
(1) 
1972 
(1) 
(1) 
1952 
(1) 
1974 
1955 
1961 
1960 
1990 
1989 
9.6 
298.9 
638.5 
19.8 
28.0 
12.7 
95.0 
231.5 
103.8 
-- 9.6 100 
0
0-- 
-- 
-- 
298.9 
572.9 
19.8 
28.0 
12.7 
-- 
-- 7.2 -- -- 
41.7 -- -- 
34.3 -- 34.3 
9.3 
15.8 
19.7 
225.0 
25.5 
18.2 
2.5 
3.0 
19.7 
-- 89.8 
-- 25.5 
1. Not started. 
2. Data for Stage 1 only. 
41-84 
100 
89 
100 
100 
100 
_-- 
0.9 
3 -- 
100 
19 
100 
41 
100 
-- 2.5 100

MISSISSIPPI RIVER COMMISSION 
TABLE 41-R PUMPING STATIONS: 
NEW ORLEANS DISTRICT 
Rehabilitation Status 
(If Applicable) 
Percent Percent 
Complete Year Complete Year 
Authorized Thru Complete Thru Complete 
Size This (Schedule/ Year This (Schedule/ 
Name (CFS) FY Actual) Initiated FY Actual) 
Bayou Yokely 489 100 1955 1990 100 1991(A) 
Bayou Yokely Enlargement 568 100 1963 1990 100 1991(A) 
Centerville 332 100 1964 1991 100 1992(A) 
Ellerslie 136 100 1953 -- -- 
Franklin 144 100 1958 1992 100 1993(A) 
Franklin Enlargement 144 100 1978 1992 100 1993(A) 
Gordy 238 100 1964 -- -- 
Maryland 136 100 1957 1991 100 1992(A) 
North Bend 52 100 1962 -- -- -- 
Tiger Island 75 100 1955 -- -- 
Wax Lake East 1,008 100 1961 1990 100 1992(A) 
Wax Lake West 496 100 1965 1990 100 1992(A) 
Teche Vermilion 1,300 100 1982 -- -- 
Point Coupee 1.500 100 1983 -- -- -- 
TOTAL 6,618 
41-85

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-S PUMPING STATIONS: 
VICKSBURG DISTRICT 
Rehabilitation Status 
(If Applicable) 
Percent Percent 
Complete Year Complete Year 
Authorized Thru Complete Thru Complete 
Size This (Schedule/ Year This (Schedule/ 
Name (CFS) FY Actual) Initiated FY Actual) 
Chauvin Bayou, LA 
Bawcomville 
Jonesville 
Natchez Port 
Wilson Point 
Greenwood - Lee Street 
Greenwood - Wilson Street 
Greenwood - Walker Lake 
Yazoo City 
Columbia 
Calion 
McKinney Bayou, MS 
Lake Chicot 
Tensas Cocodrie 
Yazoo Backwater 
Natchez Area 
Bushley Bayou 
Bushley Bayou 
Sicily-HAHA Bayou 
Sicily - Fool River 
Pelucia Creek - Rising Sun #1 
Pelucia Creek - Rising Sun #2 
Pelucia Creek Pump 
Below Red River 
Bayou Rapides2 
Ouachita Parish, 
River Styx Bayou, LA 
Total 
250 
270 
180 
100 
50 
90 
67 
675 
540 
45 
200 
250 
6,500 
4,000 
10,000 
300 
300 
20 
750 
300 
10 
15 
75 
500 
222 
500 
25,709 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
100 
44 
82 
100 
100 
100 
100
_-- 
1994 
1955 
1952 
_-- 
1953 
1953 
1949 
1954 
1939 
1959 
1962 
1987 
1986 
-- _ 
Indef' 
Indef' 
2000(3) 
1999(3) 
1992 
1992 
1993 
Indef' 
1936 
51 200(x) 
1 This project has been placed in the inactive category. 
41-86 
100 
100 
-- 
-- 
-- 
-- 
-- 
--
_-- 
_-- 
_-- 
_-- 
_-- 
-- 
1993(a) 
_-- 
-- 
_-- 
--
-- 
--
_-- 
-- 
-- 
_-- 
-- 
_-- 
_-- 
-- 
_-- 
_-- 
-- 
--
_-- 
-- 
-- 
1991 
1992 
1952 
1952 
1952 
1957 
1961 
-- _ 
-- _ 
-- _ 
-- _

MISSISSIPPI RIVER COMMISSION 
TABLE 41-T PUMPING STATIONS: 
MEMPHIS DISTRICT 
Rehabilitation Status 
(If Applicable) 
Percent Percent 
Complete Year Complete Year 
Authorized Thru Complete Thru Complete 
Size This (Schedule/ Year This (Schedule/ 
Name (CFS) FY Actual) Initiated FY Actual) 
Devall' s Bluff 215 100 1949 1987 100 1989 
Des Arc, Ark. 30 100 1954 -- -- -- 
Ensley 900 100 1966 -- ---- 
DD #17, Station #1 375 100 -- -- 
Huxtable Pumping Plant 12,000 100 1977 -- -- -- 
Graham Burke 1,500 100 1964 -- -- -- 
Finley Street 100 100 1978 -- -- -- 
Dyersburg 26 100 1961 -- -- -- 
Cotton Slough 50 100 1964 -- -- -- 
West Hickman 190 100 1976 -- -- -- 
Cypress Creek 3,000 100 1944 -- ---- 
Fairfax 53.5 100 1950 -- -- -- 
Goose Pond 110 100 1976 -- ---- 
Marble Bayou 220 100 1952 -- ---- 
Workhouse Bayou 520 100 1950 -- -- -- 
Nonconnah 1,620 100 1944 -- -- -- 
L&DD #3 Peafield 400 100 -- -- -- 
Treasure Island 150 100 1976 -- -- -- 
Lake No. 9 500 100 1981 -- -- -- 
Cairo 10th Street 65 100 1981 -- -- -- 
Cairo 28th Street 65 100 1981 -- -- -- 
DD #17, Station #2 700 100 1981 -- -- -- 
Drinkwater Sewer 150 100 1979 -- -- -- 
May Street 5 100 1948 -- -- 
Cairo 22nd Street 37 100 -- -- -- 
Gayoso Bayou 1,500 100 1915 -- -- -- 
Mud Lake 200 -- -- -- -- -- 
Madison 25 -- -- -- -- -- 
Cache River 200 -- -- -- -- -- 
New Madrid 1,500 -- -- -- -- 
St. John's Bayou 1.000 -- -- -- -- 
TOTAL 27,406.5 
1 Unknown constructed by local interest. 
41-87

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-U COSTS DURING FISCAL YEAR 1999 
Item Construction Maintenance Other 
FEDERAL FUNDS 
Flood control, Mississippi River and tributaries: 
St. Louis District: 
St. Francis Basin-Wappapello Lake $ -- $ 6,921,860 $ 51,865 
Subtotal 6,921,860 51,865 
Memphis District: 
Cache Basin, AR 741 -- -- 
Channel improvement 20,171,743 31,024,507 -- 
Eastern Arkansas Region (Comp) 3,079,453 -- -- 
Eight Mile Creek 1,403,942 -- -- 
General investigations -- -- 3,838,772 
Helena & Vicinity 824,061 -- -- 
Helena Harbor, Phillips County 3,829 398,617 -- 
Hickman Bluff, KY 4,911,739 -- -- 
Horn Lake Creek & Tribs 55,684 -- -- 
Inspection of completed works -- 817,377 -- 
Lake No. 9 Pumping Plant, KY -- 2,243 -- 
Little R. Drainage 16,819 -- -- 
Mapping -- 468,907 -- 
Memphis Harbor (McKeller Lake) -- 2,675,022 -- 
Nonconnah Creek, TN & MS 239,388 
Mississippi River levees 9,427,978 3,250,172 -- 
St. Francis River & Tributaries, AR 7,115,403 -- -- 
St. Johns Bayou & New Madrid 1,713,488 -- -- 
West Tennessee tributaries 1,585,876 -- -- 
White River Backwater -- 1,993,835 -- 
Whiteman's Creek, AR 819,271 -- -- 
Subtotal 51,369,414 54,412,997 3,838,772 
Vicksburg District: 
Channel improvement 10,629,539 9,440,862 -- 
General investigations -- -- 309,240 
Inspection of completed works -- 244,543 -- 
Lower Arkansas River -- 40,287 -- 
Lower Red River--South Bank Red River Levee -- 798,291 -- 
Mapping -- 382,885 -- 
Mississippi River levees 14,234,068 1,005,130 -- 
Tensas Basin 12,029,807 9,515,046 -- 
Yazoo Basin 34,091,801 27,812,160 -- 
Subtotal 70,985,218 49,239,270 309,240 
41-88

MISSISSIPPI RIVER COMMISSION 
TABLE 41-U COSTS DURING FISCAL YEAR 1999 
(Continued) 
Item Construction Maintenance Other 
New Orleans District: 
Atchafalaya Basin 
Atchafalaya Basin Floodway System 
B. R. Harbor Devil Swamp 
Bayou Cocodrie and Tributaries 
Bonnet Carre Spillway 
Channel Improvement 
General Investigations 
Inspection of Completed Works 
Louisiana Penitentiary Levee 
Mapping 
Mississippi & LA Estuarine 
Mississippi Delta Region 
Mississippi River Levees 
Old River 
Subtotal 
Total Federal Funds 
CONTRIBUTED FUNDS 
Memphis District 
Wolf River 
Reelfoot Lake TN & KY 
Nonconnah Creek, TN & MS 
New Orleans District: 
Atchafalaya Basin 
Old River 
Mississippi Delta Region 
Morganza, LA to Gulf of Mexico 
Total Contributed Funds 
Grand Total, Federal 
and Contributed Funds 
27,827,747 
7,742,205 
10,470,061 
887,557 
-30,898 
13,281,502 
3,861,994 
11,945,667 
951,658 
15,416 
82,543 
2,079,173 
14,267,382 
232,461 
284,626 
-- 
238,480 
547,531 
4,957,549 
875,236 
64,085,167 35,571,655 875,236 
186,439,799 146,145,781 5,075,113 
316,839 
-- -- 234,739 
-- 39,946 -- 
-- 529,000 -- 
-- 141,739 -- 
-- 834,354 -- 
-- -- 933,260 
-- 1545,039 1,544,838 
186,439,799 147,690,819 6,619,951 
41-89

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-V STATEMENT OF ALLOTMENTS AND 
ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 1999 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30, 1999 
ALLOTMENTS AND ACCRUED EXPENDITURES 
CHARGEABLE AGAINST FLOOD CONTROL 
ACT LIMITATIONS: 
COMPLETED WORKS: 
Waterways Experiment Station 
Office, Chief of Engineers 
Rock Island District: 
S. G. & O. prior to Aug. 18, 1941 
St. Louis District: 
S. G. & O. prior to Aug. 18, 1941 
Subtotal 
Memphis District: 
Des Arc, AR 
Contraction works 
DeValls Bluff, AR 
Mapping 
Memphis Harbor 
New Madrid Floodway 
Wolf River and tributaries 
Roads on levees (Mississippi River levees) 
S. G. & O. prior to Aug. 18, 1941 
Subtotal 
Vicksburg District: 
Boeuf Basin levees 
Channel realignment, Arkansas River 
Contraction works 
Eudora Floodway 
Vicksburg Harbor 
Greenville Harbor 
Grants Canal (Mississippi River levees) 
Mapping 
Jonesville, LA 
Tensas National Wildlife Refuge, LA 
Roads on levees 
S. G. & O. prior to Aug. 18, 1941 
Subtotal 
$ 874,000 
19,158 
14,010 
$ 874,000 
19,158 
$ 
14,010 
11 . ' G 
1,076,520 1,076,520 
178,925 178,925 -- 
8,692,791 8,692,791 -- 
231,215 231,215 -- 
1,450,337 1,450,337 -- 
18,736,432 18,736,432 -- 
6,521,543 6,521,543 -- 
1,723,620 1,723,620 -- 
12,426 12,426 -- 
1,998,766 1,998,766 -- 
39,546,054 39,546,054 -- 
2,764,605 2,764,605 -- 
125,074 125,074 -- 
1,972,183 1,972,183 -- 
826,235 826,235 -- 
4,664,515 4,664,515 -- 
2,864,516 2,864,516 -- 
7,070 7,070 -- 
1,531,021 1,531,021 -- 
172,950 172,950 -- 
3,980,000 3,980,000 -- 
105,660 105,660 -- 
2,350,201 2,350,201 -- 
57,184,031 57,184,031 -- 
41-90 
1 LC '2 G7

MISSISSIPPI RIVER COMMISSION 
TABLE 41-V 
(Continued) 
STATEMENT OF ALLOTMENTS AND 
ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 1999 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30, 1999 
New Orleans District: 
Baton Rouge Harbor, LA 
Atchafalaya River and Basin, LA 
Bonnet Carre' Spillway, LA 
Contraction works 
Mapping 
Roads on levees 
S. G. & O. prior to Aug. 18, 1941 
Wax Lake Outlet and Charenton Canal 
Morganza Floodway and structure 
Lake Pontchartrain 
Teche Vermilion Basin Water Supply 
Old River 
Atchafalaya Basin, rights-of-way and flowage, 
Bayou des Glaises setback 
Subtotal 
All other completed items: 
Surveys under Sec. 10, Flood Control Act of 1928 
Impounded savings 
Plant transferred to revolving fund 
OCE (portion of allotment transferred to 
revolving fund, Washington Dist.) 
Subtotal 
TOTAL COMPLETED WORKS 
UNCOMPLETED WORKS: 
Rock Island District: 
Levees under Sec. 6, Flood Control Act of 1928 
St. Louis District: 
Levees under Sec. 6, Flood Control Act of 1928 
Subtotal 
Memphis District: 
Mississippi River levees 
Mississippi River levees 
New Madrid 
Channel improvement: 
Revetments 
Dredging 
Dikes 
699,185 
3,375,492 
14,212,198 
1,258,916 
1,112,967 
540,838 
2,701,566 
10,098,817 
35,992,117 
5,513,110 
34,506,000 
292,274,000 
'3Q7 917 
14,212,198 
1,258,916 
-- 
540,838 
2,701,566 
10,098,817 
35,992,117 
5,513,110 
34,506,000 
292,274,000 
3Q7 017 
,30I,y I0I ,1 
402,673,123 402,673,123 -- 
4,995,215 4,995,215 -- 
1,593,097 1,593,097 -- 
24,924,578 24,924,578 -- 
19,882 19,882-- 
31,532,772 31,532,772 -- 
532,012,500 532,012,500 -- 
579,462 579,462 
1,897,980 1,897,980 -- 
2,477,442 2,477,442 -- 
222,437,354 
98,000 
443,537,306 
58,566,439 
236,746,963 
222,430,928 
98,000 
443,533,004 
58,566,439 
236,743,500 
6,426 
4,302 
3,463 
41-91

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-V STATEMENT OF ALLOTMENTS AND 
(Continued) ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 1999 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30, 1999 
Memphis District: (Continued) 
Reelfoot Lake 439,434 439,434 -- 
Reelfoot Lake, Lake No. 9, TN-KY 7,896,000 7,896,000 -- 
St. Francis Basin: 
Wappapello Lake 9,019,908 9,019,908 -- 
St. Francis River and tributaries 301,857,182 301,849,742 7,440 
Big Slough and Mayo ditch 965,429 965,429 -- 
Little River drainage 52,503,092 52,501,330 1,762 
Lower White River: 
Clarendon Levee 652,115 652,115 -- 
Augusta to Clarendon, AR 1,788,846 1,788,846 -- 
White River backwater levee, AR 10,624,501 10,624,501 -- 
Horn Lake Creek & Tribs 2,163,000 2,162,032 968 
Hickman Bluff, KY 17,809,600 17,802,763 6,837 
Memphis Harbor Ensley Berm 3,510,000 3,510,000 -- 
Nonconnah Creek Recreation Facility 10,910 10,900 10 
Nonconnah Creek Environmental Enhancement 11,510 11,502 8 
Nonconnah Creek, TN & MS 8,709,580 8,707,717 1,863 
West Memphis and Vicinity 571,000 571,000 -- 
Whiteman's Creek, Ar 1,840,000 1,839,748 252 
Levees under Sec. 6, Flood Control Act of 1928 108,651 108,651 -- 
West Tennessee Tributaries 53,759,900 53,757,720 2,180 
Helena Harbor 15,087,000 15,083,071 3,929 
Helena & Vicinity, AR 1,094,000 1,075,121 18,879 
Cache Basin, AR 10,849,000 10, 843,444 5,556 
West Kentucky Tributaries 1,440,000 1,440,000 0 
Mud Lake Pumping Station, TN 100,000 100,000 0 
L' Anguille River 192,000 192,000 -- 
Eight Mile Creek 3,896,000 3,895,161 839 
St. Johns Bayou & New Madrid Floodway 4,197,000 4,196,555 445 
Eastern Arkansas Reg (Comp) 3,083,000 3,079,453 3,547 
Subtotal 1,475,564,720 1,475,496,014 68,706 
Vicksburg District: 
Mississippi River Levees (excludes Grants Canal, 
$7,070, shown under completed works) 267,938,990 267,136,319 802,672 
Section 6 Levees 9,000 9,000 -- 
Lower Arkansas River: 
North Bank 7,049,414 7,049,414 -- 
South Bank 15,676,286 15,676,286 -- 
Tensas Basin: 
Lake Chicot Pumping Plant 95,639,986 95,639,945 41 
Tensas River 41,505,235 41,505,235 -- 
Red River Backwater: 
Below Red River 639,400 639,400 -- 
41-92

MISSISSIPPI RIVER COMMISSION 
TABLE 41-V STATEMENT OF ALLOTMENTS AND 
(Continued) ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 1999 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30, 1999 
Red River Backwater Levee, LA 119,767,125 119,203,669 563,456 
Tensas Cocodrie Pumping Plant 56,071,200 56,071,167 33 
Lower Red River South Bank Red River Levees 756,300 756,300 -- 
Channel improvement: 
Revetments 517,778,673 517,747,055 31,618 
Dredging 23,919,516 23,919,516 -- 
Dikes 176,713,174 176,649,093 64,081 
Levees under Sec. 6, Flood Control Act of 1928 958,175 958,175 -- 
Ouachita River Levees 400,000 400,000 -- 
Yazoo Basin: 
Sardis Lake 26,502,400 26,502,400 -- 
Enid Lake 21,292,400 21,292,400 -- 
Arkabutla Lake 16,000,700 16,000,700 -- 
Grenada Lake 45,401,494 45,401,494 -- 
Greenwood 11,543,000 11,543,000 -- 
Belzoni 316,656 316,656 -- 
Yazoo City 2,205,611 2,205,611 -- 
Will M. Whittington auxiliary channel 10,950,966 10,950,966 -- 
Big Sunflower, etc. 91,561,400 91,083,741 477,659 
Main Stem 34,586,300 34,586,281 19 
Upper Yazoo Projects 142,670,236 141,508,047 1,162,189 
Yazoo Basin--Tributaries 
Tributaries (Except Ascal-Tippo-Opossum Bayous) 106,656,966 106,598,677 58,289 
Tributaries--Bank Stabilization 612,484 612,484 -- 
Ascalmore-Tippo-Opossum Bayous 23,977,200 23,977,200 -- 
Yazoo Basin Backwater 
Yazoo Backwater 56,913,000 56,885,942 27,058 
Rocky Bayou 3,401,500 3,401,500 -- 
Yazoo Backwater Pumping Plant 9,275,850 9,261,452 14,398 
Muddy Bayou 5,145,200 5,145,200 -- 
Yazoo Backwater, F&WL Mitigation 6,326,500 6,306,590 19,910 
Yazoo Basin Reformulation 26,144,170 25,362,248 181,922 
Streambank Erosion Control, Eval. and Demo. 14,767,000 14,767,000 -- 
Demonstration Erosion Control 238,852,100 238,686,592 165,508 
Dam Safety Assurances-Sardis Dam 23,235,000 23,230,763 4,237 
Subtotal 2,243,160,609 2,239,587,519 3,573,090 
New Orleans District: 
Bayou Cocodrie and Tributaries 5,008,008 5,008,008 -- 
Miss. & LA Estuarine 4,481,600 4,434,711 46,889 
Channel Improvement: 
Dredging 35,945,266 35,945,266 -- 
Revetments 1,037,618,417 1,037,600,821 17,596 
Louisiana Penitentiary Levee 1,913,000 1,729,373 183,627 
Lower Red River (South Bank Levees) 18,056,600 18,056,600 -- 
41-93

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-V 
(Continued) 
STATEMENT OF ALLOTMENTS AND 
ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 1999 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30, 1999 
New Orleans District (Continued): 
Levees Under Sec. 6, Flood Control Act of 1928 
Mississippi River Levees 
Mississippi Delta Region 
Atchafalaya Basin Floodway: 
Atchafalaya Basin 
Atchafalaya River Navigation 
Atchafalaya Basin Floodway System 
Subtotal 
TOTAL UNCOMPLETED WORKS 
ADVANCE ENGINEERING AND DESIGN 
(CONSTRUCTION) 
Memphis District: 
L'Anguille River Basin, AR 
Reelfoot Lake, Lake No. 9 
Cache River 
Big Creek and Tributaries, Lower White River 
Clarendon Levee, Lower White River 
West Kentucky Tributaries 
Mud Lake Pumping Station, TN 
Harris Fork Creek, KY & TN 
Subtotal 
Vicksburg District: 
Yazoo Basin, Big Sunflower River, Steele Bayou 
Tensas - National Wildlife Refuge, LA 
Subtotal 
New Orleans District: 
Mississippi Delta Region (EP 309) 
Teche Vermilion Basin-Water Supply 
East Rapides & S. Central Avoyelles Parishes 
Subtotal 
TOTAL ADVANCE ENGINEERING 
AND DESIGN 
TOTAL COMPLETED WORKS, UNCOMPLETED 
WORKS AND ADVANCE ENGINEERING 
AND DESIGN 
200,680 
359,356,000 
74,256,920 
849,322,317 
303,463 
73,720,220 
200,680 
359,123,953 
73,540,571 
848,633,818 
303,463 
72,774,103 
232,047 
716,349 
688,499 
946,117 946,117 
2,460,182,491 2,457,351,368 2,831,123 
6,181,385,262 6,174,912,343 6,472,919 
150,000 150,000 -- 
30,000 30,000 -- 
420,000 420,000 -- 
365,000 365,000 -- 
65,000 65,000 -- 
175,000 175,000 -- 
350,000 350,000 -- 
540,000 540,000 -- 
2,095,000 2,095,000 -- 
29,700 29,700 -- 
200,000 200,000 -- 
229,700 229,700 -- 
69,753 69,753 -- 
1,109,000 1,109,000 -- 
965,247 965,247 -- 
2,144,000 2,144,000 -- 
4,468,700 4,468,700 -- 
6,717,866,462 6,711,393,543 6,472,919 
41-94

MISSISSIPPI RIVER COMMISSION 
TABLE 41-V 
(Continued) 
STATEMENT OF ALLOTMENTS AND 
ACCRUED EXPENDITURES FOR FLOOD 
CONTROL, MISSISSIPPI RIVER AND 
TRIBUTARIES, FROM MAY 15, 1928, 
THROUGH SEP. 30, 1999 
Unexpended 
Accrued Balance 
District or Installation and Class of Work Allotments Expenditures Sep. 30, 1999 
RECREATION FACILITIES--COMPLETED 
PROJECTS 
Eight-Year Project Funds 
St. Louis District: 
Wappapello Lake, MO 
Wappapello Lake, MO, Rockwood Landing 
Subtotal 
Vicksburg District: 
Sardis Lake 
Enid Lake 
Arkabutla Lake 
Grenada Lake 
Subtotal 
Total Eight-Year Program Funds 
Total chargeable against Flood Control 
Act Limitations excluding flood 
control emergencies 
Total maintenance since Jul. 18, 1941 
Total rehabilitation 
Total flood control emergencies 
Total general investigations 
Total flood control, MR&T appropriations 
Appropriations in addition to flood control, MR&T 
Other appropriations itemized in footnote (1), 
pp. 2068-69, Annual Report for 1953 
2,405,300 
203,286 
2,405,300 
203,286 
2,608,586 2,608,586 -- 
1,584,339 1,584,339 -- 
2,268,209 2,268,209 -- 
2,189,280 2,189,280 -- 
1,631,281 1,631,281 -- 
7,673,109 7,673,109 -- 
10,281,695 10,281,695 -- 
6,728,148,157 6,721,675,238 6,472,919 
3,248,427,563 3,247,682,326 745,237 
31,113,000 31,113,000 -- 
14,900,300 14,900,300 -- 
120,464,914 119,477,217 987,697 
10,143,053,934 10,134,848,080 8,205,854 
32,068,909 32,068,909 -- 
Grand total appropriated to Sep. 30, 1999 10,175,122,843 10,166,916,989 
41-95 
Note: Preauthorization study costs chargeable to the MR&T authorization have been transferred to completed 
work. Costs not chargeable have been excluded from this report. 
8,205,854

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-W COST AND FINANCIAL STATEMENT 
Total 
Project Funding FY 96 FY 97 FY 98 FY 99 Sep. 30, 1999 
Mississippi River General investigations: 
and tributaries Allotted 5,623,000 4,380,000 5,382,000 4,555,533 120,464,914 
(Regular Funds)' Cost 4,620,200 4,213,085 5,272,270 5,075,113 119,477,217 
Construction (includes 
advance engineering 
and design): 
Allotted 182,069,000 185,028,000 160,418,300 175,048,000 6,547,965,262 
Cost 176,998,170 166,435,626 170,984,427 186,439,799 6,541,492,344 
Maintenance 
Allotted 119,742,000 140,966,000 130,411,700 144,033,008 3,248,427,563 
Cost 120,281,489 136,931,961 132,269,594 146,145,781 3,247,682,325 
Rehabilitations 
Allotted -- -- -- -- 31,113,000 
Cost -- -- -- -- 31,113,000 
Flood control 
emergencies 
(Maintenance): 
Allotted -- -- -- -- 14,885,992 
Cost -- -- -- -- 14,885,992 
(Contributed Funds) New Work: 
Contributed 2,568,875 2,504,278 5,189,334 0 34,339,413 
Cost 430,034 3,714,434 6,142,217 0 33,270,005 
Maintenance 
Contributed 93,522 250,827 186,720 2,224,600 3,562,906 
Cost 88,929 39,617 382,013 1,016,039 3,525,506 
1. Appropriations were as follows: 
Appropriations chargeable against Flood Control Act authorizations: 
Flood Control, MR&T except for emergencies (excludes Maintenance 
allotments Aug. 18, 1941, through Sep. 30, 1998): 
Net total allotted for works under Mississippi River Commission: 
Eight-Year Program Funds, Construction General: 
Surveys under Sec. 10, Flood Control Act of 1928 (not under MRC): 
Transferred to revolving fund: 
Impounded savings: 
Flood control emergencies: 
Net total allotted: 
Impounded savings: 
Additional funds not chargeable against Flood Control Act authorizations: 
Appropriations for Flood Control, MR&T, except for flood control emergencies: 
General investigations: 
Maintenance allotments Aug. 18, 1941, through Sep. 30, 1998 
Appropriations in addition to appropriations for Flood Control, MR&T 
(itemized in footnote (1), pp. 2068-69, Annual Report for 1953): 
Budgetary and OCE Reserves: 
Grand total: 
$6,717,446,690 
10,281,695 
4,995,215 
24,944,460 
1,593,097 
14,885,922 
14,378 
120,464,914 
3,248,427,563 
$6,759,261,157 
14,900,300 
3,368,892,477 
32,068,909 
10.175.122.843 
41-96

MISSISSIPPI RIVER COMMISSION 
TABLE 41-W COST AND FINANCIAL STATEMENT 
(Continued) 
Total 
Project Funding FY 99 Sep. 30, 1999 
Reconciliation of appropriations and allotments: 
Total allotted to Sep. 30, 1999 
Transferred to revolving fund: 
Surveys under Sec. 10, Flood Control Act of 1928 (not under MRC): 
Impounded savings withdrawn by Chief of Engineers: 
10,143,575,693 
24,944,460 
4,995,215 
1.607.475 
Total Appropriations to Sep. 30, 1999: 10.175.122.843 
Appropriations for past four reporting periods were as follows: 
FY 96: $307,434,000 FY 98: $296,212,000 
FY 97: $330,374,000 FY 99: $323,636,541 
2. Totals for General Investigations include four projects transferred from Construction totals per DAEN-CWB-W, Aug. 4, 
1978, teletype. 
41-97

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE 41-X MISSISSIPPI RIVER AND TRIBUTARIES 
ACTIVE GENERAL INVESTIGATIONS 
(96X3112) 
FISCAL YEAR COST 
Item and CWIS Number Federal Non-Federal Total 
SURVEYS (Category 110) 
Flood Damage Prevention (112) 
New Orleans District 
Morganza, LA to the Gulf of Mexico-012875 
Subtotal 
Vicksburg District 
Mississippi Delta, MS-12803 
Southeast Arkansas Feasibility - 12756 
Subtotal 
Memphis District 
Reelfoot Lake, TN - 12394 
Subtotal 
Total (Category 112) 
Flood Damage Prevention-Recon Study (113) 
St. Louis District 
MS River, Alex City, IL - 010462 
New Orleans District 
Alexandria, LA to the Gulf of Mexico - 81308 
Donaldsonville, LA to the Gulf of Mexico - 013510 
Subtotal 
Memphis District 
Memphis Metro Area, TN & MS - 10461 
Wolf River, Memphis, TN - 13157 
Subtotal 
TOTAL (Category 113) 
TOTAL (Category 110) 
627.603 
627,603 
5,043 
79.054 
84,097 
67.159 
67,159 
993.260 1.620.863 
993,260 1,620,863 
5,043 
79.054 
84,097 
234.739 301 899 
234,739 301,899 
778,860 1,227,999 2,006,859 
51.865 51.865 
59.525 59.525 
185.600 185.600 
245,125 245,125 
171,519 171,519 
224.881 316.839 541,720 
396,401 316,839 713,240 
693,390 316,839 1,010,229 
1.472.250 1.544.838 3.017.088 
41-98

MISSISSIPPI RIVER COMMISSION 
TABLE 41-X MISSISSIPPI RIVER AND TRIBUTARIES 
(Continued) ACTIVE GENERAL INVESTIGATIONS 
(96X3112) 
FISCAL YEAR COST 
Item and CWIS Number Federal Non-Federal Total 
COLLECTION AND STUDY OF BASIC DATA (Category 120) 
Vicksburg District - Surveys, Gages & Observations - 81900 
Memphis District - Surveys, Gages & Observations - 81900 
TOTAL (Category 120) 
CONTINUATION OF PLANNING & ENGINEERING (Category 140) 
Flood Control Projects (140) 
Memphis District 
Grand Prairie Region, AR - 81266 
TOTAL (Category 140) 
PRE-CONSTRUCTION ENGINEERING & DESIGN (Category 160) 
Flood Control Projects (162) 
Memphis District 
Bayou Metro Basin, AR - 81307 
Eastern Arkansas Region (Comp) - 081266 
Subtotal 
New Orleans District 
Louisiana Penitentiary Levee - 12087 
Subtotal 
TOTAL (Category 160) 
GRAND TOTAL MR&T GENERAL INVESTIGATIONS 
225,143 
119,390 
344,533 
57,969 
2,789,891 
407,961 
3,197,852 
2.508 
2,508 
225,143 
119,390 
344,533 
57,969 
2,789,891 
407,961 
3,197,852 
2,508 
2,508 
3,200,360 3,200,360 
5.075.113 1.544.838 6,619.951 
41-99

U.S. ARMY ENGINEER RESEARCH AND 
DEVELOPMENT CENTER 
BACKGROUND 
The research and development laboratories of the 
U.S. Army Corps of Engineers have served the Corps, 
the Army, and the Nation with technical accomplishments 
in a variety of engineering and scientific fields for 
70 years. From beginnings in 1929 as a small hydraulics 
laboratory established to assist in developing a comprehensive 
plan for flood control of the Mississippi River to 
the 1999 establishment of the Engineer Research and 
Development Center (ERDC) consolidating the research 
and development efforts of the laboratories under the 
leadership of a single center, Corps' laboratories have 
been solving civil engineering and environmental quality 
challenges. ERDC offers a centrally managed center of 
eight laboratories that is the largest and most diverse 
civil and environmental research and development 
organization in the world. 
During FY99, ERDC had 2000 employees of which 
1339 were highly trained engineers and scientists. 
This professional staff encompassed 299 Ph.D's, 534 
Masters' degrees, and 506 Bachelor's degrees. 
ERDC executed a Civil Works program totaling 
$103.7 million; of this total $43.6 million was executed 
in direct allotted R&D Programs. The remaining $60.1 
million was executed in support of USACE District and 
Division offices and non-Corps customers. Major non- 
Corps customers included the Department of Transportation 
and the Environmental Protection Agency. 
LABORATORIES 
The diverse civil engineering and environmental 
quality research and development center consists of 
eight centrally managed laboratories located at 
Alexandria, VA; Champaign-Urbana, IL; Hanover, NH; 
and Vicksburg, MS. With world-renowned expertise 
and facilities, each laboratory adds a unique perspective 
and set of capabilities to the overall ERDC team. 
Coastal and Hydraulics Laboratory 
The Coastal and Hydraulics Laboratory was formed 
in 1996 by merging the Coastal Engineering Research 
Center and the Hydraulics Laboratory. 
The Coastal and Hydraulics Laboratory is the 
Nation's center for engineering and scientific research 
and development in the coastal zone, hydraulics, and 
hydrosciences. Nationally and internationally recognized 
experts in the fields of rip-rap design, navigation 
engineering, pump station design, fisheries engineering, 
sediment transport, estuarine engineering, dredging 
equipment, hydrodynamics, groundwater modeling, 
coastal flood and storm protection, navigation maintenance, 
harbor design and modification, coastal and 
hydraulic structures, physical processes associated with 
water resources environmental problems, military 
logistics-over-the-shore, wave climatology, and watershed 
modeling. 
Cold Regions Research and Engineering Laboratory 
The Cold Regions Research and Engineering 
Laboratory (CRREL) maintains the finest research and 
engineering staff and facilities in the world for the study 
of cold regions science and technology. CRREL's 
experience spans nearly 60 years, starting with the 
Boston District's Soils Laboratory work on frozen soils 
in the early 1940s. The creation of CRREL began in 
1961 with the merger of the Arctic Construction and 
Frost Effects Laboratory and the Snow, Ice, and Permafrost 
Research Establishment. This merger put DoD's 
principal cold regions expertise in one place. 
The 1971 beginning of a long-term program by the 
Corps of Engineers to investigate ways of extending 
navigation on the Great Lakes-St. Lawrence Seaway 
throughout the winter also marked the beginning of Civil 
Works research at CRREL. As part of the Great Lakes- 
St. Lawrence Seaway Winter Navigation Demonstration 
Program, CRREL researchers investigated ice booms to 
impede the flow of ice into navigation channels. 
CRREL later developed various methods of keeping 
waterway locks ice-free, including the use of chemical 
coatings, saws for cutting ice from lock walls, and 
bubblers for preventing ice formation. 
Construction Engineering Research Laboratory 
The Construction Engineering Research Laboratory 
was chartered over 30 years ago to provide construction 
research that would address the entire spectrum of issues 
within military construction. This research is in support 
of sustainable military installations and encompasses 
construction, operations, and maintenance as well as 
environmental and safety concerns. These technologies 
have universal application and are of extreme value in 
the civil Works arena as well. Civil Works efforts 
historically have been in the areas of corrosion control, 
high performance protective coatings (including removal 
of lead-based paint), management tools for Operation 
42-1

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
and Maintenance optimization, and environmental 
sustainment. 
Environmental Laboratory 
The Environmental Laboratory is the acknowledged 
leader for conducting environmental quality research and 
problem solution involving the consequences of water 
resources development, navigation, regulation of wetlands 
and inland and oceanic water quality, management 
of natural and cultural resources, and cleanup of 
contaminated groundwater sediments and soils. For over 
25 years, an interdisciplinary staff of peer-recognized 
professionals, augmented with the finest network of 
academic and private scientists and engineers in the 
country, have provided the environmental quality technology 
necessary to further the Corps' missions. 
Notable examples of recent accomplishments 
include wetlands research in support of Section 404 of 
the Clean Water Act; natural resource management to 
guide Corps stewardship at projects; research to 
accelerate growth of desirable, non-problem vegetation; 
distribution of the first-ever expert system/information 
manual on using biological control agents to manage 
nuisance aquatic plants; and providing guidance to the 
field on controlling zebra mussel infestations using antifoulant 
coatings (paints, thermal metal sprays, etc.), and 
continuous backwash filter systems for intakes that 
supply irrigation systems, water supply, and other lowflow 
requirements. 
Geotechnical Laboratory 
The 1928 flood control research and development 
work of the Hydraulics Laboratory led almost immediately 
to the need for soils research and prediction of 
the behavior of structures built on and/or with soil 
materials. Therefore, the Geotechnical Laboratory was 
established in 1931. 
The thrust of geotechnical engineering involves 
investigation, design, construction, operation, and maintenance 
of structures with, on, or in earth materials. 
Research addresses problems in areas such as soil and 
rock mechanics, foundation behavior, tunneling and 
trenchless technology, engineering geology, engineering 
seismology, engineering geophysics, earthquake engineering, 
pavement technology, mobility analysis and 
modeling, and trafficability studies. 
Information Technology Laboratory 
The Information Technology Laboratory (ITL) was 
established in 1986 to provide research, development, 
testing, evaluation, and services for the Corps in 
information technology, computer-aided engineering, 
and computer science areas. ITL provides ERDC, the 
Corps, Army, and DoD with a variety of advanced 
information technology capabilities and expertise. 
ITL manages the first High Performance Computing 
Major Shared Resource Center to be formed under the 
auspices of the DoD High Performance Computing 
Modernization Program; the Tri-Service CADD/GIS 
Technology Center; the Corps Civil Works Guidance 
Update Program; one of two CEAP Regional Processing 
Centers providing 60 percent of the Corps' MIS data 
processing; one of the largest high-bandwidth, highspeed 
data communication networks in the world; the 
largest library in the Corps which is also one of the 
finest civil engineering libraries in the Federal Government; 
and the largest publishing and visual information 
facility in the Corps. 
ITL has recognized expertise in the areas of highperformance 
computing; application of CADD and GIS 
technologies to Army Civil Works projects and for 
installation facility management; computer-aided interdisciplinary 
engineering and analysis; computer science 
applications; software engineering; large relational database 
systems; high-speed communications; and scientific 
visualization. This expertise is applied to address problems 
in design, analysis, and management of projects 
and facilities to support the various missions of the 
Corps. 
Sensors and electronics are a major agent for change 
in the Corps' Civil Works program. ITL's Instrumentation 
Systems Development Division and CRREL's 
Engineering Resources Division provide support to 
research and development and application efforts requiring 
sensors, sensor-integrating software, electronics, and 
feedback-control systems. 
Structures Laboratory 
The Corps' Concrete Laboratory was transferred 
from Mt. Vernon, NY, to the Corps' Waterways Experiment 
Station (WES) in 1946. In 1983, WES combined 
the Concrete Laboratory and the Weapons Effects 
Laboratory into the current Structures Laboratory. 
Sole Federal responsibility for sampling, inspecting, 
and acceptance testing of Portland cement and pozzolan 
rest with the Structures Laboratory. It is a world leader 
in research on concrete materials and construction techniques, 
and the evaluation, maintenance, and rehabilitation 
of civil works concrete structures. Other areas of 
expertise include phenomenology and effects of explosions, 
dynamic properties of soil and rock masses, and 
response of structures to a wide assortment of loading 
conditions, including seismic, penetration, and blast 
effects. 
42-2

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY99 
Topographic Engineering Center 
The Topographic Engineering Center (TEC) provides 
new topographic capabilities in geospatial science 
to the Civil Work's community to ensure superior 
implementation of the nation's civil and environmental 
initiatives through research, development, and application 
of remote sensing, geographic information, global 
positioning, topographic, and information technologies. 
TEC scientists and engineers have developed faster, 
more accurate, and cost-effective ways to use remote 
sensing technologies to describe, characterize, and 
analyze the surface of the earth. Remote sensing technologies 
form an essential part of a new national 
approach to infrastructure engineering and environmental 
management. 
Remote sensing tools can accurately characterize 
different surface conditions, including certain types and 
conditions of vegetation, soils, and surface water, and 
with further development, will provide support in an 
effort to monitor change in the biosphere. These tools 
provide indicators for the location of point and non-point 
pollution sources as well as advise of impending negative 
or positive trends. The extensive development of 
remote sensing technologies for use in construction, 
environmental rehabilitation, and resource management 
offer operational tools needed to increase capabilities to 
accomplish tasks otherwise not feasible, while at the 
same time performing existing tasks rapidly, accurately, 
and at the lowest possible cost. 
ARMY CIVIL WORKS R&D PROGRAMS 
Army Civil Works research and development efforts 
cover virtually the entire spectrum of technology and 
problem areas in the Army's Civil Works arena. 
Materials and Structural Engineering Research Area 
The focus of the Materials and Structural Engineering 
research program is to provide new or enhanced 
technologies to extend the life and reduce future operational 
costs of Corps' Civil Works facilities. These technologies 
will be produced by aggressively developing 
high-performance materials and systems, with major 
emphasis in reducing rehabilitation and maintenance 
costs; refining material characterization; and improving 
analytical procedures to assess the adequacy of aging 
facilities and for the design/analysis of rehabilitation 
measures. The research will furnish the Corps with 
improved analysis technologies to ensure a continued 
high level of safety and reliability, and technologies to 
more economically design and construct required remedial 
and rehabilitation improvements. 
High-Performance Materials and Systems 
Research Program. This program is developing new 
and improved materials and technologies that will enable 
the Corps to significantly reduce project delivery times 
and operations, maintenance, and rehabilitation costs. 
Procedures for materials selection and mixture proportioning 
for a family of low-cost, high-performance 
concrete have been developed. A current practice report 
on controlled permeability form-work for concrete structures 
was completed. A range of concrete repair 
scenarios was established for Corps structures and 
analytical studies were initiated to evaluate the relative 
importance of those interrelated material properties that 
affect the dimensional compatibility of concrete repairs. 
The performance of commercial coatings applied to 
damp metal surfaces was evaluated, and guidance was 
developed on containment structures for use at Corps 
hydraulic structures during painting. Methods to assess 
the condition of aged, lead-based paints were developed, 
and the variables effecting the over-coating of these 
aged, lead-based paint systems were determined. A 
survey of commercially available, environmentally 
acceptable lubricants was completed and their potential 
for Corps of Engineers use was determined. Candidate 
sheet pile designs were developed which take advantage 
of the unique properties of fiber-reinforced polymer 
composites. 
Geotechnical Engineering Research Program. 
This program was driven by needs for less costly, more 
timely flood protection and storm damage reduction. 
Erosion of spillway channels was identified as a major 
concern; this has led to high priority research to 
accurately predict erosion and develop methods for 
reducing this costly storm damage phenomenon. The 
need to reduce real estate acquisition costs and provide 
timely flood control structures has created the need for 
guidance for design of innovative structures built with 
man-made materials or embankments with reinforcements 
so that steeper embankments can be built on 
marginal foundation materials in less time. Development 
of applications guidance for trenchless technology 
is being driven by the need to reduce operations and 
maintenance costs and provide services to partners. This 
family of technologies can provide non-disruptive 
solutions for seepage control, drainage, and raw water 
intake pipelines for municipalities that partner on Corps 
reservoir projects. The Geotechnical Engineering 
Research Program has vigorously pursued an initiative 
to develop risk and reliability based methods for analysis 
of levee and earth dam safety. This effort is aiding 
decision makers in rationalizing expenditures of scarce 
resources to upgrade or rehabilitate older structures. The 
Analytical Model Development efforts are providing 
42-3

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
designers with greater confidence in developing measures 
to ensure the safe performance of structures subjected 
to large deformations and severe loading 
conditions. 
During FY99 a new empirical procedure for quantifying 
spillway erosion potential; preliminary guidance 
for allowing microtunneling beneath and through 
structures such as levees; advancement of soil material 
modeling techniques to three dimensions; development 
of "block cutting" software essential for numerical 
modeling of rock masses with appropriate, representative 
joint spacing, orientation, persistence, and 
fracture properties. A probabilistic procedure for liquefaction 
evaluation was developed and preliminary risk 
charts were developed for all 40 embankment dams on 
the FY99 dam safety deficiencies list. A procedure was 
developed and implemented to prioritize the 40 embankment 
dams on the dam safety deficiencies list for seismic 
safety studies. This prioritized list is being used to make 
funding decisions for dam studies. The innovative flood 
fighting work has evolved into the basis for a new direct 
allotted program including not only geotechnical levee 
issues but also emergency management issues. A new 
start investigating clay shale foundations is addressing 
an immediate deformation problem at Oahe Dam, and 
has already provided better quantitative information for 
assessment of deformations in such foundations. These 
clay shale foundations led to the failure of Ft. Peck Dam 
during construction as well as the downstream slide in 
Waco Dam during first filling. 
Concrete and Structural Engineering Research 
Program. This program emphasizes the development of 
efficient concrete and structural engineering technology 
to significantly reduce construction and rehabilitation 
costs and to improve the durability, service life, and 
safety of the Corps hydraulic structures. New technologies 
being developed in the areas of computer-aided 
analysis of welds and equipment and procedures for the 
testing and evaluation of concrete. Research on welds 
has provided designers with new guidance on both fabrication 
and repair welding of hydraulic steel structures. 
This new guidance will extend the life and eliminate 
maintenance welds that have resulted in fatigue and 
fracture of the Corps existing steel hydraulic structures. 
Cost-effective advancements in concrete technology are 
developed to improve the overall performance and 
increase their durability, thus reducing life-cycle costs of 
the Corps concrete structures. Actual field exposure 
studies will be conducted to assess the durability of 
concrete when exposed to natural extreme weathering. 
New computer-aided analysis tools were developed for 
the design of pile foundations, nonlinear incremental 
structural analyses of concrete structures, design of steel 
members in tainter gates, and layout of concrete arch 
dams. 
Coastal Navigation and Storm Damage Reduction 
Research Area 
The Coastal Navigation and Storm Damage 
Reduction Research Area is directed toward development 
of new and improved navigation project planning, 
design, operation, and maintenance criteria for the 
Corps' 800 coastal-navigation projects. In addition, the 
research benefits the Corps' 100 coastal storm-damagereduction 
projects. Corps responsibility to develop this 
navigation infrastructure in a functional and environmentally 
responsible manner dictates that knowledgebased 
sediment management be incorporated into each 
project. Annual dredging costs to maintain coastal 
waterways average about $500 million. Accordingly, 
research is being conducted in areas critical to sediment 
management including research on wave climatology, 
sediment-transport processes, and storm impacts. 
Coastal Navigation Hydrodynamics Program. 
The Coastal Navigation Hydrodynamics Program is 
investigating waves, currents, winds, and elevated water 
levels in developing and validating models of coastal 
phenomena for project design based on accurate 
estimates of forces and design conditions. These forcing 
functions produce the major forces on coastal-navigation 
structures and are the principal factors driving sediment 
transport and affecting navigation safety, thus making 
their improved prediction critical. During FY99, a field 
experiment using laser-range-finding technology to measure 
instantaneous water surface elevations as a proof of 
concept low-cost non-intrusive wave gage for use in 
navigation channels was completed. Laser range-finding 
offers the possibility of a simple first-principle approach 
to wave measurement to address both research and 
operational needs. Prototype ship transit studies at 
Charleston Harbor, SC, and Barbers Point Harbor, HI, 
were completed where wind, wave, water level, current, 
and ship motion data required to describe and calibrate 
navigation models to be used for design of deep-draft 
coastal navigation entrance channels was collected. A 
spectral wave breaking routine was implemented, 
evaluated, and verified for the STWAVE numerical 
model. 
Coastal Sedimentation and Dredging Program. 
The Coastal Sedimentation and Dredging Program is 
investigating sediment transport processes and developing 
sediment transport technologies and design guidance 
for dredging operations and sediment management 
at coastal navigation projects. Shoaling of channels is a 
major operational and safety concern and coastal erosion 
is a key contributor to coastal storm damage. A series of 
hydrodynamic experiments were completed during 
FY99 in the large-scale sediment transport facility to 
establish procedures for generating long-shore currents 
42-4

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY99 
and data acquisition and analysis. The facility will be 
used to develop long-shore sediment transport relationships 
critical to channel maintenance and sediment 
management. Field data collected using the Sediment 
Insertion System (SIS) during three storms were 
analyzed and documented in several technical papers 
and on a web page. The web site includes descriptions 
of the instrumentation, data collection procedures, 
analysis methods, measurement uncertainties, and 
references. Sediment data have been used to calculate 
cross-shore and long-shore sediment transport and initial 
evaluation of erosion predictors and transport formulas. 
The Diagnostic Modeling System (DMS) was successfully 
applied to rapidly and cost effectively assess 
frequent shoaling in navigation channels at three target 
sites (Matagorda Bay, TX; East Pass, FL; Barnegat Inlet, 
NJ). A beta version of the DMS data manager has been 
completed. 
Coastal Structures Evaluation and Design 
Program. The Coastal Structures Evaluation and 
Design Program is developing advanced methods for 
predicting the stability and functional characteristics of 
complex navigation structures, and improved methods to 
accurately predict structure performance with respect to 
overtopping, run-up, wave transmission, and breakup 
and damage to armor units. The Corps has over 
400 miles of breakwaters that must withstand the forces 
exerted on them by waves and currents. During FY99, 
verification of the CSHORE numerical model for 
determining design waves in the surf-zone region near a 
coastal structure was completed. Camera-ready versions 
of Parts II, III, and IV, and major portions of Parts V and 
VI of the Coastal Engineering Manual (the comprehensive 
updated replacement for the Shore Protection 
Manual) were finalized. All Coastal Engineering Technical 
Notes (CETN) were placed on the world wide web 
at the Coastal and Hydraulic Laboratory homepage. 
More than 200 CETNs are available. 
Inland Navigation and Flood Damage Reduction 
Research Area 
The Inland Navigation And Flood Damage Reduction 
Research Area is developing improved planning, 
design, operation, and maintenance criteria, guidance, 
and technologies in support of the Corps' inland navigation 
and flood damage reduction missions. The Corps 
operates and maintains 12,000 miles of shallow-draft 
navigation channels for commercial transportation with 
275 locks (48% of which have exceeded their 50-year 
design lives) and over 10,000 training structures in 
shallow-draft waterways. The Corps operates 383 major 
lakes and reservoirs and maintains 8,500 miles of levees. 
The navigation and flood control infrastructure includes 
locks, dams, channels, pump stations, dikes, levees, 
stream-bank protection, and erosion control structures. 
Research is conducted through three interrelated programs 
designed to improve project planning and design; 
reduce the cost of construction, operation and maintenance; 
improve functional performance and efficiency; 
and preserve environmental quality. 
Inland Navigation Program. The Inland Navigation 
Program directly supports the Corps mission to 
plan, design, improve, operate, and maintain the 
Nations' inland waterways system. Continued growth of 
waterborne transportation is increasing the demand on 
existing waterways while the aging infrastructure and 
navigation channels must be maintained with increasing 
costs and reduced budgets. The program focuses on 
developing design guidance and technologies to improve 
navigability, functionality, efficiency, and safety of 
Corps navigation projects, structures, and channels. 
During FY99, a physical model was constructed to 
investigate lock approach designs and develop engineering 
guidance that will improve tow alignment, 
navigation conditions, and safety. Improved navigability 
will reduce delays due to vessel maneuvering and 
improve lock efficiency and capacity. A physical model 
was constructed to evaluate the impact of bendway weir 
spacing, height, length, and angle on towboat navigation, 
and to develop guidance for design of structures to 
reduce shoaling and dredging in riverine navigation 
channels without adversely affecting navigation. Prototype 
vessel squat data were collected at New York and 
Charleston Harbors to develop improved safe, economic 
depth/width criteria for navigation channels. Design 
guidance will be developed to optimize depth and width 
channel requirements, reduce initial construction costs, 
and minimize dredging. 
Flood Damage Reduction Program. The Flood 
Damage Reduction Program supports the Corps flood 
damage reduction mission which is shifting from traditional 
large flood control projects towards watershed 
management, smaller systems, channel restoration, and 
multi-purpose projects that protect against flooding 
and provide recreational benefits and environmental 
enhancements. The program is developing technologies 
and criteria to address the changing focus in flood 
damage reduction and channel restoration while maintaining 
existing projects and the aging infrastructure 
consistent with authorized purposes to prevent flooding 
and reduce damages and loss of life. Field data collection 
and laboratory experiments to determine the 
hydraulic effects of in-stream habitat enhancement 
measures and erosion control structures were completed. 
A proposed channel restoration design methodology to 
determine channel geometry, slope, and planform in 
meandering channels has been developed to evaluate 
channel restoration alternatives for multi-purpose 
42-5

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
channels to ensure both flood control and environmental 
benefits. Design guidance for zoned bio-engineering 
bank protection was developed which provides for 
economical, innovative bank protection to control erosion 
in areas where aesthetics, habitat enhancements, or 
rip-rap costs are project concerns. 
Cold Regions Engineering Program. The Cold 
Regions Engineering Program focuses on alleviating 
problems from winter weather that impact Corps 
navigation and flood damage reduction projects. Ice 
formation and breakup in rivers and lakes impede 
navigation, cause flooding, and adversely affect navigation, 
flood control, water supply operations, and 
structures. Winter conditions also impact the hydrologic 
cycle, fisheries, and aquatic habitats. The program 
addresses the impact of ice on inland navigation project 
operation and maintenance, severe ice jams and related 
floods, ice hydraulics and damage to shorelines and 
structures, and hydrology and water resources in cold 
regions. The Ice Jam Database containing more than 
11,000 entries was enhanced for use by Corps districts in 
response to emergency situations through a new on-line 
search capability available via the internet. The river ice 
forecasting procedure, developed to assist Corps districts 
in anticipating winter navigation problems, was completed 
and has undergone one winter of performance 
testing. A subprogram that simulates ice jams and 
calculates resulting backwater was integrated into the 
Corps hydraulic numerical model HEC-RAS. Development 
of discrete particles computer simulation programs 
for ice transport in rivers and in lock approaches has 
been initiated and will be continued to assist in the 
design of river ice management and control methods. 
Environmental Quality Research Area 
The Corps operates and maintains 25,000 miles of 
inland and coastal waterways, 235 navigation locks, 
114 major ports, 442 lakes and reservoirs, 73 hydropower 
projects, 879 flood control projects and annually 
manages the dredging and disposal of 350,000 cubic 
yards of dredged material as part of its water resource 
mission. Wide-ranging environmental stewardship is an 
integral part of Corps water resource management. 
Moreover, recent U.S. figures have estimated $16 billion 
per year in damages caused by non-point-source 
pollution and up to 1 billion tons per year of eroded soils 
that are deposited in the Nation's waterways severely 
impacting multiple project uses and impeding navigation. 
A critical part of this mission is to ensure that 
project planning, construction, operation, and maintenance, 
while economically viable, incorporates environmental 
stewardship and restoration. The Environmental 
Quality Research Area addresses the highest priority 
technical problems with state of science, cost-effective 
technologies for managing natural resources at Corps 
projects including identifying, assessing, and managing 
contaminated dredged material; wetlands restoration; 
managing the Nations' threatened and endangered 
resources; and assessing and managing project-related 
water quality and quantity problems. This program will 
provide demonstrated economical solutions to the Corps' 
highest priority environmental problems, will reduce 
unnecessary regulatory burdens, and provide a very high 
return on taxpayer investment. 
Water Quality Research Program (WQRP). The 
WQRP conducts research on water quality problems for 
all Corps inland reservoir and waterway projects providing 
cost-effective methods, applications, and 
guidance for problems related to managing project water 
quality. In FY99, the WQRP developed a contaminant 
transport/fate model that provides the Corps with the 
capability to determine the impact of various projects on 
contaminant concentrations and to evaluate options for 
managing projects that receive contaminants. This technology 
provides a powerful tool to help Corps projects 
meet responsibilities under the Clean Water Act. A 
sediment-water iron/manganese model was developed 
that allows the Corps, for the first time, to predict the 
impact of project operations on water bodies that are 
commonly impacted by iron and manganese concentrations. 
An expanded Corps watershed modeling system 
was developed that enables selective assessment of land 
use effects on water quality in Corps projects on a larger, 
more "real-world" scale than before. 
Long Term Effects of Dredging Operations 
(LEDO) Program. The LEDO Program provides new 
or improved technology to predict long-term environmental 
impacts and to identify, assess, and manage 
contaminated sediments. The technology allows the 
Corps to meet its dredging constraints and environmental 
compliance in a manner that is technically sound 
while reducing or eliminating unneeded constraints. The 
program research supports a risk-based approach in 
managing contaminated sediments. 
LEDO provides technology for identifying, assessing, 
and managing contaminated sediments in support 
of cost-effective navigation and restoration. Specific 
LEDO research thrust areas are: development of testing, 
evaluation, and modeling procedures for volatile contaminant 
losses; application of population dynamics 
models for toxicity interpretation; consequences of bioaccumulation 
of toxic substances; application of a 
marine chronic/sublethal assay; and organic matter effect 
on toxics' bioavailability. Future work will include 
screening tests for contaminant bioavailability, biodegradation 
of polycyclic aromatic hydrocarbons, development 
of genetic screening tools, and toxicity of 
endocrine disrupting compounds. 
42-6

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY99 
LEDO implementation tools and techniques include 
the technical assistance program (DOTS), the dredged 
material management and assessment training effort of 
the DOTS Program; technical notes and lecture material 
suitable for training; EPA/Corps regulatory manuals; 
detailed guidance documents; and an interactive World 
Wide Web site. The program continues to upgrade and 
support a national bioaccumulation database to make 
certain that contaminated sediment information is 
available to a broad audience. As designed, the program 
continues to have direct programmatic input to the 
development of the EPA/Corps Testing Manuals for 
dredged material. 
Zebra Mussel Research Program (ZMRP). The 
ZMRP is the only Federally authorized R&D program 
for the development of technology for zebra mussel 
control. The focus is to develop environmentally sound 
control methods for use in and around public facilities. 
The zebra mussel has spread throughout the eastern half 
of the United States and threatens the rivers and water 
supply systems of western states. More than 
$100 million is spent annually to prevent catastrophic 
shutdown of public facilities in the east and central 
United States, and this cost will substantially increase 
over the next few years as zebra mussels continue their 
westward expansion. More cost-effective and environmentally 
sensitive methods are required to control this 
problem. 
The ZMRP is coordinated with the research 
programs of other Federal, regional, and state agencies, 
and private industry through the Zebra Mussel Coordination 
Committee, established under the Nonindigenous 
Aquatic Nuisance Prevention and Control Act. 
Research has determined that zebra mussels are 
adapting to the high temperature of southern waters. 
This allows them to increase their range, which will 
increase the cost of control significantly in areas where 
zebra mussels were originally thought to be of little or 
no concern. Additional research has also determined 
that zebra mussels increase the rate of corrosion on 
metal structures threefold. This means that structures 
must be maintained on a 3- to 5-year schedule, rather 
than the normal 10- to 15-year schedule, increasing 
maintenance costs and interrupting navigation and power 
generation nationally. 
Successes include completion of a 5-year evaluation 
of coatings and materials to prevent zebra mussel 
attachment. Published results present significant savings 
to power plants, the boating industry, and Corps facilities. 
In addition, the most widely used means of nonchemical 
control (thermal shock, desiccation, and 
freezing) were directly derived from the ZMRP research 
efforts on physiological factors affecting the control of 
zebra mussels. The ZMRP is transferring this technology 
through a CD-ROM information system (updated 
yearly) and an engineering handbook for facility 
managers and operators of locks and dams, water supply 
and treatment facilities, power plants, and vessels. The 
CD-ROM (over 5,000 distributed to date) and handbook 
help managers and operators determine the vulnerability 
of their facility and outline control options. 
As the zebra mussel continues to expand its range in 
the United States, the audience for ZMRP technology 
transfer products, such as technical notes and technical 
reports increases. To ensure rapid transfer of this 
information to the field, the ZMRP has established a 
Web site that allows interested parties to review the 
information on the site and to also download hard copies 
of the technical notes and reports. 
Ecosystem Management and Restoration 
Research Program (EMRRP). The EMRRP addresses 
environmental impact problems from Corps water 
resource development activities and projects. The objective 
of the EMRRP is to provide state-of-the-science 
methods and procedures to predict and analyze 
environmental impacts with application toward ecosystem 
management and restoration. Ecosystem is 
defined by regulation as the dynamic and interrelating 
complex of plant and animal communities and their 
associated non-living environment. The EMRRP is 
investigating basic ecosystem processes, developing 
capabilities to predict ecosystem impacts, developing 
rapid quantification and assessment methods, restoring 
habitat for species of concern, and developing ecosystem 
management and decision-support systems. 
Guidance was provided Corps managers on the tools 
needed to evaluate vegetation in and along flood channels 
to maximize stream/river vegetative habitat and 
minimize adverse hydraulic effects. Analytical techniques 
were developed to predict the roughness and 
stability characteristics of different plant species that 
have high environmental value and will reduce project 
mitigation and O&M costs associated with vegetation 
management. Work on the Resource Management 
Manual emphasized new and improved techniques for 
managing moist soil units (wildlife and waterfowl 
habitat); prescribed burning management techniques for 
wetland areas; and greenway or greenbelt corridor 
management. This national and international landmark 
manual continues the Corps' technical and scientific 
leadership in the Federal resource agency community. 
Characterization and Restoration of Wetlands 
Research Program. ERDC has conducted wetlands 
research for over 25 years and is the Nation's leader 
in wetlands delineation, evaluation, and restoration 
research and development. Wetlands research provides 
innovative, cost-effective, field-applicable guidance to 
the Corps, DoD, other Federal agencies, state and local 
agencies, and the private sector. This guidance has 
42-7

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
direct application to regulatory and land management 
activities performed on military installations. In addition 
to publishing "how-to" documents, the program provides 
regional training courses to all Corps and DoD users. 
Research has been conducted to determine how wetlands 
function as an ecosystem. Nearly 10 years of 
physical, chemical, and biological data have been 
collected in an effort to develop assessment techniques 
and models to accurately predict changes that occur in 
wetlands over time and the impacts that occur as a result 
of human activities. These data and others have been 
used to develop a model for evaluating the functions of 
riverine wetlands. The model was developed using a 
state-of-the-art wetlands functional assessment called the 
hydrogeomorphic (HGM) approach. Regional HGM 
guidance for additional wetland types (depressions, 
fringes, flats and slopes) is also being developed. The 
HGM procedure for wetlands functional evaluation has 
been endorsed by the Administration for use by all 
Federal regulatory agencies. 
Corps Division and District offices obtain direct 
technical support from research scientists and engineers 
through the Wetlands Regulatory Assistance Program 
(WRAP). Many of these requests result from a need for 
technical assistance in the field application of newly 
developed techniques/procedures for wetlands characterization, 
restoration, creation, and management. 
Scientists also act as an unbiased third party to assist in 
the resolution of complex wetlands permitting decisions 
where litigation may be involved. 
Geospatial Technology Area 
The Geospatial Technology Area comprises Survey 
and Mapping, Remote Sensing, and Geographic Information 
Systems (GIS). Activities within this area focus 
on collection, management, analysis, and exploitation 
techniques for information tied to the earth's surface and 
subsurface (geospatial data). Typical data types include 
bathymetric and topographic survey, digital elevation 
models, dredge cuts, placement sites, sub-bottom compositions, 
soil types, wetlands, land cover, endangered 
species and their habitat, stream and tide gages, cross 
sections, training structures, levees, dam deformation, 
HTRW sites, permits, piezometers, archeological sites, 
Corps projects, relief wells, etc. Data may be collected 
for and analyzed for projects at specific sites as part of 
systems: from sub-basins to large river systems, from 
individual beaches to large coastal segments. Other 
objectives of this area include automated presentation 
capability, improved QA/QC, improved data retention 
and longer data life, reduced recollection costs, 
increased data sharing, and improved, more defensible 
decision making. These efforts support decision makers 
in all Corps business program areas: navigation, flood 
control, hydropower, regulatory, environmental, 
emergency management, recreation, water supply, and 
work for others. Accurate and reliable geospatial data 
are required by each business program for the effective 
planning, design, construction, operation, maintenance, 
and rehabilitation of projects. Annual expenditures for 
these data average $175M, thus significant savings from 
more effective and efficient data collection and management 
technologies, data analysis, and data exploitation 
will be realized. 
Survey and Mapping Program. Initial calibration 
procedures for digital cameras used in mapping 
applications were developed. Initial software and procedures 
to intelligently thin very large data sets with 
minimal loss of model accuracy were developed and 
tested. Finally, software and procedures to produce 3-D 
levee design elements plus plans and profiles automatically 
from survey data were developed. 
Remote Sensing Program. Software and hardware 
techniques to integrate remotely sensed data (from 
numerous satellite and aircraft systems) into Corps 
hydrologic, environmental, and economic models were 
developed and tested and a final report on inundation 
mapping and water quality/water control integration 
distributed. Preliminary evaluation of new sensor 
systems for Corps business practices was conducted. 
Routines to measure deformations of large structures 
with GPS were developed and transferred this new 
capability to the districts. 
Geographic Information Systems (GIS) 
Program. Semi-automated procedures for the update of 
daily maps tracking the accomplishment of disasterrelated 
missions were developed. An on-line GIS tool to 
enable determination of ground location using physical 
features was created. Improved Corps-wide techniques 
for the management and storage of geospatial data were 
delivered to Corps districts and divisions. Prototype 
methods to more cost-effectively perform flood damage 
analysis were developed. A model linking standard for 
GIS and simulation models was selected. A prototype 
database for GIS support of H&H models and polygon 
extraction was developed. Algorithms for vectorization 
of raster data sets were developed, documented and 
installed. Interoperability of CADD and GIS data was 
demonstrated and documented. A prototype for linkage 
of the REMIS database and GIS was successfully 
demonstrated. An engineering manual documenting 
techniques to provide video imagery of riverbank, shoreline, 
and levee conditions including condition assessment, 
GPS location, and inclusion into conventional 
databases was produced. 
Innovations for Navigation Projects (INP) 
Research Program. The program was established to 
42-8

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY99 
aid districts in their efforts to provide innovative 
approaches to construct navigation projects. The objectives 
of this multi-laboratory, multi-discipline program 
are to identify and develop technologies and methods to 
reduce construction time and cost and minimize disturbance 
to navigation and the environment during construction. 
The focus is on technologies for Lift-in, 
Float-in, and In-the-Wet construction. This will include 
designs for new filling and emptying systems for locks, 
the use of alternative construction methods, underwater 
construction with pre-cast concrete elements, underwater 
concrete placement techniques, construction of foundations 
under water, quality-assurance/quality-control 
techniques, design of innovative lock walls for a barge 
gate impact load, innovations for lock gate operating 
equipment, and contracting procedures for innovative 
designs and construction methods. Criteria will be provided 
for enhanced construction materials such as 
controlled, low-strength materials for backfill, underwater 
concrete for foundations and filling pre-cast 
modules, lightweight concrete for Float-in construction, 
and connections and seals for joining pre-cast elements 
and modules under water. 
During FY 99, full-scale barge impact experiments 
were conducted on an abandoned lock wall to obtain 
critical data on the forces imparted to lock walls by 
barge impacts. A demonstration project was conducted 
to evaluate an underwater concrete mixture, placement 
techniques, and quality-control/quality-assurance procedures. 
Criteria were developed for a Corps specification 
for anti-washout admixtures. Current practice reports 
were prepared on equipment requirements and procedures 
for lift-in constructions using pre-cast modular 
elements, and on equipment and techniques that have 
been used worldwide to prepare foundations under 
water. Final construction tolerance requirements were 
established for underwater construction, and several 
underwater positioning systems were identified and 
evaluated. Analysis of existing data on In-Chamber 
Longitudinal Culvert Design for Filling and Emptying 
Systems was completed, and physical model testing was 
initiated on a filling and emptying system for a 600-ft 
extension of existing locks. New project delivery and 
contracting procedures were developed for innovative 
design and construction of navigation locks. Preliminary 
guidance was developed for pre-/post-tensioning for 
hydraulic structures. 
Risk Analysis for Dam Safety Research Program. 
This program was a major new initiative in FY99 to aid 
in allocating investments to improve the safety of Corps' 
dams. All Federal and state agencies responsible for the 
design, construction, operation, or regulation of water 
resource projects have recognized the need for making 
sound investment decisions regarding dam safety. The 
USACE is responsible for managing risks for its 
569 dams and protecting the public against the 
devastation caused by such catastrophes. While many of 
the USACE civil works projects have not been subjected 
to their maximum design conditions, 65 of the Corps' 
dams have been identified as being hydrologically or 
seismically deficient. The cost associated with correcting 
these deficiencies may be as high as $6.5 billion. 
The Federal Coordinating Council for Science and 
Technology (FCCS&T) Policy, Office of the Science 
and Technology Policy (OSTP), is placing increasing 
emphasis on having all Federal agencies present their 
annual programs and budgets using a risk-based 
approach. The development and implementation of risk 
analysis methods will enable the Corps to: prioritize 
dams requiring initial investigations and subsequent 
analyses; prioritize funding for critical repairs, rehabilitation, 
or modifications; select and justify the optimal 
plan to protect human life, reduce property damage, and 
mitigate environmental damage; minimize the disruptions 
of service; and maximize effectiveness of infrastructure 
investments. A multi-agencies, multi-national 
workshop was held to evaluate the current use of risk 
analysis for dam safety and to provide an assessment of 
the USACE planned research program to ensure it will 
meet USACE's future needs. Two demonstration projects 
were initiated to investigate risk analysis procedures 
for a single dam site and for a regional portfolio of dams. 
Earthquake Engineering Research Program. In 
spite of major advances over the last 25 years, serious 
gaps in our knowledge base still exist in the areas of 
earthquake hazard predictions; site characterization for 
seismically sensitive parameters; constitutive behavior 
and material properties of rock, soils, and composite 
(reinforced) materials under seismic loads; and the stress 
and deformation responses of sites and facilities to 
seismic loading. Economical remediation and defensive 
design techniques are needed in addition to careful 
calibration of fast advancing numerical methods to 
actual field performance. In order to address these 
issues, this program is producing design tools and criteria 
which incorporate innovative measures for increasing 
the seismic safety of Corps and other public facilities. 
A potentially significant breakthrough in liquefaction 
analysis of soils was made in FY99. In centrifuge 
experiments it was observed that liquefaction, 
defined as dynamically induced pore water pressure 
increase equal to the vertical effective stress, cannot 
occur at confining stresses greater than 3 atm. This 
finding significantly reduces the extent and cost of 
remedial construction needed to assure seismic safety for 
embankment dams. Also in FY99, post-earthquake 
reconnaissance trips to Turkey and Taiwan provided 
outstanding new information about liquefaction of silty 
soils, and performance and failure of embankment and 
concrete dams. Another earthquake hazard that is often 
42-9

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
ignored was observed, namely fires fueled by escaping 
flammable gases from natural deposits (such as 
swamps). Expulsion of gases from man-made deposits 
(such as landfills) was reported during the Northridge 
earthquake in CA, but no fires were observed at the time. 
In addition, guidelines were improved on the application 
of numerical and constitutive models for seismic 
analysis. Computer tools were developed to enable 
transfer of state-of-the-art procedures to District Offices. 
Remote Sensing and Geographic Information 
Systems Center (RS/GISC) Program. The RS/GISC is 
the principal catalyst for the evolution and application of 
emerging remote sensing and geographic information 
systems technologies in execution of the Corps' civil 
works water, natural resources, emergency management, 
and environmental missions. The RS/GISC manages the 
Corps' geospatial research and development program 
area, remote sensing and GIS research and development 
programs, emergency management RS/GIS support, 
RS/GIS activities in the Corps' Water Control Data 
System (WCDS) Software Modernization Program, and 
GIS support for the national management of Formerly 
Used Defense Sites (FUDS) cleanup. The RS/GISC also 
acts as the principal technology assistance hub for new 
applications of RS/GIS technologies for the Corps 
district offices across the nation. 
Based in the RS/GISC, our Remote Sensing (RS) 
and Geographic Information Systems (GIS) research 
programs supported the Army's civil works mission by 
improving methods for acquisition, image processing, 
and development, management, and analysis of geospatial 
data. The GIS program was initiated in FY 98 to 
address the integration of geospatial work across all civil 
works R&D program areas, integration of all geospatial 
data (data from GIS, remote sensing, survey and mapping, 
and CADD), and enterprise integration of geospatial 
data, as well as for the development of 
applications meeting the needs of Corps civil works 
business programs. One of the work units is closely tied 
to an additional integration effort, the integration of 
models used for land management, an issue applicable to 
both civil works land management and the management 
of lands on military bases. 
Aquatic Plant Control Research Program 
(APCRP). APCRP is the Nation's leader in aquatic 
plant research and technology for managing problem 
aquatic plant infestations of major economic significance 
in public and navigable waters. APCRP provides 
environmentally compatible, cost-effective methods for 
identifying, assessing, and managing aquatic plants. 
Through direct application of APCRP-developed technology, 
researchers have successfully reduced the levels 
of two problem emergent species (alligatorweed and 
water hyacinth) to maintenance levels throughout the 
United States. Currently, major research efforts are 
focused on technology to manage two problem submersed 
aquatic plant species (hydrilla and Eurasian 
watermilfoil) that infest waters in 43 states. 
In FY99, APCRP developed a computer-based 
Aquatic Plant Management Information System that 
guides users in selecting control options and formulating 
cost-effective management plans for most site-specific 
plant problems. Innovative biological agents were used 
to control hydrilla at an annual cost savings between $2 
and $3 million for seven Corps Districts. A novel biological 
formulation was developed in partnership with 
industry for controlling hydrilla at an added annual cost 
savings between $1 and $2 million. This formulation 
also reduced stress to the environment by reducing the 
amount of herbicides necessary to achieve control of 
hydrilla. An Endothall herbicide polymer was formulated 
that significantly reduces human health hazards 
associated with incidental exposure and concentrates 
effects in a closely defined area for maximum control at 
minimum cost. Throughout FY99, the APCRP continued 
research efforts on acquiring information on the 
growth and ecological requirements of problem aquatic 
plants, and on producing new ecologically based, biological, 
chemical, and integrated technologies for their 
management. 
Dredging Operations and Environmental 
Research Program (DOER). DOER was established to 
effectively reduce operational costs and enhance 
environmental compliance in response to numerous 
Corps field requests with support from groups with 
interests in ports, navigation, and environmental issues. 
The program focuses on operational and environmental 
dredging issues of national economic and environmental 
significance that involve both the physical processes of 
sediment and water dynamics, as well as the environmental 
concerns of contaminants, habitat, and ecological 
risk. A primary task in DOER is an aggressive 
technology transfer effort to assure rapid transition and 
acceptance of cost-effective and environmentally sensitive 
technology to field users. 
Significant accomplishments during FY1999 were 
(a) development and publication of dredged material 
characterization tests for suitability of dredged material 
for beneficial use; (b) a method to evaluate dredged 
material for phytoremediation suitability; (c) development 
and publication of screening tests for assessing 
bioreclamation of dredged material; (d) a screening test 
for manufactured soil; (e) development and publication 
of a model for sediment grain-size depth of residence; 
and (f) publication of applied research results, where the 
studies supported development of the methods, tests, and 
models listed above. In addition, DOER research results 
were integrated into the DOTS Online Institute, where 
three dredging-related courses are offered: Dredging 
42-10

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY99 
Regulations, Dredged Material Management, and Basic 
Benthic Testing. 
Issues addressed this year include investigation of 
economical contaminated sediment screens, reuse of 
disposal facilities, beneficial use placement of dredged 
materials in the near-shore, an ecological risk framework, 
seasonal environmental restrictions on dredging 
and dredged-material disposal, and improving the 
efficiency and cost-effectiveness of managing the 
dredging process to include pursuit of innovative 
technologies. A significant accomplishment has been 
the cooperation and collaboration of agencies and 
organizations sharing the Corps' interest. 
Coastal Inlets Research Program (CIRP). The 
CIRP is an effort to increase the capabilities to cost 
effectively design and maintain the more than 100 inlet 
navigation projects that comprise the bulk of Corps 
coastal operations and maintenance (O&M) expenditures. 
According to Corps estimates, expenditures will 
exceed $8 billion at coastal inlets over the next 25 years 
for dredging, structure installation, structure maintenance 
and rehabilitation, and mitigation for damages 
caused by federal projects. The CIRP is furthering 
fundamental knowledge of complex inlet processes as 
well as developing new and improved capabilities for 
conducting O&M activities. It also addresses local and 
regional impacts of navigation projects on adjacent 
shores. Transfer of technology to Districts and 
Divisions is a CIRP priority, including annual 
workshops and innovative use of the worldwide web 
http://cirp.wes.army.mil/cirp/cirp.html. 
During FY99, the next generation of the Sediment 
Budget Analysis System, an automated PC program, was 
developed in response to requests from the districts and 
local partners. The SBAS is a visually based tool that 
creates inlet and coastal sediment budgets for managing 
inlet channels and dredged material placement. 
Numerical modeling research included the Inlet 
Modeling System for field use to calculate tidal 
circulation, waves, and sediment transport at high resolution 
to allow assessment of jetty modifications and 
channel designs to reduce dredging and improve navigation 
safety. It was evaluated successfully at 
Shinnecock Inlet, NY, and at Willapa Bay and Grays 
Harbor, WA. The Inlet Morphology Modeling System 
(IMMS) was newly created to treat inlet morphology 
change and channel evolution at longer term scale and in 
rapid way. The IMMS was successfully evaluated at 
Ocean City Inlet, MD. An innovative jetty termination 
structure was evaluated for Grays Harbor, WA, through 
physical model experiments that led to construction at 
substantial cost savings. Work also began on inclusion 
of sediment transport by tidal currents in the Corps' 
standard shoreline change numerical model, which is 
expected to give substantially improved capability for 
estimating bypassing needs and impacts of navigation 
projects on adjacent beaches. Two technical transfer 
workshops were held, one on each coast, for convenience 
of Corps district and division personnel to 
demonstrate and assist in applying CIRP technology. 
Recreation Management Support Program. The 
Recreation Management Support Program (RMSP) conducts 
research and provides related technical assistance 
in support of the Civil Works Recreation Business Area. 
The program is divided into three major elements: management 
studies, management assistance, and information 
exchange. In FY99, research was completed that 
identifies recreation facility and service requirements of 
four ethnic groups: Hispanic, African American, Asian, 
and Native American. The results will lead to a better 
understanding of the diverse recreation needs and 
preferences of major ethnic user groups and more 
informed decisions regarding visitor facilities and 
services. 
Research continues to develop improved techniques 
for estimating the economic impacts of, and range of 
benefits associated with, recreational use of Corps projects. 
In FY99, nationally representative spending 
profiles were developed for several populations of 
boaters. These profiles will be used to update economic 
impact models that assess the regional economic 
implications of management actions affecting boaters. 
Work has been initiated to develop techniques to 
improve the effectiveness of facility rehabilitation and 
modernization efforts through an understanding of 
customer requirements and development of innovative 
facility design and construction techniques. 
Water Operations Technical Support (WOTS) 
Program. The WOTS Program provides comprehensive 
and interdisciplinary technology transfer and 
technology application to all Corps water resource 
projects. WOTS is managed to maximize cost-effectiveness 
and ensure broad dissemination and implementation 
of technology and information. The program 
provides effective environmental and water quality 
engineering technology to address a wide range of water 
resource management problems at Corps reservoir and 
waterway projects, and in the river systems affected by 
project operations nationwide. In addition, WOTS provides 
technology to address problems occurring from the 
presence of zebra mussels and other non-indigenous 
aquatic species, tail-water fisheries at pump-back hydropower 
projects, water quality impacts of shoreline 
erosion control and reservoir sedimentation, and other 
project operations related to environmental and water 
quality issues. 
Since its inception, WOTS has provided 
environmental and water quality technological solutions 
to over 1,000 problems identified at projects from every 
42-11

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
Corps District. The program annually publishes numerous 
copies of manuals, bulletins, notes, and reports. 
WOTS annually conducts specialty workshops, training 
personnel on the latest environmental and water quality 
management techniques. Recently, the WOTS Online 
Institute was developed to provide the field with 
inexpensive, convenient access to water quality 
monitoring training on the Internet. In FY 1999, the 
WOTS Program conducted eight technology demonstration 
efforts to verify management strategies and 
techniques, three training workshops on environmental 
and water quality management techniques, and prepared 
twelve technical publications for distribution to the field. 
WOTS continually endeavors to coordinate with 
water quality elements of other Federal agencies such as 
the Environmental Protection Agency, Tennessee Valley 
Authority, Bureau of Reclamation, Fish and Wildlife 
Service, and the Bonneville Power Administration. 
These efforts have involved watershed management 
activities, problems on the spread of zebra mussels, the 
impacts of hydropower facilities, and cold water releases 
in tail-water areas on fisheries. 
Dredging Operations Technical Support (DOTS) 
Program. The DOTS Program provides comprehensive 
and interdisciplinary technology transfer/technology 
application to all Corps navigation dredging projects. 
DOTS is managed from a centralized program to maximize 
cost-effectiveness and implement National policies 
and laws on a consistent basis. The program provides 
direct technical support to all Corps elements involved in 
maintaining navigation projects. DOTS focuses on 
applying technology and research results to field 
problems. Emerging scientific approaches to testing 
dredged material and constant changes in regulation of 
these programs cause uncertainty in administering the 
Corps' dredging program. 
Major features of the DOTS Program include training 
Corps staff on the latest environmental and engineering 
techniques associated with dredging and dredged 
material disposal and with water quality and related 
aquatic environmental issues; technology transfer of new 
and emerging techniques used to determine compliance 
with environmental protection statutes regarding the 
management of dredged material; transfer of technology 
developed by others that deal with the treatment and 
decontamination of highly contaminated sediments; and 
applying and transferring innovative risk-based technologies 
that identify, assess, and manage sediments 
contaminated with high- profile chemicals such as 
dioxin, polyaromatic hydrocarbons, and polychlorinated 
biphenols. Technology is presented in the form of fieldready 
decision support systems, technical notes, 
manuals, and an extensive World Wide Web site 
(<http://www.wes.army.mil/el/dots>). 
Since inception, DOTS has satisfied over 4,100 
requests for direct technical assistance. Ongoing dredged 
material technology application tasks include 
guidance in using the implementation manuals for the 
Clean Water Act and the Marine Protection, Research, 
and Sanctuaries Act. Guidance for applying techniques 
and methodologies to the management of contaminated 
dredged material, including risk management, equipment 
selection, confined disposal facility management, and 
quality assurance/control, were implemented and published. 
The program also reported ocean dumping activities 
to the EPA and the International Maritime 
Organization as required by the London Convention. 
Since sediment management seminars were initiated in 
1991, over 3,750 personnel from Federal, state, and local 
agencies have been trained at 12 seminars on the latest 
techniques in regulating, testing, and managing dredged 
materials. The program publishes and makes electronically 
available on the Web site all manuals, bulletins, 
technical reports, technical notes, data, and policy 
guidance documents on dredging and dredged material 
management activities. 
CUSTOMER SUPPORT 
Increasingly, ERDC expertise and products developed 
in R&D programs are being requested to solve 
challenges in critical areas of concern. 
Upper Mississippi River - Illinois Waterways 
Navigation Study (UMR-IWS). Due to the deterioration 
of much of the navigation infrastructure on the 
UMR-IWS, and the potential for increased navigation 
traffic on these key waterways over the next 50 years, 
the Corps is evaluating alternative investment strategies 
for providing reliable navigation projects on the UMRIWS. 
Equally, the natural resources of the UMR-IWS 
represent one of the most vital eco-systems in the United 
States. Thus, as a critical component of the Corps' 
study, the environmental impacts of increased navigation 
traffic on the UMR-IWS, and potential measures to 
avoid, minimize, and/or mitigate any associated impacts, 
are being assessed. 
ERDC continued technical leadership of several 
critical aspects of the environmental studies. ERDC is 
leading the Modeling Integration Simulation Team 
(MIST), a multi-disciplinary technical team charged by 
the Corps with coordinating and integrating the major 
environmental study components. These components 
involve multiple studies in fisheries, aquatic macrophytes, 
mussels, bank erosion, recreational boat craft, 
side channel/backwater sedimentation, tow-induced 
physical forces, and hydrodynamic modeling. ERDC 
completed state-of-the-art analyses of the physical 
forces imparted by moving tows on a waterway, the 
42-12

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY99 
resuspension of sediment resulting from tow passage, 
and the potential for transport of these resuspended 
sediments into critical side channel and backwater 
aquatic habitats. 
South Florida Regional Water Resources. The 
Jacksonville District tasked ERDC to develop a comprehensive 
hydrologic modeling system for examining 
impacts of C-111 Canal operations on regional water 
resources. The water resources in the area consist of 
coupled surface water and groundwater systems that, 
depending upon the hydrologic cycle, could be dominated 
by either system individually. There are a wide 
variety of local concerns that have mutually exclusive 
interests in the future operations of Corps projects in 
south Florida, so solutions to the water resources 
problems will need to be optimized against competing 
interests. 
The surface water components of the modeling 
system will simulate estuarine circulation and transport, 
including the effects of canal diversions on Florida Bay 
salinity distributions. The groundwater portion of the 
modeling system will simulate the effect of surface and 
groundwater interactions in the vicinity of the flood 
control channels and the exchanges of groundwater with 
Florida Bay. 
A cooperative research study between ERDC and 
the USGS integrated ground spectral reflectance data 
and narrow band digital multispectral videography 
(DMSV) to characterize vegetation in the Florida 
Everglades. As part of the South Florida Ecosystem 
Restoration Project, the team performed research to 
conclude whether DMSV could be used to develop 
vegetation roughness models that would provide a way 
to determine vegetative resistance to flow. This research 
is part of a larger effort to determine vegetative resistance 
to flow in the Everglades. 
Cooperative Research with the U.S. Environmental 
Protection Agency. The ERDC initiated a new 
three-year cooperative research program with the EPA 
National Exposure Research Laboratory in Athens, 
Georgia. The program focuses on the South Fork of the 
Broad River in Georgia. ERDC personnel provided 
technical assistance in establishing a network of data 
collection sites within the Broad river basin. A 
CASC2D distributed hydrology model of the basin was 
set up and run with estimates of initial values. The 
CASC2D code is capable of performing long-term simulations 
of rainfall runoff and soil erosion events. In 
FY00, the model will be calibrated to the field data. 
Ultimately, the model will be used to assist in establishing 
Total Maximum Daily Load (TMDL) criteria for 
the basin. The CASC2D code is being enhanced to 
model in-channel sediment transport and to evaluate 
water quality and pathogen transport. Future plans call 
for the CASC2D modeling effort to be expanded to other 
sub-basins within the Savannah River basin. 
Los Angeles County Drainage Area (LACDA). 
ERDC developed numerous modifications to the existing 
high velocity channels in Los Angeles, California. 
Undertaken as a cost-shared effort between the County 
of Los Angeles, CA and the Los Angeles District, efforts 
were focused on design modifications to existing 
bridges. These took the form of modifications to 
existing piers, bridge abutments, and the addition of sills 
on the channel invert. Additional modifications 
involved the removal of several existing equestrian 
ramps. Additional levee height was also required to 
contain the design flow and ERDC developed watersurface 
profiles to assist the Los Angeles District in 
designing the additional levee or parapet wall height. 
The project is currently under construction and the 
ERDC models are being used to check and modify the 
design as construction proceeds. Such coordination is 
providing a fast paced project with assurance that the 
constructed design will work as anticipated. This is 
particularly important on this project due to the existing 
channel slope being at approximately the critical slope. 
With this situation, minor deviations between the design 
and the constructed channel can have serious consequences 
in the resulting flow conditions. 
The ERDC-recommended changes are much less 
expensive than the complete bridge replacement originally 
thought to be necessary and savings in excess of 
$200 million are being realized. 
Los Angeles and Long Beach Harbors Modeling 
Program. The ports of Los Angeles and Long Beach, 
CA, both large and rapidly developing, are conducting 
planning studies for harbor development in coordination 
with the Los Angeles District master plan development 
through the year 2020. Part of this effort is a comprehensive 
modeling program that is looking at effects of 
harbor improvements on levels of wave energy in 
berthing areas as well as water quality. During 1999, 
experiments were initiated to investigate the effects of 
deepening the main Los Angeles channel and expanding 
selected berthing areas. These studies are scheduled for 
completion in 2000. Upon their completion, further 
studies are planned to examine effects of harbor 
resonance that may occur with rehabilitation of the outer 
breakwaters. In addition, studies with the Port of Long 
Beach to assist in assessing the potential effects of 
improvements on harbor resonance and water quality 
and various harbor improvement alternatives are in the 
planning stages. 
Ice Control Structure for Cazenovia Creek. The 
physical model study of the low cost ice control structure 
for Cazenovia Creek, near West Seneca, NY, was 
42-13

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
completed. Recommendations on design parameters 
were forwarded to Baltimore District of the Corps of 
Engineers. The physical model was complemented by 
numerical modeling, using HEC-RAS with ice; the 
Discrete Element Model (DEM) of ice transport that 
simulates the movement, arrest, and accumulation of ice 
in rivers was used to determine the extent of potential 
upstream flooding created by the structure during an ice 
jam event. Construction costs of this ice control 
structure have been estimated at $500,000 as opposed to 
the $3M construction costs of a traditional dam structure 
as was proposed in the 1980's. The 5:1 reduction in 
costs is a direct result of the engineering research and 
development performed earlier under this program to 
develop and test low cost ice control methods. 
Ice Management. ERDC assisted both Detroit and 
Omaha Districts with ice problems. A physical model 
study of ice management at the Soo Locks, Michigan, 
was completed for the Detroit District. The final report 
recommended size, location, and orientation of high 
flow bubblers needed to divert ice from the Poe Lock 
approach for passage through the MacArthur Lock and 
how to manage ice in the vicinity of the upstream and 
downstream miter gates of the Poe Lock to facilitate 
their operation during the early navigation season. Work 
completed for the Omaha District included the impact of 
downstream ice jamming on operation of Oahe Dam on 
the Missouri River and recommended maximum water 
releases as a function of existing downstream ice 
conditions to avoid ice jam flooding of the cities of 
Pierre and Fort Pierre, and, by using a newly developed 
scour probe, in situ field measurements of ice induced 
bed scour in the Upper Missouri River. 
Web Cameras. At the request of various districts 
(St Louis, Detroit, Omaha), a number of Web cameras 
were installed to monitor ice conditions near locks and 
dams and other river structures or in remote, difficult to 
reach areas. Images from the digital cameras are regularly 
transmitted to CRREL where they are displayed on 
web pages so that evolution of ice conditions at critical 
sites can be monitored. Cameras were recently installed 
to monitor the nesting sites of terns and plovers (two 
endangered species of birds that nest in South Dakota) 
within a few feet of the shore. Web cameras allow the 
dam operators to remotely watch the wave action and 
water level at these nesting sites without disturbing the 
nesting grounds. 
Panama Canal. The Panama Canal Commission 
(now Panama Canal Authority) is considering expanding 
the existing ship transit capacity of the canal, which 
may further increase freshwater consumption and 
increase salt intrusion from the ocean. The Commission 
requested through Mobile District that ERDC provide an 
estimate of potential adverse effects of expansion and 
an early indication if remedial measures can be expected 
to provide protection from those impacts. The objectives 
were achieved by combining desktop reviews and 
analytic tools with simple, unverified numerical models 
that provided rapid estimates of salinity intrusion 
through the locks and freshwater usage. Three conditions 
-- existing conditions, use of holding ponds to 
recirculate lock lift water and conserve fresh water, and 
use of a Syncrolift lock to increase transit capacity -- 
were examined. In addition, a number of salinity intrusion 
mitigation measures were examined for feasibility 
Corrosion Studies. ERDC assisted the New 
England and Chicago District to determine the cause of 
excessively high corrosion rates. ERDC's onsite inspections, 
corrosion potential surveys, and materials/water 
analysis identified the problem at Gridley Locks, 
Charlestown, MA, as inadequate maintenance of the zinc 
anodes on the fender pier pilings and determined that the 
anodes on the sector gates did not meet specifications. 
ERDC provided correct specifications for zinc anodes to 
be used in these applications and also validated New 
England District's choice of nickel resist cast iron as a 
corrosion-resistant replacement material for the existing 
sluice gates. For Chicago District, ERDC recommended 
an improved surface-cleaning method and installation of 
a cathodic protection system to extend the Chicago 
Lock's service life. A submersible automated remote 
inspection robot called Fury was used on this project. 
Fury use has the potential to increase the number of 
corrosion rate measurements now feasible by three 
orders of magnitude, without requiring the services of 
professional divers. 
ERGO State Supplements. The Corps of Engineers 
conducts environmental assessments at its sites, 
facilities, and outgrants. These assessments assure compliance 
with Federal, state, and engineering regulations 
through the use of TEAM and Environmental Review 
Guide for Operations (ERGO) assessment tools developed 
by ERDC. The State Supplements to TEAM were 
updated in FY99 to reflect the most recent state 
regulations. 
Regulatory Business Processes. ERDC, with Divisions, 
Districts, and HQUSACE, developed a comprehensive 
model of the Corps' regulatory business 
processes that is intended to (1) improve regulatory 
enforcement and compliance; (2) more efficiently manage 
the permitting process; (3) enhance management of 
land and water resources; (4) develop new business 
process efficiencies; and (5) promote more effective 
public outreach. In addition, ERDC assisted HQUSACE 
in developing a model of regulatory data requirements at 
the District, Division, and HQ levels. The model speci- 
42-14

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY99 
fies standard data elements used at all levels of the CW 
regulatory business process; automates data storage and 
retrieval; and allows ad hoc query and reporting capabilities 
for responding rapidly to data calls from 
Congressional committees, DA and DoD, and other 
government agencies. 
Geospatial Support. During FY99, ERDC 
expanded its involvement and communications with the 
U.S. Army Corps of Engineers (USACE) Operations 
Center (UOC) during natural disasters, providing 
support in the geospatial data sciences. A geographic 
information system (GIS) product depicting damage 
from Tropical Storm Dennis, portraying location and 
size of a washed-out portion of route US 12 near 
Buxton, NC, was provided to Wilmington District, 
UOC, and state and local officials. Another GIS 
product, depicting Hurricane Floyd flood extent in 
Franklin, VA, was provided to North Atlantic Division, 
Wilmington District, and UOC. Geospatial support was 
also provided the Department of the Interior's 
U.S. Geological Survey (USGS), the Department of 
Commerce's National Oceanic and Atmospheric Administration 
(NOAA), and the Interagency Committee On 
Dam Safety. These efforts included research and development 
efforts in survey quality control, measurement of 
structural deformations, tides measurement using GPS, 
underwater construction techniques, and terrain 
modeling; development of map-based data dissemination 
techniques; software development for geospatial data 
management; survey training; and Corps engineering 
documentation. Activities for other civil agencies 
included surface water quality monitoring for the 
Environmental Protection Agency (EPA), cooperative 
wetlands and aquatic studies with the Virginia Institute 
of Marine Science (VIMS) and the EPA, and a South 
Florida Ecosystem Restoration Project for the USGS. 
Emergency Management. Emergency management 
support activities were significant in 1999, starting 
with a series of regional meetings with the Federal 
Emergency Management Agency (FEMA) staff to better 
assure the meeting of mutual performance expectations 
by each agency. Support was provided for an unusually 
active hurricane season. For the first time, models were 
regularly run prior to landfall to help Corps mission 
managers better scope expected missions for the 
provision of potable water, ice, temporary roofing, and 
debris removal. These modeled results were posted on 
the Corps' Intranet and available to all Corps personnel. 
Continued refinement of the models will help lower 
disaster-related expenditures by reducing overestimates 
of requirements. Further, the models can help lower 
disaster impacts through improved preparedness for 
evacuation, response, and mitigation. Service to affected 
populations also will be improved by better prepositioning 
of assets closer to, but outside, expected 
impact areas. 
Global Positioning System (GPS). ERDC continued 
exploitation of centimeter-level On-the-Fly (OTF) 
GPS capability. In 1999, the exploitation of highaccuracy 
Differential GPS (DGPS) was studied and 
development of techniques to use DGPS for deformation 
measurement of dams continued, with tests conducted on 
actual dams, producing sub-centimeter results. Procedures 
and algorithms are expected to reduce field data 
collection times by more than half, and require fewer 
personnel. Actual techniques were developed for two 
large dams in the Northwest. High accuracy DGPS also 
was applied to tide measurements in the Jacksonville 
District. With the satellite-based system, time series 
measurements can be collected on anchored vessels, not 
just fixed structures, so that refined and more accurate 
datum models can be produced. With the digital model 
and DGPS on a survey vessel or dredge, tide data are 
collected accurately and automatically during construction 
activities, eliminating the need for gage readings 
and producing more consistent results between Corps 
vessels and contractors. 
Terrain Data-sets. ERDC addressed the problem 
of processing extremely large terrain data-sets. Multibeam 
and LIDAR hydrographic survey systems are 
producing hundreds of thousands, even millions, of data 
points that are too large for processing or require 
excessive time. Working with the National Institute of 
Standards and Technology, ERDC investigated 
algorithms to selectively thin data points in flat or 
constant slope areas, while leaving points in or near 
features. The result is a method that significantly 
reduces the number of points with negligible reduction 
in accuracy. 
Digital Project Notebook (DPN). ERDC continued 
development and implementation of a series of 
interactive GIS systems to enhance the operational 
capabilities of the Corps' civil works districts and to 
better inform customers about Corps projects by adding 
further capability to the web-based GIS database of 
information on all Corps of Engineers CW projects. 
Previously, each district produced an annual book of 
maps and description pages for each project. To produce 
the DPN, approximately 2,500 map sheets were scanned, 
accompanying description pages were digitized, and the 
information was coordinated with each of 38 districts. 
The data were combined with a customized version of a 
commercial GIS to enable queries of all projects based 
on geographic area, project type, funding, and 
Congressional district. In FY99, more links were added 
to the web-based DPN, so that the user can transparently 
42-15

ENGINEER RESEARCH AND DEVELOPMENT CENTER 
be transferred to a district web site for more information 
on particular projects. 
National Inventory of Dams (NID). ERDC completed 
an update in 1999 of the NID, a biennial task 
previously conducted by the Federal Emergency 
Management Agency (FEMA). The task involved collection 
of data from all 50 states, Puerto Rico, and 
16 Federal agencies; totaling 87,000 dams. ERDC published 
the information in a web-based GIS application, 
providing the user with an intuitive map-based interface. 
A CD product was also produced, which contains the 
entire NID database and a GIS interface, and is available 
to the public. 
Spectral Signatures. Environmental studies being 
conducted by ERDC include collaborative studies with 
other agencies to leverage in-house spectroradiometric 
measurements, digital multispectral video, and multi/ 
hyperspectral (MSI/HSI) image processing capabilities. 
Acquired data and experience have dual use for meeting 
civil and military intelligence and environmental 
requirements by cataloging more than 5,000 different 
spectral signatures compiled by ERDC and other organizations. 
The database incorporates visible/near infrared 
fluorescence and thermal spectra obtained from field, 
laboratory, and imagery measurement. Upon completion, 
the database will have multiple scientific tools for 
viewing data and performing numerical and statistical 
analysis. The distributed system will house the database 
and scientific tools on different servers and possibly 
different platforms. The system structure will be transparent 
to the user who will access the data over the 
Internet via web browser or similar interface. 
Laser Induced Fluorescence Imagery (LIFI). 
ERDC has initiated work on LIFI to locate petroleum 
spills. The fluorescence signal of petroleum is easily 
identified from other background features. This technology 
is particularly useful for terrestrial spills where 
the light reflectance of dark, wet soil may be similar to 
dark, oil-contaminated soil. ERDC conducted remote 
sensing research and development in partnership with 
the Virginia Institute of Marine Science in areas related 
to terrain feature extraction and the use of spectral data 
to inference terrain conditions. Cooperative studies were 
conducted in wetland environments in Northern Virginia 
using the Computerized Airborne Multi-camera Imagery 
System and ground-based spectroradiometric measurements. 
Recent emphasis has been on providing field 
sites and ecological analyses related to predicting soil 
conditions using vegetation in wetlands and coastal 
areas. 
Satellite and Airborne Remote Sensing. The 
"Analysis of New and of Current Remote Sensing 
Systems for Corps Applications" was developed as a 
guide providing a synopsis of current and future satellite 
and airborne remote sensing systems. The guide provides 
technical descriptions including resolution, 
accuracy, and costs of remote sensing systems and 
analyzes system capabilities for use in Civil Works 
applications. The final report is available in hardcopy 
now and will soon be on the ERDC TEC GIS Website. 
Decision Support Software. CorpsView, software 
developed for the analysis and visualization of reservoir 
storage, snow-cover mapping, and flood damage 
assessment, is now installed in 20 of the USACE 
districts and divisions. Successful concurrent acquisition 
of water quality and water control data has been 
documented. This software assists improved decision 
support by enabling estimation of damage from alternative 
storm/release rate scenarios through the ability to 
calculate the damages that will result. The software also 
provides a means to rapidly compare the costs and 
benefits of design changes in structures such as flood 
control works permitting the selection of the best 
alternative with attendant savings as determined by 
project objectives. 
Model Linkage. To assist with the evaluation of 
the consequences of alternative land use and project 
alternatives, work was begun on development of a 
framework of protocols and standards to handle data 
flow between concurrently running models and RS/GIS 
tools in standardized ways. Linkage of models will be 
easier and less costly due to the selection of a limited 
number of standardized approaches. For the first time, it 
will be possible to link the models necessary to 
adequately analyze the complex natural and humaninfluenced 
landscape processes necessary for proposed 
and existing projects. Protocol requirements have been 
evaluated and work is proceeding on the initial test of 
the approach. This method results in savings through 
reduction in the number of models that will be 
developed and by eliminating the need for separate 
interfaces to be developed for each model. 
Automated Vectorization. Algorithms were evaluated 
and methods to integrate raster data into vector GIS 
were distributed to Corps districts. These methods 
greatly accelerate the ability to include data sources such 
as planning information, scanned maps, orthographic 
photos, and as built drawings into GIS databases. 
Improved data integration supports better decisionmaking 
and results in more cost-effective project 
development, selection, operation, and maintenance. 
42-16

THE WATER RESOURCES SUPPORT CENTER 
The Water Resources Support Center (WRSC) is a field 
operating activity under the staff supervision of the 
Deputy Commander for Civil Works, Headquarters, U.S. 
Army Corps of Engineers (HQUSACE). The Center 
consists of the Hydrologic Engineering Center, the 
Institute for Water Resources, the Navigation Data 
Center, and support elements. It is located at the 
Humphreys Engineer Center, Alexandria, Virginia, with 
satellite elements at other locations, including the 
Hydrologic Engineering Center in Davis, California; and 
the Waterborne Commerce Statistics Center, part of the 
Navigation Data Center, in New Orleans, Louisiana. 
The accomplishments of WRSC during FY99 are listed by 
division. 
HYDROLOGIC ENGINEERING CENTER (HEC) 
Top priorities for FY99 were our Corps Water 
Management System modernization software 
development and integration project, NexGen software 
research and development project, watershed and water 
resource system analysis, and comprehensive system 
studies. Progress was substantial in all these areas. 
Customer demand for HEC services and products 
continues to be high. Our reimbursable projects 
program continues strong, resulting in another fiscal 
high at yearend. The professional staff remained 
relatively stable with just a few turnovers. 
The project to modernize the Water Control Data 
System (WCDS) software began in FY97. Because the 
modernized system will be much more than a data 
system, it has been renamed to the Corps Water 
Management System (CWMS). CWMS is the decision 
support Automated Information Systems (AIS) that 
supports the Corps water management mission. It 
embodies data acquisition, validation, transformation 
and management; forecasting, simulation and decision 
support analysis; and information dissemination. 
Modernizing and deploying the corporate software for 
CWMS is a six-year, $7.6 million centrally PRIP 
funded, Corps AIS improvement project managed under 
the Corps Life Cycle Management of Information 
Systems (LCMIS) process. The management structure 
and design teams form a unique arrangement for 
providing oversight and field participation in the 
enterprise-wide development and integration project. 
The significant accomplishment in FY99 was 
installation of Test Version 1.0 at four field sites. This 
is the first of two planned interim test installations prior 
to Test 3.0/CWMS Version 1.0, which will complete 
the system that will be deployed Corps-wide in 
2001/2002. Project documents are available on the 
project internet web site 
(http://cw71 .cw-wc.usace.army.mil/cwcinfo/cwc.html). 
Test Version 2.0 is under development to be installed at 
selected field sites in mid-FY0O. 
The NexGen software research and development 
project continues at a brisk pace. The project is 
developing and fielding software tools to help Corps 
professionals perform their work better, more 
efficiently, and with increased ease. We now have 
released to field offices and the public, maiden release 
of the River Analysis System - (HEC-RAS), followed 
by several major updates -- the latest Version 2.2 is the 
final steady flow version; maiden Version 1.0 of the 
Hydrologic Modeling System - (HEC-HMS) and a bug 
fix update (Version 1.1); and maiden Version 1.0 of the 
Flood Damage Analysis package - (HEC-FDA). Work 
is well along on expanding HEC-RAS for unsteady 
flow; the first release is planned for mid- FY00. An 
updated release of HEC-HMS is planned for FY00 that 
will include enhancements to the spatial precipitation 
and runoff modeling capability, continuous soil 
moisture accounting, and release of a snow melt adjunct 
software capability under development in cooperation 
with the Cold Regions Research and Engineering 
Laboratory. The HEC-FDA is undergoing 
improvement with a new release planned for FY00. 
New statistical uncertainty analysis, improved data base 
operations, GIS capability, and a number of enhanced 
user features will be additions for the new release. Test 
Version 1.0 of a new reservoir operation program 
emphasizing real-time decision support was completed 
and is included in the suite of CWMS software 
mentioned in the above paragraph. Notable in late 
FY99 was release of the first of several GIS-based 
utilities for HEC software: HEC-GeoRAS (Arc/Info 
digital cross section extraction and flood inundation 
computation); to be followed in FY 00 with an 
ArcView version of HEC-GeoRAS, and HEC-GeoHMS 
(ArcView-based basin delineation and watershed 
parameters derivation and HMS model development). 
Work supporting implementation of risk-based 
analysis for flood damage reduction studies continued 
at a steady pace this past year. In the previous seven 
years, twelve PROSPECT courses, sixteen on-site 
43-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS FOR FY99 
workshops and a number of executive and field project 
working sessions were held for a total of about 130 
Corps professionals. PROSPECT courses will continue 
at about one per year/two years for the near term. 
HEC-FDA, the software package written to support this 
initiative, continues in widespread use by Corps offices. 
Work was initiated to incorporate cost uncertainty into 
HEC-FDA - this is cooperative work with the Institute 
for Water Resources (IWR). Risk-based analysis for 
flood damage reduction studies is now routinely applied 
by the Corps. A National Academy of Sciences panel 
is near completion of a review of the Corps use of riskbased 
analysis. Their final report is due in mid- FY00. 
We began a research project to address hydrologic risk 
and uncertainty and environment restoration 
performance. This is an area of inquiry that is expected 
to grow. Another research project of importance is 
application of risk-based analysis to dam safety. A case 
example of determining the frequency and uncertainty 
associated with extremely rare floods is well along. 
Six PROSPECT courses were conducted for a total 
of six weeks of training. The courses covered several 
hydrologic engineering and planning analysis topics. 
Attendance averaged about 25 students per course. 
Nine on-site workshops were also held totaling five 
weeks of sessions for 160 students. This continued the 
recent trend of reduced PROSPECT sign-ups and 
increased requests for on-site workshops. Topics 
presented included HEC-RAS, HEC-HMS, risk-based 
analysis, flood damage analysis, and reservoir 
operations/HEC-5. 
Reimbursable project work was undertaken for 17 
Corps field offices as well as HQUSACE, IWR, Cold 
Regions Research and Engineering Laboratory, the 
Federal Emergency Management Agency, a combine of 
the State of California and Metropolitan Water District 
of Southern California, and the National Institute for 
Building Sciences. Projects include watershed and 
reservoir system modeling, water quality, risk-based 
analysis, river hydraulics, wetlands hydrology, water 
control management, regional statistical analysis, flood 
damage analysis, GIS applications in hydrology and 
hydraulics, and groundwater modeling. Our 
participation in the study to update flood frequency for 
the upper Mississippi continues, with major 
accomplishments in methodology development, and 
outreach to local publics. Also in the upper 
Mississippi, HEC managed the project to make use of 
recent new digital map products to update the 
Mississippi Basin Modeling System. Two major water 
resource system analysis projects were completed this 
year: data compilation and simulation and optimization 
models for the Sacramento/San Joaquin rivers flood 
control systems; and data management and simulation 
and optimization models for the Panama Canal 
Expansion study. HEC was asked to continue the 
system model development for the next project phase, 
which began in late FY99. A significant project for 
HEC is the Tres Rios environmental restoration project. 
This project requires adaptation HEC methods and 
tools to the important emerging mission area of 
environmental restoration/wetlands development. The 
total reimbursable project program was about $2.0 
million with individual projects ranging from a few 
thousand dollars to near a million. 
We expect the HEC program for FY00 will continue 
FY99 efforts at the increased pace reflected at the end 
of the year. We will continue fielding new versions of 
the NexGen software packages HEC-RAS, HEC-HMS, 
and HEC-FDA, and companion GIS utility software. 
Also emerging will be another test version of the new 
reservoir simulation program, and initial unsteady flow 
capability of HEC-RAS (Version 3.0). Test Version 
2.0 of the modernized CWMS will be installed and 
tested in four Corps offices. PROSPECT training will 
remain at about six courses and the number of field 
workshops will likely continue to modestly increase. 
Research and Development funding is expected to be 
level to modestly increase, software maintenance and 
support and WCDS modernization funding will remain 
at about FY99 levels, and reimbursable technical 
assistance and special projects will probably continue 
the recent upward trend. On balance, the result is 
expected to be a stable to slight increase in funding over 
that of 1999. The reorganization of HQUSACE, that 
will impact HEC, had not been announced at FY end. 
However, at press time, the reorganization was 
announced and we are now actively making 
management adjustments to implement the planned new 
structure. We do not expect the changes to adversely 
affect services to our customers. 
43-2

THE WATER RESOURCES SUPPORT CENTER 
INSTITUTE FOR WATER RESOURCES (IWR) 
Technical Analysis and Research Division 
The Technical Analysis and Research Division 
develops decision methods for water resources 
investments and conducts special projects assigned by 
the Office of the Chief of Engineers. Technical 
assistance is provided to Corps field divisions and 
districts. Engineers and scientists in the division apply 
specialized knowledge in fields such as economics, 
environmental science, geography and engineering to 
develop a broad range of methods aimed at producing 
practical and effective planning and decision support 
tools. Outputs are applied to water resources activities 
throughout the Corps. 
During FY99, the Technical Analysis and Research 
Division performed analyses and provided technical 
assistance to Corps districts on environmental 
restoration evaluation, risk analysis, and economic 
analysis. Methods development continued to develop 
models and techniques for watershed planning 
approaches. Included is work to develop tools to 
facilitate watershed planning, including collaborative 
problem solving planning techniques for Corps studies, 
and to explore and assess multi-objective planning 
approaches. Research into tradeoff analysis for 
evaluating multiple objectives continued. Also, 
continuing are efforts to refine guidelines and develop 
PC software for cost effectiveness and incremental cost 
analysis for environmental projects. The software and 
guidelines serve as a basis for generic guidance for 
evaluating water resources project contributions to fish 
and wildlife habitat. 
The division manages the collection, management 
and analysis of the Corps flood damage data collection 
program. Flood damage data from recent flood events 
has been collected and will help develop more accurate 
assessments of flood damages. This program will 
reduce the time and cost of developing acceptable 
projects to reduce the costs flooding. 
Other activities of the division include provision of 
technical assistance to a number of field offices to 
implement risk analysis in waterway transportation, 
project operations and management studies, and flood 
damage prevention projects. This FY, the division 
provided technical assistance to Jacksonville District on 
their Storm Damage Model. Also, assistance was 
provided to the Galveston District for navigation 
improvements to the Gulf Intercoastal Waterway. New 
research was initiated to provide decision support 
analysis tools for the Risk Analysis for Dam Safety 
Researach Program. 
Technical assistance and training was provided to 
several Corps offices and other agencies on the 
application of the cost effectiveness model (IWRPLAN) 
and the planning process. 
Policy and Special Studies Division 
The Policy and Special Studies Division carries 
out its mission in support of the Director of Civil Works 
by conducting policy analysis, planning and studies of 
national and regional scope. 
Since 1976, the program has contributed to the 
development of numerous policies and programmatic 
initiatives within the Civil Works Directorate. 
The program continues to serve the Corps by 
assessing and evaluating changing national and regional 
water; natural resources uses and management; and 
related public works infrastructure management needs 
as they affect Corps Civil Works missions, policies, 
practices, legislative mandates, and executive 
directives. During FY99, the division conducted twenty 
policy studies in direct support of the HQ Policy 
Division. In addition to the policy studies program, 
special studies of national and regional scope were 
undertaken that built on the policy directives and 
research tools which were developed at IWR. 
Among the noteworthy national and regional 
special studies undertaken in FY99 were: 
* Nationwide Permit Programmatic EIS 
* Regulatory Cost Analysis of Nationwide Permit 26 
Changes 
* Florida Wetlands Mitigation Banking Permit 
Evaluation 
* Development of Corps Environmental Database 
* Ohio River Basin El Nifio Forecast System 
* Newport News Water Supply Permit 
* Upper Mississippi River Flow Frequency Study 
Among the specific policy studies conducted 
during FY99, the following subjects and issues were 
included to support the development of legislation, 
policies, directives and guidelines for various activities 
within the Corps Civil Works (CW) program: 
* Sustainable Development Issues for Corps CW 
Program 
43-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS FOR FY99 
* Ecosystem Restoration Policy Consolidation 
* Clean Water Action Plan Support 
* Corps CW Program Performance 
* Revisions to CW Planning Guidance Notebook 
* Watershed Planning Guidance Development 
* Navigation Policy Consolidation 
* Regulatory Approaches to Watershed Based 
Planning 
* Corps Role in Abandoned Mine Lands 
* Hydropower Credit in Water Supply Reallocations 
* Expedited Recon Study Phase 
* Policies for Levee Reconstruction 
* Framework for Special Area Management Plans 
* CW Environmental Program Performance 
Brochure 
During the year, permanent staff personnel were 
joined by visiting scholars from leading universities in 
the country. Visiting scholars work full time in the 
division offices or visit from time to time during their 
appointments. They contribute to a large number of 
policy and special studies and upon their return to 
teaching, their academic programs are enriched by 
exposure to information they learn while working for 
the Corps. Overall, the division staff and visiting 
scholars have a significant influence on the state of 
current knowledge, from papers presented at various 
workshops and conferences, as well as publications in 
peer-reviewed journals. 
Navigation Analysis Division 
The Navigation Analysis Division provides 
support for HQUSACE, and field divisions and 
districts for project-specific and system studies of 
navigation improvements. In this regard, it also 
performs recurring national-level analyses such as the 
update of vessel operating costs for inland and deep 
draft waterways, development of coastal harbor and 
inland segment commodity, traffic and fleet forecasts, 
and analysis of the recovery of navigation costs. It also 
provides program management support for the Inland 
Waterways Users Board (IWUB) and performs national 
and special studies as directed by HQUSACE. 
Major activities include the following projects and 
studies: 
Continuing Support Activities. The foundation for 
evaluation of navigation projects, both inland waterway 
and deep draft harbors, is the comparison of 
transportation costs with and without proposed 
improvements. As part of the USACE Transportation 
Systems Program, the division maintains and verifies 
current data on ocean and inland water vessel operating 
costs, the dimensions of these vessels, the distribution 
of ocean vessel sizes in the world fleet, and the 
configuration of barge tows on inland waterways. This 
information is transmitted by HQUSACE to all Corps 
districts as CW planning guidance. 
Coordination of Navigation Studies. The IWUB, 
created by the Water Resources Development Act of 
1986, is charged with advising Congress on priorities 
for improving inland waterways. 
To provide technical information desired by the 
IWUB and the Army, the division performs ongoing 
analysis of construction and funding schedules for 
navigation projects on the fuel-taxed inland waterways 
system. This analysis incorporates the USACE and 
IWUB priority evaluations of inland navigation projects 
in accordance with the budget constraints imposed by 
the Trust Fund. 
Ongoing Studies: 
* National Dredging Needs Study (Section 402 of 
the WRDA of 1992) 
* Transportation Systems Program, which includes: 
- Development and application of the 
NAVSYM Inland Waterway Model 
- Update and distribution to field of 
transportation cost models for barges, rail 
and trucks 
- Update of both ocean and inland vessel 
operating and replacement costs 
- Development of a software package for 
customizing deep draft vessel operating 
costs 
- Development of national and regional 
commodity and fleet forecasts for use in 
planning studies 
- Update of the Grain Transportation Model 
* Implementation Support on Components of the 
Operations and Maintenance Program Plan of 
Improvement 
* Program Management Support on Activities of the 
IWUB 
* Analysis of Inland Navigation Project Schedules 
and Financial Status of Inland Waterways Trust 
Fund 
* Analysis of Inland Navigation Benefit Categories, 
including Quality of Life and Regional Economic 
Benefits 
* R&D Coastal Navigation Work Unit on the 
Impacts of Navigation Trends on Channel Usage 
and Design 
* Economic Evaluation of North Carolina Beaches 
after Hurricane Fran 
* Analysis of USACE Dredging Quantities and Costs 
* Regional Economic Impact Analysis for the Upper 
Mississippi River and Illinois Waterway 
43-4

THE WATER RESOURCES SUPPORT CENTER 
Navigation Study and Inner Harbor Navigational 
Lock Replacement Study 
* Development of Risk-Based Methods to Apply to 
the Evaluation of Deep Draft Navigation Projects 
Recent Products: 
* Historical Economic Perspective of Ports, National 
Dredging Needs Study 
* Background and Information Papers, National 
Dredging Needs Study 
* Evaluation of Economic Benefits of Cruise Ships 
* Economic Impact Assessment of the Proposed 
Harbor Services Users Fee, Draft and Final 
* Update to the 1997 Inland Waterway Review 
(revised August 1999) 
* Navigation Components of CW 
Information Brochures for U.S. States 
* Annual Report to Congress on the Status of the 
Harbor Maintenance Trust Fund for FY98 
* Shallow Draft Navigation Analysis for the Lower 
Snake River Juvenile Salmon Migration Study 
* Financing Practices for International Dredging of 
Port and Harbors 
Program Analysis Division 
The Program Analysis Division provides 
analytical support for improving the effectiveness and 
efficiency of CW program execution through the 
conduct of program analysis and evaluation studies, 
development of analytical budgeting tools, and through 
performance measurement systems design. The division 
provides an analytical support base and infrastructure 
outside the day-to-day press of headquarters activities 
in order to enable programmatic issues to be addressed 
comprehensively and systematically. Working with 
headquarters clients, project managers collect, analyze 
and assess data on CW program performance, structure 
information to assist decision making, manage task 
forces, and develop program management tools and 
processes. During FY99, the primary clients of the 
division were Programs Management Division; 
Operations, Construction and Readiness Division; and 
Planning Division. 
Representative projects include the following efforts: 
CW Results Initiative. The division is managing 
the development of results-oriented performance 
measures and goals for CW responsive to Corps needs 
and consistent with the intent of the Government 
Performance and Results Act of 1993 (GPRA). GPRA 
requires Federal agencies to develop strategic plans, to 
set performance goals focused on program results, and 
to develop objective indicators to measure performance 
in attaining these goals. The project proponent is 
Programs Management Division, but all CW divisions 
are participating in the initiative. In FY99, the division 
completed a "how to do it" guidebook for developing 
results-oriented performance measures. In addition, the 
division began work on an updated CW strategic plan. 
The plan focuses attention on a series of national water 
resources challenges that the nation is likely to face in 
the coming years. These challenges form the basis for 
the goals, objectives, and investment plan that are 
presented in the plan. 
Advancement of Project Management Techniques. 
The objective of this research program is to enhance the 
effectiveness and efficiency of the practice of project 
management in the Corps of Engineers. During FY99, 
work progressed on a case study of the use of earned 
value project management (EVPM) in the Albuquerque 
District. A major effort was also concluded on the 
development of guidelines achieving customer 
satisfaction using existing project planning and 
management tools. An internet web site to serve as a 
project management support and learning center was 
completed. 
Investment Trends in the CW Program. Division 
analysts completed a paper exploring trends in funding 
the CW program. The paper identified the decline in 
new investment in the program and compared 
investment rates in CW with other types of Federal 
infrastructure investments. The paper was used to 
develop a rationale for the FY00 budget. 
Support to Regionalization of Water Control Task 
Force. Division analysts supported HQUSACE 
Engineering Division in the conduct of a task force to 
develop procedures for regionalizing the water control 
function within the Corps. A series of meetings with 
the field and HQ task force was held, which resulted in 
the development of a concept plan that was presented to 
CW leadership. 
Support to CW Technical Capability Task Force. 
Division analysts consulted with a task force established 
by the CW, Chief of Engineering to assess the state of 
technical capability, and to develop recommendations 
for sustaining and enhancing it. Division analysts 
designed a questionnaire assessment instrument, as well 
as a procedure for the conduct of the overall 
assessment. 
43-5

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS FOR FY99 
THE NAVIGATION DATA CENTER (NDC) 
The Navigation Data Center's primary mission is to 
collect and supply information on the infrastructure, 
utilization, and performance of the United States 
waterways and associated ports. NDC directly supports 
the USACE navigation, regulatory, emergency and 
readiness functions as well as those of other Federal, state 
and local agencies with roles or interests in water 
transportation. The Office of Management and Budget has 
designated the USACE, acting through NDC, as the 
Federal Central Collection Agency for waterborne 
commerce and vessel activities and waterway 
infrastructure data and statistics. As the Federal central 
source, NDC continued its intra- and interagency 
coordination during FY99, including standardization 
efforts to align with DoD's Defense Data Dictionary 
System (DDDS) and the Corps Command Data Model. To 
insure Corps interoperability and minimize data entry, 
NDC initiated a linkage between NDC data and the Corps 
financial data system to produce quality, timely, 
performance measure, such as cost per ton of commerce 
moved. This initiative, called the Operation and 
Maintenance Business Information Link (OMBIL), assists 
the Corps transition to business oriented management. 
Benefits were realized in FY99, still in the developmental 
stages of this effort, by the ability to link and layer 
navigation information to gain a more comprehensive 
understanding of navigation issues. NDC supports data 
users by supplying information in both standard and 
custom products. NDC maximizes the use of electronic 
distribution of information via the internet and by 
combining data and reports on one annual CD-ROM. 
Waterborne Commerce and Vessel Statistics 
NDC continued to provide annual preliminary and 
final U.S. foreign and domestic vessel, vessel activity and 
commercial traffic products, plus monthly tonnage 
estimates, on the internet in order to furnish both the 
government and the public more accessible and more 
timely information concerning waterborne commerce 
statistics. During FY99, the system for automated 
collection of foreign vessel movements data was 
expanded to include most all Customs ports. This system, 
a partnership between Customs and the Corps, now 
generates over 85% of the vessel movement records in 
automated form. The data is now edited at the data input 
site offering more accurate, more complete, and more 
timely data at a reduced cost. In addition, for the first time 
in 50 years, the Corps is now acquiring U.S. dock-specific 
foreign vessel movement data comparable to the domestic 
vessel movement level of specificity. During 1999, NDC 
implemented a new process for producing foreign intransit 
data, formerly performed by the U.S. Census 
Bureau. NDC now produces all statistics on waterborne 
commerce moving from one foreign country to another 
foreign country via a U.S. water port in partnership with 
the U.S. Maritime Administration. 
Ports and Waterways Infrastructure 
In FY99, six reports were completed, distributed 
and available for sale: Port Series (PS) No. 5 -New York, 
NY, and NJ, and Ports on Long Island; PS No. 16 The 
Ports of Miami, Port Everglades, Palm Beach, and Port 
Canaveral, FL; PS No. 24 - The Port of Houston, TX; PS 
No. 27 - SanDiego, CA; PS No. 50 Ports of Hawaii 
(Honolulu, Kahului, Nawiliwili, Port Allen, Kaunakakai, 
Kaumalapau, Hilo, and Kawaiha); and PS No. 64 - Ports 
on Tennessee River, Tennessee-Tombigbee and Black 
Warrior-Tombigbee Waterways, and Alabama River. In 
addition to the completed reports, field surveys were 
completed and data entered into the Ports and Waterways 
Information Management System (PWIMS) database for 
port areas covered in the following reports: PS 10 - The 
Port of Baltimore, MD; PS 14 - The Ports of Savannah 
and Brunswick, GA; PS 22 - The Ports of Port Arthur, 
Beaumont,and Orange, TX; PS 43 - The Port of 
Cleveland, OH; PS 44 - The Port of Toledo, OH; PS 49 - 
The Ports of Duluth, MN and Superior, WI; Taconite 
Harbor, Silver Bay, and Two Harbors, MN; and Ashland, 
WI. 
All data are available in printed form. Summary data 
for each of the nearly 10,000 individual docks are 
available on the internet. These data are updated as each 
port area is re-surveyed and verified as current. 
Lock Performance and Characteristics 
The NDC continued to enhance its distribution media 
via the internet to include lock characteristics data and 
monthly updates of national key indicator locks around 
the country. This now provides instantaneous Corps and 
public access to the lock performance and physical lock 
characteristics information. In a move to improve data 
entry and accessability, the Lock Performance Monitoring 
System (LPMS) database had started the migration to an 
ORACLE relational database. The database structure was 
designed and tested using many recommendations from an 
LPMS User Task Force report. The data will be entered 
and retrieved via a standard web browser into a central 
database residing on a Corps processing center computer. 
43-6

THE WATER RESOURCES SUPPORT CENTER 
This will enable near real time capability and a more rapid 
flow of information to the user. 
Dredging Statistics 
The NDC completed the design, testing and 
deployment of a web-based ORACLE dredging database. 
Data entry and report generation is accomplished via the 
Corps Intranet and enables all Corps members access to 
the information in the central system. The database 
continues to meet user needs with bi- monthly updates of 
Corps and contract dredging information made available 
on the public internet web site. In addition to the standard' 
reports, custom reports or data files are quickly generated 
to meet user requests. The database is used extensively by 
the Corps and industry, resulting in improved bidding 
competition and a more efficient utilization of dredging 
equipment. 
43-7

INTERNATIONAL NAVIGATION ASSOCIATION 
(PIANC) 
The International Navigation Congresses (PIANC) is 
an organization consisting of approximately 44 national 
members. From its headquarters in Brussels, Belgium, it 
acts as a clearinghouse of technology and experiences 
relating to ocean and inland navigation improvements 
which are exchanged among engineers, scientists, port 
operators, and marina and vessel owners, to name a few. 
Its objective, broadly stated, is to promote the worldwide 
progress of inland and maritime navigation through the 
exchange of technical information on port and waterway 
development. The objective of the Association is met by 
holding International Congresses and by publishing 
technical bulletins and special reports. Special reports are 
published describing the results of the work of 
international research teams, or working groups, 
composed of those national members interested in the 
particular subject under study. Examples include methods 
of treatment and disposal of dredged material, flexible 
revetments in the marine environment, an international 
survey of dry dock facilities and their characteristics, the 
wildlife habitat and port management, standards for 
recreation navigation waterways, and various other topics 
relating to port and waterway development. The 
organization also serves as an excellent source of 
identifying individual and corporate expertise throughout 
the world on PIANC-related subjects. Personal 
interchange of ideas and information also is promulgated 
by members attending the International Congresses held 
once every four years, and technical working group 
meetings held several times each year. 
The affairs of the Association are managed by a 
Permanent International Commission (PIC), composed of 
delegates who represent each member government. The 
number of delegates is determined by the size of the 
national membership, but may not exceed 11 per country. 
The United States (U.S.), which has been a member 
of PIANC since 1902, provides an annual appropriation 
for the support and maintenance of the organization. This 
includes an annual subvention to PIANC International and 
payment of a portion of the travel expenses of officially 
appointed national delegates (Commissioners) of the 
United States to meetings of the PIC and Congresses. 
Total annual appropriation for the U.S. Section, PIANC 
is currently $45,000, including the annual subvention of 
approximately $11,000. 
The U.S. Section is administered by law, under the 
auspices of the Department of the Army (Corps of 
Engineers). It is located in the Water Resources Support 
Center, Casey Building, Humphreys Engineer Center. 
The U.S. Section is composed of both individual and 
corporate members who pay membership dues. 
Membership of the U.S. Section on September 30, 1999 
totaled 326, consisting of 268 individual members, 57 
corporate members and 1 student member. 
United States National Commission 
The United States National Commission constitutes 
the governing body of the National Section. At the 
beginning of FY99 the ex-officio offices of the U.S. 
National Commission were: Chairman (Dr. Joseph W. 
Westphal, Assistant Secretary of the Army (CW)); 
President (MG Russell L. Fuhrman, Director of Civil 
Works); and Secretary (Mr. Thomas M. Ballentine). 
Following the reassignment of MG Fuhrman, as Deputy 
Commander, on June 1, 1999, MG Hans A. VanWinkle 
became the Deputy Commanding General for Civil 
Works and the President of the U.S. Section, PIANC. 
At the beginning of FY99, U.S. National 
Commissioners were: Mr. Robert D. Nichol, President, 
Moffatt and Nichol Engineers; Mr. Kurt J. Nagle, 
President, American Association of Port Authorities; Mr. 
Donald G. Waldon, Vice President representing the 
Central Region of the U. S. Section and Administrator, 
Tennessee-Tombigbee Waterway Development Authority; 
who served through June 1999; Dr. Anatoly B. 
Hochstein, Director, George Washington/Louisiana State 
University (GW/LSU) Ports and Waterways Institute; Mr. 
Charles F. Lehman, Vice President, (Retired) American 
Commercial Barge Line Company; Mr. John M. Pisani, 
Director of Ports and Domestic Shipping, Maritime 
Administration, U.S. Department of Transportation; Mr. 
Walter D. Ritchie, Vice President representing the 
Western Region of the U. S. Section and Vice President, 
Frederic R. Harris, Inc.; and Mr. Joseph J. Birgeles, Vice 
President representing the Eastern Region of the U. S. 
Section and a Principal of B&B Marine Consultants. Mr. 
Charles C. Calhoun, Jr., Consultant was elected in June 
1999, as Commissioner and Vice President representing 
the Central Region. 
44-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY99 
The Treasurer is Captain James R. Carman , 
(retired,) Chief, Division of Port and Intermodal 
Planning, Office of Port and Domestic Shipping in the 
Maritime Administration. 
Conferences 
The U. S. Section sponsored its annual conference in 
May 1999. The meeting was held in Memphis, Tennessee 
with the Port of Memphis and Shelby County Port 
Commission serving as the host organization. Mr. 
Donald C. McCrory, Executive Director, was responsible 
for planning the local arrangements. 
The U. S. Section also participated in several other 
conferences which were sponsored by navigation 
organizations. The Association continued the long 
tradition of holding a PIANC breakfast at the annual 
meeting of the National Waterways Conference, Inc. The 
breakfast speaker was Dr. Sandra K. Knight, Chief, 
Navigation Branch, Coastal and Hydraulics Laboratory, 
Waterways Experiment Station. The subject of her talk 
was "Navigation Trials and Tribulations: Are there 
Solutions?" 
Representatives to Permanent Committees and 
Commissions 
The U.S. Section representatives to the Permanent 
Technical Committees I and II (PTC I & II), the 
Permanent Environmental Commission (PEC) and the 
Permanent Committee for Development and Cooperation 
(PCDC), were as follows: 
Permanent Environmental Commission -- Dr. 
Robert M. Engler, USACE Waterways Experiment 
Station. 
Permanent Committee for Development and 
Cooperation -- Dr. Anatoly B. Hochstein, GW/ LSU 
Ports and Waterways Institute. 
Permanent Technical Committee I (PTC I )(Inland 
Waterways and Ports) -- Dr. Sandra K. Knight, P.E., 
USACE. Waterways Experiment Station. 
Permanent Technical Committee II (PTC II) 
(Maritime Ports and Seaways) -- Mr. Thomas H. 
Wakeman, III, Port Authority of New York and New 
Jersey. 
Permanent Commission for Sport and 
Recreational Navigation (SRN) -- Mr. John M. Nichol 
(Retired) and Mr. Richard B. Dornhelm, Vice-President, 
Moffatt and Nichol Engineers. 
Commission for Communications -- Mr. Barry W. 
Holliday, Chief, Dredging and Navigation Branch, 
Operations, Construction, Readiness Division, Office of 
the Chief of Engineers 
Technical Working Groups Established and 
Publication of Reports 
During the year two working groups completed their 
tasks and reports were published. Seven new working 
groups were approved. The titles of active working 
groups and the names of the U. S. Representatives are: 
PTC I WG 19, Problems of Collisions Due to the 
Presence of Bridges, Organizaed September 1994, Mr. 
Michael A. Knott, P.E., Moffatt and Nichol Engineers 
PTC I WG 21, Economic Studies of Inland 
Waterways. Organized February 1996. Mr. David 
Grier, USACE, Institute for Water Resources. 
PTC I WG 22, Safety in Inland Navigation. 
Organized November 1996. RADM William T. 
McMullen, Texas A&M, Galveston, Texas. 
PTC I WG 23, Technical and Economic Problems 
of Channel Icing. Organized December 1997. Mr. 
Claude Strauser, USACE District, St. Louis. 
PTC I WG 24, Vessel Traffic Management in the 
Inland Waterways. Organized March 1998. Mr. J. 
Michael Sollosi, U. S. Coast Guard. 
PTC I, WG 25, Maintenance and Renovation of 
Navigation Infrastructure. Organized July 1999. Mr. 
James McDonald, USACE, WES and Captain James 
Blanchar, USACE District, Rock Island. 
PTC II WG 33, Fenders. Organized January 1996. 
Mr. Mark T. Faeth, Han-Padron Associates. 
44-2

INTERNATIONAL NAVIGATION ASSOCIATION (PIANC) 
PTC II WG 34, The Effect of Earthquakes on Port 
Structures. Organized June 1996. Mr. Bradley P. 
Erickson, VZM TranSystem Corporation; Valery M. 
Buslov, Ph.D., Han-Padron Associates; and Stephen E. 
Dickenson,, Ph.D., Oregon State University. 
PTC II WG 35, Dangerous Goods in Ports 
(Handling, Storage and Transportation). Organized 
October 1996. 
PTC II WG 36, Catalogue of Precast Elements. 
Organized October 1996. Dr. Billy L. Edge, Texas- 
A&M University. 
PTC II WG 37, Advances in Maritime Intermodal 
Freight Transportation. Organized September 1997. 
Mr. M. John Vickerman, VZM TranSystems Corporation. 
PTC II WG 38, Polar Navigation. Organized 
December 1997. Orson P. Smith, Ph.D., University of 
Alaska, Anchorage. 
PTC II WG 39, Monitoring of Breakwaters. 
Organized January 1998. Mr. James D. Prehn, RLS, 
W.F. Baird & Assoc. Ltd. 
PTC II WG 40, Guidelines for the Designing of 
Berm Breakwaters. Organized January 1998. Mr. 
Jeffrey F. Gilman, P.E., Vice President, Peratrovich, 
Nottingham & Drage, Inc. 
PTC II WG 41, High-Speed Ferries at Sea and 
Port Approaches. Organized July 1999. LCDR George 
H. Burns III, U.S. Coast Guard. 
SRN WG 9, Regeneration of Harbour Areas for 
Sport and Pleasure Navigation Use. Organized July 
1995. Mr. Jack C. Cox, Michael Baker Corporation. 
SRN WG 10, Provision for Low Cost Moorings 
for Seasonal Use. Organized July 1995. 
SRN WG 11, Waterway Planning for Marinas 
and Resorts. Organized February 1997. Mr. Ron Stone, 
National Marine Manufactures Association. 
SRN WG 12, Recreational Navigation and Nature. 
Organized February 1998. Mr. Scott Jackson USACE 
Waterways Experiment Station and Mr. Paul E. 
Donheffner, Oregon State Marine Board. 
SRN WG 13, Dredging of Marinas. Organized July 
1999. Mr. R. W. Lofgren, Lofgren Imagineering & 
Construction Company. 
PEC WG 2, Wildlife Habitat and Port 
Management. Organized March 1995. Mary C. Landin, 
Ph.D.
PEC WG 3, Glossary of Environmental Terms 
and Terminology as Related to PIANC Activities. 
Organized March 1995. Mr. Thomas R. Patin, USACE 
Waterways Experiment Station. 
PEC WG 4, Environmental Management System 
for Ports. Organized January 1996. 
PEC WG 5, Environmental Guidelines for 
Marine, Nearshore and Inland Confined Disposal 
Facilities for Contaminated Dredged Material. 
Organized January 1998. Michael C. Palermo, Ph.D., 
USACE Waterways Experiment Station and Mr. John C. 
Roberge, Ocean and Coastal Consultants, Inc. 
PEC WG 6, Ecological and Engineering 
Guidelines for Sustainable Development of Inland 
Navigation as Related to Navigation Infrastructure. 
Organized July 1999. Craig Fischenich, Ph.D., USACE 
Waterways Experiment Station. 
PEC WG 7, Ecological and Engineering 
Guidelines for Wetlands Restroration in Relation to 
the Development, Operation and Maintenance of 
Navigation Infrastructure. Organized July 1999. 
Russell Theriot, Ph.D., USACE, Waterways Experiment 
Station. 
44-3

INTERNATIONAL BOUNDARY WATERS BOARDS 
In order to carry out United States obligations 
under international agreements, the Office of the Chief of 
Engineers and several Corps divisions and districts with 
jurisdiction over areas bordering Canada have 
representation on numerous international boards, 
committees, and other groups. The majority of these 
boards were established by the International Joint 
Commission (IJC) as empowered in accordance with the 
provisions of the Boundary Waters Treaty of 1909 
between the United States and Great Britain (for Canada). 
IJC boards fall into two broad categories: boards of 
control, which are more or less permanent and supervise 
compliance over an IJC order; and engineering, technical, 
or study boards, which are usually dissolved after 
completing and reporting on an investigation assignment. 
In addition to boards created by the Commission, 
other international boards and committees are created by 
treaties or other arrangement in matters concerned with 
the water resources of joint interest, and the members 
report directly to the Governments or establishing agency. 
International boundary waters boards and committees 
having Corps of Engineers memberships during the fiscal 
year are listed in Table 45-1. For an explanation of the 
constitution of the various boards and committees, see the 
annual reports, Volume II for fiscal years 1977 and 1980. 
TABLE 45-1 
International Boundary Waters Boards Having Corps of Engineers Members 
YEAR 
ESTABLISHED 
1. Int. Lake Superior 
2. Int. St. Croix River 
3. Int. Lake Memphremagog 
4. Int. Lake of the Woods Control Board 
5. Int. Lake Champlain 
6. Int. Kootenay Lake 
7. Int. Rainy Lake Board of Control 
8. Int. Osoyoos Lake 
9. Int. Souris-Red Rivers Engineer Board 
10. Int. Niagara 
11. Int. St Lawrence River 
12. Coordinating Committee on Great Lakes 
Basic Hydraulic and Hydrologic Data 
13. Int. Niagara Committee 
1914 
1915 
1920 
1925 
1937 
1938 
1941 
1943 
1948 
1953 
1953 
1953 
1955 
UNITED STATES 
REPRESENTATION 
*Division Engineer, Great Lakes and Ohio River 
Division 
*District Engineer, New England District 
*District Engineer, New York 
*District Engineer St. Paul - Chairman 
*District Engineer, New York 
* 1. District Engineer, Seattle 
2. Dept. of Interior, USGS, Boise, ID 
*District Engineer, St. Paul -- Chairman 
1. District Engineer, Seattle 
2. *Dept. of Interior, USGS, Tacoma, WA 
3. Washington State Parks & Recreation 
Commission, Olympia, WA 
1. District Engineer, St. Paul - Board Member 
2. *Dept. of Interior, BOR, Wash., D.C. 
3. Dept. of Interior, USGS, Reston, VA 
1. *Division Engineer, Great Lakes and Ohio River 
Division 
2. Dept. of Energy, FERC, Wash., D.C. 
1. *Division Engineer, Great Lakes and Ohio River 
Division 
2. New York Dept. of Environmental Conservation 
3. New York Power Authority 
4. Rochester Institute of Technology 
5. Cornell University 
1. Division Engineer -- Great Lakes and Ohio River 
Division 
2. Dept. of Commerce, Ann Arbor, MI 
*Division Engineer, Great Lakes and Ohio River 
Division 
45-1

BOARD NAME 
YEAR 
ESTABLISHED 
UNITED STATES 
REPRESENTATION 
14. Int. Souris River Board of Control 
15. Columbia River Treaty Entities 
16. Columbia River Treaty 
17. Int. Champlain-Richelieu 
18. Study Team 
1959 
1964 
1964 
1975 
1999 
1. District Engineer, St. Paul - Board Member 
2. *ND State Engr., Bismark, ND 
3. Dept. of Interior, USGS, Bismarck, ND 
1. Division Engineer, Northwestern Division 
2. *Bonneville Power Admin., Portland, OR 
1. *HQUSACE, CECW-ZB, Wash., D.C. 
2. Department of Energy, Tucson, AZ 
1. *New York Dept. Environmental Conservation 
2. District Engineer, New York 
3. Vermont Environmental Conservation. Agency 
4. New England River Basins Commission, Staff 
Associate 
5. Dept. of Interior F&WS, Boston, MA 
1. *Deputy Commander, Great Lakes Regional 
Office, Great Lakes and Ohio River 
Division 
2. Bureau of Reclamation 
3. Great Lakes Commission. 
4. Council of Great Lakes Governors 
6. U.S. Geological Survey 
7. Western Sates Water Council 
* Signifies U.S. Section Chairman 
Protection of the Waters of the Great Lakes Under the February 10, 1999, Reference 
A final report, "Protection of the Waters of the 
Great Lakes" was submitted to the U.S. and Canadian 
Governments on February 22, 2000 by the 12-member 
Study Team. The Study Team was co-chaired by the 
Deputy Commander of the Great Lakes Regional Office, 
Great Lakes and Ohio River Division 
Because there is uncertainty about the 
availability of Great Lakes water to meet all ecosystem 
needs, including human needs, over the long term, the 
report concludes that water should be managed with 
caution to protect the resource for the future. It also 
concludes that international trade law obligations, 
including the provisions of the North American Free 
Trade Agreement (NAFTA) and the General Agreement 
on Tariffs and Trade (GATT), do not prevent Canada and 
the United States from taking measures to protect their 
water resources and preserving the integrity of the Great 
Lakes basin ecosystem so long as there is no 
discrimination against individuals from other countries in 
the application of those measures. 
The report recommends that federal, state and provincial 
governments should not authorize or permit any new 
removals, and should exercise caution with respect to 
major new or increased consumptive use, until these 
standards have been promulgated or until 24 months have 
passed, whichever comes first. States and provinces 
should also build on the Great Lakes Charter by 
developing a broader range of consultation procedures 
than currently exist. 
The Final Report responds to the request made by the 
governments of Canada and the United States in their 
February 10, 1999 Water Uses Reference for 
recommendations for the protection of the Great Lakes. 
The IJC previously issued an Interim Report under this 
Reference on August 18, 1999. Since issuing its Interim 
Report, the IJC has obtained additional information from 
a variety of sources, including 12 public hearings. 
45-2

INVESTIGATION OF PROJECTS UNDER FEDERAL POWER ACT 
- This page intentionally left blank - 
46-1

REGULATORY, SUNKEN VESSEL REMOVAL AND 
NATIONAL EMERGENCY PREPAREDNESS ACTIVITIES 
1. Regulatory Activities 
Authorities. The following authorities 
charge the Corps of Engineers with the 
regulation of various construction related 
activities in U. S. waters and wetlands: Sections 
9 and 10 of the Rivers and Harbors Act of 1899 
(structures in waterways and the alteration of 
waterways); Section 103 of the Marine, 
Protection, Research, and Sanctuaries Act of 
1972 (Ocean Dumping); and Section 404 of the 
Clean Water Act (discharge of dredged or fill 
material). 
Work Completed. During FY 1999, the 
Corps reviewed and authorized approximately 
90,600 permit activities, 92 percent of which 
were approved within 60 days. About 7,100 
projects were issued individual permits, and 
another 83,500 activities were reviewed and 
approved under regional or nationwide general 
permits. General permits are issued to the public 
at large and define types of minor activities with 
no more than minimal adverse effects on the 
aquatic environment, which do not usually 
require the extensive review necessary for 
projects authorized by individual permits. Use 
of general permits provides significant relief to 
the regulated public by avoiding red tape for 
small projects with minimal environmental 
impacts. The Corps denied only about 200 
permits during FY 1999 since most projects 
which might otherwise have been denied a 
permit were either modified or conditioned to 
meet Corps requirements, scaled down to qualify 
for approval under general permits, or 
withdrawn. About 3,800 permit applications 
were either withdrawn or canceled. Under the 
regulatory program, the Corps made nearly 
60,000 jurisdiction determinations in FY 1999, 
many of which were made in response to 
requests from landowners who were not applying 
for permits. The Corps investigated 
approximately 6,000 alleged illegal activities, 
most of which were violations of Section 404 of 
the Clean Water Act. Under the permit program 
in FY 1999, the Corps authorized the filling of 
approximately 21,600 acres of wetlands but 
required the restoration, enhancement, or 
creation of approximately 46,400 wetland acres. 
During FY 1999, the Corps continued work 
to implement some aspects of the President's 
Wetlands Plan, announced in August 1993. The 
plan was designed to both improve protection of 
the nation's wetlands and to make the regulatory 
process easier and more fair for the regulated 
public. 
During FY 1999, the Corps initiated an 
Administrative Appeals process for applicant's 
who have had their permit denied, or believe that 
the conditions of an issued permit are so onerous 
that the applicant considers the conditions as a 
denial of their application. The Corps also 
issued a conforming regulation implementing the 
1998 ruling of the Circuit Court decision in the 
Tulloch case. The conforming rule states that 
activities that involve a discharge that only 
results in "incidental fallback" of excavated 
material do not require a Corps permit. 
On July 21, 1999, the Corps issued proposed 
changes to the Nationwide Permit Program. 
These proposed changes were intended to 
increase the protection of the Nation's aquatic 
resources, with particular attention to protection 
of the Nation's 100 year floodplains. A total of 
1,700 comments were received on the proposed 
changes to the NWP program, most expressing 
concern about the workload associated with 
increased protection of the 100 year floodplains. 
47-1

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
TABLE A 
GENERAL REGULATORY FUNCTIONS 
Obligations 
Unobligated Balance - 30 Sep 98 
Allotments 
Total Funds Available 
Obligations 
Unobligated Balance- 30 Sep 99 
Expenditures 
Unexpended Balance - 30 Sep 98 
Allotment 
$ 4,079,404 
$ 106,000,000 
$ 110,079,404 
$ 105,622,068 
$
$$ 
4,457,336 
6,346,543 
106,000,000 
Total Funds Available 
Expenditures 
Unexpended Balance - 30 Sep 99 
Investigation and Removal of Sunken Vessels 
Under the authority of Sections 19 and 20 of 
the River and Harbor Act of 1988, the Corps of 
Engineers investigated sunken vessels in navigable 
$ 112,346,543 
$ 105,509,306 
6,837,237 
waters and removed those obstructing navigation. 
For obligation expenditures, see Table B. 
47-2

REGULATORY, SUNKEN VESSEL REMOVAL AND NATIONAL EMERGENCY PREPAREDNESS ACTIVITIES 
TABLE B 
REMOVAL OF SUNKEN VESSELS 
($000) 
Obligations 
Unobligated Balance - 30 Sep 98 
Allotment 
Total Funds Available 
Obligations 
Unobligated Balance - 30 Sep 99 
Expenditures 
Unexpended Balance - 30 Sep 99 
Allotment 
$ 2,999 
500 
3,499 
146 
$ 3,353 
$ 2,999 
500 
$ 3,499 
143 
$ 3,356 
Total Funds Available 
Expenditures 
Unexpended Balance - 30 Sep 99 
3. National Emergency Preparedness 
Activities 
Authority. Executive Order 12656, as amended, 
assigns responsibilities to executive departments and 
agencies in order to undertake the national 
emergency planning and preparedness activities 
necessary to develop an effective national capability 
to meet essential civilian and national security needs 
during major domestic crises (including catastrophic 
disasters) and national security emergencies. 
Status. During FY 1999, the Corps of Engineers 
continued its effort to improve the command's 
readiness posture and its ability to respond to various 
national emergencies. Emphasis on those activities 
to prepare for catastrophic natural and technological 
disasters and to improve Continuity of Government 
(COG) programs was continued. The primary focus 
during FY 1999 was to provide support to two major 
national level civil planning areas: (a) support to the 
nation" ability to mobilize national assets to meet 
national/regional level emergencies and (b) support 
to continuity of government and continuity of 
operations during national emergencies (e.g., some 
NEPP funding was used to staff USACE emergency 
operations centers through the new year period to 
respond to State and local emergencies pertaining to 
the Y2K threat). Lessons learned from Midwest 
Floods of 1993, as well as those gleaned from events 
such as Hurricanes Hugo, Andrew and Iniki, Loma 
Prieta and Northridge Earthquakes and the evolving 
New Madrid Earthquake scenario, clearly indicate 
that, while the Federal Response Plan is a solid 
response system, it does not provide for response to 
disasters with national implications in a way that is 
sufficiently timely or comprehensive. To alleviate 
this situation, the Corps is in the process of 
developing scenario specific plans for catastrophic 
disasters. This should lead to a more timely and 
effective execution of Corps responsibilities during 
disasters that have national impacts. Extensive 
coordination with Federal agencies and state and 
local governments is being incorporated into plan 
development. Other activities included a 
continuation of the planning for and maintenance of 
emergency facilities needed to support continuity of 
operations and coordination with the Federal 
47-3

REPORT OF THE SECRETARY OF THE ARMY ON CIVIL WORKS ACTIVITIES FOR FY 1999 
Emergency Management in the development of a operations. For fiscal year obligations and 
new Continuity of Government (COG) concept of expenditures, see Table C. 
TABLE C 
NATIONAL EMERGENCY PREPAREDNESS 
Obligations 
Unobligated Balance - 30 Sep 98 
Appropriations FY 99 
Total Funds Available 
Obligations 
Unobligated Balance - 30 Sep 99 
Expenditures 
Unexpended Balance - 30 Sep 98 
Appropriations FY 99 
Total Funds Available 
Expenditures 
Unexpended Balance - 30 Sep 99 
$ 901,383 
5,000,000 
$ 5,901,383 
4,543,535 
$ 1,357,848 
$ 1,365,355 
5,000,000 
$ 6,365,355 
4,634,737 
$ 1,730,618 
47-4

NATURAL DISASTER PREPAREDNESS RESPONSE AND RECOVERY 
ACTIVITIES 
Authority. Public Law 84-99 provides the 
authority for the U. S. Army Corps of Engineers 
to provide emergency/disaster assistance for 
Flood Control and Coastal Emergencies (33 
U.S.C. 701n) (69 Stat. 186). Under this law, the 
Chief of Engineers, acting for the Secretary of 
the Army, is authorized to undertake activities 
including disaster preparedness, advance 
measures, emergency operations (Flood 
Response and Post Flood Response), 
rehabilitation of flood control works threatened 
or destroyed by flood, protection or repair of 
federally authorized shore protective works 
threatened or damaged by coastal storm, and 
provisions of emergency water due to drought or 
contaminated source. Under Public Law 93-288, 
The Robert T. Stafford Disaster Relief and 
Emergency Assistance (42 U.S.C. 5121 et seq.) 
(88 Stat. 143) Act (The Stafford Act), the 
Federal Emergency Management Agency may 
direct USACE to use its resources to provide 
assistance in the event of a major disaster or 
emergency declaration by the President. Under 
The Stafford Act and the Federal Response Plan, 
USACE has a standing mission to provide 
assistance in the area of Public Works and 
Engineering, Emergency Support Function #3 
for response to a major disaster or catastrophic 
event. 
Activities. Major disaster preparedness 
activities included: the review and updating of 
response plans to ensure viability; training 
personnel to ensure their capability to respond in 
adverse circumstances; procurement and 
propositioning of critical equipment and supplies 
which would likely not be available during initial 
stages of a response; periodic exercises to test 
and evaluate plans, personnel and training; 
inspection of non-Federal flood control projects 
to ensure their viability to provide flood 
protection; and the overall management of the 
Disaster Preparedness and Response Program to 
ensure a workable, coordinated effort is 
undertaken in a timely manner. In addition, 
work continued on response planning activities 
related to the Federal Emergency Management 
Agency's (FEMA) Federal Response Plan for 
providing engineering and construction support 
following catastrophic events such as Hurricanes 
Andrew, and Georges, the Northridge 
Earthquake, and the Oklahoma City bombing. 
For each specific event, Headquarters augments 
its staff to manage the event involving resource 
allocations (dollars and people), logistics of 
moving people and materials, funding 
contractors and materials and coordination with 
agencies involved in the event. These 
augmentation activities include overtime for 
Headquarters staff, travel to the event area, 
purchasing materials and supplies, increase 
staffing to include Individual Mobilization 
Augmentees (IMA), and providing Geographic 
Information System (GIS) services. 
Significant Events. In 1999, the Corps 
responded to 15 national emergencies and 
disasters, including: devastating Mid-West 
tornadoes, major floods in the Pacific Northwest 
and a number of hurricanes, including 
Hurricanes Floyd that hit the East Coast in 
September of 1999 killing 75 people and causing 
$6.0 billion in damages. During 1999, the Corps 
responded to requirements for flood fighting, 
debris removal, emergency power, the supply of 
ice and water, temporary housing and technical 
assistance. In FY1999, approximately $230M in 
funds were expended to execute FEMA missions 
and another $18M of Corps funds were 
expended on disaster operations under PL 84-99 
authorities. 
48-1

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No PrHeight 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
ALASKA 
Chena River Lakes 
ARIZONA 
Adobe 
Alamo 
Cave Buttes 
Dreamy Draw 
New River 
Painted Rock 
Tat Momolikot 
Whitlow Ranch 
ARKANSAS 
Blakely Mountain 
Blue Mountain 
DeGray 
DeQueen 
Dierks 
Gillham 
Yukon 
Kuskokwim 
Gila 
Colorado 
Gila 
Gila 
Gila 
Gila 
Gila 
Gila 
Ouachita Dam 
Arkansas 
Ouachita 
Red 
Red 
Red 
Chena River 
Skunk Creek 
Bill Wms. 
River 
Cave Creek 
Dreamy Draw 
New River 
Gila River 
Santa Rosa 
Wash 
Queen Creek 
Ouachita 
Petit Jean River 
Caddo 
Rolling Fork 
River 
Saline River 
Cossatot River 
Fairbanks 
Phoenix 
Wenden 
Phoenix 
Phoenix 
Phoenix 
Gila Bend 
Casa Grande 
Superior 
Hot Springs 
Paris 
Arkadelphia 
DeQueen 
Dierks 
Gillham 
1979 
1982 
1968 
1979 
1973 
1985 
1959 
1974 
960 
1955 
1947 
1971 
1977 
1975 
1975 
2,000 
18,350 
1,045,300 
46,600 
320 
43,520 
2,476,340 
198,550 
34,500 
2,768,500 
257,900 
881,900 
136,100 
96,800 
221,800 
NPP 
NPP 
560 
NPP 
NPP 
NPP 
NPP 
NPP 
NPP 
20,900 
2,910 
6,400 
1,680 
1,360 
1,370 
FR Earth 
FR Earth 
FRWX Earth 
FRX 
FRX 
F 
FRWX 
GWX 
Earth 
Earth 
Earth 
Earth 
Earth 
FX Earth 
FP 
FRWX 
FPRSQN 
FSQRW 
Earth 
Earth 
Earth 
Earth 
FSRAW Earth 
&
Rock 
FSQW Earth 
&
Rock 
50 40,200 
109 
283 
109 
50 
104 
181 
75.5 
25 
235 
115 
243 
160 
2,275 
975 
2,275 
448 
2,320 
4,780 
12,500 
978 
1,100 
2,800 
3,400 
2,360 
153 2,500 
160 1,750 
A-1 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Name 
Millwood 
Narrows Dam 
Nimrod 
CALIFORNIA 
Black Butte 
Brea 
Buchanan Dam 
H.V. Eastman Lake 
Carbon Canyon 
Coyote Valley 
Dry Creek 
(Warm Springs) 
Lake and Channel 
Farmington 
Fullerton 
Hansen 
Harry L. Englebright 
Hidden Dam- Hensley 
Lake 
Isabella 
River Basin 
Red 
Ouachita 
Arkansas 
Sacramento 
Santa Ana 
San Joaquin 
Santa Ana 
Russian 
Russian 
San Joaquin 
Santa Ana 
Los Angeles 
Sacramento 
San Joaquin 
San Joaquin 
Stream 
Little River 
Little Missouri 
Fourche LaFve 
River 
Stony Creek 
Brea Creek 
Chowchilla 
River 
Carbon Canyon 
River 
East Fork 
Russian River 
Dry Creek 
Littlejohn 
Creek 
East Fullerton 
Crk 
Big Tujunga 
Wash 
Yuba River 
Fresno River 
Kern River 
Community 
in Vicinity 
Ashdown 
Murfreesboro 
Plainview 
Orland 
Fullerton 
Chowchilla 
Brea 
Ukiah 
Healdsburg 
Farmington 
Fullerton 
Los Angeles 
Marysville 
Madera 
Bakersfield 
Cal. Year 
Placed in 
Useful OP 
1966 
1949 
1942 
1963 
1942 
1975 
1961 
1959 
1983 
1952 
1941 
1940 
1941 
1975 
1953 
Total 
Storage 
(Acre-Ft.) 
1,854,930 
407,900 
336,010 
160,000 
4,009 
150,000 
6,614 
122,500 
381,000 
52,000 
764 
51,000 
69,000 
90,000 
570,000 
Pool 
(Acreage) 
or No 
Pool (NPP) 
29,200 
2,500 
3,550 
770 
NPP 
470 
NPP 
1,700 
500 
NPP 
NPP 
120 
400 
5,000 
1,850 
Project 
Functions 
FSW 
FP 
FSWX 
FIRX 
FRX 
FIRW 
FERX 
FRXS 
FRSW 
F 
FRX 
FRWX 
DR 
FIRW 
FIRW 
Type 
Earth 
Concrete 
Concrete 
Earth 
Earth 
Earth 
&
Rock 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Concrete 
Earth 
Earth 
Height 
(Feet) 
88 
175 
97 
156 
87 
205.5 
99 
160 
319 
60 
46 
97 
280 
163 
185 
Length 
(Feet) 
17,554 
941 
1,012 
2,970 
1,765 
1,800 
2,150 
3,500 
3,000 
7,800 
575 
10,475 
1,142 
5,730 
4,952 
A-2 
. ~

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Lopez 
Martis Creek 
Merced County 
Streamed Group 
Bear 
Burns 
Mariposa 
Owens 
Mojave River 
New Hogan 
North Fork 
Pine Flat 
Prado 
Redbank and Fancher 
Creeks 
San Antonio 
Santa Fe 
Sepulveda 
Success 
Terminus 
Los Angeles 
Sacramento 
San Joaquin 
San Joaquin 
San Joaquin 
San Joaquin 
Mojave 
San Joaquin 
Sacramento 
Pacoima Wash 
Martis Creek 
Bear Creek 
Burns Creek 
Mariposa Creek 
Owens Creek 
Mojave River 
Calaveras River 
American River 
San Fernanado 
Reno 
Merced 
Merced 
Merced 
Merced 
Victorville 
Valley Springs 
Auburn 
San Joaquin Kings River Piedra 
Santa Ana 
San Joaquin 
Santa Ana 
River 
Fancher Creek 
Santa Ana San Antonio 
Creek 
San Gabriel San Gabriel 
River 
Los Angeles Los Angeles 
River 
San Joaquin Tule River 
San Joaquin Kaweah River 
1954 
1971 
1954 
1950 
1948 
1949 
1971 
1963 
1939 
440 
20,400 
7,700 
7,000 
15,000 
3,600 
89,669 
325,000 
14,700 
1954 1,000,000 
Corona 
Fresno 
Upland 
Duarte 
Van Nuys 
Porterville 
Visalia 
1941 
1993 
1956 
1949 
1941 
1960 
1961 
196,235 
9,712 
7,703 
32,109 
17,425 
85,000 
150,000 
NPP 
71 
NPP 
NP 
NPP 
NPP 
NPP 
715 
280 
NPP 
NPP 
NPP 
NPP 
NPP 
NPP 
400 
345 
FX 
FSR 
F
F
F
F 
FRWX 
FIRX 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
&
Rock 
DR Concrete 
FIRX Concrete 
FRX Earth 
F Earth 
FX Earth 
FRX Earth 
FRX Earth 
FIRX Earth 
FIRX Earth 
50 
113 
92 
55 
88 
75 
106 
210 
155 
429 
106 
1,333 
2,670 
1,830 
4,075 
1,330 
790 
1,250 
1,960 
620 
1,820 
2,280 
44 16,135 
160 3,850 
92 23,800 
57 15,444 
142 
250 
3,490 
2,375 
A-3 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Whittier Narrows San Gabriel San Gabriel El Monte 1957 49,143 NPP FRWX Earth 56 
River and Rio 
Hondo 
COLORADO 
Bear Creek 
Chatfield 
Cherry Creek 
John Martin 
Trinidad 
CONNECTICUT 
Black Rock 
Colebrook River 
Hancock Brook 
Hop Brook 
Mansfield Hollow 
Northfield Brook 
Thomaston 
West Thompson 
Missouri 
Missouri 
Missouri 
Arkansas 
Arkansas 
Bear Creek 
South Platte 
River 
Cherry Creek 
Arkansas River 
Purgatoire 
River 
Housatonic Branch Brook 
Connecticut West Branch, 
Farmington 
River 
Housatonic Hancock Brook 
Housatonic Hop Brook 
Thames Natchaug River 
Thames Northfield 
Brook 
Housatonic Naugatuck 
River 
Thames Quinebaug 
River 
Denver 
Denver 
Denver 
Lamar 
Trinidad 
Thomaston 
Riverton 
Plymouth 
Middlebury 
Willimantic 
Thomaston 
Thomaston 
Thompson 
1978 
1974 
1950 
1943 
1977 
1970 
1969 
1960 
1968 
1952 
1965 
1960 
1965 
30,810 
231,429 
93,920 
605,115 
124,463 
8,700 
97,700 
4,030 
6,970 
52,000 
2,430 
42,000 
26,800 
109 
1,412 
852 
1,844 
563 
20 
760 
40 
21 
450 
8 
NPP 
200 
FRX Earth 
FRX Earth 
FRX Earth 
FIR Concrete 
& 
Earth 
FIRX Earth 
FR Earth 
FRSX Earth 
FRW 
FR 
FRW 
FRW 
Earth 
Earth 
Earth 
Earth 
F Earth 
FRW Earth 
180 
148 
141 
106 
200 
154 
223 
57 
97 
68 
118 
142 
5,300 
12,400 
14,300 
13,962 
6,610 
933 
1,300 
630 
520 
12,420 
810 
2,000 
70 2,550 
A-4 
Length 
(Feet) 
16,960

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
IDAHO 
Lucky Peak 
ILLINOIS 
Carlyle 
Farmdale 
Fondulac 
Shelbyville 
Rend Lake 
INDIANA 
Brookville 
Cagles Mill 
Cecil M. Harden 
J. Edward Roush 
Mississinewa 
Monroe 
Patoka 
Salamonie 
Columbia 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Boise River Boise 
Kaskaskia 
River 
Farm Creek 
Fondulac Creek 
Kaskaskia 
River 
Big Muddy 
River 
East Fork of 
Whitewater 
River 
Mill Creek 
Raccoon Creek 
Wabash River 
Mississinewa 
Salt Creek 
Patoka River 
Salamonie 
Carlyle 
East Peoria 
East Peoria 
Shelbyville 
Benton 
Brookville 
Tere Haute 
Rockville 
Huntington 
Peru 
Harrodsburg 
Ellsworth 
Wabash 
1955 
1967 
1951 
1951 
1970 
1970 
1974 
1952 
1960 
1969 
1967 
1964 
1978 
1966 
306,000 
983,000 
15,500 
3,780 
684,000 
294,000 
359,600 
228,120 
132,800 
153,100 
368,400 
441,000 
301,600 
263,600 
2,820 FIR Earth 
26,000 FSNRWA Earth 
NPP 
NPP 
11,100 
18,900 
2,250 
1,400 
1,100 
500 
1,100 
3,280 
2,010 
976 
F Earth 
F Earth 
FSNRW Earth 
FQRSW Earth 
FRSW Earth& 
Rock 
FRX 
FRX 
FRW 
FRW 
FARS 
FRSQW 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
&
Rock 
FRW Earth 
340 2,340 
67 6,570 
80 1,275 
67 1,000 
108 3,000 
54 10,600 
182 
150 
117 
91 
137 
93 
84 
133 
3,000 
950 
1,790 
5,332 
8,100 
1,400 
1,550 
6,100 
A-5 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
IOWA 
Coralville 
Red Rock 
Rathbun 
Saylorville 
KANSAS 
Clinton 
Council Grove 
El Dorado 
Elk City 
Fall River 
Hillsdale 
John Redmond 
Kanopolis 
Marion 
Melvern 
Upper 
Mississippi 
Upper 
Mississippi 
Missouri 
Upper 
Mississippi 
Missouri 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Missouri 
Arkansas 
Missouri 
Arkansas 
Missouri 
Iowa River 
Des Moines 
River 
Chariton River 
Des Moines 
River 
Iowa City 
Des Moines 
Centerville 
Des Moines 
Wakarusa River Lawrence 
Grand 
(Neosho) 
Walnut River 
Elk River 
Fall River 
Big Bull Creek 
Grand 
(Neosho) 
Smoky Hill 
River 
Cottonwood 
River 
Marais des 
Cygnes 
Council Grove 
El Dorado 
Independence 
Fall River 
Hillsdale 
Burlington 
Marquette 
Marion 
Melvern 
1958 
1969 
1969 
1975 
1977 
1964 
1981 
1966 
1949 
1981 
1964 
1948 
1968 
1972 
475,000 
1,717,235 
552,000 
585,000 
397,200 
112,882 
246,882 
287,200 
254,900 
160,000 
626,000 
450,000 
141,890 
363,000 
5,430 
19,000 
11,000 
5,950 
7,000 
3,259 
8,400 
4,440 
2,330 
4,580 
9671 
3,815 
6,210 
6,930 
FARWQ 
FARWQ 
FNRWXQ 
S 
FARWQ 
Earth 
Earth 
Earth 
Earth 
FSWXRQ Earth 
&
Rock 
FSQR Earth 
FSQR Earth 
FSQWR Earth 
FSXQR Earth 
FSQRWX Earth 
FSQR Earth 
FRWXS Earth 
FRQS Earth 
FRQWXS Earth 
A-6 
Length 
(Feet) 
100 
110 
86 
105 
114 
96 
99 
107 
94 
75 
86.5 
131 
67 
98 
1,400 
5,676 
10,600 
6,750 
9,250 
6,500 
20,930 
4,840 
6,015 
11,600 
21,790 
15,360 
8,495 
9.700

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No PrHeight 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Milford 
Pearson Skubitz Big 
Hill 
Perry 
Pomona 
Toronto 
Tuttle Creek 
Wilson 
KENTUCKY 
Barren River 
Buckhorn 
Carr Creek 
Cave Run 
Dewey 
Missouri 
Arkansas 
Missouri 
Missouri 
Arkansas 
Missouri 
Missouri 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Republican 
River 
Big Hill Creek 
Deleware River 
110 Mile Creek 
Verdigris River 
Big Blue River 
Saline River 
Barren River 
Middle Fork of 
Kentucky River 
Carr Fork 
Licking River 
Johns Creek 
Junction City 
Cherryvale 
Perry 
Pomona 
Toronto 
Manhattan 
Wilson 
Glasgow 
Buckhorn 
Hazard 
Farmers 
Paintsville 
1965 
1981 
1969 
1963 
1960 
1962 
1964 
1964 
1960 
1976 
1974 
1949 
1,160,000 
39,540 
770,000 
230,000 
200,800 
2,346,000 
776,000 
815,200 
168,000 
47,700 
614,100 
93,000 
15,600 
1,190 
12,500 
4,000 
2,660 
15,800 
9,000 
4,340 
550 
530 
6,790 
1,100 
FRSXWN 
FSRW 
FRSXWN 
FRSWXQ 
FXSQWR 
FRWXQN 
S 
FIRWXN 
FARS 
FQRW 
FQRW 
FQRW 
FARW 
Earth 
Rock 
Earth 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
Earth 
&
Rock 
Earth 
Earth 
Earth 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
126 
83 
96 
85 
90 
157 
160 
146 
162 
130 
148 
118 
Length 
(Feet) 
6,300 
3,902 
7,750 
7,750 
4,712 
7,500 
5,600 
3,970 
1,020 
720 
2,740 
913 
A-7

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Name 
Fishtrap 
Grayson 
Green River 
Martins Fork 
Paintsville 
Nolin 
Rough River 
Taylorsville 
Yatesville 
LOUISIANA 
Bayou Bodcau 
River Basin 
Ohio 
Ohio 
Ohio 
Cumberland 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Red 
Stream 
Levisa Fork, 
Big Sandy 
River 
Little Sandy 
Green River 
Martins Fork 
Paint Creek 
Nolin River 
Rough River 
Salt River 
Blaine Creek 
Community 
in Vicinity 
Pikeville 
Grayson 
Campbellsville 
Harlan 
Paintsville 
Kyrock 
Leitchfield 
Taylorsville 
Yatesville 
Bayou Bodcau Shreveport 
Cal. Year 
Placed in 
Useful OP 
1968 
1967 
1969 
1978 
1983 
1963 
1958 
1983 
1988 
1949 
Total 
Storage 
(Acre-Ft.) 
164,360 
118,990 
723,200 
21,00 
73,500 
609,400 
334,400 
291,670 
86,951 
357,300 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
569 
1,050 
5,070 
578 
261 
2,890 
2,180 
1,625 
3,921 
NPP 
I
l 
F
Project 
nctions Type 
FARW Rock 
FQRW Earth 
&
Rock 
'RSQW Earth 
&
Rock 
FQ Concrete 
FQRW Earth 
&
Rock 
FAR Earth 
&
Rock 
FRX Earth 
&
Rock 
FQRW Earth 
&
Rock 
FQRW Earth 
&
Rock 
FRW Earth 
Height 
(Feet) 
195 
120 
142 
97 
160 
174 
124 
164 
105 
Length 
(Feet) 
1,100 
1,460 
2,350 
574 
1,600 
990 
1,530 
1,280 
760 
70 12,850 
A-8 
Chrceitiso a

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Name 
Caddo Lake 
Wallace Lake 
MARYLAND 
Jennings Randolph 
Lake 
MASSACHUSETTS 
Barre Falls 
Birch Hill 
Buffumville 
Charles River Natural 
Valley Storage 
Conant Brook 
East Brimfield 
River Basin 
Red 
Red 
Potomac 
Connecticut 
Connecticut 
Thames 
Charles 
Connecticut 
Connecticut 
Stream 
Cypress Bayou 
Cypress Bayou 
North Branch 
Potomac River 
Ware River 
Millers River 
Little River 
Charles River 
Conant Brook 
Quinebaug 
River 
Community 
in Vicinity 
Shreveport 
Shreveport 
Barnum 
Barre 
So. Roylaston 
Charlton 
Millis 
Monson 
Fiskdale 
Cal. Year 
Placed in 
Useful OP 
1971 
1946 
1981 
1958 
1941 
1958 
1983 
1966 
1960 
Total 
Storage 
(Acre-Ft.) 
175,000 
96,100 
130,900 
24,000 
49,900 
12,700 
35,000 
3,740 
30,000 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
32,700 
2,300 
952 
NPP 
NPP 
200 
NPP 
NPP 
360 
Project 
Functions 
NFRS 
FQRS 
FQRSW 
FRW 
FRW 
FRW 
F
F 
FRW 
Type 
Concrete 
& 
Earth 
Earth 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Nonstructural 
Earth 
&
Rock 
Earth 
&
Rock 
Height 
(Feet) 
30 
296 
62 
56 
Length 
(Feet) 
3,700 
4,994 
2,130 
885 
1,400 
66 3,255 
85 
55 
1,050 
520 
A-9 
I 
~

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Name 
Hodges Village 
Knightville 
Littleville 
Tully 
West Hill 
Westville 
River Basin 
Connecticut 
Connecticut 
Connecticut 
Connnecticut 
Blackstone 
Thames 
Stream 
French River 
Westfield River 
Middle Branch, 
Westfield River 
Tully River 
West River 
Quinebaug 
River 
MINNESOTA 
Big Stone Lake- 
Whetstone River 
(HWY 75) 
Lac Qui Parle 
Chippewa River 
LacQui Parle 
Community 
in Vicinity 
Oxford 
Huntington 
Chester 
Fryville 
Uxbridge 
Sturbridge 
Cal. Year 
Placed in 
Useful OP 
1959 
1941 
1965 
1949 
1960 
1961 
Total 
Storage 
(Acre-Ft.) 
12,800 
49,000 
32,400 
22,000 
12,350 
11,100 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
NPP 
NPP 
275 
300 
NPP 
23 
Project 
Functions 
FRW 
FRW 
FRWS 
FRW 
FRW 
FRW 
Height 
(Feet) 
55 
160 
1,164 
62 
51 
78 
Type 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Length 
(Feet) 
2,140 
1,200 
1,360 
1,570 
2,400 
560 
Upper 
Mississippi 
Upper 
Mississippi 
Upper 
Mississippi 
Minnesota 
River 
Chippewa 
River 
Minnesota 
River 
Odessa 
Watson 
Montevideo 
1974 
1950 
1950 
45,000 
(2) 
158,700 
12,700 
NPP 
7,750 
FRW 
FRWX 
FRWX 
Earth 
Rolled 
Earth 
Rolled 
Earth 
25 
23.3 
25 
13,700 
17,975 
4,100 
A-10O 
Characteristics 
~ I, of Dam

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Name 
Marsh Lake 
Orwell 
Red Lake 
MISSISSIPPI 
Arkabutla Lake 
Enid Lake 
Grenada Lake 
Okatibbee 
Sardis Lake 
MISSOURI 
Clearwater 
Long Branch 
River Basin 
Upper 
Mississippi 
Red River 
Red River 
Lower 
Mississippi 
Lower 
Mississippi 
Lower 
Mississippi 
Pascagoula 
Lower 
Mississippi 
White 
Grand Chariton 
Stream 
Minnesota 
River 
Otter Tail River 
of the North 
Red Lake River 
of the North 
Coldwater 
River 
Yocona River 
Mississippi 
Yalobusha 
River 
Okatibbee 
Creek 
Little 
Tallahatchie 
Rivere 
Black River 
Little Charlton 
Community 
in Vicinity 
Montevideo 
Fergus Falls 
Red River 
Arkabutla 
Enid 
Grenada 
Meridian 
Sardis 
Piedmont 
Macon 
Cal. Year 
Placed in 
Useful OP 
1953 
1953 
1951 
1945 
1952 
1954 
1969 
1940 
1948 
1980 
Total 
Storage 
(Acre-Ft.) 
35,900 
14,100 
3,270,000 
525,300 
660,000 
1,337,400 
142,400 
1,570,000 
413,700 
65,000 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
8,100 
790 
288,800 
5,100 
6,100 
9,800 
1,280 
10,700 
1,630 
2,430 
Project 
Functions 
FARS 
FARS 
FARSX 
F
F
F 
FQSR 
F 
FRWX 
FRSQW 
Type 
Rolled 
Earth 
Rolled 
Earth 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
Height 
(Feet) 
19.5 
47 
15.5 
81 
99 
102 
67 
117 
154 
71 
Length 
(Feet) 
11,800 
1,355 
36,500 
11,500 
8,400 
13,900 
6,543 
15,300 
4,225 
3,800 
A-11 
---- I 
Characteristics 
of Dam

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Little Blue River 
Lakes
Blue Springs 
Longview 
Pomme de Terre 
Smithville 
Wappapello 
NEBRASKA 
Harlan County 
Papillion Creek and 
Tributaries 
Glenn Cunningham 
(Site 11) 
Standing Bear (Site 
16) 
Ed Zorinsky (Site 18) 
Wehrspann (Site 20) 
Salt Creek & 
Tributaries Olive 
Creek (Site 2) 
Missouri 
Missouri 
Missouri 
Missouri 
Lower 
Mississippi 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Little Blue 
River 
Little Blue 
River 
Pomme de 
Terre River 
Little Platte 
River 
St. Francis 
River 
Republican Riv 
Knight Creek 
Trib of Big 
Papillion Creek 
Boxelder Creek 
S. Papillion 
Creek 
S. Trib. Olive 
Br. Creek 
Kansas City 
Kansas City 
Hermitage 
Smithville 
Wappapello 
Republican 
City 
Omaha 
Omaha 
Omaha 
Omaha 
Kramer 
1988 
1986 
1961 
1982 
1941 
1952 
1975 
1973 
1991 
1991 
1964 
26,600 
46,900 
650,000 
246,500 
613,200 
850,000 
17910 
5,220 
6,910 
1,990 
5,470 
560 
930 
7,820 
7,190 
4,100 
13,600 
391 
137 
418 
203 
174 
F
F
FRW Earth 
Rock 
FRWQ Earth 
RWXA Earth 
&
Rock 
SQRW Earth 
FR Earth 
&
Rock 
FIRWXA 
FQEX 
FRX 
FR 
FR 
FR 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
78 2,500 
120 
155 
95 
109 
107 
67 
70 
64 
59 
45 
1,900 
4,630 
4,200 
2,700 
11,827 
1,940 
1,460 
11,400 
11,810 
3,020 
A-12 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Blue Stem (Site 4) Missouri N. Trib Olive Sprague 1963 10,260 316 FR Earth 57 
Wagon Train (Site 8) 
Stagecoach Site (9) 
Yankee Hill (Site 10) 
Conestoga (Site 12) 
Town Lake (Site 13) 
Pawnee (Site 14) 
Holmes Park Lake 
(Site 17) 
Branched Oak (Site 
18) 
NEW HAMPSHIRE 
Blackwater 
Edward MacDowell 
Franklin Falls 
Hopkinton-Everett 
Otter Brook 
Surry Mountain 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Missouri 
Merrimack 
Merrimack 
Merrimack 
Merrimack 
Merrimack 
Connecticut 
Connecticut 
Br. Creek 
N. Trib. 
Hickman Creek 
S. Trib. 
Hickman Creek 
Cardwell Creek 
Holmes Creek 
Middle Creek 
N. Middle 
Creek 
Antelope Creek 
Oak Creek 
Blackwater 
River 
Nubanusit 
Brook 
Pemigewasset 
Riv 
Contoocook 
River 
Piscataquog 
Riv 
Otter Brook 
Ashuelot River 
Holland 
Hickman 
Denton 
Denton 
Pleasantdale 
Emerald 
Lincoln 
Raymond 
Webster 
West 
Peterborough 
Franklin 
West 
Hopkinton 
East Weare 
Keene 
Keene 
1963 
1964 
1966 
1964 
1966 
1965 
1963 
1968 
1941 
1950 
1943 
1962 
1962 
1958 
1941 
9,280 
6,640 
7,560 
10,640 
8,080 
29,520 
6,510 
97,560 
46,000 
12,800 
154,000 
71,500 
87,500 
18,300 
32,500 
303 
196 
208 
230 
255 
728 
100 
1,780 
NPP 
NPP 
NPP 
200 
120 
85 
265 
FR 
FB 
FR 
FR 
FR 
FR 
FR 
FR 
FRW 
FRW 
FRW 
FRW 
FRW 
FRW 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
FRW Earth 
52 
48 
52 
63 
65 
55 
70 
75 
67 
140 
76 
115 
133 
Length 
(Feet) 
2,760 
1,650 
2,250 
3,100 
3,000 
5,000 
7,700 
5,200 
1,150 
1,030 
1,740 
790 
2,000 
1,288 
86 1,670 
A-13

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
NEVADA 
Mathews Canyon 
Pine Canyon 
NEW MEXICO 
Abiquiu 
Cochiti 
Conchas 
Colorado 
Colorado 
Mathews 
Canyon 
Pine Canyon 
Caliente 
Caliente 
Rio Grande Rio Charma Abiquiu 
Rio Grande Rio Grande Pena Blanca 
Arkansas 
Galisteo 
Jemez Canyon 
Santa Rosa 
Two Rivers: 
Diamond "A" Dam 
Rocky Dam 
NEW YORK 
Almond 
Arkport 
East Sidney 
Mount Morris 
Whitney Point 
Rio Grrande 
Rio Grande 
Pecos 
Pecos 
Pecos 
Susquehanna 
Susquehanna 
Susquehanna 
Genesee 
Susquehanna 
Canadian River 
Galisteo Creek 
Jemez River 
Pecos 
Rio Hondo 
Rocky Arroyoo 
Canacadea Crk 
Canisteo Crk 
Ouleout Crk 
Genesee River 
Otselic River 
Tucumcari 
Santa Fe 
Bernailillo 
Santa Rosa 
Roswell 
Hornell 
Arkport 
Franklin 
Mount Morris 
Whitney Point 
1957 
1957 
1963 
1975 
1939 
1970 
1953 
1979 
1963 
1949 
1940 
1950 
1952 
1942 
6,271 
7,747 
1,192,800 
582,019 
513,900 
89,468 
97,425 
438,364 
163,775 
14,005 
7,900 
33,550 
337,000 
86,440 
NPP 
NPP 
NPP 
1,200 
2,694 
NPP 
NPP 
NPP 
NPP 
162 
NPP 
210 
170 
1,200 
FX Earth 
FX Earth 
FXS Earth 
FRWX Earth 
FI Concrete 
& 
Earth 
FX Earth 
FX Earth 
FIX Earth 
FX Earth 
FRW Earth 
F Earth 
FRW Concrete 
& 
Earth 
FR Concrete 
FRW Earth 
71 800 
92 884 
325 
241 
200 
156 
146.6 
212 
998 
118 
90 
113 
130 
210 
1,540 
28,300 
19,400 
2,820 
780 
1,950 
4,885 
2,940 
1,260 
1,200 
2,010 
1,028 
95 4,900 
A-14 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
NORTH 
CAROLINA 
B. Everett Jordan 
Falls 
W. Kerr Scott 
NORTH DAKOTA 
Baldhill 
Bowman-Haley 
Homme 
Pipestem 
OHIO 
Alum Creek 
Berlin 
Caesar Creek 
Clarence J. Brown 
Deer Creek 
Cape Fear 
Neuse 
Yadkin Pee 
Dee 
Red River of 
the North 
Missouri 
Red River of 
the North 
James River 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
New Hope 
Neuse 
Yadkin 
Sheyenne River 
North Fork, 
Grand River 
South Branch 
of Park River 
Pipestem Creek 
Durham 
Raleigh 
Wilkesboro 
Valley City 
Haley 
Park River 
Jamestown 
Alum Creek Africa 
Mahoning 
Creek 
Caesar Creek 
Deerfield 
Wilmington 
Buck Creek Springfield 
Deer Creek New Holland 
1982 
1983 
1963 
1951 
1967 
1953 
1974 
1975 
1943 
1978 
1974 
1968 
753,500 
335,620 
153,000 
101,365 
92,980 
6,700 
146,880 
134,800 
91,200 
242,200 
63,700 
102,500 
14,300 
11,300 
1,470 
5,430 
1,750 
194 
885 
348 
240 
13,300 
1,010, 
727 
FQRSWX 
FQRSWX 
FARSX 
Earth 
Earth 
Earth 
FARS Earth 
FSRWK Earth 
FARS Earth 
FRWX Earth 
FRSW Concrete 
& 
Earth 
FARSWQ Concrete 
& 
Earth 
FRSQW Earth 
&
Rock 
FQRW Earth 
&
Rock 
FRW Earth 
112 
92 
148 
1,330 
1,915 
1,740 
61 1,650 
79 5,730 
67 
108 
865 
4,000 
93 10,000 
96 5,750 
165 2,750 
72 6,620 
93 3,880 
A-15 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool(NPP) Functions T e (Feet) 
Delaware Ohio Olen Tangy Deleware 1961 273,000 1,325 FRWX Earth 118 
Dillon 
Michael J. Kirwan 
Mosquito Creek 
Muskingum River 
Reservoirs: 
Atwood 
Beach City 
Bolivar 
Charles Mill 
Clendening 
Dover 
Leesville 
Mohawk 
Mohicanville 
Piedmont 
Pleasant Hill 
Senecaville 
Tappan 
Wills Creek 
North Branch, 
Kokosing River Lake 
River 
Licking River 
West Branch, 
Mahoning 
River 
Mosquito Creek 
Indian Fork 
Sugar Creek 
Sandy Creek 
Black Fork 
Brushy Fork 
Tuscarawas 
River 
McGuire Creek 
Walhondoing 
Riv 
Lake Fork 
Stillwater 
Creek 
Clear Fork 
Seneca Fork 
Little Stillwater 
Crk 
Wills Creek 
North Branch 
of Kokosing 
River 
Zanesville 
Newton Falls 
Cortland 
New 
Cumberland 
Beach City 
Bolivar 
Mifflin 
Tippecanoe 
Dover 
Leesville 
Nellie 
Mohicanville 
Piedmont 
Perrysville 
Senecaville 
Tappan 
Conesville 
Fredericktown 
1961 
1966 
1944 
1937 
1937 
1938 
1936 
1937 
1938 
1937 
1937 
1936 
1937 
1938 
1937 
1936 
1937 
1973 
273,000 
78,700 
104,100 
49,700 
71,700 
149,600 
88,000 
54,000 
203,000 
37,400 
285,000 
102,000 
65,000 
87,700 
88,500 
61,60-0 
196,000 
14,900 
1,325 
580 
700 
1,540 
420 
NPP 
1,350 
1,800 
350 
1,000 
NPP 
NPP 
2,270 
850 
3,550 
2,350 
900 
98 
FRWX Earth 
FAQRSW Earth 
FARSWQ Earth 
FRX Earth 
FRX Earth 
FR Earth 
FRX Earth 
FRX Earth 
FRX Concrete 
FRX Earth 
FR Earth 
FR Earth 
FRX Earth 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Earth 
Earth 
Earth 
FRX Earth 
FRW Earth 
118 
83 
Length 
(Feet) 
1,400 
1,400 
9,900 
47 5,650 
65 3,700 
64 
87 
48 
64 
83 
74 
111 
46 
56 
113 
45 
52 
87 
71 
5,600 
6,300 
1,390 
950 
824 
1,694 
2,330 
1,220 
1,750 
775 
2,350 
1,550 
1,950 
1,400 
A-16 
FRX 
FRSX 
FRX

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Paint Creek Ohio Paint Creek New 1972 145,000 710 FRSQW Earth 118 
Petersburg & 
Tom Jenkins 
West Fork Mill Creek 
William H. Harsha 
OKLAHOMA 
Arcadia 
Birch 
Canton 
Copan 
Fort Supply 
Great Salt Plains 
Heyburn 
Hugo 
Hulah 
Kaw 
Oologah 
Optima 
Pine Creek 
Sardis 
Skiatook 
Waurika 
East Branch, 
Sunday Creek 
Mill Creek 
Little Miami 
River 
Deep Fork 
River 
Birch Creek 
North Canadian 
River 
Little Caney 
River 
Wolf Creek 
Salt Fork of the 
Arkansas River 
Polecat Creek 
Kiamichi River 
Caney River 
Arkansas River 
Verdigris River 
North Canadian 
River 
Little River 
Jackfork Creek 
Hominy Creek 
Beaver Creek 
Gloucester 
Mt Healthy 
Williamsburg 
Edmond 
Barnsdall 
Canton 
Copan 
Fort Supply 
Cherokee 
Sapulpa 
Hugo 
Bartlesville 
Ponca City 
Oologah 
Hardesty 
Wright City 
Clayton 
Skiatook 
Waurika 
1951 
1952 
1978 
1986 
1977 
1948 
1983 
1942 
1941 
1950 
1974 
1951 
1976 
1963 
1978 
1969 
1982 
1984 
1977 
26,900 
11,380 
284,500 
92,010 
59,030 
383,800 
227,700 
100,700 
271,400 
55,395 
955,200 
289,000 
1,327,160 
1,559,270 
229,500 
465,780 
396,900 
500,700 
325,680 
394 
200 
18,760 
1,820 
1,145 
3,800 
4,850 
1,820 
8,690 
880 
13,140 
3,570 
16,750 
31,040 
5,340 
3,750 
13,610 
10,190 
10,100 
Rock 
FRSWX Concrete 
FRX Earth 
FRSQW Earth 
FSR Earth 
FSQRW Earth 
FSI Earth 
FSQRW Earth 
FSX Earth 
FRWX Earth 
FRWXS 
FSQRW 
FSAX 
FSQRW 
FSNRW 
FSRW 
FSQWR 
FSRW 
FSQRW 
FISQWR 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
Earth 
84 
100 
200 
102 
97 
68 
Length 
(Feet) 
700 
944 
1,100 
1,450 
5,250 
3,190 
15,140 
73 7,730 
85 
68 
89 
101 
94 
125 
137 
120 
124 
101 
143 
106 
11,865 
6,010 
2,920 
10,200 
5,200 
9,466 
4,000 
15,200 
7,712 
14,138 
3,590 
16,637 
A-17 
Ohio 
Ohio 
Ohio 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Red 
Arkansas 
Arkansas 
Arkansas 
Arkansas 
Red 
Red 
Arkansas 
Red

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No PrHeight 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Wister Arkansas Poteau River Wister 1949 427,480 7,333 FSAX Earth 99 
OREGON 
Applegate 
Blue River 
Cottage Grove 
Dorena 
Fall Creek 
Fern Ridge 
Willow Creek 
PENNSYLVANIA 
Alvin R. Bush 
Rogue 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Columbia 
Susquehanna 
Applegate 
River 
Blue River 
Coast Fork, 
Willamette 
River 
Row River 
Middle Fork, 
Willamette 
River 
Long Tom 
River 
Willow Creek 
Kettle Creek 
Medford 
Blue River 
Cottage Grv 
Cottage Grv 
Eugene 
Eugene 
Heppner 
Renovo 
1981 
1968 
1942 
1949 
1965 
1941 
1983 
1962 
82,000 
85,000 
30,060 
70,500 
115,000 
110,000 
13,250 
75,000 
988 
975 
1,155 
1,885 
1,865 
10,305 
96 
160 
AFIQRSW Gravel 
Embankment 
FINR Earth 
FINR Concrete 
& 
Earth 
FINR Concrete 
& 
Earth 
FINR Rockfill 
& 
Concrete 
FINR Rockfill 
& 
Concrete 
FRN Roller 
Compacted 
Concrete 
FRWQ Earth 
& Rock 
242 
319 
114 
145 
193 
Length 
(Feet) 
5,700 
1,300 
1,329 
2,110 
3,352 
5,100 
49 6,624 
160 
165 
1,780 
1,350 
A-18

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Name 
Aylesworth Creek 
Beltzville 
Blue Marsh 
Conemaugh 
Cowanesque 
Crooked Creek 
River Basin 
Susquehanna 
Delaware 
Delaware 
Ohio 
Susquehanna 
Ohio 
Stream 
Aylesworth 
Creek 
Pohopoco 
Creek 
Tulpehocken 
Creek 
Conemaugh 
River 
Cowanesque 
River 
Crooked Creek 
Community 
in Vicinity 
Archbald 
Lehighton 
Reading 
Saltsburg 
Lawrenceville 
Ford City 
Curwensville 
East Branch, Clarion 
River 
Foster Joseph Sayers 
Francis E. Walter 
(Bear Creek) 
Susquehanna 
Ohio 
Susquehanna 
Delaware 
West Branch, 
Susquehanna 
River 
East Branch, 
Clarion River 
Bald Eagle 
Creek 
Lehigh River 
Curwensville 
Wilcox 
Blanchard 
White Haven 
1965 
1952 
1969 
1961 
124,200 
84,300 
99,000 
109,610 
790 
90 
1,730 
80 
FRS Earth 
FARQW 
FRWQ 
FRW 
Earth 
Earth 
Earth 
& Rock 
131 2,850 
184 
100 
234 
1,725 
6,835 
3,000 
A-19 
Cal. Year 
Placed in 
Useful OP 
1970 
1971 
1978 
1952 
1980 
1940 
Total 
Storage 
(Acre-Ft.) 
1,700 
68,250 
50,010 
262,700 
89,000 
93,900 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
64 
947 
960 
800 
1085 
350 
Project 
Functions 
FRQ 
FQRSWA 
FAQRSW 
FW 
FRSQW 
FRW 
Type 
Earth 
&
Rock 
Earth 
&
Rock 
Earth 
&
Rock 
Concrete 
&
Earth 
Earth 
&
Rock 
Earth 
Height 
(Feet) 
90 
170 
98 
137 
151 
143 
Length 
(Feet) 
1,270 
4,560 
1,775 
1,265 
3,100 
1,480 
Characteristics 
of Dam 
0 .

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Name 
Gen. Edgar Jadwin 
Hammond Lake 
Indian Rock 
Kinzua 
Loyalhanna 
Mahoning Creek 
Prompton 
Raystown 
Shenango 
Stillwater 
Tioga Lake 
River Basin 
Delaware 
Susquehanna 
Susquehanna 
Ohio 
Ohio 
Ohio 
Delaware 
Susquehanna 
Ohio 
Susquehanna 
Susquehanna 
Stream 
Dyberry Creek 
Crooked Creek 
Codorus Creek 
Allegheny 
River 
Loyalhanna 
Creek 
Mahoning Crk 
West Branch, 
Lackawaxen 
River 
Raystown 
Branch, Juniata 
River 
Shenango River 
Lackawanna 
River 
Tioga River 
Community 
in Vicinity 
Honesdale 
Tioga 
York 
Warren 
Saltsburg 
New 
Bethlehem 
Honesdale 
Huntingdon 
Sharpsville 
Uniondale 
Tioga 
Cal. Year 
Placed in 
Useful OP 
1960 
1978 
1942 
1965 
1942 
1941 
1960 
1973 
1966 
1960 
1978 
Total 
Storage 
(Acre-Ft.) 
24,500 
63,000 
28,000 
1,180,000 
95,300 
74,200 
52,000 
762,000 
191,400 
12,000 
62,000 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
NPP 
680 
NPP 
1,900 
210 
170 
290 
8,300 
1,910 
85 
470 
Project 
Functions 
F 
FRQW 
F 
PFAQRW 
FRW 
FRW 
FRW 
Type 
Earth 
Earth 
&
Rock 
Earth 
&
Rock 
Concrete 
& 
Earth 
Concrete 
& 
Earth 
Concrete 
Earth 
FRWPQ Earth 
&
Rock 
FAQRW Concrete 
FS Earth 
FRQW Earth 
& Rock 
A-20 
Height 
(Feet) 
109 
122 
83 
1'77 
114 
162 
140 
225 
68 
77 
140 
Length 
(Feet) 
1,255 
6,450 
1,000 
1,877 
960 
926 
1,200 
1,700 
720 
1,700 
2,710 
Characteristics 
of Dam 
w

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Tionesta 
Union City 
Woodcock Creek 
Youghiogheny River 
SOUTH DAKOTA 
Cold Brook 
Cottonwood Springs 
Lake Traverse: 
Reservation Dam 
White Rock 
TEXAS 
Addicks 
Aquilla 
Barker 
Belton 
Benbrook 
Canyon 
Ferrells Bridge Dam- 
Lake O' the Pines 
Granger Dam and 
Lake 
Ohio 
Ohio 
Ohio 
Ohio 
Missouri 
Missouri 
Red River of 
the North 
Red River of 
the North 
San Jacinto 
Brazos 
San Jacinto 
Brazos 
Trinity 
Guadalupe 
Red 
Brazos 
Tionesta Creek 
French Creek 
French Creek 
Youghiogheny 
Riv 
Cold Brook 
Cottonwood 
Springs Creek 
Bois de Sioux 
River 
Bois de Sioux 
River 
South Mayde 
Crk 
Aquilla Creek 
Buffalo Bayou 
Leon River 
Clear Fork, 
Trinity River 
Guadalupe 
River 
Cypress Creek 
San Gabriel 
River 
Tionesta 
Union City 
Meadville 
Confluence 
Hot Springs 
Hot Springs 
Wheaton 
Wheaton 
Addicks 
Hillsboro 
Barker 
Belton 
Fort Worth 
New 
Braunfels 
Jefferson 
Granger 
1940 
1970 
1973 
1943 
1953 
1970 
1941 
1941 
1948 
1983 
1945 
1954 
1952 
1964 
1959 
1980 
133,400 
47,640 
20,000 
254,000 
7,200 
8,385 
177,000 
96,000 
204,500 
146,000 
207,000 
1,097,600 
258,600 
480 
NPP 
118 
450 
36 
41 
FRW 
F 
FQRA 
FARWQ 
Earth 
Earth 
Earth 
Earth 
FRWX Earth 
FRWX Earth 
10,925 FRX 
3,850 FRX 
NPP 
3,280 
NPP 
12,300 
3,770 
366,400 346,400 
842,100 
244,200 
18,700 
4,400 
Rolled 
Earth 
Rolled 
Earth 
FX Earth 
FSX 
FX 
FIRSX 
Earth 
Earth 
Earth 
FNRXA Earth 
FRSX Earth 
FRS Earth 
FRSWX Earth 
154 
88 
90 
184 
127 
123 
1,050 
1,420 
4,650 
1,610 
925 
1,190 
14 9,100 
16 14,400 
49 61,166 
104.5 
27 
192 
130 
224 
11,890 
72,844 
5,524 
9,130 
4,410 
97 10,600 
115 16,320 
A-21 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No PrHeight 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
Grapevine 
Hords Creek 
Joe Pool 
Jim Chapman Lake 
Lavon 
Lewisville 
Navarro Mills 
North San Gabriel 
Dam, Lake 
Georgetown 
O.C. Fisher 
Pat Mayse 
Proctor 
Ray Roberts 
Somerville 
Stillhouse Hollow 
Waco 
Wright Patman 
UTAH 
Little Dell Lake 
Trinity 
Colorado 
Trrinity 
Red 
Trinity 
Trinity 
Trinity 
Brazos 
Colorado 
Red 
Brazos 
Trinity 
Brazos 
Brazos 
Brazos 
Red 
Jordan River 
Denton Creek 
Hords Creek 
Mountain 
Creek 
Sulphur River 
East Fork, 
Elm Fork, 
Trinity River 
Richland Creek 
North Fork, 
San Gabriel 
River 
North Concho 
River 
Sanders Creek 
Leon River 
Elm Fork 
Yegua Creek 
Lampasas River 
Bosque River 
Sulphur River 
Dell Creek 
Grapevine 
Coleman 
Grand Prairie 
Cooper 
Fort Worth 
Trinity River 
Lewisville 
Corsicana 
Georgetown 
San Angelo 
Arthur City 
Comanche 
Denton 
Somerville 
Belton 
Waco 
Texarkana 
Salt Lake City 
1952 
1948 
1986 
1991 
1953 
1954 
1962 
1980 
1952 
1967 
1963 
1987 
1967 
1968 
1965 
425,500 
25,310 
304,000 
441,200 
748,200 
989,700 
212,200 
130,800 
396,400 
182,940 
374,200 
1,064,600 
507,500 
630,400 
726,400 
7,280 
510 
7,470 
19,305 
21,400 
23,280 
5,070 
1,310 
5,440 
5,940 
4,610 
29,350 
11,460 
6,430 
7,270 
1957 2,654,300 20,300 
1993 20,500 1,000 
FNRSXA 
FARSX 
FRSX 
Earth 
Earth 
Earth 
FRSWX Earth 
FRSW Earth 
FRSX Earth 
FRSX Earth 
FRSWX Rock 
FRSX Earth 
FRSW 
FRSX 
FRSX 
FRSX 
FRSX 
Earth 
Earth 
Earth 
Earth 
Earth 
FRSX Concrete 
& 
Earth 
FRSX Earth 
FS Earth 
137 
91 
109 
12,850 
6,800 
22,360 
79 28,070 
81 19,483 
125 
82 
164 
128 
96 
86 
109 
80 
200 
145 
100 
224 
32,888 
6,700 
6,700 
40,885 
7,080 
13,460 
14,965 
26,175 
15,624 
24,618 
18,500 
1,700 
A-22 
Length 
(Feet)

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
VERMONT 
Ball Mountain 
North Hartland 
North Springfield 
Townshend 
Union Village 
VIRGINIA 
John W. Flannagan 
Gathright Dam & 
Lake Moomaw 
Connecticut West River 
Connecticut Ottauguechee 
River 
Jamaica 
North 
Hartland 
Connecticut Black River Springfield 
Connecticut West River 
Connecticut Ompompanoosuc 
River 
Ohio 
James 
Pound River 
Jackson 
Townshend 
Union Village 
Haysi 
Alleghany 
1961 
1960 
1960 
1961 
1950 
1963 
1979 
54,600 
71,420 
51,067 
33,700 
38,000 
145,700 
123,739 
75 
220 
290 
100 
NPP 
310 
2,532 
FRW Concrete 
&
Earth 
FRW Concrete 
&
Earth 
FRW Concrete 
&
Earth 
FRW Concrete 
&
Earth 
FRW Concrete 
&
Earth 
FAWR Concrete 
& 
Earth 
FQR Earth 
& Rock 
A-23 
Length 
(Feet) 
265 
185 
120 
133 
170 
250 
257 
915 
1,520 
2,940 
1,700 
1,100 
960 
1,172

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No PrHeight 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
North Fork of Pound Ohio North Fork of Pound 1968 11,300 349 FRSW Earth 122 
River Pound &
Rock 
WASHINGTON 
Howard A. Hanson 
Mill Creek 
Mud Mountain 
WEST VIRGINIA 
Beech Fork 
Bluestone 
Burnsville 
East Lynn 
R. D. Bailey 
Stonewall Jackson 
Lake 
Summersville Lake 
Sutton 
Tygart River 
Green 
Columbia 
Puyallup 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Ohio 
Green River 
Mill Creek 
White River 
Beech Fork 
New River 
Little Kanawha 
Twelvepole 
Creek 
Guyandotte 
River 
West Fork 
Gauley River 
Elk River 
Tygart River 
Kanaskat 
Walla Walla 
Enumclaw 
Lavalette 
Hinton 
Burnsville 
East Lynn 
Justice 
Weston 
Summersville 
Sutton 
Grafton 
1961 
1942 
1953 
1977 
1952 
1977 
1970 
1979 
1988 
1965 
1960 
1938 
106,000 
8,300 
106,000 
37,540 
631,000 
65,400 
82,500 
203,700 
74,650 
413,800 
265,300 
287,700 
1,600 
225 
NPP 
450 
1,800 
550 
823 
440 
360 
407 
270 
620 
FAS Rock 
FR Earth 
FR Rock 
FRW Earth 
FRWX Concrete 
FQRW Earth 
&
Rock 
FQRW Earth 
&
Rock 
FQRW Earth 
&
Rock 
FAQAS Concrete 
FANR Rock 
FNAR Concrete 
FNAR Concrete 
235 
125 
427 
86 
180 
500 
3,200 
810 
1,080 
2,048 
89 1,400 
122 
310 
95 
390 
220 
230 
650 
1,397 
620 
2,280 
1,921 
1,921 
A-24 
Length 
(Feet) 
600

APPENDIX A 
Flood Control Reservoirs Operable September 30, 1999 
Characteristics of Dam 
Permanent 
Pool 
Cal. Year Total (Acreage) 
Community Placed in Storage or No Project Height 
Name River Basin Stream in Vicinity Useful OP (Acre-Ft.) Pool (NPP) Functions Type (Feet) 
WISCONISIN 
Eau Galle Chippewa Eau Galle Spring Valley 1969 43,600 153 FR Earth 122 
Length 
(Feet) 
1,800 
KEY FOR PROJECT FUNCTIONS: 
A - Low Flow Augmentation 
D - Debris Control 
F - Flood Control 
I - Irrigation 
N - Navigation 
P - Power 
Q - Water Quality Control 
R - Public Recreation (Annual Attendance exceeding 5,000) 
S - Water Supply 
W - Fish and Wildlife (Federal or State) 
X - Water Conservation and Sedimentation 
A-25

APPENDIX A 
Flood Control Reservoirs Constructed or Contributed to by Corps of Engineers 
But Operated by Others September 30, 1999 
Name 
CALIFORNIA 
Big Dry Creek 
Camanche 
Cherry Valley 
Del Valle 
Eaton Wash 
New Bullards Bar 
New Don Pedro 
New Exchequer 
Oroville 
Tahchevah Creek 
COLORADO 
Pinon Canyon 
River Basin Stream 
San Joaquin Big Dry 
Creek 
San Joaquin Mokelumne 
River 
Tuolumne Cherry Creek 
Alameda 
Rio Hondo 
Sacramento 
San Joaquin 
San Joaquin 
Sacramento 
Whitewater 
Colorado 
Arroyo Del 
Valle 
Eaton Wash 
Yuba River 
Tuolumne 
River 
Merced River 
Feather River 
Tahchevah 
Creek 
Pinon 
Canyon 
Arroyo 
Community 
in Vicinity 
Fresno 
Clements 
Sonora' 
Livermore 
Pasadena 
Marysville 
Modesto 
Merced 
Oroville 
Palm 
Springs 
Trinidad 
Cal. Year 
Placed in 
Useful 
OP 
1948 
Total 
Storage 
(Acre-Ft.) 
16,250 
1963 431,500 
1956 268,000 
1968 
1937 
1968 
1970 
1966 
1964 
1965 
1954 
77,000 
960 
960,000 
2,030,000 
1,026,000 
3,539,000 
960 
4,350 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
NPP 
NPP 
475 
200 
NPP 
1,910 
3,520 
1,900 
5,838 
NPP 
NPP 
Project 
Functions 
Heigh 
Type t 
(Feet) 
F Earth 
FRS Earth & 
Rock 
FS Earth & 
Rock 
FRS Earth 
F 
FIRPW 
FISP 
FIR 
FIRSW 
F 
Earth 
Concrete 
Earth & 
Rock 
Rock 
Earth 
Earth 
Length 
(Feet) 
40 20,038 
171 2,450 
315 2,500 
223 
82 
645 
565 
880 
1,795 
2,323 
1,920 
480 1,200 
770 6,850 
42 3,610 
FW Earth 
CONNECTICUT 
East Branch 
Hall Meadow 
Brook 
Housatonic 
Housatonic 
East Branch, 
Naugatuck 
River 
Hall Meadow 
Brook 
Torrington 
Torrington 
1964 
1962 
4,350 
8,620 
NPP 
NPP 
FR Earth 
F Earth & 
Rock 
A-26

APPENDIX A 
Flood Control Reservoirs Constructed or Contributed to by Corps of Engineers 
But Operated by Others September 30, 1999 
Name 
Mad River 
Sucker Brook 
HAWAII 
Kaneohe-Kailua 
River Basin 
Connecticut 
Connecticut 
Kaneohe 
Stream 
Community 
in Vicinity 
Mad River Winchester 
Sucker Brook Winchester 
Kaneohe 
Stream 
Kaneohe 
Cal. Year 
Placed in 
Useful 
OP 
1963 
1970 
1981 
Total 
Storage 
(Acre-Ft.) 
9,700 
1,480 
3,800 FR Earth 
IDAHO 
Ririe Upper Snake 
MARYLAND 
Savage River 
MISSOURI 
Bear Creek 
NEW MEXICO 
Cuchillo Negro 
NEW YORK 
Onandaga 
Potomac 
Upper 
Mississippi 
Rio Grande 
Oswego 
Willow Creek Idaho Falls 
Savage 
Bear Creek 
Cuchillo 
Creek 
Onondaga 
Creek 
Westernport 
Hannibal 
Truth or 
Consequence 
Syracuse 
1975 100,500 
1952 
1962 
1991 
1949 
20,000 
8,700 
13,500 
18.200 
364 
360 
NPP 
NPP 
NPP 
FIR Earth 
FRSW Earth & 
Rock 
F Earth 
F Roller 
Compacted 
Concrete 
F Earth 
A-27 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
10 
NPP 
26 
Project 
Functions 
FR 
F 
Heigh 
t 
(Feet) 
Length 
Type (Feet) 
Earth 
Earth 
- _ 
i

APPENDIX A 
Flood Control Reservoirs Constructed or Contributed to by Corps of Engineers 
But Operated by Others September 30, 1999 
Heigh 
Type t 
(Feet) 
OKLAHOMA 
Altus 
Grand Lake 0' the 
Cherokees 
Lake Hudson 
TEXAS 
Lake Kemp 
UTAH 
Big Wash 
VERMONT 
East Barre 
Waterbury 
Wrightsville 
WASHINGTON 
Wynoochee 
Red 
Arkansas 
Arkansas 
Red 
Beaver 
Winooski 
Winooski 
Winooski 
Chehalis 
North Fork of 
the Red River 
Grand 
(Neosho) 
River 
Grand 
(Neosho) 
River 
Wichita 
River 
Big Wash 
Jail Branch 
Waterbury 
North Branch 
Wynoochee 
River 
Altus 
Disney 
Locust 
Grove 
Wichita 
Falls 
Milford 
East Barre 
Waterbury 
Wrightsville 
Montesano 
1948 152,429 6,260 
1941 2,197,000 46,5006 
1964 444,600 10,9006 
1972 502,900 15,590 
1961 
1938 
1938 
1938 
1972 
1,200 
12,050 
64,700 
20,300 
70,000 
NPP 
NPP 
890 
570 
1,150 
FIS Concrete 
FRP Concrete 
FRP Concrete 
& 
Earth 
FIS Earth 
F Earth 
F 
FRP 
FR 
Earth 
Earth 
Earth 
FSARI Concrete 
& 
Earth 
90 1,104 
147 6,565 
90 4,494 
115 8,890 
34 2,814 
65 
158 
115 
1,460 
1,800 
1,525 
177 1,700 
A-28 
Name River Basin Stream 
Community 
in Vicinity 
Cal. Year 
Placed in 
Useful 
OP 
Permanent 
Pool 
(Acreage) 
or No 
Pool (NPP) 
Total 
Storage 
(Acre-Ft.) 
Project 
Functions 
Length 
(Feet)

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project Operation Completion NatureofProject 
Aberdeen & Vicinity, SD (Sec 205) 
Aitkin County, CSAH 10, MN 
Alenaio Stream, Hawaii, HI 
Alii Drive, Hawaii, HI (Sec 14) 
Aloha-Rigolette Area, LA 
Alton to Gale Levee System, Mississippi River, IL and MO 
Aquashicola Creek (Borough of Palmerton) 
Arkansas River at Riverfront Park, North Little Rock, AR 
Arizona Flood Warning, AZ (Sec 205) 
Aroostook River, Fort Fairfield, ME (Sec 205) 
Ascalmore-Tippo Items, MS 
Ashland Road Bridge, Four Mile Creek, NE (Sec 14) 
Atchafalaya Basin, LA 
Atchafalaya Basin Floodway System, CA 
B. Everett Jordan Dam and Lake, NC 
Badger Creek near Browning, Glacier County, MT (Sec 14) 
Batesville Sewage Lagoon 
Batesville Water Tower, Batesville, AR (Sec 14) 
Battle Mountain, NV (Sec 205) 
Bayou Des Glaises, LA 
Bayview Court, Bat St Louis, MS 
Beals Creek, Big Spring, TX 
Beaver Creek at Slough Hollow Road, MO (Sec 14) 
1995 
1999 
1995 
1999 
1996 
1983 
1998 
1998 
1998 
1999 
1984 
1996 
1928 
1985 
1967 
1993 
1990 
1998 
1998 
1938 
1995 
1993 
1998 
1997 
1999 
1998 
(2) 
1982 
1994 
1990 
1999 
1939 
1998 
2001 
2000 
1997 
2000 
1999 
Indefinite 
1999 
1999 
2001 
2001 
1987 
1996 
2021 
TBD 
1999 
1994 
1990 
1999 
2000 
1939 
1996 
1998 
2000 
Local Protection 
Streambank Protection 
Local Protection 
Shoreline Protection 
Interior Drainage 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Floodway and Levees 
FC, Rec, and Public Access 
Reservoir 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Interior Drainage 
Local Protection 
Local Protection 
Streambank Protection 
B-1

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
Fiscal Year Placed in 
Started Useful 
Project Operation 
Beech Fork, Bardstown, KY (Sec 205) 
Berrien County, Lake Charter Township, MI (Sec 14) 
Bethel Bank Stabilization, AK 
Big Tujunga Wash, CA (Sec 14) 
Black River, Poplar Bluff MO (Sec 205) 
Black Warrior River, Northport Levee, AL 
Blue River Channel, Kansas City, MO 
Brays Bayou (Houston), TX 
Broad Top Region, PA (Wood-Broad Top-Wells) 
Brush Creek, Jeanette, PA (Sec 14) 
Buffalo Bayou and Tributaries, TX 
Buffalo Creek, Freeport, PA (Sec 14) 
Buford Trenton Irrigation District, ND 
Cache Creek Settling Basin, CA 
Cape Girardeau-Jackson, MO 
Cato Spring, Fayetteville, AR (Sec 205) 
Cedar Point Seawall Bay St. Louis, MO 
Cedar River, Renton, WA (Sec 205) 
Central and Southern, FL 
Chaska, MN 
Cheat River Basin, WV FWS 
Chena River Lakes, AK 
Chicago Shoreline, IL 
City Ditch, Brevoort, IN (Sec 205) 
Choctawhatchee/Pea Rivers, Alabama and Florida 
1998 
1998 
1992 
1997 
1997 
1998 
1984 
1998 
1997 
1994 
1956 
1994 
1998 
1990 
1992 
1996 
1998 
1998 
1950 
1988 
1997 
1973 
1997 
1998 
1995 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
2000 
1999 
1997 
2000 
1999 
1999 
2003 
2013 
2000 
1998 
Indefinite 
1998 
2008 
1995 
2002 
1996 
1999 
1999 
Indefinite 
1998 
1998 
1989 
2005 
2000 
1996 
B-2 
Nature of Project 
Local Protection 
Shoreline Protection 
Emergency Bank Stabilization 
Bank Protection 
Local Protection 
Local Protection Levee 
Local Protection 
Local Protection 
Water Supply 
Streambank Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Reservoirs and Levee 
Local Protection 
Interior Drainage 
Flood Wamrning 
1998 
1996 
1979

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
/ . 0 Project Operation .xAOYNmM, piMeVo A n 
Choctawhatchee/Pea Rivers, Elba/Geneva Levees, AL 
Chubb Runn, Franklin, PA (Sec 14) 
Clear Creek, TX 
Clifton, AZ 
Clinton Wastewater Treatment Plant, Clinton, NC (Sec 205) 
Colorado River at Grand Junction, CO (Sec 205) 
Comite River Diversion, LA 
Conneaut Lake, PA (Sec 14) 
Connellsville, PA (Sec 205) 
Connoquenessing Creek, Marion Twp, PA (Sec 205) 
Connoquenessing Creek, N. Swickley Twp, PA (Sec 205) 
Corte Madera Creek, CA 
County Road 62, Santa Fe, NM (Sec 14) 
Cowanesque Lake, PA 
Coyote and Beressa Creeks, CA 
Crooked Creek, Harrison, AR 
Dade County, FL 
Danville, VA (Sec 205) 
Dearbom River near Wolf Creek Lewis & Clark County, MT 
(Sec 14) 
Delaware River, Water Intake, Kickapoo Reservation, KS (Secl4) 
Delaware River Vicinity of Port Jervis, NY 
Demonstration Erosion Control, MS 
Deshee River, Brevoort, IN (Sec 205) 
Des Moines Recreational River and Greenbelt, IA 
1997 
1995 
1990 
1994 
1997 
1994 
1999 
1998 
2008 
1998 
2000 
1997 
2010 
1998 
1998 
1998 
1998 
Indefinite 
1995 
1990 
Indefinite 
1996 
2038 
1999 
1994 
2001 
1996 
Indefinite 
2000 
Indefinite 
Nature of Project 
Local Protection Levees 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Water Supply Modification 
Local Protection 
Local Protection, channel improvement 
Shore Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection (Ice Diversion) 
Local Protection 
Interior Drainage 
Recreation 
B-3 
om 
1998 
1995 
1988 
1994 
1999 
1994 
1999 
1996 
1996 
1996 
1997 
1966 
1994 
1987 
1994 
1994 
1975 
1996 
1994 
1996 
1995 
1985 
1998 
1989

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
Fiscal Year 
Started 
m Project 
Dry Creek (Warm Springs) Lake & Channel, CA 
East Nishnabotna River, Page County Bridge, IA (Sec 14) 
East St Louis and Vicinity, IL - Rehabilitation 
Eight Mile Creek, AR 
El Paso, TX 
Elk Creek Lake, OR 
Emmonak Shoreline Erosion, AK (Sec 14) 
Escanaba Delta County, MI (Sec 14) 
Fairfield Vicinity Streams, CA 
Falls Lake, NC 
Flathead River, MT 
Flatrock River, Rushville, IN (Sec 205) 
Fort Wayne and Vicinity, IN 
Four Rivers Basin, FL 
Fourche Bayou, Vicinity of Little Rock, AR 
French Creek, Wattsburg, PA (Sec 14) 
Gallatin River, (1-90), Gallatin County, MT 
Grank Forks, ND-East Grand Forks, MN 
Grand Prairie Region and Bayou Meto Basin, AR 
Grand River, Chariton County, MO (Sec 14) 
Gray's Creek, TN (Sec 14) 
Great Bend,KS 
Great Miami River, Fairfield, OH (Sec 14) 
Greenbrier River, WV, Flood Waming System 
Greenwood Bendway, Site 3, MS 
Placed in 
Useful 
Operation 
1983 
1993 
1973 
1999 
1993 
1983 
1986 
1996 
1992 
1998 
1999 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
1996 
1994 
2002 
2003 
2002 
Indefinite 
1999 
2001 
1993 
2000 
1999 
2000 
2001 
1996 
2002 
1998 
1992 
2006 
2005 
2000 
1998 
1994 
2000 
1999 
1988 
B-4 
I I I 
1967 
1992 
1988 
1986 
1971 
1971 
1998 
1999 
1985 
1973 
1998 
1998 
1994 
1966 
1987 
1996 
1991 
1999 
1999 
1998 
1998 
1988 
1999 
1998 
1986 
Nature of Project 
Reservoir 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Reservoir 
Shoreline Protection 
Streambank Protection 
Local Protection 
Reservoir 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Water Supply 
Streambank Protection 
Streambank Protection 
Local Protection 
Streambank Protection 
Local Protection 
Riverbank Protection

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
I 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project Operation ompieuon 
Greenwood Bendway, Site 4, MS 
Greenwood Bendway, Site 5, MS 
Guadalupe River, CA 
Guntersville Lake, Guntersville, AL 
Halstead,KS 
Hamilton County Streambank Stabilization, TN 
Hamlet City Lake, NC (Sec 602) 
Hancock County Seawall, Hancock County, MS 
Hargus Creek, Circleville, OH (Sec 205) 
Hatchie River, Alcora & Tippah Co, MS 
Helena & Vicinity, AR 
Highway 75, Embudo Creek, Dixon, NM (Sec 14) 
Highway 119, Derry, LA (Sec 14) 
Highway 218, Grand Chenier, LA (Sec 14) 
Highway 495, Natchitoches,Paish, LA (Sec 14) 
Highway 69 at Black River, AR (Sec 14) 
Hodges Village Dam, MA - Rehabilitation 
Holbrook, AZ 
Holes Creek, OH 
Homme Lake and Dam, ND 
Hoopersville Road, MD (Sec 14) 
Hom Lake Creek, MS 
Houston, MN (Sec 205) 
Howell Evansville Wetland, IN (Sec 1135) 
Huntington Sewer Main, WV (Sec 14) 
1987 
1987 
1992 
1988 
1991 
1999 
1998 
1995 
1996 
1997 
1997 
1995 
1994 
1995 
1994 
1999 
1997 
1995 
1998 
1995 
1993 
1993 
1995 
1999 
1999 
1988 
1988 
2001 
1989 
1995 
2001 
1999 
1995 
1997 
1999 
2001 
1995 
1994 
1996 
1994 
1999 
2000 
19978 
2000 
2002 
1994 
1998 
1999 
2000 
1999 
Nature of Project 
Riverbank Protection 
Riverbank Protection 
Local Protection 
Streambank Protection 
Local Protection 
Streambank Protection 
Lake Program 
Shorline Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection; Complete 
Bank Stabilization 
Streambank Protection; Complete 
Streambank Protection 
Reservoir 
Local Protection 
Local Protection 
Dam Safety Assurances 
Shoreline Protection 
Local Protection 
Local Protection 
Ecosystem Restoration 
Streambank Protection 
B-5 
mlwlm 
1998 
1997 
1998 
1995 
1994 
1996 
1994 
1999 
1994 
1994 
1999

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
m 
Fiscal Year Placed in 
Started Useful 
Operation 
1994 1996 
1995 1996 
Project 
Jackson County Hwy 2318, MN 
Jacksonport, White River, AR 
Jackson Twp, Butler Co, PA (Sec 205) 
James R Olin Flood Control Project, VA 
James River Road (CR213), SD (Sec 14) 
Jim Chapman Lake, TX 
Joe Pool Lake, TX 
Kahawainui Stream, Oahu, HI (Sec 205) 
Kahoma Stream, Maui, HI 
Kanawha Ave, So Charleston, WV (Sec 14) 
Kawainui Marsh, Oahu HI (Sec 205) 
Kings Creek, Tupelo, MS 
Klamath River, Klamath Glen Levee, CA 1996 
Lake Ashtabula-Baldhill Dam, ND 
Lake Elsinore, CA (Sec 205) 
Lake Pontchartrain, LA 
Lake Wichita, Holliday Creek, TX 
Larose to Golden Meadow, LA 
Lesueur River, CSAH 28, Blue Earth County, MN 
Levisa & Tug Forks of the Big Sandy River & Cumberland River, 
KY, WV & VA 
Little Calumet River, IN 
Little Dell Lake, UT 
Little Missouri River, E. River Road, Medora, ND (Secl4) 
Liverpool, IL (Sec 205) 
1991 
1986 
1990 
1990 
1999 
1997 
1997 
1993 
1999 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
1996 
1997 
1998 
1998 
2000 
1994 
1994 
1990 
1990 
1999 
1997 
1999 
1997 
2000 
1995 
2013 
1995 
2007 
1999 
Indefinite 
2008 
1996 
1999 
1998 
B-6 
m 
. Nature of Project 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Emergency Streambank Protection 
Reservoir, channel improvement 
Reservoir 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Dam Safety/Major Rehabilitation 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Reservoirs 
Emergency Streambank Protection 
Local Protection 
1997 
1994 
1999 
1958 
1975 
1989 
1986 
1999 
1995 
1996 
1996 
1994 
1993 
1967 
1987 
1972 
1999 
1981 
1990 
1985 
1999 
1997

m 
APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project 
Lock Haven, PA 
Logan Creek, Pender, NE (Sec 205) 
Long Branch Lake, MO 
Loosahatchie, Memphis, TN (Sec 14) 
Los Angeles County Drainage Area (LACDA), CA 
Louisiana State Penitentiary Levee, LA 
Loves Park, IL 
Lower San Joaquin River, CA (Snagging and Clearing) 
Madrid Fire Station, Madrid, MO (Sec 14) 
Magpie Creek & Don Julio, CA (Sec 205) 
Mahoning River, Struthers, OH (Sec 205) 
Mahoning River, Warren, OH (Sec 14) 
Maple Creek E. Fork, Howells, NE (Sec 205) 
Marshall, MN 
Marysville/Yuba City Levee Reconstruction, CA 
Masefau Bay, Tutuila Island, American Samoa (Sec 14) 
Mayfield Creek, KY (Sec 205) 
Mazon River Twp Road, IL 
McCreadys Point Road, MD (Sec 14) 
Meramec River Basin (Valley Park Levee), MO 
Merced County Streams, CA 
Metropolitan Region of Cinnati Duck Creek, OH 
Middle Rio Grande Flood Protection, 
Bemalillo to Belen, NM 
Mid-Valley Area Levee Reconstruction, CA 
uperation .1p1Ln Nature of Project 
1994 
1980 
1998 
1996 
1996 
1996 
1992 
1993 
1995 
1994 
1994 
1991 
1996 
1973 
1998 
1995 
1999 
1991 
1985 
1995 
1997 
1997 
1995 
1994 
1996 
1993 
1989 
1992 
1994 
1993 
1991 
1985 
1999 
1996 
1993 
1995 
1999 
Indefinite 
1999 
2006 
2002 
2002 
Indefinite 
1997 
2000 
1998 
1998 
1996 
2001 
1999 
1992 
1998 
1996 
1994 
2004 
Indefinite 
2003 
2008 
2000 
B-7 
Local Protection 
Local Protection 
Reservoir 
Streambank Protection 
Local Protection 
Flood Control 
Local Protection 
Snagging and Clearing 
Streambank Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Shoreline Protection 
Local Protection 
Streambank Protection 
Shoreline Protection 
Local Protection 
Reservoirs 
Local Protection 
Local Protection 
Local Protection

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project Operation Completion Nature of Project 
Milk River, Malta, MT (Sec 205) 
Mill Creek, Fort Smith, AR (Sec 205) 
Mill Creek, OH 
Mingo Creek, OK 
Mississippi River Channel Improvements 
(IA, IL, KY, LA, MI, MO & TN) 
Mississippi River Levees 
Missouri National Rec River, NE & SD 
Missouri River Levee System, IA, NE, KS and MO 
Missouri River, Richland County Rd 152, MT (Sec 14) 
Molly Ann's Brook, NJ 
Mon River, Sewage Treatment Plant, Point Marion, PA 
Mon River, Water St. Point Marion, PA 
Monroe Lake Wetland, IN (Sec 1135) 
Moorefield, WV 
Mt. St. Helens Sediment Control, WA 
Muddy Creek Cascade, Vaughn, MT (Sec 14) 
Muddy Creek, Gruney Co, MO 
Mudline to Pineville, MS 
Mud Mountain Dam, WA (Dam Safety Assurance) 
Muscatine Island, IA 
Muskingham River Lakes, OH 
Muskingum River Lakes, OH (Dam Safety Assurance) 
New Orleans to Venice, LA 
1994 
1990 
1970 
1988 
1928 
1928 
1985 
1948 
1998 
1995 
1997 
1998 
1999 
1996 
1986 
1992 
1997 
1984 
1986 
1995 
1976 
1982 
1969 
1997 
1992 
1999 
2000 
1998 
1990 
1999 
1985 
1995 
1998 
19995 
Indefinite 
1998 
2020 
2031 
2008 
Unscheduled 
1999 
2000 
1999 
1999 
2000 
1997 
To be 
detenmined 
1994 
1999 
1985 
2001 
2000 
1988 
Indefinite 
2017 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Channel Improvements 
Main Line Levees 
Local Protection 
Local Protection 
Emergency Streambank Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Ecosystem Restoration 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Modemization of Dam 
Local Protection 
Major Rehabilitation 
Modemization of Dams 
Local Protection 
B-8

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
m 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project Operation compleuon 
Nickleplate Road, French Creek, Fairfield, PA 
Nishnabotna River, Hamburg, IA (Sec 205) 
Nonconnanh Creek, TN & MS 
North Beach Boulevard, Bay St Louis, MS 
North Branch Chicago River 
North Ellenville, NY 
Nogales Wash, AZ 
North Fork, KY Rivers, Jackson, KY (Sec 205) 
North Fork, KY River, Hwy 15N, Whitesburgh, KY (Sec 14) 
North Fork, KY River, River Rd, Whitesburg, KY (Sec 14) 
Oates Creek, GA 
Oconto River, McDonald St., WI 
Oelwin, Fayette County, IA (Sec 205) 
O'Hare Reservoir, IL 
Ohio River, Chester, WV (Sec 14) 
Ohio River, Daviess Co Middle School, KY 
Ohio River Flood Protection, IN 
Ohio River, Moundsville, WV (Sec 14) 
Otter Creek, Shannon Hills, AR (Sec 205) 
Ouachita River Levees, LA 
Pajaro River, CA 
Panola-Quitman Item C, MS 
Papillion Creek and Tributaries Lake, NE 
Passaic River Preservation of National Storage Areas, NJ 
Pebble Creek, Scribner, NE (Sec 205) 
1998 
1996 
1990 
1995 
1970 
1995 
1994 
1997 
1999 
1999 
1990 
1996 
1993 
1990 
1994 
1998 
1999 
1996 
1984 
1990 
1987 
1984 
1972 
1997 
1993 
2001 
2000 
2003 
1996 
Indefinite 
1997 
1998 
2000 
1999 
1999 
1992 
1999 
1997 
1999 
1998 
1999 
2001 
1998 
1986 
Indefinite7 
1989 
1993 
1995 
2004 
1995 
Nature of Project 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Snagging and Clearing 
Local Protection 
Flood Warning System 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Streambank Protection 
Local Protection 
Reservoir 
Streambank Protection 
Streambank Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Reservoirs 
Local Protection 
Local Protection 
B-9 
1999 
1999 
1993 
1999 
1984 
1989 
1974 
1994

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
Fiscal Year 
Started 
mProject 
Pelucia Creek, Item 1, MS 
Pelucia Creek, Item lA, MS 
Pelucia Creek, Item 2, MS 
Pelucia Creek, Item 3, MS 
Pelucia Creek, Item 4, MS 
Peninsula Drainage District #1, OR (Sec 205) 
Perry County L & D Nos. 1, 2, 3, MO 
Perry Creek, IA 
Petaluma River, Petaluma, CA (Sec 205) 
Petersburg WV 
Pine River Dam, MN 
Phoenix, AZ, and Vicinity (including New River) 
Pigeon Creek, Monongahela, PA (Sec 205) 
Pinopolis Dam, SC (Sec 14) 
Portage, WI 
Portugues and Bucana Rivers, PR 
Pt. Leflore, MS 
Punch Island Road 
Raccoon River, IA 
Ramapo River at Oakland, NJ 
Raritan Bay and Sandy Hook Bay, NJ, Matawan and Union 
Beach Sections 
Raritan River Basin, Greenbrook Sub-basin, NJ 
Ray Roberts Lake, TX 
Redbank & Fancher Creeks, CA 
Placed in 
Useful 
Operation 
1986 
1987 
1993 
1993 
1993 
1985 
1997 
1994 
1995 
1986 
1996 
1987 
1993 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
1987 
1987 
1993 
1994 
1994 
1999 
1985 
2003 
1998 
1998 
2001 
1994 
1999 
1995 
1999 
1999 
1986 
1996 
1999 
2002 
Indefinite 
2011 
1999 
1994 
B-10 
I --- - , I 
1985 
1987 
1990 
1990 
1993 
1997 
1977 
1995 
1997 
1996 
1995 
1980 
1998 
1995 
1997 
1975 
1985 
1996 
1994 
1995 
1965 
1998 
1975 
1987 
Nature of Project 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Dam Safety 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Reservoir 
Reservoir

0 
APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
Fiscal Year 
Fiscal Year Placedin Completed or 
Started Useu Scheduled for 
Project Operation Chodpeeninou 
Red River Basin Chloride Control (Area X) OK and TX 
Red River Below Denison Dam 
Rend Lake, IL 
Reno Flood Waming System, NV (Sec 205) 
Richmond, VA 
Rillito River, AZ 
Rio de LaPlata, PR 
Rio Puerto Neuvo, PR 
Roanoke River, Upper Basin, VA 
Roughan's Point, Revere, MA 
Running Slough Ditch 
Sacramento River Bank Protection, CA 
Sacramento River, Chico Landing to Red Bluff CA 
Sacramento River Flood Control, CA 
Sacramento Urban Area Levee Reconstruction, CA 
Salinas River, San Ardo, CA 
Salyersville, KY 
San Antonio Channel Improvement, TX 
San Luis Rey River, CA 
Santa Ana River Mainstem, CA 
Santa Paula Creek, CA 
Santree Dam, SC (Sec 14) 
Savan Gut, VI (Sec 205) 
Saylorville Lake, IA 
Saw Mill Run, PA 
1991 
1948 
1996 
1998 
1986 
1994 
1995 
1994 
1990 
1997 
1990 
1963 
1963 
1918 
1990 
1993 
1991 
1957 
1988 
1990 
1973 
1995 
1987 
1965 
1997 
Indefinite 
1995 
1999 
2000 
1995 
Indefinite 
2003 
2007 
2008 
2000 
1990 
Indefinite 
Indefinite 
Indefinite 
1997 
1993 
1999 
2002 
Indefinite 
Indefinite 
2002 
1995 
2001 
1996 
2002 
Nature of Project 
Chloride Control 
Levee & Streambank Protection 
Deficiency Correction 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Reservoir 
Local Protection 
B-11 
1970 
1995 
1999 
1990 
1997 
1995 
1989 
1977

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
m 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project Operation ompieuon 
Seitz Run, Allegheny Co., PA (Sec 205) 
Sheyenne River, ND 
Sicily Island, LA, Levee 
Sidney, NE (Sec 205) 
Simmons Fieldcontrol Structure, AR (Sec 1135) 
Sims Bayou, TX 
Skyrocket Creek, Quray, Co (Sec 14) 
Solomons Island, Calvert County, MD (Sec 14) 
Souris River Basin, ND 
South Central, PA Environmental Restoration (Mill Run) 
Southeast Louisiana 
Sowashee Creek, Meridian, MS 
Springbrook Creek, PA 
Steele Bayou, MS 
Ste. Genevieve, MO 
St. Francis Basin 
Stillwater, MN 
St. Johns Bayou- New Madrid Floodway, MO 
Sugar Creek, Bellbrook, OH (Sec 205) 
Swan Creek, Taney County, MO (Sec 14) 
Sweetwater River, CA 
Ted Rhodes Golf Course, Nashville, TN 
Tensas Cocodrie Pumping Plant, LA 
Tensas Cocodrie, LA, Levee () 
Teton River near Choteau, Teton County, MT (Sec 14) 
1998 
1990 
1983 
1993 
1998 
1990 
1998 
1992 
1985 
1993 
1997 
1988 
1989 
1966 
1995 
1938 
1996 
1997 
1996 
1984 
1972 
1995 
1983 
1974 
1992 
1999 
2003 
2003 
1995 
1999 
2008 
1999 
1993 
1998 
2000 
2007 
(8) 
1990 
2003 
2002 
1999 
Unscheduled 
2003 
2000 
1986 
1993 
1995 
1996 
Indefinite4 
1993 
Nature of Project 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Environmental Restoration 
Local Protection 
Streambank Protection 
Streambank Protection 
Reservoir 
Water Treatment Plant 
Urban Flood Control 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Tributary Levees & Channels 
Local Protection 
Rural Urban Flood Control 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection; Complete 
Streambank Protection 
B-12 
m 
1994 
1993 
1990 
(3) 
1997 
1986 
1993 
1995 
1987 
1993

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
Fiscal Year 
Fiscal Year Placed in Completed or 
Started Useful Scheduled for 
Project Operation _oum pltopneunl 
Thurman to Hamburg, IA 
Tombigbee River Tributaries, AL and MS 
Tongue River, State Park, Ranchester, WY (Sec 14) 
Town Brook, Quincy, MA 
Tropicana and Flamingo Washes, NV 
Tulsa and West Tulsa, OK 
Turtle Creek, PA 
Tygart Lake, WV 
Upper Gordon Creek, Hattiesburg, MS 
Upper Scioto River, Marion County, OH (Sec 205) 
Upper Yazoo Projects, MS 
Van Bibber Creek, CO (Sec 205) 
Village Creek, AL 
Walnut Canyon, CA (Sec 14) 
Walnut Creek, CA 
Waveland Seawall, Seawall, MS 
Westbank and Vicinity, New Orleans, LA 
West Columbus, OH 
West Creek, Topeka (Sec 14) 
West Fork, Grand River, Rte H (Sec 14) 
West Fork, Grand River, Rte W (Sec 14) 
West Ray, Marshall, PA (Sec 14) 
West Tennessee Tributaries 
Westwego to Harvey, LA 
Wheeler Creek, Gainesville, TX (Sec 205) 
1996 
1965 
1993 
1992 
1995 
1943 
1995 
1996 
1993 
1986 
1976 
1995 
1989 
1994 
1964 
1995 
1991 
1993 
1997 
1997 
1998 
1990 
1960 
1991 
1983 
1997 
1997 
1994 
2001 
2006 
1993 
1997 
2001 
1995 
1987 
2011 
2002 
1996 
1998 
1997 
1995 
2014 
2003 
2000 
2000 
2000 
1990 
Indefinite 1 
2011 
1984 
Nature of Project 
Local Protection 
Local Protection 
Streambank Protection 
Local Protection 
Local Protection 
Rehabilitation of Levee System 
Local Protection 
Dam Safety Assurance 
Channel Improvement 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Local Protection 
Shoreline Protection 
Local Protection 
Local Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Streambank Protection 
Drainage and Flood Control 
Local Protection 
Local Protection 
B-13 
I 
1990 
1994 
1945 
1995 
1990 
1994

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
Fiscal Year 
Started 
Project 
White River, Indianapolis Central, Waterfront, IN 
White River, Batesville, AR (Sec 205) 
White River, Jacksonport, AR (Sec 205) 
Whiteman's Creek, AR 
Willamette River Bank Protection, OR 
Wildcat and San Pablo Creeks, CA 
Wyoming Valley Levee Raising 
Yalobusha River Mile 7.5, MS 
Yellowstone River, Livingston, MT (Sec 14) 
Yonkers (Nepera Park), NY 
1995 
1005 
1996 
1994 
1938 
1980 
1996 
1993 
1992 
1994 
Placed in 
Useful 
Operation 
1996 
1996 
1993 
1993 
Fiscal Year 
Completed or 
Scheduled for 
Completion Nature of Project 
2002 Local Protection 
1999 Local Protection 
1998 Local Protection 
1999 Local Protection 
Indefinite Local Protection 
1996 Local Protection 
2002 Local Protection 
1993 Streambank Protection 
1993 Streambank Protection 
1995 Local Protection 
B-14 
I , m 
m

APPENDIX B 
Flood Control Projects Under Construction 
During Fiscal Year 1999 
1 Construction of further channel improvement was halted in 1987 due to the denial of water quality certification. 
Construction work currently underway includes the channel stabilization at bridge, utility and tributary crossings in the 
uncompleted portion of the project. 
2 Project was in useful operation before Corps started working on it. Work consists primarily of improvements to existing 
channels, levees, pumping stations and other flood control structures. 
3 Item 2A temporarily deferred. 
4 Levee enlargement remains to be accomplished for 0.8 miles. 
s Awaiting financial completion. Requires a correction in the financial management system. 
6 Completion of project depended upon the receipt of adequate funding. 
7 Landscaping remains to be accomplished. 
8 Recreation contract award is unscheduled. 
B-15

APPENDIX B 
Beach Erosion Control Projects Under Construction 
During Fiscal Year 1999 
Project 
Atlantic Coast of Maryland 
Delaware Coast Protection, DE 
Cape May Inlet to Lower Twp, NJ 
Carlsbab Seawall, CA (Sec 103) 
Carolina Beach and Vicinity, NC - Area South 
Carolina Beach and Vicinity, NC - Carolina Beach Portion 
Casino Beach, IL 
Castle Pinckney, SC 
Dade County, FL 
Duval County, FL 
East Rockaway to Rockaway Inlet and Jamaica Bay, NY 
Emeryville, Alameda, CA (Sec 103) 
Fire Island to Jones Inlet, NY 
Fire Island Inlet to Montauk Point, NY 
Great Egg Harbor Inlet & Peck Beach, NJ 
Homer Spit storm Damage Reduction, AK 
Hunting Island, SC 
Lummi Shore Road, WA (Sec 103) 
Martin County, FL 
Myrtle Beach, SC 
Panama City Beaches, FL 
Pinellas County, FL (Long Key) 
Presque Isle Peninsula, PA (Permanent) 
Rockaway Inlet to Norton Point (Coney Island), NY 
Sandy Hook to Barnegat Inlet, Sec 1 
Fiscal 
Year 
Started 
1990 
1989 
1990 
1996 
1996 
1965 
1995 
1999 
1975 
1976 
1979 
1993 
1988 
1963 
1991 
1992 
1999 
1998 
1994 
1995 
1997 
1969 
1990 
1994 
1994 
Placed in Useful 
Operation 
1994 
1990 
1991 
1997 
1998 
1982 
1993 
1992 
1994 
1999 
1999 
1993 
1995 
Incremental 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
2043 
2021 
2041 
1997 
2047 
2014 
Indefinite 
2000 
2038 
2028 
2006 
1993 
2039 
2027 
2043 
1995 
1999 
1999 
2046 
2047 
1999 
2043 
2042 3 
2045 
2049 
B-16 
m I

APPENDIX B 
Beach Erosion Control Projects Under Construction 
During Fiscal Year 1999 
Project 
Sarasota County, FL 
Shore Drive, Singleton Swash, SC 
Surfside-Sunset and Newport Beach, CA (Stage 10) 
Town of North Beach, MD 
Turkey Creek, Sumter County, SC 
Tybee Island, GA 
Virginia Beach, VA (Reimbursement) 
Virginia Beach, VA 
Woodmont Beach, Milford, CT (Sec 103) 
Wrightsville Beach, NC 
Fiscal 
Year 
Started 
1994 
1999 
1997 
1993 
1999 
1975 
1962 
1996 
1993 
1965 
Placed in Useful 
Operation 
1999 
1994 
1999 
1976 
1962 
1994 
1966 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
2047 
1999 
19974 
1994 
2000 
2024 
20122 
2051 
20004 
Indefinite 
B-17

APPENDIX B 
Beach Erosion Control Projects Under Construction 
During Fiscal Year 1999 
' Emergency Repairs due to Hurricane Andrew as per FY 92 Dire Emergency Act authorization. 
Original authorized project completed in 1991. 
2 IAW Section 355 of WRDA 1996, the project will be extended until the earlier of; year 2012 or completion of the beach erosion 
control and hurricane Protection project at Virginia Beach, Virginia. 
3 Fiscal year 1997 was the fifth year of 50 years of nourishment. 
4 Periodic beach nourishment. 
B-18

APPENDIX B 
Environmental Restoration Projects Under Construction 
During Fiscal Year 1999 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Amazon Creek Wetlands Restoration, OR (Sec 1135) 
Anacostia River & Tributaries, MD & DC 
Barataria Bay Marsh Creation, LA (CWPPRA) 
Battery Island Bird Habitat Preservation, NC (Sec 1135) 
Cape Fear L&D No. 1 Fish Ladder, NC (Sec 1135) 
Chesapeake Bay Oyster Recovery, MD 
Columbia River Fish Mitigation, OR & WA 
Dead Lake, AL 
Deepwater Slough, WA (Sec 1135) 
Everglades & South Florida Ecosystem 
Fem Ridge Lake Marsh Restoration, OR (Sec 1135) 
Hidden Lake Restoration, NE 
Kissimmee River, FL 
Lake Seminole Habitat, FL 
Little Falls Dam, MD (Sec 1135) 
Miller Comer, SC 
Missouri River Bank Stabilization & Navigation Project, NE 
Morgan Point Bendway Closure Structure, AR (Sec 1135) 
MRGO Back Dike Marsh Protection, LA (CWPPRA) 
Murphy's Slough, CA (Sec 1135) 
Nimrod Fisheries Restoration, AR (Sec 1135) 
North Fork Feather River, Chester, CA (Sec 1135) 
Numana Dam, CA (Sec 1135) 
Pine Flat Bypass, CA (Sec 1135) 
Poplar Island, MD 
1999 
1999 
1996 
1999 
1996 
1997 
1991 
1998 
1999 
1998 
1999 
1996 
1989 
1998 
1999 
1999 
1992 
1995 
1999 
1998 
1999 
1994 
1998 
1998 
1998 
1996 
2000 
1997 
1995 
1999 
1999 
1999 
1995 
2001 
2001 
2000 
2000 
2000 
2000 
2007 
1998 
2004 
2004 
2000 
2002 
2009 
1999 
2000 
2000 
2000 
1999 
1999 
2000 
1999 
2000 
1999 
2000 
2022 
Environmental Restoration 
Environmental Restoration 
Environmental Restoraiton 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
B-19

APPENDIX B 
Environmental Restoration Projects Under Construction 
During Fiscal Year 1999 
Project 
Porter Levee, WA (Sec 1135) 
Puget Creek, WA (Sec 1135) 
Sammamish River Weir Restoration, WA (Sec 1135) 
So. WV (Gilbert, WV) Sewage Treatment Plant 
So. WV (Mercer Co) Water Distribution System 
South Fork, Putah Creek, CA (Sec 1135) 
Thornton Creek, WA (Sec 1135) 
Turning Basin #3, Seattle WA (Sec 1135) 
Twenty Mile Creek Habitat, MS 
Vic Fazio Yolo Wildlife Area, CA (Sec 1135) 
Wehrspann Lake Aquatic Habitat Control, NE 
Fiscal 
Year 
Started 
1999 
1999 
1998 
1998 
1998 
1998 
1998 
1999 
1997 
1992 
1999 
Placed in 
Useful 
Operation 
1998 
1999 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
2004 
2002 
2005 
1999 
2000 
2001 
1999 
2004 
1998 
1999 
2004 
Nature of Project 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
Environmental Restoration 
B-20 
m

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Chann 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dept 
Aiww Between Norfolk, Va & St. Johns River, FI 
Deep Creek 10.6 Chesapeake, Va 52 300 12 12 12 Miter 1940 22.0 5 
Great Bridge I11.5 Chesapeake, Va 75 540 3 16 16 Miter 1932 6.0 1 
South Mills 33.2 South Mills, Nc 52 300 12 12 12 Miter 1941 22.0 
Alabama-Coosa Rivers 
Claiborne 117.5 Claiborne, Al 84 600 30 16 13 Moveable 1603.0 1969 61.0 
Millers Ferry 178.0 Camden, Al 84 600 45 16 13 Moveable 9900.0 1969 103.0 
Robert F. Henry 281.2 Benton, Al 84 600 45 16 13 Moveable 1496.0 1972 88.0 
Allegheny 
2 6.7 Aspinwall, Pa 56 360 11 11 12 Miter 1393.0 1934 8.0 
3 14.5 Cheswick, Pa 56 360 14 12 11 Miter 1436.0 1934 10.0 
4 24.2 Natrona, Pa 56 360 11 9 10 Miter 876.0 1927 6.0 
5 30.4 Freeport, Pa 56 360 12 10 11 Miter 780.0 1927 6.0 
6 36.3 Clinton, Pa 56 360 12 11 11 Miter 1140.0 1928 9.0 
7 45.7 Kittanning, Pa 56 360 13 11 10 Miter 916.0 1930 7.0 
8 52.6 Templeton, Pa 56 360 18 14 10 Miter 984.0 1931 10.0 
9 62.2 Rimer, Pa 56 360 22 11 11 Miter 950.0 1938 10.0 
Apalachicola, Chattahoochee, And Flint Rivers 
George W. Andrews 46.7 Columbia, Ga 82 450 25 19 13 Moveable 620.0 1962 29.0 
Walter F. George 75.1 Fort Gaines, Ga 82 450 88 18 13 Moveable 1337.0 1963 85.0 
Jim Woodruff 106.3 Chattahoochee, FI 82 450 33 14 14 Moveable 5924.0 1954 47.0 
Bayou Teche, La 
Keystone 72.0 New Iberia, La 36 160 8 9 8 Miter 175.0 1913 35.0 
Bayou Teche, La (Fcmr&T) 
Berwick 1.5 Berwick, La 45 300 14 9 9 Sector 1950 125.0 
East & West Calumet 4.0 , La 45 90 0 0 0 Sector 1950 80.0 
Charenton 35.7 Charenton, La 45 0 0 0 0 Sector 1949 80.0 
Black Rock Channel & Tonawanda Harbor 
Black Rock 4.0 Buffalo, Ny 70 625 5 22 22 Replaced 1914 6.0 2 
l 
h Width 
0 50 
2 200 
6 50 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
9 100 
9 100 
6 100 
6 80 
8 80 
8 80 
8 80 
1 200 
C-1

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Depth 
Black Warrior & Tombigbee Rivers, Al 
Coffeeville 116.6 Coffeeville, Al 110 600 34 13 13 Moveable 1185.0 1960 97.0 
Demopolis 213.2 Demopolis, Al 110 600 40 13 13 Moveable 1485.0 1954 48.0 
Armistead I. Seldon 262.0 Eutaw, Al 110 600 22 13 13 Moveable 1832.0 1957 77.0 
William Bacon Oliver 337.6 Tuscaloosa, Wa 110 600 28 18 18 Moveable 800.0 1991 43.0 
Holt 347.0 Holt, Al 110 600 64 19 13 Moveable 1138.0 1966 18.0 
John Hollis Bankhead 366.0 Adger, Al 110 600 68 13 13 Moveable 1170.0 1975 43.0 
Calcasieu River And Pass, La 
Calcasieu Barrier 38.9 West Lake, La 56 575 0 0 0 Sector 450 1968 15.0 1 
Canaveral Harbor 
Canaveral 3.0 Cape Canaveral, Fl 90 600 3 13 13 Sector 0.0 1965 6.0 1 
Cape Fear River 
1 39.0 Kings Bluff, Nc 40 200 11 9 9 Miter 275.0 1915 32.0 
2 71.0 Browns Landing, Nc 40 200 9 12 12 Miter 229.0 1917 24.0 
William O. Huske 95.0 Tolars Landing, Nc 40 300 9 9 9 Miter 220.0 1935 20.0 
Chicago Harbor 
Chicago 327.2 Chicago, II 80 600 4 27 23 Sector 2100 1939 1.0 2 
Colorado River 
Colorado River East 441.1 Matagorda, Tx 125 1180 12 15 15 Sector 520 1944 3,700.0 1 
Colorado River West 441.8 Matagorda, Tx 125 1180 12 15 15 Replaced 520 1944 3,700.0 1 
Columbia River 
Bonneville 145.3 Cascade Locks, Or 86 650 65 19 24 Miter 2680.0 1993 1,080.0 1 
The Dalles 191.7 The Dalles, Or 86 650 88 15 15 Vertical 8735.0 1957 1,000.0 1 
John Day 216.5 Rufus, Or 86 650 110 15 15 Vertical 5900.0 1968 1,600.0 1 
Mcnary 292.0 Plymouth, Wa 86 650 83 15 20 Miter 7365.0 1953 64.0 14 
Width 
9 200 
9 200 
9 200 
9 200 
9 200 
9 200 
3 56 
2 100 
8 100 
8 100 
8 100 
1 470 
2 125 
2 125 
4 300 
4 250 
4 250 
4 250 
C-2

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Depti 
Cumberland River, Tn & Ky 
Barkley 30.6 Grand Rivers, Ky 110 800 57 24 13 Miter 9959.0 1964 118.0 
Cheatham 148.7 Ashland City, Tn 110 800 26 14 12 Miter 801.0 1952 68.0 
Old Hickory 216.2 Old Hickory, Tn 84 400 60 14 13 Miter 3605.0 1954 97.0 
Cordell Hull 313.5 Carthage, Tn 84 400 59 14 13 Miter 1138.0 1973 72.0 
Freshwater Bayou, La 
Freshwater Bayou 1.2 Intracoastal Cit, La 84 590 4 16 16 Sector 401.0 1968 250.0 1 
Giww Between Apalachee Bay, Fl & Mexican Border 
Algiers 0.0 Algiers, La 75 760 18 13 13 Sector 1956 384.0 1 
Harvey 0.0 Harvey, La 75 415 20 12 12 Miter 1935 384.0 1 
Inner Harbor Nvg Chnl 5.6 New Orleans, La 75 626 17 31 31 Miter 1923 384.0 1 
Bayou Sorrel 37.5 Plaquemine, La 56 790 21 14 14 Sector 1952 64.0 1 
Port Allen 64.1 Port Allen, La 84 1188 45 13 14 Miter 1961 64.0 1 
Bayou Boeuf 93.3 Morgan City, La 75 1148 11 13 13 Sector 0.0 1954 384.0 1 
Leland Bowman 162.7 Abbeville, La 110 1190 5 11 11 Sector 1985 384.0 1 
Calcasieu 238.5 Lake Charles, La 75 1194 4 13 13 Sector 0.0 1950 384.0 1 
Brazos East 400.4 Freeport, Tx 75 260 0 15 15 Sector 520 1943 3,700.0 1 
Brazos West 400.9 Freeport, Tx 75 260 0 15 15 Sector 520 1943 3,700.0 1 
Green And Barren Rivers,Ky 
1 9.1 Spottsville, Ky 84 600 8 12 15 Miter 482.0 1956 54.0 
2 63.1 Calhoun, Ky 84 600 14 12 12 Miter 519.0 1956 45.0 
Hudson River 
Troy 153.8 Troy, Ny 45 493 17 16 13 Fixed 1.0 1916 2.0 1
1
h Width 
9 300 
9 200 
9 150 
9 150 
2 120 
6 150 
2 120 
2 150 
2 120 
2 120 
6 150 
6 200 
6 200 
2 125 
2 125 
9 150 
9 150 
4 200 
C-3

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dept 
Illinois Waterway 
Lagrange 80.2 Beardstown, II 110 600 10 16 13 Miter 1066 1939 78.0 
Peoria 157.7 Creve Coeur, I 110 600 11 15 12 Miter 3446 1938 73.0 
Starved Rock 231.0 Uitca, ll 110 600 19 17 14 Miter 1280 1933 14.0 
Marseilles 244.6 Marseilles, II 110 600 24 19 14 Miter 778.5 1933 27.0 
Dresden Island 271.5 Morris, I 110 600 22 17 12 Miter 1615.5 1933 15.0 
Brandon Road 286.0 Joliet, II 110 600 34 18 14 Miter 2373 1933 5.0 
Lockport 291.1 Lockport, I1 110 600 40 20 15 Miter 500 1933 35.0 
Thomas J. O'Brien 326.5 Chicago, II 110 1000 4 18 18 Sector 256.75 1960 7.0 
Kanawha Lock & Dam, Washington 
Winfield 31.1 Winfield, Wv 110 800 28 18 18 Miter 700.0 1997 37.0 
31.1 Winfield, Wv 56 360 28 18 12 Miter 700.0 1937 37.0 
31.1 Winfield, Wv 56 360 28 18 12 Miter 700.0 1937 37.0 
Marmet 67.7 Marmet, Wv 56 360 24 18 12 Miter 557.0 1934 16.0 
67.7 Marmet, Wv 56 360 24 18 12 Miter 557.0 1934 16.0 
London 82.8 London, Wv 56 360 24 18 12 Miter 557.0 1934 8.0 
82.8 London, Wv 56 360 24 18 12 Miter 557.0 1933 8.0 
Kaskaskia River 
Kaskaskia 0.8 Modoc, II 84 600 29 19 11 Miter 120.0 1973 35.0 
l
h Width 
9 300 
9 300 
9 300 
9 300 
9 300 
9 160 
9 300 
9 300 
9 300 
9 300 
9 300 
9 150 
9 150 
9 150 
9 150 
9 225 
C-4

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dept 
Kentucky River, Ky 
1 4.0 Carrollton, Ky 38 145 8 8 15 Miter 424.0 1839 27.0 
2 31.0 Lockport, Ky 38 145 14 8 6 Fixed 400.0 1839 11.0 
3 42.0 Gest, Ky 38 145 13 9 6 Miter 465.0 1844 23.0 
4 65.0 Frankfort, Ky 38 145 13 6 7 Fixed 534.0 1844 17.0 
5 82.2 Tyrone, Ky 38 145 15 10 6 Fixed 556.0 1844 14.0 
6 96.2 High Bridge, Ky 52 147 14 9 6 Fixed 413.0 1891 21.0 
7 117.0 High Bridge, Ky 52 147 15 9 7 Fixed 350.0 1897 23.0 
8 139.9 Camp Nelson, Ky 52 146 19 11 6 Fixed 257.0 1900 18.0 
9 157.5 Valley View, Ky 52 148 17 11 7 Fixed 362.0 1907 19.0 
10 176.4 Ford, Ky 52 148 17 9 6 Fixed 472.0 1907 25.0 
11 201.0 Irvine, Ky 52 148 18 10 6 Fixed 208.0 1906 20.0 
12 220.9 Ravenna, Ky 52 148 17 10 6 Fixed 240.0 1973 19.0 
13 239.9 Willow, Ky 52 148 18 10 6 Fixed 248.0 1915 9.0 
14 249.0 Heidelberg, Ky 52 148 17 9 6 Fixed 248.0 1917 26.0 
Lake Washington Ship Canal 
Hiram M. Chittenden 1.3 Seattle, Wa 28 123 26 16 16 Miter 235.0 1916 0.0 3 
1.3 Seattle, Wa 80 760 26 36 29 Miter 235.0 1916 8.0 3
el 
h Width 
6 150 
6 150 
6 150 
6 150 
6 100 
6 100 
6 100 
6 100 
6 100 
6 100 
6 100 
6 100 
6 100 
6 100 
0 0 
0 100 
C-5

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Depth 
Mcclellan-Kerr Arkansas River Navigation System 
Norrell 10.3 Arkansas Post, Ar 110 600 30 16 15 Fixed 277.0 1967 3.0 
2 13.3 Arkansas Post, Ar 110 600 20 18 14 Tainter 6300.0 1967 37.0 
Joe Hardin 50.2 Grady, Ar 110 600 20 18 14 Tainter 2240.0 1968 16.0 
Emmett Sanders 66.0 Pine Bluff, Ar 110 600 14 18 14 Tainter 5.0 1968 20.0 
5 86.3 Redfield, Ar 110 600 17 18 14 Tainter 7455.0 1968 22.0 
David D. Terry 108.1 Little Rock, Ar 110 600 18 18 14 Tainter 4040.0 1968 17.0 
Murray 125.4 Little Rock, Ar 110 600 18 18 14 Tainter 3530.0 1969 31.0 
Toad Suck Ferry 155.9 Conway, Ar 110 600 16 18 14 Tainter 1200.0 1969 21.0 
Arthur V. Ormond 176.9 Morrilton, Ar 110 600 19 18 14 Tainter 1797.0 1969 29.0 
Dardanelle 205.5 Russellville, Ar 110 600 55 18 14 Tainter 1210.0 1969 51.0 
Ozark - Jeta Taylor 256.8 Ozark, Ar 110 600 34 18 15 Tainter 900.0 1969 36.0 
James W. Trimble 292.8 Fort Smith, Ar 110 600 20 18 14 Tainter 4260.0 1969 27.0 
W.D. Mayo 319.6 Spiro, Ok 110 600 21 14 14 Moveable 7400.0 1970 17.0 
Robert S. Kerr 336.2 Salisaw, Ok 110 600 48 16 14 Moveable 7230.0 1970 30.0 
Webbers Falls 366.6 Webber Falls, Ok 110 600 30 16 14 Moveable 4370.0 1970 35.0 
Chouteau 401.4 Muskogee, Ok 110 600 21 15 14 Moveable 11690. 1970 20.0 
Newt Graham Lock 421.6 Inola, Ok 110 600 21 15 14 Moveable 1630.0 1970 23.0 
Mermentau River, La 
Schooner Bayou 3.4 Abbeville, La 75 525 0 0 0 Sector 1950 11.0 
Catfish Point 25.0 Creole, La 56 500 0 0 0 Sector 1951 50 1 
I 
Width 
9 300 
9 300 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 250 
9 150 
9 150 
6 60 
5 200 
C-6

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Depti 
Mississippi R Betwn Missouri R & Minneapolis, Mn 
Melvin Price 200.8 East Alton, II 
200.8 East Alton, II 
25 241.4 Winfield, Mo 
24 273.4 Clarksville, Mo 
22 301.2 Saverton, Mo 
21 324.9 Quincy, II 
20 343.2 Canton, Mo 
19 364.2 Keokuk, la 
18 410.5 Gladstone, II 
17 437.1 New Boston, I1 
16 457.2 Muscatine, II 
15 482.9 Rock Island, II 
482.9 Rock Island, II 
14 493.0 Leclaire, la 
493.0 Leclaire, la 
13 523.0 Clinton, I1 
12 556.0 Bellevue, la 
11 583.0 Dubuque, Ia 
10 615.0 Guttenburg, la 
9 647.0 Lynxville, Wi 
8 679.0 Genoa, Wi 
7 702.0 Dresbach, Mn 
6 714.0 Trempealeau, Wi 
5A 728.5 Winona,Mn, Mn 
5 738.1 Minneiska, Mn 
4 752.8 Alma, Wi 
3 796.9 Red Wing, Mn 
2 815.0 Hastings, Mn 
1 847.6 Minn. St. Paul, Mn 
847.6 Minn. St. Paul, Mn 
Lower Saint Anthony Falls 853.3 Minneapolis, Mn 
Upper Saint Anthony Falls 853.9 Minneapolis, Mn 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
80 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
56 
56 
56 
56 
1200 24 
600 24 
600 15 
600 15 
600 10 
600 10 
600 10 
1200 38 
600 10 
600 8 
600 9 
360 16 
600 16 
600 11 
320 11 
600 11 
600 9 
600 11 
600 8 
600 9 
600 11 
600 8 
600 6 
600 5 
600 9 
600 7 
600 8 
500 12 
400 38 
400 38 
400 25 
400 49 
23 
42 
19 
19 
18 
17 
15 
15 
17 
16 
17 
27 
27 
18 
21 
19 
17 
19 
15 
16 
22 
18 
17 
18 
18 
17 
17 
22 
13 
13 
14 
16 
18 Vertical 
18 Miter 
12 Miter 
12 Miter 
14 Miter 
12 Moveable 
12 Moveable 
13 Fixed 
14 Moveable 
13 Moveable 
12 Moveable 
11 Moveable 
11 Moveable 
11 Moveable 
14 Moveable 
13 Moveable 
13 Moveable 
13 Moveable 
12 Miter 
13 Miter 
14 Miter 
12 Miter 
13 Miter 
13 Miter 
12 Miter 
13 Miter 
14 Miter 
13 Miter 
10 Miter 
8 Miter 
10 Miter 
14 Miter 
990.0 1990 
990.0 1994 
1140.0 1939 
1200.0 1940 
3084.0 1938 
2955.0 1938 
2144.0 1936 
8809.0 1957 
6960 1937 
3196 1939 
3555.0 1937 
1203.0 1934 
1203.0 1934 
2703.0 1939 
2703.0 1922 
14075 1938 
8369 1938 
4784 1937 
763.0 1936 
811.0 1938 
935.0 1937 
940.0 1937 
893.0 1936 
682.0 1936 
1.0 1935 
1.0 1935 
365.0 1938 
822.0 1930 
574.0 1932 
574.0 1930 
188.0 1959 
3.0 1963 
C-7 
h Width 
40.0 
40.0 
32.0 
27.0 
24.0 
18.0 
21.0 
46.0 
27.0 
20.0 
26.0 
0.0 
10.0 
29.0 
29.0 
34.0 
26.0 
32.0 
33.0 
31.0 
23.0 
12.0 
14.0 
10.0 
15.0 
44.0 
18.0 
32.0 
6.0 
6.0 
1.0 
4.0 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
200 
100

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Depth 
Mississippi R Betwn Ohio And Missouri Rivers 
27 185.5 Granite City, Il 110 600 21 15 15 Miter 3000.0 1953 15.0 
185.5 Granite City, ll 110 1200 21 15 15 Vertical 3000.0 1953 15.0 
Monongahela River 
2 11.2 Braddock, Pa 56 360 9 15 16 Miter 748.0 1905 13.0 
11.2 Braddock, Pa 110 720 9 15 16 Miter 748.0 1905 13.0 
3 23.8 Elizabeth, Pa 56 720 8 11 11 Miter 670.0 1907 18.0 
23.8 Elizabeth, Pa 56 360 8 11 11 Miter 670.0 1907 18.0 
4 41.5 Monessen, Pa 56 720 17 20 10 Miter 535.0 1932 20.0 
41.5 Monessen, Pa 56 360 17 20 10 Miter 535.0 1932 20.0 
Maxwell 61.2 Maxwell, Pa 84 720 20 20 14 Miter 460.0 1963 24.0 
61.2 Maxwell, Pa 84 720 20 20 14 Miter 460.0 1963 24.0 
Grays Landing 82.0 Grays Landing, Pa 84 720 15 27 18 Miter 576.0 1993 21.0 
Pt. Marion 90.8 Point Marion, Pa 84 720 19 16 35 Miter 682.0 1994 11.0 
Morgantown 102.0 Morgantown, Wv 84 600 17 17 14 Miter 410.0 1950 6.0 
Hildebrand 108.0 Morgantown, Wv 84 600 21 14 15 Miter 530.0 1959 7.0 
Opekiska 115.4 Opekiska, Wv 84 600 22 18 14 Miter 366.0 1964 7.0 
1 
Width 
9 350 
9 350 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
C-8

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Depti 
Ohio River 
Emsworth 
Dashields 
Montgomery 
New Cumberland 
Pike Island 
Hannibal 
Willow Island 
Belleville 
Racine 
Robert C. Byrd 
Greenup 
Captain Anthony Meldahl 
Markland 
Mcalpine 
Cannelton 
Newburgh 
John T. Myers 
Smithland 
6.2 Emsworth, Pa 
6.2 Emsworth, Pa 
13.3 Glenwillard, Pa 
13.3 Glenwillard, Pa 
31.7 Monaca, Pa 
31.7 Monaca, Pa 
54.4 Stratton, Oh 
54.4 Stratton, Oh 
84.2 Warwood, Wv 
84.2 Warwood, Wv 
126.4 Hannibal, Oh 
126.4 Hannibal, Oh 
161.7 Newport, Oh 
161.7 Newport, Oh 
203.9 Reedsville, Oh 
203.9 Reedsville, Oh 
237.5 Letart, Wv 
237.5 Letart, Wv 
279.2 Hogsett, Wv 
279.2 Hogsett, Wv 
341.0 Greenup, Ky 
341.0 Greenup, Ky 
436.2 Chilo, Oh 
436.2 Chilo, Oh 
531.5 Markland, Ky 
531.5 Warsaw, Ky 
606.8 Louisville, Ky 
606.8 Louisville, Ky 
720.7 Cannelton, In 
720.7 Cannelton, In 
776.1 Newburgh, In 
776.1 Newburgh, In 
846.0 Mount Vernon, In 
846.0 Mount Vernon, In 
918.5 Hamletsburg, II 
918.5 Hamletsburg, II 
56 
110 
110 
56 
110 
56 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
110 
360 18 
600 18 
600 10 
360 10 
600 18 
360 18 
1200 21 
600 21 
1200 18 
600 18 
600 21 
1200 21 
600 20 
1200 20 
600 22 
1200 22 
600 22 
1200 22 
1200 23 
600 23 
1200 30 
600 30 
1200 30 
600 30 
600 35 
1200 35 
600 37 
1200 37 
1200 25 
600 25 
1200 16 
600 16 
600 18 
1200 18 
1200 22 
1200 22 
C-9 
16 
17 
13 
13 
16 
16 
17 
17 
17 
17 
38 
38 
35 
35 
37 
37 
37 
37 
41 
41 
45 
45 
45 
45 
50 
50 
19 
49 
40 
40 
31 
31 
34 
34 
34 
34 
13 Miter 
13 Miter 
18 Miter 
18 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
18 Miter 
18 Miter 
17 Miter 
17 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
18 Miter 
18 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
11 Miter 
12 Miter 
15 Miter 
15 Miter 
15 Miter 
15 Miter 
16 Miter 
16 Miter 
12 Miter 
12 Miter 
1717.0 1921 
1717.0 1921 
1585.0 1929 
1585.0 1929 
1379.0 1936 
1379.0 1936 
1315.0 1959 
1315.0 1959 
1315.0 1965 
1315.0 1965 
1098.0 1973 
1098.0 1973 
1128.0 1972 
1128.0 1972 
1206.0 1969 
1206.0 1969 
1173.0 1969 
1173.0 1969 
1132.0 1993 
1132.0 1993 
1287.0 1959 
1287.0 1959 
1756.0 1962 
1756.0 1962 
1395.0 1959 
1395.0 1959 
8725 1961 
8725 1961 
2054.0 1971 
2054.0 1971 
2275.6 1975 
2275.6 1975 
3504.0 1975 
3504.0 1975 
2962.0 1980 
2962.0 1980 
Width 
h Width 
6.0 
6.0 
7.0 
7.0 
18.0 
18.0 
23.0 
23.0 
30.0 
30.0 
36.0 
36.0 
35.0 
35.0 
36.0 
36.0 
34.0 
34.0 
42.0 
42.0 
62.0 
62.0 
95.0 
95.0 
75.0 
95.0 
75.0 
75.0 
114.0 
114.0 
55.0 
55.0 
70.0 
70.0 
73.0 
73.0 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300 
300

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Dept 
52 938.9 Brookport, I 110 600 12 15 11 Miter 2978.0 1928 20.0 
938.9 Brookport, I 110 1200 12 15 11 Miter 2998.0 1969 20.0 
53 962.6 Mound City, Il 110 1200 12 15 10 Miter 3560.0 1980 24.0 
962.6 Mound City, II 110 600 12 15 10 Miter 3560.0 1929 24.0 
Okeechobee Waterway, Fl 
St. Lucie 15.3 Stuart, FI 50 225 13 14 12 Sector 170.0 1941 15.0 
Port Mayaca 38.5 Port Mayaca, Fl 56 400 2 14 14 Sector 116.0 1977 5.0 
Moore Haven 78.0 Moore Haven, FI 50 250 2 10 11 Sector 89.8 1953 16.0 
Ortona 93.6 Labelle, FI 50 225 11 12 11 Sector 104.0 1937 16.0 
W. P. Franklin 122.0 Fort Myers, FI 56 400 3 13 13 Sector 1150.0 1965 8.0 
Old River, La (Mr&T) 
Old River 304.0 Simmesport, La 75 1190 35 11 11 Miter 1100 1963 7.0 1 
Ouachita And Black Rivers Below Camden, Ar 
Jonesville 25.0 Jonesville, La 84 600 30 18 15 Moveable 450.0 1972 92.0 
Columbia 117.2 Columbia, La 84 600 18 18 18 Moveable 400.0 1972 109.0 
Felsenthal 226.8 Felsenthal, La 84 600 18 18 13 Moveable 350.0 1984 55.0 
H. K. Thatcher 281.7 Calion, La 84 600 12 18 13 Moveable 350.0 1984 50.0 
Pearl River Lateral Canal 
1 29.7 Pearl River, La 65 274 27 10 10 Moveable 0.0 1949 11.0 
2 40.8 Bush, La 65 274 15 10 10 Moveable 1950 3.0 
3 43.9 Sun, La 65 274 11 10 10 Moveable 1950 5.0 
Red River Ww-Mississippi R To Shreveport, La 
Lindy Claiborne Boggs 44.0 Larto, La 84 685 36 22 13 Moveable 630.0 1984 30.0 
John H.Overton 74.0 Ruby, La 84 685 24 23 23 Moveable 348.0 1987 42.0 
3 116.4 Colfax, La 84 685 31 25 18 Moveable 1992 40.0 
4 169.0 Coushatta, La 84 685 25 25 18 Miter 690.0 1994 31.0 
Joe D. Waggonner 200.0 Caspiana, La 84 685 25 22 23 Miter 663.0 1994 28.0 
Savannah River 
New Savannah Bluff 187.2 Augusta, Sc 56 360 15 14 12 Miter 360.0 1937 16.0 
l
h Width 
9 300 
9 300 
9 300 
9 300 
8 80 
8 100 
8 90 
8 90 
8 90 
2 120 
9 100 
9 100 
9 100 
7 100 
7 80 
7 80 
7 80 
9 200 
9 200 
9 100 
9 200 
9 200 
9 90 
C-10

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Channel 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Depth Widt 
Snake River 
Ice Harbor 9.7 Pasco, Wa 86 650 103 14 15 Vertical 2790.0 1962 32.0 14 25 
Lower Monumental 41.6 Kahlotus, Wa 86 650 103 19 15 Vertical 3800.0 1969 29.0 14 25 
Little Goose 70.3 Starbuck, Wa 86 650 101 20 15 Miter 2655.0 1970 37.0 14 25 
Lower Granite 107.5 Pomeroy, Wa 86 650 105 20 15 Miter 3200.0 1975 38.0 14 25 
St. Marys River, Mi 
Davis 47.0 Sault Ste. Marie, Mi 80 1320 22 24 23 Leaf 1914 0.0 0 30 
Macarthur 47.0 Sault Ste. Marie, Mi 80 780 22 31 31 Leaf 1300.0 1943 0.0 27 30 
New Poe 47.0 Sault Ste. Marie, Mi 110 1200 22 32 32 Leaf 1300.0 1963 0.0 0 30 
Tennessee River, Tn, Al, And Ky 
Pickwick Landing 206.7 Pickwick Dam, Tn, Tn 110 600 55 16 17 Fixed 7385.0 1937 53.0 9 30 
Guntersville 349.0 Guntersville, Al 60 360 39 17 18 Tainter 3837.0 1937 76.0 9 30 
Tennessee River, Tn, Al, And Ky 
Kentucky 22.4 Grand Rivers, Ky 110 600 57 24 13 Miter 7976.0 1942 184.0 9 30 
Melton Hill 23.1 Kingston, Tn 75 400 58 13 13 Tainter 1072.0 1963 38.0 9 30 
Pickwick Landing 206.7 Pickwick Dam, Tn, Tn 110 1000 55 19 17 Fixed 7385.0 1984 53.0 9 30 
Wilson 259.4 Florence, Al 110 600 94 11 11 Fixed 3728.0 1959 16.0 9 30 
259.4 Florence, Al 60 300 49 13 13 Miter 3728.0 1927 16.0 9 30 
259.4 Florence, Al 60 300 45 11 11 Fixed 3728.0 1927 16.0 9 30 
General Joseph Wheeler 274.9 Rogersville, Al 60 400 48 15 13 Fixed 5738.0 1934 74.0 9 30 
274.9 Rogersville, Al 110 600 48 15 13 Fixed 5738.0 1963 74.0 9 30 
Guntersville 349.0 Guntersville, Al 110 600 39 17 18 Miter 3837.0 1965 76.0 9 30 
Nickajack 424.7 Jasper, Tn 110 600 39 13 11 Miter 3763.0 1967 46.0 9 30 
Chickamauga 471.0 Chattanooga, Tn 60 360 49 10 14 Miter 5654.0 1937 59.0 9 30 
Watts Bar 529.9 Breendenton, Tn 60 360 58 12 12 Tainter 2646.0 1941 72.0 9 30 
Ft. Loudon 602.3 Lenoir City, Tn 60 360 72 12 12 Tainter 3687.0 1943 50.0 9 30 
h
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 
C-11

APPENDIX C 
Navigation Locks and Dams Operable September 30, 1999 
River/ River Chamber Depth on Sills Dam Year Channe 
Lock Mile Community Width Length Lift Upper Lower Type Length Open Length Depth 
Tennessee-Tombigbee Waterway Al, Ms 
Howell Heflin 266.1 Gainesville, Al 110 600 36 15 15 Moveable 1546.0 1978 49.0 
Tom Bevill 306.8 Aliceville, Al 110 600 27 15 15 Moveable 1479.0 1979 41.0 
John C. Stennis 334.7 Columbus, Ms 110 600 27 15 15 Moveable 1004.0 1980 28.0 
Aberdeen 357.5 Aberdeen, Ms 110 600 27 15 15 Moveable 1064.0 1985 23.0 
Amory 371.1 Amory, Ms 110 600 30 15 15 Moveable 0.0 1985 14.0 
Glover Wilkins 376.3 Smith.Sville, Al 110 600 25 18 18 Moveable 0.0 1985 15.0 
Fulton 391.0 Fulton, Ms 110 600 25 18 18 Moveable 0.0 1985 7.0 
John E. Rankin 398.4 Fulton, Ms 110 600 30 18 18 Moveable 0.0 1985 8.0 
G.V. "Sonny" Montgomery 406.7 Belmont, Ms 110 600 30 18 18 Moveable 0.0 1985 5.0 
Jamie Whitten 411.9 Tupelo, Ms 110 600 84 18 18 Moveable 1064.0 1985 65.0 
Willamette River At Willamette Falls 
Willamette Falls Locks 26.0 West Linn, Or 40 198 20 6 8 Leaf 0.0 1873 0.0 
Williamette Falls Guard Lock 26.4 West Linn, Or 40 198 10 6 8 Leaf 0.0 1873 24.0 
1 
Width 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
9 300 
6 150 
6 150 
C-12

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 1999 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Agat Small Boat Harbor, Guam (Sec 107) 
AIWW Replacement of Federal Hwy Bridges in NC 
Aquadilla Harbor, PR (Sec 107) 
Baltimore Harbor (50 foot), MD & VA 
Blair Waterway, Tacoma, WA (Sec 107) 
Bonneville Navigation Lock, OR & WA 
Boston Harbor, MA 
Burns Harbor, IN 
Chain of Rocks Canal, IL 
Canaveral Harbor Deepening, FL 
Canaveral Harbor, FL 
Channel to Newport News, VA (1965 Mod.) 
Channel to Newport News, VA (1986 Mod.) 
Channel to Victoria, TX 
Charleston Harbor (Deeping/Widening), SC 
Chicago Harbor (Lock), IL 
Chicago Harbor (Lock), IL 
Cook Inlet Navigation Improvement, AK 
Crescent City Harbor, CA 
Fort Pierce Harbor, FL 
Four Locks, Illinois Waterway, IL 
Freeport Harbor, TX 
Grays Harbor, WA 
1987 
1974 
1993 
1987 
1999 
1985 
1998 
1995 
1999 
1993 
1994 
1967 
1987 
1993 
1998 
1995 
1996 
1998 
1998 
1995 
1993 
1987 
1990 
1989 
1986' 
1990 
1953 
1968 
1989 
1991 
1997 
1989 
2001 
1995 
1993 
2000 
1998 
2000 
1999 
2004 
1994 
1995 
Indefinite 
Indefinite 
2001 
2003 
1997 
1997 
2001 
1999 
1996 
1996 
1998 
2001 
Dredging and breakwater 
Replacement of existing bridges 
Breakwater 
Deepdraft channel deepening 
Deepen Channel and Turning Basin 
New larger lock 
Channel deepening 
Breakwater Rehabilitation 
Deficiency Correction 
Navigation Channels 
Jetty extension and sand tightening 
Deferred anchorage construction 
Dredge 50 ft. Channel. Deepen to 55 feet 
Enlarging and deepening channel to 12 foot 
depth 
Deepen Entrance Channel to 47 feet and inner 
channels to 45 feet depth. 
Lock Bulkhead Fabrication 
Construct Slots to Dewater Lock Gate Bays 
Channel Dredging 
Deepen Channel 
Enlarge entrance channel 
Major rehabilitation of lock and dam 
Dredging, jetty construction, and recreation 
Navigation channel widening and deepening 
D-1

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 1999 
Project 
Grays Landing Lock & Dam (Lock & Dam 7) 
Monongahela River, PA 
Gulf Intracoastal Waterway, Aransas National Wildlife 
Refuge, TX (Sec 216) 
Gulfport Harbor, MS 
Helena Harbor, AR 
Hempstead Harbor, NY 
Houston-Galveston Navigation Channels, TX 
Humboldt Harbor and Bay Deepening, CA 
Hyannis Harbor, MA (Sec 107) 
Illinois Waterway Four Locks 
Inner Harbor Navigation Canal Lock 
Kawaihae Small Boat Harbor, Hawaii, HI 
Kentucky Lock Addition, KY 
Kill Van Kull - Newark Bay, NJ and NY (Stage 1) 
Kill Van Kull - Newark Bay, NJ and NY (Stage II) 
Kodiak Harbor, AK 
Lake Erie, Colley Canal, Lucas Co, (Sec 107) 
Laupahoehoe Harbor, Hawaii, HI 
Lock and Dams 2, 3 and 4, Monongahela, PA and WV 
Lock and Dam 3, MN 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Started peration u,,1p u,1u1 
1986 2001 
1998 
1991 
1989 
1992 
1998 
1997 
1997 
1993 
1999 
1996 
1998 
1986 
1999 
1993 
1998 
1988 
1992 
1998 
1994 
1999 
1999 
1988 
2001 
(6) 
1995 
1995 
2003 
2000 
1999 
1996 
2011 
1998 
2010 
1995 
2005 
1996 
1999 
1988 
2008 
2003 
Nature of Project 
Construct new lock & dam to replace existing 
lock & dam 7 
Bank Protection to protect Gulf Intracoastal 
Waterway and the critical habitat of 
endangered whooping crane 
Deepen Channel 
New Slackwater Harbor 
Removal of derelect barges 
Deepen and Widen Houston Ship Channel and 
Galveston Harbor and Channel 
Deepening and Widen channel 
Channel deependng and realignment 
Major rehabilitation of locks and dams 
Lock Replacement 
Breakwater 
Lock Addition (1200 feet) 
Deepdraft channel - widening and deepening 
to 40 ft 
Deepdraft channel - widening and deepening 
to 45 ft 
Breakwater and navigation channel widening 
Breakwater and Navigation Channel 
Breakwater 
Major rehabilitation of locks and dams, 
removal of Lock and Dam 3 
Major rehabilitation/embankments 
D-2 
n

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 1999 
Fiscal Year 
Fiscal Placed in Completed or 
Year Useful Scheduled for 
Project Started Operation Completion Nature of Project 
Lock and Dams 3, 5A, 6,7,8 and 9, MN, WI and IA 1989 2005 Major rehabilitation of electrical/mecha 
Lock and Dam 13, IL 
Lock and Dam 14, IL 
Lock and Dam 15, IL 
Lock and Dam 24, MO 
Lock and Dam 25, MO 
London Locks and Dam, Kanawha River, WV 
Los Angeles Harbor, CA 
McAlpine Lock and Dam 
McClellan-Kerr Arkansas River Navigation System, AR 
Manatee Harbor, FL 
Marmet Locks & Dam, WV 
Melvin Price Lock and Dam, IL and MO 
Miami Harbor Channel, FL 
Mississippi River between Ohio and Missouri Rivers 
IL and MO 
Mississippi River, Ship Channel, Gulf to 
Baton Rouge, LA 
Missouri River Fish and Wildlife Mitigation, IA, NE, KS 
and MO 
Montgomery Point Lock and Dam, AR 
Mouth of Colorado River, TX (Gulf Intracoastal 
Waterway) 
1993 
1996 
1993 
1996 
1994 
1999 
1996 
1996 
1963 
1995 
1998 
1974 
1991 
1910 
1987 
1992 
1997 
1984 
1938 
1939 
1934 
1940 
1939 
1970 
1990 
1987 2 
1994 
1997 
2000 
1997 
2007 
2001 
2003 
2000 
2007 
2000 
1995 
2009 
2003 
1995 
2015 
nical 
systems 
Major rehabilitation of lock and dam 
Major rehabilitation of lock and dam 
Major rehabilitation of lock and dam 
Major rehabilitation of lock and dam 
Major rehabilitation of lock and dam 
Major rehabilitation of lock and dam 
Deepening Channel 
Lock Replacement (1200 feet) 
Locks and dams 
Enlarge turning basin, construct wideners, 
mitigation 
Construction of new lock 
Replacement 
Navigation Channels & Turning Basin 
Regulating works 
Indefinite 3 Dredging 55-foot channel 
2006 Mitigation of fish and wildlife losses from 
construction and operation of Missouri 
River Bank Stabilization and Navigation 
Project 
2002 Lock and Dam 
1995 Breakwaters, dredging, and recreation 
D-3

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 1999 
Project 
Nawiliwili Harbor, Kauai, HI 
New York Harbor and Adjacent Channels, Port Jersey 
Channel, NJ 
New York Harbor, NY and NJ 
Norfolk Harbor Channel, VA (1965 Mod.) 
Norfolk Harbor Channel, VA (1986 Mod) 
Norfolk Harbor, Thimble Shoal Channel, VA 
North Pass-Pass Manchac, LA (107) 
Oakland Harbor, CA 
Olmsted Locks and Dam, IL & KY 
Ouachita and Black River, AR and LA 
Palm Valley Bridge, FL 
Pascagoula Harbor, MS 
Point Marion, Lock & Dam 8, Monongahela River, PA 
Port of Florence, AL 
Port Of Long Beach (Deepening), CA 
Red River WW, Mississippi River to Shreveport, LA 
Richmond Harbor, CA 
Robert C. Byrd Locks and Dam, Ohio River 
Fiscal 
Year 
Started 
1985 
1998 
1976 
1966 
1987 
1987 
1995 
1987 
1992 
1964 
1998 
1994 
1986 
1994 
1998 
1974 
1985 
1985 
Placed in 
Useful 
Operation 
1987 
Incremental 
1967 
1989 
1989 
1995 
1984 
1995 
19844 
1992 
Fiscal Year 
Completed or 
Scheduled for 
Completion Nature of Project 
1987 Breakwater repair 
2010 Deepening channel to 45 ft. providing a 
turning basin and bulkheading portions of the 
turning basin. 
Indefinite Removal of drift sources 
Indefinite Deferred anchorage const. 
Indefinite Dredge 50 ft. channel and deepen to 55 feet 
Indefinite Dredge outbound element and deepen to 55 
feet 
1996 9ft.x 130ft. barge channel 
1999 Channel deepening and widening turning 
basin 
2010 Navigation 
Indefinite Replacement of six locks and dams, channel 
deepening to 9 feet and realignment 
2002 Bridge Replacement 
2000 Channel dredging and construction of a new 
turning basin 
1997 Replaces existing 56x360' lock chamber with 
new 84'x720' chamber 
1995 Channel Dredging 
2000 Channel Deepening 
Indefinite5 Lock and dam construction. Channel 
improvement and realignment 
2000 Channel deepening and turning basin 
2003 Replacement of existing locks and major 
rehabilitation of the dam 
D-4 
m

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 1999 
Project 
Rudee Inlet, VA 
Sacramento River Deep Water Ship Channel, CA 
Salem River, NJ 
San Francisco Bay to Stockton, CA (John F. Baldwin and 
Stockton Ship Channels) 
San Juan Harbor, PR 
Santa Monica Breakwater, CA 
Sonoma Baylands Wetlands Demonstration Project, CA 
Savannah Harbor Deepening, GA 
Savannah Harbor Widening, GA 
Seattle Harbor, East Waterway, WA 7 
Shinnecock Inlet, NY 
Sitka Harbor, AK 
St. George Channel Extension, AK 
St. Paul Harbor Improvements, AK 
Tampa Harbor, FL (Main Channel) 
Taylor Point Cut, LA (107) 
Tenn River, Port of Florence 
Thimble Shoal Channel, VA 
Wallisville Lake, TX 
Wilmington Harbor, NC 
Winfield Locks and Dam, Kanawha River, WV 
Fiscal 
Year 
Started 
1990 
1986 
1995 
1971 
1998 
1998 
1993 
1993 
1990 
1999 
1990 
1993 
1994 
1999 
1976 
1999 
1994 
1987 
1967 
1999 
1990 
Placed in 
Useful 
Operation 
Fiscal Year 
Completed or 
Scheduled for 
Completion 
1991 1991 
Being Determined 
1996 1996 
Being Determined 
1999 
1989 
1999 
1997 
2002 
2002 
1997 
1994 
1992 
2003 
1995 
1997 
1996 
2004 
1987 
1999 
Nature of Project 
Dredge 7 foot channel 
Deep draft channel, widening and deepening 
Channel deepening 
Deep draft channel, widening, deepening and 
dredging 
Deepening & widening for channel 
Repair Breakwater 
Restoration of Tidal Wetlands on a 348 acre 
site 
Channel deepening 
Widening channel 
Dredge East Waterway to 51 ft. 
Dredging and repair of jetties 
Navigation Channel 
Dredging 
Breakwater Improvements and Dredging 
Dredging 
Navigation cut from Charenton LK to Grand 
Isle 
1995 Channel Improvements 
Indefinite Dredge 50 ft outbound element and dredge to 
55 feet 
2001 Multipurpose lake (navigation, salinity 
control, water supply, fish & wildlife, & 
recreational) 
2005 Dredging to Deepen 
2002 Construction of new lock 
D-5 
I ,

APPENDIX D 
Navigation Projects Under Construction During Fiscal Year 1999 
Walter Jones, Joseph P. Knapp, Core Creek, and Gene A. Potter Memorial Bridge are complete. Fairfield bridge is under 
construction. 
2 Phase I, forty-five foot channel to New Orleans, LA. Forty-five foot channel to Mile 181 (Donaldsonville, LA) placed in useful 
operation in 1988. Phase II, forty-five foot channel from mile 181 to Baton Rouge placed in useful operation in 1994. 
Awaiting further PCA's to go deeper than 45 feet. 
4 Lock and Dam No. 1 placed in useful operation in 1984. Lock and Dam No. 2 in 1987. Lock and Dam No. 3 in 1992. Lock and 
Dam No. 4 and 5 in 1994. 
5 Schedule for completion of entire project is indefinite. However, the project opened to 9-foot navigation on 31 December 1994. 
6 Thin-layer monitoring program is continuing. 
7 O& M funded. 
D-6

APPENDIX E 
Multiple-Purpose Projects Including Power 
Operable September 30, 1999 
Flood Control 
Total and/or Nav. 
Storage Feature Placed Initial Existing Ultimate 
Community in Capability in Useful Power in Installation Installation Project Height 
Project River Vicinity (acre-feet)' Operation CY FY (KW) (KW) Functions Type2 (feet) 
Albeni Falls, ID Pend Oreille Newport,WA 1,153,000 
Allatoona Lake,GA Etowah Cartersville,GA 670,000 
Barkley Dam & Lake Cumberland Frand Rivers, 2,082,000 
Barkley, KY & TN KY 
Beaver Lake, AR White Eureka Springs, 1,952,000 
Big Bend Dam (Lake Missouri Chamberlain,S 1,883,000 
Sharpel), SD D 
Blakely Mountain Ouachita Mt. Pine, AR 2,768,000 
Dam-Lake Ouachita 
Bonneville L&D Lake Columbia Bonneville,OR 537,000 
Bonneville, OR & WA 
Broken Bow Lake, OK Mountain Fork Broken Bow, 1,368,230 
OK 
Buford Dam, Lanier, Chattahoochee Buford, GA 2,554,000 
GA 
Bull Shoals Lake AR White Mountain 5,408,000 
& MO Home 
Clarence Cannon Dam Salt Perry, MO 1,428,000 
Carters Dam, GA Coosawatte Carters, GA 472,756 
Center Hill Lake, TN Caney Fork Lancaster,TN 2,092,000 
Cleatham L&D, TN Cumberland Ashland City, 104,000 
TN 
Chief Joseph Dam, Columbia Bridgeport, WA 593,000 
(Rufus Woods Lake), 
WA 
Cooper River, Santee St. Stephen, SC 2,560,000 
Charleston Harbor, SC 
Cordell Hull L&D, TN Cumberland Carthage, TN 310,900 
Cougar Lake, OR S.Fork Blue River, OR 219,000 
McKenzie 
1952 
1950 
1964 
1963 
1964 
1953 
1938 
1968 
1956 
1952 
1983 
1975 
1948 
1952 
1955 
N/A 
1973 
1963 
1955 42,600 
1950 74,000 
1966 130,000 
42,600 
74,000 
130,000 
1965 112,000 112,000 
1965 468,000 468,000 
1956 75,000 75,000 
1938 1,145,700 1,145,700 
NFPR C 90 
FPRW C 190 
NPFR CE 157 
FPSR CE 228 
FPRIW E 95 
FPRW 
NPR 
1970 100,000 100,000 FPWSR E 
1957 86,000 86,000 
1953 340,000 340,000 
1985 
1975 
1951 
1958 
1,055 
1,250 
9,959 
2,575 
10,570 
E 235 1,100 
C 122 2,690 
225 2,750 
NFPW E 192 5,400 
FPR C 258 2,256 
58,000 58,000 FNPRSW CE 138 
500,000 500,000 FPRW ER 450 
135,000 135,000 FPR CE 250 
36,000 36,000 NPR C 75 
1956 2,457,384 2,457,384 
1985 84,000 84,000 
1974 100,000 100,000 
1964 25,000 64,600 
PIR 
1,700 
1,950 
2,160 
801 
C 230 5,998 
NPW CE 86 876 
NPR CE 93 
NFPRI ER 445 
1,306 
1,738 
E-1 
Length 
(feet)

APPENDIX E 
Multiple-Purpose Projects Including Power 
Operable September 30, 1999 
m 
Greers Ferry Lake, AR Little Red 
Harry S. Truman Dam Osage 
& Res. 
Hartwell Dam & Lake, Savannah 
GA & SC 
Hills Creek Lake, OR Middle Fork 
Wilamette 
Heber Spings 2,844,000 
Warsaw, MO 5,202,000 
Hartwell, GA 2,842,700 
Oakridge, OR 356,000 
Flood Control 
and/or Nav. 
Feature Placed Initial Existing Ultimate 
in Useful Power in Installation Installation Project Height Length 
Operation CY FY (KW) (KW) Functions Type2 (feet) (feet) 
1943 
1969 
1969 
1944 
1953 
Total 
Storage 
Community in Capability 
Project River Vicinity (acre-feet)' 
Dale Hollow Lake, TN Obey Celina, TN 1,706,000 
& KY 
Dardanelle L&D, AR Arkansas Dardanelle, AR 486,200 
DeGray Lake, AR Caddo Arkadelphia, 831,900 
AR 
Denison Dam (Lake Red Denison, TX 5,194,163 
Texoma), TX & OK 
Detroit Lake, OR, North Santiam Mill City, OR 461,000 
including Big Cliff 
Lake, OR 
Dworshak Dam & N. Fork, Orofino, ID 3,468,000 
Reservoir, ID Clearwater 
Eufaula Lake, OK Canadian Eufaula, OK 3,825,400 
Fort Gibson Lake, OK Grand Ft. Gibson, OK 1,284,400 
(Neosho) 
Fort Peck Lake, MT Missouri Glasglow, MT 18,909,000 
Fort Randal Dam Lake Missouri Lake Andes, 5,574,000 
Francis (Case), SD SD 
Garrison Dam ( Lake Missouri Riverdale, ND 24,137,000 
Sakakawea), ND 
Gavins Point Dam Missouri Yankton, SD 504,000 
(Lewis & Clark Lake), 
SD & NE 
Green Peter Lake,OR, Middle Sweet Home, 491,000 
including Foster Lake, Santiam OR 
OR 
1949 
1965 
1972 
1945 
1954 
1973 
1964 
1953 
1944 
1954 
1956 
1957 
54,000 
124,000 
68,000 
70,000 
118,000 
400,000 
90,000 
45,000 
185,250 
320,000 
430,000 
100,000 
54,000 
124,000 
108,000 
199,000 
118,000 
1,060,000 7 
90,000 
67,500 
185,250 
320,000 
430,000 
100,000 
FPR 
NPR 
FNPRS 
FPRSN 
NFPRI 
PNFR 
FNPS 
FP 
NFPRIW 
NFPRIW 
NFPRIW 
NFPRIW 
C
C
E
E
C 
CG 
E
E
E
E
E
E 
200 
68 
243 
165 
382 
717 
114 
110 
251 
165 
210 
74 
1967 100,000 100,000 PFNIR C 340 
1964 
1982 
1962 
1962 
96,000 
160,000 
344,000 
30,000 
96,000 
160,000 
344,000 
30,000 
FPRS 
FPRWS 
FPRSW 
NFPRI 
C 
CE 
CE 
GE 
243 
96 
204 
304 
1,717 
2,683 
3,400 
17,200 
1,528 
3,287 
3,200 
2,990 
21,026 
10,700 
11,300 
8,700 
1,380 
1,704 
5,000 
17,880 
2,150 
E-2 
1972 
1964 
1949 
1938 
1953 
1954 
1956 
1967 
1962 
19793 
1961 
1961

APPENDIX E 
Multiple-Purpose Projects Including Power 
Operable September 30, 1999 
Flood Control 
Total and/or Nav. 
Storage Feature Placed Initial Existing Ultimate 
Community in Capability in Useful Power in Installation Installation Project Height 
Project River Vicinity (acre-feet)' Operation CY FY (KW) (KW) Functions Type2 (feet) 
Ice Harbor L&D (Lake Snake Pasco, WA 417,000 1961 1961 603,000 603,000 NPRI CG 130 
Sacajawea), WA 
J. Percy Priest Dam & Stones Nashville, TN 652,000 
Reservoir, TN 
J. Strom Thurmond Savannah Augusta, GA 2,900,000 
Dam & Lake GA & 
SC6 
Jim Woodruff Dam Appalachicola Chattahoochee, 367,300 
(Lake Seminole), FL, FL 
GA & AL 
John Day L&D (Lake Columbia Rufus, OR 2,500,000 
Umatilla), OR & WA 
John H. Kerr Dam & Roanoke Boydton, VA 2,750,300 
Reservoir, NC& VA 
Keystone Lake, OK Arkansas Tulsa, OK 1,672,613 
Lake Greeson, AR Little Missouri Murfreesboro, 407,900 
AR 
Laurel River, KY Laurel London, KY 
Libby Dam, Lake Kootenai Libby, MT 
Koocanusa, MT 
Little Goose L&D Snake Starbuck, W 
(Lake Bryan), WA 
Lookout Point Lake Middle Fork Lowell, OR 
including Dexter Lake, 
OR 
Lost Creek Lake, OR Rogue 
Lower Granite L&D, Snake 
WA 
Lower Monumental Snake 
L&D (Lake Herbert G. 
West), WA 
435,600 
5,809,000 
TA 565,200 
483,000 
Trail, OR 465,000 
Pomeroy, WA 483,800 
Kahlotus, WA 376,000 
1967 
1952 
1957 
1968 
1952 
1964 
1950 
1973 
1972 
1970 
1954 
1977 
1975 
1969 
1970 28,000 28,000 
1953 282,000 282,000 
1957 30,000 30,000 
FPRW CE 147 
FPRSW CE 200 
NPRW CE 
Length 
(feet) 
2,822 
2,716 
5,680 
67 6,150 
1969 2,160,000 2,700,000 NPRFI CE 161 
1953 204,000 204,000 
1968 
1950 
70,000 
25,500 
1978 61,000 
1975 525,000 
70,000 
25,500 
61,000 
840,000 
1970 810,000 810,000 
5,900 
FPRW CE 144 22,285 
FNPWS E 121 
FPRW C 183.5 
FPRW 
FPR 
R
C 
282 
420 
NPRI CG 165 
1955 135,000 135,000 NFPRI CE 243 
1977 
1975 
49,000 49,000 DFPISWR CE 345 
810,000 810,000 NPRIF CG 146 
1969 810,000 810,000 NPRI CG 135 
4,600 
941 
1,420 
3,055 
2,655 
3,381 
3,600 
3,200 
3,791 
E-3 
(

APPENDIX E 
Multiple-Purpose Projects Including Power 
Operable September 30, 1999 
Total 
Storage 
Community in Capability 
Project River Vicinity (acre-feet)' 
McNary L&D OR & Columbia Umatilla, OR 1,350,000 
WA 
Millers Ferry L&D, Alabama Camden, AL 331,8090 
AL 
Mississippi Delta Mississippi Braithwaite, LA 
Region, LA 
(Caernarvon 
Freshwater Diversion) 
Nanpil River Nanpil River Pohnpei, FSM 
Hydropower, Pohnpei, 
FSM 
New Melones Lake, Stanislaus Oakdale, CA 2,400,000 
CA4 
Norfork Lake, AR & North Fork Norfolk, AR 1,983,000 
MO 
Oahe Dam (Lake Missouri Pierre, SD 23,337,000 
Oahe), SD & ND 
Old Hickory L&D, TN Cumberland Hendersonville, 545,000 
TN 
Ozark-Jeta Taylor Arkansas Ozark, AR 148,400 
L&D, AR 
Philpott Lake, VA Roanoke Bassett, VA 318,500 
Richard B. Russell Savannah Augusta, GA 1,026,244 
Dam & Lake, GA & 
SC 
Robert F. Henry L&D, Alabama Benton, AL 234,200 
AL 
Robert S. Kerr L&D Arkansas Sallisaw, OK 525,700 
and Reservoir, OK 
Sam Rayburn Dam& Angelina Jasper, TX 3,997,600 
Reservoir, TX 
St. Mary's Riv, MI Great Lakes Sault Ste. Marie 
Flood Control 
and/or Navy. 
Feature Placed 
in Useful 
Operation CY 
1953 
1969 
1991 
1987 
1978 
1943 
1959 
1954 
1969 
1951 
1984 
1972 
1970 
1965 
1855 
Initial Existing Ultimate 
Power in Installation Installation Project Height 
FY (KW) (KW) Functions Type2 (feet) 
1954 980,000 980,000 NPRI CG 183 
1979 75,000 75,000 NPRW CE 90 
W CE 38.5 
1988 
1979 
1944 
1962 
1957 
1973 
1954 
1984 
1975 
1971 
1966 
1952 
2,000 
300,000 
80,550 
595,000 
100,000 
100,000 
14,000 
300,000 
68,000 
110,000 
52,000 
18,400 
2,000 
300,000 
163,000 
595,000 
100,000 
100,000 
14,000 
600,000 
68,000 
110,000 
52,000 
18,400 
Length 
(feet) 
7,365 
11,380 
371 
P C 17 70 
FIPRW ER 625 
FPRS C 216 
NFPRIW E 245 
NPR CE 98 
NPR C 58 
FPR C 220 
PRFSW CE 200 
NPRW CE 101 
NPR E 75 
FPWR CE 120 
NP Control 
Gate 
1,560 
2,624 
9,300 
3,605 
2,480 
892 
5,616 
14,962 
7,230 
19,430 
E-4 
I

-APPENDIX E 
Multiple-Purpose Projects Including Power 
Operable September 30, 1999 
Flood Control 
Total and/or Nav. 
Storage Feature Placed Initial Existing Ultimate 
Community in Capability in Useful Power in Installation Installation Project Height 
Project River Vicinity (acre-feet)' Operation CY FY (KW) (KW) Functions Type' (feet) 
Snettisham, AK' Speel Juneau, AK 352,400 1973 73,700 73,700 P C6 18 
Stockton Lake, MO Sac Stockton, MO 1,674,000 1969 1973 45,200 45,200 FPRWSQ CEG 128 
Table Rock Lake, AR White Branson, MO 3,462,000 1958 1959 200,000 200,000 FPR CE 252 
& MO 
Tenkiller Lake, OK Illinois 
The Dalles L&D (Lake Columbia 
Celilo), WA & OR 
Walter F. George Chattahoo. 
L&D, GA & FL 
Webbers Falls L&D, Arkansas 
Gore, OK 1,230,800 
The Dalles, OR 53,000 
che Fort Gaines, 934,000 
GA 
Wevbbers Falls, 170,100 
OK OK 
West Point Lake, AL Chattahooche West Point, GA 604,500 
& GA 
Whitney Lake, TX Brazos Whitney, TX 1,999,500 
Wolf Creek Dam Cumberland Jamestown, KY 6,089,000 
(Lake Cumberland), 
KY 
1952 
1957 
1963 
1970 
1975 
1953 
1950 
1953 39,100 39,100 
1957 1,806,800 1,806,800 
FP 
NPR 
E 197 
CR 300 
1963 130,000 130,000 NPRW CE 114 
1973 
1975 
60,000 
73,375 
60,000 
108,375 
1954 30,000 30,000 
1952 270,000 270,000 
Length 
(feet) 
338 
5,100 
6,423 
3,000 
8,875 
13,585 
NP E 84 4,370 
FPRW CE 
FPR 
FPR 
97 7,250 
CE 159 17,695 
CE 258 5,736 
E-5

APPENDIX E 
Multiple-Purpose Projects'Including Power 
Operable September 30, 1999 
NOMENCLATURE FOR PROJECT FUNCTIONS 
D - Debris Control P - Power 
F - Flood Control R - Public Recreation Annual Attendance exceeding 5,00 
I - Irrigation S - Water Supply 
N - Navigation W - Fish & Wildlife (Federal Or State) 
1 Total of all storage functions, including inactive and dead storage to normal full pool 
2 G: gravel; R: rock; C: concrete; E: earth 
3 All six units have successfully generated power; however, repairs and modifications have been required on all units. Units 2, 3, 4, 5 and 
fully repaired and operational. Repairs to remaining unit No. 1 will be completed in FY 99. 
4 Being operated for the Department of Interior by the Bureau of Reclamation 
s Being operated by the Alaska Power Administration 
6 Formerly Clarks Hill Lake 
7 Units 5 and 6 were deauthorized in 1990. 
E-6 
)0 
6

APPENDIX F 
Multiple-Purpose Projects Including Power 
Under Construction September 30, 1999 
Nameplate Capacity 
Project Fiscal Scheduled Scheduled Scheduled Ultimate Installation 
Year For For Functions Installation 
Started Operation Completion 
Chief Joseph Additional Units, WA 1973 1994 1999 PIR 2,273,160 2,525,000 
Cooper River, Charleston Hbr, SC 1977 1985 2000 NWDP 84,000 84,000 
Garrison Dam & Powerplant, ND (Maj 1997 2005 2005 P/F/N/I 109,950 98,000 
Rehab) 
Harry S. Truman Dam and Reservoir, Osage 1965 1982 2 1996 FRPWS 160,000 
River, MO 
Mississippi Delta Region, LA (Davis Pond 1996 2000 2003 2003 W 
Freshwater Diversion) 
New Melones Lake, CA 3 1966 1979 Indefinite DFIPRW 300,000 300,000 
Richard B. Russell Dam and Lake, Savannah 1975 1985 2004 FRPW 600,000 600,000 
River, GA and SC 
Snettisham, AK 1967 1989 1993 P 73,700 27,000 
KEY 
- Redevelopment 
- Power 
F
R 
- Flood Control 
- Recreation 
I
S 
- Irrigation 
- Water Supply 
N
W 
- Navigation 
- Fish & Wildlife 
F-1 
D
P

APPENDIX F 
Multiple-Purpose Projects Including Power 
Under Construction September 30, 1999 
' Limited by hydraulic factors. Units 1-27. 
2 All six units have successfully generated power; however, repairs and modifications have been required on all units. Units 3, 4, 5, 
and 6 are fully repaired and operational. Repairs to remaining units will be completed in FY 98. 
3 New Melones Lake was turned over to the Bureau of Reclamation for operation on November 20, 1979. Corps retains responsibility 
for facilities along the lower Stanisalaus River. Remaining construction consists of unscheduled recreation facilities and minor feature 
closeouts. 
F-2

Appendix G 
ANNUAL FLOOD DAMAGE REPORT 
Page Numbers 
* FIGURES 
Figure 1 -- Damages Prevented G-3 
Figure 2 -- Potential Flood Damages G-4 
Figure 3 -- Flood Related Lives Lost G-5 
Figure 4 -- Continental U.S. River Basins (For Use With Table 6) G-6 
Figure 5 -- Benefits And Accumulated Expenditures G-7 
Figure 6 -- Atlantic Tropical Storms G-8 
* TABLES 
Table 1 -- Flood Damages Prevented, By State in Fiscal Year 1999 G-10 
Table 2 -- Total Damages Suffered, By State in Fiscal Year 1999 G-12 
Table 3 -- Flood Damages Prevented, Fiscal Years 1990-99 G-14 
Table 4 -- Total Damages Suffered By State, Fiscal Years 1990-99 G-16 
Table 5 -- Total Lives Lost, By State in Fiscal Years 1990-99 G-18 
Table 6 -- Regional Distribution, Flood Damages Prevented G-20 
Table 7 -- Atlantic Ocean Tropical Cyclones and their Effects G-22 
G-1

FIGURES 
G-2

Figure 1 
DAMAGES PREVENTED 
0) 0 0 
0) 0) 0) 
Flood Damages Prevented in the U.S.A. by the U.S. Army Corps of Engineers 
G-3 
50- 
45- 
40- 
35- 
30- 
25- 
20- 
15- 
10- 
L.. 
aNO
Cl) 
0 
*- 
m*
i 
5
0 
0-r) 
I) 
0O)3l 
co 
a, 
0) 
00 
O3' 
0) 
0r) 
0)

Figure 2 
POTENTIAL FLOOD DAMAGES 
60 
50 
o 40 
30 - _ 3 
= 20 
10
O-I 00 0 
U"Flood Damages Suffered i Flood Damages Prevented 
G-4

Figure 3 
Flood Related Lives Lost 
- I 4lslsPslP -i -ILPsP PI IP spri 
0) O 0r ) N c! CD . 00 0 OD c0) m 0) 0) 0) 0 O) 
0) 0 00))4 0c) C! c) 0) 0) C0) 0) 
r U- YTE .r r T T 
Fiscal Year 
G-5 
140 
120 
100 
80 
60 
Cl) 
0 
-
,.... 
40 
20
0

Figure 4 
CONTINENTAL U.S. RIVER BASINS 
For use with Table 6 
G-6

Figure 5 
Benefits of Federal Projects (Damages Prevented) 
Accumulative Corps Expenditures (Principle plus O&M) 
Billions of Dollars (Adjusted to 1999 using Construction Cost Index) $800 
$700 
$600 
$500 
$400 
$300 
$200 
$100 
$0 
G-7 
00 r O M (0 0) C4 1 00 r - I O C) 0 O() C 10 00 r.-0) C CCd) 1 d)1 10 1t 0 ( 0 (0 (0 Id CC 00 00 00 O O) O) ) 
0) 0) V0r) - 0) ) rr 0) ) 0) ) ) r0 ) Fis0) c0)a l e0)a r ) 0) 0) 0) 0 ) ) 0 r) r) 
Fiscal Year 
- 
.o 
m
111 
1111

Figure 6 
Atlantic Tropical Storms 
20- 
15 
E
3 
04 
0) )) 0) 0) 0) 0) 0) 0 0) 
0) 0) 0) c ) 0) 0) 0) 0) 0) 0) 
r ! T r l r r r r r 
Hurricanes Tropical Storms 
G-8 
a a~ 
0s�

TABLES 
G-9

TABLE - 1 
FLOOD DAMAGES PREVENTED BY THE U.S. ARMY CORPS OF ENGINEERS 
BY STATE (THOUSANDS OF DOLLARS) During Fiscal Year 1999 
Prevented by Prevented by Damages Prevented Total Flood Average *Comparision of 
Location Corps Supported Corps by Corps Supported Damages Prevented Damages 1999 to the 
Reservoirs Levees Emergency by the Corps Prevented Ten-Year Avg 
Operations of Engineers FY 1990-99 FY 1990-99 
ALABAMA 0 49,143 0 49,143 4,914 Very High 
ALASKA 0 0 0 0 3,560 Low 
ARIZONA 5,018 0 0 5,018 28,502 Low 
ARKANSAS 90,902 589,617 0 680,519 1,174,556 Medium 
CALIFORNIA 40,418 46,817 0 87,235 885,710 Low 
COLORADO 30,247 14,657 0 44,904 6,204 Very High 
CONNECTICUT 26,819 484 0 27,303 30,910 Medium 
DELAWARE 0 0 0 0 0 Low 
FLORIDA 15,730 0 1,000 16,730 34,837 Low 
GEORGIA 30,979 0 0 30,979 17,449 Medium 
GUAM 0 0 0 0 16 Low 
HAWAII 0 0 0 0 2,556 Low 
IDAHO 94,854 3,282 0 98,136 81,817 Medium 
ILLONOIS 13,838 28,998 0 42,836 728,509 Low 
INDIANA 76,478 53,522 0 130,000 123,035 Medium 
IOWA 30,935 79,317 0 110,252 196,782 Medium 
KANSAS 296,706 213,520 1,500 511,726 773,093 Medium 
KENTUCKY 12,449 1,489 0 13,938 147,838 Low 
LOUISIANA 3,045 11,216,059 0 11,219,104 8,340,350 Medium 
MAINE 0 0 0 0 7 Low 
MARYLAND & DC 0 3 0 3 37,934 Low 
MASSACHUSETTS 1,211 832 0 2,043 21,176 Low 
MICHIGAN 0 2,419 0 2,419 5,148 Medium 
MINNISOTA 3,963 2,285 0 6,248 35,970 Low 
MISSISSIPPI 6,475 773,050 0 779,525 689,721 Medium 
MISSOURI 4,578,116 187,020 3,575 4,768,711 3,219,041 Medium 
MONTANA 10,552 0 0 10,552 24,024 Medium 
G-10O

TABLE - 1 
FLOOD DAMAGES PREVENTED BY THE U.S. ARMY CORPS OF ENGINEERS 
BY STATE (THOUSANDS OF DOLLARS) During Fiscal Year 1999 
Prevented by Prevented by Damages Prevented Total Flood Average *Comparision of 
Location Corps Supported Corps by Corps Supported Damages Prevented Damages 1999 to the 
Reservoirs Levees Emergency by the Corps Prevented Ten-Year Avg 
Operations of Engineers FY 1990-99 FY 1990-99 
NEBRASKA 50,628 29,460 0 80,088 125,001 Medium 
NEVADA 3,780 0 0 3,780 94,320 Low 
NEW HAMPSHIRE 171 0 0 171 708 Low 
NEW JERSEY 0 46,248 0 46,248 12,342 High 
NEW MEXICO 5,018 2,781 0 7,799 64,191 Low 
NEW YORK 2,583 178,710 0 181,293 132,839 Medium 
N. CAROLINA 156,260 988 1,000 158,248 105,130 Medium 
N. DAKOTA 50,915 46,095 0 97,009 74,957 Medium 
OHIO 94,150 2,594 0 96,744 250,671 Low 
OKLAHOMA 160,575 0 0 160,575 144,835 Medium 
OREGON 24,276 641,877 0 666,153 900,059 Medium 
PENNSYLVANIA 12,844 40,369 0 53,213 405,849 Low 
PUERTO RICO & VI 0 0 0 0 46,916 Low 
RHODE ISLAND 0 0 0 0 1,649 Low 
S. CAROLINA 0 0 0 0 888 Low 
S. DAKOTA 31 499 2,718 3,248 8,318 Low 
TENNESSEE 932 17,135 0 18,067 64,291 Low 
TEXAS 605,113 21,331 0 626,444 2,673,751 Low 
UTAH 10,361 0 0 10,361 6,006 Medium 
VERMONT 1,654 106 0 1,760 2,794 Medium 
VIRGINIA 13 16,943 0 16,956 36,421 Medium 
WASHINGTON 41,612 240,168 0 281,780 329,854 Medium 
W. VIRGINA 3,434 2,057 0 5,491 219,180 Low 
WISCONSON 0 103 0 103 1,709 Low 
WYOMING 8,303 502 0 8,805 12,432 Medium 
TOTALS 6,601,387 14,550,479 9,793 21,161,659 22,328,770 
FY 1999 Damages Prevented in the U.S. = 95% of the 10-year (1990.99) Average 
* LEGEND: LOW = Less than 1/2 average. HIGH = Twice to five times average. 
MED= 1/2 to twice average. VERY HIGH = More than five times average. 
G-11

TABLE- 2 
TOTAL DAMAGES SUFFERED IN FY 1999, 
BY STATE (THOUSANDS OF DOLLARS) 
Damages Damages Potential Percent Average Lives Lives 
LOCATION Suffered Prevented Damages Damages Damages Lost Lost FY 
FY 1999 FY 1999 FY 1999 Prevented Suffered FY 1999 1990-99 
FY 1999 1990-99 
ALABAMA 4,663 49143 53,806 91 62,019 9 33 
ALASKA 0 0 0 0 9,891 0 0 
ARIZONA 12796 5018 17,814 28 28,029 4 28 
ARKANSAS 1777 680519 682,296 100 17,812 1 5 
CALIFORNIA 14176 87235 101,411 86 452,043 16 62 
COLORADO 50675 44904 95,579 47 39,011 0 9 
CONNECTICUT 1112 27303 28,415 96 1,469 0 1 
DELAWARE 0 0 0 0 264 0 0 
FLORIDA 60080 16730 76,810 22 88,679 0 4 
GEORGIA 8520 30979 39,499 78 62,529 1 49 
GUAM 400 0 400 0 373 0 0 
HAWAII 0 0 0 0 4,558 0 8 
IDAHO 1297 98136 99,433 99 18,065 0 1 
ILLONOIS 3666 42836 46,502 92 290,691 1 13 
INDIANA 50124 130000 180,124 72 37,017 2 19 
IOWA 111,221 110252 221,473 50 669,486 0 13 
KANSAS 60,030 511726 571,756 90 61,146 0 10 
KENTUCKY 506 13938 14,444 96 62,309 2 36 
LOUISIANA 5,979 11219104 11,225,083 100 378,820 1 12 
MAINE 1,580 0 1,580 0 6,584 0 5 
MARYLAND & DC 9,715 3 9,718 0 9,917 0 3 
MASSACHUSETTS 250 2043 2,293 89 10,130 0 1 
MICHIGAN 325 2419 2,744 88 6,324 0 8 
MINNISOTA 466 6,248 6,714 93 173,955 2 7 
MISSISSIPPI 1,769 779525 781,294 100 38,321 0 5 
MISSOURI 36,862 4768711 4,805,573 99 352,661 4 77 
MONTANA 184 10552 10,736 98 3,484 0 8 
Damage values of less than $50 thousand dollars are shown as zeros. 
G-12

TABLE - 2 
TOTAL DAMAGES SUFFERED IN FY 1999, 
BY STATE (THOUSANDS OF DOLLARS) 
Damages Damages Potential Percent Average Lives Lives 
LOCATION Suffered Prevented Damages Damages Damages Lost Lost FY 
FY 1999 FY 1999 FY 1999 Prevented Suffered FY 1999 1990-99 
FY 1999 1990-99 
NEBRASKA 22,765 80088 102,853 78 47,193 0 8 
NEVADA 25,009 3780 28,789 13 65,561 0 8 
NEW HAMPSHIRE 1,002 171 1,173 15 1,696 1 1 
NEW JERSEY 800,000 46248 846,248 5 9,779 0 8 
NEW MEXICO 3,980 7799 11,779 66 4,394 0 11 
NEW YORK 18,715 181293 200,008 91 46,349 3 26 
N. CAROLINA 3,117,160 158248 3,275,408 5 14,404 0 55 
N. DAKOTA 100,355 97009 197,364 49 394,365 2 6 
OHIO 963 96744 97,707 99 53,335 8 58 
OKLAHOMA 9,578 160575 170,153 94 10,231 4 21 
OREGON 2,100 666153 668,253 100 340,000 2 10 
PENNSYLVANIA 27,642 53213 80,855 66 54,417 0 31 
PUERTO RICO & VI 4,488 0 4,488 0 12,426 1 56 
RHODE ISLAND 0 0 0 0 24 0 0 
S. CAROLINA 75 0 75 0 7,105 2 17 
S. DAKOTA 619 3248 3,867 84 90,641 0 5 
TENNESSEE 554 18067 18,621 97 15,187 13 28 
TEXAS 612,634 626444 1,239,078 51 196,681 19 155 
UTAH 1,314 10361 11,675 89 3,805 1 1 
VERMONT 1,036 1760 2,796 63 5,903 0 5 
VIRGINIA 255,062 16956 272,018 6 29,091 0 17 
WASHINGTON 2,371 281780 284,151 99 71,725 0 9 
W. VIRGINA 363 5491 5,854 94 30,932 2 28 
WISCONSON 9,305 103 9,408 1 142,139 1 5 
WYOMING 0 8805 8,805 100 420 0 2 
TOTALS 5,455,263 21,161,660 26,616,923 80 4,533,386 102 988 
AVERAGE 80 99 
Damage values of less than $50 thousand dollars are shown as zeros. 
G-13

TABLE- 3 
G-14 
FLOOD DAMAGES PREVENTED BY THE U.S. ARMY CORPS OF ENGINEERS 
FISCAL YEARS 1990 - 1999 (IN THOUSANDS OF DOLLARS) 
LOCATION FY 90 FY 91 FY 92 FY 93 FY94 FY 95 FY96 FY97 FY98 FY99 
ALABAMA 0 0 0 0 0 0 0 0 0 00 
ALASKA 0 8,100 10,000 0 8,750 8,750 0 0 0 0 
ARIZONA 0 0 3,945 113,000 0 140,456 5,202 13,219 4,180 5,018 
ARKANSAS 635,569 478,008 65,947 161,070 861,023 1,350,558 1,066,854 5,733,106 712,907 680,519 
CALIFORNIA 9,500 64,022 406,036 750,435 138 1,484,202 389,649 3,042,730 2,623,156 87,235 
COLORADO 0 482 9,367 928 509 3,071 0 2,782 0 44,904 
CONNECTICUT 53,180 100 4,228 56,339 25,746 305 74,414 11,518 55,971 27,303 
DELAWARE 0 0 0 0 0 0 0 0 0 00 
FLORIDA 256 1,305 17,591 19,155 5,342 104,072 66,655 13,486 103,780 65,873 
GEORGIA 37,618 1,689 1,474 6,549 3,771 3,889 50,305 6,952 31,263 30,979 
GUAM 0 0 44 45 68 0 
HAWAII 1,085 5,457 194 10 6,728 5,126 4,608 2,349 0 0 
IDAHO 5,073 23,018 253 85,743 9,844 54,948 190,618 272,955 77,578 98,136 
ILLONOIS 450,687 64,996 10,369 2,483,431 94,914 2,664,865 553,925 557,829 361,233 42,836 
INDIANA 57,583 149,239 27,288 106,604 128,040 24,661 152,440 273,661 180,836 130,000 
IOWA 128,746 77,099 14,662 624,071 41,110 75,133 97,882 653,984 144,879 110,252 
KANSAS 78,201 30,816 298,933 5,760,259 32,293 849,044 65,443 87,605 16,614 511,726 
KENTUCKY 25,868 159,089 35,464 31,614 178,350 79,609 216,292 675,177 62,976 13,938 
LOUISIANA 9,623,200 13,670,272 1,005,357 7,452,058 7,903,263 9,683,360 5,311,449 12,264,278 5,271,162 11,219,104 
MAINE 0 0 0 0 0 70 0 0 0 0 
MARYLAND & DC 9 14 93,074 71,225 0 2 214,782 220 14 3 
MASSACHUSETTS 6,975 9,472 574 33,956 26,276 135 57,870 19,238 55,218 2,043 
MICHIGAN 3,405 0 412 0 0 867 344 23,345 20,690 2,419 
MINNISOTA 1,485 5,400 2,929 133,273 10,980 8,978 19,949 167,250 3,208 6,248 
MISSISSIPPI 626,709 1,196,409 155,364 105,666 121,003 1,059,468 628,384 1,380,714 843,968 779,525 
MISSOURI 245,361 200,669 299,878 9,793,809 769,333 5,740,837 2,240,713 7,903,399 227,701 4,768,711 
MONTANA 7,394 15,408 4,483 20,070 6,542 13,004 49,674 101,164 11,947 10,552 
10 Yr. Avg
0 
3, 560 
28, 502 
1,174, 556 
885,710 
6j20430,910 
0 
39,752 
17,449 
16 
2,556 
81,817 
728,508 
123, 035 
1961782 
773,093 
147,838 
8,340,350 
7 
37,934 
21,176 
5,148 
35,970 
689,721 
3,219,041 
24,024

TABLE- 3 
FLOOD DAMAGES PREVENTED BY THE U.S. ARMY CORPS OF ENGINEERS 
FISCAL YEARS 1990 - 1999 (IN THOUSANDS OF DOLLARS) 
LOCATION FY 90 FY 91 FY 92 FY 93 FY94 FY 95 FY96 FY97 FY98 FY99 
NEBRASKA 11,007 58,559 7,351 226,589 36,715 80,795 96,985 635,868 16,050 80,088 
NEVADA 0 0 0 0 0 63,611 19,974 852,687 3,149 3,780 
NEW HAMPSHIRE 0 0 0 3,549 250 0 1,250 943 916 171 
NEW JERSEY 4,991 1,247 445 5,836 8,355 13,017 10,008 27,172 6,097 46,248 
NEW MEXICO 42,531 91,189 27,619 109,486 164,439 29,195 116,598 52,598 453 7,799 
NEW YORK 12,879 17,566 6,120 157,744 56,334 31,201 568,026 234,297 62,932 181,293 
N. CAROLINA 17,063 23,231 8,474 24,023 54,536 26,823 558,461 65,769 114,667 158,248 
N. DAKOTA 6,429 1,591 942 109,062 35,802 32,848 76,344 342,323 47,222 97,009 
OHIO 140,824 250,242 6,601 107,340 312,590 47,934 828,586 397,145 318,700 96,744 
OKLAHOMA 220,136 19,116 52,838 556,345 87,545 196,801 12,739 65,815 76,439 160,575 
OREGON 693,409 42,633 47,243 87,844 83,039 1,342 2,755,876 4,203,503 419,550 666,153 
PENNSYLVANIA 16,424 40,498 3,046 189,825 46,304 3,954 3,497,659 141,559 66,007 53,213 
PUERTO RICO & VI 0 0 4,665 4,400 0 12,242 107,500 0 340,356 0 
RHODE ISLAND 2,940 1,620 0 2,145 0 0 0 114 9,672 0 
S. CAROLINA 59 2,849 625 300 2,268 943 955 149 735 0 
S. DAKOTA 460 572 4,140 1,978 651 7,992 1,152 62,073 915 3,248 
TENNESSEE 7,588 310,926 496 768 35,528 39,500 31,000 193,158 5,876 18,067 
TEXAS 4,122,558 13,860 5,197,449 2,631,802 5,707,236 2,672,764 4,736 5,113,947 646,713 626,444 
UTAH 500 1,500 700 34,326 4,553 0 0 8,120 0 10,361 
VERMONT 1,874 2,525 2,275 1,892 3,006 3,304 4,200 3,355 3,752 1,760 
VIRGINIA 10,035 1,686 124,553 18,683 3,621 5,736 135,894 5,598 41,446 16,956 
WASHINGTON 258,333 357,877 54,343 67,028 65,935 6,228 732,293 1,120,921 353,805 281,780 
W. VIRGINA 7,406 76,882 40,152 98,580 103,464 129,065 1,272,486 395,426 62,851 5,491 
WISCONSON 0 0 0 13,914 65 31 473 2,296 210 103 
WYOMING 2,603 4,424 1,373 22,095 3,750 19,548 23,480 29,217 9,020 8,805 
TOTALS 17,577,953 17,481,657 8,059,272 32,284,819 17,049,941 26,780,284 22,314,171 47,161,059 13,416,882 21,161,659 
G-15 
10 Yr. Avg 
125,001 
94,320 
708 
12,342 
64,191 
132,839 
105,130 
74,957 
250,671 
144,835 
900,059 
405,849 
46,916 
1,649 
888 
8,318 
64,291 
2,673,751 
6,006 
2,794 
36,421 
329,854 
219,180 
1,709 
12,432 
22,328,770

TABLE 4 
TOTAL FLOOD DAMAGES SUFFERED, BY STATE 
FISCAL YEARS 1990-1999 (IN THOUSANDS OF DOLLARS) 
LOCATION FY 90 FY 91 FY 92 FY 93 FY 94 FY 95 FY 96 FY 97 FY 98 FY 99 10 Yr. Avg. 
ALABAMA 120,000 15,055 320 0 112,696 0 1,649 1,354 368,938 4,663 62,468 
ALASKA 0 0 7,302 0 74,000 10,025 0 1,271 314 0 9,291 
ARIZONA 3,220 258 5,189 228,900 1,616 6,618 701 85 66 12796 25,945 
ARKANSAS 143,056 12,006 909 2,680 2,024 0 205 12,874 2045 1777 17,758 
CALIFORNIA 570 3,376 93,152 165,920 1,792 1,495,960 13,205 2,086,125 621588 14176 449,586 
COLORADO 130 2,820 1,602 100 1,242 18,240 4,058 358,890 2550 50675 44,031 
CONNECTICUT 10 16 10,366 0 1,316 0 2,092 52 40 1112 1,500 
DELAWARE 0 0 2 0 741 0 300 0 0 0 104 
FLORIDA 500 0 41,938 2,080 182,605 18,536 158,001 49,707 431311 60080 94,476 
GEORGIA 30,658 106,158 1,156 7,340 300,000 8,845 2,581 464 166291 8520 63,201 
GUAM 0 0 0 3725 400 413 
HAWAII 665 23,715 9,260 2,910 3,700 0 1,935 0 0 0 4,219 
IDAHO 113 2,574 224 0 0 2,096 49,400 125,060 1005 1297 18,177 
ILLINOIS 71,045 19,834 189 2,640,140 32,606 27,240 107,585 4,295 2380 3666 290,898 
INDIANA 105,550 89,504 45,424 9,550 2,852 6,789 21,575 68,598 19611 50124 41,958 
IOWA 351,401 195,703 50,800 5,740,000 9,124 3,498 165,265 3,680 168,101 111,221 679,879 
KANSAS 2,048 16,551 10,127 551,070 10,437 8,874 3,969 102 4,888 60,030 66,810 
KENTUCKY 5,664 9,034 46,870 4,980 2,544 17,673 21,323 470,915 16,639 506 59,615 
LOUISIANA 115,901 221,720 4,191 4,020 675 3,097,250 121 4,359 17,845 5,979 347,206 
MAINE 0 16,336 2,179 3,040 9,323 0 4,916 26,845 0 1,580 6,422 
MARYLAND & DC 23 48 339 0 4,524 1,620 90,481 198 334 9,715 10,728 
MASSACHUSETTS 50 9,716 176 160 0 0 2,663 75,024 13,510 250 10,155 
MICHIGAN 627 6,133 355 1,600 6,236 2,900 26,690 325 18,190 325 6,338 
MINNISOTA 3,032 1,280 1,760 964,050 1,867 3,750 460 743,218 2,529 466 172,241 
MISSISSIPPI 21,805 313,359 1,010 4,480 1,352 1,092 200 32,774 3,498 1,769 38,134 
MISSOURI 1,842 1,960 2,044 3,429,630 37,864 25,415 871 692 10,227 36,862 354,741 
MONTANA 1,758 10,743 1,403 6,720 3,392 510 2,243 2,874 3,001 184 3,283 
Damage values of less than $50 thousand dollars are shown as zeroes. 
G-16

TABLE 4 
TOTAL FLOOD DAMAGES SUFFERED, BY STATE 
FISCAL YEARS 1990-1999 (IN THOUSANDS OF DOLLARS) 
LOCATION FY 90 FY 91 FY 92 FY 93 FY 94 FY 95 FY 96 FY 97 FY 98 FY 99 10 Yr. Avg. 
NEBRASKA 36,536 53,615 6,683 294,500 2,710 5,129 31,233 10,273 1,483 22,765 46,493 
NEVADA 51 2 1,621 0 160 11,970 370 640,110 1,300 25,009 68,059 
NEW HAMPSHIRE 1,200 0 0 0 0 110 4,000 10,952 700 1,002 1,796 
NEW JERSEY 1 16,002 500 0 3,520 0 36,720 38,700 750 800,000 89,619 
NEW MEXICO 1,187 1,567 32,264 210 2,000 954 1,285 380 713 3,980 4,454 
NEW YORK 6,530 19,603 1,862 55,480 25,707 1,485 220,011 55,909 38,627 18,715 44,393 
N. CAROLINA 1,075 2,694 12,927 1,400 2,032 26,596 42,119 17,994 16,135 3,117,160 324,013 
N. DAKOTA 0 32 0 413,600 58,552 44,366 220 3,408,298 2,583 100,355 402,801 
OHIO 40,846 55,165 20,078 25,800 39,913 28,511 22,721 66,666 181,409 963 48,207 
OKLAHOMA 40,650 90 10,871 44,720 166 3,275 0 155 262 9,578 10,977 
OREGON 1,070 9,010 32 1,760 0 11,320 3,203,500 173,200 10 2,100 340,200 
PENNSYLVANIA 792 8,342 1,805 440 16,194 10,385 494,862 3,136 1,103 27,642 56,470 
PUERTO RICO & VI 65 16 90,127 5,300 160 115 131 157 28,190 4,488 12,875 
RHODE ISLAND 50 174 16 0 0 0 0 0 0 24 
S. CAROLINA 677 11,871 0 17,920 6,228 28,169 668 1,105 4,044 75 7,076 
S. DAKOTA 3,000 2,934 3,460 763,380 20,399 12,270 360 100,541 50 619 90,701 
TENNESSEE 18,059 13,109 204 5,070 51,039 1,264 2,740 23,479 25,427 554 14,095 
TEXAS 386,886 188,766 199,356 56,990 1,721 85,050 407,066 136,472 163,407 612,634 223,835 
UTAH 56 6,005 24 160 0 1,500 312 10,100 4,485 1,314 2,396 
VERMONT 15,657 19 2 7,550 1,502 5,150 5,123 170 23,805 1,036 6,001 
VIRGINIA 3,472 984 7,371 0 16,169 66,759 153,516 898 2,381 255,062 50,661 
WASHINGTON 58,770 227,634 176 2,080 160 250 370,060 54,675 3,120 2,371 71,930 
W. VIRGINA 8,930 908 5,791 620 5,397 8,595 224,172 18,391 35,506 363 30,867 
WISCONSON 31,159 180 29,305 903,660 62,052 675 218,025 93,346 82,825 9,305 143,053 
WYOMING 44 2,160 0 0 0 0 181 192 22 0 260 
TOTALS 1,636,431 1,698,781 762,762 16,370,010 1,120,309 5,110,829 6,121,884 8,935,080 2,496,963 5,455,263 4,970,831 
Damage values of less than $50 thousand dollars are shown as zeroes. 
G-17

TABLE - 5 
TOTAL LIVES LOST, BY STATE 
FISCAL YEARS 1990-1999 
LOCATION FY 90 FY 91 FY 92 FY 93 FY 94 FY 95 FY 96 FY 97 FY 98 FY 99 10-Yr Total 
ALABAMA 16 1 2 0 2 0 2 0 9 1 33 
ALASKA 0 0 0 0 0 0 0 0 0 0 0 
ARIZONA 4 1 3 3 0 1 0 12 4 0 28 
ARKANSAS 1 1 0 2 0 0 0 0 1 0 5 
CALIFORNIA 3 2 2 17 2 8 2 7 16 3 62 
COLORADO 0 0 0 0 0 0 3 6 0 0 9 
CONNECTICUT 0 0 1 0 0 0 0 0 0 0 1 
DELAWARE 0 0 0 0 0 0 0 0 0 0 0 
FLORIDA 0 0 2 0 0 0 2 0 0 0 4 
GEORGIA 11 4 1 3 29 0 0 0 1 0 49 
GUAM 0 0 0 0 0 0 0 0 0 0 0 
HAWAII 0 1 6 0 1 0 0 0 0 0 8 
IDAHO 0 0 0 0 0 0 1 0 0 0 1 
ILLINOIS 4 1 0 1 2 1 2 1 1 0 13 
INDIANA 1 3 1 1 1 3 2 1 2 4 19 
IOWA 3 3 0 5 0 0 0 1 0 1 13 
KANSAS 0 0 1 3 1 0 2 0 0 3 10 
KENTUCKY 0 2 8 2 0 2 2 16 2 2 36 
LOUISIANA 1 2 1 0 0 6 0 1 1 0 12 
MAINE 0 4 0 0 0 0 0 1 0 0 5 
MARYLAND & DC 0 0 0 0 0 0 3 0 0 0 3 
MASSACHUSETTS 0 1 0 0 0 0 0 0 0 0 1 
MICHIGAN 4 0 0 0 0 0 2 0 0 2 8 
MINNISOTA 1 0 0 4 0 0 0 0 2 0 7 
MISSISSIPPI 2 2 0 0 1 0 0 0 0 0 5 
MISSOURI 5 0 0 29 11 3 7 4 4 14 77 
MONTANA 0 1 3 0 0 0 4 0 0 0 8 
G-18

TABLE - 5 
TOTAL LIVES LOST, BY STATE 
FISCAL YEARS 1990-1999 
LOCATION FY 90 FY 91 FY 92 FY 93 FY 94 FY 95 FY 96 FY 97 FY 98 FY 99 10-Yr Total 
NEBRASKA 1 2 0 5 0 0 0 0 0 0 8 
NEVADA 2 0 0 1 0 1 0 3 0 1 8 
NEW HAMPSHIRE 0 0 0 0 0 0 0 0 1 0 1 
NEW JERSEY 0 0 0 0 2 0 1 0 0 5 8 
NEW MEXICO 2 4 0 0 0 0 4 1 0 0 11 
NEW YORK 0 2 0 7 3 0 10 0 3 1 26 
N. CAROLINA 4 3 2 1 0 9 1 3 0 32 55 
N. DAKOTA 0 0 0 1 0 0 0 2 2 1 6 
OHIO 32 0 2 0 1 5 3 5 8 2 58 
OKLAHOMA 1 0 2 5 0 4 0 3 4 2 21 
OREGON 0 1 0 0 0 0 6 1 2 0 10 
PENNSYLVANIA 0 1 0 0 1 4 25 0 0 0 31 
PUERTO RICO & VI 3 1 25 3 0 1 19 0 1 3 56 
RHODE ISLAND 0 0 0 0 0 0 0 0 0 0 0 
S. CAROLINA 4 5 0 2 0 3 1 0 2 0 17 
S. DAKOTA 0 0 0 5 0 0 0 0 0 0 5 
TENNESSEE 3 0 2 0 3 0 3 4 13 0 28 
TEXAS 13 3 19 6 0 48 0 19 19 28 155 
UTAH 0 0 0 0 0 0 0 0 1 0 1 
VERMONT 1 0 0 0 1 1 2 0 0 0 5 
VIRGINIA 0 2 1 1 2 2 9 0 0 0 17 
WASHINGTON 3 4 0 0 0 0 1 1 0 0 9 
W. VIRGINA 0 1 3 0 5 0 12 5 2 0 28 
WISCONSON 0 0 0 1 2 0 0 1 1 0 5 
WYOMING 0 0 0 1 0 1 0 0 0 0 2 
TOTALS 125 58 87 109 70 103 131 98 102 105 988 
G-19

TABLE - 6 
REGIONAL DISTRIBUTION 
FLOOD DAMAGES PREVENTED BY THE U.S. ARMY CORPS OF ENGINEERS 
FISCAL YEARS 1980-1999 (IN THOUSANDS OF DOLLARS) 
REGION FY80 FY81 FY82 FY83 FY84 FY85 FY86 FY87 FY88 FY89 
NEW ENGLAND 75,911 53,661 239,970 9,496 839,029 625 665 463,321 0 250 
MID-ADLANTIC 16,740 24,171 10,419 25,703 2,486,292 18,823 357,665 30,340 26,450 24,802 
GULF & S. ATLANTIC 28,086 2,499 24,398 49,384 27,756 21,301 41,774 219,938 11,438 30,014 
OHIO 289,655 231,431 188,802 207,363 556,603 268,796 633,658 172,866 63,538 285,510 
TENNESSEE 0 0 0 0 0 45 570 4,376 0 16,176 
GREAT LAKES 9,594 9,842 27,836 5,856 24,953 30,107 28,071 51,245 9,587 24,982 
UPPER MISSISSIPPI 0 11,622 96,150 251,594 66,209 57,941 113,777 430,592 1,576 6,761 
SOURIS-RED-RAINY 0 0 0 2,700 1,314 1,721 18,966 52,015 411 68,814 
MISSOURI 2,243 89,862 370,993 435,296 1,077,828 32,555 860,513 1,504,538 2,669 176,066 
ARKANSAS-RED-WHITE 108,025 11,617 55,960 161,010 88,788 168,558 174,737 996,615 161,923 186,727 
LOWER MISSISSIPPI 4,087,675 3,067 552,850 20,386,036 10,294,428 9,820,704 9,336,140 666,758 1,453,371 5,970,206 
RIO GRANDE 46,260 889 2,526 29,918 98,419 127,698 87,139 113,621 21,528 2,755 
TEXAS AND GULF 14,910 83,436 441,874 17,537 8,513 28,840 208,168 190,914 6,026 535,689 
COLORADO 117,761 0 0 13,000 90,630 14,300 0 0 0 0 
GREAT BASIN 0 0 8,000 15,015 18,600 2,200 16,300 0 0 500 
CALIFORNIA 1,981,428 680 307,013 1,075,869 102,360 72,800 13,910,920 154,858 98 4,770 
COLUMBIA N PACIFIC 514,257 633,016 1,939,909 547,510 979,308 94,350 1,521,659 125,995 296,159 918,874 
ALASKA 2,117 4,473 4,741 4,885 5,055 6,846 6,828 17,000 0 8,000 
HAWAII & GUAM 4,254 220 800 624 0 0 220 220 8,540 82 
TOTALS 7,298,916 1,160,486 4,272,241 23,238,796 16,766,085 10,768,210 27,317,770 5,195,212 2,063,314 8,260,978 
G-20

TABLE- 6 
REGIONAL DISTRIBUTION 
FLOOD DAMAGES PREVENTED BY THE U.S. ARMY CORPS OF ENGINEERS 
FISCAL YEARS 1980-1998 (IN THOUSANDS OF DOLLARS) 
REGION FY90 FY91 FY92 FY93 FY94 FY95 FY96 FY97 FY98 FY99 1990-9 
NEW ENGLAND 63,094 11,010 4,528 95,580 51,906 375 132,805 31,243 121,825 29,147 51 
MID-ADLANTIC 16,607 8,993 97,947 277,641 34,455 33,530 1,881,703 224,560 79,819 250,493 268 
GULF & S. ATLANTIC 57,057 31,003 150,717 70,326 68,517 149,705 830,955 88,877 598,430 257,000 207 
OHIO 248,699 655,077 102,832 369,414 714,206 248,096 4,809,346 1,706,408 726,721 281,676 986 
TENNESSEE 3,082 334,809 18,920 13,304 52,909 12,480 2,305 131,135 8,326 5,017 58 
GREAT LAKES 16,849 19,100 5,702 124,935 50,981 24,810 141,824 112,230 25,977 19,190 54 
UPPER MISSISSIPPI 516,506 27,200 19,043 1,303,564 14,979 7,147 22,160 570,094 390,463 99,151 297 
SOURIS-RED-RAINY 7,156 4,700 517 91,473 6,875 28,686 67,053 154,001 36,316 76,877 47 
MISSOURI 250,873 272,237 609,640 11,573,040 206,912 4,466,330 2,199,478 7,207,086 177,769 5,111,491 3,207 
ARKANSAS-RED-WHITE 456,041 43,396 87,792 949,112 206,387 469,242 60,386 187,332 183,987 688,697 333 
LOWER MISSISSIPPI 10,820,837 15,457,393 1,213,731 13,538,946 9,589,003 16,904,365 7,925,144 22,033,170 6,933,597 12,507,805 11,692, 
RIO GRANDE 42,531 91,189 39,619 109,486 164,439 29,195 116,598 52,598 453 52,570 69 
TEXAS AND GULF 4,105,103 13,717 5,184,633 2,621,230 5,705,933 2,632,986 4,425 5,113,613 646,241 626,317 2,665 
COLORADO 0 0 3,945 147,326 0 204,067 25,176 31,616 7,329 8,931 42 
GREAT BASIN 500 1,500 700 0 4,553 0 0 842,730 0 10,361 86 
CALIFORNIA 9,500 64,022 406,036 750,435 138 1,484,202 389,649 3,042,730 2,623,156 87,235 885 
COLUMBIA N PACIFIC 962,433 432,754 102,776 248,997 162,270 71,192 3,700,512 5,629,242 856,406 1,049,702 1,321 
ALASKA 0 8,100 10,000 0 8,750 8,750 0 0 0 0 3 
HAWAII & GUAM 1,085 5,457 194 10 6,728 5,126 4,652 2,394 68 0 2 
TOTALS 17,577,953 17,481,657 8,059,272 32,284,819 17,049,941 26,780,284 22,314,171 47,161,059 13,416,883 21,161,659 22,328
9 Avg 
,262 
,006 
,560 
,248 
,229 
,160 
,031 
,365 
,486 
,237 
399 
,868 
,420 
,839 
,034 
,710 
,628 
,560 
,571 
,770 
G-21

TABLE 7 
Saffin-Simpson Scale for Wind Speed 
Tropical Storm: 34-39 kt. (39 to 73mph) 
Hurricane: 64 kt. (74 mph) or highter 
G-22 
1999 ATLANTIC OCEAN TROPICAL CYCLONES 
AND THEIR EFFECTS 
NAME Category CLASS DATES Max Min Damages Lives 
Wind Pressure In U.S.A. Lost 
(Kt.) (MB) ($ Million) 
Arlene Tropical Storm Jun 11-18 50 1006 
Bret 4 Hurricane Aug 18-25 120 944 60 
Cindy 4 Hurricane Aug 19-31 120 944 
Dennis 2 Hurricane Aug 24-Sep 7 90 962 157 4 
Emily Tropical Storm Aug 24-28 45 1004 
Floyd 5 Hurricane Sep 7-17 135 921 3000-6000 57 
Gert 4 Hurricane Sep 11-23 130 930 2 
Harvey Tropical Storm Sep 19-22 50 994 15 
Irene 2 Hurricane Oct 13-19 95 958 800 
Jose 2 Hurricane Oct 18-25 85 979 2 
Katrina Tropical Storm Oct 28-Nov 1 35 999 
Lenny 5 Hurricane Nov 13-23 135 933 330 17

A 
Aberdeen and Vicinity, SD (NWO) 26-3, 26-18, 26-25 
Abiquiu Dam, NM (SPA) 36-4, 36-12 
Acequias Irrigation System, NM (SPA) 36-1, 36-11, 
36-14 
Active Investigations (SAC) 7-9, 7-24 
Addicks and Barker Reservoirs, TX (SWG) 40-14 
Addison, NY (NAB) 4-15, 4-29 
Advance Engineering and Design 
Alaska District (POA) 32-8 
Albuquerque District (SPA) 36-10 
Baltimore District (NAB) 4-25 
Detroit District (LRE) 21-52 
Fort Worth District (SWF) 39-14 
Galveston District (SWG) 40-20 
Honolulu District (POH) 31-4 
Jacksonville District (SAJ) 9-36 
Little Rock District (SWL) 36-13 
Los Angeles District (SPL) 33-12 
Louisville District (LRL) 24-15 
Mobile District (SAM) 10-25 
Nashville District (LRN) 23-8 
New England Division (NAE) 1-23 
Philadelphia District (NAP) 3-20 
Pittsburgh District (LRP) 18-13 
Portland District (NWP) 28-24 
Rock Island District (MVR) 15-8 
Sacramento District (SPK) 35-30 
San Francisco District (SPN) 34-12 
Seattle District (NWS) 29-15 
St. Paul 16-13 
Walla Walla District (NWW) 30-12 
Wilmington District (SAW) 6-21 
Aitkin County, CSAH 10, MN (MVP) 16-4, 16-14, 
16-18 
AIWW Bridge, Deep Creek (NAO) 5-2 
AIWW Bridge, Great Bridge (NAO) 5-2 
Alabama-Coosa Rivers, AL & GA (SAM) 10-3, 
10-27, 10-47 
Alamo Dam, AZ (SPL) 33-6, 33-14, 33-22 
Alamogordo, NM (SPA) 36-2, 36-11 
Alamosa, CO (SPA) 36-2, 36-11, 36-14 
Albeni Falls Dam, ID (NWS) 29-11, 29-20, 29-25 
Alil Drive Shoreline Protection, Hawaii, Hawaii 
(POH) 31-3, 31-5 
Allatoona Dam - Coosa River Basin, GA (SAM) 
10-21, 10-31, 10-41 
Allegheny River, PA (LRP) 18-2, 18-14, 18-18, 18-26 
Allendale Dam, North ProvideLRE, RI (NAE) 1-10, 
1-27, 1-36 
Almond Lake, NY (NAB) 4-15, 4-29 
Aloha Rigolette, LA (MVK) 12-3, 12-10, 12-12 
Alpena Harbor, MI (LRE) 21-2, 21-54, 21-74 
Alton to Gale Organized Levee Districts, IL & MO 
(MVS) 14-3, 14-8, 14-11 
Alum Creek Lake, OH (LRH) 25-2, 25-12, 25-17 
Alvin R. Bush Dam, PA (NAB) 4-20, 4-31 
American River Watershed, CA (SPK) 35-5, 35-33, 
35-43, 35-49 
Amite River and Tribs, LA, East Baton Rouge 
Watershed (MVN) 11-4, 11-25 
Anacortes Harbor, WA (NWS) 29-2, 29-17, 29-24 
Anacostia River and Tributaries, MD & DC (NAB) 
4-22, 4-32, 4-39 
Anahuac Channel, TX (SWG) 40-12 
Anchorage Harbor, AK (POA) 32-2, 32-9, 32-12, 
32-13 
Andrews River (NAE) 1-3, 1-23, 1-32 
Apalachicola Bay, FL (SAM) 10-4, 10-27, 10-33 
Apalachicola, Chattahoochee, and Flint Rivers, AL, 
FL & GA (SAM) 10-4, 10-27 
Applegate Lake, Rogue River Basin, OR (NWP) 
28-11, 28-27, 28-35, 28-43 
Appomattox River, VA (NAO) 5-2 
Aquatic Ecosystem Restoration 
Baltimore District (NAB) 4-24 
Mobile District (SAM) 10-25 
Omaha District (NWO) 26-13 
Pittsburgh, District (LRP) 18-13 
Aquatic Plant Control 
Charleston District (SAC) 7-1, 7-10, 7-14, 7-20 
Galveston District (SWG) 40-2, 40-21, 40-26 
Jacksonville District (SAJ) 9-3, 9-40, 9-52 
Mobile District (SAM) 10-6 
New York District (NAN) 2-3, 2-40, 2-52 
Savannah District (SAS) 8-2, 8-13, 8-15 
Wilmington District (SAW) 6-2, 6-22, 6-31 
Aquilla Lake, TX (SWF) 39-3, 39-15, 39-19 
Arcadia Harbor, MI (LRE) 21-3, 21-54, 21-74 
Arcadia Lake, OK (SWT) 38-2, 38-15, 38-24 
Area V, Estelline Springs, TX (SWT) 38-3, 38-15, 
38-24 
Area VIII, TX (SWT) 38-3, 38-15, 38-24 
Arecibo Harbor, FL (SAJ) 9-3, 9-40, 9-52 
Arkansas City, KS (SWT) 38-3, 38-15, 38-24 
I-1

Arkansas-Red River Basins Chloride Control Projects, 
KS, OK and TX (SWT) 38-3, 38-15, 38-24 
Arkansas River Basin, AR, OK and KS (SWL) 37-2, 
37-20 
Arkport Dam, NY (NAB) 4-15, 4-30 
Aroostook River, Fort Fairfield, MD (NAE) 1-10, 1- 
27, 1-36 
Arroyo Colorado, TX (SWG) 40-17 
Arthur V. Ormond Lock and Dam (No. 9), AR (SWL) 
37-3 
Ashland Harbor, WI (LRE) 21-3, 21-54, 21-74 
Ashtabula Harbor, OH (LRB) 20-2, 20-15, 20-23 
Atlantic Coast of Maryland (NAB) 4-10, 4-28 
Atlantic Coast of Long Island, Jones Inlet to East 
Rockaway Inlet; Long Beach Island, NY (NAN) 
2-12, 2-30 
Atlantic Intracoastal Bridge at Great Bridge, VA 
(NAO) 5-3, 5-12, 5-16 
Atlantic Intracoastal Waterway Between Norfolk, VA 
and St. Johns River, FL (NAO) 5-2 (SAW) 6-2, 
6-22, 6-28, (SAC) 7-2, 7-10, 7-14 (SAS) 8-2, 
8-13, 8-15 (SAJ) 9-3, 9-40, 9-52 
Aunt Lydia's Cove, Chatham, MA (NAE) 1-3, 1-24, 
1-33 
Authorized Alteration of Bridges (LRN) 23-4 
Authorized Beach Erosion Control Projects (LRE) 
21-38 
Avoca, NY (NAB) 4-15, 4-30 
Avon Harbor, NC (SAW) 6-4, 6-22 
Aylesworth Creek Lake, PA (NAB) 4-12, 4-28, 4-37 
B 
B. Everett Jordan Dam and Lake, NC (SAW) 6-12, 
6-25 
Back River, Poquoson, VA (NAO) 5-3 
Bakers Haulover Inlet, FL (SAJ) 9-4, 9-40, 9-53 
Ball Mountain Lake, VT (NAE) 1-12, 1-27 
Baltimore Harbor and Channels, MD and VA (NAB) 
4-3, 4-26, 4-34 
Baltimore Harbor, MD Collection and Removal of 
Drift (NAB) 4-4, 4-26, 4-34 
Barcelona Harbor, NY (LRB) 20-2, 20-15 
Bardwell Lake, TX (SWF) 39-3, 39-15, 39-19 
Barnegat Inlet, NJ (NAP) 3-2, 3-21, 3-27 
Barre Falls Dam, MA (NAE) 1-12, 1-27 
Barren River Lake, KY (LRL) 24-6, 24-17, 24-34 
Bassett Creek, MN (MVP) 16-5, 16-14, 16-18 
Battery Island Bird Habitat Preservation, NC (CAP 
Section 204) (SAW) 6-21 
Bayou Coden, AL (SAM) 10-6, 10-27, 10-33 
Bayou La Batre, AL (SAM) 10-7, 10-27, 10-33 
Bayview Court, Bay St. Louis, MS (SAM) 10-17, 
10-31, 10-41 
Beach Erosion Control Work Under Special 
Authorization 
Baltimore District (NAB) 4-10 
Chicago District (LRC) 22-10 
Detroit District (LRE) 21-39 
Honolulu District (POH) 31-3 
Jacksonville District (SAJ) 9-30 
New York District (NAN) 2-17 
San Francisco District (SPN) 34-8 
Savannah District (SAS) 8-8 
Beals Creek, Big Spring, TX (SWF) 39-3, 39-15, 
39-19 
Bear Creek Lake, CO (NWO) 26-4, 26-18, 26-25 
Beaufort Harbor, NC (SAW) 6-4, 6-22, 6-29 
Beaver Lake, AR (SWL) 37-10, 37-18 
Beech Fork Lake, WV (LRH) 25-3, 25-12, 25-17 
Belton Lake, TX (SWF) 39-4, 39-15, 39-19 
Beltzville Lake, PA (NAP) 3-13, 3-24, 3-33 
Benbrook Lake, TX (SWF) 39-4, 39-15, 39-19 
Bennett's Creek, VA (NAO) 5-4 
Berlin Lake, Ohio River Basin, OH (LRP) 18-7, 
18-15, 18-20 
Bethel Bank Stabilization, AK (POA) 32-6, 32-11, 
32-15 
Bethel Small boat Harbor, AK (POA) 32-2, 32-9, 
32-13 
Big Bay Harbor, MI (LRE) 21-4, 21-54, 21-74 
Big Bend Dam-Lake Sharpe, Missouri River Basin, 
SD (NWO) 26-13, 26-23, 26-28, 26-37 
Big South Fork National River and Recreation Area, 
KY and TN (LRN) 23-4, 23-9 
Biloxi Harbor, MS (SAM) 10-7, 10-27, 10-33 
Binghamton, NY (NAB) 4-16, 4-30 
Birch Hill Dam, MA (NAE) 1-12, 1-27 
Birch Lake, OK (SWT) 38-4, 38-16, 38-24 
Black Fox, Murfree and Oaklands Springs, TN (LRN) 
23-5 
Black River Poplar Bluff, MO (SWL) 37-5, 37-16, 
37-24 
Black Rock Channel and Tonawanda Harbor, NY 
(LRB) 20-2, 20-15, 20-23 
Black Rock Lake, CT (NAE) 1-15, 1-29 
I-2

Black Warrior and Tombigbee Rivers, AL (SAM) 
10-8, 10-28, 10-34, 10-49 
Black Warrior River, Northport Levee, AL (SAM) 
10-17, 10-30, 10-40 
Blackstone River Basin, MA and RI (NAE) 1-10, 
1-27, 1-50, 1-51 
Blackwater Dam, NH (NAE) 1-17, 1-29 
Blair Waterway, Tacoma, WA (NWS) 29-2, 29-17, 
29-24 
Blue Marsh Lake, PA (NAP) 3-14, 3-24, 3-33 
Blue Mountain Lake, AR (SWL) 37-5, 37-16 
Blue River Basin, Kansas City, MO (NWK) 27-2, 
27-12, 27-16 
Blue River Channel, Kansas City, MO (NWK) 27-3, 
27-12, 27-17 
Blue River Lake, OR (NWP) 28-11, 28-27, 28-35 
Bluestone Lake, Ohio River Basin, WV (LRH) 25-3, 
25-12, 25-17 
Bon Secour River, AL (SAM) 10-9, 10-28, 10-35 
Bonneville Lock and Dam - Lake Bonneville, OR and 
WA (NWP) 28-15, 28-29, 28-36 
Bonneville Navigation Lock, Bonneville Dam, OR and 
WA (NWP) 28-2, 28-25, 28-32, 28-46 
Boston Harbor, MA (NAE) 1-3, 1-24, 1-33 
Bowie County Levee, TX (SWT) 38-4, 38-16, 38-24 
Bowman-Haley Lake, ND (NWO) 26-4, 26-17, 26-24 
Boyer Chute, NE (NWO) 26-10, 26-21, 26-27 
Brays Bayou, TX (SWG) 40-14 
Brazos Island Harbor, (SWG) 40-2, 40-21, 40-26, 
40-46, 40-48, 40-54 
Brevard County, FL (SAJ) 9-22, 9-47 
Broad Top Region, PA (NAB) 4-10, 4-28, 4-36 
Broken Bow Lake, OK (SWT) 38-12, 38-21 
Brookville Lake, KY (LRL) 24-7, 24-17, 24-33 
Broward County, FL Beach Erosion Control and 
Hillsboro Inlet, FL Navigation Project (SAJ) 
9-23, 9-47, 9-71 
Brunswick Harbor, GA (SAS) 8-3, 8-13, 8-16 
Brush Creek, Kansas City, MO (NWK) 27-3, 27-12, 
27-17 
Buchanan Dam-H.V. Eastman Lake, Chowchilla 
River, CA (SPK) 35-5, 35-34 
Buckhorn Lake, KY (LRL) 24-7, 24-17, 24-33 
Buffalo Bayou and Tributaries, TX (SWG) 40-14, 
40-23, 40-40 
Buffalo Bayou at Lynchburg, TX (SWG) 40-16, 40-24 
Buffalo Harbor, NY (LRB) 20-3, 20-15, 20-24 
Buffalo Harbor Environmental Dredging (LRB) 20-4, 
20-15, 20-26 
Buffumville Lake, MA (NAE) 1-20, 1-30 
Buford Dam, Lake Sidney Lanier, GA (SAM) 10-21, 
10-31, 10-42 
Buford Trenton Irrigation District, ND (NWO) 26-4, 
26-18, 26-25 
Bull Shoals Lake, AR (SWL) 37-11, 37-18 
Burns Waterway Harbor, IN (LRC) 22-3, 22-17, 
22-21, 22-26 
Burns Waterway SBH, IN (LRC) 22-3, 22-17, 22-21, 
22-26 
Burns Waterway Harbor (Maj. Rehab), IN (LRC) 22-4 
Burnsville Lake, Ohio River Basin, WV (LRH) 25-3, 
25-12, 25-17 
Bypass Levees, CA (SPK) 35-44 
C 
Cache Creek Basin, (Cache Creek Settling Basin), CA 
(SPK) 35-6, 35-34, 35-49 
Caesar Creek Lake, OH (LRL) 24-7, 24-17 
Cagles Mill Lake, IN (LRL) 24-7, 24-17 
Calaveras River and Littlejohn Creek and Tributaries, 
including New Hogan Lake and Farmington 
Dam, CA (SPK) 35-7, 35-34 
California Bend, NE (NWO) 26-11, 26-22, 26-28 
Calumet Harbor and River, IL and IN (LRC) 22-4, 
22-17, 22-21 
Canaveral Harbor, FL (SAJ) 9-4, 9-40, 9-53, 9-86 
Candy Lake, OK (SWT) 38-4, 38-16, 38-24 
Canisteo, NY (NAB) 4-16, 4-30 
Canton Lake, OK (SWT) 38-5, 38-16, 38-24 
Canyon Lake, TX (SWF) 39-4, 39-15, 39-19 
Cape Cod Canal, MA (NAE) 1-3, 1-24, 1-34 
Cape Fear River, Above Wilmington, NC (SAW) 6-4, 
6-22 
Cape Fear River Basin, NC (SAW) 6-11, 6-36 
Cape Fear River L&D No. 1 Fish Ladder, NC (CAP 
Section 1135) (SAW) 6-20 
Cape Girardeau-Jackson, MO (MVS) 14-3, 14-8, 
14-11 
Cape May Inlet to Lower Twp., NJ (NAP) 3-12, 3-24, 
3-32 
Carolina Beach and Vicinity, NC (SAW) 6-12, 6-25 
Carpenters Bayou, TX (SWG) 40-16 
Carr Creek Lake, KY (LRL) 24-8, 24-17 
Carrabelle Harbor, FL (SAM) 10-10, 10-28, 10-35 
I-3

Carters Dam and Reservoir, GA (SAM) 10-22, 10-31, 
10-47 
Caseville Harbor, MI (LRE) 21-4, 21-54, 21-74 
Casino Beach, IL (LRC) 22-9, 22-19, 22-24 
Castle Pinckney, Charleston, SC (SAC) 7-8, 7-13, 
7-19 
Catastrophic Disaster Preparedness Program (MVN) 
11-11 (MVK) 12-9 (MVM) 13-2 (MVS) 14-6 
(MVR) 15-7 
Cattaraugus Creek Harbor, OH (LRE) 20-4, 20-16, 
20-26 
Cave Run Lake, KY (LRL) 24-8, 24-18 
Cecil M. Harden Lake, IN (LRL) 24-8, 24-18, 24-33 
Cedar Creek, DE (NAP) 3-3, 3-21, 3-27 
Cedar Point Seawall Bay, St. Louis, MS (SAM) 
10-17, 10-30, 10-40 
Cedar River Harbor, MI (LRE) 21-5, 21-55, 21-74 
Cedar River, Renton, WA (NWS) 29-9, 29-20, 29-27 
Center Hill Lake, Ohio River Basin, TN (LRN) 23-7, 
23-9 
Central and Southern Florida (SAJ) 9-30, 9-49, 9-75, 
9-83, 9-89, 9-90, 9-91, 9-92 
Channel from Naples to Big Marco Pass, FL (SAJ) 
9-5, 9-48, 9-53 
Channel Islands Harbor, CA (SPL) 33-2, 33-13, 
33-17, 33-32 
Channel to Bolivar, TX (SWG) 40-2, 40-21, 40-46, 
40-68 
Channel to Liberty, TX (SWG) 40-12 
Channel to Newport News, VA (NAO) 5-4 
Charles River (Natural Valley Storage Areas), MA 
(NAE) 1-11 
Charleston Harbor Rediversion (Fish Lift), SC (SAC) 
7-3, 7-10, 7-16 
Charleston Harbor, SC (SAC) 7-2, 7-10, 7-15 
Charlevoix Harbor, MI (LRE) 21-5, 21-55, 21-74 
Charlotte Harbor, FL (SAJ) 9-5, 9-41, 9-53 
Chaska, MN (MVP) 16-5, 16-14, 16-18 
Chatfield Lake, CO (NWO) 26-4, 26-19, 26-25 
Chatham (Stage) Harbor, MA (NAE) 1-4, 1-23, 1-33 
Chena River Lakes, AK (POA) 32-7, 32-12, 32-15 
Cherry Creek Lake, CO (NWO) 26-5, 26-19, 26-25 
Chesapeake and Delaware Canal, St. Georges Bridge 
Replacement, DE, (NAP) 3-2, 3-21, 3-27 
Chesapeake Bay Oyster Recovery, MD (NAB) 4-22, 
4-32, 4-39 
Chesapeake Bay Shoreline, VA (NAO) 5-4 
Chester River, MD (NAB) 4-4, 4-27, 4-35 
Chetco River, OR (NWP) 28-2, 28-25, 28-32 
Chicago Harbor, IL (LRC) 22-4, 22-17, 22-22, 22-26 
Chicago River, IL (LRC) 22-5, 22-18, 22-22, 22-26 
Chicago River, IL (North Branch) (LRC) 22-11, 
22-19, 22-25 
Chicago Shoreline, IL (LRC) 22-9, 22-19 
Chief Joseph Dam - Rufus Woods Lake, WA (NWS) 
29-12, 29-21, 29-27 
Chignik Harbor, AK (POA) 32-2, 32-9, 32-13 
Chincoteague Inlet, VA (NAO) 5-5 
Choctawhatchee and Pea Rivers, FL and AL (SAM) 
10-18, 10-30, 10-40 
Choctawhatchee and Pea Rivers Elba and Geneva 
Levees, Al (SAM) 10-18, 10-30, 10-40 
Claiborne Lock and Dam, AL (SAM) 10-3, 10-27, 
10-47 
Clarence J. Brown Dam and Reservoir, OH (LRL) 
24-9, 24-18 
Clear Creek (SWG) 40-16, 40-24, 40-40 
Clear Creek and Clear Lake (SWG) 40-3, 40-21, 
40-27, 40-48 
Clearwater Lake, MO (SWL) 37-5, 37-16 
Cleveland Harbor, OH (LRB) 20-4, 20-16, 20-26 
Clifton, San Francisco River, AZ (SPL) 33-6, 33-14, 
33-22 
Clinton Lake, Wakarusa River, KS (NWK) 27-3, 
27-12, 27-17 
Clinton River, MI (LRE) 21-6, 21-55, 21-74 
Clinton River Spillway, MI (LRE) 21-41, 21-71, 
21-86 
Clinton Wastewater Treatment & Plant, Clinton, NC 
(SAW) 6-13, 6-25 
Coastal Wetlands Planning, Protection, and 
Restoration Act (MVN) 11-11 
Cocheco River, NH (NAE) 1-4, 1-24, 1-34 
Cochiti Lake, NM (SPA) 36-5, 36-12, 36-16 
Cohassett Harbor, MA (NAE) 1-5, 1-25, 1-34 
Cold Spring Inlet, NJ (NAP) 3-3, 3-21, 3-27 
Colebrook River Lake, CT (NAE) 1-12, 1-27 
Coleman Creek Little Rock, AR (SWL) 37-14 
Collection and Study of Basic Data 
Alaska District (POA) 32-8 
Albuquerque District (SPA) 36-12 
Baltimore District (NAB) 4-24 
Buffalo District (LRB) 20-15 
Chicago District (LRC) 22-14 
Detroit District (LRE) 21-52 
Fort Worth District (SWF) 39-14 
I-4

Galveston District (SWG) 40-20 
Honolulu District (POH) 31-4 
Huntington District (LRH) 25-11 
Jacksonville District (SAJ) 9-36 
Little Rock District (SWL) 37-14 
Los Angeles District (SPL) 33-11 
Louisville District (LRL) 24-15 
Mobile District (SAM) 10-25 
Nashville District (LRN) 23-8 
New England Division (NAE) 1-23 
New York District (NAN) 2-22 
Norfolk District (NAO) 5-13 
Philadelphia District (NAP) 3-20 
Pittsburgh District (LRP) 18-13 
Portland District (NWP) 28-24 
Rock Island District (MVR) 15-8 
Sacramento District (SPK) 35-30 
San Francisco District (SPN) 34-12 
Savannah District (SAS) 8-11 
Seattle District (NWS) 29-15 
St. Paul District (MVP) 16-13 
Tulsa District (SWT) 38-14 
Walla Walla District (NWW) 30-11 
Wilmington District (SAW) 6-21 
Colorado River at Grand Junction, CO (SPK) 35-8, 
35-34, 35-57 
Columbia and Lower Willamette Rivers below 
Vancouver, WA and Portland, OR (NWP) 28-2, 
28-25, 28-32, 28-42 
Columbia River at Baker Bay, WA (NWP) 28-3, 
28-25, 28-33, 28-42 
Columbia River at the Mouth, OR and WA (NWP) 
28-4, 28-25, 28-33 
Columbia River Basin, Local Flood Protection Projects 
(NWW) 30-1, 30-16 
Columbia River between Chinook, WA and Head of 
Sand Island (NWP) 28-4, 28-25, 28-33 
Columbia River between Vancouver, WA and The 
Dalles, OR (NWP) 28-4, 28-25, 28-33 
Columbia River Fish Mitigation Program (The Dalles, 
Project), OR and WA (NWP) 28-16, 28-29, 
28-36 
Columbia River Juvenile Fish Mitigation Program 
(Walla Walla District) (NWW) 30-3, 30-13 
Columbia River, Seafarers Memorial, Hammond, OR 
(NWP) 28-5, 28-25, 28-33 
Columbia River Treaty Fishing Sites, OR and WA 
(NWP) 28-17, 28-29, 28-36 
Comite River, LA (Diversion) (MVN) 11-5, 11-14, 
11-18 
Conant Brook Dam, MA (NAE) 1-13, 1-27 
Conchas Lake, NM (SPA) 36-2, 36-11 
Conemaugh River Lake, Ohio River Basin, PA (LRP) 
18-7, 18-15, 18-20 
Conneaut Harbor, OH (LRB) 20-5, 20-16, 20-29 
Connecticut River Basin, VT, NH, MA and CT 
(NAE) 1-11, 1-51 
Construction of Locks and Dams, Ohio River (LRL) 
24-2 
Construction of Locks and Dams on Ohio River 
(LRH) 25-2 
Construction of Locks and Dams on Ohio River (OR) 
19-1, 19-4, 19-6 
Construction of Locks and Dams, Ohio River (LRP) 
18-2 
Continuing Authorities Program (NWK) 27-9 
Continuation of Planning and Engineering 
Jacksonville District (SAJ) 9-36 
Cooper River, Charleston Harbor, SC (SAC) 7-3, 
7-10, 7-16 
Coordination with other Agencies (LRL) 24-15, 
(SWG) 40-20 
Coos Bay, OR (NWP) 28-5, 28-25, 28-33 
Coosa River, Montgomery to Gadsden, AL (SAM) 
10-4, 10-27 
Copan Lake, OK (SWT) 38-5, 38-16, 38-24 
Coquille River, OR (NWP) 28-6, 28-26, 28-34 
Coralville Lake, IA (MVR) 15-4, 15-9, 15-13 
Coming, NY (NAB) 4-16, 4-30 
Cornucopia Harbor, WI (LRE) 21-6, 21-55, 21-74 
Corpus Christi Beach, TX (SWG) 40-13, 40-23, 40-39 
Corpus Christi Ship Channel, TX (SWG) 40-3, 40-21, 
40-27, 40-28 
Corte Madera Creek, CA (SPK) 35-9, 35-34, 35-43, 
35-45, (SPN) 34-8, 34-24 
Cottage Grove Lake, OR (NWP) 28-11, 28-28, 28-35 
Cougar Lake, OR (NWP) 28-17, 28-29, 28-37, 28-43 
Council Grove Lake, KS (SWT) 38-5, 38-16, 38-24 
Cowanesque Lake, PA (NAB) 4-19, 4-31 
Coyote and Berryessa Creeks, CA (SPK) 35-9, 35-43, 
35-49 
Crescent City Harbor, CA (SPN) 34-1, 34-16, 34-22 
Crisfield Harbor, MD (NAB) 4-5, 4-27, 4-35 
Crooked Creek Lake, Ohio River Basin, PA (LRP) 
18-7, 18-15. 18-20 
I-5

Cross Florida Barge Canal, (SAJ) 9-6, 9-41, 9-54, 
9-86 
Cumberland, MD and Ridgeley, WV (NAB) 4-10, 
4-28, 4-37 
Cumberland River, TN and KY (LRN) 23-2, 23-9, 
23-11, 23-15 
Curwensville Lake, PA (NAB) 4-20, 4-31 
Cypress Creek, TX (SWG) 40-17, 40-24, 40-41 
D 
Dade County, FL (SAJ) 9-32, 9-49 
Dade County, North of Haulover Beach, FL (SAJ) 
9-33, 9-49 
Dale Hollow Lake, Ohio River Basin, TN and KY 
(LRN) 23-7, 23-9 
Danville (Southside Wastewater Treatment Plant), VA 
(SAW) 6-13, 6-25 
Dardanelle Lock and Dam (No. 10), AR (SWL) 
37-11, 37-18 
Dauphin Island, AL (SAM) 10-10, 10-28, 10-35 
David D. Terry Lock and Dam (No. 6), AR (SWL) 
37-3, 37-26 
Deauthorization Projects 
New York District (NAN) 2-22, Mobile District 
(SAM) 10-17, 10-45 
Deep Water Slough, WA (NWS) 29-13, 29-22, 29-28 
Deer Creek Lake, Ohio River Basin, OH (LRH) 25-4, 
25-12, 25-17 
Delaware Coast Protection, DE (NAP) 3-13, 3-24, 
3-32 
Delaware Lake, Ohio River Basin, OH (LRH) 25-4, 
25-13, 25-17 
Delaware River between Philadelphia, PA and 
Trenton, NJ (NAP) 3-3, 3-21, 3-27 
Delaware River, PA, NJ and DE Philadelphia to the 
Sea (NAP) 3-5, 3-22, 3-28 
Delaware River Mainstem Channel & Deepening 
(NAB) 3-4, 3-21, 3-27 
Depoe Bay, OR (NWP) 28-7, 28-26, 28-34, 28-42 
DeQueen Lake, AR (SWL) 37-6, 37-16 
Deroin Bend, MO (NWO) 26-12, 26-22, 26-28 
Des Moines Recreational River and Greenbelt, IA 
(MVR) 15-5, 15-9, 15-13 
Des Plaines River (LRC) 22-11, 22-19 
Detroit Lake - Big Cliff, OR (NWP) 28-18, 28-29, 
28-37 
Detroit River, MI (LRE) 21-7, 21-56, 21-74, 21-92, 
21-99 
Dewey Lake, Ohio River Basin, KY (LRH) 25-4, 
25-13, 25-17 
Dickson City (Olyphant) PA (NAB) 4-13, 4-29, 4-37 
Dierks Lake, AR (SWL) 37-6, 37-17 
Dillingham Emergency Bank Stabilization, AK (POA) 
32-6, 32-12, 32-15 
Dillingham Harbor, AK (POA) 32-3, 32-9, 32-13 
Dillon Lake, Ohio River Basin, OH (LRH) 25-4, 
25-13, 25-17 
Dog and Fowl Rivers, AL (SAM) 10-11, 10-29, 10-37 
Dorena Lake, OR (NWP) 28-11, 28-28, 28-36, 28-43 
Double Bayou, TX (SWG) 40-4, 40-21, 40-29, 40-48 
Douglas Harbor, AK (POA) 32-3, 32-10, 32-13 
Drum Inlet, NC (SAW) 6-5, 6-22 
Duck Creek, OH (LRL) 24-3, 24-16, 24-23 
Duluth-Superior Harbor, MN and WI (LRE) 21-7, 
21-56, 21-76, 21-92 
Dunkirk Harbor, NY (LRB) 20-6, 20-16, 20-29 
Duval County, FL (SAJ) 9-23, 9-47, 9-72 
Dworshak Units 5 and 6, ID (NWW) 30-4, 30-13, 
30-18, 30-24 
E 
East Branch, Clarion River Lake, Ohio River Basin, 
(LRP) 18-8, 18-15, 18-20 
East Brimfield Lake, MA (NAE) 1-22, 1-31 
East Lynn Lake, Ohio River Basin, WV (LRH) 25-5, 
25-13, 25-18 
East Pass Channel from Gulf of Mexico into 
Choctawhatchee Bay, FL (SAM) 10-11, 10-28, 
10-36 
East Rockaway Inlet, NY (NAN) 2-13, 2-24, 2-27 
East Rockaway Inlet to Rockaway Inlet and Jamaica 
Bay, NY (NAN) 2-12, 2-25, 2-30 
East Sidney, NY (NAB) 4-17, 4-30 
East St. Louis and Vicinity, IL (MVS) 14-4, 14-8, 
14-12 
Eau Gallie Harbor, FL (SAJ) 9-6, 9-41, 9-54 
Ecosystem Restoration Work Under Special 
Authorization (MVM) 13-2, (MVS) 14-6, (MVK) 
12-9, (SAC) 7-9, (MVR) 15-7 
Ediz Hook, WA (NWS) 29-2, 29-17, 29-24 
Edward MacDowell Lake, NH (NAE) 1-17, 1-29 
El Dorado Lake, KS (SWT) 38-5, 38-16, 38-24 
El Paso, TX (SPA) 36-3, 36-11 
I-6

Elk City Lake, KS (SWT) 38-6, 38-17, 38-24 
Elk Creek Lake, Rogue River Basin, OR (NWP) 
28-12, 28-28, 28-36 
Elkins, WV (LRP) 18-4, 18-14, 18-19 
Elmira, NY (NAB) 4-17, 4-30 
Emergency Bank Protection (NAP) 3-14 
Emergency Flood Control Activities 
Norfolk District (NAO) 5-12, Tulsa District 
(SWF) 38-12 
Emergency Response Activities (NWK) 27-10, 
Portland District (NWP) 28-23, Los Angeles 
District (SPL) 33-11, (SAC) 7-9 
Emergency Shore Protection (LRE) 21-38 
Emergency Streambank and Shoreline Protection 
Under Special Authorization 
Galveston District (SWG) 40-19 
Savannah District (SAS) 8-8 
Emmett Sanders Lock and Dam (No. 4) (SWL) 37-3 
Enforcement (SAJ) 9-37 
Environmental Data Studies (SPA) 36-10 
Erie Harbor, PA (LRB) 20-6, 20-17, 20-30 
Eufaula Lake, OK (SWT) 38-12, 38-22 
Everett Harbor and Snohomish River, WA (NWS) 
29-2, 29-16, 29-22 
Everglades South Florida Ecosystem Restoration (SAJ) 
9-38 
F 
Fairfield Vicinity Streams, CA (SPK) 35-10, 35-35 
Fairport Harbor, OH (LRB) 20-6, 20-17, 20-29 
Fall Creek Lake, OR (NWP) 28-13, 28-28, 28-36, 
28-43 
Fall River Basin, SD (NWO) 26-5, 26-19, 26-26 
Fall River Lake, KS (SWT) 38-6, 38-17, 38-24 
Falls Lake, NC (SAW) 6-15, 6-25 
Far Creek, NC (SAW) 6-5, 6-23 
Faulkner Island, CT (NAE) 1-15, 1-29, 1-36 
Fern Ridge Lake, OR (NWP) 28-13, 28-28, 28-36, 
28-43 
Fernandina Harbor, FL (SAJ) 9-6, 9-41, 9-54 
Ferrells Bridge Dam-Lake O'The Pines, TX (SWF) 
39-5, 39-15, 39-17, 39-19 
Fire Island Inlet to Montauk Point, NY (NAN) 2-13, 
2-25, 2-30 
Fire Island to Jones Inlet, NY (NAN) 2-3, 2-24, 2-27 
Fishtrap Lake, Ohio River Basin, KY (LRH) 25-5, 
25-13, 25-18 
Fivemile River, CT (NAE) 1-5, 1-24, 1-33 
Flathead River, MT (NWS) 29-9, 29-20, 29-27 
Flood Control and Coastal Emergencies 
Mobile District (SAM) 10-25 
Omaha District (NWO) 26-16 
Savannah District (SAS) 8-12 
St. Paul District (MVP) 16-13 
Flood Control Reservoir Operations (NAE) 1-22 
Flood Control Work Under Special Authorization 
Alaska District (POA) 32-7 
Albuquerque District (SPA) 36-10 
Baltimore District (NAB) 4-22 
Charleston District (SAC) 7-7, 7-22 
Chicago District (LRC) 22-15 
Detroit District (LRE) 21-45 
Galveston District (SWG) 40-19 
Honolulu District (POH) 31-3 
Huntington District (LRH) 25-11 
Jacksonville District (SAJ) 9-36 
Little Rock District (SWL) 37-19 
Los Angeles District (SPL) 33-11 
Louisville District (LRL) 24-14 
Memphis District (MVM) 13-2 
Mobile District (SAM) 10-17, 10-45 
Nashville District (LRN) 23-6, 23-18 
New England Division (NAE) 1-22 
New Orleans District (MVN) 11-10 
New York District (NAN) 2-21 
Omaha District (NWO) 26-9 
Philadelphia District (NAP) 3-14 
Pittsburgh District (LRP) 18-13, 18-30 
Rock Island District (MVR) 15-7 
Sacramento District (SPK) 35-28 
San Francisco District (SPN) 34-12 
Savannah District (SAS) 8-8 
St. Louis District (MVS) 14-6 
Tulsa District (SWT) 38-12 
Vicksburg District (MVK) 12-8 
Wilmington District (SAW) 6-17 
Fly Creek, Fairhope, AL (SAM) 10-11, 10-28, 10-36 
Folly River, SC (SAC) 7-4, 7-10, 7-16, 7-20 
Formerly Utilized Sites Remedial Action Program 
(FUSRAP) (MVS) 14-7 
Fort Gibson Lake, OK (SWT) 38-13, 38-22 
Fort Myers Beach, FL (SAJ) 9-7, 9-41, 9-54 
Fort Peck Lake, MT (NWO) 26-13, 26-23, 26-29 
Fort Pierce Beach, FL (SAJ) 9-24, 9-47, 9-72 
Fort Pierce Harbor, FL (SAJ) 9-7, 9-42, 9-55 
1-7

Fort Randall Dam-Lake Francis Case, Missouri River 
Basin, SD (NWO) 26-14, 26-23, 26-29 
Fort Supply Lake, OK (SWT) 38-6, 38-17, 38-24 
Fort Wayne Metro Area, IN (LRE) 21-41, 21-71, 
21-86 
Foster Joseph Sayers Dam, PA (NAB) 4-21, 4-32 
Four River Basins, FL (SAJ) 9-33, 9-49, 9-77, 9-93, 
9-94 
Fourche Bayou Basin, Little Rock, AR (SWL) 37-67, 
37-17 
Fox River, WI (LRE) 21-8, 21-56, 21-76, 21-96 
Francis E. Walter Dam, PA (NAP) 3-15, 3-24, 3-33 
Frankfort Harbor, MI (LRE) 21-9, 21-56, 21-77 
Franklin Falls Dam, NH (NAE) 1-16, 1-30 
Freeport Harbor, TX (SWG) 40-4, 4-22, 40-29, 
40-30, 40-46, 40-48, 40-54 
Friday Harbor, WA (NWS) 29-3, 29-17, 29-24 
Fry Creeks, Bixby, OK (SWT) 38-6, 38-17, 38-24 
G 
Galilee Salt Marsh, RI (NAE) 1-15, 1-29, 1-36 
Galisteo Dam, NM (SPA) 36-5, 36-12, 36-16 
Galveston Harbor and Channel, TX (SWG) 40-5, 
40-22, 40-30, 4-31, 40-46, 40-48 
Garrison Dam-Lake Sakakawea, Missouri River Basin, 
ND (NWO) 26-14, 26-24, 26-29, 28-37 
Garrison Dam Major Rehabilitation, Lake Sakakawea, 
ND (NWO) 26-14, 26-24, 26-29 
Gathright Dam and Lake Moomaw, VA (NAO) 5-12 
Gavins Point Dam-Lewis and Clark Lake, Missouri 
River Basin, NE and SD (NWO) 26-14, 26-24, 
26-29, 26-33, 26-37 
General Investigations (NWK) 27-10, (NWO) 26-17, 
(NPO) 5-12 
General Regulatory Functions (NWO) 26-16, (NWS) 
29-75, (MVR) 15-7, (MVK) 12-9, (MVM) 13-2, 
(MVS) 14-6 
General Regulatory Program (MVN) 11-12 
General Edgar Jadwin Dam and Reservoir, PA (NAP) 
3-15, 3-25, 3-33 
George W. Andrews Lock and Dam, AL & GA 
(SAM) 10-5, 10-27 
Georgetown Harbor, SC (SAC) 7-4, 7-11, 7-16 
Gillham Lake, AR (SWL) 37-7, 37-17 
Glen Foerd, PA (NAP) 3-16, 3-25, 3-33 
Grand Forks, ND - East Grand Forks, MN (MVP) 
16-6, 16-14, 16-18 
Grand Haven Harbor, MI (LRE) 21-10, 21-57, 21-77, 
21-93 
Grand Isle and Vicinity, LA (MVN) 11-6, 11-14, 
11-18 
Grand Traverse Bay Harbor (LRE) 21-11, 21-57, 
21-77, 21-92 
Grapevine Lake, TX (SWF) 39-5, 39-15, 39-19 
Grays Harbor and Chehalis River, WA (NWS) 29-3, 
29-18, 29-24 
Grayson Lake, KY (LRH) 25-5, 25-13, 25-18 
Great Bend, KS (SWT) 38-6, 38-17, 38-24, 38-29 
Great Egg Harbor Inlet and Peck Beach, NJ (NAP) 
3-13, 3-24, 3-33 
Great Salt Plains Lake, OK (SWT) 38-6, 38-17, 38-25 
Green and Barren Rivers, KY (LRL) 24-2, 24-16, 
24-21, 24-30, 24-34 
Green Bay Harbor, WI (LRE) 21-12, 21-58, 21-77 
Green Harbor, MA (NAE) 1-5, 1-25, 1-34 
Green Peter-Foster Lakes, OR (NWP) 28-18, 28-29, 
28-37 
Green River Lake, KY (LRL) 24-9, 24-18, 24-34 
Greens Bayou, TX (SWG) 40-15 
Greers Ferry Lake, AR (SWL) 37-11, 37-19 
Greiliekville Harbor, MI (LRE) 21-13, 21-58, 21-78 
Guadalupe River, CA (SPK) 35-10, 35-35 
Guilford Creek, VA (NAO) 5-5 
Gulf Intracoastal Waterway between Apalachee Bay, 
FL & Mexican Border (SAM) 10-12, 10-28, 
10-37 (MVN) 11-13 (SWG) 40-6, 40-21, 40-31, 
40-32, 40-33, 40-34, 40-46, 40-54 
Gulfport Harbor, MS (SAM) 10-12, 10-28, 10-37 
H 
Hackensack Meadowlands, NJ (NAN) 2-17, 2-26, 
2-31 
Halls Bayou, TX (SWG) 40-15 
Halstead, KS (SWT) 38-7, 38-17, 38-25, 38-29 
Hamilton County, TN (LRN) 23-5, 23-9 
Hamlet City Lake, NC (SAW) 6-14, 6-25 
Hampton Roads, VA (Collection and Removal of 
Drift) (NAO) 5-5 
Hancock Brook Lake, CT (NAE) 1-15, 1-29 
10-41 
Hansen Dam, CA (SPL) 33-6, 33-14, 33-22 
Harbor Beach Harbor, MI (LRE) 21-13, 21-58, 21-78 
Harbor of Refuge, Block Island, RI (NAE) 1-5, 1-25, 
1-34 
I-8

Harlan County Lake, Republican River, NE (NWK) 
27-3, 27-13, 27-17, 27-30 
Harrisville Harbor, MI (LRE) 21-14, 21-58, 21-78 
Harry S. Truman Dam and Reservoir, Osage River, 
MO (NWK) 27-8, 27-15 
Hartwell Dam and Lake, GA and SC (SAS) 8-10, 
8-14, 8-20, 8-23 
Hastings Harbor, MN 25-7 
Herring Bay & Rockhold Creek, MD (NAB) 4-6, 
4-27, 4-35 
Herring Creek, Tall Timbers, MD (NAB) 4-6, 4-27, 
4-36 
Heyburn Lake and Polecat Creek, OK (SWT) 38-7, 
38-18, 38-25 
Hidden Dam-Hensley Lake, Fresno River, CA (SPK) 
35-11, 35-35 
Hidden Lake/Great Marsh, NE (NWO) 26-12, 26-22, 
26-28 
Highway 69 Bridge at Black River, Jackson County, 
AR (SWL) 37-15 
Hills Creek Lake, OR (NWP) 28-19, 28-29, 28-37 
Hillsdale Lake, Big Bull Creek, KS (NWK) 27-4, 
27-13, 27-17, 27-30 
Hodges Village Dam, MA (NAE) 1-20, 1-31 
Holes Creek, Ohio (LRL) 24-3, 24-16, 24-23 
Holland Harbor, MI (LRE) 21-14, 21-59, 21-78, 
21-92 
Homer Harbor, AK (POA) 32-3, 32-10, 32-13 
Homer Spit Erosion, AK (POA) 32-7, 32-12, 32-16 
Homme Lake and Dam, ND (MVP) 16-6, 16-14, 
16-18 
Honga River and Tar Bay, MD (NAB) 4-4, 4-26, 4-34 
Hop Brook Lake, CT (NAE) 1-16, 1-29 
Hopkinton-Everett Lakes, NH (NAE) 1-17, 1-30 
Hords Creek Lake, TX (SWF) 39-6, 39-16, 39-19 
Hornell, NY (NAB) 4-17, 4-30 
Housatonic River, CT (NAE) 1-15 
Houston, MN (MVP) 16-7, 16-15, 16-18 
Houston-Galveston Navigation Channels, TX (SWG) 
40-8, 40-22, 40-34, 40-55 
Houston Ship Channel, TX (SWG) 40-7, 40-21, 
40-33, 40-34, 40-45, 40-47, 40-53 
Howard A. Hanson Dam, WA (NWS) 29-10, 29-20, 
29-27 
Hudson River at Athens, NY (NAN) 2-5, 2-24, 2-28 
Hudson River, NY (NAN) 2-4, 2-24, 2-27, 2-32 
Hugo Lake, OK (SWT) 38-7, 38-18, 38-25 
Hulah Lake, OK (SWT) 38-7, 38-18, 38-25 
Humboldt Harbor and Bay, CA (SPN) 34-2, 34-16, 
34-22 
Hunting Bayou, TX (SWG) 40-15 
Hunting Island State Park Waste Treatment Plant, SC 
(SAC) 7-8, 7-13, 7-19 
Huron Harbor, OH (LRB) 20-7, 20-17, 20-31 
Hurricane Barrier Operations 
New England Division (NAE) 1-22 
Hyannis Harbor, MA (NAE) 1-5, 1-25, 1-35 
I 
Ice Harbor Lock and Dam - Lake Sacajawea, WA 
(NWW) 30-6, 30-13, 30-18, 30-24, 30-29 
Illinois and Mississippi Canal, (MVR) IL 15-2, 15-9 
Illinois Beach State Park, IL (LRC) 22-10, 22-19, 
22-24 
Illinois Waterway, IL (MVS) 14-2 
Illinois Waterway, IL and IN (MVR) 15-2, 15-9, 
15-11, 15-24, 15-25 
Indian River County, FL (SAJ) 9-24, 9-47, 9-72 
Indian River Inlet and Bay, DE (NAP) 3-5, 3-21, 3-29 
Indiana Dunes National Lakeshore, Bank Protection, 
Beverly Shores, IN (LRC) 22-10, 22-19, 22-24 
Indiana Harbor CDF (LRC) 22-6, 22-18 
Indiana Harbor, IN (LRC) 22-6, 22-18, 22-22, 22-27 
Indiana Shoreline Erosion, IN (LRC) 22-10, 22-19, 
22-25 
Inland Route, MI (LRE) 21-15, 21-59, 21-78 
Inland Waterway from Delaware River to Chesapeake 
Bay, DE, MD, (NAP) 3-6, 3-22, 3-29 
Inland Waterway Rehoboth to Delaware Bay, DE 
(NAP) 3-6, 3-21, 3-29 
Inner Harbor Navigation Canal Lock, LA (MVN) 11-2 
Inspection of Completed Beach Erosion Control 
Projects (NAE) 1-10 
Inspection of Completed Flood Control Projects 
Alaska District (POA) 32-7 
Albuquerque District (SPA) 36-9 
Baltimore District (NAB) 4-23 
Detroit District (LRE) 21-45 
Fort Worth District, (SWF) 39-12, 39-24 
Galveston District (SWG) 40-17 
Honolulu District (POH) 31-2 
Huntington District (LRH) 25-11, 25-19, 25-24 
Jacksonville District (SAJ) 9-35 
Kansas City District (NWK) 27-8, 27-15 
Little Rock District (SWL) 37-9 
1-9

Los Angeles District (SPL) 33-11 
Louisville District (LRL) 24-14 
Memphis District (MVM) 13-2 
Mobile District (SAM) 10-20 
Nashville District (LRN) 23-6 
New England Division (NAE) 1-21 
New Orleans District (MVN) 11-10 
New York District (NAN) 2-21 
Omaha District (NWO) 26-9 
Philadelphia District (NAP) 3-16 
Pittsburgh District (LRP) 18-13, 18-29 
Portland District (NWP) 28-13 
Rock Island District (MVR) 15-7 
Sacramento District (SPK) 35-28 
San Francisco District (SPN) 34-11 
Savannah District (SAS) 8-8, 8-14 
Seattle District (NWS) 29-10 
St. Louis District (MVS) 14-6 
St. Paul District (MVP) 16-13 
Tulsa District (SWT) 38-12 
Vicksburg District (MVK) 12-8 
Walla Walla District (NWW) 30-1 
Wilmington District (SAW) 6-17 
Inspection of Completed Works (SAC) 7-7, 7-25 
Inspection of Non-Federal Levees (NAP) 3-16 
Intracoastal Waterway, Caloosahatchee River to 
Anclote River, FL (SAJ) 9-8, 9-42, 9-56 
Intracoastal Waterway, Jacksonville to Miami, FL 
(SAJ) 9-8, 9-42, 9-56 
Irondequoit Bay, NY (LRB) 20-7, 20-17, 20-32 
Isabella Lake, Kern River, CA (SPK) 35-11, 35-35 
J 
J. Edward Roush Lake, IN (LRL) 24-9, 24-18 
J. Percy Priest Dam and Reservoir, Ohio River Basin, 
TN (LRN) 23-7, 23-9 
J. Strom Thurmond Dam and Reservoir, GA and SC 
(Formerly Clarks Hill Lake, GA and SC) (SAS) 
8-9, 8-14, 8-20, 8-23 
Jackson Hole, WY (NWW) 30-1, 30-13 
Jackson Port, Vicinity of Jackson, AL (SAM) 10-9, 
10-28, 10-34 
Jacksonville Harbor (Mill Cove), FL (SAJ) 9-10, 
9-42, 9-57 
Jacksonville Harbor, FL (SAJ) 9-9, 9-42, 9-57 
Jamaica Bay, NY (NAN) 2-5, 2-24, 2-28 
James R. Olin Flood Control Project (NAO) 5-12 
James River, VA (NAO) 5-6 
James W. Trimble Lock and Dam (No. 13) (SWL) 
37-3 
Jemez Canyon Dam, NM (SPA) 36-5, 36-12 
Jennings Randolph Lake, MD and WV (NAB) 4-11, 
4-28, 4-37 
Jim Chapman Lake, TX (SWF) 39-6, 39-16, 39-19 
Jim Woodruff Lock and Dam, FL & GA (SAM) 
10-22, 10-31, 10-42 
Joe Hardin Lock and Dam (No. 3), AR (SWL) 37-4 
Joe Pool Lake, TX (SWF) 39-6, 39-16, 39-19 
John Day Lock and Dam - Lake Umatilla, OR and 
WA (NWP) 28-19, 28-30, 28-37, 28-46 
John H. Kerr Dam and Reservoir, VA and NC (SAW) 
6-17 
John Martin Reservoir, CO (SPA) 36-3, 36-12 
John Redmond Dam and Reservoir, KS (SWT) 38-7, 
38-18, 38-25 
John W. Flannagan Dam and Reservoir, Ohio River 
Basin, VA (LRH) 25-6, 25-13, 25-18 
John's Pass, FL (SAJ) 9-11, 9-43, 9-58 
Johnstown, PA (LRP) 18-4, 18-14, 18-19 
Jones Creek, VA (NAO) 5-6 
Joseph G. Minish Passaic River Waterfront and 
Historic Area, NJ (NAN) 2-17, 2-26, 2-31 
K 
Kake Harbor, AK (POA) 32-4, 32-10, 32-13 
Kanawha River, WV (LRH) 25-2, 25-12, 25-17 
Kanopolis Lake, Smoky Hill River, KS (NWK) 27-4, 
27-13, 27-17 
Kaw Kawlin River, MI (LRE) 21-42, 21-71, 21-86 
Kaw Lake, OK (SWT) 38-8, 38-18, 38-25 
Kaweah and Tule Rivers, including Terminus Dam 
and Success Lake, CA (SPK) 35-13, 35-36, 
35-43 
Kennebec River, ME (NAE) 1-6, 1-25 
Kenosha Harbor, WI (LRE) 21-15, 21-59, 21-78, 
21-92 
Kentucky Lock (LRN) 23-3, 23-9 
Kentucky River, KY (LRL) 24-2, 24-16, 24-30, 24-34 
Kewaunee Harbor, WI (LRE) 21-16, 21-60, 21-79, 
21-92 
Keweenaw Waterway, MI (LRE) 21-17, 21-60, 21-79 
Keystone Lake, OK (SWT) 38-13, 38-22 
Kikiaola Small Boat Harbor, Kauai, Hawaii (POH) 
31-2, 31-5, 31-6, 31-7 
I-10

Kill Van Kull-Newark Bay, N.J. & NY (NAN) 2-6, 
2-24, 2-28 
Kings Creek, Tupelo, MS (SAM) 10-19, 10-31 
Kinzua Dam and Allegheny Reservoir, Ohio River 
Basin, PA and NY, (LRP) 18-8, 18-15, 18-20 
Kissimmee River Restoration (SAJ) 9-37, 9-78 
Knapps Narrow, MD (NAB) 4-4, 4-26, 4-34 
Knife River Harbor, MN (LRE) 21-17, 21-60, 21-79 
Knightville Dam, MA (NAE) 1-13, 1-28 
Kodiak Harbor, AK (POA) 32-4, 32-11, 32-14 
L 
LA-LB Harbor (LA Harbor), CA (SPL) 33-2, 33-13, 
33-17 
Lackawanna River Basin, PA (NAB) 4-11, 4-28, 4-37 
Lackawawnna River, Olyphant, PA (NAB) 4-13, 4-29, 
4-37 
Lackawanna River, Scranton, PA (NAB) 4-13, 4-29, 
4-37 
LaFarge Lake and Channel Improvement, WI (MVP) 
16-7, 16-15, 16-19 
Lake Ashtabula and Baldhill Dam, Sheyenne River, 
ND (MVP) 16-8, 16-15, 16-19 
Lake Crockett, WA (NWS) 29-4, 29-18, 29-25 
Lake Elsinore, CA (SPL) 33-6, 33-14, 33-22 
Lake Erie-Cooley Canal - Lucas, OH (LRE) 20-12, 
20-21 
Lake George, Hobart, IN (LRC) 22-12, 22-19, 22-25 
Lake Kemp, TX (SWT) 38-8, 38-19, 38-25 
Lake Michigan Diversion (LRC) 22-7, 22-18, 22-23 
LaPointe Harbor, MI (LRE) 21-18, 21-60, 21-80 
Lake Pontchartrain and Vicinity, LA (Hurricane 
protection) (MVN) 11-6, 11-14, 11-18 
Lake Pontchartrain Stormwater Discharge Project, LA 
(MVN) 11-7, 11-14, 11-19 
Lake St. Clair, MI, Channels in (LRE) 21-18, 21-61, 
21-80 
Lake Texoma (Denison Dam) OK and TX (SWT) 
38-13, 38-22 
Lake Washington Ship Channel, WA (NWS) 29-5, 
29-18, 29-25 
Lake Wichita, Holliday Creek, TX (SWT) 38-8, 
38-19, 38-25 
Larose to Golden Meadow, LA (Hurricane protection) 
(MVN) 11-8, 11-15, 11-19 
Las Cruses, NM (SPA) 36-4, 36-12 
Laurel River Lake, Ohio River Basin, KY (LRN) 23-8 
Lavon Lake, TX (SWF) 39-7, 39-16, 39-19 
Lavon Lake Modification and East Fork Channel 
Improvement, TX (SWF) 39-7, 39-16, 39-20 
Lee County, FL (SAJ) 9-25, 9-48, 9-73 
Leland Harbor, MI (LRE) 21-18, 21-61, 21-80 
LeSuer River, CASH 28, Blue Earth County, MN 
(MVP) 16-8, 16-15, 16-19 
Levisa and Tug Forks of the Big Sandy and 
Cumberland Rivers, KY, WV and VA (LRH) 
25-6, 25-13, 25-18 
Lewisville Dam, TX (SWF) 39-7, 39-16, 39-20 
Lexington Harbor, MI (LRE) 21-19, 21-61, 21-80 
Libby Dam - Lake Koocanusa, MT (NWS) 29-12, 
29-21, 29-28 
Lisle, NY (NAB) 4-18, 4-30 
Little Blue River Lakes, MO (NWK) 27-4, 27-13, 
27-18 
Little Calumet River Basin, Cady Marsh Ditch, IN 
(LRC) 22-13, 22-20, 22-25 
Little Calumet River, IN (LRC) 22-12, 22-19, 22-25 
Little Dell Lake, UT, CA (SPK) 35-14, 35-36 
Little Falls Dam Passage #2, MD (NAB) 4-23 
Little Goose Lock and Dam - Lake Bryan, WA 
(NWW) 30-6, 30-13, 30-18, 30-25, 30-29 
Little Harbor, NH (NAE) 1-6, 1-25 
Little Lake Harbor, MI (LRE) 21-19, 21-63, 21-80 
Little River Basin, AR (SWL) 37-7 
Little River Inlet, NC and SC (SAC) 7-5, 7-11, 7-17 
Little Sodus Bay Harbor, NY (LRB) 20-7, 20-17, 
20-32 
Little White Oak Bayou, TX (SWG) 40-14 
Little Wicomico River, VA (NAB) 4-5, 4-26, 4-34 
Littleville Lake, MA (NAE) 1-12, 1-27 
Lock and Dam No. 5, AR (SWL) 37-4, 37-25 
Lock Haven, PA (NAB) 4-12, 4-28, 4-37 
Lock No. 2 and Wilber D. Mills Dam (No. 2), AR 
(SWL) 37-4, 37-25 
Lockwoods Folly River, NC (SAW) 6-5, 6-23 
Logan Creek, Pender, NE (NWO) 26-5, 26-19, 26-26 
Long Branch Lake, Little Chariton River, MO (NWK) 
27-5, 27-13, 27-18 
Longboat Pass, FL (SAJ) 9-11, 9-43, 9-58 
Lookout Point-Dexter Lakes, OR (NWP) 28-19, 
28-30, 28-43 
Lorain Harbor, OH (LRB) 20-7, 20-18, 20-32 
Los Angeles County Drainage Area, CA (SPL) 33-7, 
33-14, 33-22 
I-11

Los Angeles River Sepulveda to Arroyo Seca 
Recreation Development, CA (SPL) 33-7, 33-15, 
33-23 
Lost Creek Lake, Rogue River, OR (NWP) 28-20, 
28-30, 28-37, 28-43 
Lower Columbia River Basin Bank Protection, OR and 
WA (NWP) 28-14, 28-28, 28-36 
Lower Decatur, NE (NWO) 26-12, 26-23, 26-28 
Lower Girard Dam, OH (LRP) 18-8, 18-15 
Lower Granite Lock and Dam, WA (NWW) 30-7, 
30-13, 30-18, 30-26, 30-29 
Lower Monumental Lock and Dam - Lake Herbert G. 
West, WA (NWW) 30-8, 30-13, 30-18, 30-27, 
30-29 
Lower Rio Grande Basin, TX (SWG) 40-17, 40-24, 
40-41 
Lower Savannah River Basin Environmental 
Restoration Study (SAS) 8-8, 8-20 
Lower Snake River Fish and Wildlife Compensation 
Plan, WA, OR and ID (NWW) 30-9, 30-14, 
30-18 
Lower Thorafare, Deal Island, MD (NAB) 4-5, 4-26, 
4-34 
Loyalhanna Lake, Ohio River Basin, PA (LRP) 18-8, 
18-15, 18-21 
Lucky Peak Lake, ID (NWW) 30-2, 30-13 
Ludington Harbor, MI (LRE) 21-20, 21-62, 21-80 
Lummi Shore Road, WA (NWS) 29-9, 29-20, 29-27 
Lynnhaven Inlet VA (NAO) 5-6 
M 
Maalaea Harbor, Maui, HI (POH) 31-2, 31-5, 31-6 
Mad River, Waterbury, (Woodtick Area) CT (NAE), 
1-15, 1-28 
Mahoning Creek Lake, Ohio River Basin, PA (LRP) 
18-9, 18-15, 18-21 
Maintenance and Repair Fleet and Marine Terminals, 
AR (SWL) 37-5 
Mamaronek Harbor, NY (NAN) 2-6, 2-24, 2-28 
Manatee County, FL (SAJ) 9-26, 9-48, 9-72 
Manatee Harbor, FL (SAJ) 9-12, 9-43, 9-58 
Manistee Harbor, MI (LRE) 21-20, 21-62, 21-80 
Manistique Harbor, MI (LRE) 21-21, 21-63, 21-81 
Manitowoc Harbor, WI (LRE) 21-21, 21-63, 21-81, 
21-93 
Mankato Township, MN (MVP) 16-8, 16-14, 16-18 
Mansfield Hollow Lake, CT (NAE) 1-20, 1-31 
Manteo (Shallowbag) Bay, NC (SAW) 6-6, 6-23 
Marina Del Rey, CA (SPL) 33-2, 33-13, 33-19, 33-32 
Marion Reservoir, KS (SWT) 38-8, 38-19, 38-25 
Marquette Harbor, MI (LRE) 21-22, 21-63, 21-81 
Marshall, MN (MVP) 16-9, 16-16, 16-19 
Martin County, FL (SAJ) 9-26, 9-48, 9-74 
Martins Fork Lake, KY (LRN) 23-5, 23-9 
Martis Creek Lake, Martis Creek, NV and CA (SPK) 
35-15, 35-36 
Massillon, OH, (LRH) 25-6, 25-14, 25-18, 25-24 
Matagorda Ship Channel, TX (SWG) 40-9, 40-23, 
40-35, 40-36, 40-50, 40-56 
Mayaguez Harbor, PR (SAJ) 9-12, 9-43, 9-58 
Mayfield Creek, KY (MVM) 13-1, 13-3 
McClellan-Kerr Arkansas River Navigation System, 
Bank Stabilization and Channel (SWL) 37-3 
McClellan-Kerr Arnkansas River Navigation System, 
OK (SWT) 38-2, 38-15, 38-24 
McCook and Thorton Reservoirs, IL (LRC) 22-13, 
22-20, 22-25 
McGrath Creek, Wichita Falls, TX (SWT) 38-8, 
38-19, 38-25 
McKinney Bayou, AR (MVK) 12-4, 12-13, 12-20 
McNary Lock and Dam - Lake Wallula, OR and WA 
(NWW) 30-9, 30-14, 30-18, 30-37 
Melbourne Harbor, FL (SAJ) 9-13, 9-43, 9-59 
Melvern Lake, Marais des Cygnes (Osage) River, KS 
(NWK) 27-5, 27-12, 27-17, 27-28 
Menominee Harbor and River, MI and WI (LRE) 
21-24, 21-64, 21-81 
Meramec River Basin Valley Park, MO (MVS) 14-4, 
14-8, 14-12 
Merced County Stream Group, CA (SPK) 35-17, 
35-36 
Merced County Streams, CA (SPK) 35-16, 35-36 
Merrimack River Basin, NH and MA (NAE) 1-16, 
1-54, 1-55 
Metlakatla Harbor, AK (POA) 32-4, 23-10, 32-14 
Miami Harbor, FL (SAJ) 9-12, 9-44, 9-59 
Michael J. Kirwan Dam and Reservoir, Ohio River 
Basin, OH (LRP), 18-9, 18-16, 18-22 
Michigan City Harbor, IN (LRC) 22-7, 22-18, 22-23, 
22-27 
Middle Rio Grande Flood Protection, Bernalillo to 
Belen, NM (SPA) 36-6, 37-12, 36-15 
Middlesboro, Cumberland River Basin, KY (LRN) 
23-6 
I-12

Milford Lake, Republican River, KS (NWK) 27-5, 
27-13, 27-18, 27-30 
Milk River, Matta, MT (NWO) 26-6, 26-19, 26-26 
Mill Creek, Bennington Lake, WA (NWW) 30-2, 
30-13 
Mill Creek, OH (LRL) 24-4, 24-16, 24-34 
Mill Creek, Fort Smith, AR (SWL) 37-7, 37-17 
Miller Corner Phragmites Control, SC (SAC) 7-9, 
7-13, 7-19 
Millers Ferry Lock and Dam, AL (SAM) 10-22, 
10-32, 10-47 
Millwood Lake, AR (SWL) 37-8, 37-18, 37-30 
Milwaukee Harbor, WI (LRE) 21-24, 21-64, 21-82, 
21-93 
Mingo Creek, OK (SWT) 38-8, 38-19, 38-25 
Miscellaneous Work Under Special Authorization 
San Francisco District (SPN) 34-12 
Walla Walla District (NWW) 30-10 
Mispillon River (NAP) 3-8, 3-22, 3-30 
Mississinewa Lake, IN (LRL) 24-10, 24-18 
Mississippi River Between Missouri and Minneapolis, 
MN (MVS) 14-2 
Mississippi River Between the Missouri River and 
Minneapolis, MN (MVR) 15-4 
Mississippi River Between the Missouri River and 
Minneapolis, MN (MVP) 16-3, (MVR) 15-3 
Mississippi River between Ohio and Missouri Rivers, 
MO and IL (MVS) 14-2, 14-8, 14-10 
Mississippi River-Gulf Outlet, LA (MVN) 11-2, 
11-14, 11-16, 11-23 
Mississippi River Main Stem Model Development 
(NWK) 27-10, 27-15 
Mississippi River Ship Channel, Gulf to Baton Rouge, 
LA (MVN) 11-3, 11-14, 11-16 
Missouri National Recreational River, NE and SD 
(NWO) 26-6, 26-19, 26-26 
Missouri River Basin Colloboration Effort (NWK) 
27-10 
Missouri River Between Ft. Peck Dam, MT and 
Gavins Point Dam, SD & NE (NWO) 26-15, 
26-24, 26-29 
Missouri River Fish and Wildlife Mitigation, IA, NE, 
KS and MO (NWK) 27-2, 27-12, 27-16, 
(NWO) 26-3, 26-18, 26-25 
Missouri River, Kenslers Bend, NE to Sioux City, IA 
(NWO) 26-6, 26-20, 26-26 
Missouri River Levee System, IA, NE, KS and MO 
(Kansas City District) (NWK) 27-5, 27-14, 
27-18, 27-30 
Missouri River Master Water Control Manual Review 
and Update (NWO) 26-16, 26-24, 26-29 
Missouri River, Sioux City, IA to Rulo, NE (NWO) 
26-3, 26-18, 26-25, (NWK) 27-2, 27-12, 
27-16 
Mitigation of Shore Damages 
Detroit District (LRE) 21-39 
Mobile Harbor, AL (SAM) 10-13, 10-28, 10-37 
Mojave River Dam, Mojave River Basin, CA (SPL) 
33-7, 33-15, 33-24 
Molly Ann's Brook, NJ (NAP) 3-16, 3-25, 3-33 
Monongahela River, PA and WV (LRP) 18-2, 18-14, 
18-19, 18-27, 18-28 
Monroe Harbor, MI (LRE) 21-24, 21-64, 21-82 
Monroe Lake, IN (LRL) 24-10, 24-18 
Moorefield, WV (NAB) 4-12, 4-29, 4-37 
Moravian Creek, Wilkesboro, NC (SAW) 6-14, 6-25 
Morehead City Harbor, NC (SAW) 6-7, 6-23 
Morgan Point Bendway Closure Structure (SWL) 
37-14 
Moriches Inlet, NY (NAN) 2-7, 2-24, 2-28 
Morro Bay Harbor, CA (SPL) 33-3, 33-13, 33-19 
Mosquito Creek Lake, Ohio River Basin, OH (LRP) 
18-10, 18-16, 18-21 
Mount Morris Lake, NY Genesee River (LRB) 20-13, 
20-20, 20-36 
Mud Mountain Dam, WA (NWS) 29-10, 29-20, 29-27 
Multiple Purpose Projects Including Power (SAC) 7-8, 
7-13, 7-19 
Murderkill River, DE (NAP) 3-8, 3-23, 3-30 
Murray Lock and Dam (No. 7), AR (SWL) 37-4, 
37-26 
Murrells Inlet, SC (SAC) 7-5, 7-11, 7-17 
Muscatine Island, IA (MVR) 15-7, 15-10, 15-14 
Muskegon Harbor, MI (LRE) 21-26, 21-65, 21-82 
Muskingum River Lakes, OH (LRH) 25-7, 25-14, 
25-18 
Myrtle Beach, SC (SAC) 7-6, 7-12, 7-18 
N 
Nandua Creek (NAO) 5-7 
Nanticoke River, DE & MD (NAB) 4-4, 4-26, 4-34 
Narrows & Lake Champlain, NY (NAN) 2-8, 2-24, 
2-28 
Nassau County, FL (SAJ) 9-26, 9-48, 9-74 
I-13

National Emergency Preparedness 
Chicago District (LRC) 22-9 
Kansas City District) (NWK) 27-10, 27-15 
Mobile District (SAM) 10-26 
Omaha District (NWO) 26-16 
Philadelphia District (NAP) 3-17 
St. Paul 16-13 
Savannah District (SAS) 8-12 
Seattle District (NWS) 29-15 
Navarro Mills Lake, TX (SWF) 39-8, 39-16, 39-20 
Navigation Projects on which Reconnaissance and 
Condition Surveys only were Conducted 
during Period (SAJ) 9-22 
Navigation Work Under Special Authorization 
Baltimore District (NAB) 4-10 
Charleston District (SAC) 7-6 
Detroit District (LRE) 21-37 
Galveston District (SWG) 40-13 
Honolulu District (POH) 31-2 
Jacksonville District (SAJ) 9-22 
Louisville District (LRL) 24-3 
Little Rock District (SWL) 37-5 
Memphis District (MVM) 13-1 
Mobile District (SAM) 10-17, 10-45 
Nashville District (LRN) 23-4 
New Orleans District (MVN) 11-4 
New York District (NAN) 2-12 
Omaha District (NWO) 26-3 
Philadelphia District (NAP) 3-17 
San Francisco District (SPN) 34-8 
Savannah District (SAS) 8-6 
St. Louis District (MVS) 14-3 
Vicksburg District (MVK) 12-3 
Neah Bay, WA (NWS) 29-5, 29-19, 29-25 
Neah Bay, WA (Section 101) (NWS) 29-4, 29-14, 
29-20 
Neches River and Tributaries, Salt Water Barrier, TX 
(SWG) 40-10 
Neuse River, NC (SAW) 6-8, 6-23 
Neuse River Basin, NC (SAW) 6-15, 6-36 
New Bedford, Fairhaven, and Acushnet, MA (NAE) 
1-18, 1-30 
New Buffalo Harbor, MI (LRE) 21-26, 21-65, 21-82 
New Jersey Intracoastal Waterway (NAP) 3-9, 3-23, 
3-30 
New Melones Lake, CA (SPK) 35-28 
New Orleans to Venice, LA (Hurricane protection) 
(MVN) 11-8, 11-15, 11-19 
New Pass, Sarasota, FL (SAJ) 9-13, 9-44, 9-60 
New York and New Jersey Channels (NAN) 2-10, 
2-25, 2-30 
New York City Watershed, NY (NAN) 2-18, 2-26, 
2-31 
New York Harbor and Adjacent Channels (Port 
Jersey) (NAN) 2-8, 2-25, 2-28 
New York Harbor-Collection and Removal of Drift 
(NAN) 2-8, 2-25, 2-29 
New York Harbor-Entrance Channels and Anchorage 
Areas (NAN) 2-9, 2-25, 2-29 
New York State Canal System (LRB) 20-12, 20-21 
Newark Bay, Hackensack and Passaic River, NY 
(NAN) 2-7, 2-24, 2-28 
Newark, OH (LRH) 25-7, 25-14, 25-18, 25-21, 25-24 
Newburyport Harbor, MA (NAE) 1-7, 1-25 
Newport Bay Harbor, CA (SPL) 33-3, 33-13, 33-19, 
33-27 
Newport News Creek, VA (NAO) 5-7 
Nimrod Fisheries Restoration (SWL) 37-15 
Nimrod Lake, AR (SWL) 37-8, 37-29 
Nimrod Waterfowl Levee (SWL) 37-15, 37-20 
Ninilchik Harbor, AK (POA) 32-4, 32-10, 32-14 
Nishnabotna River, Hamburg, IA (NWO) 26-6, 26-19, 
26-26 
Nogales Wash, AZ (SPL) 33-7, 33-15, 33-24 
Nolin Lake, KY (LRL) 24-11, 24-19 
Nome Harbor, AK (POA) 32-5, 32-10, 32-14 
Norco Bluffs, CA (SPL) 33-7, 33-15, 33-24 
Norfolk Harbor and Channels, VA (NAO) 5-7 
Norfolk Lake, AR (SWL) 37-13, 37-20, 37-30 
Norrel Lock and Dam (No. 1) and Entrance Channel, 
AR (SWL) 37-4, 37-26 
North Branch, Chicago River, IL (LRC) 22-12, 22-18, 
22-23 
North Branch of Kokosing River Lake, OH (LRH) 
25-8, 25-14, 25-18 
North Ellenville, NY (NAN) 2-17, 2-26, 2-31 
North Fork of Pound River Lake, VA (LRH) 25-8, 
25-14, 25-19 
North Hartland Lake, VT (NAE) 1-13, 1-28 
North Nashua River, Lancaster, MA (NAE) 1-18, 
1-30, 1-36 
North Springfield Lake, VT (NAE) 1-13, 1-28 
Northeast River, MD (NAB) 4-6, 4-26, 4-34 
Northfield Brook Lake, CT (NAE) 1-16, 1-29 
1-14

Nutwood Drainage and Levee District, IL (MVS) 
14-5, 14-13, 14-17, 14-22 
O 
O.C. Fisher Dam and Lake, TX (SWF) 39-8, 39-16, 
39-20 
Oahe Dam-Lake Oahe, Missouri River Basin, SD and 
ND (NWO) 26-15, 26-24, 26-29, 26-34, 26-37 
Oak Orchard, NY (LRB) 20-8, 20-18, 20-34 
Oakland Harbor, CA (SPN) 34-3, 34-17, 34-23 
Ocean City Harbor and Inlet and Sinepuxent Bay, MD 
(1954 River & Harbor Act) (NAB) 4-6, 4-27, 
4-35 
Oceanside Harbor, CA (SPL) 33-3, 33-13, 33-19, 
33-32 
Oceanside Harbor Sand By-Pass, CA (SPL) 33-4, 
33-13, 33-19 
O'Hare Reservoir, IL (LRB) 22-14, 22-20, 22-25 
Ohio River Basin 
Huntington District (LRH) 25-8, 25-14 
Louisville District (LRL) 24-11, 24-19, 24-21 
Nashville District (LRN) 23-6, 23-9, 23-12, 
23-17 
Pittsburgh District (LRP) 18-10, 18-16, 18-21 
Ohio River Flood Protection (LRL) 24-4, 24-16 
Okatibbee Lake, MS (SAM) 10-18, 10-30 
Okeechobee Waterway, FL (SAJ) 9-13, 9-44, 9-61, 
9-87 
Oklawaha River, FL (SAJ) 9-14, 9-44, 9-61 
Olcott Harbor, NY (LRB) 20-8, 20-18, 20-34 
Oliver Lock and Dam (Replacement), AL (SAM) 
10-9, 10-28, 10-35 
Olympia Harbor, WA (NWS) 29-5, 29-19, 29-25 
Onandaga Storm Water Discharge (LRB) 20-14, 20-22 
Ontonagon Harbor, MI (LRE) 21-26, 21-66, 21-83, 
21-93 
Oologah Lake, OK (SWT) 38-9, 38-19, 38-25 
Open Channel Work, Licking River, KY (LRL) 24-2, 
24-16 
Open Channel Work, Ohio River (LRH) 25-2, (ORD) 
19-3, 19-4, 19-5, (LRP) 18-3, (LRL) 24-3 
Optima Lake, OK (SWT) 38-9, 38-20, 38-25 
Oswego Harbor, NY (LRB) 20-9, 20-18, 20-34 
Other Aquatic Habitat (SAM) 10-25 
Other Authorized Beach Erosion Projects 
Chicago District (LRC) 22-11 
Jacksonville District (SAJ) 9-30 
Mobile District (SAM) 10-17, 10-43 
New York District (NAN) 2-17 
Other Authorized Bridge Alterations (LRC) 22-9 
Other Authorized Flood Control Projects 
Albuquerque District (SPA) 36-10 
Charleston District (SAC) 7-7, 7-21 
Chicago District (LRC) 22-15 
Detroit District (LRE) 21-45 
Fort Worth District (SWF) 39-12, 39-23 
Jacksonville District (SAJ) 9-36 
Little Rock District (SWL) 37-9 
Louisville District (LRL) 24-14 
Mobile District (SAM) 10-17, 10-44 
New York Division (NAN) 2-21 
Pittsburgh District (LRP) 18-13, 18-23, 18-24 
Rock Island District (MVR) 15-7 
Savannah District (SAS) 8-8, 8-22 
Tulsa District (SWT) 38-12 
Other Authorized Navigation Projects 
Charleston District (SAC) 7-6 
Detroit District (LRE) 21-37 
Huntington District (LRH) 25-2, 25-20 
Jacksonville District (SAJ) 9-22 
Little Rock District (SWL) 37-5 
Louisville District (LRL) 24-3 
Mobile District (SAM) 10-17 
New England Division (NAE) 1-36 
New York District (NAN) 2-12 
Pittsburgh District (LRP) 18-4, 18-23 
Rock Island District (MVR) 15-4 
Savannah District (SAS) 8-6, 8-21 
Tulsa District (SWT) 38-12 
Other Authorized Shore Protection Projects 
Charleston District (SAC) 7-7, 7-20 
Other Programs and Activities (MVS) 14-6 
Other Work Under Special Authority 
St. Paul District (MVP) 16-13 
Sacramento District (SPK) 35-31 
Seattle (NSW) 29-14 
Otter Brook Lake, NH (NAE) 1-14, 1-28 
Ouachita and Black Rivers below Camden, AR (MVK) 
12-2, 12-10, 12-12 
Ouachita River and Tributaries, AR and LA (MVK) 
12-5, 12-13 
Ouachita River Levees, LA (MVK) 12-5, 12-11, 12-19 
Owasco Outlet, Auburn, NY (LRE) 20-9, 20-18 
Oxford, NY (NAB) 4-18, 4-31 
Oyster Channel, VA (NAO) 5-8, 5-13 
I-15

Ozark-Jeta Taylor Lock and Dam (No. 12), AR 
(SWL) 37-13, 37-20, 37-27 
P 
Paint Creek Lake, Ohio River Basin, OH (LRH) 25-8, 
25-14, 25-19 
Painted Rock Dam (Gila River), AZ (SPL) 33-8, 
33-15, 33-23 
Paintsville Lake, KY (LRH) 25-9, 25-15, 25-19 
Pajaro River, CA (SPK) 35-17, 35-37 
Palm Beach County, FL (SAJ) 9-27, 9-48, 9-74 
Palm Beach Harbor, FL (SAJ) 9-15, 9-44, 9-62 
Palm Beach Island, FL (SAJ) 9-28, 9-48, 4-74 
Palm Valley Bridge, FL (SAJ) 9-15, 9-44, 9-62 
Pamlico and Tar Rivers, NC (SAW) 6-8, 6-23 
Panama City Harbor, FL (SAM) 10-13, 10-28, 10-38 
Papillion Creek and Tributaries Lakes, NE (NWO) 
26-7, 26-20, 26-26 
Parker Creek, VA (NAO) 5-9 
Parker Lake, OK (SWT) 38-9, 38-20, 38-25 
Pascagoula Harbor, MS (SAM) 10-14, 10-28, 10-38 
Passaic River Basin, N.J. & NY (NAN) 2-19, 2-31 
Pat Mayse Lake, TX (SWT) 38-9, 38-20, 38-25 
Patchogue River, CT (NAE) 1-7, 1-25 
Patoka Lake, IN (LRL) 24-11, 24-19, 24-33 
Paxton Creek, Harrisburg, PA (NAB) 4-14, 4-30, 
4-39 
Pearl River Basin, MS and LA (MVK) 12-5, 12-11, 
12-14 
Pearl River, Slidell, St. Tammany Parish, LA (MVK) 
12-6, 12-11, 12-14 
Pearson-Skubitz Big Hill Lake, KS (SWT) 38-10, 
38-20, 38-25 
Pebble Creek, Scribner, NE (NWO) 26-7, 26-20, 
26-27 
Pensacola Harbor, FL (SAM) 10-15, 10-28, 10-39 
Pentwater Harbor, MI (LRE) 21-27, 21-66, 21-83, 
21-93 
Perdido Pass Channel, AL (SAM) 10-15, 10-29, 10-39 
Permit Evaluation (SAJ) 9-36 
Perry Creek, IA (NWO) 26-7, 26-21, 26-26 
Perry Lake, Delaware River, KS (NWK) 27-6, 27-13, 
27-17, 27-28 
Petaluma River, Petaluma, CA (SPN) 34-9, 34-17, 
34-25 
Petersburg, WV (NAB) 4-13, 4-29, 4-37 
Petoskey Harbor, MI (LRE) 21-28, 21-66, 21-83 
Philpott Lake, VA (SAW) 6-18 
Pick-Sloan Missouri Basin Program (Kansas City 
District) (NWK) 27-6, 27-18 
Pick-Sloan Missouri River Basin Program (Omaha 
District) (NWO), 26-8, 26-27 
Pine and Mathews Canyons Dams, Colorado River 
Basin, NV (SPL) 33-8, 33-15, 33-24 
Pine Creek Lake, TX (SWT) 38-10, 38-20, 38-25 
Pine Flat Lake and Kings River, CA (SPK) 35-17, 
35-37 
Pinellas County, FL (SAJ) 9-28, 9-75 
Pipestem Lake, ND (NWO) 26-8, 26-21, 26-27 
Planning Assistance to States (SAS) 8-11 
Planning, Engineering and Design (NAE) 1-23 
Plymouth Harbor, MA (NAE) 1-7, 1-25 
Point Beach, Milford, CT (NAE) 1-9, 1-26, 1-36 
Pomme de Terre Lake, Pomme de Terre River, MO 
(NWK) 27-6, 27-14, 27-19, 27-30 
Pomona Lake, One Hundred Ten Mile Creek, KS 
(NWK) 27-6, 27-14, 27-19, 27-30 
Ponce de Leon Inlet, FL (SAJ) 9-16, 9-45, 9-63 
Ponce Harbor, PR (SAJ) 9-16, 9-45, 9-63 
Pond Creek, KY (LRL) 24-4, 24-16, 24-23 
Poplar Island, MD (NAB) 4-23, 4-32, 4-39 
Port Clinton Harbor, OH (LRB) 20-9, 20-19, 20-35 
Port Everglades Harbor, FL (SAJ) 9-17, 9-45, 9-63 
Port Fourchon, LA (MVN) 11-4, 11-14, 11-16 
Port Hueneme, CA (SPL) 33-4, 33-13, 33-19, 33-32 
Port of Long Beach, CA (SPL) 33-13, 33-14, 33-19 
Port Orford, OR (NWP) 28-7, 28-26, 28-34 
Port Royal Harbor, SC (SAC) 7-5, 7-11, 7-18 
Port Sanilac Harbor, MI (LRE) 21-28, 21-66, 21-83 
Port Townsend, WA (NWS) 29-6, 29-19, 29-26 
Port Washington Harbor, WI (LRE) 21-29, 21-67, 
21-83 
Port Wing Harbor, WI (LRE) 21-29, 21-67, 21-83 
Portage Lake Harbor, MI (LRE) 21-30, 21-67, 21-83 
Portage,'WI (MVP) 16-10, 16-16, 16-19 
Portland Harbor, ME (NAE) 1-7, 1-26 
Portugues and Bucana Rivers, PR (SAJ) 9-34, 9-49, 
9-77 
Potomac and Anacostia Rivers, DC, Collection and 
Removal of Drift (NAB) 4-6, 4-27, 4-35 
Potomac River - Aquatic Plant Control, MD, VA, DC 
(NAB) 4-7, 4-27, 4-35 
Potomac River at Mt. Vernon (NAB) 4-7, 4-27, 4-35 
1-16

Potomac River at Alexandria, VA (NAB) 4-7, 4-27, 
4-35 
Potomac River below Washington, DC (NAB) 4-7, 
4-27, 4-35 
Preconstruction Engineering and Design - See 
Advance Engineering and Design 
Preservation of Natural Flood Storage, Passaic River, 
NJ (NAN) 2-19, 2-31 
Presque Isle Peninsula, Erie, PA (LRB) 20-13, 20-21, 
20-37 
Prevention of Obstructions and Injurious Deposits, 
Baltimore Harbor, MD (NAB) 4-7, 4-27, 4-35 
Proctor Lake, TX (SWF) 39-9, 39-18, 39-22 
Project Condition Surveys 
Portland District (NWP) 28-7 
Seattle District (NWS) 29-6 
Project Modifications for Improvement of 
Environment (SAS) 8-8 (SWG) 40-19 
(LRE) 21-42, (SAM) 10-25, (LRP) 18-13, 
(NWO) 26-11 
Projects Not Specifically Authorized (NWP) 28-21 
Prompton Lake, PA (NAP) 3-17, 3-25, 3-33 
Protection of Navigation (MVN) 11-11 
Providence River and Harbor, RI (NAE) 1-7, 1-26, 
1-35 
Pugent Creek, WA (NWS) 29-13, 29-22, 29-29 
Puget Sound and its Tributary Waters, WA (NWS) 
29-6, 29-19, 29-26 
Punxsatawney, Ohio River Basin, PA (LRP) 18-5, 
18-14, 18-19 
Put-In-Bay Harbor, OH (LRB) 20-9, 20-19 
Q 
Quillayute River, WA (NWS) 29-7, 29-19, 29-26 
Quonset Point, Davisville, RI (NAE) 1-18, 1-30, 1-37 
R 
R.D. Bailey Lake, WV (LRH) 25-9, 25-15, 25-19 
Rampano at Oakland, NJ (NAN) 2-20, 2-26, 2-31, 
Raritan Bay and Sandy Hook, NJ (NAN) 2-15, 2-25, 
2-30 
Raritan River Basin, Greenbook Sub-Basin, NJ (NAN) 
2-20, 2-26, 2-31 
Rathbun Lake, Chariton River, IA (NWK) 27-7, 
27-14, 27-20 
Ray Roberts Lake, TX (SWF) 39-8, 39-17, 39-20 
Raymondville Drain, TX (SWG) 40-18 
Raystown Lake, Raystown Branch, Juniata River, PA 
(NAB) 4-13, 4-29, 4-37 
Reconnaissance and Condition Surveys 
Baltimore District (NAB) 4-10 
Charleston District (SAC) 7-6 
Chicago District (LRC) 22-9 
Detroit District (LRE) 21-37 
Galveston District (SWG) 40-13 
Honolulu District (POH) 31-2 
Mobile District (SAM) 10-17, 10-47 
New York District (NAN) 2-12 
Philadelphia District (NAP) 3-17 
San Francisco District (SPN) 34-8 
Savannah District (SAS) 8-6 
Red River Basin Chloride Control, TX & OK (SWT) 
38-4, 38-15, 38-24 
Red River below Denison Dam, levees and bank 
stabiliation (Vicksburg District) (MVK) 12-7, 
12-15, 21-20 
Red River below Denison Dam (Vicksburg District) 
(MVK) 12-7, 12-11, 12-20, 12-21 
Red River Emergency Bank Protection (MVK) 12-2, 
12-10, 12-12 
Red River-Waterway-Mississippi River to Shreveport, 
LA (MVK) 12-3, 12-10, 12-12 
Red Rock Dam and Lake Red Rock, IA (MVR) 15-5, 
15-10, 15-13 
Redbank and Fancher Creeks, CA (SPK) 35-19, 35-37 
Redondo Beach Harbor (King Harbor), CA (SPL) 
33-4, 33-13, 33-20 
Regulatory Functions Program 
Mobile District (SAM) 10-25 
Savannah District (SAS) 8-12 
St. Paul District (MVP) 16-13 
Regulatory Programs (NWK) 27-10, (NAB) 4-24 
Removal of Aquatic Growth from Navigable Waters in 
the State of Florida, (SAJ) 9-17, 9-45, 9-64, 
9-88 
Reno Beach, OH (LRB) 20-14, 20-22 
Research and Development 
Pittsburgh District (LRP) 18-13 
Sacramento District (SPK) 35-30 
Savannah District (SAS) 8-11 
Reservoirs at Headwaters of Mississippi River, MN 
(MVP) 16-3, 16-14, 16-18, 16-27 
Restoration Work Under Special Authorization (SAJ) 
9-39 
1-17

Richard B. Russell Dam and Lake, GA and SC 
(Formerly Trotters Shoals Lake, GA and SC) 
(SAS) 8-10, 8-14, 8-20, 8-23 
Richmond Harbor (Deepening), CA (SPN) 34-4, 14-24 
Rillitoo River, AZ (SPL) 33-8, 33-15, 33-24 
Rio De La Plata, PR (SAJ) 9-34, 9-78 
Rio Grande Basin, NM (SPA) 36-4, 36-12 
Rio Grande Floodway, NM (SPA) 36-6, 36-13, 36-15 
Rio Puerto Nuevo, PR (SAJ) 9-35, 9-78 
Rio Salado, Phoenix Reach, AZ (SPL) 33-12, 33-16 
Rio Salado, Tempe Reach, AZ (SPL) 33-12, 33-16 
Rivers and Harbors Contributed Funds (SAM) 10-26 
Roanoke River, NC (SAW) 6-8, 6-24 
Roanoke River Basin, VA and NC (SAW) 6-17, 6-36 
Roanoke River Upper Basin, VA Headwaters Area 
(SAW) 6-15, 6-25 
Robert Douglas Willis Hydropower, TX (SWF) 39-12, 
39-17, 39-21 
Robert F. Henry Lock and Dam, AL (SAM) 10-23, 
10-32, 10-47 
Robert S. Kerr Lock and Dam and Reservoir, OK 
(SWT) 38-13, 38-22 
Rochester Harbor, NY (LRB) 20-10, 20-19, 20-35 
Rochester Harbor, NY (Wave Surger) (LRB) 20-13, 
20-21 
Rochester, MN (MVP) 16-10, 16-16, 16-19 
Rock Hall Harbor, MD (NAB) 4-9, 4-29, 4-37 
Rockaway Inlet to Norton Point (Coney Island) NY 
(NAN) 2-15, 2-25, 2-31 
Rocky River, OH (LRB) 20-10, 20-19, 20-36 
Rogue River Harbor at Gold Beach, OR (NWP) 28-7, 
28-26, 28-34 
Rollinson Channel, NC (SAW) 6-9, 6-24 
Rooster Island, Dorchester County, MD (NAB) 4-24, 
4-33, 4-41 
Roseville, OH (LRH) 25-9, 25-15, 25-19, 25-24 
Rouge River, MI (LRE) 21-30, 21-67, 21-84, 21-93 
Rough River Lake and Channel Improvement, KY 
(LRL) 24-11, 24-19 
Roughans Point, Revere, MA (NAE) 1-18, 1-30, 1-37 
Rudee Inlet, VA (NAO) 5-9 
Russian River Basin including Dry Creek (Warm 
Springs Lake) and Lake Mendocino (Coyote 
Valley Dam), CA (SPK) 35-20, 35-37, 35-46, 
(SPN) 34-10, 34-18, 34-25 
S 
Sabine-Neches Waterway, TX (SWG) 40-9, 40-21, 
40-36, 40-37, 40-38, 40-47, 40-51, 40-56 
Sacramento River and Tributaries, CA (debris control) 
35-2A, 35-7A, 35-11A 
Sacramento River and Tributaries from Collinsville to 
Shasta Dam, CA (SPK) 35-21, 35-38, 35-46 
Sacramento River, CA (SPK) 35-2, 35-4A, 35-7A, 
35-12A 
Sacramento River Deep Water Ship Channel, CA 
(SPK) 35-3, 35-43 
Sagamore Marsh, Cape Cod Canal, MA (NAE) 1-19, 
1-30, 1-37 
Saginaw River, MI (LRE) 21-31, 21-67, 21-72, 21-84, 
21-86, 21-93 
Saint Joun River Basin, ME (NAE) 1-19, 1-30, 1-37 
Salamonie Lake, IN (LRL) 24-12, 24-19 
Salem Harbor, MA (NAE) 1-8, 1-26, 1-35 
Salem River, NJ (NAP) 3-10, 3-23, 3-31 
Salt Creek and Tributaries, NE (NWO) 26-8, 26-21, 
26-28 
Salyersville, KY (LRL) 24-5, 24-16, 24-23, 24-30 
Sam Rayburn Dam and Reservoir, TX (SWF) 39-13, 
39-17, 39-20 
Sam Rayburn Dam and Reservoir, TX (Dam Safety) 
(SWF) 39-13, 39-17, 39-20 
Sammamish River Weir Restoration, WA (NWS) 
29-14, 29-22, 29-29 
San Acacia to Bosque del Apache Unit, NM (SPA) 
36-7 
San Antonio Channel Improvement, TX (SWF) 39-9, 
39-17, 39-20 
San Diego Harbor, CA (SPL) 33-5, 33-14, 33-20, 
30-32 
San Diego River & Mission Bay, CA (SPL) 33-5, 
33-14, 33-21, 33-32 
San Francisco Bay and Delta Model, CA (SPN) 34-6 
San Francisco Bay Long Term Management Strategy 
(LTMS), CA (SPN) 34-7 
San Francisco Bay to Stockton, CA (John F. Baldwin 
and Stockton Ship Channels) (SPN) 34-5 
San Gabriel River, TX (SWF) 39-9, 39-17, 39-21, 
39-23 
San Joaquin River, CA (SPK) 35-4, 35-33 
San Juan Harbor, PR (SAJ) 9-20, 9-46, 9-65 
San Lorenzo Creek, CA (SPK) 35-23, 38-38, 38-43 
San Luis Rey River, CA (SPL) 33-9, 33-15, 33-25 
Sandusky Harbor, OH (LRB) 20-10, 20-19, 20-36 
I-18

Sandy Hook to Barnegat Inlet, N.J. (NAN) 2-16, 
2-25, 2-31 
Santa Ana River Basin and Orange County, CA (SPL) 
33-9, 33-15, 33-25 
Santa Ana River Mainstem, CA (SPL) 33-8, 33-15, 
33-24 
Santa Barbara Harbor, CA (SPL) 33-5, 33-14, 33-21, 
33-32 
Santa Monica Breakwater, CA (SPL) 33-5, 33-14, 
33-21 
Santa Paula Creek, CA (SPL) 33-9, 33-15, 33-25 
Santa Rosa Dam and Lake, NM (SPA) 36-7, 36-13 
Sarasota County, FL (SAJ) 9-29, 9-75 
Sardis Lake, OK (SWT) 38-10, 38-20, 38-25 
Saugatuck Harbor and Kalamazoo River, MI (LRE) 
21-33, 21-78, 21-85 
Savannah Harbor, GA (SAS) 8-4, 8-13, 8-17 
Savannah River Basin at Oates Creek, GA (SAS) 8-8, 
8-13, 8-20 
Savannah River Basin, GA and SC (SAS) 8-9 
Savannah River Below Augusta, GA (SAS) 8-6, 8-13, 
8-19 
Saw Mill Run, PA (LRP) 18-5, 18-14, 18-20 
Saylorville Lake, IA (MVR) 15-6, 15-10, 15-13 
Scappoose Drainage District, OR (NWP) 28-14, 
28-28, 28-36 
Scheduling Flood Control Reservoir Operations 
Albuquerque District (SPA) 36-9 
Baltimore District (NAB) 4-22 
Fort Worth District (SWF) 39-12 
Kansas City District (NWK) 27-8, 27-14 
Los Angeles District (SPL) 33-11 
Mobile District (SAM) 10-24 
Omaha District (NWO) 26-9, 26-22 
Portland District (NWP) 28-15 
Sacramento District (SPK) 35-28 
San Francisco District (SPN) 34-12 
Seattle District (NWS) 29-11 
Tulsa District (SWT) 38-12 
Walla Walla District (NWW) 30-3 
Wilmington District (SAW) 6-18 
Schuylkill River, PA (NAP) 3-10, 3-23, 3-31 
Schuylkill River Park, Philadelphia, PA (NAP) 3-18, 
3-25, 3-34 
Scranton, PA (NAB) 4-15, 4-30, 4-39 
Scranton, Lackawanna River, PA (NAB) 4-15, 4-30, 
4-39 
Sea Turtle Habitat Restoration, Long Beach, NC (CAP 
Section 1135) (SAW) 6-20 
Seattle Harbor, WA (NWS) 29-7, 29-19, 29-26 
Sebago Lake, SACdish, MA (NAE) 1-18, 1-30, 1-35 
Sebewaing River, MI (LRE) 21-33, 21-69, 21-72, 
21-86 
Seekonk River, RI (NAE) 1-8, 1-26, 1-35 
Sepulveda Dam, CA (Recreation Development) (SPL) 
33-9, 33-15, 33-25 
Sesuit Harbor, MA (NAE) 1-8, 1-26, 1-35 
Shallow Creek, Baltimore, MD (NAB) 4-8, 4-27, 4-35 
Sheboygan Harbor, WI (LRE) 21-34, 21-69, 21-85 
Shenango River Lake, Ohio River Basin, PA and OH 
(LRP) 18-10, 18-17, 18-23 
Sheyenne River, ND (MVP) 16-10, 16-16, 16-19 
Shinnecock Inlet, NY (NAN) 2-11, 2-25, 2-30 
Shipyard River, SC (SAC) 7-5, 7-11, 7-18 
Shoal Harbor and Compton Creek, NJ (NAN) 2-11, 
2-25, 2-30 
Shore Drive, Singleton Swash, Myrtle Beach, SC 
(SAC) 7-8, 7-12, 7-19 
Shore Protection Projection Under Special Authority 
Charleston District (SAC) 7-7 
Silver Bay Harbor, MN (LRE) 21-34, 21-69, 21-85 
Silver Lake Harbor, NC (SAW) 6-9, 6-24, 6-30 
Simmon Field Control Structure (MVM) 13-1, 13-3 
Sims Bayou, TX (SWG) 40-18, 40-24, 40-41 
Sitka Harbor, AK (POA) 32-5, 32-11, 32-14 
Siuslaw River, OR (NWP) 28-7, 28-26, 28-34 
Skiatook Lake, OK (SWT) 38-10, 38-20, 38-25 
Skipanon Channel, OR (NWP) 28-8, 28-26, 28-34 
Smithville Lake, Little Platte River, MO (NWK) 27-7, 
27-14, 27-20 
Snake River Downstream from Johnson Bar Landing, 
OR, WA and ID (NWW) 30-10, 30-14, 30-19 
Somerville Lake, TX (SWF) 39-10, 39-17, 39-21 
Sonoma Baylands Wetlands Demonstration Project 
(SPN) 34-5, 34-24 
Souris River Basin, ND (MVP) 16-11, 16-16, 16-19 
South Central Pennsylvania Environmental 
Improvement, PA (NAP) 3-18, 3-25, 3-34, 
(NAB) 4-14, 4-29, 4-38 
South Central, PA Environment Improvement Program 
(LRP) 18-5, 18-14, 18-20 
South Haven Harbor, MI (LRE) 21-35, 21-69, 21-85 
South Main Channel, TX (SWG) 40-17 
South Platte River Basin, CO (NWO) 26-8, 26-28 
I-19

Southeast Louisiana Urban Drainage Project (MVN) 
11-9, 11-15, 11-20 
Southeastern Pennsylvania, PA (NAP) 3-19, 3-25, 
3-34 
Southern and Eastern, KY (LRL) 24-5, 24-17 
Southern New York Flood Control Projects (NAB) 
4-15 
Southwestern Jefferson County, KY (LRL) 24-5, 
24-16 
Sowashee Creek, Meridian, MS (SAM) 10-19, 10-32 
Spadra Creek, Clarksville, AR (SWL) 37-15 
St. Augustine Harbor, FL (SAJ) 9-18, 9-45, 9-64 
St. Clair River, MI (LRE) 21-32, 21-68, 21-84, 21-93 
St. Croix River, Stillwater, MN (MVP) 16-12, 16-16, 
16-19 
St. Genevieve, MO (MVS) 14-5, 14-9, 14-13 
St. George, AK (POA) 32-5, 32-11, 32-14 
St. John River Basin, ME (NAE) 1-18, 1-30, 1-35 
St. Johns County, FL (SAJ) 9-29, 9-48, 9-75 
St. Johns River, Jacksonville to Lake Harney, FL 
(SAJ) 9-18, 9-46, 9-64 
St. Joseph Harbor, MI (LRE) 21-32, 21-68, 21-84 
St. Louis Bay St. Louis, MS (SAM) 10-19, 10-31 
St. Louis Harbor, MO and IL (MVS) 14-3, 14-11, 
14-22 
St. Lucie Inlet, FL (SAJ) 9-19, 9-46, 9-65 
St. Marys River, MI (LRE) 21-49, 21-72, 21-87 
St. Paul, MN (MVP) 16-12, 16-17, 16-20 
St. Paul Island Harbor, AK (POA) 32-6, 32-11, 32-15 
Stamford, CT (NAE) 1-19, 1-30 
Stillaguamish River, WA (NWS) 29-11, 29-21, 29-27 
Stillhouse Hollow Dam, TX (SWF) 39-10, 39-17, 
39-21 
Stillwater Lake, Lackawanna River, PA (NAB) 4-19, 
4-38 
Stockton Lake, Sac River, MO (NWK) 27-8, 27-15 
Stonewall Jackson Lake, Ohio River Basin, WV (LRP) 
18-11, 18-17, 18-23 
Streambank Erosion Under Special Authorization 
(SAC) 7-7, 7-20 
Studies (SAJ) 9-37 
Sturgeon Bay and Lake Michigan Ship Canal, WI 
(LRE) 21-35, 21-70, 21-85 
Sturgeon Point, NY (LRE) 20-11, 20-20, 20-37 
Summersville Lake, Ohio River Basin, WV (LRH) 
25-9, 25-15, 25-19 
Supervisor of New York Harbor (NAN) 2-11, 2-25, 
2-32 
Supervisor of the Norfolk Harbor (NAO) 5-9 
Surfside, Sunset and Newport Beach, CA (SPL) 33-5, 
33-14 
Surry Mountain Lake, NH (NAE) 1-14, 1-28 
Surveillance of Northern Waters and International 
Water Studies (LRE) 21-46 
Surveys 
Alaska District (POA) 32-7 
Albuquerque District (SPA) 36-10 
Baltimore District (NAB) 4-24 
Chicago District (LRC) 22-14 
Detroit District (LRE) 21-51 
Fort Worth District (SWF) 39-15 
Galveston District (SWG) 40-19 
Honolulu District (POH) 31-3 
Huntington District (LRH) 25-11 
Jacksonville District (SAJ) 9-36 
Little Rock District (SWL) 37-13 
Los Angeles District (SPL) 33-12 
Louisville District (LRL) 24-14 
Mobile District (SAM) 10-25 
Nashville District (LRN) 23-8 
New England Division (NAE) 1-23 
New York District (NAN) 2-22 
Norfolk District (NAO) 5-11 
Philadelphia District (NAP) 3-20 
Pittsburgh District (LRP) 18-13 
Portland District (NWP) 28-24 
Rock Island District (MVR) 15-8 
San Francisco District (SPN) 34-12 
Savannah District (SAS) 8-11 
Seattle District (NWS) 29-15 
St. Paul District (MVP) 16-13 
Tulsa District (SWT) 38-14 
Walla Walla District (NWW) 30-11 
Wilmington District (SAW) 6-21 
Susquehanna River Flood Control Projects, NY and 
PA (NAB) 4-19, 4-38 
Sutton Lake, Ohio River Basin, WV (LRH) 25-10, 
25-15, 25-19 
Sweetwater River, CA (SPL) 33-10, 33-15, 33-25 
Swinomish Channel, WA (NWS) 29-8, 29-20, 29-26 
T 
Table Rock Lake, MO (SWL) 37-12, 37-19 
Tacoma, Puyallup River, WA (NWS) 29-11, 29-21, 
29-27 
I-20

Tampa Harbor, FL (SAJ) 9-20, 9-46, 9-47, 9-67 
Taylorsville Lake, KY (LRL) 24-3, 24-12, 24-19 
Tedious Creek, MD (NAB) 4-10, 4-29, 4-37 
Tenkiller Ferry Lake, OK (SWT) 38-14, 38-23 
Tennessee River, TN, AL & KY (LRN) 23-3, 23-9, 
23-11, 23-17 
Tennessee-Tombigbee Waterway AL & MS (SAM) 
10-15, 10-29, 10-39, 10-50, (LRN) 23-4, 
23-9, 23-12 
Tennessee-Tombigbee Wildlife Mitigation, AL and MS 
(SAM) 10-16, 10-29, 10-40 
Texas City Channel, TX (SWG) 40-11, 40-23, 40-38, 
40-47, 40-50, 40-56 
Thames River Basin, CT, RI and MA (NAE) 1-19, 
1-30, 1-55, 1-56 
Thimble Shoals Channel, VA (NAO) 5-10 
Thomaston Dam, CT (NAE) 1-16, 1-29 
Thorton Creek, WA (NWS) 29-14, 29-22, 29-29 
Threemile Creek, Mobile, LA (SAM) 10-19, 10-30, 
10-40 
Thurman to Hamburg, IA (NWO) 26-9, 26-21, 26-28 
Tillamook Bay and Bar, OR (NWP) 28-8, 28-27, 
28-34 
Tioga-Hammond Lakes, PA (NAB) 4-20, 4-31 
Tionesta Lake, Ohio River Basin, PA (LRP) 18-11, 
18-16, 18-22 
Toad Suck Ferry Lock and Dam (No. 8), AR (SWL) 
37-5 
Tolchester Channel, S-Turn, MD (NAB) 4-8, 4-27, 
4-35 
Toledo Harbor, OH (LRB) 20-11, 20-20, 20-36 
Tom Jenkins Dam, Ohio River Basin, OH (LRH) 
25-10, 25-15, 25-19 
Tombigbee River (East Fork), MS & AL (SAM) 
10-19, 10-31, 10-41 
Tombigbee River & Tributaries, MS & AL (SAM) 
10-20, 10-32, 10-42 
Touissaint River, OH (LRB) 20-11, 20-20 
Toronto Lake, KS (SWT) 38-10, 38-21, 38-25 
Town Bluff Dam-B.A. Steinhagen Lake, TX 39-13, 
39-18, 39-21 
Town Brook, Quincy and Braintree, MA (NAE) 1-21, 
1-37 
Town Creek, SC (SAC) 7-6, 7-12, 7-18 
Townshend Lake, VT (NAE) 1-14, 1-28 
Trinidad Lake, CO (SPA) 36-8, 36-13 
Trinity River and Tributaries, TX (SWG) 40-11, 
40-23, 40-39, 40-47, 40-51 
Trinity River Project, TX (SWF) 39-2, 39-15, 39-21 
Tropicana and Flamingo Washes, NV (SPL) 33-10, 
33-15, 33-26 
Tuckerton Creek (NAP) 3-11, 3-23, 3-31 
Tucson Drainage Area, AZ (SPL) 33-12, 33-16 
Tucson Diversion Channel (Recreation Development) 
(SPL) 33-10, 33-16, 33-26 
Tug and Levisa Forks of the Big Sandy River and 
Cumberland River, WV, VA and KY (LRN) 
23-6, 23-9 
Tully Lake, MA (NAE) 1-14, 1-28 
Tulsa and West Tulsa Levees, OK (SWT) 38-11, 
38-21, 38-25, 38-29 
Turkey Creek Basin, KS & MO (NWK) 27-7, 27-20 
Turkey Creek, Sumter County, SC (SAC) 7-7, 7-12, 
7-19, 7-21 
Turning Basin #3, Seattle, WA (NWS), 29-14, 29-22, 
29-29 
Tuttle Creek Lake, Big Blue River, KS (NWK) 27-7, 
27-14, 27-20, 27-28 
Twitch Cove and Big Thorofare, MD (NAB) 4-8, 
4-27, 4-36 
Two Rivers Dam, NM (SPA) 36-8, 36-13 
Two Rivers Harbor, WI (LRE) 21-36, 21-70, 21-85, 
21-94 
Tybee Island, GA (SAS) 8-6, 8-13, 8-19 
Tygart Lake, WV (LRP) 18-3, 18-14, 18-19 
U 
Umpqua River, OR (NWP) 28-9, 28-27, 28-35 
Union City Dam, Ohio River Basin, PA (LRP) 18-12, 
18-16, 18-22 
Union Village Dam, VT (NAE) 1-14, 1-28 
Upper Gordon Creek, Hattiesburg, MS (SAM) 10-20, 
10-31, 10-41 
Upper Jordan, UT (SPK) 35-24, 35-38, 35-43 
Upper Mississippi River Environmental Management 
Program (MVS) 14-6 
Upper Mississippi River - Illinois Navigation Study 
(MVR) 15-3, 15-9 
Upper Mississippi River System Environmental 
Management Program (UMRS-EMP), IL, IA, 
MN, MO, WI (MVR) 15-4, 15-9, 15-12 
Upper Mississippi River System Environmental 
Management Program (UMRS-EMP)(MVP) 
16-3 
1-21

Upper Thorofare, Deal Island, MD (NAB) 4-8, 4-28, 
4-36 
V 
Van Bibber Creek, CO (MWO) 26-9, 26-21, 26-28, 
26-44 
Ventura Harbor, CA (SPL) 33-6, 33-14, 33-21, 33-32 
Vermilion Harbor, OH (LRB) 20-11, 20-20, 20-37 
Village Creek, Birmingham, AL (SAM) 10-20, 10-31, 
10-41 
Virginia Beach, VA (Hurricane Protection) (NAO) 
5-11 
Virginia Beach, VA (Reimbursement) (NAO) 5-11 
W 
W. Kerr Scott Dam and Reservoir, NC (SAW) 6-16, 
6-26 
Wabash River, New Harmony, IN (LRL) 24-6, 24-17 
Wabash River Basin (LRL) 24-13, 24-22, 24-34 
Waco Lake, TX (SWF) 39-11, 39-17, 39-21 
Waco Lake, TX (Safety Dam) (SWF) 39-11, 39-17, 
39-22 
Wallisville Lake, TX (SWG) 40-12 
Walnut Creek, CA (SPK) 35-25, 35-38 
Walter F. George Lock and Dam, AL & GA (SAM) 
10-23, 10-32, 10-42 
Washington Aqueduct (NAB) 4-24 
Washington Harbor, DC (NAB) 4-9, 4-28, 4-36 
Waterway Connecting Pamlico Sound and Beaufort 
Harbor, NC (SAW) 6-9, 6-24, 6-30 
Waterway on the Coast of VA (NAO) 5-10 
Waukegan Harbor, IL (LRC) 22-8, 22-18, 22-24, 
22-27 
Waurika Lake, OK (SWT) 38-11, 38-21, 38-26 
Webbers Falls Lock and Dam, OK (SWT) 38-14, 
38-23 
Wehrspann Lake Aquatic (NWO) 26-13, 26-23, 26-28 
Wells Harbor, ME (NAE) 1-9, 1-26, 1-35 
West Agurs, LA, Levee (MVK) 12-7 
West Bank and Vicinity, New Orleans, LA, Hurricane 
Protection (MVN) 11-9, 11-15, 11-20 
West Branch of Susquehanna River, PA (NAB) 4-20 
West Columbus, OH (LRH) 25-10, 25-15, 25-19, 
25-24 
West Des Moines, IA (MVR) 5-7, 5-10, 5-14 
West Fork of Mill Creek Lake, OH (LRL) 24-13, 
24-19 
West Harbor, OH (LRB) 20-12, 20-20, 20-37 
West Hill Dam, MA (NAE) 1-11, 1-27 
West Point Lake, Chattahoochee River Basin, AL & 
GA (SAM) 10-24, 10-32, 10-42 
West Sacramento, CA (SPK) 35-26, 35-38 
West Thompson Lake, CT (NAE) 1-20, 1-31 
West Virginia and Pennsylvania Flood Control (LRP) 
18-6, 18-15, 18-20, (NAB) 4-14, 4-29, 4-38 
Westville Lake, MA (NAE) 1-21, 1-31 
Wetland and Other Aquatic Habitat Creation Under 
Special Authorization (SAJ) 9-39 
White Lake Harbor, MI (LRE) 21-36, 21-70, 21-86 
White River Basin (Little Rock District, AR & MO) 
(SWL) 37-8, 37-17, 37-21 
White River, Batesville, AR (SWL) 37-9, 37-18 
White River, IN (LRL) 24-6, 24-17, 24-24, 24-25 
White River, Jacksonport, AR (SWL) 37-9, 37-18, 
37-27 
Whitefish Point Harbor (LRE) 21-37, 21-71, 21-86 
Whitlow Ranch Dam, Queen Creek, AZ (SPL) 33-10, 
33-16, 33-26 
Whitney Lake, TX (SWF) 39-13, 39-22 
Whitney Point Lake, NY (NAB) 4-18, 4-31 
Whitney Point Village, NY (NAB) 4-18, 4-31 
Wicomico River, MD (NAB) 4-9, 4-28, 4-36 
Wildcat and San Pablo Creeks, CA, (SPK) 35-26, 
35-38 
Willamette River at Willamette Falls, OR (NWP) 
28-9, 28-27, 28-35, 28-37, 28-42 
Willamette River Basin Bank Protection, OR (NWP) 
28-15, 28-28, 28-36 
Willapa River and Harbor and Naselle River, WA 
(NWS) 29-8, 29-20, 29-26 
William H. Harsha Lake, OH (LRL) 24-13, 24-19 
Willow Creek Lake, Heppner, OR (NWP) 28-15, 
28-29, 28-36 
Wilmington Harbor, DE (NAP) 3-11, 3-23, 3-31 
Wilmington Harbor, NC (SAW) 6-10, 6-24 
Wilson Harbor, NY (LRB) 20-12, 20-20, 20-37 
Wilson Lake, Saline River, KS (NWK) 27-8, 27-14, 
27-30 
Winfield, KS (SWT) 38-11, 38-21, 38-26 
Wister Lake, OK (SWT) 38-11, 38-21, 38-26 
Wolf Creek Dam - Lake Cumberland, Ohio River 
Basin, KY (LRN) 23-8, 23-10 
I-22

Woodcock Creek Lake, Ohio River Basin, PA (LRP) 
18-12, 18-16, 18-22 
Woodmont Beach, Milford, CT (NAE) 1-9, 1-27, 1-36 
Work Under Continuing Authority (NAO) 5-11 
Work Under Special Authorization (SWF) 39-12, 
39-25 
Wrangell Harbor, AK (POA) 32-6, 32-11, 32-15 
Wright Patman Dam and Lake, TX (SWF) 39-11, 
39-17, 39-22 
Wrightsville Beach, NC (SAW) 6-16, 6-26 
Wyoming Valley, PA (Levee Raising) (NAB) 4-21, 
4-32, 4-39 
Y 
Yadkin River Basin, NC and SC (SAW) 6-16, 6-36 
Yaquina Bay and Harbor, OR (NWP) 28-10, 28-27, 
28-35 
Yaquina River, OR (NWP) 28-10, 28-21, 28-35 
Yatesville Lake, KY (LRH) 25-11, 25-15, 25-19 
Youghiogheny River Lake, Ohio River Basin, PA and 
MD (LRP) 18-12, 18-16, 18-22 
York, Indian Rock Dam, PA (NAB) 4-21, 4-32, 4-39 
York River, VA (NAO) 5-10, 5-14 
Z 
No entries 
I-23

